Contract Quality Requirements Manual SLM Issue 3

Size: px
Start display at page:

Download "Contract Quality Requirements Manual SLM Issue 3"

Transcription

1 Contract Quality Requirements Manual SLM Issue 3 20 th October 2015 Gary Rushforth Supply Chain Quality Sellafield Ltd

2 Introduction Sellafield Ltd (SL) aims to deliver excellence in everything it does, operating safely, securely, reliably and predictably. This expectation extends to the SL Supply Chain in terms of delivering products / services safely, to schedule, of the right quality and to agreed cost. The aim of this presentation is to communicate the requirements to ensure SL s Supply Chain delivers our products and services as described above

3 SLM is one of a series of documents within SL Management System. It defines the Contract Quality Requirements that will enable delivery of products and services to the appropriate Quality Grade Presented in booklet form Above BS EN ISO 9001:2008 Nuclear Safety Culture Graded approach Flow down of requirements Resource Management Subcontractor Control Assurance Deviation of non conforming product Quality Plan LTR s

4 Commitment to Working Together SL are committed to working together with its suppliers in delivering excellence in everything it does through; the right people, right skills at the right time. This is achieved through; Open and Honest Communication Throughout the supply chain at all levels and tiers. Checking understanding of specifications at all levels and tiers Sharing Learning LFE Focussed improvements Right measures with actions Structured Problem Solving Decisions taken based on facts, root cause identification and robust corrective actions.

5 1 Nuclear Safety - definition The protection of workers, the public and the environment from undue radiological hazard by achievement of proper operating conditions, prevention from accidents and the mitigation of accident consequences

6 1 Nuclear Safety - definition The protection of workers, the public and the environment from undue radiological hazard by achievement of proper operating conditions, prevention from accidents and the mitigation of accident consequences All personnel involved in design, fabrication, installation, inspection and testing understand how their role impacts upon nuclear safety and how the failure of a product or service can impact upon the associated plant and local community.

7 2 - QMS Requirements Contractors / Suppliers shall operate a UKAS certified Quality Management System in accordance with BS EN ISO The requirements of the CQR Manual are to be flowed down to all tiers of the supply chain where the risk associated with the procurement of goods or services continues to be either a Quality Grade 01,02 or 03 Contractors shall have a Business Continuity Plan in place Contractors shall have a documented procedure for LFE which clearly demonstrates improvements and effective implementation.

8 3 - Resource Management incl. SQEP Those undertaking work are Suitably Qualified and Experienced with a clear auditable trail that demonstrates that the contractors employees are as equally SQEP d as the customers employees are for the same or similar role Implement and maintain a competency/training register which includes: All personnel Role Profile Status of Training Experience in the Role Training Plan Training and Qualification Records Annual Reviews

9 4 Procurement A Graded Approach SL deploys a graded approach to the procurement of all goods and services which ensures that we focus resource and effort on those activities that pose greatest risk/hazard The Quality Grade determines the level of control that will be applied. The higher the level of risk, the greater the level of assurance to mitigate the associated risk. SLP : How do I determine the Quality Grade of My Supply Chain Requirements

10 Graded Approach The Way Forward Specify need Risk assessment Quality grade SAP code Controls Radiological / Nuclear Conventional Safety Environmental Business Risk Risk Quality Grade Very High QG 01 High QG 02 Medium QG 03 Low / No risk QG 04 SLM Contract Quality Requirements Manual Supplier Selection QASL Inspection Requirements Off Site and Receipt Inspection

11 4 Procurement A Graded Approach Quality Grade 01 Very High Risk & Quality Grade 02 High Risk Both grades require SL oversight controlled by Quality Plans, Inspection and Test Plans or Method Statements to document the quality requirements. Quality Grade 02P Proprietary This grade is utilised for proprietary spares and equipment i.e. typically catalogue items. The contractor shall apply Quality Grade - 03 requirements. Quality Grade 03 Medium Risk This grade requires SL inspectors to conduct receipt inspections. A Quality Plan may be required by exception. Quality Grade 04 Low/No Risk Excluded from the CQR requirements. Quality Grade 04 should only be used for items that if fail have low or no impact with regards to safety and risk.

12 Quality Assessed Supplier List Goods and Services defined as having a Quality Grade of 01, 02 or 03, shall only be procured from Suppliers that have been through a process of evaluation and are listed on the Quality Assessed Supplier List (QASL). Evaluation shall either by the Complete Tender Management (CTM) tender process or by QASL Questionnaire (SLF ) NOT a list of preferred suppliers NOT a barrier to a company wanting to supply to SL Produced and maintained by Supply Chain Quality

13 5 Quality Plans A top level Quality Plan is required covering the entire scope of work and should be a live document subject to continual review by the Contractor. Any significant changes should be subject to SL approval. Individual Inspection and Test Plans should be generated for each work package so the work can be signed off when a work package is complete. The contractor shall not commence work identified in the Quality Plan and / or Inspection and Test Plan prior to SL approval. Any special processes identified within the Quality Plan and/or Inspection and Test Plan shall have an appropriate procedure which will require SL acceptance. All hold points must be complied with, failure to comply will result in SL raising a non-conformance report.

14 6 Sub-Contractor Control The Contractor shall ensure that the full extent of their supply chain has a clear understanding of the Sellafield Ltd contract Technical and Quality specified requirements. If the Contractor subcontracts work, the Contractor is responsible for controlling the scope of work in accordance with the associated Quality grade and the specified requirements The Contractor shall implement a process for ongoing verification and monitoring of their Subcontractors to ensure that they are delivering products and services safely, to schedule, to the specified requirements and to the agreed cost.

15 7 - Assurance SL reserve the right to undertake assurance activities within the supply chain. Contractors / Suppliers shall ensure that Sub-Contractors are informed of this requirement. Contractors shall develop and implement a risk based audit programme which covers the scope of work. The Contractor on request shall report any findings to SL from the audit programme. The Contractor shall notify SL of any Management Review actions which will effect compliance with contractual requirements. Contractors shall establish metrics which include safety, schedule, quality and cost performance. Contractors shall report the agreed metrics at each financial period end. These requirements shall be cascaded down the supply chain.

16 8 Deviation and Non-Conformance Standard requirements for managing deviations and Non-Conformance in accordance with ISO The Contractor shall establish a documented process to identify a request for deviations or a justification for the use of non-conforming product from SL specified requirements Aligned with; SLP How Do I resolve engineering queries SLP How Do I Monitor and Report Non Conformances SLF Defect /Non conformance Report Contractor and subcontractors shall not repair spoilt work after final inspection by the nominated Inspectorate without prior written approval from SL

17 11 Production and Service Provision Material test Certificates (Stainless and Carbon Steels) must be; The original material test certificate, or a legible red line stamped version stating verified true certified copy of the original by the mill/stockist. Certification must be as specified in BS EN type 3.1 which includes chemical and mechanical data. Where a product such as a pipe flange has been manufactured, the Contractor must provide both the original material test certificate for the base material and the certificate provided by the flange manufacturer. Contractors must endorse all material test certificates to verify conformance with requirements. This verification must be carried out by a suitably qualified and experience authorised personnel.

18 Potential for Counterfeit Materials Potential for suspect/counterfeit materials in Global supply chains Global markets, value for money opportunities, some associated risks Vendors with little / no experience in the nuclear industry entering market Long supply chains Counterfeit valves/circuit breakers identified in US nuclear facilities Appropriate response required

19 Examples

20 11 Production and Service Provision Release of goods shall either be by; SLF (5199) Intermediate Certificate of Inspection. This shall be used when goods are being released between the Contractor / Contractor and Sub-Contractor / Contractor. SLF (5059) Final Certificate of Inspection. This shall be used when goods are being released and despatched direct to SL.

21 13 Records SLP Life-Time Records (LTR no Q) Correction Fluid (Tippex) is not to be used. Mistakes should be crossed out by a single line so the previous information can still be read, signed, stamped and dated at the side of the change. The person who conducted the activity being signed for is the only person authorised to sign a document. Documents are not to be signed as pp on behalf of another person. Drawings included in the LTR must be SL stamped approved versions. Records are to be generated and available for verification concurrently with the activity they relate. Records which require a signature MUST be signed this includes the customers signatures as there is a responsibility for ensuring they also comply!!!!!

22 Thank You!

Contract Quality Requirements Manual

Contract Quality Requirements Manual SLM 4.06.02 Issue 4 Effective date: 09/2017 Contract Quality Requirements Manual Page 1 SLM 4.06.02 Issue 4 Effective date: 09/2017 Page 2 Contents Introduction... 4 Aims... 4 Purpose and Scope... 4 Projects,

More information

Supplier Quality Assurance Requirements

Supplier Quality Assurance Requirements 1 Scope No. 1.1 This document details the requirements to be satisfied by suppliers to Tekdata Interconnections Ltd (TIL). TIL requires each supplier and their sub-tier suppliers to comply with the quality

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

ITER Quality Assurance

ITER Quality Assurance US ITER Central Solenoid Vendor Meeting ITER Quality Assurance by John Mashburn USIPO QA Manager 1 QA Topics ITER s Nuclear License Graded Approach Proposal QA Items Quality Plan Specific to Contract Manufacturing

More information

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,

More information

SHELTON INDUSTRIAL PATTERN INC.

SHELTON INDUSTRIAL PATTERN INC. Defintions: Seller : Supplier of materials, parts and or services that support production Supplies : materials, parts that support production FOD : Foreign Object Debri / Damage 1. Quality Management System

More information

PROCUREMENT QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS

PROCUREMENT QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS GAA-000-0001 PROCUREMENT QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS LEGAL NOTICE These Procurement Quality Management Requirements for Suppliers are deemed part of any L-3 Communications MAS (Canada)

More information

MAGNETIC COMPONENT ENGINEERING, INC.

MAGNETIC COMPONENT ENGINEERING, INC. MAGNETIC COMPONENT ENGINEERING, INC. 2830 Lomita Blvd., Torrance, CA 90505 Tel: 310-784-3100 Fax: 310-784-3192 d t Special Purchase Order Conditions Purchase Orders issued by Buyer to Supplier may contain

More information

EN39 TUBE ASSESSMENT REPORT. Assessment Summary

EN39 TUBE ASSESSMENT REPORT. Assessment Summary EN39 TUBE ASSESSMENT REPORT : Category: Manufacturer Manufacturer Manufacturer Manufacturer Location: Name: Location Location Location Location Previous Assessment Category: N/A Meeting With: Assessment

More information

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,

More information

Quality Assurance Policy and Procedures

Quality Assurance Policy and Procedures 650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance

More information

Vendor Qualification Survey

Vendor Qualification Survey 1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service

More information

Quality Management System

Quality Management System Quality Management System 6.1 Quality Q-Codes () 6.1 Quality Q-Codes Quality Clauses The following quality control clauses apply when specifically noted on the Gear Technology purchase order: Q1- Material

More information

Regulations of the Euromate Quality Management- and Social Compliance Process

Regulations of the Euromate Quality Management- and Social Compliance Process May 12th, 2009 Regulations of the Euromate Quality Management- and Social Compliance Process Dear valued Business Partner, Lux and Euromate are responsible for the global sourcing and development of private

More information

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein.

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein. 1. SCOPE Quality Specification TEC-1019 12 Jul 11 Rev C All Paragraphs Revised Global Quality Management System Supplement for the Aerospace Industry Model, AS 9100 (C) 1.1. Content This specification

More information

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26 Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including

More information

QUALITY ASSURANCE REQUIREMENTS

QUALITY ASSURANCE REQUIREMENTS SPACE AT MUCKLENEUK CAMPUS PRETORIA QUALITY ASSURANCE REQUIREMENTS SPACE AT MUCKLENEUK CAMPUS, PRETORIA Page 1 1.1 QUALITY ASSURANCE REQUIREMENTS In undertaking the works (including all incidental services

More information

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to: Approved By: Purchasing Manager Candice Lane (signature on file) Date: 5/26/17 Approved By: Process Owner James D. Moore (signature on file) Date: 5/26/17 1. PURPOSE 1.1. To define Cambridge Valley Machining,

More information

Appendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items

Appendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items REVISION RECORD The latest issue to this document is the version that is available on the Lockheed Martin

More information

APPENDIX B Corrosion Management System Framework and Guidance

APPENDIX B Corrosion Management System Framework and Guidance APPENDIX B Corrosion Management System Framework and B.1 INTRODUCTION A framework for a Corrosion Management System (CMS) for assets is described in this Appendix. The CMS developed shall include and document

More information

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

PPI/TZ Standard Quality Requirements for Suppliers -SQRS- PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: March 19, 2014 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact

More information

Supplier Quality Assurance Requirements

Supplier Quality Assurance Requirements Supplier Quality Assurance Requirements Supplier Quality Assurance Requirements ARQM 005.3 Issue Date: 17/12/2013 1 1 Table of Contents 1. Table of Contents...2 2. Purpose.3 3. General Requirements 3 4.

More information

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17 Quality Manual DRAFT Page 1 of 17 Document Acceptance and Release Notice This is Revision A1 of the East Coast Designer Builders Quality Manual. The Manual is a managed document. For identification of

More information

INSPECTION SYSTEM REQUIREMENTS

INSPECTION SYSTEM REQUIREMENTS MILITARY SPECIFICATIONS MIL-I-45208A INSPECTION SYSTEM REQUIREMENTS This specification has been approved by the Department of Defense and is mandatory for use by all Agencies. 1. SCOPE 1.1 Scope. This

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ Quality Manual Quality Manual Issue I Dated 8 th October 2012 Contents Page Section 1 - Introduction 2 Section 2 - Company Details 2 Section

More information

BS EN ISO 9001 QUALITY ASSURANCE MANUAL

BS EN ISO 9001 QUALITY ASSURANCE MANUAL PAC PRICE ARTHUR CONSULTANCY BS EN ISO 9001 QUALITY ASSURANCE MANUAL COPY NO: 025 ISSUE: 4 QUALITY ASSURANCE MANUAL BS EN ISO 9001 CONTENTS PAC Price Arthur Consultancy - Building Services Consulting Engineers

More information

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS CONTROL OF NON-CONFORMING PRODUCTS (8.3) Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: ALL ALL RELEASE DATE: Revision Approval: J.BENTINK Signature: Date: 20/02/17

More information

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 1.0 SCOPE This document establishes the quality program requirements for an organization providing engineering

More information

Łańcuch dostaw i procedury zapewnienia jakości w realizacji elektrowni jądrowej budowanej w oparciu o technologię amerykańską.

Łańcuch dostaw i procedury zapewnienia jakości w realizacji elektrowni jądrowej budowanej w oparciu o technologię amerykańską. Łańcuch dostaw i procedury zapewnienia jakości w realizacji elektrowni jądrowej budowanej w oparciu o technologię amerykańską. Supply chain and quality assurance procedures in execution of nuclear power

More information

Facilities Planning and Construction (FP&C)

Facilities Planning and Construction (FP&C) Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:

More information

Parts Management Implementation Spring LMI. PSMC Spring

Parts Management Implementation Spring LMI. PSMC Spring Parts Management Implementation Spring 2016 - LMI 1 PM Implementation Goal Develop and define processes and training for the implementation of the Parts Management requirements in MIL-STD-3018 Initial

More information

SUPPLIER QUALITY REQUIREMENTS

SUPPLIER QUALITY REQUIREMENTS SUPPLIER QUALITY REQUIREMENTS TABLE OF CONTENTS 1) PURPOSE PG 2 2) KINNEAR PURCHASE ORDER PG 2 3) USE AND COMMUNICATION PG 2 4) SUPPLIER APPROVAL PG 2 5) GENERAL REQUIREMENTS PG 3 SQD Rev 2 2014-08-13

More information

Supplier/ sub-contractor/ partners audit and control. NAA Level of involvement.

Supplier/ sub-contractor/ partners audit and control. NAA Level of involvement. Supplier/ sub-contractor/ partners audit and control. NAA Level of involvement. The production approval holder is strictly responsible for manufacture according to design data. 21.A.165 Obligations of

More information

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept ALTA Quality Requirements for Suppliers 25 Sept 2017 1 2 3.2. Purchase order information a- When Alta customer is indicated on the purchase order or related engineering documents, customer quality requirements

More information

RUWACON QUALITY MANUAL

RUWACON QUALITY MANUAL RUWACON QUALITY MANUAL Rev Date Preparation Review Approved Description of Revision 1 29 June SHEQ Manager SHEQ Manager Managing 2011 Director Ruwacon (PTY) Ltd P.O. Box 13596 Noordstad 9303 THIS DOCUMENT

More information

Integrated Management System Manual

Integrated Management System Manual QUALITY & ENVIRONMENTAL MANAGEMENT SYSTYEMS Integrated Management System Manual ISO 9001:2008, 14001:2004 and OHSAS 18001: 2007 Document ID: IMS Manual/ Rev. No. 00/ Rev. Date: 01-Jun-2009/ Page 1 of 19

More information

Quality Assurance Manual

Quality Assurance Manual Quality Assurance Manual Current Electrical is committed to leading the market in satisfying customer needs by providing versatile and innovative electrical and control solutions We take pride in the ability

More information

ISO 9001:2015. Quality Management System. Manual

ISO 9001:2015. Quality Management System. Manual ISO 9001:2015 Quality Management System Manual Introduction Company has made the Strategic Business Decision to develop and implement an effective Quality Management Systems (QMS) across all areas of the

More information

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary BS2482 TIMBER BOARDS ASSESSMENT REPORT : Category: Manufacturer Manufacturer Manufacturer Manufacturer Location: Name: Location Location Location Location Previous Assessment Category: N/A Meeting With:

More information

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

MANUAL QUALITY CONTROL & QUALITY ASSURANCE MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE

More information

Quality Assurance Procedure Issued: 15NOV2017 Page 1 of 11

Quality Assurance Procedure Issued: 15NOV2017 Page 1 of 11 Quality Assurance Procedure Issued: 15NOV2017 Page 1 of 11 1.0 Purpose To ensure that Fleet Canada states applicable requirements for purchased products on purchase orders and applicable documents. Requirements

More information

Humantech Environmental Management System Manual

Humantech Environmental Management System Manual Humantech Management System Version 1.0 March 2014 Humantech, Inc. Humantech Management System Revision No.: 1 Date : 03-10-14 Prepared by: Approved by: (EMR) President Revision History Revision Date Description

More information

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70 Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70 RUSSTECH PURCHASE ORDER CLAUSES RPOC 1000 EARLY DELIVERY OK "Time is of the essence for performance under this Purchase Order. Seller

More information

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope SECTION 1 Page 1/1 1.0 INTRODUCTION 1.1 Scope The purpose of the Quality Manual is to provide a documented quality management system for BOLTEX mfg. The manual includes the organization structure, responsibilities,

More information

Quality Assurance Procedure Issued: 14FEB2017 Page 1 of 11 PURCHASING. Issue 0 Revision 9 QAP 6.0

Quality Assurance Procedure Issued: 14FEB2017 Page 1 of 11 PURCHASING. Issue 0 Revision 9 QAP 6.0 Quality Assurance Procedure Issued: 14FEB2017 Page 1 of 11 Please note that the old MRP system called Phoenix has been replaced by a new ERP system called Epicor. As a result, affected QAPs will be revised

More information

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised. REF ONLY-DATA MANAGEMENT: 1 ST (2) PAGES IS NOT PART OF FORM 1135. QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised. FORM 1135 QUALITY ASSURANCE CLAUSES

More information

Nuclear Quality Standard Association General information about Quality Management System in the nuclear industry

Nuclear Quality Standard Association General information about Quality Management System in the nuclear industry Nuclear Quality Standard Association General information about Quality Management System in the nuclear industry This document is the property of NQSA Its copying, use or communication is subject to prior

More information

TASK REQUIREMENTS. Supplier Quality Requirements

TASK REQUIREMENTS. Supplier Quality Requirements This document is applicable only to suppliers of Production Items as defined below and their subtier suppliers. Non-Production Item suppliers are not subject to this document. This document specifies the

More information

TÜV SÜD BABT Production Quality Certification Scheme

TÜV SÜD BABT Production Quality Certification Scheme TÜV SÜD BABT Production Quality Certification Scheme The Production Quality Certification Scheme for Manufacturers A Certification Body of Copyright TÜV SÜD BABT 2014 Page 1 of 38 CONTENTS Page AMENDMENT

More information

FEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio

FEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio QMS-20 2016 FEC QUALITY MANUAL Federal Equipment Company 5298 River Rd Cincinnati, Ohio 45233 www.federalequipment.com www.fecheliports.com www.usdrillhead.com www.orionseals.com www.tkf.com REVISION:

More information

Quality Manual. Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09. Reviewed by Bernard Lennon Fire and Safety Officer

Quality Manual. Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09. Reviewed by Bernard Lennon Fire and Safety Officer Quality Manual Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09 Reviewed by Bernard Lennon Fire and Safety Officer 9 th April 09 Corporate Authorisation Joe Hoare Estates Officer

More information

Reliance Aerospace Solutions

Reliance Aerospace Solutions Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a

More information

Counterfeit Parts Prevention

Counterfeit Parts Prevention Counterfeit Parts Prevention 1.0 Purpose The purpose of this document is to describe the process performed to prevent the purchase and / or use of Counterfeit Parts and to outline the Detection, Mitigation

More information

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1. PROBUILD SUBCONTRACTOR QUALITY MANAGEMENT GUIDE Section Two Project Specific Quality Management Plans Version No 1. PREFACE This document has been developed to assist subcontractors to meet Probuild s

More information

ISTA Accreditation Standard for Seed Testing and Seed Sampling

ISTA Accreditation Standard for Seed Testing and Seed Sampling INTERNATIONAL SEED TESTING ASSOCIATION (ISTA) Secretariat, Zürichstrasse 50, 8303 Bassersdorf, CH-Switzerland Phone: +41-44-838 60 00, Fax: +41-44-838 60 01, Email: ista.office@ista.ch, http://www.seedtest.org

More information

ASME As a Help to Export! Our Topic today: Nuclear Quality Assurance ASME NQA 1

ASME As a Help to Export! Our Topic today: Nuclear Quality Assurance ASME NQA 1 ASME As a Help to Export! Our Topic today: Nuclear Quality Assurance ASME NQA 1 Karte: Wikipedia CIS GmbH Experts in ASME Code Consulting CIS GmbH Consulting Inspection Services 3 rd Party Inspection Training

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

Cargotec Supplier Requirements

Cargotec Supplier Requirements Cargotec Supplier Requirements 2015-02-17 CSR V2.0 1 Management Responsibility... 6 1.1 Business Plan... 6 1.2 Key Performance Indicators... 6 1.3 Financial Stability... 6 1.4 Quality Management System...

More information

Altech Machining, Inc. Terms and Conditions

Altech Machining, Inc. Terms and Conditions 11000 Woodside Avenue North Phone: (619) 448-3392 Santee, CA 92071 Fax: (619) 448-6854 info@altechmachining.net Altech Machining, Inc. Terms and Conditions The terms and conditions listed in this document

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

pproval of rvc upplrsno. 2.9 APRIL 2013

pproval of rvc upplrsno. 2.9 APRIL 2013 pproval of rvc upplrsno. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Approval of Service Suppliers No. 405 Service Suppliers Engaged in Surveys and Maintenance of Fire Extinguishing Equipment, Systems

More information

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies Accreditation International Association for Certifying Bodies Guidance on the Application of ISO / IEC 17020 Guidance on the Application of ISO/IEC 17020 Page 1 of 16 Introduction This guidance document

More information

NUMBER OF EMPLOYEES TOTAL ENGINEERING MANUFACTURING QUALITY SUPPLIER IN-HOUSE SPECIAL PROCESS CAPABILITIES

NUMBER OF EMPLOYEES TOTAL ENGINEERING MANUFACTURING QUALITY SUPPLIER IN-HOUSE SPECIAL PROCESS CAPABILITIES Kearfott/ACA SUPPLIER QUALITY SYSTEM SURVEY SUPPLIER NAME SUPPLIER CODE DATE ADDRESS & ZIP CODE AREA CODE & PHONE QUALITY MANAGEMENT (NAME & TITLE) PRODUCT LINE (DESCRIBE) NUMBER OF EMPLOYEES TOTAL ENGINEERING

More information

A02 Assessment Rating Guide Revision 2.9 August 21, 2016

A02 Assessment Rating Guide Revision 2.9 August 21, 2016 Revision 2.9 August 21, 2016 Laboratory Name: Assessment Date: (Lead) Assessor: Signature: ! TABLE OF CONTENTS 1.0! INTRODUCTION... 1 2.0! ASSESSOR NOTES ON THE USE OF CALA A02 ASSESSMENT RATING GUIDE...

More information

Umbra Cuscinetti. Quality Supplier Requirements

Umbra Cuscinetti. Quality Supplier Requirements Page: 1 of 4 Distribuzione controllata / Controlled Distribution Ciclo di Vita / Life cycle Prepared / Reviewed: Checked: Approved: M. Tozzi P.Trasciatti G. Sturniolo Indice Revisioni / Revision Index

More information

Procurement Quality Assurance Requirements

Procurement Quality Assurance Requirements 1. REQUIREMENTS 1.1 Quality System This document provides the minimum Quality System Requirements to externally provided processes, products and services to Superior Thread Rolling (STR). Suppliers must

More information

NUCLEAR SAFETY REQUIREMENTS BSR

NUCLEAR SAFETY REQUIREMENTS BSR NUCLEAR SAFETY REQUIREMENTS BSR-1.8.2-2015 APPROVED BY Order No. 22.3-99 of The Head of State Nuclear Power Safety Inspectorate, of 7 October 2011 (as amended by Order No. 22.3-57 of the Head of State

More information

CHESM Expectations for Inspection Companies

CHESM Expectations for Inspection Companies CHESM Expectations for Inspection Companies Andrew Tan OE/HES Specialist Supply & Trading OE/HES 15 May 2014 1 Introduction Chevron s Contractor Health, Environment & Safety Management (CHESM) process

More information

Document Number: QSP-06-01

Document Number: QSP-06-01 Page 1 of 1 Introduction to the Fluke Biomedical Supplier Handbook Dear Fluke Supplier, The Fluke Biomedical Supplier Handbook was written for you to better understand Fluke and Fluke s engagement with

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR STRUCTURAL STEEL APPROVED FABRICATOR INSPECTION PROGRAMS 1.0 PURPOSE EC 020-2014 (Adopted

More information

Quality Guideline for Suppliers. 1. Purpose

Quality Guideline for Suppliers. 1. Purpose Quality Guideline for Suppliers 1. Purpose The Quality Guideline (QGL) of Aumann Beelen GmbH forms an integral part of the purchase orders and is thus binding for all Suppliers, hereinafter referred to

More information

Verify Category A Audit Content

Verify Category A Audit Content Verify Category A Audit Content V10.0 Achilles Group Limited, 2014. All rights reserved. Objective The objective of this document is to provide suppliers who have registered for a Verify Category A (V10.0)

More information

Quality Manual ISO 9001:2015 Quality Management System

Quality Manual ISO 9001:2015 Quality Management System Quality management input comprises the standard requirements from ISO 9001:2015 which are deployed by our organization to achieve customer satisfaction through process control. Quality Manual ISO 9001:2015

More information

ISO The International Energy Management Standard. esta.org.uk

ISO The International Energy Management Standard. esta.org.uk ISO 50001 The International Energy Management Standard Background to Standard UK led development with British Standards Institute Based on committee member s experience and that of other advisors Based

More information

Measurement Assurance and Certification Scotland

Measurement Assurance and Certification Scotland Measurement Assurance and Certification Scotland Performance Standard MACS-WAT-02 Sample and data management Version 2 August 2017 Record of amendments Version Date Amendment(s) 1 October 2016 First issue.

More information

This part of the Works Information sets out the obligations of the Contractor with regards to:

This part of the Works Information sets out the obligations of the Contractor with regards to: Works Information Volume 2B Part 13 Assurance, Records and Certification Part 13 Assurance, Records and Certification 13.1 Introduction The Contractor self-certifies the quality of the works. This part

More information

Qualification of Suppliers of Safety Critical Engineering Products and Services

Qualification of Suppliers of Safety Critical Engineering Products and Services Qualification of Suppliers of Safety Critical Engineering Products and Services Signatures removed from electronic version Submitted by George Clayton Nominated Responsible Manager Approved by Colin Boocock

More information

This document describes the minimum quality assurance requirements suppliers of RUAG Switzerland Ltd. have to comply with.

This document describes the minimum quality assurance requirements suppliers of RUAG Switzerland Ltd. have to comply with. of 14.02.2013 Page 1 / 6 This document describes the minimum quality assurance requirements suppliers of RUAG Switzerland Ltd. have to comply with. This requirements are not terminal, but may be additional

More information

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock 1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles

More information

Page 1 / 11. Version 0 June 2014

Page 1 / 11. Version 0 June 2014 Page 1 / 11 CORRESPONDENCE MATRIX NQSA NSQ-100 version 0 NUCLEAR SAFETY AND QUALITY MANAGEMENT SYSTEM REQUIREMENTS Model for quality management in design & development, manufacturing, erection, commissioning

More information

AVNET Logistics & EM Americas. Quality Manual

AVNET Logistics & EM Americas. Quality Manual AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual 1 1. Introduction Scope Purpose Application Implementation 2. Purchasing Expectations Terms and Conditions Engineering / Technical Support Customer Support Resources Pricing Consistent

More information

Definitions contained in the above mentioned document and industry regulations are applicable herein.

Definitions contained in the above mentioned document and industry regulations are applicable herein. Quality Specification TEC-1021 21May12 Rev E Global Quality Management System Supplement for Various International Nuclear Quality Assurance Criteria, Regulations, and Requirements 1. SCOPE 1.1. Content

More information

SANAS Accr. No/s. F Date/s of evaluation

SANAS Accr. No/s. F Date/s of evaluation ISO/IEC 17020: 2012 Generic Checklist for Accreditation of Various Types of Bodies Performing Inspection to ISO/IEC 17020:2012, incorporating TR 80: Technical Requirements for Inspection Bodies in the

More information

RFC-SOP-0002 Skyworks RF Ceramics Supplier Quality Manual

RFC-SOP-0002 Skyworks RF Ceramics Supplier Quality Manual Skyworks RF Ceramics Supplier Quality Manual Page 1 of 8 RFC-SOP-0002 Rev. 1 1 Purpose and Scope 1.1 Purpose The purpose of this manual is to define the basic quality systems and business procedures required

More information

ALTA Precision Inc. Quality Procedure

ALTA Precision Inc. Quality Procedure ALTA Precision Inc. Quality Procedure Procedure QAP 7.4.2 Issue 7 Date September 28, 2015 Page 1 of 5 ALTA Quality Requirements for Suppliers Prepared and issued by Marc Dumouchel Approved by Sonia Alonso

More information

QUALITY MANUAL 07QA REVISION. General i 8/26/2017. Quality Manual PREPARED BY: Burt Tanaka Quality Assurance Manager

QUALITY MANUAL 07QA REVISION. General i 8/26/2017. Quality Manual PREPARED BY: Burt Tanaka Quality Assurance Manager 1755 La Costa Meadows, San Marcos, California 92078, USA 64818 Quality Manual 8/26/2017 SECTION PAGE REVISION General i N QUALITY MANUAL PREPARED BY: Burt Tanaka Quality Assurance Manager Ronald E. Ogle

More information

Guidance Document For Selecting Applicable Quality Assurance Requirements For Department of Transportation Packaging

Guidance Document For Selecting Applicable Quality Assurance Requirements For Department of Transportation Packaging Guidance Document For Selecting Applicable Quality Assurance Requirements For Department of Transportation Packaging By the Packaging Management Council (PMC) And Energy Facilities Contractors Group Supply

More information

SABRe : Inspection Processes. Supplier Briefing Pack.

SABRe : Inspection Processes. Supplier Briefing Pack. SABRe : Inspection Processes. Supplier Briefing Pack. 2008 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or

More information

SUPPLIER QUALITY REQUIREMENTS (SQR S)

SUPPLIER QUALITY REQUIREMENTS (SQR S) SUPPLIER QUALITY REQUIREMENTS (SQR S) Q01 Q02 Q03 Q04 Q05 Q06 MANDATORY AMRO SOURCE INSPECTION When specified on individual Purchase Orders, Amro Source Inspection shall be performed at supplier s facility

More information

QUALITY ASSURANCE TERMS & CONDITIONS FOR PROCUREMENT Rev E

QUALITY ASSURANCE TERMS & CONDITIONS FOR PROCUREMENT Rev E Sections 1.0 through 5.0 apply to all suppliers doing business with RSI. Sections 6.0 through 8.0 apply to those suppliers providing materials and products for Aerospace and Defense applications. Acceptance

More information

PRINTED COPY IS NOT CONTROLLED

PRINTED COPY IS NOT CONTROLLED Quality Manual We Deliver Quality on Time Form 1217 (01.16.2018) Rev. 12 SOR Inc. sorinc.com SOR QUALITY MANUAL Page 1 of 18 Table of Contents Quality Manual 8701-001 Revision 12 Introduction....4 1.0

More information

METUCHEN CAPACITORS INCORPORATED. Quality Manual P.O. BOX HIGHWAY 35, SUITE 2 HOLMDEL NJ USA

METUCHEN CAPACITORS INCORPORATED. Quality Manual P.O. BOX HIGHWAY 35, SUITE 2 HOLMDEL NJ USA METUCHEN CAPACITORS INCORPORATED Quality Manual P.O. BOX 399 2139 HIGHWAY 35, SUITE 2 HOLMDEL NJ 07733 USA Copy Holder Copy Number : 1 This Quality Manual Covers the activities and functions performed

More information

[Type text] QUALITY MANUAL. ISO 9001:2015 Quality Management System QMS1 ISSUE 1 12/09/16

[Type text] QUALITY MANUAL. ISO 9001:2015 Quality Management System QMS1 ISSUE 1 12/09/16 [Type text] QUALITY MANUAL ISO 9001:2015 Quality Management System APPROVAL The signatures below certify that this management system manual has been reviewed and accepted, and demonstrates that the signatories

More information

Vendor Quality. Requirements Manual

Vendor Quality. Requirements Manual ate Released 05/07/10 Last Review ate 03/14/16 Page 1 of 7 Vendor Quality Requirements Manual Nasco Aircraft Brake, Inc. 13300 Estrella Ave. Gardena California 90248 Telephone No. 310-532-4430 Fax. No.

More information

Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions

Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions PREFACE The DLA Troop Support Construction and Equipment Supply Chain (C & E) has instituted a Qualified Suppliers List

More information

EPRI QUALITY PROGRAM MANUAL

EPRI QUALITY PROGRAM MANUAL Controlled Copy No. : If no Controlled Copy No. is assigned; this copy is uncontrolled EPRI QUALITY PROGRAM MANUAL REVISION 13 Effective TOC: TABLE OF CONTENTS Sec. Title Page SUMMARY OF CHANGES... 2 Mapping

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 9001 Third edition 2000-12-15 Quality management systems Requirements Systèmes de management de la qualité Exigences Reference number ISO 9001:2000(E) ISO 2000 Contents Page

More information