1 Traffic Solutions MUTCD Compliance Dates & Systematic Upgrades Rick Mowlds State Sign Engineer Lynn Peterson Secretary of Transportation John Nisbet State Traffic Engineer Road & Street Maintenance Supervisors Conference Yakima, WA October 5, 203

2 Assessment/Management Method for Maintaining Sign Retroreflectivity (Compliance Date: June 3, 204) WSDOT s Approach: Currently our approach encompasses all sign types, not just regulatory and warning signs Our approach is a combination of assessment/management methods: Visual Nighttime Inspection (Review each sign every two years) Expected Sign Life Control Signs 2

3 Assessment/Management Methods for Maintaining Sign Retroreflectivity (Continued) Visual Nighttime Inspection: Typically a Two- Person Crew Preferred Vehicle is a Pick Up or SUV preferable with the newer headlight style (VOA, HID) The Crew Records Deficient Signs into the Department s Sign Inventory Database Traffic Sign Management System (TSMS) Traffic and Maintenance Personnel are able to generate a Needed Maintenance Report of the identified deficient signs 3

4 Assessment/Management Methods for Maintaining Sign Retroreflectivity (Continued) Visual Nighttime Inspection: (Needed Maintenance Report) 4

5 Assessment/Management Methods for Maintaining Sign Retroreflectivity (Continued) Expected Sign Life: Associated with Capitol or Preservation Projects WSDOT policy was to replace any existing sign that is 0 years or older within project limits 5

6 Assessment/Management Methods for Maintaining Sign Retroreflectivity (Continued) Control Signs: Currently tracking yearly retroreflectivity readings for STOP signs at four locations Planning on partnering with Thurston County to implement a Weathering Test Deck for Sheeting Types II, III, IV, VIII, IX, and XI and with colors of white, red, yellow, green, fluorescent yellow green, fluorescent yellow, blue, and brown. Sheeting Type White Red Yellow Fluorescent Yellow Green Brown Blue Fluorescent Yellow Green II NC NC NC III AV, NC * AV, NC * AV, NC IV AV, 3M* AV, 3M* AV, 3M AV, 3M VIII AV, NC AV, NC AV AV IX AV,3M AV,3M AV,3M XI AV, 3M 6

7 Assessment/Management Methods for Maintaining Sign Retroreflectivity (Continued) Issues: Funding Staff Levels 7

8 Crashworthiness of Sign Supports (Compliance Date: January 7, 203) Placed on roads with posted speed limit of 50 mph or higher WSDOT Approach: Department policy all sign supports installed on the state highway system have been crash tested and approved by FHWA, since the 980 s. Meets NCHRP 350 or AASHTO Manual for Assessing Safety Hardware (MASH) Hardware accepted under NCHRP Report 350 is appropriate for replacement and new installation. Retesting is not required. As of January, 20, all new products must be tested using MASH crash test criteria for use on the National Highway System (NHS). No Impact 8

9 One Way Signs (Compliance Date: December 3, 209) Placed on roads with posted speed limit of 50 mph or higher WSDOT Approach: Currently identifying needs Future coordination with city s over 25 K in population 9

10 Horizontal Alignment Warning Signs (Compliance Date: December 3, 209) The placement of a Large Arrow or Chevrons on curves where the difference between the speed limit and advisory speed is 5 mph or more. WSDOT Approach: Identify impacted curves Provide funding for three Regions each biennium Systematic approach of addressing curves that have higher serious injuries and/or fatal crashes first Currently approximately 30% of the identified curves have been addressed 0

11 Yellow Change and Red Clearance Intervals (Compliance Date: June 3, 207) Duration of yellow change and red clearance intervals shall be determined using engineering practices. The engineering practices are available in ITE s Traffic Control Devices Handbook and ITE s Manual of Traffic Signal Design WSDOT Approach: Consistent with Department policy If needed, addressing yellow change and red clearance intervals when timing adjustments are needed at individual intersection and/or corridor Continue dialogue with the six Region to ensure compliance date is meet

12 Pedestrians Intervals and Signal Phases (Compliance Date: June 3, 207) Pedestrian change interval shall not extend into the red clearance interval and shall be followed by a buffer interval of at 3 seconds. WSDOT Approach: When timing adjustments are needed at individual intersection and/or corridor adjustments are being made to bring the intervals into compliance Continue dialogue with the six Region to ensure compliance date is meet Follow up with City s that are operating Department owned signals to ensure compliance date is meet Currently, roughly 5% - 20% signals have been adjusted 2

13 Grade Crossing (Crossbuck) Signs and Supports (Compliance Date: December 3, 203) Retroreflective Strip on Crossbuck sign and Support WSDOT Approach: The responsibility lies with the Railroad owner since the sign assembly is when Railroad right of way 3

14 Crossbuck Assemblies with Yield or Stop Signs (Compliance Date: December 3, 203) The use of STOP or YIELD signs with Crossbuck signs at passive grade crossings WSDOT Approach: The responsibility lies with the Railroad owner since the sign assembly is when Railroad right of way 4

15 Systematic Approach Strategic Items to consider when upgrading existing traffic control devices: Crash History, especially severe crash locations Reduce Risk Liability Roadway Classification Traffic Volumes Geometrics (Lane and Shoulder Widths) Existence of Horizontal and Vertical Curves 5

16 Systematic Approach Example: WSDOT ASSESSMENT GUIDE FOR REPLACING SIGNS - August 203 Note: This guide illustrates the range of potential consequences and likelihood that may be associated with key department risk areas. Judgment is required to assess the consequences and likelihood of a risk event (both before and after effective risk treatment action). STEP Determine the Severity Level for each Major Risk Area (Score the Risk Severity for each Key Area that is applicable) Severity Score Quantities & Costs Regulatory Warning Guide Informational Sign Fab Number Major Risk Areas for Signs # R-Series, R3-, R3-2, R3-4, W-Series, W2-Series, W3- E4-50, E6-0, E- Series R3-8, R5-, R5-A, R6-, R6- Series, W3-2 Series, W3-2 Series STEP 2 Estimate the Risk Impact ( Score the Likelihood and determine the Level of Risk) Risk Levels Not Applicable Low Medium High Appendix A - Priority Matrix Risk Severity for Signs High (Level One) Medium (Level Two) 7* 2 Total # of Signs 24,790 20,49,664 0 Average Daily Traffic Square Feet 73,962 49,678 72,92 0 Retroreflectivity Fair Marginal Low Estimate Replacement Cost $3,479,240 $2,993,560 $6,96,840 $0 Likelihood Score R2-Series, R4-Series, R5-2 S-, S3- Series, S4-3, W3- D-Series, D3-Series, D5- Series, R5-000 Series, R6-3 through W3-50, W4- Series, D8-Series, D0-Series, Series, R8-Series, R9-Series, Series, W5- through W5-3, E-Series, E3-0, E4-30, E5- R0-Series, R- Series, R2- W6-Series, W7- through W7- Series, E6-2, E8-Series, E2- Sign Fab Number Series, R3-Series, R4-4E, W8-Series, W9-Series, Series, M- thru M-70, M3- Series, R5-Series, R6- W0-Series, W-Series, Series, Series, R8-0, R8-20, S-W2- Series, W4-Series, through S5-2 W5-Series, W6-Series I2-40, I2-50, I7-40, I7-7 thru I7-702, I8-0 thru I8-70, I8-90, I8-00, I25-Series, I35-0 Total # of Signs 9,536 25,97 44,879,779 Square Feet 64,98 6, ,39 23,0 Estimate Replacement Cost $4,925,940 $3,233,40 $9,9,570 $462,020 See Table below for Average Daily Traffic Score Tier 2 Tier 2 Tier 2 Low (Level Three) Sign Fab Number R3-6, R3-7, R7-Series, R8- W5-4, W7-5, W7-30 D4-Series, D6-Series, D7-Series, D9-Series, D-, D2-Series, D3-, E2-A, E7-, E9-, E3- Series, M-8, M-9, M2-Series, M4-Series, M5-Series, M6- Series, M7-Series, M8-Series I-Series, I2-0 thru I2-30, I2-60, I2-70, I3-Series, I4- Series, I5-Series, I6-Series, I7-30, I7-60, I8-7 Series, I8-80, I8-804, I9-0, I20- Series, I30-Series, I35-02, Ride Share signs Total # of Signs 2, ,99 0,234 Tier 3 Tier 3 Tier 3 Square Feet 7, ,983 82,742 Estimate Replacement Cost $50,00 $440 3,99,575 $,654,840 Level of Risk Definitions: Consequences threaten the effective the ability of WSDOT to carry out its mission and strategic plan - existing controls must be effective and requires additional action to High be managed at the executive management level. Consequences threaten completion of a critical WSDOT function - existing controls must be effective and possibly additional action implemented - action to be managed Medium at Division level. Risk is managed by current practices and procedures - consequences are dealt with by routine operations at Director/Office level - monitor routine practices and Low procedures for effectiveness. Adapted from "Risk Management Procedure PN 224P", version., Governance Branch, Roads and Traffic Authority, NSW, Australia. STEP 3 Develop the Risk Response Plan (Develop the Risk Strategy & Remedial Actions) # If an existing sign is more than 5 years add one point to the final score. * - For Level One Signs with a low retro-reflectivity receives a score of 7; signs with a marginal retroreflectivity receives a score of 5; signs with a fair retroreflectivity receives a score of 3. ) The Estimate Replacement Cost does not include the replacement cost of support structures. Risk Levels Average Daily Traffic < >4000 Likelihood Score

17 Questions? Rick Mowlds (360)

Road Markings for Machine Vision NCHRP Project (6) Update to AASHTO SCOTE June 2016

Road Markings for Machine Vision NCHRP Project (6) Update to AASHTO SCOTE June 2016 Road Markings for Machine Vision NCHRP Project 20-102(6) Update to AASHTO SCOTE June 2016 NCHRP Project 20-102 Impacts of Connected Vehicles and Automated Vehicles on State and Local Transportation Agencies

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form

More information

Geometric Design: Past, Present, and Future

Geometric Design: Past, Present, and Future A2A02: Committee on Geometric Design Chairman: Daniel B. Fambro Geometric Design: Past, Present, and Future DANIEL B. FAMBRO, Texas A&M University JOHN C. COLLINGS, Delcan Corporation ROBERT DELLA VEDOVA,

More information

Selecting a Method to Comply with the Requirements for Traffic Sign Retroreflectivity

Selecting a Method to Comply with the Requirements for Traffic Sign Retroreflectivity Selecting a Method to Comply with the Requirements for Traffic Sign Retroreflectivity James W. Ellison, P.E. Consulting Traffic Engineer Federal Way, WA The Complexity of Sign Retroreflectivity Driver

More information

AASHTO S NATIONAL TRANSPORTATION PRODUCT EVALUATION PROGRAM (NTPEP)

AASHTO S NATIONAL TRANSPORTATION PRODUCT EVALUATION PROGRAM (NTPEP) AASHTO S NATIONAL TRANSPORTATION PRODUCT EVALUATION PROGRAM (NTPEP) TEMPORARY TRAFFIC CONTROL DEVICES DATA USAGE GUIDE INRODUCTION The NTPEP program has successfully supplied material performance data

More information

Field Guide on. Safe Maintenance and. Work Zone Operations

Field Guide on. Safe Maintenance and. Work Zone Operations Field Guide on Installation and Removal of Temporary Traffic Control for Safe Maintenance and Work Zone Operations August 2008 Introduction This field guide provides field personnel with introductory guidance

More information

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office VDOT and MAP-21 Performance Management VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office Overview Map-21- How is VDOT Preparing?

More information

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE FORWARD It shall be the responsibility of the person in charge to institute the placing of all appropriate cautionary devices and controls as may be required for the particular job. Traffic protection

More information

2017 Highway Safety Improvement Program Call

2017 Highway Safety Improvement Program Call 2017 Highway Safety Improvement Program Call The Highway Safety Improvement Program (HSIP) is for highway safety projects that eliminate or reduce the number of fatalities and serious injuries on all public

More information

2016 MUTCD CONCEPT TTC COMMENTS. Michael A. Chacon Traffic Operations Division

2016 MUTCD CONCEPT TTC COMMENTS. Michael A. Chacon Traffic Operations Division 2016 MUTCD CONCEPT TTC COMMENTS Michael A. Chacon Traffic Operations Division MUTCD 4 Ballot items were discussed at the June 2014 meeting in TTC, as well as additional topics. TTC No. 1 Pedestrian and

More information

Performance Based Practical Design. An FHWA Perspective

Performance Based Practical Design. An FHWA Perspective Performance Based Practical Design An FHWA Perspective Early Adopters Research on PBPD and Background Materials http://www.fhwa.dot.gov/design/pbpd/ FAST Act Changes that Encourage PBPD On the NHS, design

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

Conclusions & Lessons Learned

Conclusions & Lessons Learned What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County

More information

SECTION 616 TEMPORARY TRAFFIC CONTROL

SECTION 616 TEMPORARY TRAFFIC CONTROL SECTION 616 TEMPORARY TRAFFIC CONTROL 616.1 Description. This work shall consist of furnishing, installing, operating, maintaining, cleaning, relocating and removing temporary traffic control devices and

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: ROADWAY SAFETY FEATURES SPECIFIC SUBJECT: NCHRP 350 TEST REQUIREMENTS LOCATION

More information

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY THE COMMONWEALTH OF MASSACHUSETTS Number: P-92-010 Date: 10-08-92 - ) HIGHWAY DEPARTMENT FROM: NON-NHS BRIDGE R&R POLICY The purpose of this Engineering Directive is to formally notify Department Personnel

More information

Mobility and System Reliability Goal

Mobility and System Reliability Goal Mobility and System Reliability Goal Provide surface transportation infrastructure and services that will advance the efficient and reliable movement of people and goods throughout the state. Background:

More information

AASHTO s Highway Safety Manual and Performance Measures / Targets

AASHTO s Highway Safety Manual and Performance Measures / Targets AASHTO s Highway Safety Manual and Performance Measures / Targets Dr. Anthony Kane Director of Engineering and Technical Services Wednesday October 26, 2011 Bom dia damas e cavalheiros Talk Overview Highway

More information

Appendix B. Benefit-Cost Technical Memorandum

Appendix B. Benefit-Cost Technical Memorandum Appendix B Benefit-Cost Technical Memorandum This Page Left Blank Intentionally MEMORANDUM TO: FROM: Michael Kalnbach MnDOT District 1 Project Manager Graham Johnson, PE DATE: September 2, 2014 RE: TH

More information

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement 2 Purpose and Need 2.1 Study Area Interstate 81 (I-81) is relied upon for local and regional travel and interstate travel in the eastern United States. It extends 855 miles from Tennessee to New York at

More information

Barriers, Parapets, and Railings

Barriers, Parapets, and Railings Barriers, Parapets, and Railings Arielle Ehrlich State Bridge Design Engineer May 17, 2017 Bridge Office mndot.gov/bridge MnDOT Vocabulary Is it a barrier, a parapet or a railing? BARRIER. It is concrete

More information

An Introduction to the. Safety Manual

An Introduction to the. Safety Manual An Introduction to the Highway Safety Manual An Introduction to the HIGHWAY SAFETY MANUAL Table of Contents Section 1: HSM Overview... 1 What is the Highway Safety Manual?... 1 How is the HSM Applied?...

More information

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Section 13. Guidelines for the Design of Ground Mounted Sign Supports Section 13 BDC11MR-04 13.1 Introduction Highway signs fall into two main categories, which are subdivided as follows: 1. Overhead Signs a. Sign Bridge Structures (GO) b. Sign Cantilever Structures (GO)

More information

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY 805.1 DESCRIPTION Provide, erect, maintain and remove traffic control devices as shown in the Contract Documents. BID ITEMS UNITS Work Zone Signs (0 to

More information

Performance Based Practical Design (PBPD)

Performance Based Practical Design (PBPD) Performance Based Practical Design (PBPD) 2016 ODOT D08 LPA Day John R. Kasich, Ohio Governor Jerry Wray, ODOT Director PBPD PBPD Presenter Katherine DeStefano, P. E. District 08 Design Engineer ODOT D08

More information

Application of Road Safety Audits to Urban Streets

Application of Road Safety Audits to Urban Streets Application of Road Safety Audits to Urban Streets ABSTRACT EUGENE M. WILSON Professor Civil Engineering Dept. University of Wyoming Laramie, WY 82071 MARTIN E. LIPINSKI Professor Department of Civil Engineering

More information

MONITORING IMPLEMENTATION AND PERFORMANCE

MONITORING IMPLEMENTATION AND PERFORMANCE 12 MONITORING IMPLEMENTATION AND PERFORMANCE The FAST Act continues the legislation authorized under MAP-21, which created a data-driven, performance-based multimodal program to address the many challenges

More information

TABLE OF CONTENTS SECTION

TABLE OF CONTENTS SECTION PREFACE This manual contains current information for designing and submitting transportation plans for proposed projects to be constructed in unincorporated Hillsborough County. This manual is a readily

More information

Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual

Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual Andrew Ooms November 2012 Outline Safety Overview Current practices Safety Fundamentals Introduction the Highway

More information

TRAFFIC STUDY GUIDELINES

TRAFFIC STUDY GUIDELINES TRAFFIC STUDY GUIDELINES December 2013 The scope of the traffic impact analysis (TIA) should follow these guidelines and the requirements of VMC 11.80.130 and VMC 11.70, transportation concurrency (attached

More information

MUTCD Part 6F: Temporary Traffic Control Zone Devices

MUTCD Part 6F: Temporary Traffic Control Zone Devices MUTCD Part 6F: Temporary Traffic Control Zone Devices 6F.01 Types of Devices FHWA policy requires that all roadside appurtenances such as traffic barriers, barrier terminals and crash cushions, bridge

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

GUARDRAIL WARRANTS FOR LOW VOLUME ROADS

GUARDRAIL WARRANTS FOR LOW VOLUME ROADS 74 GUARDRAIL WARRANTS FOR LOW VOLUME ROADS Louis B. Stephens, P.E. INTRODUCTION Low volume roads present many challenges to highway engineers and public administrators. Although, by definition, these facilities

More information

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES 1 st Edition City of San Luis Obispo 2035 Circulation Element 1 Table of Contents Introduction... 2 Process... 2 When Impact Studies Are Required... 3

More information

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment Concept of Operations prepared for Minnesota Department of (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment December 22, 2014 Table of Contents 1. Introduction and Concept Overview...1

More information

Updated August 1, 2016

Updated August 1, 2016 Updated August 1, 2016 American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of for: Elimination of a U.S. (Interstate) Route

More information

IOWA TRANSPORTATION BY THE NUMBERS:

IOWA TRANSPORTATION BY THE NUMBERS: IOWA TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility MARCH 2013 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Chapter URBAN & RURAL FREEWAY DESIGN

Chapter URBAN & RURAL FREEWAY DESIGN Chapter 5 URBAN & RURAL FREEWAY DESIGN 5.1 INTRODUCTION This chapter provides standards and guidance for urban and rural freeways on new construction/reconstruction projects. The chapter also provides

More information

MAINE TRANSPORTATION BY THE NUMBERS:

MAINE TRANSPORTATION BY THE NUMBERS: MAINE TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility OCTOBER 2012 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Traffic Signals Affect Our Everyday Lives

Traffic Signals Affect Our Everyday Lives Traffic Signals Affect Our Everyday Lives Everyday we encounter traffic signals on our way to and from work, running errands and picking up the kids from soccer practice. Traffic signals can either help

More information

ROADSIDE SAFETY BARRIER ELEMENTS Module 3

ROADSIDE SAFETY BARRIER ELEMENTS Module 3 2 ROADSIDE SAFETY BARRIER ELEMENTS Module 3 3 Roadside Design Options 4 Expected Crash Reduction of Relocation of Fixed Objects Source: NCHRP Report 500, Vol 6, Exhibit V-26 Purpose of Safety Barriers

More information

Chapter 8 WORK ZONE TRAFFIC CONTROLS

Chapter 8 WORK ZONE TRAFFIC CONTROLS October 31, 2009 Chapter 8 WORK ZONE TRAFFIC CONTROLS TABLE OF CONTENTS Page 8-1.00 INTRODUCTION..........................................................8-3 1.01 Purpose 1.02 Scope 1.03 Relation to Other

More information

Public Meeting. US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County

Public Meeting. US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County Public Meeting US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County Cary Cleland Road Design Engineering Supervisor January 17, 2017 Project Limits US18/US281 US281

More information

I-10 KENDALL EXTENSION. Open House

I-10 KENDALL EXTENSION. Open House I-10 KENDALL EXTENSION Open House The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT

More information

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY 805.1 DESCRIPTION Provide, erect, maintain and remove traffic control devices as shown in the Contract Documents. On roadways that carry traffic through

More information

MAINE TRANSPORTATION BY THE NUMBERS:

MAINE TRANSPORTATION BY THE NUMBERS: MAINE TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe, Smooth and Efficient Mobility OCTOBER 2016 202-466-6706 tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Roadside Design Guide. Update from the Technical Committee on Roadside Safety Chris Poole, Iowa DOT

Roadside Design Guide. Update from the Technical Committee on Roadside Safety Chris Poole, Iowa DOT Roadside Design Guide Update from the Technical Committee on Roadside Safety Chris Poole, Iowa DOT TCRS Strategic Plan Vision - Lead roadside policy development, support safety innovations, and be an information

More information

Application of Human Factors Guidelines for Road Systems. June 15, 2016

Application of Human Factors Guidelines for Road Systems. June 15, 2016 Application of Human Factors Guidelines for Road Systems June 15, 2016 Today s Presenters Moderator Dr. Sue Chrysler, Texas A&M Transportation Institute Brief Background and Layout of the Human Factors

More information

COMPARISON OF SPUI & TUDI INTERCHANGE ALTERNATIVES WITH COMPUTER SIMULATION MODELING

COMPARISON OF SPUI & TUDI INTERCHANGE ALTERNATIVES WITH COMPUTER SIMULATION MODELING COMPARISO OF SPUI & TUDI ITERCHAGE ALTERATIVES WITH COMPUTER SIMULATIO MODELIG Matthew J. Selinger, PTOE William H. Sharp, PTOE ABSTRACT There are numerous technical papers and reports discussing the operations

More information

Dr. Benjamín Colucci Ríos

Dr. Benjamín Colucci Ríos Centro de Transferencia de Tecnología en Transportación Departamento de Ingeniería Civil y Agrimensura UPR-Recinto Universitario de Mayagüez Call Box 9000 * Mayagüez, PR 00681 Tel. 787-834-6385 * Fax:

More information

NJDOT: Asset Management Strategies and Tools

NJDOT: Asset Management Strategies and Tools NEW JERSEY DEPARTMENT OF TRANSPORTATION NJDOT: Asset Management Strategies and Tools Wednesday, October 1, 2014 Afternoon Session (1:45pm 2:30pm) Presenters Michael Castaldo New Jersey Department Of Transportation

More information

Chapter 10 Goals, Objectives + Policies

Chapter 10 Goals, Objectives + Policies Chapter 10 Goals, + Policies Warehouse on Nestle Way near I-78 114 115 10.1 ESTABLISHMENT OF CONSISTENT GOALS 10.2 NATIONAL FREIGHT GOALS The Lehigh Valley s freight transportation investment decisions

More information

QUALITY STANDARDS for Temporary Traffic Control Devices

QUALITY STANDARDS for Temporary Traffic Control Devices QUALITY STANDARDS for Temporary Traffic Control Devices Contents Introduction 1 Quality Requirements 2 Quality Standards 2 General 2 Barricades, Channelizing Devices, and Signs 3 Warning Lights 3 Flashing

More information

CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION

CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION SECTION 2B 1 - GROUND SURVEYS Survey Authorization... 2B-1 Interstate... 2B-1 Principal / Minor Arterial... 2B-1 Urban...

More information

Guideline For Inspecting and Testing Preemption of Interconnected Traffic Control Signals and Railway Crossing Warning Systems

Guideline For Inspecting and Testing Preemption of Interconnected Traffic Control Signals and Railway Crossing Warning Systems Guideline For Inspecting and Testing Preemption of Interconnected Traffic Control Signals and Railway Crossing Warning Systems TP 13755 ISBN T33-11/2001 0-662-65823-X Table of Contents 1. Introduction

More information

Alder Drive / Blair Road Bridge Replacement Projects

Alder Drive / Blair Road Bridge Replacement Projects Alder Drive / Blair Road Bridge Replacement Projects Presented By: County of El Dorado Community Development Agency Transportation Division Matthew Smeltzer, P.E. Deputy Director of Engineering Paul Hom,

More information

Roadway Data Extraction Technical Assistance Program (RDETAP) Traffic Safety Conference College Station, June 2016

Roadway Data Extraction Technical Assistance Program (RDETAP) Traffic Safety Conference College Station, June 2016 Roadway Data Extraction Technical Assistance Program (RDETAP) Traffic Safety Conference College Station, June 2016 Overview Project motivation and objectives MIRE-MIS Program RDETAP Project Overview of

More information

Pennsylvania TESC. 7 December Alan Toppen, P.E.

Pennsylvania TESC. 7 December Alan Toppen, P.E. Pennsylvania TESC 7 December 2016 Alan Toppen, P.E. 1 A Vision for the Future of Transport Reduce transportation costs by 44 percent or AED 900 million, saving AED 1.5 billion through reduction of environmental

More information

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No T-02 October 30, 2014

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No T-02 October 30, 2014 MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 14-11-T-02 To: From: Subject: Electronic Distribution Recipients Jon M. Chiglo, P.E. Division Director, Engineering

More information

REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES. TAB September 20, 2017

REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES. TAB September 20, 2017 REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES TAB September 20, 2017 2 2016 Application Categories Bridge Incorporate Highway Truck Corridor Study Tiers instead of Freight Project Elements

More information

extent feasible. Per the and low constructability,

extent feasible. Per the and low constructability, RELEVANT PUBLIC PROJECTS AND REFERENCES TranTech is proud of its accomplishments in structural engineering. Our staff members have provided design servicess to numerous public agencies on very successful

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

Subject: ACTION: National Cooperative Highway Research Program (NCHRP) Report 350 Hardware Compliance Dates

Subject: ACTION: National Cooperative Highway Research Program (NCHRP) Report 350 Hardware Compliance Dates Memorandum - FHWA Safety Program Page 1 of 2 Memorandum US Department of Transportation Federal Highway Administration Subject: ACTION: National Cooperative Highway Research Program (NCHRP) Report 350

More information

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS

More information

State Highway 10A Improvements (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma)

State Highway 10A Improvements (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma) (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma) Open House January 31, 2017 Open House Purpose Explain purpose and need for SH-10A improvements

More information

USING TRAVEL TIME RELIABILITY DATA TO DEVELOP CONGESTION MANAGEMENT STRATEGIES IN THE TRANSPORTATION PLANNING PROCESS.

USING TRAVEL TIME RELIABILITY DATA TO DEVELOP CONGESTION MANAGEMENT STRATEGIES IN THE TRANSPORTATION PLANNING PROCESS. USING TRAVEL TIME RELIABILITY DATA TO DEVELOP CONGESTION MANAGEMENT STRATEGIES IN THE TRANSPORTATION PLANNING PROCESS by Shuangshuo Wang B.S. Engineering, Tongji University, 2014 Submitted to the Graduate

More information

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures Scarborough Fire Department Scarborough, Maine Standard Operating Procedures Book: Emergency Operations Chapter: Alarm & Response Procedures Subject: 3020 - Safe Vehicle Positioning Revision Date: 7/31/2007;

More information

Watch out behind you! Responder Safety on the Roadway

Watch out behind you! Responder Safety on the Roadway Watch out behind you! Original Incident Squad 2 reports no injuries and cancels the ambulance. Ladder 2 personnel remain in the truck while in blocking position. Midwest City Fire Department, OK Incident

More information

HORIZON 2030: Plan Projects November 2005

HORIZON 2030: Plan Projects November 2005 Horizon PROJECTS 2030 Projects 10-1 10-2 The Horizon 2030 Project Information section is comprised of individual project information in alphabetical order by project name. The information provided for

More information

LOCATED IN WASHINGTON COUNTY LAND AREA: 8.75 SQ. MI. POPULATION: 14, C/L MILES ODOT DISTRICT 10 CONTAINS 5 STATE ROUTES 1ST SETTLEMENT IN THE

LOCATED IN WASHINGTON COUNTY LAND AREA: 8.75 SQ. MI. POPULATION: 14, C/L MILES ODOT DISTRICT 10 CONTAINS 5 STATE ROUTES 1ST SETTLEMENT IN THE LOCATED IN WASHINGTON COUNTY LAND AREA: 8.75 SQ. MI. POPULATION: 14,085 88 C/L MILES ODOT DISTRICT 10 CONTAINS 5 STATE ROUTES 1ST SETTLEMENT IN THE NORTHWEST TERRITORY WOOD-WIRT-WASHINGTON INTERSTATE PLANNING

More information

Section 3-01 General Concepts, Design Standards and Design Exceptions TABLE OF CONTENTS

Section 3-01 General Concepts, Design Standards and Design Exceptions TABLE OF CONTENTS Section 3-01 General Concepts, Design Standards and Design Exceptions TABLE OF CONTENTS GENERAL CONCEPTS...2 General...2 Design Vehicle...2 Driver Expectancy...2 Design Speed...2 Sight Distances...3 Exhibit

More information

Quantifying the performance of a traffic data collection system: Scout Connect match rate evaluation

Quantifying the performance of a traffic data collection system: Scout Connect match rate evaluation Technology Showcase Miovision Scout Quantifying the performance of a traffic data collection system: Scout Connect match rate evaluation Contents Executive summary 2 Elements of the study 2 Objectives

More information

SPECIFICATION FOR NOISE MITIGATION

SPECIFICATION FOR NOISE MITIGATION SPECIFICATION FOR NOISE MITIGATION 1. SCOPE This specification covers the design, construction, documentation and postconstruction review of state highway road-traffic noise mitigation. This specification

More information

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program New Jersey Department of Transportation Local Freight Impact Fund Handbook Procedures and Criteria for Local Freight Impact Fund Grant Program Page 1 of 10 Overview The New Jersey Department of Transportation

More information

Automated Traffic Enforcement

Automated Traffic Enforcement Automated Traffic Enforcement Red Light Running and Railroad Grade Crossing Violations Priscilla Tobias Steve Travia Illinois Department of Transportation Automated Traffic Enforcement Public Act 94-0795

More information

Status of Highway Safety Manual Implementation. October 2015

Status of Highway Safety Manual Implementation. October 2015 Status of Highway Safety Manual Implementation October 2015 Agenda NCHRP Project 17-50 Overview Project Objective Panel members and support states Project Deliverables to Date Status of HSM Implementation

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-09/0-4701-5 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle EVALUATION OF TRAFFIC CONTROL DEVICES: FIFTH-YEAR ACTIVITIES Technical Report Documentation

More information

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS Page 1 of 15 ST-01: I-95 ITS DEPLOYMENT (DE STATE LINE TO AIRPORT) PROJECT DESCRIPTION AND SCOPE: Project will address gaps in ITS device coverage on I-95 from

More information

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN Prepared for: City of Colorado Springs Prepared by: Felsburg Holt & Ullevig 508 South Tejon Street Colorado Springs, CO 80903

More information

Wisconsin Department of Transportation (WisDOT) Stand-alone Signals and ITS Program FY17 Project Application Form GENERAL INSTRUCTIONS

Wisconsin Department of Transportation (WisDOT) Stand-alone Signals and ITS Program FY17 Project Application Form GENERAL INSTRUCTIONS Wisconsin Department of Transportation (WisDOT) Stand-alone Signals and ITS Program FY17 Project Application Form GENERAL INSTRUCTIONS APPLICATIONS DUE: FEBRUARY 16, 2016 Please upload applications to

More information

Introduction. Background

Introduction. Background Example Transportation Asset Management Plan Outline This outline was created using the Transportation Asset Management Plan (TAMP) Builder ( www.tamptemplate.org ), a product of NCHRP Project 8-36/116.

More information

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally

More information

600 Roadside Design. Table of Contents

600 Roadside Design. Table of Contents 600 Roadside Design Table of Contents 600.1 Introduction... 6-1 600.2 Clear Zone... 6-1 600.2.1 Parallel Embankment Slopes & Ditches... 6-2 600.2.2 Urban Lateral Offsets... 6-2 600.2.3 Operational Offsets

More information

RIDOT S Statewide Roadway and Asset Data Collection Project

RIDOT S Statewide Roadway and Asset Data Collection Project RIDOT S Statewide Roadway and Asset Data Collection Project GIS-T Conference 2017 Shane White Rhode Island DOT; Daniel Behnke DTS Accent image here Primary Image here RDIP Technical Assistance Started

More information

Exit 73 I-29 Interchange Modification Justification Study

Exit 73 I-29 Interchange Modification Justification Study xit 73 I-29 Interchange Modification Justification tudy Introduction Figure 1 shows the location of xit 73. This interchange is proposed to be the connecting point of the ast and West Corridors to I-29.

More information

PRO Traffic Management

PRO Traffic Management MS&L Procedure PRO-4.5-0001-1-08 Traffic Management Version: 1 Prepared by: Adrian Connolly Authorised by: Michael Learmonth Authorisation Date: 29/5/2016 This document has been approved for release and

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION LOCAL AGENCY PROGRAMS GUIDELINES FOR GEOMETRICS

MICHIGAN DEPARTMENT OF TRANSPORTATION LOCAL AGENCY PROGRAMS GUIDELINES FOR GEOMETRICS MICHIGAN DEPARTMENT OF TRANSPORTATION LOCAL AGENCY PROGRAMS GUIDELINES FOR GEOMETRICS INCLUDING GUIDELINES FOR: New Construction/Reconstruction (4R) Resurfacing, Restoration, and Rehabilitation (3R) Preventive

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

Highway Engineering. 3 _ 2/2 Lecture/Laboratory Hours

Highway Engineering. 3 _ 2/2 Lecture/Laboratory Hours COURSE OUTLINE CIV216 Course Number Highway Engineering Course Title 3 _ 2/2 Credits Lecture/Laboratory Hours COURSE DESCRIPTION Explores the planning, design, construction, and characteristics of highways

More information

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier 2.11 HIGH TENSION CABLE BARRIER 2.11.1 GENERAL This Work consists of the supply, installation, removal, disposal and reinstallation of High Tension Cable Barrier (HTCB) system. 2.11.2 DEFINITIONS AND INTERPRETATION

More information

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES 3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES All sanitary sewers shall be designed in accordance with these Design Standards, LBWD Rules and Regulations, and to accepted engineering principles. In

More information

Implementing Asset Management: WSDOT s Experience

Implementing Asset Management: WSDOT s Experience Implementing Asset Management: WSDOT s Experience 6 th National Conference on Transportation Asset Management Aaron Butters, P.E. Systems Analysis and Program Development Manager November 2, 2005 1 Highway

More information

SCOPM Task Force Findings on National-Level Performance Measures

SCOPM Task Force Findings on National-Level Performance Measures November 9, 2012 SCOPM Task Force Findings on National-Level Performance Measures AASHTO Standing Committee on Performance Management Task Force on Performance Measure Development, Coordination and Reporting

More information

Technical Memorandum MULTIMODAL NEEDS. Prepared for: Oklahoma Department of Transportation. Prepared by:

Technical Memorandum MULTIMODAL NEEDS. Prepared for: Oklahoma Department of Transportation. Prepared by: Technical Memorandum MULTIMODAL NEEDS Prepared for: Oklahoma Department of Transportation Prepared by: May 2015 Technical Memorandum The Technical Memos were written to document early research for the

More information

Improved Methods for Superelevation Distribution: I. Single Curve

Improved Methods for Superelevation Distribution: I. Single Curve Improved Methods for Superelevation Distribution: I. Single Curve Udai Hassein 1, Said Easa 2, Kaarman Raahemifar 3 1 Ph.D Candidate, 2 Professor, Dept. of Civil Engineering, Ryerson University, Toronto,

More information

2016 Mid-Continent Transportation Research Symposium, October 24-25, Donna Brown-Martin, Director Bureau of Planning and Economic Development

2016 Mid-Continent Transportation Research Symposium, October 24-25, Donna Brown-Martin, Director Bureau of Planning and Economic Development 2016 Mid-Continent Transportation Research Symposium, October 24-25, 2016 Donna Brown-Martin, Director Bureau of Planning and Economic Development Why the State Freight Plan is Important to You Vision,

More information

Intersection Lighting Impacts on Nighttime Crashes Reduction and Safety Improvement

Intersection Lighting Impacts on Nighttime Crashes Reduction and Safety Improvement 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Intersection Lighting Impacts on Nighttime Crashes Reduction and Safety Improvement Mohammed Said Obeidat 1 and Malgorzata J. Rys 2 1 Research Associate, Department

More information

National Traffic Signal Report Card

National Traffic Signal Report Card National Traffic Signal Report Card Executive Summary 2007 The National Transportation Operations Coalition (NTOC) serves as an important foundation for institutionalizing management and operations into

More information