Master Plan Study Public Workshop #3. June 1-2, 2016
|
|
- Lenard Wheeler
- 6 years ago
- Views:
Transcription
1 Master Plan Study Public Workshop #3 June 1-2, 2016
2 Agenda Master Plan Status Alternatives Process Development Screening Vision2040 Next Steps Alternatives (Boards)
3 Master Plan Study Progress COMPLETED IN PROGRESS UPCOMING Inventory Aviation Forecast Demand/ Capacity and Facility Requirements Alternatives Development Implementation and Documentation JUNE 2016
4 Schedule Summer 2015 Fall 2015 Winter Spring 2016 Summer 2016 Fall 2016 Winter Vision2040 is following the defined 18-month schedule.
5 Alternatives Definition Process Alternatives represent future concepts of airport growth not a rigid development plan Meet defined aeronautical needs Comply with FAA criteria Consider operational safety and efficiency Recognize hierarchy among facilities AIRFIELD FACILITIES TERMINAL LANDSIDE FACILITIES GENERAL AVIATION CARGO FACILITIES SUPPORT FACILITIES
6 Alternatives Development Airfield challenges (Runways, taxiways, aprons) Evolving aircraft fleet / fleet diversity Runway length needs (international / long haul) Runway 5L-23R reconstruction Runway capacity: incremental and long range
7 Alternatives Development Terminal challenges (Terminal 1, Terminal 2, aircra/ gates, interna3onal facili3es) Available apron depth Increasing gate demand Increasing international activity / FIS location Changing aircraft fleet (long term) Long range growth potential Phased implementation
8 Alternatives Development Landside challenges (Roadways, terminal curbsides, parking, rental car) Maximize utilization Parking Curbside Roadway Mixed curbsides (single level and dual level) Significant parking demand Passenger convenience Connectivity
9 Alternatives Screening Screen Components 10 Runway Alternatives 24 Terminal Alternatives Integrate components 21 Landside Alternatives 9+ Support Facilities Alternatives Hybridize and refine Mitigate Deficiencies 9 Composite Alternatives
10 Master Plan Goals Encompass improvements that will ensure the Airport s safety, efficiency, and capability to serve the community s aviation needs. Optimize infrastructure and resources in an operationally, financially and environmentally sustainable manner. Enhance the passenger and customer experience through long range development actions. Define development plans that are scalable to respond to variations in demand over the planning horizon. Preserve flexibility to adapt to emerging and future technologies. Accommodate connectivity to various modes of transportation as components of Airport development plans.
11 Initial Screening Identify alternatives not viable for further evaluation Representative screening criteria Ability to meet future demand Implementa3on complexity and scalability Opera3onal efficiency Order of magnitude costs Level of service impacts/benefits Flexibility (technology, schedule, demand, other) Impacts to natural/undisturbed areas Impacts to/integra3on with exis3ng facili3es Connec3vity Criteria will evolve during the evaluation process.
12 Vision2040 Next Steps Alternatives evaluation: 9 shortlisted to 4 Shortlist may be hybrids of 9 composite alternatives Select and refine Preferred Alternative Incorporate GA, cargo, and support facilities Integrate land use/development planning concepts Land Use Planning Public Workshop June 28 Public Workshop #4 present preferred alternative Implementation planning and financial analysis Shortlist of 4 alternatives to be identified late-june
13 Workshop Next Steps Review 9 composite alternatives Boards Handouts Authority and Vision2040 team representatives Ask questions / provide feedback and input Participate in future workshops
14 Public Involvement Your comments are critical to Vision2040 s success. Join us online or through social media for information on our master plan study and to provide your comments.
15 Review of Alternatives (Boards)
Airport Development Plan Update
Airport Development Plan Update Prepared by: SAN DIEGO COUNTY REGIONAL AIRPORT AUTHORITY SDIA Planning Timeline 2 Where Is SDIA Today? The Airport is implementing the recommendations from the 2008 master
More information6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES
6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES The projected activity levels at Sacramento International Airport as described in Chapter 3 are the basis for determining the terminal facilities that will be
More informationAppendix H Support Facilities Preliminary and Intermediate Alternatives Analysis
Appendix H SUPPORT FACILITIES PRELIMINARY AND INTERMEDIATE ALTERNATIVES ANALYSIS H TABLE OF CONTENTS EXHIBITS TABLES H.1 Evaluation Criteria... 1 H.1.1 Meeting the Base Constrained Demand Level... 1 H.1.2
More informationCity of Kansas City AIRPORT COMMITTEE BRIEFING. New Terminal Evaluation for Kansas City International Airport. March 15, 2016
City of Kansas City AIRPORT COMMITTEE BRIEFING New Terminal Evaluation for Kansas City International Airport March 15, 2016 1 Agenda Process Overview Establishing Requirements & Identifying Issues Forecast
More informationPangborn Memorial Airport I One Pangborn Drive I East Wenatchee, WA 98802
TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Kickoff Meeting #1 DATE: August 22, 2016 On behalf of the Pangborn Memorial Airport, I would like to invite you to serve
More informationFINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS
FINAL ENVIRONMENTAL IMPACT REPORT SDCRAA # EIR-06-01 State Clearinghouse No. 2005091105 CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS Lead Agency: SAN DIEGO COUNTY REGIONAL AIRPORT AUTHORITY
More informationDallas/Fort Worth International Airport ASCE Presentation. Terminal Development Program. November, 2009
Dallas/Fort Worth International Airport ASCE Presentation Terminal Development Program November, 2009 ASCE PRESENTATION, NOVEMBER 2009 Background Objective The objective of today s presentation 1. Review
More informationAirport Master Plan Update (AMPU) Phase 2. Scope of Work
BST AMPU Phase 2 Scope of Work Page 1 of 19 Belfast Municipal Airport Belfast, Maine Airport Master Plan Update (AMPU) Phase 2 Scope of Work The intent of this project is to update the 1999 Belfast Municipal
More informationAirports Council International North America Air Cargo Conference Atlanta March 29, Alternative Land Use: The Airport Logistics Park
Airports Council International North America Air Cargo Conference Atlanta March 29, 2007 Alternative Land Use: The Airport Logistics Park The Airport Logistics Park A 21 st Century Logistics Solution The
More informationAviation Capital Construction Program Update
Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance
More informationAirport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions
Airport Construction Project Risk Management Presented by: Mindy Price- Direct Effect Solutions Topics ACRP 01-22 Research Background Research Findings and Conclusions Project Risk Management Recommendations
More informationBuilding an Enterprise GIS for SFO Then and Now
Building an Enterprise GIS for SFO Then and Now Introduction Overhead View Humble Beginnings Organization Overhaul Technical Transformation Stakeholder Engagement Enterprise Implementation Next Destination
More informationGoals and Standards The ICAO Perspective
Goals and Standards The ICAO Perspective Environment Section Air Transport Bureau International Civil Aviation Organization 2 October 2009 Agenda ICAO Objective and Goals for Environment Quantification
More informationDraft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements
JUNE 2016 RONALD REAGAN WASHINGTON NATIONAL AIRPORT Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements PREPARED BY: Ricondo & Associates, Inc. IN
More informationCHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION
CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION 14.1 AFFECTED ENVIRONMENT 14.1.1 Definition of Resource This section describes the existing transportation facilities, specifically roads, the Tinian International,
More informationEXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT
EXECUTIVE SUMMARY ES.1 BACKGROUND The purpose of this Draft Environmental Report (DEIR) is the implementation of improvement projects at Charles M. Schulz Sonoma County Airport (the Airport). The improvement
More informationPlanned Procurement Opportunities Report. November 2017
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationAirport of the Future. Air Cargo Conference June 2017
Airport of the Future Air Cargo Conference June 2017 How CVG landed its biggest deal in history. The deal at $1.49 billion is the largest ever one-time capital investment by a company in Northern Kentucky,
More informationSFO Climate Action Plan. March 2014
SFO Climate Action Plan March 2014 Executive Summary Expanded Summary I Background... 1 Section 1 - Profile of SFO... 2 Section 2 - SFO's Carbon Footprint... 2 Components of Category 1 SFO Controlled GHG
More informationParking Control System for Automated Gate Management
Leading you safely to the gate Parking Control System for Automated Gate Management Honeywell Airports Business Increases in passenger traffic require higher gate efficiency and optimized throughput -
More informationImplementing An effective Airport Pavement Management System
Implementing An effective Airport Pavement Management System Hazim M Abdulwahid 13 th, MSC, MBA International O&M Conference in the Arab Countries,17-19 Nov 2015 1 Content What is Pavement Engineering
More informationUpdates on FAA Order F. Agenda. Communicate FAA Order Updates. Educate attendees on the changes to FAA Order
Updates on FAA Order 1050.1F Rhonda Solomon March 3, 2015 Airports Conference 2015 Agenda Communicate FAA Order 1050.1 Updates Educate attendees on the changes to FAA Order 1050.1 1 1 Overview of NEPA
More informationA Best Practice for the Implementation of a Pavement Management System For Small and Medium Airports
A Best Practice for the Implementation of a Pavement Management System For Small and Medium Airports Architectural & Engineering Services Civil Engineering Directorate Airport Engineering ATR-045 Real
More informationMIA Cargo Facilities and Needs Workshop June 29 th, 2011
MIA Cargo Facilities and Needs Workshop June 29 th, 2011 SMP Overview 1. Prior Studies 2. Current MIA Capital Improvement Program (CIP) 3. SMP Goals and Objectives 4. SMP Study Approach 2 SMP Background
More informationNASA Aeronautics Airspace Operations and Safety Program
NASA Aeronautics Airspace Operations and Safety Program Discussion with the ARTR John A. Cavolowsky Director, AOSP Akbar Sultan Deputy Director, AOSP September 26, 2014 1 of 44 Ability to Manage Increasing
More informationBNA Master Plan Update
BNA Master Plan Update Community Advisory Committee Meeting No. 6 January 31, 2013 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America, Inc. Gresham, Smith and Partners
More informationCHAPTER 4 IDENTIFICATION AND EVALUATION OF ALTERNATIVES
CHAPTER 4 IDENTIFICATION AND EVALUATION OF ALTERNATIVES Chapter 4, Identification and Evaluation of Alternatives presents the various alternatives considered to address the facility requirements presented
More informationAthens International Airport
Athens International Airport Developing Airport Business: the key role of pavements in airfield investments BCRRA 2017, International Conference in Athens Dimitrios J. DIMITRIOU Professor Asst, DUTh BoD
More informationHong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012
Hong Kong International Airport Medium & Long Term Development Plans The British Chamber of Commerce 18 July 2012 Connecting HK with the World More than 100 airlines serving 160 destinations worldwide
More informationCollaborative Decision Making in Aviation
the way we do it Collaborative Decision Making in Aviation In an uncertain world there is reasonable certainty in stating that air travel will increase in the future. How airlines and airports will work
More informationDEVELOPMENT OF A MASTER PLAN FOR
DEVELOPMENT OF A MASTER PLAN FOR AIRPORTS WITH VISSIM SUPPORT VISSIM USER S GROUP MEETING May 1 st 2009 Portland, Or Luis E. Maumejean Multiservicios Integrales de America S.A. de C.V. lmn@mia.com.mx OUR
More informationAviation Lighting Fall Conference Tucson, Arizona October 22, 2013
Aviation Lighting Fall Conference Tucson, Arizona October 22, 2013 Richard Larivée, ing. P.Eng. Chair RP-37 IESNA RP-37 - Update Recommended Practice for Outdoor Lighting for the Airport Environment IESALC
More informationThe Port of Seattle. The Airport
The Port of Seattle The Port of Seattle plays a key role in bringing international trade and travel to the Pacific Northwest. The Port provides maritime and airport operations for the greater Seattle area.
More informationDraft Environmental Assessment for Phoenix Sky Harbor International Airport Sky Train Stage 2
Draft Environmental Assessment for Phoenix Sky Harbor International Airport Sky Train Stage 2 Prepared for: City of Phoenix Aviation Department and U.S. Department of Transportation Federal Aviation Administration
More informationAirport Ground Access Planning Reading the Crystal Ball
ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Airport Ground Access Planning Reading the Crystal Ball Gavin Duncan Associate Director LeighFisher gavin.duncan@leighfisher.com Why Should We Care? Ground access
More informationChapter 5.0 Alternatives Analysis
Chapter 5.0 Alternatives Analysis The Master Plan process thus far has accumulated the baseline of existing airport data, presented the outlook for the future in terms of operational activity, and defined
More informationPlanned Procurement Opportunities Report. December 2017
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationRunway Protection Zones: Incompatible Land Use Alternatives Analysis & Risk Assessment
March 3rd, 2015 Runway Protection Zones: Incompatible Land Use Alternatives Analysis & Risk Assessment Matt Lee Vice President Landrum & Brown Cincinnati, OH Cody Meyer Consultant Landrum & Brown Cincinnati,
More informationPort Everglades Master/Vision Plan Update Stakeholder Meeting. January 28, 2010
Port Everglades Master/Vision Plan Update Stakeholder Meeting January 28, 2010 1 2 Agenda Updated Market Assessments determine. Master Plan Facility/Infrastructure Needs requiring. Berth Expansion into.
More informationWhat s New in Airport Curbside Management?
PRESENTATION What s New in Airport Curbside Management? Prepared for ACI-NA Operations and Technical Affairs Conference April 6, 2011 Agenda Outline Commercial Vehicles Current technologies Emerging technologies
More informationMassachusetts Port Authority April 4, :00pm MEPA Scoping Meeting. Multi-Purpose Room 10 Mudge Way Bedford, MA 01730
2012 L.G. Hanscom Field Environmental Status and Planning Report (ESPR) Scope Massachusetts Port Authority April 4, 2012 6:00pm MEPA Scoping Meeting Bedford Town Hall Multi-Purpose Room 10 Mudge Way Bedford,
More informationSmart Airport of The Future. Planning for Innovation at Airports
Smart Airport of The Future Planning for Innovation at Airports Topics to be covered Single Token SITA Smart Path Day of Travel Airport App Day of Operations Airport Pulse 2 3 SITA Smart Path SINGLE TOKEN
More informationPART K SECTION 2 TRAINING STRATEGY
K-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 January 2011 PART K SECTION 2 TRAINING STRATEGY 1. for Ground Handling s 1.1 The aircraft ground handling are primarily responsible for the training
More informationPhoenix Sky Harbor People Mover. ❸ Financial Considerations
Phoenix Sky Harbor People Mover ❸ Financial Considerations Phoenix Sky Harbor People Mover ❸ Financial Considerations Key Elements: A people mover that accesses the terminals and parking structures at
More informationactions and approvals by the Federal Aviation Administration ( FAA) and the Federal
METROPOLITAN AIRPORTS COMMISSION In re MSP 2020 Improvements Final Environmental Assessment/Environmental Assessment Worksheet, Adequacy Determination, and Negative Declaration on the Need for an Environmental
More informationISE480 Sequencing and Scheduling
ISE480 Sequencing and Scheduling INTRODUCTION ISE480 Sequencing and Scheduling 2012 2013 Spring term What is Scheduling About? Planning (deciding what to do) and scheduling (setting an order and time for
More informationPlanned Procurement Opportunities Report. May 2017
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationAirport Asset Management
Airport Investment Assessment Page Airport Asset Management M2P PRODUCT OFFERING GmbH Bockenheimer Landstrasse 94-96 60323 Frankfurt am Main Germany Airport Asset Management M2P Product Offering First
More informationContents. Airport Director s Message. Report Summary
Contents Airport Director s Message Report Summary i Background... 1 Section 1. Profile of SFO... 2 Section 2. SFO's Carbon Footprint... 2 Components of Category 1 SFO Controlled GHG Emissions.... 3 Category
More informationAirport Master Plan Update June 14, 2017
Airport Master Plan Update June 14, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe
More informationPotential Benefits of Operations
Destination Green ICAO Symposium on Aviation and Climate Change, Destination Green, 14 16 May 2013 Potential Benefits of Operations John-Paul B. Clarke Associate Professor Daniel Guggenheim School of Aerospace
More informationLos Angeles International Airport (LAX) Terminals 2 and 3 Modernization Project
and Los Angeles International Airport (LAX) Terminals 2 and 3 Modernization Project Prepared By: One World Way, Room 218 Los Angeles, CA 90045 with assistance from: CDM Smith 111 Academy Way, Suite 150
More informationTRANSPORTATION PLAN Donald Vary
LOUISIANA STATEWIDE TRANSPORTATION PLAN Donald Vary March 2, 2016 AGENDA Plan Development Decision-Making Process Outreach Activities Vision and Goals Transportation Needs Financial Analysis (revenue scenarios
More informationFramework for Developing Feasibility Assessments JULY 2017
2017 Framework for Developing Feasibility Assessments JULY 2017 July 2017 Framework for Clean Air Action Plan Feasibility Assessments A series of regular feasibility assessments have been established by
More informationda WESTERN SYDNEY AIRPORT INDUSTRY INFORMATION SESSION 5 December 2017
da WESTERN SYDNEY AIRPORT INDUSTRY INFORMATION SESSION 5 December 2017 Graham Millett Executive General Manager Airport Infrastructure 2 Session agenda 1. Welcome and Acknowledgement of Country 2. Probity
More informationPlanned Procurement Opportunities Report. February 2018
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationJustification MVY. Chapter 3 Project Development &
MVY Martha s Vineyard Airport Chapter 3 Project Development & Justification The purpose and need for each component of the MVY improvement program are presented below with additional development and details
More informationPavement Condition Report
Pavement Condition Report Marshall Southwest Minnesota Regional Airport (MML) Prepared for: Office of Aeronautics Minnesota Department of Transportation 222 East Plato Boulevard Saint Paul, MN 55107 (800)
More informationNATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD
NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD September 18, 2013 District Department of Transportation Federal Railroad Administration AGENDA Vision History & Background Study Area Purpose & Need
More informationBoston Overflight Noise Study. Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES
Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES March 8, 2004 Project Consultant Phase 1 Scope of Services 3/8/2004 TABLE OF CONTENTS INTRODUCTION... 2 1 STUDY DESIGN... 3 2 PROJECT MANAGEMENT... 4 2.1 Project
More informationRail Service at Brookley Aeroplex
WHAT The Mobile Airport Authority, hopes to attain improved rail infrastructure to advance economic performance and job growth. I. Background The Mobile Airport Authority s goal for Brookley Aeroplex is
More informationAirport of the Future
Airport of the Future - Airport Planning, Design and Operation - Minor code: Minor name: Minor administration by the faculty of: Minor is jointly organized by the faculties of: Minor coordinator: Deputy
More informationChapter 4: Transportation and Land Use
Chapter 4: Transportation and Land Use Transportation and land use together make possible the wide range of destination opportunities in the region. Transportation provides the connections, and, in turn,
More informationSLC Terminal Redevelopment Program. Salt Lake City International Airport
SLC Terminal Redevelopment Program Salt Lake City International Airport Terminal Redevelopment Program Goals and Expectations Address Seismic Risk Provide Right-Sized Facilities Solve Operational Problems
More informationTransport Domain Plan. Draft list of Enduring Questions
Transport Domain Plan Draft list of Engagement Draft v1.0 August 2014 Introduction The Transport Domain Plan is jointly led by Statistics NZ and the Ministry of Transport. It is a project that will identify
More informationUnder New Management. groundops. Apron Risk Management
Airlines today want shorter turnaround times at airports and zero ground accidents aiming for ever more efficient ground-handling operations without compromising safety. Yet time pressures and associated
More informationAirport Collaborative Decision Making Enhancing Airport Efficiency
Airport Collaborative Decision Making Enhancing Airport Efficiency David Gamper Director, Safety & Technical ACI World SWIFT Conference, Banff 18 September 2012 1 Airports are facing challenges Capacity
More informationABSTRACT INTRODUCTION
` D2 EXPANSION PROGRAM AT WASHINGTON DULLES INTERNATIONAL AIRPORT BY FELIX C. BARTHOLOMEW ABSTRACT Lessons Learned: An examination of the Program Management policies and procedures that contributed to
More informationA-CDM: Integrated working Stefan Beitelsmann, Head of Aviation and Central Infrastructure Management, Düsseldorf Airport
www.internationalairportreview.com Issue 1 2014 IAR proud to support: A-CDM: Integrated working Stefan Beitelsmann, Head of Aviation and Central Infrastructure Management, Düsseldorf Airport Winter operations
More informationYOUR PARTNER IN AIRPORT OPERATION AND DEVELOPMENT
YOUR PARTNER IN AIRPORT OPERATION AND Egis Airport Operation, a partner of choice for development and operation of airports, all over the world. Egis Airport Operation is a subsidiary of the Egis Group
More informationKosovo s PPP Policy, Legal, & Institutional Framework
MODULI 1 Kosovo s PPP Policy, Legal, & Institutional Framework Case study PIA concesssion 02, November 2016 Arton Ahmeti Central Public-Private Partnership Department Ministry of Finance 2 Overview Investment
More informationVisual Guidance. Research and Development. By: Holly Cyrus, Project Manager Date: August 23, Federal Aviation Administration
Visual Guidance Research and Development By: Holly Cyrus, Project Manager Date: August 23, 2010 Signs Markings Lighting Ground Surveillance Mission Improve Visual Aids on Airports to reduce runway Incursions
More informationRURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES
Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Discourage future development of rural residential patterns
More informationPlanned Procurement Opportunities Report. April 2018
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPROJECT PLANNING & LIFE CYCLE ASSESSMENT OF AVIATION AND HIGH-SPEED RAIL
PROJECT PLANNING & LIFE CYCLE ASSESSMENT OF AVIATION AND HIGH-SPEED RAIL ESD.00 Recitation 7 Professor Joseph Sussman Regina Clewlow TODAY S AGENDA Life Cycle Assessment of Aviation & HSR Review basic
More informationNextGen ATM Concept of Operations: ASAS-Reliant
NextGen ATM Concept of Operations: ASAS-Reliant See http://www.jpdo.gov for the latest JPDO info Doug Arbuckle, Rose Ashford NextGen Joint Planning & Development Office 18-Sep-2007 Joint 5th ASAS TN2 Workshop
More informationInternational Airport Expansion Project. Terms of Reference for Legal Advisor
A. Background International Airport Expansion Project Terms of Reference for Legal Advisor 1. [ ] International Airport (IA) is a medium size airport with a total passenger per year volume of [ ]. IA has
More information2016 Environmental Benchmarking Survey
2016 Environmental Benchmarking Survey General Environmental Questions 1. Contact information: * Airport 3 letter identifier Organization full name First name of survey respondent Last name Title Email
More informationRegional Transportation Studies Regional Council
Pima Association of Governments 1 E. Broadway, Tucson, Arizona Santa Rita Conference Room Regional Transportation Studies Regional Council September 28, 2017 I-11 Tier 1 Environmental Impact Statement
More informationAIRPORT SERVICES. the airport sector. Our people are experts at understanding and
airport services AIRPORT SERVICES Our SP+ Airport Services operating division focuses exclusively on the airport sector. Our people are experts at understanding and addressing the unique demands of an
More informationChapter 7 ENVIRONMENTAL OVERVIEW
Chapter 7 ENVIRONMENTAL OVERVIEW 7.1 INTRODUCTION This Environmental Overview conceptually evaluates the potential environmental impacts associated with each of the projects recommended in the Master Plan
More informationColumbia Regional Airport (COU) Columbia, Missouri. Draft Environmental Assessment Airside, Landside, and Surface Transportation Developments
(COU) Columbia, Missouri Draft Environmental Assessment Airside, Landside, and Surface Transportation Developments RS&H No. 226-1077-000 Prepared for the: City of Columbia and U.S. Department of Transportation
More informationChapter 4 Future Demand Forecasts
Chapter 4 Future Demand Forecasts This chapter summarizes the work done under Task 4 to build the Action Plan, which is further described in Tech Memos 4a (Freight Demand) and 4b (System Performance Report).
More informationENTERPRISE CAPITAL BROWARD COUNTY CAPITAL BUDGET
ENTERPRISE CAPITAL This section includes the capital program for four enterprise funds - Aviation, Port Everglades, Water and Wastewater, and Waste and Recycling. The Aviation capital program is supported
More informationAIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAWAN SAFDARJUNG AIRPORT NEW DELHI
AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAWAN SAFDARJUNG AIRPORT NEW DELHI 110003 Advt. No.: 4/2015 NAME OF THE POSITION Post Name of the Position on purely code contractual basis 01 Deputy Head Commercial&
More informationCaltrain Business Plan Draft Business Strategy and Scope. Board of Directors December 7, 2017 Agenda Item 9
Caltrain Business Plan Draft Business Strategy and Scope Board of Directors December 7, 2017 Agenda Item 9 Overview Background and Process Draft Business Strategy Draft Phase 2 Scope - Technical Tasks
More informationMitigation Monitoring and Reporting Program for Final Environmental Impact Report No. 617 John Wayne Airport Settlement Agreement Amendment
Mitigation Monitoring and Reporting Program for Final Environmental Impact Report No. 617 John Wayne Airport Settlement Agreement Amendment SCH No. 2001111135 COUNTY OF ORANGE John Wayne Airport 3160 Airway
More informationARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN
p EXECUTIVE SUMMARY Report Prepared by: ARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN The Arlington County Transit Development Plan (TDP) is an effort to evaluate and assess the performance, connectivity,
More informationRobert Pryor TSA/ACC Security Capabilities Workshop July 20, 2017
Intermodal Robert Pryor TSA/ACC Security Capabilities Workshop July 20, 2017 Agenda Items Discussed in the Briefing: Surface Overview 4 Surface Capability Gaps by Mode 5 Air Cargo EDS Modernization Overview
More informationeasyjet s experience of our first safety culture survey Future Sky Safety Public Workshop, 2017 Siân Blanchard and David Cross
easyjet s experience of our first safety culture survey Future Sky Safety Public Workshop, 2017 Siân Blanchard and David Cross something about us > What we do: We are a low-cost European point-topoint
More informationTORONTO PEARSON INTERNATIONAL AIRPORT ENVIRONMENTAL MANAGEMENT
TORONTO PEARSON INTERNATIONAL AIRPORT ENVIRONMENTAL MANAGEMENT Committed to green operations The GTAA has made environmental management a cornerstone of our approach to the development and operation of
More informationThe Employer s Requirements in EPC contracts: What is the proper level of definition? Experience from projects in the airport sector
The Employer s Requirements in EPC contracts: What is the proper level of definition? Experience from projects in the airport sector Didier GUYNET ADP Ingénierie Contract Manager FIDIC accredited trainer
More informationOklahoma Long Range Transportation Plan
Oklahoma 2015-2040 Long Range Transportation Plan Oklahoma Metropolitan Planning Organization Meetings Tulsa and Oklahoma City Transportation Management Areas July 2014 Agenda Public Input- Structure and
More informationDock and Yard Management e.g. for Air Cargo Terminals. Siemens AG 2012
Dock and Yard Management e.g. for Air Cargo Terminals 1 Introduction/Table of Contents Dock & Yard Management (DYM) a software solution for systematic planning and controlling of transport processes within
More informationVALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK
VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE 6604 - RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK UNIT 1 RAILWAY PLANNING 1. Define Permanent way. 2. List out the elements
More informationTopic areas for the PEGASAS COE Summer Experience for 2018
Topic areas for the PEGASAS COE Summer Experience for 2018 1) Terminal Area Safety, Software and Systems Branch Overview: Seeking an engineer or mathematician to assist with research for the Terminal Area
More informationAustin Straubel International Airport Development Committee Study & Findings Report. Background and Introduction:
Austin Straubel International Airport Development Committee Study & Findings Report Background and Introduction: The Austin Straubel International Airport Development Committee is one of four economic
More informationNoise Compatibility Program Update
Table of Contents 1.0 Introduction Pg. 1 2.0 Purpose and Need Pg. 1 3.0 Airport Environs Pg. 1 4.0 Land Use Compatibility Pg. 1 5.0 Study Methodology Pg. 2 6.0 2008 Existing Baseline Pg. 2 Noise Exposure
More informationo&i consulting: at a glance
s u p p l i e r o f a i r p o r t a r r i v a l & d e p a r t u r e o p e r a t i o n a l p l a n n i n g s e r v i c e s t o t h e L o n d o n 2 0 1 2 G a m e s aviation. logistics. services. o&i consulting:
More informationRecreation System Group Meeting #5. July 23, 2014
Recreation System Group Meeting #5 July 23, 2014 Meeting #5 Outcomes 1. Member Poll on Metrics 2. Preview of design charrette process 3. Feedback on design features Meeting #5 Agenda 1. Message from Executive
More information