CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING

Size: px
Start display at page:

Download "CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING"

Transcription

1 ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 314 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING SCOPE REFERENCES Not Used Not Used MATERIALS Aggregates Not Used CONSTRUCTION TABLE OF CONTENTS Select Subgrade Material, Granular Subbase, Base and Surface.02 Winter Grading of Granulars.03 Edge Ramping of Bituminous Pavement.04 Shoulders Compaction General.02 Compaction Requirements.03 Modified Layer Compaction Method Surface Tolerances General.02 Granular Courses.03 Bituminous Courses, Sidewalk, Curb and Gutter.04 Concrete Courses, Sidewalk, Curb and Gutter Stockpiling of Granular Material Not Used Page 1 Rev. Date: 12/1993 OPSS 314

2 MEASUREMENT FOR PAYMENT Granular A, B Type I & II, M, Stockpiled and from Stockpile, and Select Subgrade Material Actual Measurement Tonne.02 Cubic Metre.03 Square Metre Plan Quantity Measurement Square Metre BASIS OF PAYMENT Granular A - Item Granular A, Stockpiled - Item Granular A, from Stockpile - Item Granular B, Type I - Item Granular B, Type I, Stockpiled - Item Granular B, Type I, from Stockpile - Item Granular B, Type II - Item Granular B, Type II, Stockpiled - Item Granular B, Type II, from Stockpile - Item Granular M - Item Granular M, Stockpiled - Item Granular M, from Stockpile - Item Select Subgrade Material, Compacted - Item.02 Stockpile Site SCOPE This specification covers the requirements for the construction of untreated granular subbase, base, roadway surface and shoulder, edge ramping for bituminous pavements and stockpiling at specified sites REFERENCES This specification refers to the following standards, specifications or publications: Ontario Provincial Standard Specifications, General: OPSS 102 Weighing of Materials Ontario Provincial Standard Specifications Construction: OPSS 350 OPSS 501 Concrete Pavement, Concrete Base and Lean Concrete Base Compacting Page 2 Rev. Date: 12/1993 OPSS 314

3 Ontario Provincial Standard Specifications, Material: OPSS 1001 OPSS 1010 Aggregates - General Aggregates - Granular A, B, M and Select Subgrade Material MATERIALS Aggregates Granular materials and select subgrade material, shall conform to OPSS CONSTRUCTION Select Subgrade Material, Granular Subbase, Base and Surface Materials shall be kept free from clay and other types of deleterious materials. The Contractor shall ensure that his operations do not disturb underlying work. Materials shall be placed without segregation in uniform layers such, that the thickness of the compacted layer is not greater than 150 mm, except as provided under clause Subbase materials shall not be placed on the roadway more than 300 m in advance of the base material. Each layer shall be bladed to a smooth surface conforming to the required cross-section. Prior to closing down operations for each working day the subbase material shall be bladed and compacted and, if necessary, covered with sufficient base material to carry traffic. The granular base shall be maintained to the tolerances in grade and cross-section and to the specified density until the project is accepted, or if the Contract includes paving, until the surface is paved Winter Grading of Granulars All ice and snow shall be removed from all portions of the work area. Frozen materials shall not be incorporated into the work. Material shall not be placed over frozen ground, except, at the Contractor's option, a single lift may be placed over frozen ground in which case final grading and compaction shall be done after the underlying materials have thawed Edge Ramping of Bituminous Pavement A ramp of the designated granular material shall be built along the outside edges of each bituminous pavement construction course. Such ramps shall be of a height level with the pavement course and fall away from its edge at a slope not steeper than 4:1. Care shall be taken to prevent any ramping material from being spilled or pushed onto the pavement. Any materials so spilled shall be removed immediately without damage to the pavement and the surface thoroughly cleaned with the use of a power broom or other suitable means. Prior to paving any section, only sufficient material to construct the ramps shall be placed on the shoulders. No other shoulder material shall be placed until the conditions of permit, as detailed in clause have been attained. Page 3 Rev. Date: 12/1993 OPSS 314

4 Ramps shall be kept completed at all times to the end of that portion of pavement opened to traffic behind the paver, and no portion of the new pavement shall be open to traffic until the ramps have been constructed Shoulders The granular materials for shoulder construction shall be placed by means of a shoulder spreader. Where obstacles on the shoulder prohibit the efficient use of a spreader, the shoulder material to be placed adjacent to the obstacle may be end dumped. Shoulder spreaders are not required for placement of granular materials in areas of hot mix patching. Before commencing shoulder construction, all debris and deleterious material shall be removed. Shouldering operations shall commence as soon as, but not before, the pavement conditions will permit. Conditions of permit are as follows: 1. Bituminous Pavements: Shouldering operations shall not commence along any section of pavement until 24 h have elapsed from the time of completion of the final bituminous pavement course in that section, but the shouldering operations shall be completed within the next 24 h on sections which are open to traffic. When traffic is not yet using the paved surface, the shouldering shall be completed before traffic is permitted. 2. Concrete Pavement, Concrete Base and Lean Concrete Base: Shouldering operations shall commence in conformance with OPSS 350, Shouldering shall be completed before opening the concrete base or concrete pavement to traffic. Regardless of the method of placing and the width of shoulder, all shoulder construction material shall be placed directly onto the shoulder without segregation and any spillage and materials dragged onto the pavement surface shall be removed immediately without damage to the pavement, and the area so affected shall be thoroughly cleaned with the use of a power broom or other suitable means. The shoulder shall be shaped to the specified line, grade and cross-section Compaction General The rate of placing material shall be controlled by the adequacy of the compaction obtained. Each layer of material shall be compacted to the specified density before the next layer is placed Compaction Requirements The compaction requirements shall conform to OPSS Modified Layer Compaction Method At the option of the Contractor, granular materials may be placed in layers thicker than permitted under subsection subject to the following provisions: 1. All material shall be placed in uniform layers such that each layer shall have a depth of not more than 300 mm after compaction. Page 4 Rev. Date: 12/1993 OPSS 314

5 2. Before placing each material in such thicker layers, the Contractor shall prove the ability of his proposed method to achieve the specified density by means of a two lane trial area, the location and extent of which shall be as approved by the Contract Administrator. The Contractor shall give the Contract Administrator at least 48 h notice before commencing any work on the trial area, and shall also give the Contract Administrator full details of the placing and compaction system, or systems, which the Contract Administrator proposes to evaluate, including the rate of placing, depth of layer, number and type of compaction units and number of passes. The areas designated to evaluate each system shall be of sufficient length to be properly representative and shall normally comprise approximately 150 m. 3. When the Contract Administrator on the basis of test results, approves a system of placing and compacting, the Contractor shall continue to employ that system for the remainder of the work to which it is applicable, except that, a. Should the Contractor find it necessary at any time to change the system or any part of it, including the source of material, or the rate of placing the material, the Contractor shall first obtain the approval of the Contract Administrator, who may require a further trial area. b. If at any time tests show that a previously approved system is no longer producing the required degree of compaction, the Contractor shall make whatever changes are necessary to satisfy the requirements of this specification. c. Where vibration effects are creating environmental problems the Contractor shall make whatever changes are necessary Surface Tolerances General The surface of the uppermost layer of granular material shall be bladed, shaped and compacted to produce the required surface contour Granular Courses The finished granular courses shall not deviate more than 30 mm from the specified grade and crosssection and the surface shall not deviate more than 15 mm at any place on a 3 m template Bituminous Courses, Sidewalk, Curb and Gutter The finished granular surface shall not deviate more than 30 mm from the specified grade and crosssection except when the finished bituminous grade is controlled by fixed components such as existing pavements and curbs, in which case the finished granular surface shall not deviate more than 10 mm from the specified grade. Granular surfaces shall not deviate more than 10 mm on a 3 m template Concrete Courses, Sidewalk, Curb and Gutter The finished granular surface shall not deviate more than 10 mm from the specified grade and crosssection and the surface shall not deviate more than 10 mm on a 3 m template Stockpiling of Granular Material Stockpiles of granular material shall be constructed at the site(s) specified in the Contract conforming to OPSS Page 5 Rev. Date: 12/1993 OPSS 314

6 MEASUREMENT FOR PAYMENT Granular A, B, Type I & II, M, Stockpiled and from Stockpile, and Select Subgrade Material Actual Measurement Tonne Should the Contract require payment by the tonne, the method of determining the mass of materials for payment shall conform to OPSS 102. Where the Contractor supplies Granular A and M composed of air cooled iron blast furnace slag or nickel slag, the payment quantities will be determined by applying the following factors. 1. The total measured mass of air cooled iron blast furnace slag incorporated into the work shall be multiplied by a factor of The total measured mass of nickel slag incorporated into the work shall be multiplied by a factor of When Granular B is composed of slag, the payment quantities will be determined by comparing the density of the material to the average density of granular material as set by the Owner for that specific area and applying the conversion factors so determined to the weighed tonnes. When granular material is composed of slag, it is necessary to determine the amount of overrun or underrun. Such overrun and underrun shall be the difference between the tender quantity and the payment quantity as determined by applying the foregoing factors to the weighed tonnes Cubic Metre Should the Contract require payment by the cubic metre, one of the following methods will be employed, as determined by the Contract Administrator. 1. End Area Method, At Source The volume of material will be measured at the source in their original location and computed in cubic metres by the method of average end areas. Cross sections will be taken after the source has been cleared, grubbed and stripped of all unsuitable surface materials. The volume of boulders removed from borrow pits that cannot be accommodated in embankments will be deducted. 2. End Area Method, In Place When the measurement for payment of borrow materials in their original location is impracticable, the measurement for payment will be made of borrow materials measured in place with no allowance for shrinkage and computed in cubic metres by the method of average end areas. Page 6 Rev. Date: 12/1993 OPSS 314

7 3. Truck Box Method Materials will be measured in cubic metres, loose, by predetermined truck box capacities. The predetermined capacity of each truck will be that computed from its box dimensions. Each truck shall bear, as an identification symbol, either a letter of the alphabet, or a Roman numeral, followed by the predetermined capacity of the truck, of such a size as to be easily read Square Metre Should the Contract require payment of the granulars course by the square metre, the area shall be based on that shown on the contract drawings Plan Quantity Measurement Square Metre Measurement for payment is by Plan Quantity, as may be revised by Adjusted Plan Quantity, of the horizontal area in square metre. The area shall be based on that shown on the contract drawings BASIS OF PAYMENT Granular A - Item Granular A, Stockpiled - Item Granular A, from Stockpile - Item Granular B, Type I - Item Granular B, Type I, Stockpiled - Item Granular B, Type I, from Stockpile - Item Granular B, Type II - Item Granular B, Type II, Stockpiled - Item Granular B, Type II, from Stockpile - Item Granular M - Item Granular M, Stockpiled - Item Granular M, from Stockpile - Item Select Subgrade Material, Compacted - Item Payment at the contract price for the above item(s) shall be full compensation for all labour, equipment and material required to do the work Stockpile Site Compensation for clearing, grubbing, stripping, clean up of the stockpile site and for supplying and placing a pad upon which the materials are to be stockpiled, shall be paid as Extra Work. Page 7 Rev. Date: 12/1993 OPSS 314

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 314 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING TABLE OF CONTENTS

More information

Select Subgrade Material, Compacted

Select Subgrade Material, Compacted 314.1 GENERAL B314 SHOULDER, SELECTED SUBGRADE, AND STOCKPILING OPSS.PROV 314 Granular materials meeting the requirements of OPSS.PROV 1010 are obtained from pits and quarries, and recycled materials.

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 1.0 EXCAVATION AND FILL 1.1 GENERAL.1 The excavation or fill shall be made to provide proper grade, lines and crosssection for the laying of

More information

Construction Specification for Utility Adjustments

Construction Specification for Utility Adjustments Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1001 NOVEMBER 2013 MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL TABLE OF CONTENTS 1001.01 SCOPE 1001.02 REFERENCES 1001.03 DEFINITIONS 1001.04 DESIGN

More information

Special Provision No. 405F03 March 2005

Special Provision No. 405F03 March 2005 PIPE SUBDRAINS - Item No. VIDEO CAMERA INSPECTION Item No. Special Provision No. 405F03 March 2005 OPSS 405, February 1990, Construction Specification for Pipe Subdrains is deleted in its entirety and

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 401 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01 SCOPE 401.02 REFERENCES 401.03 DEFINITIONS

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying AMVIC GEOFOAM products and execution. The specifier needs to edit the guide specifications to

More information

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method 3.56 COLD IN-PLACE RECYCLING 3.56.1 GENERAL This specification covers the requirements for Cold In-Place Recycling (CIR) which consists of reclaiming the existing asphalt pavement; sizing the reclaimed

More information

SECTION FLEXIBLE PAVING

SECTION FLEXIBLE PAVING SECTION 321200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Include GENERAL CONDITIONS and applicable parts of Division 1 as part of this Section. B. Examine all Drawings and other Sections of the Specifications

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

January 2008 No. 700

January 2008 No. 700 January 2008 No. 700 INDEX FOR SPECIFICATIONS FOR GRANULAR BASE COURSE Page 700. 1 SCOPE...1 1.1 Pre-Construction Meeting...1 1.2 Mobilization of Equipment...1 700. 3 MATERIALS 3.1 Granular Base Course

More information

BASE CONSTRUCTION MATERIALS A Aggregate

BASE CONSTRUCTION MATERIALS A Aggregate BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3

More information

SECTION 3: SUB BASE AND BASE COURSES

SECTION 3: SUB BASE AND BASE COURSES SECTION 3: SUB BASE AND BASE COURSES Page i TABLE OF CONTENTS SECTION 3: SUB BASE AND BASE COURSES i SECTION 3.01 MATERIALS FOR SUB-BASE AND BASE COURSES 1 3.01.01 SCOPE 1 3.01.02 GENERAL 1 3.01.03 GRANULAR

More information

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL I-1 GENERAL SECTION I ROADWORKS The Consultant Engineer is to monitor all specified asphalt, granular materials and sub-grade preparation to ensure all road and curb construction is undertaken as outlined

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3 CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

SECTION BITUMINOUS CONCRETE PAVEMENT

SECTION BITUMINOUS CONCRETE PAVEMENT SECTION 321216 BITUMINOUS CONCRETE PAVEMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) 275.1. Description. This Item shall govern for treating subgrade, new and/or existing base [with or without asphaltic concrete pavement (ACP)], or

More information

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE GENERAL Final restoration of areas within the public right-of-way associated with Street Excavation Permits shall be completed as determined

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1 SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL TABLE OF CONTENTS 2.1 General...2-1 2.2 Materials...2-1 2.2.1 Compacted Non-granular Material...2-1 2.2.2 Gravel Material and Crushed Aggregate

More information

MATERIAL SPECIFICATION FOR AGGREGATES - BASE, SUBBASE, SELECT SUBGRADE, AND BACKFILL MATERIAL

MATERIAL SPECIFICATION FOR AGGREGATES - BASE, SUBBASE, SELECT SUBGRADE, AND BACKFILL MATERIAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 1010 NOVEMBER 2013 MATERIAL SPECIFICATION FOR AGGREGATES - BASE, SUBBASE, SELECT SUBGRADE, AND BACKFILL MATERIAL TABLE OF CONTENTS 1010.01 SCOPE

More information

CITY OF WHITEHORSE SERVICING STANDARDS MANUAL SECTION 2 - CONSTRUCTION DESIGN CRITERIA SUB-SECTION ROADS

CITY OF WHITEHORSE SERVICING STANDARDS MANUAL SECTION 2 - CONSTRUCTION DESIGN CRITERIA SUB-SECTION ROADS Table of Contents 2.7.1 Geometric Design Standards 2.7-3 2.7.2 Vertical Alignment 2.7-4 2.7.3 Horizontal Alignment 2.7-5 2.7.3.1 Curb Returns 2.7-5 2.7.4 Road Structures 2.7-5 2.7.5 Earthworks 2.7-5 2.7.5.1

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 304 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT TABLE OF CONTENTS 304.01 SCOPE 304.02 REFERENCES 304.03 DEFINITIONS

More information

Construction Specification for Concrete Bus Pad

Construction Specification for Concrete Bus Pad Engineering & Construction Services Division Standard Specifications for Road Works TS 3.41 June 2017 for Concrete Bus Pad Table of Contents SCOPE... 3 REFERENCES... 3 DEFINITIONS... 3 DESIGN AND SUBMISSION

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL January 2000 Page 1 of 10 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 APPROVALS PART 2 PRODUCTS 2.01 CEMENT 2.02 WATER The General Conditions of the Contract,

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS CITY OF TORONTO TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 4.70 November 2007 CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF

More information

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING 402.1 Description. This work shall consist of placing, spreading and compacting a bituminous mixture as shown on the plans or as directed by the engineer.

More information

SECTION 301 SELECTED MATERIAL SUBBASE DESCRIPTION

SECTION 301 SELECTED MATERIAL SUBBASE DESCRIPTION 301 SECTION 301 SELECTED MATERIAL SUBBASE DESCRIPTION 301.01.01 GENERAL A. This work shall consist of excavating and placing selected granular materials in one or more courses for subbase in accordance

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

Special Provision No. 305S02 January 2016

Special Provision No. 305S02 January 2016 GRANULAR SEALING - Item No. Special Provision No. 305S02 January 2016 Amendment to OPSS 305, March 1998 OPSS 305, March 1998, Construction Specification for Granular Sealing is deleted in its entirety

More information

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION A. Section Includes B. References C. Quality Assurance D. Submittals E. Delivery, Storage and Handling F. Environmental Conditions G. Summary H. Concrete

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

SECTION Section Excavation and Backfill For Structures Section Embedment and Base Course Aggregate

SECTION Section Excavation and Backfill For Structures Section Embedment and Base Course Aggregate SECTION 2110 EXCAVATION AND EMBANKMENT 1.00 GENERAL 1.01 Scope. Work to be performed under this section shall include all labor, equipment, materials and miscellaneous items necessary to perform all clearing

More information

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. SECTION 1300 - ASPHALTIC CONCRETE PAVEMENT 1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. 1302 GENERAL. Pavement shall be constructed to the lines, grades,

More information

CONSTRUCTION SPECIFICATION FOR GRANULAR SEALING

CONSTRUCTION SPECIFICATION FOR GRANULAR SEALING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 305 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR GRANULAR SEALING TABLE OF CONTENTS 305.01 SCOPE 305.02 REFERENCES 305.03 DEFINITIONS 305.04 DESIGN

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Division 400 - Asphalt Pavements and Surface Treatments SECTION 4XX - WARM MIX ASPHALT (WMA) PAVEMENT Warm mix asphalt (WMA) is the generic

More information

DIVISION 3 - AGGREGATE

DIVISION 3 - AGGREGATE DIVISION 3 - AGGREGATE Section 03001 Supply of Aggregates 03001_Jan31_2018.pdf Section 03005 Granular Base Course 03005_Jan31_2018.pdf Section 03010 Granular Sub-base Course 03010_Jan31_2018.pdf Section

More information

Construction Specification for Utility Cut and Restoration

Construction Specification for Utility Cut and Restoration Engineering and Construction Services Division Standard Specifications for Road Works TS 4.60 September 2017 for Utility Cut and Table of Contents TS 4.60.01 SCOPE... 3 TS 4.60.02 REFERENCES... 3 TS 4.60.03

More information

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $ Addendum No. 1 TOWNSHIP ROAD 510 RECONSTRUCTION Invitation to Tender No. T170523EN Amendment 1. Bidders shall note the following: a) Revised Section 3.3.2 Unit Price Table : REVISED Schedule A : Invitation

More information

The Brampton Standard Specifications are Amendments to the following noted OPSS.

The Brampton Standard Specifications are Amendments to the following noted OPSS. Brampton Standard Specifications (BSS) The Brampton Standard Specifications are Amendments to the following noted OPSS. OPSS BSS OPSS 310 BSS 310 Construction Specification for Hot Mix Asphalt OPSS 351

More information

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE BE IT ORDAINED by the Town Council of the Town of Plainville: SECTION 1. SUBDIVISIONS. All subdivisions hereinafter developed within

More information

Attachment 6 DETAILED SPECIFICATIONS

Attachment 6 DETAILED SPECIFICATIONS GROUP 33700 Fine and Coarse Aggregates PAGE 1 of 15 Attachment 6 DETAILED SPECIFICATIONS REFERENCES: References are made herein to the New York State Department of Transportation Standard Specifications,

More information

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course. SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

Construction Specification for Hot Mixed, Hot Laid Asphaltic Concrete Paving

Construction Specification for Hot Mixed, Hot Laid Asphaltic Concrete Paving Engineering & Construction Services Division Standard Specifications for Road Works TS 310 September 2017 for Hot Mixed, Hot Laid Asphaltic Concrete Paving Table of Contents TS 310.01 SCOPE... 3 TS 310.02

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL TABLE OF CONTENTS 5.1 General...5-1 5.2 Certification...5-1 5.3 Fabrication...5-1 5.4 Handling and Storage...5-1 5.5 Field Repair of Epoxy

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

4-07 Asphalt Treated Permeable Base (ATPB)

4-07 Asphalt Treated Permeable Base (ATPB) 1 1 0 1 0 1 Supplement Division with the following: (November 0,, APWA GSP) -0 Asphalt Treated Permeable Base (ATPB) -0.1 Description Asphalt treated permeable base (ATPB) consists of a compacted course

More information

SECTION INTERLOCKING CONCRETE PAVERS

SECTION INTERLOCKING CONCRETE PAVERS SECTION 23 14 13 INTERLOCKING CONCRETE PAVERS (1995 MasterFormat Section 02780) Note: This guide specification for concrete paver applications in the U.S. for concrete pavers and bedding sand over a compacted

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

SPECIFICATIONS FOR SAND SEAL

SPECIFICATIONS FOR SAND SEAL SPECIFICATIONS FOR SAND SEAL 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee of the

More information

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS The following list of Standard Documents defines the methods, materials, and testing to be utilized when designing and

More information

Cement Stabilized Soil (CSS) (Portland cement)

Cement Stabilized Soil (CSS) (Portland cement) Cement Stabilized Soil (CSS) (Portland cement) 1.0 DESCRIPTION. This specification shall govern the process known as Cement Stabilized Soil (CSS). CSS consists of mixing the existing base, subbase and

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007 Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate

More information

DIVISION 300 BASES AND GRANULAR SURFACES SECTION 301 LIME TREATED SUBGRADE

DIVISION 300 BASES AND GRANULAR SURFACES SECTION 301 LIME TREATED SUBGRADE DIVISION 300 BASES AND GRANULAR SURFACES SECTION 301 LIME TREATED SUBGRADE 301 301.01 Description. This item shall consist of treating the existing subgrade with water and lime according to these specifications

More information

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase. SECTION 20.22 LEVELING COURSE Article 22.1 General The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase. Article

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 Sheet 1 of 14 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 NOTE: This special provision is generally written in the imperative mood. The subject,

More information

PAVING SLABS ON A CONCRETE BASE

PAVING SLABS ON A CONCRETE BASE SECTION 32 14 13.16 PAVING SLABS ON A CONCRETE BASE (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs on a sand bed over concrete for pedestrian applications.

More information

Section 25 Aggregate Subbase

Section 25 Aggregate Subbase Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GRANULAR

More information

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

AMENDMENTS TO OPSS 914 (SEPT 88) CONSTRUCTION SPECIFICATION FOR WATERPROOFING BRIDGE DECKS ASPHALTIC MEMBRANE 1

AMENDMENTS TO OPSS 914 (SEPT 88) CONSTRUCTION SPECIFICATION FOR WATERPROOFING BRIDGE DECKS ASPHALTIC MEMBRANE 1 Works and Emergency Services CITY OF TORONTO TS 914 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 AMENDMENTS TO OPSS 914 (SEPT 88) CONSTRUCTION SPECIFICATION FOR WATERPROOFING

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS March 2, 2015 806.01 Description 806.02 JMF Field Adjustments 806.03

More information

asphalt (PWMA) processes in accordance with these Specifications. PWMA processes include organic 9

asphalt (PWMA) processes in accordance with these Specifications. PWMA processes include organic 9 Proposed Special Provision for Description Section -0.1 is supplemented with the following: This Work shall consist of providing and placing one or more layers of plant-mixed porous hot mix asphalt (PHMA)

More information

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING 507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL 489 DELETE: SECTION 507 SLURRY SEAL in its entirety. INSERT: The following. SECTION 507 SLURRY SEAL AND MICRO-SURFACING

More information

SPECIFICATION FOR FIRST COAT SEALING

SPECIFICATION FOR FIRST COAT SEALING SPECIFICATION FOR FIRST COAT SEALING 1. SCOPE The first coat seal shall be applied in accordance with this specification upon the finished surface of compacted granular basecourse pavement. 2. EDGE DEFINITION

More information

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal.

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal. 508.01 Section 508. CHIP SEALS 508.01 Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal. 508.02 Materials. Use materials meeting the following.

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

Re: Town of Yarmouth Tender Patching & Paving Program 2018 Construction Season

Re: Town of Yarmouth Tender Patching & Paving Program 2018 Construction Season May 1, 2018 Re: Town of Yarmouth Tender Patching & Paving Program 2018 Construction Season To whom it may concern: We are requesting contract unit prices for patching and paving various streets within

More information

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1004 NOVEMBER 2012 MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS TABLE OF CONTENTS 1004.01 SCOPE 1004.02 REFERENCES 1004.03 DEFINITIONS

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

EINRIP. Specification and Construction Issues

EINRIP. Specification and Construction Issues EINRIP Specification and Construction Issues There are a significant number of changes in the Specification Not all issues can be discussed here A more detailed list of changes will be provided with bid

More information

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS SECTION 2100 - GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS The City of Lee s Summit hereby adopts Section 2100 of the Kansas City Metropolitan Chapter of APWA Construction

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007 (Revision 2) Page 1 of 21 CONCRETE CONSTRUCTION

City of Brandon Division 2 Standard Construction Specifications Section January 2007 (Revision 2) Page 1 of 21 CONCRETE CONSTRUCTION January 2007 (Revision 2) Page 1 of 21 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 STANDARDS 1.05 QUALITY ASSURANCE The General Conditions of the Contract,

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information

County of Park PARK COUNTY WYOMING PRIVATE SOURCE GRAVEL POWELL AREA PRODUCE TO STOCKPILE REQUEST FOR QUOTE

County of Park PARK COUNTY WYOMING PRIVATE SOURCE GRAVEL POWELL AREA PRODUCE TO STOCKPILE REQUEST FOR QUOTE PUBLIC WORKS DEPARTMENT Brian J. Edwards, PE Park County Engineer Road & Bridge and Engineering 527-8520 or 754-8520 PARK COUNTY, WYOMING ORGANIZED 1911 ORIGINAL PARK COUNTY COURTHOUSE CODY, WYOMING COMPLETED

More information

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee

More information

53.20 PAINTED ROADWAY LINES

53.20 PAINTED ROADWAY LINES 53.20 PAINTED ROADWAY LINES 53.20.1 GENERAL The Work consists of supplying paint and painting roadway lines on pavement surfaces. The various configurations of roadway lines are shown in the Department

More information

SECTION ASPHALT PAVING

SECTION ASPHALT PAVING SECTION 321216- ASPHALT PAVING PART I-GENERAL 1.1 SUMMARY A. Section Includes: 1. Hot-mix asphalt patching. 2. Hot-mix asphalt paving. B. Related Sections: 1. Division 31 Section "Earthwork and Aggregate

More information

A. Testing Laboratory Services: Section B. Excavation, Site Fill and Rough Grading: Section Sub-Base Course Material (If requested).

A. Testing Laboratory Services: Section B. Excavation, Site Fill and Rough Grading: Section Sub-Base Course Material (If requested). SECTION 02500 - PART 1 - GENERAL 1.01 RELATED WORK SPECIFIED ELSEWHERE A. Testing Laboratory Services: Section 01411. B. Excavation, Site Fill and Rough Grading: Section 02200. C. Concrete: Section 03310.

More information

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard

More information