Overview Of PJM Demand Response and Energy Efficiency. Issues September 22, Susan Covino, Senior Consultant Market Strategy
|
|
- Jason Chapman
- 6 years ago
- Views:
Transcription
1 Overview Of PJM Demand Response and Energy Efficiency MARAMA Workshop on Energy and Air Quality Issues September 22, 2008 Susan Covino, Senior Consultant Market Strategy
2 Energy price incentive changes in 2008 Energy Revenue incentive no longer available. Energy providers now paid the market price minus their cost (retail G&T) to buy the resold energy. Prior to 2008 energy demand response providers were not charged for the cost of their resold energy. Direct access to Energy market remains for demand responders. 2
3 Energy Market Economic Load Response* Self Scheduled Dispatched by PJM in Real Time Cleared by PJM in the Day Ahead Market Emergency Load Response Energy Only Option Full Emergency Load Response Synchronized Reserve * Incentive payment when LMP equals or exceeds $75/MWh expired 12/31/07 3
4 Yearly CSP Credit Economic annual total CSP revenue $50,000,000 $45,000,000 $40,000,000 $35,000,000 CSP Credit ($) $30,000,000 $25,000,000 $20,000,000 $15,000,000 $10,000, $5,000,000 $ Year 4
5 Economic annual total CSP curtailed Mwh Yearly Curtailed Load 700, , ,000 Cur rtailed Load (MWh h) 400, , , , Year 5
6 Demand Side Response Scheduled Curtailments August 8, ) rtailed Load (MW) Cu PJ JM LMP ($/MWh) Hour Ending 0 6 Economic Emergency PJM LMP
7 Capacity Market Reliability Pricing Model Load Management (LM)* Demand Resource (DR) Existing or Planned Bids into the forward RPM auctions Paid the auction clearing gprice Interruptible Load for Reliability (ILR) Certified to PJM 3 months before the delivery year Paid the final zonal ILR price *LM must respond to no more than 10 events of 6 hours duration between June 1 and September 30 of the delivery year or be subject to penalty 7
8 Demand Response Participation Volume in Capacity Market MW RPM Implemented Prior to RPM Implementation 2005/ / / / / /2012 Delivery Year ALM RPM - ILR RPM-DR 8
9 Synchronized Reserve Market Demand resource must: be capable of providing a response within 10 minutes have metering infrastructure in place to verify response and compliance (1 minute scan rate) Mandatory training for Curtailment Service Provider Subject to penalties for failure to perform during an event Limited to 25% of the synchronized reserve requirement in each Reserve Zone 9
10 CSP Credits vs. MWh Reductions Total Payments Cleared MWh $500,000 40,000 $450,000 $400,000 $350,000 $300,000 $250,000 $200,000 $150,000 $100,000 $50,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 Dollars MWh $0 0 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 10
11 Qualified Synchronized Reserves Participation: CSPs vs. Resources CSPs Registration IDs Qualified Synchronized Reserve Resources Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 11
12 Regulation Market Must meet all of the requirements of regulation including real-time telemetry Mandatory training for Curtailment Service Provider Subject to penalty for failure to perform in response to PJM direction Limited it to 25% of the regulation requirement in the Reliability First Corporation Council region To date no demand resources have qualified for participation in the regulation market 12
13 Demand Response Roadmap Demand Response Roadmap Derived from many sources (DR opportunities identified at the Demand Response Symposium, MADRI, state commission DR working groups, PJM DSRWG, and the NARUC/FERC demand response collaborative Provides a guide for better coordination of demand response development and activity between the wholesale and retail markets Adopted unanimously by the Mid-Atlantic Demand Resources Initiative (MADRI) steering committee in late 2007 DR Symposium II held May 12 &13 focused on AMI/Data Management, Customer Education and Coordination of DR with Planning and the Reliability Pricing Model Five functional areas: dispatch, data management, settlement, planning process, forward price signals 13
14 Data Management Efficient communication of critical customer data without comprising customer privacy Lack of transparency and standardization for getting customer authorization Data Peak Load Contribution (PLC) value for ILR and DR PJM requirement to complete calculation by January 1 Option to put PLC value in the notes section of the customer s bill Loss Factor G+T (retail rate) Electric distribution company (EDC) account number 14
15 Data Management Action Items Develop standard customer data consent form for the region Maintain the AMI Pilot Matrix for the PJM region PJM to provide market participants with updates on the new Load Response application (targeted production date of 6/1/09) and development of Meter Data Service Provider certification and standards 15
16 Customer Education Action Items Speaker s Bureau established by the Mid- Atlantic Distributed Resources Initiative to develop general demand response messages and identify key policy makers and media outlets Improve customer s bills to show what they could have saved or did save by choosing DR Use text messages, cell phone messages, , etc. to more quickly and effectively make customers aware of high h load/high h cost days 16
17 Integration of Energy Efficiency into the Capacity Market Market design and rules before the Demand Response Steering Committee Measurement and Verification key to stakeholder support Goal to include Energy Efficiency in the upcoming Base Residual Auction to be conducted in May 2009 for the 2012/2013 Planning Year. 17
Demand Response. Overview. Recommendations
Section 6 Demand Response Demand Response Markets require both a supply side and a demand side to function effectively. The demand side of wholesale electricity markets is underdeveloped. Wholesale power
More informationIntegrating Energy Efficiency and Demand Response
Integrating Energy Efficiency and Demand Response Energy Efficiency and Active Demand Management Colleen M. Snee, Director - Integrated Demand Resources Johnson Controls, Inc. ACEEE Energy Efficiency as
More informationElectric Forward Market Report
Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08
More informationSection 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.
Section 3 Operating Reserve Operating Reserve Day-ahead and real-time operating reserve credits are paid to market participants under specified conditions in order to ensure that resources are not required
More informationCongestion and Marginal Losses
Section 10 Congestion and Marginal Losses Congestion and Marginal Losses The Locational Marginal Price (LMP) is the incremental price of energy at a bus. The LMP at any bus is made up of three components:
More informationBenefits from Generation and Storage on the Distribution System
Benefits from Generation and Storage on the Distribution System Andrew Levitt Senior Market Strategist Emerging Markets Special MRC Meeting DER Aug 24, 2016 Generation/Storage Resource Location and Types
More informationDemand Response. Mathangi Srinivasan. New York Market Orientation Course (NYMOC) Senior Market Trainer, NYISO. March 20-23, 2018 Rensselaer, NY 12144
Demand Response Mathangi Srinivasan Senior Market Trainer, NYISO New York Market Orientation Course (NYMOC) March 20-23, 2018 Rensselaer, NY 12144 1 Demand Response Module Objectives Upon completion of
More informationData Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps
Data Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps As of March 20, 2018 www.pjm.com 2018 Roadmap Data Viewer, Voting, Account Manager, DR Hub and Power Meter, Data
More informationLoad Management Performance Report 2015/2016
Load Management Performance Report 2015/2016 August 2016 PJM has made all efforts possible to accurately document all information in this report. However, PJM cannot warrant or guarantee that the information
More informationRPM 301 Performance in Reliability Pricing Model
RPM 301 Performance in Reliability Pricing Model PJM State & Member Training Dept. PJM 2017 Disclaimer: PJM has made all efforts possible to accurately document all information in this presentation. The
More informationDemand Response Programs. Donnie Clary CoServ President/CEO
Demand Response Programs Donnie Clary CoServ President/CEO CoServ at a Glance Counties served: Collin, Cooke, Denton, Grayson, Tarrant and Wise Total meters: Electric 215,000 Gas - 108,000 Electric load:
More informationLoad Management Performance Report 2017/2018. (mid Delivery Year update)
Load Management Performance Report 2017/2018 (mid Delivery Year update) January 2018 PJM has made all efforts possible to accurately document all information in this report. However, PJM cannot warrant
More informationCUSTOMER GUIDE TO PJM BILLING
CUSTOMER GUIDE TO PJM BILLING Billing Line Items include PJM Open Access Tariff (OATT) references, PJM Operating Agreement (OpAgr) references, and PJM Manual references. Reports are available for viewing,
More informationPJM EIS Generation Attribute Tracking System (GATS)
PJM EIS Generation Attribute Tracking System (GATS) Presented to NASEO 2015 Mid-Atlantic Regional Meeting June 22, 2015 Who is PJM EIS? PJM Environmental Information Services, Inc. Formed in February 2005
More informationDay-ahead ahead Scheduling Reserve (DASR) Market
Day-ahead ahead Scheduling Reserve (DASR) Market Agenda Implementation Overview of the DASR Market Market Clearing Process Market Clearing Example Performance Compliance Market Settlements Appendix: emkt
More informationAdministration Division Public Works Department Anchorage: Performance. Value. Results.
Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,
More informationCapacity Performance Training. June 24, 2015
Capacity Performance Training June 24, 2015 Training Objectives Provide Capacity Market Sellers with information necessary to participate in the Reliability Pricing Model (RPM) under a Capacity Performance
More informationPJM Roadmap for edart
PJM Roadmap for edart As of March 15, 2017 Background edart (electronic Dispatcher Application and Reporting Tool) is suite of electronic applications used to facilitate dispatcher-todispatcher communications,
More informationPORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS
PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS Edwin Castro CNEE Guatemala Viena, september 2009 What is the reason to develop this model? In our own electricity market
More informationCOURSE LISTING. Courses Listed. with SAP ERP. 3 January 2018 (00:08 GMT) SCM600 - Business Processes in Sales and Distribution
with SAP ERP COURSE LISTING Courses Listed SCM600 - Business Processes in Sales and Distribution SCM605 - SCM610 - Delivery Processing in SAP ERP SCM615 - Billing in SAP ERP SCM620 - SCM650 - Cross-Functional
More informationMarkets Report. Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar January 20, 2015 PJM 2015
Markets Report Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar January 20, 2015 Executive Summary PJM Wholesale Cost for calendar year 2014 was $70.40/MWh, and increase of 47% and 33% over
More informationPJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017
PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017 Prepared by Market Settlements Development Department PJM 2017 Table of Contents Table of Contents
More informationDispatch Signal & Locational Marginal Pricing (LMP)
Dispatch Signal & Locational Marginal Pricing (LMP) PJM State & Member Training Dept. Objectives Students will be able to: Identify how PJM dispatches & utilizes LMP Dispatch Rate Economic control signal
More informationMarket Settlements - Advanced
Market Settlements - Advanced RPM Module PJM State & Member Training Dept. PJM 2017 Capacity vs. Energy Capacity A commitment of a resource to provide energy during PJM emergency under the capped energy
More informationCOURSE LISTING. Courses Listed. with Customer Relationship Management (CRM) SAP CRM. 15 December 2017 (12:23 GMT)
with Customer Relationship Management (CRM) SAP CRM Courses Listed SAPCRM - Overview of the SAP CRM Solution CR100 - CRM Customizing Fundamentals CR500 - CRM Middleware CR580 - SAP CRM User Interface TCRM10
More informationBreaking the Silo Mentality Working With Opinion Leaders
CBI s 2 nd Annual KOL Conference Breaking the Silo Mentality Working With Opinion Leaders Kashif Chaudhry Objectives Share a view on the changing environment impacting the pharmaceutical industry and KOL
More informationCHP Economic Factors: Electric and Natural Gas Market Trends PREPARED BY: PREPARED FOR: DATE:
CHP Economic Factors: Electric and Natural Gas Market Trends PREPARED BY: PREPARED FOR: DATE: Daniel Peaco, Principal Consultant Efficiency Maine Combined Heat & Power Conference SEPTEMBER 29, 2016 Discussion
More informationLoad Shift Working Group. https://gridworks.org/initiatives/load-shift-working-group/
Load Shift Working Group APRIL 18 10AM 2PM PST CPUC GOLDEN GATE ROOM https://gridworks.org/initiatives/load-shift-working-group/ Agenda 10:00 10:20am: Intro and Purpose (Gridworks) 10:20 12:00pm: Grid
More informationCapacity Performance Training. March 16, 2015
Capacity Performance Training March 16, 2015 Training Objectives Provide Capacity Market Sellers with information necessary to participate in the Reliability Pricing Model (RPM) under a Capacity Performance
More informationPJM Economic Demand Resource in Energy Market. PJM State & Member Training Dept.
PJM Economic Demand Resource in Energy Market PJM State & Member Training Dept. PJM 2014 Disclaimer: PJM has made all efforts possible to accurately document all information in this presentation. The information
More informationNew Specialty Crops for California
New Specialty Crops for California Mark Gaskell, Farm Advisor UC Cooperative Extension - Santa Maria UC Statewide Small Farm Program California Offers A Special Mix Diverse growing environments Large,
More informationDocket Review of Energy Efficiency and Advanced Gas Technology Incentives For 12.5 MW Combined Heat and Power System Supplemental Filing
Jennifer Brooks Hutchinson Senior Counsel March 8, 2013 VIA HAND DELIVERY & ELECTRONIC MAIL Luly E. Massaro, Commission Clerk Rhode Island Public Utilities Commission 89 Jefferson Boulevard Warwick, RI
More informationHeating the University of Glasgow with river sourced heat pumps. Adam McConkey Andrew Poon-King Zhibin Yu
Heating the University of Glasgow with river sourced heat pumps Adam McConkey Andrew Poon-King Zhibin Yu Opportunity - Reduce Glasgow University s 1.9 m gas bill - The University is set to upgrade its
More information% Change. Total. Total Retail Sales Index* Estimate ($M)
Index % Change RETAIL SALES INDEX RETAIL SALES ROSE 2.6 PER CENT The total retail sales index was 2.6 per cent higher than the level reached in January. Building material stores recorded the largest growth
More informationU.S. Farm and Retail Egg Price Relationships to 2005 Changing Share of the Consumer's Egg Dollar
6/9/2006 U.S. Farm/Retail Egg Prices 1 Egg Economics Update # 274 U.S. Farm and Retail Egg Price Relationships - Changing Share of the Consumer's Egg Dollar This review of U.S. farm and retail egg prices
More informationLa regulación del incierto futuro de los sistemas eléctricos
La regulación del incierto futuro de los sistemas eléctricos Foro XM-2017 El futuro de la energía eléctrica en Colombia 25 de mayo, Cartagena, Colombia Carlos Batlle https://energy.mit.edu/profile/carlos-batlle
More informationTraffic Division Public Works Department Anchorage: Performance. Value. Results.
Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the
More informationSEPA Direct Debits indicator evolution (Spanish basic indicator vs Euro area)
Payment Systems Department Settlement Systems Analysis Division STATISTICS SEPA INDICATORS 100,00% 90,00% 80,00% 70,00% 60,00% 50,00% 40,00% 30,00% 20,00% 10,00% 0,00% SEPA Direct Debits indicator evolution
More informationTiming of Markets- the Key Variable in Design of Ancillary Service Markets for Power Reserves
Timing of Markets- the Key Variable in Design of Ancillary Service Markets for Power Reserves Alireza Abbasy 1, Reinier A. C. van der Veen, Rudi A. Hakvoort Faculty of Technology, Policy and Management,
More informationCost-Benefit Analysis of the PSE&G Energy Efficiency Program 2014 Prospective
Nov 2014 Cost-Benefit Analysis of the PSE&G Energy Efficiency Program 2014 Prospective CENTER FOR ENERGY, ECONOMICS & ENVIRONMENTAL POLICY EDWARD J. BLOUSTEIN SCHOOL OF PLANNING AND PUBLIC POLICY RUTGERS,
More informationPJM Manual 29: Billing. Revision: 23 Effective Date: January 1, Prepared by Strategic Market Services Department
PJM Manual 29: Billing Revision: 23 Effective Date: January 1, 2012 Prepared by Strategic Market Services Department PJM 2012 Table of Contents PJM Manual 29: Billing Table of Contents Table of Contents...
More informationQUICK START GUIDE. SQF Implementation. for.
QUICK START GUIDE for SQF Implementation www.22000-tools.com CONTENTS WHAT IS SQF? BENEFITS OF SQF SQF LEVELS SQF MODULES IMPLEMENTING SQF AND PREPARING FOR CERTIFICATION ASSIGN YOUR PEOPLE RESOURCES
More informationMeter Data Management System (MDMS) Sharing. Ricky Ip CLP Project Manager
Meter Data Management System (MDMS) Sharing Ricky Ip CLP Manager Agenda Introduction Objectives Critical Success Factors Change Management Lessons Learned 2 CLP Power Hong Kong Limited (CLP Power) is the
More informationReserve Market. PJM State & Member Training Dept. PJM /06/2016
Reserve Market PJM State & Member Training Dept. PJM 2016 Objectives Define Reserve products Explain the Reserve requirements Calculate Reserve offers PJM 2016 2 Reserves Reserves are additional generation
More informationMarket Trial Working Group I-SEM Project
Market Trial Working Group I-SEM Project Dublin, 31 August 2017 1 Overview of the Session Meeting Details Meeting Purpose Chair Secretariat I-SEM Market Trial Working Group Mark Needham Louise Dalton Amy
More information2014 State of the Market
2014 State of the Market 24 August 2015 SPP Market Monitoring Unit Disclaimer The data and analysis in this report are provided for informational purposes only and shall not be considered or relied upon
More informationElectricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)
For the first quarter of 2015, Ontario experienced overall demand that was typical for the province in winter, and strong generator output. Demand for Ontario electricity increased as a result of cold
More informationSchedule 2 TECHNICAL INFORMATION
Schedule 2 TECHNICAL INFORMATION This document is intended to provide context to the Haida Gwaii Request for Expressions of Interest (RFEOI) for the potential electricity supply opportunity for clean electricity
More informationVictorian AMI Program Stephen Thomson, AMI Program Director Principal Consultant Marchment Hill Consulting
Victorian AMI Program Stephen Thomson, AMI Program Director Principal Consultant Marchment Hill Consulting 21 January 2009 Victorian AMI Program Phases 2006 Jul 2007 May 2010 2013 Establishment Phase Involved
More informationImpacts of the EU ETS on Electricity Prices
Impacts of the EU ETS on Electricity Prices Prof. P. Capros E3Mlab - NTUA, kapros@central.ntua.gr Presented to Final Meeting of ETRES - Life Project Athens, March 31, 2006 The EU ETS - definition Cap and
More informationMax Load Reduction in DRHUB
Max Load Reduction in DRHUB DRS June 17, 2017 Focus of this presentation: Maintaining up to date Max Load Reduction number remains crucial for PJM reporting accuracy Incorporating a validation check on
More informationRegional Habitat Indicators Project. Workshop #1. Nov 9, 2016
Regional Habitat Indicators Project Workshop #1 Nov 9, 2016 Workshop Objectives Vet recommendations for management questions with Fist-to-Five Review and identify missing indicators Identify criteria for
More informationI-SEM Interconnectors Project
Moyle EWIC I-SEM Interconnectors Project Financial Transmission Rights Auction: Initial Trial Report VERSION: 1.0 STATUS: Final for Publication DATE: 29 th SEPTEMBER 2017 Contents Introduction... 3 Objectives
More informationCOURSE LISTING. Courses Listed. Training for Applications with Integration in SAP Business One. 27 November 2017 (07:09 GMT) Advanced
Training for Applications with Integration in SAP Business One Courses Listed Advanced TB1000 - SAP Business One - Logistics TB1100 - SAP Business One - Accounting TB1200 - SAP Business One - Implementation
More informationTransmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008
Transmission Planning at the Midwest ISO Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008 Midwest ISO: What We Do Monitor flow of power over the high voltage
More informationResidual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources
Market Issues Bulletin Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources March 10, 2015 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400
More information5 Star London Hotels - Example Report
5 Star London Hotels - Example Report January 2018 CONTENTS Your Benchmark Report Website Traffic Conversion Rates Ecommerce Performance AdWords Spend Your Traffic Index Your Conversion Rate Index Your
More informationCalifornia ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring
California Independent System Operator Corporation California ISO Q1 2017 Report on Market Issues and Performance July 10, 2017 Prepared by: Department of Market Monitoring TABLE OF CONTENTS Executive
More informationSituation and Outlook of the Canadian Livestock Industry
Situation and Outlook of the Canadian Livestock Industry 2011 USDA Agricultural Outlook Forum Tyler Fulton February 25, 2011 tyler@hamsmarketing.ca Lost in Translation Canadian Livestock Industry - Outline
More informationOkaloosa RESTORE Advisory Committee (ORAC) January 8, :30 PM 4:30 PM Emerald Coast Convention Center
Okaloosa RESTORE Advisory Committee (ORAC) January 8, 2014 2:30 PM 4:30 PM Emerald Coast Convention Center Agenda Minutes Approval Consultant s Administrative Report Scheduled Presentations - None Regional
More informationRegional Analysis of Policy Reforms to promote Energy Efficiency and Renewable Energy Investments Interaction with National Participating Institutions
UN Economic Commission for Europe Regional Analysis of Policy Reforms to promote Energy Efficiency and Renewable Energy Investments Interaction with National Participating Institutions Presentation to
More informationOrder 831 Offer Validation for Demand Response: Enhancements to DR Hub and Markets Gateway
Order 831 Offer Validation for Demand Response: Enhancements to DR Hub and Markets Gateway DRS September 22, 2017 Demand Response Offer Cap Validation Process Demand Response (Economic and Load Management):
More informationCity of Olean Water Filtration Plant
1332 River Street Olean, NY 14760 Phone: (716) 376-5699/ 376-5627 Fax: (716) 376-5704 E-Mail: dwalker@cityofolean.org Dale Walker, Senior Operator and Lab Director City of Olean Water Filtration Plant
More informationΕπιχειρησιακή Συνέχεια και Εφοδιαστική Αλυσίδα, 14 Οκτωβρίου Moving ahead in a changing environment
Moving ahead in a changing environment Changes in consumer behavior and their effect on customer service levels Change of customer requirements to smaller quantities and shorter delivery times due to:
More informationFinal Flexible Capacity Needs Assessment for 2018
Final Flexible Capacity Needs Assessment for 2018 April 28, 2017 1 Table of Contents 1. Introduction... 3 2. Summary... 3 3. Defining the ISO System-Wide Flexible Capacity Need... 5 4. Forecasting Minute-by-Minute
More informationIRP 101. Intro to Integrated Resource Planning. Scott Benson Manager, Resource & Transmission Planning. March 23, 2017
IRP 101 Intro to Integrated Resource Planning Scott Benson Manager, Resource & Transmission Planning March 23, 2017 1 What is an IRP? Definition Integrated resource planning is a process by which a power
More informationUpdate on Cotton: Prices, Responsible Sourcing, and Resources for Your Business
Update on Cotton: Prices, Responsible Sourcing, and Resources for Your Business Hosted by United States Fashion Industry Association (USFIA) & Cotton Incorporated August 30, 2016 2:00 P.M. Eastern/11:00
More informationRaynet Software Lifecycle
Raynet Software End of End of RMSi 10.6 2016-Dec 2018-Dec* 2020-Dec* RMSi 10.5 2016-Jan 2018-Jan 2020-Jan RMSi 10.4 2014-May 2016-May 2018-May RMS/RMSi 10.3 2014-Feb 2016-Feb 2018-Feb RMS/RMSi 10.2 2013-Nov
More informationWater Conservation Planning and Tools and Models. Brian Skeens, P.E. CH2M HILL
Water Conservation Planning and Tools and Models Brian Skeens, P.E. CH2M HILL Definition of Water Conservation Reduction of water use, waste, or loss Extend the life of current water supplies Program Goals
More informationFueling the Future with Natural Gas: Bringing It Home
NCSL Energy Policy Summit Minneapolis, MN August 19, 2014 Fueling the Future with Natural Gas: Bringing It Home Kathryn Clay, Ph.D. Vice President, Policy Strategy American Gas Association Shale Gas Resources
More informationTertiary reserve: 15 min 1 h
DESCRIPTION OF THE REQUIRED POSITIVE TERTIARY RESERVE ENERGY ABSTRACT Eva Marie Kurscheid Transmission system operators need tertiary to guarantee reliable grid operation. The used tertiary energy varies
More informationFurther Analyses of the Exercise and Cost Impacts of Market Power In California s Wholesale Energy Market
Further Analyses of the Exercise and Cost Impacts of Market Power In California s Wholesale Energy Market March 2001 Prepared by Eric Hildebrandt, Ph.D. Department of Market Analysis California Independent
More informationAugust 22, 2014 FIRE ISLAND WIND
August 22, 2014 FIRE ISLAND WIND Phase 1 Summary: Performance Project Performance: Benefits realized: 93,500 MWh LTD >875,000 MCF of NG burn avoided ~$6.5 MM in NG purchases avoided 55,000 tons of CO2
More informationThe Confluence Model. Presentation to Modeling and Forecasting Working Group January 21, 2015
The Confluence Model Presentation to Modeling and Forecasting Working Group January 21, 2015 Introductions Presenter: Gary Fiske Working Group Water Department staff Objective: Penetrate the Black Box
More informationPolicy and Regulatory Approaches to Grid Integration of Renewable Energy in the US
Policy and Regulatory Approaches to Grid Integration of Renewable Energy in the US Amy Rose, Ph.D. Energy Analyst National Renewable Energy Laboratory US RE policies & regulations are set at multiple levels
More informationImpact of the Dark Rule Amendments. Baiju Devani Director, Analytics IIROC
Impact of the Dark Rule Amendments Baiju Devani Director, Analytics IIROC Agenda 1. Background 2. Objectives 3. Approach and metrics 4. Key findings 2 Background Recognize the value of dark orders/markets
More informationUnderstanding Hourly Electricity Pricing. NYSERDA Programs
Understanding Hourly Electricity Pricing NYSERDA Programs Today s Presentation General overview of Hourly Pricing Historical pricing information What does Hourly Pricing mean to the customer, price elastic/inelastic
More informationTOC INDEX. Basis Levels in Cattle Markets. Alberta Agriculture Market Specialists. Introduction. What is Basis? How to Calculate Basis
TOC INDEX Basis Levels in Cattle Markets Feeder Associations of Alberta Ltd. Alberta Agriculture Market Specialists Introduction Basis levels are an effective tool to use for monitoring feeder and fed
More informationBusiness Practice Manual for The Transmission Planning Process
Business Practice Manual for The Transmission Planning Process Posted: June 2, 2015 Intentionally left blank TABLE OF CONTENTS 1. Introduction... 9 1.1. Purpose of California ISO Business Practice Manuals...
More informationEnergy Markets - The Basics
Disclaimer This training presentation is provided as a reference for preparing for the PJM Certification Exam. Note that the following information may not reflect current PJM rules and operating procedures.
More informationPower Potential webinar
Power Potential webinar Thank you for joining our webinar. Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a
More informationBordei Verde. 8 MW Wind Park Romania.
Bordei Verde 8 MW Wind Park Romania www.globalwindpower.com Project introduction Project ownership: Global Wind Power Europe ApS Global Wind Power is proud to offer the wind turbine project Bordei Verde
More informationThe New York Independent System Operator s Market Clearing Price Auction Is Too Expensive for New York
McCullough Research The New York Independent System Operator s Market Clearing Price Auction Is Too Expensive for New York 6123 REED COLLEGE PLACE PORTLAND OREGON 97202 503-777-4616 ROBERT@MRESEARCH.COM
More informationGHANA. February 2015 CONTENTS. 1.Introduction Farm Gate price Data Collection in Ghana: Data Reporting... 3
FARM-GATE PRICE MONITORING IN SELECTED IMPACT COUNTRIES GHANA February 2015 CONTENTS 1.Introduction... 2 2. Farm Gate price Data Collection in Ghana: Data Reporting... 3 3. Price differentials by commodity
More informationIntroduction to the Demand Response Auction. IESO Training
Introduction to the Demand Response Auction IESO Training May 2017 Introduction to the Demand Response Auction AN IESO TRAINING PUBLICATION This guide has been prepared to assist in the IESO training of
More informationROUTINE MAINTENANCE EMERGENCY SERVICES EQUIPMENT REPAIR
critical facilities preventative maintenance ROUTINE MAINTENANCE EMERGENCY SERVICES EQUIPMENT REPAIR a l p h a t e c h n o l o g i e s s e r v i c e s, i n c. m e m b e r o f t h e a l p h a g r o u p
More informationBritish Columbia Utilities Commission Information Request No Dated: April 4, 2005 BC Hydro Response issued April 22, 2005
British Columbia Utilities Commission Information Request No. 1.1.0 Dated: April 4, 2005 BC Hydro Response issued April 22, 2005 1.0 Reference: Application, pp. 1 9 and 1-22 British Columbia Hydro and
More informationCP 94bis Statement of amounts due with weight brackets
CP 94bis Statement of amounts due with weight brackets Completion instructions Document version: 1.0 Date: 2016 03 29 UPU form template valid from: 2017 01 01 1 General rules A CP 94bis statement of amounts
More informationEvolution of SWIFT pricing. September 2015
Evolution of SWIFT pricing September 2015 Learn more about the evolution of SWIFT's pricing over the past years, and plans to continue to evolve pricing in the context of SWIFT2020 2 SWIFT s pricing initiatives
More informationNew Higg.org Platform Training. Understanding and Navigating the new platform
New Higg.org Platform Training Understanding and Navigating the new platform Sustainable Apparel Coalition 1 Attendees are all muted. Please type your questions into the Q&A box in the top left side of
More informationHV SHRM Member Survey
HV SHRM Member Survey 1. Currently, we meet 7:30 a.m. 10:00 a.m. on the first Thursday of the month. In general, do Thursdays work for you? Yes 89.5% 34 No 10.5% 4 Of not, what days work better? 2 2. What
More informationEnergy Marketplace. Nicolé K. Grottoli. Market Overview Course. Senior Market Trainer, Market Training, NYISO. March 8, 2018 Rensselaer, NY 12144
Energy Marketplace Nicolé K. Grottoli Senior Market Trainer, Market Training, NYISO Market Overview Course March 8, 2018 Rensselaer, NY 12144 1 NYISO Energy Marketplace Benefits to Understanding How is
More informationMEMORANDUM. January 6, Power Committee. Maury Galbraith. Draft Sixth Plan Electricity Price Forecasts
W. Bill Booth Chair Idaho James A. Yost Idaho Tom Karier Washington Dick Wallace Washington Bruce A. Measure Vice-Chair Montana Rhonda Whiting Montana Melinda S. Eden Oregon Joan M. Dukes Oregon January
More informationBackbone Transportation Service
Backbone Transportation Service California Producer Set-Aside Rights 2005 San Diego Gas and Electric and Southern California Gas Company. All copyright and trademark rights reserved Overview Firm Access
More informationATTACHMENT M-2 (BGE) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE
ATTACHMENT M-2 (BGE) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE This document outlines the process by which BGE determines Capacity
More informationCape Town water outlook 2018
Cape Town water outlook 2018 25 January 2018 Department of Water and Sanitation City of Cape Town Cape Town s water is part of an integrated system Cape Town gets its water from a system of dams that supply
More informationEnergy Storage and Distributed Energy Resources Phase 3
Energy Storage and Distributed Energy Resources Phase 3 Straw Proposal February 15, 2018 Market & Infrastructure Policy Table of Contents 1 Introduction... 3 2 Stakeholder Process... 4 3 Energy Imbalance
More informationDesigning Incentives and Rewards
Total Rewards instructor s Manual Designing Incentives and Rewards By Dale Dwyer, Ph.D. Project Team Author: SHRM project contributor: External contributor: Copy editing: Design: Dale Dwyer, Ph.D. Nancy
More informationBriefing on 2018 Policy Initiatives Roadmap and Annual Plan
Briefing on 2018 Policy Initiatives Roadmap and Annual Plan Greg Cook Director, Market and Infrastructure Policy EIM Governing Body Meeting General Session January 23, 2018 The ISO previously committed
More informationModeling the Restructured Illinois Electricity Market as a Complex Adaptive System
Modeling the Restructured Illinois Electricity Market as a Complex Adaptive System Charles M. Macal Gale A. Boyd Richard R. Cirillo Guenter Conzelmann Michael J. North Prakash R. Thimmapuram Thomas D.
More information