BNA Master Plan Update

Size: px
Start display at page:

Download "BNA Master Plan Update"

Transcription

1 BNA Master Plan Update Community Advisory Committee Meeting No. 6 January 31, 2013

2 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America, Inc. Gresham, Smith and Partners Community Advisory Committee Members Others

3 Agenda Status of the BNA Master Plan Update Overview of Airport Development Concepts Process Recommended Airport Development Concepts Landside Development Plan Next Steps Comments/Questions

4 Status Completed Demand/Capacity Analysis & Facility Requirements Completed Working Paper No. 3 Continued Airport Landside Development Plan Preparing Draft Working Paper No. 4 Continued Airport Development Concepts Preparing Draft Working Paper No. 5 Began Airport Layout Plan (ALP) set Began Financial Analysis

5 Sustainability Study Master Plan A Six Sigma Organization The Airport Master Plan/Sustainability Study Process Aerial Survey & Mapping Pre-Planning, Study Design, Secure Funding Inventory Existing Conditions Activity & Demand Forecasting Demand/ Capacity Analysis & Facility Requirements Alternative Development Concepts Implementation Plan ALP Plan Set Final Documents Public Involvement - Study Advisory Committees Conduct Sustainability Baseline Assessment Identify Sustainability Goals & Targets Identify Sustainability Strategies Develop Implementation Plan Prepare Final Sustainability Plan July 2011 November 2011 January 2012 July 2012 September 2012 October 2012 January 2013 April 2013 Sustainability Legend Master Plan Legend = complete = in progress/to be completed = complete = in progress/to be completed = ongoing

6 Airport Development Concepts Overview Addresses necessary facility requirements that are essential to accommodate the forecast demand Used to facilitate the selection of a long-term improvement concept for the Airport Addresses: Airside Terminal/Landside General Aviation, Support, & Cargo facilities Ground Access and Parking Planning charrette with MNAA was conducted in May to contribute information to the planning process

7 Airport Development Concepts Overview cont Evaluation of alternative concepts, individually and collectively, to gain clear understanding of strengths weakness, opportunities, and threats Includes: Recommended Alternatives Preliminary Environmental Analysis Phasing and Flexibility Feasibility factors Landside Development Plan is being prepared in conjunction with Airport Development Concepts BNA Sustainability Study factors are included in evaluation of Airport Development Concepts

8 Airport Development Concepts Airfield Concept 1 Potential Airfield Expansion This concept includes an extension of 3,297 feet on the south end of Runway 2L/20R to achieve a total length of 11,000 feet

9 Airport Development Concepts Airfield Concept 1 Potential Airfield Expansion Pros Achieves desired 11,000 feet runway length. Provides closest proximity to the Air Cargo operators on the western portion of the Airport. Extension construction area is limited to one end of the runway. Cons Concept imposes the greatest impact to off-airport property users such as Johnston & Murphy, although MNAA currently owns the land required for this concept. Concept requires tunneling of 6-lane highway. Concept requires multiple road closures and residential area displacement. Provides aviation expansion areas to the west. Requires relocation of existing Navaids.

10 Airport Development Concepts Airfield Concept 2 Potential Airfield Expansion This concept includes an extension of 1,500 feet on both ends of Runway 2R/20L to achieve a total length of 11,000 feet

11 Airport Development Concepts Airfield Concept 2 Potential Airfield Expansion Pros Cons Proposed construction area is already within the confines of the Airport perimeter fence. Extended runway is the furthest runway from the air-cargo and commercial passenger aircraft aprons. Provides aviation expansion areas to the east. Operations to and from both runway ends would require displaced thresholds and declared distances for RPZ compliance. Construction is required on both ends of the runway; 2 blast pads require relocation as opposed to 1. Requires relocation of TVA transmission lines. Requires closure of Couchville Pike (longer Employee Shuttle Bus route). Requires relocation (or in-ground protection) of aircraft fuel transmission line. Requires relocation of Colonial Pipeline. Requires relocation of existing Navaids. Requires relocation of McCrory Creek (Blue Line Stream) and Detention Dam.

12 Airport Development Concepts Airfield Concept 3 Potential Airfield Expansion This concept includes an extension of 3,000 feet on the north end of Runway 2C/20C to achieve a total length of 11,000 feet

13 Airport Development Concepts Airfield Concept 3 Potential Airfield Expansion Pros Cons Proposed construction area is already within the confines of the Airport perimeter fence. Existing drainage areas would be required to be filled/re-located. Extension construction area is limited to one end of the runway. Construction requires the closure of crosswind Runway Provides closest proximity to the Airport s passenger terminal. Creates another runway-runway intersection; increases the potential of runway incursions. Requires relocation of SWTF ($14 million). Requires a displaced threshold to the approach end of Runway 20C, and a reduction in the declared Landing Distance Available (LDA) to Runway 20C. Creates situations where T1 and T2 become endaround taxiways. Places numerous items in RPZ. Minimal aviation expansion areas.

14 Airport Development Concepts Airfield Fourth Parallel Runway The fourth parallel runway is beyond the 20-year planning horizon. It is included to preserve the airspace and land envelopes

15 Airport Development Concepts On-Airport Development West of Runway 2L/20R Maintenance, repair, and overhaul (MRO)/ /Cargo Building (Group IV Aircraft) Hangar development

16 Airport Development Concepts On-Airport Development West of Runway 2L/20R Pros Cons Near Runway 2L/20R with connectivity to Taxiway Romeo. Site is more conducive for combined mixed uses. Nearby existing utilities. Limited expansion capabilities. Allows for phased development of area. Deicing at this location is difficult based on current pond. Nearby access to Briley Parkway. Ideal layout for MRO/Cargo development.

17 Airport Development Concepts On-Airport Development South of Runway 13/31 Provides space for MRO/Cargo or GA Development Depicts future expansion of Taxiway Kilo

18 Airport Development Concepts On-Airport Development South of Runway 13/31 Pros Cons Nearby existing utility infrastructure. Topographical constraints (i.e., extreme elevation differences). Area near Embraer facilities allows for expanded MRO and/or cargo development. Area near Runway 13 end allows for either MRO/Cargo or GA activities and connectivity to the future Taxiway Kilo extension. Nearby access to major arterial roadways. The presence of a Blue Line Stream would likely require mitigation prior to development of area. Limited expansion capability. GA aircraft would be required to taxi within proximity of large aircraft. Some of areas would require removal of vegetation and trees. Future Taxiway Kilo extension would likely be required prior to development of area near Runway 13 end.

19 Airport Development Concepts On-Airport Development North of Runway 13/31 (A) Provides space for MRO/Cargo Development Depicts phased development of area

20 Airport Development Concepts On-Airport Development North of Runway 13/31 (B) Depicts removal or relocation of VORTAC Depicts acquisition of Knights of Columbus Property

21 Airport Development Concepts On-Airport Development North of Runway 13/31 (A) & (B) Pros Cons Allows for phased development of area. Elevation differences throughout area. Increased expansion area. VORTAC would require relocation or removal prior to development of entire area. Nearby existing utility infrastructure. Majority of area would require removal of vegetation and trees. Adequate area for expansion capability. Nearby roadways may require improvements due to increased vehicular traffic. Area would allow isolation for large aircraft.

22 Airport Development Concepts On-Airport Development South of Murfreesboro Road Provides space for General Aviation Development

23 Airport Development Concepts On-Airport Development South of Murfreesboro Road Pros Cons Ideal layout for corporate/private hangar campus. Limited expansion capability. Nearby access to major arterial roadways. Portion of area would require removal of vegetation and trees. Nearby existing utility infrastructure. Site is excavation is mostly rock with blasting required. Area would allow isolation from larger aircraft. Height of buildings at this site are restricted by line of site and airspace surfaces.

24 Airport Development Concepts On-Airport Development West of Runway 2L Provides space for General Aviation Development

25 Airport Development Concepts On-Airport Development West of Runway 2L Pros Cons Ideal layout for corporate/private hangar campus. Limited expansion capability. Nearby existing utility infrastructure. Nearby roadways may require improvements due to increased vehicular traffic. Area would allow isolation from larger aircraft. Requires relocation of MNAA maintenance functions on the west side. Relatively even terrain.

26 Airport Development Concepts On-Airport Development Existing General Aviation Area Provides space for General Aviation Development

27 Airport Development Concepts On-Airport Development Concept 6 Existing General Aviation Area Pros Cons Ideal layout for corporate/private hangar campus. Existing Airport development would need to be removed or relocated prior to full development. Existing utility infrastructure. Potential removal of roadway/parking pavement to accommodate portion of taxiway OFA. Proximity to existing GA infrastructure. Relatively even terrain. Nearby access to major arterial roadways.

28 Airport Development Concepts On-Airport Development Air Traffic Control Tower & Aircraft Rescue and Firefighting Depicts proposed relocation sites for Air Traffic Control Tower (ATCT) & Aircraft Rescue and Firefighting (ARFF)

29 Airport Development Concepts Intl. Arrivals Building Concept 1 Potential Reuse of Concourse A This concept includes: Reuse of 19,500 sq.ft. of upper concourse Repurposing of 9,400 sq.ft. of existing MNAA space at ramp level

30 Airport Development Concepts Intl. Arrivals Building Concept 1 Potential Reuse of Existing Concourse A Pros Utilizes existing Concourse A. Maintains aircraft movement circulation and existing ramp aircraft parking for staging international flights. Utilizes ramp level space beneath concourse for additional IAB functional space. Opportunity to create dedicated curbside serving IAB facility Cons Eliminates existing MNAA Maintenance Department space at ramp level. Remote distance from main terminal amenities, such as exits, ground transportation, baggage claim, etc. Requires demolition of existing IAB, so there will not be an IAB during construction.

31 Airport Development Concepts Intl. Arrivals Building Concept 2 Potential Reuse of Concourse A This concept includes: Widening of concourse circulation and gates Provides 28,900 square feet for new International Arrivals Building (IAB)

32 Airport Development Concepts Intl. Arrivals Building Concept 2 Potential Re-use/Expansion of Existing Concourse A Pros Maintains ramp level space beneath concourse for additional MNAA or aircraft use. Cons Construction activities may impact facility operations. Opportunity to create dedicated curbside serving IAB facility Primary construction access is from airside. Existing IAB has exceeded its useful life Existing gates on Concourse A will require relocation. Closest proximity to main terminal amenities and exit from IAB meeter/greeter area, baggage claim and ground transportation

33 Airport Development Concepts Intl. Arrivals Building Concept 3 Potential Reuse/Expansion of Concourse D This concept includes: Re-use of Concourse D upper and lower levels Expansion eastwards

34 Airport Development Concepts Intl. Arrivals Building Concept 3 Potential Reuse/Expansion of Concourse D Pros Cons Existing IAB has exceeded its useful life Required separation distance and wingtip clearance cannot be met for international arrivals, therefore access at the end of C Concourse will be limited to a single lane. No ramp tower for ramp control. Existing ramp pavement east of Concourse D provides staging area for international flights. Long, inefficient building footprint may result in narrow hold rooms, impact concession opportunities and IAB functional layout Opportunities to create dedicated curbside serving IAB facility. Potential Line of Sight issue which must be investigated. Mechanical rooms would require renovation. TSA offices would require relocation.

35 Airport Development Concepts Terminal Ticket Lobby Terminal Ticket Lobby is currently under design, considering selfservice equipment at ends of airline ticket counters Concept 1 includes: Location of self-service and self bag-tagging kiosks at ends of ticket counters Focus on faster check-in processes away from agents Freestanding lobby kiosks

36 Airport Development Concepts Terminal Ticket Lobby Concept 1 Self-Service Equipment at Ticket Counter Ends Pros Cons Projected passenger needs will be addressed throughout the planning period. Modifications to existing facilities impact both facility operations and customer service. Lobby circulation efficiencies and passenger flow are improved. Increased use of self-service equipment increases efficiency and speed of check-in process. Self-service check-in proximity to Security Screening Checkpoint (SSCP).

37 Airport Development Concepts Terminal Baggage Claim PAL 4 Addition of new claim carousel and expansion of building This concept includes: Building expansion to the northeast Creates additional space for pedestrian circulation, ATO s and restrooms Additional bag claim carousel

38 Airport Development Concepts Terminal Baggage Claim PAL 4 Building Expansion and Additional Claim Device Pros Cons Adds bag claim capacity, including required circulation space around the claim device. Construction costs associated with expansion. Additional restroom capacity and provides expanded ATO space for use by the air carriers. Utilizes central escalator core for floor infill to increase circulation space. Provides needed pedestrian circulation space. Build-out can provide floor for Ticketing expansion.

39 Airport Development Concepts Baggage Make-up Phase 1 Re-use of two existing Main Terminal baggage make-up rooms No expansion of Concourse C make-up area This concept includes: Renovation of existing facilities to accommodate new entrant air carrier Replacement of existing run-out conveyors

40 Airport Development Concepts Baggage Make-up Phase 1 Re-use of Existing Main Terminal Bag Make-up Rooms Pros Cons Re-use and renovation of existing vacant baggage make-up rooms necessitated by need of existing or new entrant air carriers. Sizes of existing rooms can be a limiting factor depending on size of carrier using make-up room. Does not require build-out of new space. Maintains individual make-up rooms and operations between air carriers. Sufficient capacity through PAL 2.

41 Airport Development Concepts Baggage Make-up Phase 2 Creation of new shared make-up room No expansion of Concourse C make-up area This concept includes: Creation of new 5,000 sq. ft. shared make-up room Provides new slope plate make-up carousel with capacity to serve multiple carriers simultaneously

42 Airport Development Concepts Baggage Make-up Phase 2 Shared Make-up Room and Equipment Pros Cons With anticipated increases in use of third party ramp service providers servicing multiple carriers, shared carousel operations would not present challenge. Requires demolition of existing walls and equipment to create contiguous space for shared use. Improves circulation of tugs. Cost associated with construction of new shared sloped plate make-up carousel. Increases make-up loading capacity. Need to gain consensus with air carriers for shared use equipment. Capacity from PAL 3 through planning period. Any additional expansion outside of building.

43 Airport Development Concepts Post-Secure Concessions Concourse A Repurposing of existing hold room and office space This concept includes: Additional concession offerings adjacent to United Airline gates Repurposing of MNAA office space adjacent to gate A-1 for concessions Occurs at PAL 3

44 Airport Development Concepts Post-Secure Concessions Concourse A Concessions Development Pros Cons Utilizes existing Concourse A does not require expansion of existing facilities. Eliminates existing MNAA office space adjacent to gate A-1, currently an inactive gate. Improves concessions exposure as first offering is before all gates. Creates potential restriction for future expansion of hold room seating space. Does not reduce concourse circulation. Product delivery locations and distance. Revenue can be limited based on passenger levels.

45 Airport Development Concepts Post-Secure Concessions Concourse B Repurposing of existing hold room space and facility expansion This concept includes: Additional concession offerings adjacent to US Airways gates Expansion to building exterior Occurs at PAL 2 and 3

46 Airport Development Concepts Post-Secure Concessions Concourse B Concessions Development Pros Cons Expands concessions offerings by expanding outwards, not internally affecting concourse circulation. Requires some existing facility expansion at middle of concourse. Construction above existing airline operations can be disruptive. Provides increased offerings, keeping in pace with increased passenger activity levels. Creates potential restriction for future expansion of hold room seating space. Minimized passenger impacts at concourse. Product delivery locations and distance.

47 Airport Development Concepts Post-Secure Concessions Concourse C Repurposing of existing hold room space and limited exterior expansion This concept includes: Additional concession offerings adjacent to Southwest and AA gates Expanded existing F&B offerings do not affect concourse circulation

48 Airport Development Concepts Post-Secure Concessions Concourse C Concessions Development Pros Cons Utilizes existing Concourse C through re-purposing of hold room space or potential vacant gate space. Re-purposing of vacant gate hold room space can be restrictive to future air carrier expansion requiring gate space. Increases concessions offerings at each PAL to accommodate increased passenger activity levels. Expansion above baggage make-up areas can be disruptive to operations and increase construction costs. Does not reduce concourse circulation. Product delivery locations and distance.

49 Airport Development Concepts Post-Secure Concessions Main Terminal building expansion to capture additional concession offerings This concept includes: Building expansion to begin between PAL 2 and PAL 3. Additional re-composure space created at SSCP exit

50 Airport Development Concepts Post-Secure Concessions Main Terminal Concessions Development Pros Cons Utilizes existing Gate C-1 holdroom and office space. Construction costs for expanding existing building towards airfield. Good concession exposure immediately at SSCP exit, including views of airfield. Also creates added a SSCP exit re-composure area and improved circulation. Expansion above baggage make-up areas and active vehicle drives can be disruptive to operations and increase construction costs. Provides expanded cover over ramp area below.

51 Airport Development Concepts Pre-Secure Concessions Phase 1 Pre-Secure Concessions This concept includes: Additional concessions added adjacent to Concourse C meeter/greeter seating area PAL 2 addition of 882 sq. ft.

52 Airport Development Concepts Pre-Secure Concessions Phase 3 Pre-Secure Concessions Development Pros Cons Increased concession offerings for passengers and meeters/greeters, while creating revenue opportunities at ingress/egress points of lobby. Higher construction costs for exterior infill project, including additional costs associated with new exterior building materials vs. interior remodel. Does not reduce bag claim lobby circulation. Exterior infill roof structure can be designed to be utilized for floor above, to accommodate future ticket lobby expansion.

53 Demand/Capacity & Facility Requirements Summary cont Surface Transportation and Parking Recommendations Summary Year Enplanements ¹ On-Airport Demand ² Off-Airport Demand ³ Effective Supply ⁴ Surplus / (Deficit) ,806,092 8,699 2,211 14,428 5, ,835,700 13,247 2,211 14,428 1, ,929,300 15,730 2,211 14,428 (1,302) ,190,000 18,591 2,211 14,428 (4,163) ,658,600 21,925 2,211 14,428 (7,497) ¹ RW Armstrong; Preferred Forecast Summary, April 6, ² Based on 2.27 spaces / 1,000 enplanements. ³ 2012 Parking supply (includes on- and off-airport). ⁴ Assume off-airport parking demand remains at existing levels. Source: Albersman & Armstrong Ltd., 2012.

54 Airport Development Concepts Roadway Concept 1 Maintain Existing Infrastructure

55 Airport Development Concepts Roadway Concept 1 Maintain Existing Roadway Infrastructure; No-build. Pros Cons Achieves desired roadway capacity for current traffic volumes. Does not require State or Federal coordination or approvals. Does not involve additional funds for infrastructure. Does not address the existing roadway weaving or capacity concerns. Does not provide opportunities to expand areas available for parking. Without the expansion, the existing areas will require larger and higher cost vertical parking garages. Without providing opportunities to expand the parking areas by new road alignments, the construction of parking garages will have a greater impact on the existing parking operations.

56 Airport Development Concepts Roadway Concept 2 Relocate Donelson Pike & Terminal Drive to the east side of Long-Term Lot B and with new connections at I-40

57 Airport Development Concepts Roadway Concept 2 Donelson Pike & Ring Road Relocations. Pros Cons Achieves desired roadway capacity to accommodate future traffic growth. Improves the conflicting traffic movement issues. Improves the traffic merging issues. Concept allows opportunities to expand the surface parking adjacent to the existing parking garage. Doing so allows construction of smaller parking structures which would have less impact to current parking operations and lower overall cost. Provides greater opportunities to access airport lands east of existing Donelson Pike and Runway 20L. Dependant on the State and Federal approval and funds to construct the Interstate 40 / Donelson Pike interchange. Nominal impact to existing traffic patterns during certain construction phases. Requires utility relocations that exist along Donelson Pike (NES, Communications) and coordination with others that are scheduled to remain (Colonial Gas Line, TVA).

58 Airport Development Concepts Parking Concept 1 All new parking developed in expanded Lot A Assumes Donelson Pike realignment Total net gain: 8,000 spaces Increase surface parking in Lot A by 6,200 spaces Expand existing parking structure to the south (three levels, 2,700 spaces) Total spaces: 20,800

59 Airport Development Concepts Parking Concept 1 All new parking developed in expanded Lot A Pros Cons Simplifies parking system (combines Lots A and B). Requires realignment of Donelson Pike. Least expensive option for expanding parking (less structured parking). Substantial amount of parking outside of the Airport ring road (Economy and Valet Lots). More parking within walking distance from the terminal. Requires development of large multi-level parking structure. Maintains CONRAC throughout the planning period. Does not reduce shuttling costs. Flexibility to expand parking structure horizontally. Does not simplify parking operations or wayfinding.

60 Airport Development Concepts Parking Concept 2 All new parking inside of Airport ring road Assumes Donelson Pike realignment Total net gain: 8,400 spaces Increase surface parking in Lot A by 4,500 spaces Expand existing parking structure to the southeast (three levels, 9,500 spaces) Total spaces: 21,200

61 Airport Development Concepts Parking Concept 2 All new parking inside of Airport ring road. Pros Cons Frees up real estate for future Airport development. Requires realignment of Donelson Pike. Nearly all public parking within Airport ring road. Requires development of large multi-level parking structure. More parking within walking distance from the terminal. Maintains CONRAC throughout the planning period. Flexibility to expand parking structure horizontally. Greatly simplifies parking operations and wayfinding.

62 Airport Development Concepts Parking Concept 3 Convert CONRAC to public parking Assumes no realignment of Donelson Pike Total net gain: 8,000 spaces Convert CONRAC to public parking (3,400 spaces) Expand existing parking structure to the east (three levels, 6,500 spaces) Total spaces: 20,800

63 Airport Development Concepts Parking Concept 3 Convert CONRAC to public parking Pros Cons Can be built without realignment of Donelson Pike. Requires development of large multi-level parking structure. Increases amount of parking within walking distance of the passenger terminal. Requires the CONRAC to be converted to public parking. New remote CONRAC facility required. Does not simplify the parking operations or wayfinding. No room to expand parking structure after PAL 4 (unless realignment of Donelson Pike occurs).. Does not reduce shuttling costs.

64 Airport Development Concepts Parking Concept 4 CONRAC facility to remain Assumes no realignment of Donelson Pike Total net gain: 8,000 spaces Expand existing parking structure to the east (four and one half levels, 9,800 spaces) Total spaces: 20,800

65 Airport Development Concepts Parking Concept 4 CONRAC facility to remain Pros Cons Can be built without realignment of Donelson Pike. Requires development of large multi-level parking structure. Increases amount of parking within walking distance of the passenger terminal. Does not simplify the parking operations or wayfinding. Allows existing CONRAC facility to remain. No room to expand parking structure after PAL 4 (unless realignment of Donelson Pike occurs). Does not reduce shuttling costs.

66 Airport Development Concepts Parking Phased for before and after Donelson Pike realignment Total net gain Phase 1: 2,200 spaces Total net gain Phase 2: 9,200 spaces Expand existing parking structure to the east (four and one half levels, 3,700 spaces) Increase surface parking in Lot A by 7,000 spaces Total spaces Phase 1: 15,000 Total spaces: Phase 2: 22,000

67 Airport Development Concepts Parking Concept 5 Phased for before and after Donelson Pike realignment Pros Cons Phased approach for parking expansion. Requires development of large multi-level parking structure. Increases amount of parking within walking distance of the passenger terminal. Does not simplify the parking operations or wayfinding. Allows existing CONRAC facility to remain. Does not reduce shuttling costs. Provides room for horizontal expansion of parking structure.

68 Airport Development Concepts Rental Car Massing Concepts Rental Car Service Center Sites Concept 1: Assumes the rental car service centers would expand, as needed, in the existing service center area Concept 2: Assumes relocation of rental car service centers to an area east of Donelson Pike and be planned in a manner that facilitates a future CONRAC

69 Airport Development Concepts Ground Transport. Center Concept 1 At north wing lot Ground Transportation Center (GTC) area is 5.0 acres with a net gain of 2.7 acres City and charter buses continue to use existing center island at level 1 Vehicle conflicts between pedestrians and vehicles would still occur at city/charter bus lanes All shuttles pick-up and drop-off on level 1

70 Airport Development Concepts Ground Transport. Center Concept 1 At North Wing Lot Pros Cons Most incoming traffic related to the GTC is diverted before reaching terminal curbside (except buses). Requires relocation of employees from the North Wing Lot. Most outgoing traffic related to the GTC exits downstream of curbside (except buses). Eliminates pedestrian conflicts with taxis/limos/shuttles. Narrow site may limit GTC layout somewhat. Short walking distance (adjacent to rental car counters). Uncovered parking areas. Easy patron access and way-finding. Will not accommodate high-headroom vehicles (city, charter, and shuttle buses). Alleviates congestion on all three levels of curbside.

71 Airport Development Concepts Ground Transport. Center Concept 2 At parking garage GTC area is 4.7 acres with a net gain of 2.4 acres Conflicts between pedestrians and vehicles would still occur on level 1 inside of GTC All shuttles pick-up and drop-off on level 1

72 Airport Development Concepts Ground Transport. Center Concept 2 At parking garage Pros Cons With the exception of the city and charter buses, this concept provides covered GTC functions. Does not eliminate all pedestrian / vehicle conflicts. South-half of garage area provides for maximum flexibility for GTC layout. Not enough headroom for city and charter buses. Easy patron access and way-finding. May not alleviate congestion at level 1 curbside since ingress and egress are near level 1 curbside. Alleviates congestion on levels 2 and 3 of terminal curbside. Loss of approx. 350 parking garage spaces.

73 Airport Development Concepts Ground Transport. Center Concept 3 Adjacent to parking garage GTC area is 4.0 acres with a net gain of 1.7 acres All GTC vehicles would continue to pass between level 1 parking garage and terminal building thus not reducing conflicts between pedestrians and vehicles All shuttles pick-up and drop-off on level Would require relocation of existing parking exit plaza

74 Airport Development Concepts Ground Transport. Center Concept 3 Adjacent to parking garage Pros Cons Alleviates congestion on levels 2 and 3 of terminal curbside. All incoming GTC traffic must pass through the level 1 curbside. All outgoing traffic exits downstream of terminal curbside. Increases pedestrian / vehicle conflicts. Triangular shaped site may limit GTC layout somewhat. Requires relocation and reconstruction of parking exit plaza. Uncovered parking areas.

75 Airport Development Concepts Ground Transport. Center Concept 4 At south wing lot GTC area is 5.0 acres with a net gain of 2.7 acres Eliminates all conflicts between pedestrians and vehicles All shuttles pick-up and drop-off on level 1 No GTC specific traffic required to drive along passenger terminal curbside

76 Airport Development Concepts Ground Transport. Center Concept 4 At South Wing Lot Pros Cons No GTC related traffic using curbside areas. Narrow site may limit GTC layout somewhat. Least amount of pedestrian / vehicular conflicts. Uncovered parking areas. Easy patron access and way-finding. Requires relocation of valet functions. Long walking distance (adjacent to rental car counters). At Donelson Pike, a signal may be required. Potential safety concerns with roadway geometry.

77 Airport Development Concepts Curbside Congestion Existing Arrivals Curbside Peak Hour Vehicles Curbside Requirements in Linear Feet PAL POV Existing Required Surplus/ Length Deficit UF Baggage Claim/Arrivals Level Baseline ,054 (87) 1.09 PAL 1 1, ,254 (287) 1.30 PAL 2 1, ,500 (533) 1.55 PAL 3 1, ,831 (864) 1.89 PAL 4 1, ,363 (1,396) 2.44 Experiencing congestion and vehicle backup during peak periods Contributing factors include POV maneuvering, and double parking in through lanes related to angled timed parking Passenger Pickup Parking (20 spaces) = 324, Passenger Pickup, Curbside = 643

78 Airport Development Concepts Curbside Congestion Proposed Arrivals Curbside Peak Hour Vehicles Curbside Requirements in Linear Feet Surplus/ PAL POV Proposed Required Length Deficit UF Baggage Claim/Arrivals Level Baseline 843 1,286 1, PAL 1 1,003 1,286 1, PAL 2 1,200 1,286 1,500 (214) 1.17 PAL 3 1,465 1,286 1,831 (545) 1.42 PAL 4 1,890 1,286 2,363 (1,077) 1.84 Proposed Passenger Pickup Curb = 2 x 643 feet = 1,286 feet (signage will distribute POVs equally to each loading lane) Guard rail will prevent driver-side drop-off

79 Airport Development Concepts Curbside Congestion Proposed Arrivals Curbside Pros Cons Increased curbside parking capacity is gained through elimination of angled, timed parking spaces. Loss of angled, time parking spaces is a negative customer service concern. Improved vehicle circulation through elimination of recirculating vehicles waiting for angled spaces to vacate. Adds 319 linear feet of curbside parking capacity to bring the overall total to 1,286 linear feet of available POV curbside capacity. Added construction cost to construct raised concrete curb and sidewalk in place of open parking spaces. Additional curbside capacity deficiencies of PAL 2, PAL 3 and PAL 4. Note: The proposed Arrivals curbside capacity is approximately 1,286 linear feet (equivalent to two times the length of the existing curb) with no angled parking spaces. The existing curb length is 1,610 linear feet.

80 Airport Development Concepts Hotel Development Concept 1 Potential hotel location on northeast side of terminal This concept includes: 300 rooms with conference and meeting facilities Direct connectivity to terminal Ground level delivery access

81 Airport Development Concepts Hotel Development Concept 2 Potential hotel location adjacent to Donelson Pike This concept includes: 300 rooms with conference and meeting facilities Direct connectivity to terminal by moving walkway Potential two-way roadway access from Donelson Pike

82 Airport Development Concepts Hotel Development Concept 3 Potential hotel location on northwest side of terminal This concept includes: 300 rooms with conference and meeting facilities Direct connectivity to terminal

83 Airport Development Concepts Hotel Development Concept 4 Similar to Concept 2 with closer proximity to terminal This concept includes: 300 rooms with conference and meeting facilities Direct connectivity to terminal by fixed pedestrian bridge Potential two-way roadway access from Donelson Pike

84 Airport Development Concepts Hotel Development Concept 5 Similar to Concept 3 located further from terminal on the west This concept includes: 300 rooms with conference and meeting facilities Direct connectivity to terminal by fixed pedestrian bridge Potential ground level access and deliveries

85 Airport Development Concepts Hotel Development Concept 6 Potential hotel location adjacent to Interstate 40 and long-term parking This concept includes: 300 rooms with conference and meeting facilities Vehicular access off I- 40 avoids circulating within BNA roadways

86 Airport Landside Development Plan Overview A Six Sigma Organization

87 Airport Landside Development Plan Overview Identifies recommended land uses for existing and proposed property areas around the Airport Assists in developing an implementation strategy and development phase review Developed based of FAA development guidance criteria and previous BNA land use studies

88 Next Steps Finalize Working Paper No. 4 (Landside Development Plan) Finalize Working Paper No. 5 (Airport Development Concepts) Conduct Environmental Overview Complete Airport Layout Plan set Complete Financial Analysis Conduct Public Meeting No. 3 (March 5, 2013) Complete final Master Plan Update

89 Comments/Questions Thank you for your participation!

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES 6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES The projected activity levels at Sacramento International Airport as described in Chapter 3 are the basis for determining the terminal facilities that will be

More information

Appendix H Support Facilities Preliminary and Intermediate Alternatives Analysis

Appendix H Support Facilities Preliminary and Intermediate Alternatives Analysis Appendix H SUPPORT FACILITIES PRELIMINARY AND INTERMEDIATE ALTERNATIVES ANALYSIS H TABLE OF CONTENTS EXHIBITS TABLES H.1 Evaluation Criteria... 1 H.1.1 Meeting the Base Constrained Demand Level... 1 H.1.2

More information

Aviation Capital Construction Program Update

Aviation Capital Construction Program Update Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance

More information

City of Kansas City AIRPORT COMMITTEE BRIEFING. New Terminal Evaluation for Kansas City International Airport. March 15, 2016

City of Kansas City AIRPORT COMMITTEE BRIEFING. New Terminal Evaluation for Kansas City International Airport. March 15, 2016 City of Kansas City AIRPORT COMMITTEE BRIEFING New Terminal Evaluation for Kansas City International Airport March 15, 2016 1 Agenda Process Overview Establishing Requirements & Identifying Issues Forecast

More information

MIC Core Pre-Schematic Program Analysis

MIC Core Pre-Schematic Program Analysis MIC Core Pre-Schematic Program Analysis April 2001 MIAMI INTERMODAL CENTER (MIC) PROGRAM Work Program Item No. 6113820 State Project No. 87000-1528 Financial Management Item No. 249643 PRE-SCHEMATIC DESIGN

More information

Airport of the Future. Air Cargo Conference June 2017

Airport of the Future. Air Cargo Conference June 2017 Airport of the Future Air Cargo Conference June 2017 How CVG landed its biggest deal in history. The deal at $1.49 billion is the largest ever one-time capital investment by a company in Northern Kentucky,

More information

Dallas/Fort Worth International Airport ASCE Presentation. Terminal Development Program. November, 2009

Dallas/Fort Worth International Airport ASCE Presentation. Terminal Development Program. November, 2009 Dallas/Fort Worth International Airport ASCE Presentation Terminal Development Program November, 2009 ASCE PRESENTATION, NOVEMBER 2009 Background Objective The objective of today s presentation 1. Review

More information

Airport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions

Airport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions Airport Construction Project Risk Management Presented by: Mindy Price- Direct Effect Solutions Topics ACRP 01-22 Research Background Research Findings and Conclusions Project Risk Management Recommendations

More information

Airport Ground Access Planning Reading the Crystal Ball

Airport Ground Access Planning Reading the Crystal Ball ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Airport Ground Access Planning Reading the Crystal Ball Gavin Duncan Associate Director LeighFisher gavin.duncan@leighfisher.com Why Should We Care? Ground access

More information

DEVELOPMENT OF A MASTER PLAN FOR

DEVELOPMENT OF A MASTER PLAN FOR DEVELOPMENT OF A MASTER PLAN FOR AIRPORTS WITH VISSIM SUPPORT VISSIM USER S GROUP MEETING May 1 st 2009 Portland, Or Luis E. Maumejean Multiservicios Integrales de America S.A. de C.V. lmn@mia.com.mx OUR

More information

Aviation Lighting Fall Conference Tucson, Arizona October 22, 2013

Aviation Lighting Fall Conference Tucson, Arizona October 22, 2013 Aviation Lighting Fall Conference Tucson, Arizona October 22, 2013 Richard Larivée, ing. P.Eng. Chair RP-37 IESNA RP-37 - Update Recommended Practice for Outdoor Lighting for the Airport Environment IESALC

More information

Airport Development Plan Update

Airport Development Plan Update Airport Development Plan Update Prepared by: SAN DIEGO COUNTY REGIONAL AIRPORT AUTHORITY SDIA Planning Timeline 2 Where Is SDIA Today? The Airport is implementing the recommendations from the 2008 master

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

AED Design Requirements: Site Layout Guidance

AED Design Requirements: Site Layout Guidance US Army Corps of Engineers Afghanistan Engineer District AED Design Requirements: Various Locations, Afghanistan MARCH 2009 TABLE OF CONTENTS AED DESIGN REQUIREMENTS FOR SITE LAYOUT GUIDANCE VARIOUS LOCATIONS,

More information

Project Initiation Form

Project Initiation Form Meeting Date: The Project Initiation Form should be completed in conjunction with the Level 2 Screening Form. Process Leads and/or Planners should complete the Project Initiation Form to document coordination

More information

Planned Procurement Opportunities Report. November 2017

Planned Procurement Opportunities Report. November 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Updates on FAA Order F. Agenda. Communicate FAA Order Updates. Educate attendees on the changes to FAA Order

Updates on FAA Order F. Agenda. Communicate FAA Order Updates. Educate attendees on the changes to FAA Order Updates on FAA Order 1050.1F Rhonda Solomon March 3, 2015 Airports Conference 2015 Agenda Communicate FAA Order 1050.1 Updates Educate attendees on the changes to FAA Order 1050.1 1 1 Overview of NEPA

More information

Planned Procurement Opportunities Report. May 2017

Planned Procurement Opportunities Report. May 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

CHAPTER 4 IDENTIFICATION AND EVALUATION OF ALTERNATIVES

CHAPTER 4 IDENTIFICATION AND EVALUATION OF ALTERNATIVES CHAPTER 4 IDENTIFICATION AND EVALUATION OF ALTERNATIVES Chapter 4, Identification and Evaluation of Alternatives presents the various alternatives considered to address the facility requirements presented

More information

Runway Protection Zones: Incompatible Land Use Alternatives Analysis & Risk Assessment

Runway Protection Zones: Incompatible Land Use Alternatives Analysis & Risk Assessment March 3rd, 2015 Runway Protection Zones: Incompatible Land Use Alternatives Analysis & Risk Assessment Matt Lee Vice President Landrum & Brown Cincinnati, OH Cody Meyer Consultant Landrum & Brown Cincinnati,

More information

Chapter 5.0 Alternatives Analysis

Chapter 5.0 Alternatives Analysis Chapter 5.0 Alternatives Analysis The Master Plan process thus far has accumulated the baseline of existing airport data, presented the outlook for the future in terms of operational activity, and defined

More information

Draft Environmental Assessment for Phoenix Sky Harbor International Airport Sky Train Stage 2

Draft Environmental Assessment for Phoenix Sky Harbor International Airport Sky Train Stage 2 Draft Environmental Assessment for Phoenix Sky Harbor International Airport Sky Train Stage 2 Prepared for: City of Phoenix Aviation Department and U.S. Department of Transportation Federal Aviation Administration

More information

SLC Terminal Redevelopment Program. Salt Lake City International Airport

SLC Terminal Redevelopment Program. Salt Lake City International Airport SLC Terminal Redevelopment Program Salt Lake City International Airport Terminal Redevelopment Program Goals and Expectations Address Seismic Risk Provide Right-Sized Facilities Solve Operational Problems

More information

3.6 Construction Methods

3.6 Construction Methods Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

MIA Cargo Facilities and Needs Workshop June 29 th, 2011

MIA Cargo Facilities and Needs Workshop June 29 th, 2011 MIA Cargo Facilities and Needs Workshop June 29 th, 2011 SMP Overview 1. Prior Studies 2. Current MIA Capital Improvement Program (CIP) 3. SMP Goals and Objectives 4. SMP Study Approach 2 SMP Background

More information

Planned Procurement Opportunities Report. December 2017

Planned Procurement Opportunities Report. December 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Business Education Courses Facility Services Project Review DAVID MASHBURN, DIRECTOR DENVER INTERNATIONAL AIRPORT JANUARY 25 TH, 2017

Business Education Courses Facility Services Project Review DAVID MASHBURN, DIRECTOR DENVER INTERNATIONAL AIRPORT JANUARY 25 TH, 2017 Business Education Courses Facility Services Project Review DAVID MASHBURN, DIRECTOR DENVER INTERNATIONAL AIRPORT JANUARY 25 TH, 2017 AGENDA Facility Services Organization at DEN Project Lifecycle Design

More information

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY? WHAT IS AN INTERMODAL TRANSIT FACILITY? An intermodal transit facility gathers many modes of transportation together and is strategically located to increase destination alternatives. Intermodal facilities

More information

Vertical Transportation Planning Retail/Mixed-Use

Vertical Transportation Planning Retail/Mixed-Use Fortune Consultants LTD Elevator Consulting Vertical Transportation Planning Retail/Mixed-Use This paper is to provide design guidance for the initial planning of vertical transportation in either a standalone

More information

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION 02001 Bus Traffic. Separation between bus traffic, regular vehicular flow, service traffic and pedestrian traffic. Bus traffic must have adequate

More information

CITY OF FORTUNA, CALIFORNIA

CITY OF FORTUNA, CALIFORNIA CITY OF FORTUNA, CALIFORNIA Community Development Department Building and Safety Division 621 11 th street Fortuna, California 95540 Phone: 707-725-7600 - Fax: 707-725-7610 ACCESSIBLE PARKING REQUIREMENTS

More information

Planned Procurement Opportunities Report. August 2017

Planned Procurement Opportunities Report. August 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012

Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012 Hong Kong International Airport Medium & Long Term Development Plans The British Chamber of Commerce 18 July 2012 Connecting HK with the World More than 100 airlines serving 160 destinations worldwide

More information

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS FINAL ENVIRONMENTAL IMPACT REPORT SDCRAA # EIR-06-01 State Clearinghouse No. 2005091105 CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS Lead Agency: SAN DIEGO COUNTY REGIONAL AIRPORT AUTHORITY

More information

Phoenix Sky Harbor People Mover. ❸ Financial Considerations

Phoenix Sky Harbor People Mover. ❸ Financial Considerations Phoenix Sky Harbor People Mover ❸ Financial Considerations Phoenix Sky Harbor People Mover ❸ Financial Considerations Key Elements: A people mover that accesses the terminals and parking structures at

More information

Section 1 OBC FADS /13 Access to Parking Areas

Section 1 OBC FADS /13 Access to Parking Areas Section 1 OBC 3.8.2.2 4.3.12/13 Access to Parking Areas A barrier-free path of travel is provided from: a) the entrance to the exterior parking area b) at least one parking level where a passenger elevator

More information

Los Angeles International Airport (LAX) Terminals 2 and 3 Modernization Project

Los Angeles International Airport (LAX) Terminals 2 and 3 Modernization Project and Los Angeles International Airport (LAX) Terminals 2 and 3 Modernization Project Prepared By: One World Way, Room 218 Los Angeles, CA 90045 with assistance from: CDM Smith 111 Academy Way, Suite 150

More information

Airport Master Plan Update (AMPU) Phase 2. Scope of Work

Airport Master Plan Update (AMPU) Phase 2. Scope of Work BST AMPU Phase 2 Scope of Work Page 1 of 19 Belfast Municipal Airport Belfast, Maine Airport Master Plan Update (AMPU) Phase 2 Scope of Work The intent of this project is to update the 1999 Belfast Municipal

More information

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements JUNE 2016 RONALD REAGAN WASHINGTON NATIONAL AIRPORT Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements PREPARED BY: Ricondo & Associates, Inc. IN

More information

What s New in Airport Curbside Management?

What s New in Airport Curbside Management? PRESENTATION What s New in Airport Curbside Management? Prepared for ACI-NA Operations and Technical Affairs Conference April 6, 2011 Agenda Outline Commercial Vehicles Current technologies Emerging technologies

More information

2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES

2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES 2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES 2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES 2.1 PROPOSED ACTIONS, FORT GREELY, ALASKA The additional GMD VOC activities analyzed in this supplemental

More information

TABLES OF CONTENTS APPENDIX C

TABLES OF CONTENTS APPENDIX C TABLES OF CONTENTS APPENDIX C SECTION C-1 DESIGN FEATURES On-Street Parking... C-1 Park-And-Ride Lots... C-6 Bus Turnout (Bus Stop) Design: Location, Type and Dimensions... C-15 Bus (Transit) Stops, Shelters

More information

Douglas Woods Wind Farm

Douglas Woods Wind Farm Traffic Evaluation and Access Management Report Douglas Woods Wind Farm Douglas,Massachusets Prepared for American Pro Wind 195 Libbey Parkway - Unit Two Weymouth, MA 02189 Prepared by Transportation,

More information

High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project

High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal May 2012 Draft Report: Alternatives Screening Version 1.0 1.0 Introduction This document outlines the alternatives screening process used

More information

Planned Procurement Opportunities Report. February 2018

Planned Procurement Opportunities Report. February 2018 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe: November 8, 2006 Mr. Glenn Rowe, P.E. Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering Commonwealth Keystone Building 400 North Street, 6 th Floor Harrisburg,

More information

Conclusions & Lessons Learned

Conclusions & Lessons Learned What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County

More information

Interchange Workshop Report (August 2004)

Interchange Workshop Report (August 2004) U.S. Highway 14 Corridor Study New Ulm to North Mankato Table of Contents Section Interchange Workshop Report (August 2004) Page 1. Introduction and Next Steps 1 2. Interchange Workshop Participants &

More information

Planned Procurement Opportunities Report. January 2018

Planned Procurement Opportunities Report. January 2018 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

CMPA Campus Wide Solar Array Installation 2 of 4

CMPA Campus Wide Solar Array Installation 2 of 4 Reference 27 This Campus Master Plan Amendment was adopted by the Board of Regents Facilities and Land Management Committee at the June 2013 Board of Regents meeting and placed on the consent agenda for

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 5-1 July 2015 501.1 General... 5-1 501.2 Interchange Type... 5-1 501.2.1 General... 5-1 502 Interchange Design Considerations... 5-2 502.1

More information

5. ENVIRONMENTAL ACTION PLAN

5. ENVIRONMENTAL ACTION PLAN 5. ENVIRONMENTAL ACTION PLAN Through the course of formulating, designing, evaluating, and refining the Master Plan project, measures have been, and will be, incorporated to avoid or reduce impacts to

More information

Hamilton Rapid Transit Preliminary Design and Feasibility Study

Hamilton Rapid Transit Preliminary Design and Feasibility Study Hamilton Rapid Transit Preliminary Design and Feasibility Study B-LINE STRUCTURAL ASSESSMENT DESIGN BRIEF Version:1.0 Hamilton Rapid Transit Preliminary Design and Feasibility Study B-LINE STRUCTURAL ASSESSMENT

More information

Columbia Regional Airport (COU) Columbia, Missouri. Draft Environmental Assessment Airside, Landside, and Surface Transportation Developments

Columbia Regional Airport (COU) Columbia, Missouri. Draft Environmental Assessment Airside, Landside, and Surface Transportation Developments (COU) Columbia, Missouri Draft Environmental Assessment Airside, Landside, and Surface Transportation Developments RS&H No. 226-1077-000 Prepared for the: City of Columbia and U.S. Department of Transportation

More information

Visual Guidance. Research and Development. By: Holly Cyrus, Project Manager Date: August 23, Federal Aviation Administration

Visual Guidance. Research and Development. By: Holly Cyrus, Project Manager Date: August 23, Federal Aviation Administration Visual Guidance Research and Development By: Holly Cyrus, Project Manager Date: August 23, 2010 Signs Markings Lighting Ground Surveillance Mission Improve Visual Aids on Airports to reduce runway Incursions

More information

Transit Service Guidelines

Transit Service Guidelines G R E AT E R VA N CO U V E R T R A N S P O RTAT I O N A U T H O R I T Y Transit Service Guidelines PUBLIC SUMMARY REPORT JUNE 2004 Greater Vancouver Transportation Authority TRANSIT SERVICE GUIDELINES

More information

# Mercyhealth Hospital Project Review for Planning and Zoning Commission

# Mercyhealth Hospital Project Review for Planning and Zoning Commission #2017-38 Mercyhealth Hospital Project Review for Planning and Zoning Commission Meeting Dates: December 6, 2017 and January 3, 2018 Requests: 1. Preliminary Planned Unit Development and 2. Special Use

More information

ABSTRACT INTRODUCTION

ABSTRACT INTRODUCTION ` D2 EXPANSION PROGRAM AT WASHINGTON DULLES INTERNATIONAL AIRPORT BY FELIX C. BARTHOLOMEW ABSTRACT Lessons Learned: An examination of the Program Management policies and procedures that contributed to

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

TRANSPORTATION IMPACT ANALYSIS GUIDELINES FOR ENVIRONMENTAL REVIEW

TRANSPORTATION IMPACT ANALYSIS GUIDELINES FOR ENVIRONMENTAL REVIEW TRANSPORTATION IMPACT ANALYSIS GUIDELINES FOR ENVIRONMENTAL REVIEW October 2002 The Planning Department City and County of San Francisco TABLE OF CONTENTS I. Introduction 1 II. Overview of Process and

More information

California Environmental Quality Act Findings LAX Terminals 2 and 3 Modernization Project 1. Project Description Summary

California Environmental Quality Act Findings LAX Terminals 2 and 3 Modernization Project 1. Project Description Summary California Environmental Quality Act Findings LAX Terminals 2 and 3 Modernization Project 1. Project Description Summary The (LAX) Terminals 2 and 3 (T2/T3) Modernization Project includes the modernization

More information

CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION

CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION 14.1 AFFECTED ENVIRONMENT 14.1.1 Definition of Resource This section describes the existing transportation facilities, specifically roads, the Tinian International,

More information

Pangborn Memorial Airport I One Pangborn Drive I East Wenatchee, WA 98802

Pangborn Memorial Airport I One Pangborn Drive I East Wenatchee, WA 98802 TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Kickoff Meeting #1 DATE: August 22, 2016 On behalf of the Pangborn Memorial Airport, I would like to invite you to serve

More information

A Summary of the Four Options Under Consideration for Colorado State University s Football Stadium

A Summary of the Four Options Under Consideration for Colorado State University s Football Stadium A Summary of the Four Options Under Consideration for Colorado State University s Football Stadium October 2014 Preamble This summary booklet is provided by Colorado State University to enable decision

More information

U.S. Army Corps of Engineers Permit Application Tips

U.S. Army Corps of Engineers Permit Application Tips U.S. Army Corps of Engineers Permit Application Tips MnDOT Environmental Conference Ben Orne and Sarah Wingert, USACE 4-29-2015 US Army Corps of Engineers BUILDING STRONG Outline Introduction to Corps

More information

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally

More information

3.6 GROUND TRANSPORTATION

3.6 GROUND TRANSPORTATION 3.6.1 Environmental Setting 3.6.1.1 Area of Influence The area of influence for ground transportation consists of the streets and intersections that could be affected by automobile or truck traffic to

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

HISTORICAL OVERVIEW OPN ARCHITECTS. Home Office Building of The Bankers Life Building, 1940

HISTORICAL OVERVIEW OPN ARCHITECTS. Home Office Building of The Bankers Life Building, 1940 OPN ARCHITECTS Home Office Building of The Bankers Life Building, 1940 HISTORICAL OVERVIEW Designed as the home office of The Bankers Life Insurance Company by architects Tinsley, McBroom & Higgins in

More information

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA DESIGN REVIEW REPORT DOCKET NO: SUMMAR NO.: : : Paul D. Johnston AT LARGE: A: Chris Roberts B: Elton M. Lagasse ADVERTISING DATES: PAB PUBLIC HEARING:

More information

Design-Build Capital Infrastructure Project

Design-Build Capital Infrastructure Project Design-Build Capital Infrastructure Project US$60 Million Project Duration 2012 Responsible for drainage systems and construction QA-QC oversight and project documentation and as-built review and acceptance.

More information

Freight Movement Element

Freight Movement Element Freight Movement Element Planning for mobility includes more than just moving people it means moving freight and services as well. The Salem Transportation System Plan places a greater emphasis on planning

More information

August 8, 2017 Community Engagement Panel Meeting #3 Alternatives Evaluation Process & Identification of Preferred Alternatives

August 8, 2017 Community Engagement Panel Meeting #3 Alternatives Evaluation Process & Identification of Preferred Alternatives Lake Elmo Airport Environmental Assessment (EA)/ Environmental Assessment (EAW) Worksheet August 8, 2017 Community Engagement Panel Meeting #3 Alternatives Evaluation Process & Identification of Preferred

More information

Appendix B Highway 407 Interchange Review - Cochrane Street Area

Appendix B Highway 407 Interchange Review - Cochrane Street Area Appendix B Highway 407 Interchange Review - Cochrane Street Area AECOM 300 ater Street hitby, ON, Canada L1N 9J2 www.aecom.com Memorandum To Michael May, P.Eng., Town of hitby Page 1 CC Subject Greg Hardy,

More information

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1 TRANSPORTATION IMPACT STUDY (TIS) GUIDELINES FOR DEVELOPMENT APPLICATIONS Transportation and Works Department The Regional Municipality of York 17250 Yonge Street Newmarket, Ontario L3Y 6Z1 August, 2007

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR July 12, 2002 A Paper Submitted for the AREMA Annual Conference by: Paul B. Satterly, P.E. HNTB CORPORATION 111 Monument Circle, Suite 1200 Indianapolis,

More information

SFO Climate Action Plan. March 2014

SFO Climate Action Plan. March 2014 SFO Climate Action Plan March 2014 Executive Summary Expanded Summary I Background... 1 Section 1 - Profile of SFO... 2 Section 2 - SFO's Carbon Footprint... 2 Components of Category 1 SFO Controlled GHG

More information

Santa Clara Valley Transportation Authority Board of Directors. General Manager, Nuria I. Fernandez

Santa Clara Valley Transportation Authority Board of Directors. General Manager, Nuria I. Fernandez 8.1.C Date: Current Meeting: Board Meeting: December 6, 2017 December 7, 2017 December 7, 2017 BOARD MEMORANDUM TO: Santa Clara Valley Transportation Authority Board of Directors THROUGH: General Manager,

More information

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

ONLY ONLY BUILDING AND PARKING ENVELOPE RAMP STAIRS NEW SURFACE PARKING PROPOSED HOTEL PROPOSED TWO STORY PARKING STRUCTURE NEW SURFACE PARKING

ONLY ONLY BUILDING AND PARKING ENVELOPE RAMP STAIRS NEW SURFACE PARKING PROPOSED HOTEL PROPOSED TWO STORY PARKING STRUCTURE NEW SURFACE PARKING LOCATION MAP SITE DEVELOPMENT DATA: --ACREAGE: ± 5. ACRES -- ZONING: MUDD-O -- USES: UP TO TWO () HOTELS WITH UP TO 70 ROOMS (APPROXIMATELY 00 ROOMS IN THE EXISTING HOTEL ON THE SITE, AND UP TO 70 ROOMS

More information

actions and approvals by the Federal Aviation Administration ( FAA) and the Federal

actions and approvals by the Federal Aviation Administration ( FAA) and the Federal METROPOLITAN AIRPORTS COMMISSION In re MSP 2020 Improvements Final Environmental Assessment/Environmental Assessment Worksheet, Adequacy Determination, and Negative Declaration on the Need for an Environmental

More information

Salem MBTA Commuter Rail Station Intermodal Center Project September 1, Meeting Notes

Salem MBTA Commuter Rail Station Intermodal Center Project September 1, Meeting Notes Salem MBTA Commuter Rail Station Intermodal Center Project September 1, 2009 10.2 Meeting Notes M E E T I N G N O T E S PROJECT: Station and Parking Improvements for Salem Commuter Rail Station AECOM PROJ.

More information

Kosovo s PPP Policy, Legal, & Institutional Framework

Kosovo s PPP Policy, Legal, & Institutional Framework MODULI 1 Kosovo s PPP Policy, Legal, & Institutional Framework Case study PIA concesssion 02, November 2016 Arton Ahmeti Central Public-Private Partnership Department Ministry of Finance 2 Overview Investment

More information

Potential Benefits of Operations

Potential Benefits of Operations Destination Green ICAO Symposium on Aviation and Climate Change, Destination Green, 14 16 May 2013 Potential Benefits of Operations John-Paul B. Clarke Associate Professor Daniel Guggenheim School of Aerospace

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

Macau International Airport Environmental Optimization Design Competition Rules and Regulations

Macau International Airport Environmental Optimization Design Competition Rules and Regulations Macau International Airport Environmental Optimization Design Competition Rules and Regulations 1. Competition Objective Macau is a World Center of Tourism and Leisure. As a portal to Macau, Macau International

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION

ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION Dr. Arun Chatterjee Professor Emeritus Dept of Civil & Environmental Engineering The University of Tennessee Knoxville,

More information

TRANSPORTATION PLAN Donald Vary

TRANSPORTATION PLAN Donald Vary LOUISIANA STATEWIDE TRANSPORTATION PLAN Donald Vary March 2, 2016 AGENDA Plan Development Decision-Making Process Outreach Activities Vision and Goals Transportation Needs Financial Analysis (revenue scenarios

More information

VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK

VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE 6604 - RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK UNIT 1 RAILWAY PLANNING 1. Define Permanent way. 2. List out the elements

More information

STAIRWAYS, HANDRAILS, AND GUARDRAILS (RESIDENTIAL)

STAIRWAYS, HANDRAILS, AND GUARDRAILS (RESIDENTIAL) 01/25/08 STAIRWAYS, HANDRAILS, AND GUARDRAILS (RESIDENTIAL) City of Austin International Residential Code: 500 Fourth Avenue NE R314.1 Width. Stairways shall not be less than 36 in clear width at all points

More information

Priority 2 Access to Goods & Services

Priority 2 Access to Goods & Services Based on the 2010 ADA Standards for Accessible Design Project Building Location Date Surveyors Contact Information The layout of the building should allow people with disabilities to obtain goods and services

More information

APPENDIX H. Capital Improvement Program Detail Project Costs NORTH PERRY AIRPORT MASTER PLAN UPDATE APPENDICES

APPENDIX H. Capital Improvement Program Detail Project Costs NORTH PERRY AIRPORT MASTER PLAN UPDATE APPENDICES MASTER PLAN UPDATE APPENDICES APPENDIX H Capital Improvement Program Detail Project Costs Montgomery Consulting Group August 11, 2009 Appendix H CAPITAL IMPROVEMENT PROGRAM Short Term (0-5 years) SUB-

More information

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY THE COMMONWEALTH OF MASSACHUSETTS Number: P-92-010 Date: 10-08-92 - ) HIGHWAY DEPARTMENT FROM: NON-NHS BRIDGE R&R POLICY The purpose of this Engineering Directive is to formally notify Department Personnel

More information

Smart Airport of The Future. Planning for Innovation at Airports

Smart Airport of The Future. Planning for Innovation at Airports Smart Airport of The Future Planning for Innovation at Airports Topics to be covered Single Token SITA Smart Path Day of Travel Airport App Day of Operations Airport Pulse 2 3 SITA Smart Path SINGLE TOKEN

More information

Bijwasan: A World Class Station

Bijwasan: A World Class Station Bijwasan: A World Class Station Presentation to Governing Body, UTTIPEC 19 th December, 2014 INDEX 1. AIMS & OBJECTIVE OF THE PROJECT 2. EXISTING CONDITIONS 3. MASTER PLAN - GENERAL LAYOUT 4. TRAFFIC STUDY

More information

STANDARD OPERATING PROCEDURE NO. 3 Revision No. 1 WICHITA DWIGHT D. EISENHOWER NATIONAL AIRPORT

STANDARD OPERATING PROCEDURE NO. 3 Revision No. 1 WICHITA DWIGHT D. EISENHOWER NATIONAL AIRPORT STANDARD OPERATING PROCEDURE NO. 3 Revision No. 1 WICHITA DWIGHT D. EISENHOWER NATIONAL AIRPORT Operating and Maintenance Responsibilities and Procedures for Parking Garage, Surface Parking Lots and Supporting

More information