Master Plan Study Public Workshop #3. June 1-2, 2016

Size: px
Start display at page:

Download "Master Plan Study Public Workshop #3. June 1-2, 2016"

Transcription

1 Master Plan Study Public Workshop #3 June 1-2, 2016

2 Agenda Master Plan Status Alternatives Process Development Screening Vision2040 Next Steps Alternatives (Boards)

3 Master Plan Study Progress COMPLETED IN PROGRESS UPCOMING Inventory Aviation Forecast Demand/ Capacity and Facility Requirements Alternatives Development Implementation and Documentation JUNE 2016

4 Schedule Summer 2015 Fall 2015 Winter Spring 2016 Summer 2016 Fall 2016 Winter Vision2040 is following the defined 18-month schedule.

5 Alternatives Definition Process Alternatives represent future concepts of airport growth not a rigid development plan Meet defined aeronautical needs Comply with FAA criteria Consider operational safety and efficiency Recognize hierarchy among facilities AIRFIELD FACILITIES TERMINAL LANDSIDE FACILITIES GENERAL AVIATION CARGO FACILITIES SUPPORT FACILITIES

6 Alternatives Development Airfield challenges (Runways, taxiways, aprons) Evolving aircraft fleet / fleet diversity Runway length needs (international / long haul) Runway 5L-23R reconstruction Runway capacity: incremental and long range

7 Alternatives Development Terminal challenges (Terminal 1, Terminal 2, aircra/ gates, interna3onal facili3es) Available apron depth Increasing gate demand Increasing international activity / FIS location Changing aircraft fleet (long term) Long range growth potential Phased implementation

8 Alternatives Development Landside challenges (Roadways, terminal curbsides, parking, rental car) Maximize utilization Parking Curbside Roadway Mixed curbsides (single level and dual level) Significant parking demand Passenger convenience Connectivity

9 Alternatives Screening Screen Components 10 Runway Alternatives 24 Terminal Alternatives Integrate components 21 Landside Alternatives 9+ Support Facilities Alternatives Hybridize and refine Mitigate Deficiencies 9 Composite Alternatives

10 Master Plan Goals Encompass improvements that will ensure the Airport s safety, efficiency, and capability to serve the community s aviation needs. Optimize infrastructure and resources in an operationally, financially and environmentally sustainable manner. Enhance the passenger and customer experience through long range development actions. Define development plans that are scalable to respond to variations in demand over the planning horizon. Preserve flexibility to adapt to emerging and future technologies. Accommodate connectivity to various modes of transportation as components of Airport development plans.

11 Initial Screening Identify alternatives not viable for further evaluation Representative screening criteria Ability to meet future demand Implementa3on complexity and scalability Opera3onal efficiency Order of magnitude costs Level of service impacts/benefits Flexibility (technology, schedule, demand, other) Impacts to natural/undisturbed areas Impacts to/integra3on with exis3ng facili3es Connec3vity Criteria will evolve during the evaluation process.

12 Vision2040 Next Steps Alternatives evaluation: 9 shortlisted to 4 Shortlist may be hybrids of 9 composite alternatives Select and refine Preferred Alternative Incorporate GA, cargo, and support facilities Integrate land use/development planning concepts Land Use Planning Public Workshop June 28 Public Workshop #4 present preferred alternative Implementation planning and financial analysis Shortlist of 4 alternatives to be identified late-june

13 Workshop Next Steps Review 9 composite alternatives Boards Handouts Authority and Vision2040 team representatives Ask questions / provide feedback and input Participate in future workshops

14 Public Involvement Your comments are critical to Vision2040 s success. Join us online or through social media for information on our master plan study and to provide your comments.

15 Review of Alternatives (Boards)

Airport Development Plan Update

Airport Development Plan Update Airport Development Plan Update Prepared by: SAN DIEGO COUNTY REGIONAL AIRPORT AUTHORITY SDIA Planning Timeline 2 Where Is SDIA Today? The Airport is implementing the recommendations from the 2008 master

More information

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES 6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES The projected activity levels at Sacramento International Airport as described in Chapter 3 are the basis for determining the terminal facilities that will be

More information

Appendix H Support Facilities Preliminary and Intermediate Alternatives Analysis

Appendix H Support Facilities Preliminary and Intermediate Alternatives Analysis Appendix H SUPPORT FACILITIES PRELIMINARY AND INTERMEDIATE ALTERNATIVES ANALYSIS H TABLE OF CONTENTS EXHIBITS TABLES H.1 Evaluation Criteria... 1 H.1.1 Meeting the Base Constrained Demand Level... 1 H.1.2

More information

City of Kansas City AIRPORT COMMITTEE BRIEFING. New Terminal Evaluation for Kansas City International Airport. March 15, 2016

City of Kansas City AIRPORT COMMITTEE BRIEFING. New Terminal Evaluation for Kansas City International Airport. March 15, 2016 City of Kansas City AIRPORT COMMITTEE BRIEFING New Terminal Evaluation for Kansas City International Airport March 15, 2016 1 Agenda Process Overview Establishing Requirements & Identifying Issues Forecast

More information

Pangborn Memorial Airport I One Pangborn Drive I East Wenatchee, WA 98802

Pangborn Memorial Airport I One Pangborn Drive I East Wenatchee, WA 98802 TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Kickoff Meeting #1 DATE: August 22, 2016 On behalf of the Pangborn Memorial Airport, I would like to invite you to serve

More information

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS FINAL ENVIRONMENTAL IMPACT REPORT SDCRAA # EIR-06-01 State Clearinghouse No. 2005091105 CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS Lead Agency: SAN DIEGO COUNTY REGIONAL AIRPORT AUTHORITY

More information

Dallas/Fort Worth International Airport ASCE Presentation. Terminal Development Program. November, 2009

Dallas/Fort Worth International Airport ASCE Presentation. Terminal Development Program. November, 2009 Dallas/Fort Worth International Airport ASCE Presentation Terminal Development Program November, 2009 ASCE PRESENTATION, NOVEMBER 2009 Background Objective The objective of today s presentation 1. Review

More information

Airport Master Plan Update (AMPU) Phase 2. Scope of Work

Airport Master Plan Update (AMPU) Phase 2. Scope of Work BST AMPU Phase 2 Scope of Work Page 1 of 19 Belfast Municipal Airport Belfast, Maine Airport Master Plan Update (AMPU) Phase 2 Scope of Work The intent of this project is to update the 1999 Belfast Municipal

More information

Airports Council International North America Air Cargo Conference Atlanta March 29, Alternative Land Use: The Airport Logistics Park

Airports Council International North America Air Cargo Conference Atlanta March 29, Alternative Land Use: The Airport Logistics Park Airports Council International North America Air Cargo Conference Atlanta March 29, 2007 Alternative Land Use: The Airport Logistics Park The Airport Logistics Park A 21 st Century Logistics Solution The

More information

Aviation Capital Construction Program Update

Aviation Capital Construction Program Update Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance

More information

Airport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions

Airport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions Airport Construction Project Risk Management Presented by: Mindy Price- Direct Effect Solutions Topics ACRP 01-22 Research Background Research Findings and Conclusions Project Risk Management Recommendations

More information

Building an Enterprise GIS for SFO Then and Now

Building an Enterprise GIS for SFO Then and Now Building an Enterprise GIS for SFO Then and Now Introduction Overhead View Humble Beginnings Organization Overhaul Technical Transformation Stakeholder Engagement Enterprise Implementation Next Destination

More information

Goals and Standards The ICAO Perspective

Goals and Standards The ICAO Perspective Goals and Standards The ICAO Perspective Environment Section Air Transport Bureau International Civil Aviation Organization 2 October 2009 Agenda ICAO Objective and Goals for Environment Quantification

More information

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements JUNE 2016 RONALD REAGAN WASHINGTON NATIONAL AIRPORT Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements PREPARED BY: Ricondo & Associates, Inc. IN

More information

CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION

CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION 14.1 AFFECTED ENVIRONMENT 14.1.1 Definition of Resource This section describes the existing transportation facilities, specifically roads, the Tinian International,

More information

EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT

EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT EXECUTIVE SUMMARY ES.1 BACKGROUND The purpose of this Draft Environmental Report (DEIR) is the implementation of improvement projects at Charles M. Schulz Sonoma County Airport (the Airport). The improvement

More information

Planned Procurement Opportunities Report. November 2017

Planned Procurement Opportunities Report. November 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Airport of the Future. Air Cargo Conference June 2017

Airport of the Future. Air Cargo Conference June 2017 Airport of the Future Air Cargo Conference June 2017 How CVG landed its biggest deal in history. The deal at $1.49 billion is the largest ever one-time capital investment by a company in Northern Kentucky,

More information

SFO Climate Action Plan. March 2014

SFO Climate Action Plan. March 2014 SFO Climate Action Plan March 2014 Executive Summary Expanded Summary I Background... 1 Section 1 - Profile of SFO... 2 Section 2 - SFO's Carbon Footprint... 2 Components of Category 1 SFO Controlled GHG

More information

Parking Control System for Automated Gate Management

Parking Control System for Automated Gate Management Leading you safely to the gate Parking Control System for Automated Gate Management Honeywell Airports Business Increases in passenger traffic require higher gate efficiency and optimized throughput -

More information

Implementing An effective Airport Pavement Management System

Implementing An effective Airport Pavement Management System Implementing An effective Airport Pavement Management System Hazim M Abdulwahid 13 th, MSC, MBA International O&M Conference in the Arab Countries,17-19 Nov 2015 1 Content What is Pavement Engineering

More information

Updates on FAA Order F. Agenda. Communicate FAA Order Updates. Educate attendees on the changes to FAA Order

Updates on FAA Order F. Agenda. Communicate FAA Order Updates. Educate attendees on the changes to FAA Order Updates on FAA Order 1050.1F Rhonda Solomon March 3, 2015 Airports Conference 2015 Agenda Communicate FAA Order 1050.1 Updates Educate attendees on the changes to FAA Order 1050.1 1 1 Overview of NEPA

More information

A Best Practice for the Implementation of a Pavement Management System For Small and Medium Airports

A Best Practice for the Implementation of a Pavement Management System For Small and Medium Airports A Best Practice for the Implementation of a Pavement Management System For Small and Medium Airports Architectural & Engineering Services Civil Engineering Directorate Airport Engineering ATR-045 Real

More information

MIA Cargo Facilities and Needs Workshop June 29 th, 2011

MIA Cargo Facilities and Needs Workshop June 29 th, 2011 MIA Cargo Facilities and Needs Workshop June 29 th, 2011 SMP Overview 1. Prior Studies 2. Current MIA Capital Improvement Program (CIP) 3. SMP Goals and Objectives 4. SMP Study Approach 2 SMP Background

More information

NASA Aeronautics Airspace Operations and Safety Program

NASA Aeronautics Airspace Operations and Safety Program NASA Aeronautics Airspace Operations and Safety Program Discussion with the ARTR John A. Cavolowsky Director, AOSP Akbar Sultan Deputy Director, AOSP September 26, 2014 1 of 44 Ability to Manage Increasing

More information

BNA Master Plan Update

BNA Master Plan Update BNA Master Plan Update Community Advisory Committee Meeting No. 6 January 31, 2013 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America, Inc. Gresham, Smith and Partners

More information

CHAPTER 4 IDENTIFICATION AND EVALUATION OF ALTERNATIVES

CHAPTER 4 IDENTIFICATION AND EVALUATION OF ALTERNATIVES CHAPTER 4 IDENTIFICATION AND EVALUATION OF ALTERNATIVES Chapter 4, Identification and Evaluation of Alternatives presents the various alternatives considered to address the facility requirements presented

More information

Athens International Airport

Athens International Airport Athens International Airport Developing Airport Business: the key role of pavements in airfield investments BCRRA 2017, International Conference in Athens Dimitrios J. DIMITRIOU Professor Asst, DUTh BoD

More information

Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012

Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012 Hong Kong International Airport Medium & Long Term Development Plans The British Chamber of Commerce 18 July 2012 Connecting HK with the World More than 100 airlines serving 160 destinations worldwide

More information

Collaborative Decision Making in Aviation

Collaborative Decision Making in Aviation the way we do it Collaborative Decision Making in Aviation In an uncertain world there is reasonable certainty in stating that air travel will increase in the future. How airlines and airports will work

More information

DEVELOPMENT OF A MASTER PLAN FOR

DEVELOPMENT OF A MASTER PLAN FOR DEVELOPMENT OF A MASTER PLAN FOR AIRPORTS WITH VISSIM SUPPORT VISSIM USER S GROUP MEETING May 1 st 2009 Portland, Or Luis E. Maumejean Multiservicios Integrales de America S.A. de C.V. lmn@mia.com.mx OUR

More information

Aviation Lighting Fall Conference Tucson, Arizona October 22, 2013

Aviation Lighting Fall Conference Tucson, Arizona October 22, 2013 Aviation Lighting Fall Conference Tucson, Arizona October 22, 2013 Richard Larivée, ing. P.Eng. Chair RP-37 IESNA RP-37 - Update Recommended Practice for Outdoor Lighting for the Airport Environment IESALC

More information

The Port of Seattle. The Airport

The Port of Seattle. The Airport The Port of Seattle The Port of Seattle plays a key role in bringing international trade and travel to the Pacific Northwest. The Port provides maritime and airport operations for the greater Seattle area.

More information

Draft Environmental Assessment for Phoenix Sky Harbor International Airport Sky Train Stage 2

Draft Environmental Assessment for Phoenix Sky Harbor International Airport Sky Train Stage 2 Draft Environmental Assessment for Phoenix Sky Harbor International Airport Sky Train Stage 2 Prepared for: City of Phoenix Aviation Department and U.S. Department of Transportation Federal Aviation Administration

More information

Airport Ground Access Planning Reading the Crystal Ball

Airport Ground Access Planning Reading the Crystal Ball ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Airport Ground Access Planning Reading the Crystal Ball Gavin Duncan Associate Director LeighFisher gavin.duncan@leighfisher.com Why Should We Care? Ground access

More information

Chapter 5.0 Alternatives Analysis

Chapter 5.0 Alternatives Analysis Chapter 5.0 Alternatives Analysis The Master Plan process thus far has accumulated the baseline of existing airport data, presented the outlook for the future in terms of operational activity, and defined

More information

Planned Procurement Opportunities Report. December 2017

Planned Procurement Opportunities Report. December 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Runway Protection Zones: Incompatible Land Use Alternatives Analysis & Risk Assessment

Runway Protection Zones: Incompatible Land Use Alternatives Analysis & Risk Assessment March 3rd, 2015 Runway Protection Zones: Incompatible Land Use Alternatives Analysis & Risk Assessment Matt Lee Vice President Landrum & Brown Cincinnati, OH Cody Meyer Consultant Landrum & Brown Cincinnati,

More information

Port Everglades Master/Vision Plan Update Stakeholder Meeting. January 28, 2010

Port Everglades Master/Vision Plan Update Stakeholder Meeting. January 28, 2010 Port Everglades Master/Vision Plan Update Stakeholder Meeting January 28, 2010 1 2 Agenda Updated Market Assessments determine. Master Plan Facility/Infrastructure Needs requiring. Berth Expansion into.

More information

What s New in Airport Curbside Management?

What s New in Airport Curbside Management? PRESENTATION What s New in Airport Curbside Management? Prepared for ACI-NA Operations and Technical Affairs Conference April 6, 2011 Agenda Outline Commercial Vehicles Current technologies Emerging technologies

More information

Massachusetts Port Authority April 4, :00pm MEPA Scoping Meeting. Multi-Purpose Room 10 Mudge Way Bedford, MA 01730

Massachusetts Port Authority April 4, :00pm MEPA Scoping Meeting. Multi-Purpose Room 10 Mudge Way Bedford, MA 01730 2012 L.G. Hanscom Field Environmental Status and Planning Report (ESPR) Scope Massachusetts Port Authority April 4, 2012 6:00pm MEPA Scoping Meeting Bedford Town Hall Multi-Purpose Room 10 Mudge Way Bedford,

More information

Smart Airport of The Future. Planning for Innovation at Airports

Smart Airport of The Future. Planning for Innovation at Airports Smart Airport of The Future Planning for Innovation at Airports Topics to be covered Single Token SITA Smart Path Day of Travel Airport App Day of Operations Airport Pulse 2 3 SITA Smart Path SINGLE TOKEN

More information

PART K SECTION 2 TRAINING STRATEGY

PART K SECTION 2 TRAINING STRATEGY K-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 January 2011 PART K SECTION 2 TRAINING STRATEGY 1. for Ground Handling s 1.1 The aircraft ground handling are primarily responsible for the training

More information

Phoenix Sky Harbor People Mover. ❸ Financial Considerations

Phoenix Sky Harbor People Mover. ❸ Financial Considerations Phoenix Sky Harbor People Mover ❸ Financial Considerations Phoenix Sky Harbor People Mover ❸ Financial Considerations Key Elements: A people mover that accesses the terminals and parking structures at

More information

actions and approvals by the Federal Aviation Administration ( FAA) and the Federal

actions and approvals by the Federal Aviation Administration ( FAA) and the Federal METROPOLITAN AIRPORTS COMMISSION In re MSP 2020 Improvements Final Environmental Assessment/Environmental Assessment Worksheet, Adequacy Determination, and Negative Declaration on the Need for an Environmental

More information

ISE480 Sequencing and Scheduling

ISE480 Sequencing and Scheduling ISE480 Sequencing and Scheduling INTRODUCTION ISE480 Sequencing and Scheduling 2012 2013 Spring term What is Scheduling About? Planning (deciding what to do) and scheduling (setting an order and time for

More information

Planned Procurement Opportunities Report. May 2017

Planned Procurement Opportunities Report. May 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Airport Asset Management

Airport Asset Management Airport Investment Assessment Page Airport Asset Management M2P PRODUCT OFFERING GmbH Bockenheimer Landstrasse 94-96 60323 Frankfurt am Main Germany Airport Asset Management M2P Product Offering First

More information

Contents. Airport Director s Message. Report Summary

Contents. Airport Director s Message. Report Summary Contents Airport Director s Message Report Summary i Background... 1 Section 1. Profile of SFO... 2 Section 2. SFO's Carbon Footprint... 2 Components of Category 1 SFO Controlled GHG Emissions.... 3 Category

More information

Airport Master Plan Update June 14, 2017

Airport Master Plan Update June 14, 2017 Airport Master Plan Update June 14, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Potential Benefits of Operations

Potential Benefits of Operations Destination Green ICAO Symposium on Aviation and Climate Change, Destination Green, 14 16 May 2013 Potential Benefits of Operations John-Paul B. Clarke Associate Professor Daniel Guggenheim School of Aerospace

More information

Los Angeles International Airport (LAX) Terminals 2 and 3 Modernization Project

Los Angeles International Airport (LAX) Terminals 2 and 3 Modernization Project and Los Angeles International Airport (LAX) Terminals 2 and 3 Modernization Project Prepared By: One World Way, Room 218 Los Angeles, CA 90045 with assistance from: CDM Smith 111 Academy Way, Suite 150

More information

TRANSPORTATION PLAN Donald Vary

TRANSPORTATION PLAN Donald Vary LOUISIANA STATEWIDE TRANSPORTATION PLAN Donald Vary March 2, 2016 AGENDA Plan Development Decision-Making Process Outreach Activities Vision and Goals Transportation Needs Financial Analysis (revenue scenarios

More information

Framework for Developing Feasibility Assessments JULY 2017

Framework for Developing Feasibility Assessments JULY 2017 2017 Framework for Developing Feasibility Assessments JULY 2017 July 2017 Framework for Clean Air Action Plan Feasibility Assessments A series of regular feasibility assessments have been established by

More information

da WESTERN SYDNEY AIRPORT INDUSTRY INFORMATION SESSION 5 December 2017

da WESTERN SYDNEY AIRPORT INDUSTRY INFORMATION SESSION 5 December 2017 da WESTERN SYDNEY AIRPORT INDUSTRY INFORMATION SESSION 5 December 2017 Graham Millett Executive General Manager Airport Infrastructure 2 Session agenda 1. Welcome and Acknowledgement of Country 2. Probity

More information

Planned Procurement Opportunities Report. February 2018

Planned Procurement Opportunities Report. February 2018 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Justification MVY. Chapter 3 Project Development &

Justification MVY. Chapter 3 Project Development & MVY Martha s Vineyard Airport Chapter 3 Project Development & Justification The purpose and need for each component of the MVY improvement program are presented below with additional development and details

More information

Pavement Condition Report

Pavement Condition Report Pavement Condition Report Marshall Southwest Minnesota Regional Airport (MML) Prepared for: Office of Aeronautics Minnesota Department of Transportation 222 East Plato Boulevard Saint Paul, MN 55107 (800)

More information

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD September 18, 2013 District Department of Transportation Federal Railroad Administration AGENDA Vision History & Background Study Area Purpose & Need

More information

Boston Overflight Noise Study. Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES

Boston Overflight Noise Study. Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES March 8, 2004 Project Consultant Phase 1 Scope of Services 3/8/2004 TABLE OF CONTENTS INTRODUCTION... 2 1 STUDY DESIGN... 3 2 PROJECT MANAGEMENT... 4 2.1 Project

More information

Rail Service at Brookley Aeroplex

Rail Service at Brookley Aeroplex WHAT The Mobile Airport Authority, hopes to attain improved rail infrastructure to advance economic performance and job growth. I. Background The Mobile Airport Authority s goal for Brookley Aeroplex is

More information

Airport of the Future

Airport of the Future Airport of the Future - Airport Planning, Design and Operation - Minor code: Minor name: Minor administration by the faculty of: Minor is jointly organized by the faculties of: Minor coordinator: Deputy

More information

Chapter 4: Transportation and Land Use

Chapter 4: Transportation and Land Use Chapter 4: Transportation and Land Use Transportation and land use together make possible the wide range of destination opportunities in the region. Transportation provides the connections, and, in turn,

More information

SLC Terminal Redevelopment Program. Salt Lake City International Airport

SLC Terminal Redevelopment Program. Salt Lake City International Airport SLC Terminal Redevelopment Program Salt Lake City International Airport Terminal Redevelopment Program Goals and Expectations Address Seismic Risk Provide Right-Sized Facilities Solve Operational Problems

More information

Transport Domain Plan. Draft list of Enduring Questions

Transport Domain Plan. Draft list of Enduring Questions Transport Domain Plan Draft list of Engagement Draft v1.0 August 2014 Introduction The Transport Domain Plan is jointly led by Statistics NZ and the Ministry of Transport. It is a project that will identify

More information

Under New Management. groundops. Apron Risk Management

Under New Management. groundops. Apron Risk Management Airlines today want shorter turnaround times at airports and zero ground accidents aiming for ever more efficient ground-handling operations without compromising safety. Yet time pressures and associated

More information

Airport Collaborative Decision Making Enhancing Airport Efficiency

Airport Collaborative Decision Making Enhancing Airport Efficiency Airport Collaborative Decision Making Enhancing Airport Efficiency David Gamper Director, Safety & Technical ACI World SWIFT Conference, Banff 18 September 2012 1 Airports are facing challenges Capacity

More information

ABSTRACT INTRODUCTION

ABSTRACT INTRODUCTION ` D2 EXPANSION PROGRAM AT WASHINGTON DULLES INTERNATIONAL AIRPORT BY FELIX C. BARTHOLOMEW ABSTRACT Lessons Learned: An examination of the Program Management policies and procedures that contributed to

More information

A-CDM: Integrated working Stefan Beitelsmann, Head of Aviation and Central Infrastructure Management, Düsseldorf Airport

A-CDM: Integrated working Stefan Beitelsmann, Head of Aviation and Central Infrastructure Management, Düsseldorf Airport www.internationalairportreview.com Issue 1 2014 IAR proud to support: A-CDM: Integrated working Stefan Beitelsmann, Head of Aviation and Central Infrastructure Management, Düsseldorf Airport Winter operations

More information

YOUR PARTNER IN AIRPORT OPERATION AND DEVELOPMENT

YOUR PARTNER IN AIRPORT OPERATION AND DEVELOPMENT YOUR PARTNER IN AIRPORT OPERATION AND Egis Airport Operation, a partner of choice for development and operation of airports, all over the world. Egis Airport Operation is a subsidiary of the Egis Group

More information

Kosovo s PPP Policy, Legal, & Institutional Framework

Kosovo s PPP Policy, Legal, & Institutional Framework MODULI 1 Kosovo s PPP Policy, Legal, & Institutional Framework Case study PIA concesssion 02, November 2016 Arton Ahmeti Central Public-Private Partnership Department Ministry of Finance 2 Overview Investment

More information

Visual Guidance. Research and Development. By: Holly Cyrus, Project Manager Date: August 23, Federal Aviation Administration

Visual Guidance. Research and Development. By: Holly Cyrus, Project Manager Date: August 23, Federal Aviation Administration Visual Guidance Research and Development By: Holly Cyrus, Project Manager Date: August 23, 2010 Signs Markings Lighting Ground Surveillance Mission Improve Visual Aids on Airports to reduce runway Incursions

More information

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Discourage future development of rural residential patterns

More information

Planned Procurement Opportunities Report. April 2018

Planned Procurement Opportunities Report. April 2018 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

PROJECT PLANNING & LIFE CYCLE ASSESSMENT OF AVIATION AND HIGH-SPEED RAIL

PROJECT PLANNING & LIFE CYCLE ASSESSMENT OF AVIATION AND HIGH-SPEED RAIL PROJECT PLANNING & LIFE CYCLE ASSESSMENT OF AVIATION AND HIGH-SPEED RAIL ESD.00 Recitation 7 Professor Joseph Sussman Regina Clewlow TODAY S AGENDA Life Cycle Assessment of Aviation & HSR Review basic

More information

NextGen ATM Concept of Operations: ASAS-Reliant

NextGen ATM Concept of Operations: ASAS-Reliant NextGen ATM Concept of Operations: ASAS-Reliant See http://www.jpdo.gov for the latest JPDO info Doug Arbuckle, Rose Ashford NextGen Joint Planning & Development Office 18-Sep-2007 Joint 5th ASAS TN2 Workshop

More information

International Airport Expansion Project. Terms of Reference for Legal Advisor

International Airport Expansion Project. Terms of Reference for Legal Advisor A. Background International Airport Expansion Project Terms of Reference for Legal Advisor 1. [ ] International Airport (IA) is a medium size airport with a total passenger per year volume of [ ]. IA has

More information

2016 Environmental Benchmarking Survey

2016 Environmental Benchmarking Survey 2016 Environmental Benchmarking Survey General Environmental Questions 1. Contact information: * Airport 3 letter identifier Organization full name First name of survey respondent Last name Title Email

More information

Regional Transportation Studies Regional Council

Regional Transportation Studies Regional Council Pima Association of Governments 1 E. Broadway, Tucson, Arizona Santa Rita Conference Room Regional Transportation Studies Regional Council September 28, 2017 I-11 Tier 1 Environmental Impact Statement

More information

AIRPORT SERVICES. the airport sector. Our people are experts at understanding and

AIRPORT SERVICES. the airport sector. Our people are experts at understanding and airport services AIRPORT SERVICES Our SP+ Airport Services operating division focuses exclusively on the airport sector. Our people are experts at understanding and addressing the unique demands of an

More information

Chapter 7 ENVIRONMENTAL OVERVIEW

Chapter 7 ENVIRONMENTAL OVERVIEW Chapter 7 ENVIRONMENTAL OVERVIEW 7.1 INTRODUCTION This Environmental Overview conceptually evaluates the potential environmental impacts associated with each of the projects recommended in the Master Plan

More information

Columbia Regional Airport (COU) Columbia, Missouri. Draft Environmental Assessment Airside, Landside, and Surface Transportation Developments

Columbia Regional Airport (COU) Columbia, Missouri. Draft Environmental Assessment Airside, Landside, and Surface Transportation Developments (COU) Columbia, Missouri Draft Environmental Assessment Airside, Landside, and Surface Transportation Developments RS&H No. 226-1077-000 Prepared for the: City of Columbia and U.S. Department of Transportation

More information

Chapter 4 Future Demand Forecasts

Chapter 4 Future Demand Forecasts Chapter 4 Future Demand Forecasts This chapter summarizes the work done under Task 4 to build the Action Plan, which is further described in Tech Memos 4a (Freight Demand) and 4b (System Performance Report).

More information

ENTERPRISE CAPITAL BROWARD COUNTY CAPITAL BUDGET

ENTERPRISE CAPITAL BROWARD COUNTY CAPITAL BUDGET ENTERPRISE CAPITAL This section includes the capital program for four enterprise funds - Aviation, Port Everglades, Water and Wastewater, and Waste and Recycling. The Aviation capital program is supported

More information

AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAWAN SAFDARJUNG AIRPORT NEW DELHI

AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAWAN SAFDARJUNG AIRPORT NEW DELHI AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAWAN SAFDARJUNG AIRPORT NEW DELHI 110003 Advt. No.: 4/2015 NAME OF THE POSITION Post Name of the Position on purely code contractual basis 01 Deputy Head Commercial&

More information

Caltrain Business Plan Draft Business Strategy and Scope. Board of Directors December 7, 2017 Agenda Item 9

Caltrain Business Plan Draft Business Strategy and Scope. Board of Directors December 7, 2017 Agenda Item 9 Caltrain Business Plan Draft Business Strategy and Scope Board of Directors December 7, 2017 Agenda Item 9 Overview Background and Process Draft Business Strategy Draft Phase 2 Scope - Technical Tasks

More information

Mitigation Monitoring and Reporting Program for Final Environmental Impact Report No. 617 John Wayne Airport Settlement Agreement Amendment

Mitigation Monitoring and Reporting Program for Final Environmental Impact Report No. 617 John Wayne Airport Settlement Agreement Amendment Mitigation Monitoring and Reporting Program for Final Environmental Impact Report No. 617 John Wayne Airport Settlement Agreement Amendment SCH No. 2001111135 COUNTY OF ORANGE John Wayne Airport 3160 Airway

More information

ARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN

ARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN p EXECUTIVE SUMMARY Report Prepared by: ARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN The Arlington County Transit Development Plan (TDP) is an effort to evaluate and assess the performance, connectivity,

More information

Robert Pryor TSA/ACC Security Capabilities Workshop July 20, 2017

Robert Pryor TSA/ACC Security Capabilities Workshop July 20, 2017 Intermodal Robert Pryor TSA/ACC Security Capabilities Workshop July 20, 2017 Agenda Items Discussed in the Briefing: Surface Overview 4 Surface Capability Gaps by Mode 5 Air Cargo EDS Modernization Overview

More information

easyjet s experience of our first safety culture survey Future Sky Safety Public Workshop, 2017 Siân Blanchard and David Cross

easyjet s experience of our first safety culture survey Future Sky Safety Public Workshop, 2017 Siân Blanchard and David Cross easyjet s experience of our first safety culture survey Future Sky Safety Public Workshop, 2017 Siân Blanchard and David Cross something about us > What we do: We are a low-cost European point-topoint

More information

TORONTO PEARSON INTERNATIONAL AIRPORT ENVIRONMENTAL MANAGEMENT

TORONTO PEARSON INTERNATIONAL AIRPORT ENVIRONMENTAL MANAGEMENT TORONTO PEARSON INTERNATIONAL AIRPORT ENVIRONMENTAL MANAGEMENT Committed to green operations The GTAA has made environmental management a cornerstone of our approach to the development and operation of

More information

The Employer s Requirements in EPC contracts: What is the proper level of definition? Experience from projects in the airport sector

The Employer s Requirements in EPC contracts: What is the proper level of definition? Experience from projects in the airport sector The Employer s Requirements in EPC contracts: What is the proper level of definition? Experience from projects in the airport sector Didier GUYNET ADP Ingénierie Contract Manager FIDIC accredited trainer

More information

Oklahoma Long Range Transportation Plan

Oklahoma Long Range Transportation Plan Oklahoma 2015-2040 Long Range Transportation Plan Oklahoma Metropolitan Planning Organization Meetings Tulsa and Oklahoma City Transportation Management Areas July 2014 Agenda Public Input- Structure and

More information

Dock and Yard Management e.g. for Air Cargo Terminals. Siemens AG 2012

Dock and Yard Management e.g. for Air Cargo Terminals. Siemens AG 2012 Dock and Yard Management e.g. for Air Cargo Terminals 1 Introduction/Table of Contents Dock & Yard Management (DYM) a software solution for systematic planning and controlling of transport processes within

More information

VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK

VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE 6604 - RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK UNIT 1 RAILWAY PLANNING 1. Define Permanent way. 2. List out the elements

More information

Topic areas for the PEGASAS COE Summer Experience for 2018

Topic areas for the PEGASAS COE Summer Experience for 2018 Topic areas for the PEGASAS COE Summer Experience for 2018 1) Terminal Area Safety, Software and Systems Branch Overview: Seeking an engineer or mathematician to assist with research for the Terminal Area

More information

Austin Straubel International Airport Development Committee Study & Findings Report. Background and Introduction:

Austin Straubel International Airport Development Committee Study & Findings Report. Background and Introduction: Austin Straubel International Airport Development Committee Study & Findings Report Background and Introduction: The Austin Straubel International Airport Development Committee is one of four economic

More information

Noise Compatibility Program Update

Noise Compatibility Program Update Table of Contents 1.0 Introduction Pg. 1 2.0 Purpose and Need Pg. 1 3.0 Airport Environs Pg. 1 4.0 Land Use Compatibility Pg. 1 5.0 Study Methodology Pg. 2 6.0 2008 Existing Baseline Pg. 2 Noise Exposure

More information

o&i consulting: at a glance

o&i consulting: at a glance s u p p l i e r o f a i r p o r t a r r i v a l & d e p a r t u r e o p e r a t i o n a l p l a n n i n g s e r v i c e s t o t h e L o n d o n 2 0 1 2 G a m e s aviation. logistics. services. o&i consulting:

More information

Recreation System Group Meeting #5. July 23, 2014

Recreation System Group Meeting #5. July 23, 2014 Recreation System Group Meeting #5 July 23, 2014 Meeting #5 Outcomes 1. Member Poll on Metrics 2. Preview of design charrette process 3. Feedback on design features Meeting #5 Agenda 1. Message from Executive

More information