1 Welcome to World Pipelines annual Offshore Technology Review. Catch-up on a year s worth of international offshore oil and gas activity before the whole sector meets at OTC (4-7 May, Houston). In this reprint from World Pipelines April 2015, Land & Marine highlights its recent and current projects and announces the launch of two new 800t linear winches. Visit us at OTC on booth 2541-D OFFSHORE Technology Review

2 Reprinted from OFFSHORE Technology Review / 2015 Land & Marine UK, booth 2541 Land & Marine, a wholly owned subsidiary of J. Murphy & Sons Limited, has a growing international order book for offshore projects. In Montevideo, Uruguay, the company will be conducting a 3 km, 20 in. submarine pipe pull for Constructora OAS SA as part of the GNL Del Plata project. Installation engineering, carried out from its UK office, included the design of a pipeline end manifold (PLEM) that was incorporated into the towhead. The pipeline will be assembled from strings fabricated onshore and a fibre optic cable will be strapped to the line, protection will then be added and the pipeline bottom-pulled, tested and tied-in to an offshore terminal constructed for what will be the world s largest LNG floating storage and regasification unit (FSRU). Land & Marine is providing the hydrotesting services for the offshore pipeline. The company will also be involved with the installation and hyrotesting of twin 20 in. offloading pipelines and PLEM from a tank farm in Luanda, Angola. The new pipelines and CBM buoy will facilitate the use of dwt tankers. Land & Marine is delighted to be supporting Project Management International (PMI) and its client Puma Energy for this and a number of other international projects in 2015 and In Canada, Land & Marine was recently contracted to manage the removal and replacement of a subsea PLEM. Working in the region with the highest tidal rise and fall in the world, the company s team was integrated into the client s project team to manage divers, crew vessels, tugs, barge and the hydrotesting to successfully complete operations over a 36 day period. Figure 1. Launch-way construction in preparation for the landfall works at Montevideo in Uruguay. Twin 9 km, 48 in. sea lines will be required for the new Jazan refinery on the Red Sea coast of Saudi Arabia and Land & Marine is supporting Six Construct Co. Ltd by providing installation engineering and pulling equipment for this complex project. Expected to be one of the largest offshore bottom-pull projects ever completed, the work is challenging as the mainly unburied pipelines are designed to be stable, when empty, in both the temporary installation and in-service conditions. Land & Marine is a specialist landfall and pipe pulling and towing contractor. The company also undertakes the installation of submarine pipelines for terminals, refineries, desalination plants and cooling water intake lines for power stations. It also carries out landfalls for subsea power cables. With a comprehensive range of pipe handling equipment, such as rollers and rail bogies, and with a large fleet of linear winches with up to 800 t capacity, the company can also provide equipment for hire. Land & Marine has recently added two new stateof-the art linear winches to its fleet. These modular units are designed as universal winches to meet a complete range of pulling capacities from 300 t up to 800 t. Land & Marine s highly innovative design allows socket passing under load with the minimum of manual intervention and utilises advanced hydraulic controls with PLC systems and data logging to provide load sensitive control, comprehensive data displays and load trend reporting. Offshore industry 2015 prediction Andrew Ball, Managing Director of Land & Marine commented: We are delighted to be investing in major new equipment which will add significantly to our capabilities. In addition to the new winches, we are also investing in a range of new marine plant. Land & Marine is a renowned pipe pulling contractor with over six decades of international experience and a brand synonymous with excellence in landfalls, outfalls, intakes, bundles and pipe towing. The company has always been innovative to meet the challenges of offshore pipeline installation and looking ahead we intend to be even more resourceful to keep Land & Marine at the forefront of our market sector. We will continue to seek opportunities around the world to install new pipelines and replace ageing infrastructure that will invariably need our considerable experience and expertise.

3 REPRINTED FROM OFFSHORE Technology Review Figure 2. Pile gate, pile and anchor chain Figure 3. Subsea pile and anchor chain installation for Single Point Mooring in Canada.

4 CLEAN LANDFALL SOLUTION How many projects suffer significant delays due to planning issues arising from the landfall element? The number is considerably higher than it should be. There are many examples of projects where the landfall or beach crossing has been the cause of major delays, sometimes taking years to resolve. Careful long-term planning is essential to ensure that as far as reasonably possible, when the time finally arrives for the pipeline to be installed, the Tim Ley, Technical Manager, Land and Marine Engineering Limited, UK, examines how early planning is the most important element in providing a landfall scheme that is safe to install and constructed on time. work can proceed unheeded. The technical challenges can be significant, but by careful planning, evaluation of the options and selection of the appropriate methodology, the overall construction risks to the project can generally be managed effectively. Land and Marine Engineering Limited (Land & Marine), a wholly owned subsidiary of J. Murphy & Sons Limited, has conducted hundreds of landfall feasibility studies and welcomes opportunities to provide this Figure 1. Flat-pack bundle launched from rail track routed around curve to avoid plant.

5 Figure 2. Pipeline bundle reaches the sea. Figure m long pipe string being lowered onto transport bogies in cofferdam at tunnel entrance. type of support. The company is regularly commissioned to carry out landfall and other studies and recent clients include E.ON E&P UK, Genesis Oil & Gas Consultants, Centrica, Statoil, BP Iraq and Worley Parsons Ltd. Selecting a landfall solution The early involvement of a specialist landfall contractor can add great value to a project by identifying scenarios which, after conducting risk assessments, will allow recommendations to be made such that the most suitable landfall solution can be agreed with the various authorities. It cannot be overstressed that this can take a significant amount of time particularly for new landfall locations. Where pipelines have previously been installed at a gas terminal or tanker offloading facility, there is more likely to be a good understanding and awareness of the process and acceptance by the local community, planning authorities and the various third parties. In these cases the risk of disruption to the schedule may be lower than for a green-field site where there is no existing development or experience. However, this should not be assumed as environmental constraints and safety implications have become more stringent than they use to be, especially if the original pipeline construction took place decades earlier. Working with environmental agencies, the local planning authority and third party organisations, explaining how the pipeline or pipelines will be installed at the landfall and how the connection will be made within the terminal or to the onshore pipeline should help to alleviate concerns and establish a forum whereby the benefits of the project can be explained. For example, there may be potential for local employment over the short and longer term. These arguments are not new and the process discussed is commonplace for many projects. But in some cases, the landfall issues may not be addressed until much later in the project when, unless the fundamental principles for the landfall have already been thoroughly established, it may be too late to develop the optimum construction method and this could result in major delays and cost increases. Some landfall methods lend themselves to disconnecting the landfall scope from the offshore pipelay scope. If the landfall pipeline or pipelines can be constructed onshore and pulled offshore, an opportunity can be created to allow the landfall to be completed ahead or independently from the main marine scope. In cases where there is a potential for the landfall pipeline or pipelines to be constructed onshore for installation by pulling (or pushing) there can be particular advantages for projects involving: )) Multiple pipelines, e.g. flat-pack bundles. )) Tunnelled landfall sections. )) HDD and other trenchless landfalls. The installation of a flat-pack bundle of pipes can provide an extremely elegant and efficient landfall solution. One example that highlights the many benefits of using a flat-pack design is the Camisea project in Peru, where four pipelines and an umbilical cable were constructed onshore and launched as a bundle into a single trench. To assemble the 3 km long, 5000 t bundle in a continuous length, it was necessary to fabricate the pipelines on land available inshore of a liquefaction plant and a temporary rail track was therefore constructed through a curve to align with the dredged trench as shown in the photograph below. As the bundle entered the water, the pipelines were progressively transferred from rail bogies onto conveyor rollers and into the dredged trench. By accurate buoyancy control the pull forces were reduced to less than 300 t and the bundle was installed in a less REPRINTED FROM APRIL 2015 / World Pipelines

6 than two days. It was fortuitous that this method could be developed at a relatively late stage in the project, otherwise the installation of such a complex bundle, which included two 24 in. pipe-in-pipe cryogenic lines, would have been more difficult and costly. Opportunities to use techniques that allow the landfall pipelines or bundle to be built onshore are sometimes overlooked, often because early engineering and feasibility studies are not carried out or did not identify the optimum landfall location and technique. There are instances where the development or expansion of an onshore plant such as a refinery, power station or desalination plant takes little or no account of the methods to install the submarine pipelines, as different project management teams without landfall experience may not appreciate the methods used to install submarine pipelines. Without a viable landfall installation option the whole project may not be able to get underway. Figure 4. View of tunnel with pipeline and other services during installation. Tunnelled landfalls and crossings The use of tunnels to route landfall pipelines is not new they have been used for many decades. However, the development of advanced earth pressure balance tunnel boring machines has transformed the capability, speed and above all, the safety of such operations and tunnelling is a system that in some cases can offer a viable and cost-effective solution, both for landfalls and river crossings. A tunnel may be required to enable the pipeline or pipelines to cross the cliff face and to exit at a suitable depth on the beach as illustrated by many examples in the UK at Bacton and Easington. These east coast locations generally involve relatively short tunnels of up to a few hundred metres but other projects involving tunnelled crossings for onshore pipelines leading from the beach landfall location may require much longer tunnels. One such example is the Corrib pipeline, the route for which ultimately required a 4.9 km long tunnel under Sruwaddacon Bay in County Mayo in the North West of Ireland and in 2013, Murphy International Limited, a wholly owned subsidiary of J. Murphy & Sons Limited, was awarded the contract to install the 20 in. high pressure gas pipeline in the tunnel. It was a requirement that the gas pipe was to be installed in strings and welded within the tunnel. During 2014, over a seven week period, the gas pipeline was installed in 74 m long sections and welded in the Figure 5. Land & Marine 800 t linear winch. tunnel. A number of other service lines and umbilical cables were installed and each was secured to the tunnel wall. The pipeline and service lines were installed within schedule and no lost time injuries were sustained. As an alternative to installing in sections and welding the pipe in the tunnel, pipe strings can be assembled and welded outside the tunnel and pulled into position. In this case, welding inside the tunnel can be avoided and clever methods can be adopted which reduce the manual intervention required to the absolute minimum. As with landfall techniques, the development of the tunnel design from concept phase onwards, should anticipate the pipe installation methodology by the involvement of a specialist landfall or pipe pulling contractor so that simple, safe and effective pipeline installation can be carried out. Planning the project so that the tunnelling and pipeline World Pipelines / REPRINTED FROM APRIL 2015

7 installation scopes are properly integrated should ensure each others success. New winches break new ground Landfall techniques that utilise pull offshore methods offer the advantage that buoyancy systems can be designed to allow the pulling forces to be significantly reduced. For onshore pulls, i.e. pulling from a lay barge to the beach, it is generally impractical for a large quantity of temporary buoyancy to be strapped to the pipeline so the landfall contractor will need to provide a high pull force. More projects require longer, heavier pipelines to be installed and there is an increasing need to provide larger winches. For pipe pulling projects, demanding very high pull forces over significant distances, the use of large diameter wire ropes are required. The larger the diameter and weight of wire rope, the shorter the length of wire that can be transported on reels and handled so more individual lengths of wire are required. These need to be connected together using spelter sockets which are also large, heavy and awkward to handle. Whether using a linear winch on a barge to pull offshore or on the beach to pull onshore, there will inevitably be a requirement to pass sockets through the grip boxes. Handling of large diameter wires and spelter sockets, especially under load, requires that the design of modern winch systems allows these operations to be carried out safely and with manual intervention reduced to a minimum. To help meet these needs, Land & Marine has developed new linear winches with up to 800 t capacity. These state-of-the-art winches are designed to operate with minimum manual intervention for all phases including socket passing operations. The innovative techniques developed will set new standards for winching operations. Conclusion Whatever the landfall scenario, the message is the same. Early planning and the involvement of a specialist landfall contractor will pay dividends later. Whether the landfall involves a pull offshore, a pull onshore, pipe installation in a tunnel, pipe towing, HDD or other trenchless system, the most important objective is to provide a landfall scheme that is safe to install and can be constructed on time. REPRINTED FROM APRIL 2015 / World Pipelines

SAFETY BENEFITS 18. Tide-independence 18 Rapid ballasting 19 Integrated hydraulic Ro-Ro ramps 20 Safety features, the future and engineering 22

SAFETY BENEFITS 18. Tide-independence 18 Rapid ballasting 19 Integrated hydraulic Ro-Ro ramps 20 Safety features, the future and engineering 22 HYDRO DECK CONTENTS OVERVIEW 3 DESIGN 4 OVERVIEW OF KEY FEATURES 6 DESIGN BENEFITS 8 Versatile 8 High capacity ballast system 9 High deck strength and space 10 Integrated mooring system 11 Adaptable 12

More information

Ecosse Subsea Systems. Cost Effective Pipeline Fabrication and Lay in Remote Locations. Australia Oil and Gas Exhibiton and Conference 2015

Ecosse Subsea Systems. Cost Effective Pipeline Fabrication and Lay in Remote Locations. Australia Oil and Gas Exhibiton and Conference 2015 Ecosse Subsea Systems Cost Effective Pipeline Fabrication and Lay in Remote Locations Australia Oil and Gas Exhibiton and Conference 2015 Presentation Overview Typical Pipelay Operations ESS s alternative

More information

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry On Board Regasification for LNG Ships 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry New Greenfield U.S. Terminals Will Be Almost Impossible to Site Key opportunity is to solve U.S. terminalling

More information

FUGRO GROUP LNG FIELD DEVELOPMENT AND FACILITIES. TACKLING your complex challenges. UNDERSTANDING your operational objectives

FUGRO GROUP LNG FIELD DEVELOPMENT AND FACILITIES. TACKLING your complex challenges. UNDERSTANDING your operational objectives LNG FIELD DEVELOPMENT AND FACILITIES FUGRO GROUP UNDERSTANDING your operational objectives TACKLING your complex challenges DELIVERING your global success stories LNG FIELD DEVELOPMENT AND FACILITIES Developing

More information

Brochure Cable transport. Engineering. Cable handling & storage. Equipment

Brochure Cable transport. Engineering. Cable handling & storage. Equipment Brochure 2015 Engineering Cable transport Cable handling & storage Equipment 02 About Oceanteam Solutions Oceanteam Solutions focuses on solution driven offshore services by combining strong engineering

More information

Pipeline Bundles. subsea partner of choice

Pipeline Bundles.  subsea partner of choice Pipeline Bundles Subsea 7 Installed Bundles What exactly is a Pipeline Bundle? What can a Pipeline Bundle bring to you Active control of thermal properties Reduction of expensive alloy materials Completion

More information

Azeri, Chirag & Gunashli Full Field Development Phase 3 Environmental & Socio-economic Impact Assessment

Azeri, Chirag & Gunashli Full Field Development Phase 3 Environmental & Socio-economic Impact Assessment 5.7 Export Pipelines 5.7.1 Overview Phase 3 offshore facilities will use the existing Azeri Project marine export pipeline infrastructure to export its oil and gas to the onshore terminal at Sangachal.

More information

Experts in tunneling with Tunnel Boring Machines

Experts in tunneling with Tunnel Boring Machines www.eurohinca.com www.terratest.es Experts in tunneling with Tunnel Boring Machines info@eurohinca.com EUROHINCA Europea de Hincas Teledirigidas, S.A., EUROHINCA, was incorporated in 1996 for the execution

More information

Anchor Handling and Towing Vessels. State of the art solutions for Anchor handling - and towing vessels

Anchor Handling and Towing Vessels. State of the art solutions for Anchor handling - and towing vessels Anchor Handling and Towing Vessels State of the art solutions for Anchor handling - and towing vessels Passion for performance united by the sea MacGregor is a family of innovators. By engineering solutions

More information

Marginal Field Production Vessel The Solution For Marginal Fields & Early Production!

Marginal Field Production Vessel The Solution For Marginal Fields & Early Production! Marginal Field Production Vessel The Solution For Marginal Fields & Early Production! 1 Presentation in Partnership with SOPETRO Offshore Nigeria Sopetro and IOC have formed a strategic alliance to pursue

More information

OLT Offshore LNG Toscana Alessandro Fino CEO

OLT Offshore LNG Toscana Alessandro Fino CEO Small Scale to large Market Strategies & Technologies towards the Mediterranean Area "La logistica primaria per la distribuzione del GNL" OLT Offshore LNG Toscana Alessandro Fino CEO 1 OLT Shareholders

More information

Platform Construction and Installation

Platform Construction and Installation Platform Construction and Installation Platform Construction and Installation UK Construction Yards. Worldwide Construction. Construction Quality and Safety. Construction Risks. Offshore Installation.

More information

LNG Import Facility Infrastructure Options

LNG Import Facility Infrastructure Options LNG Import Facility Infrastructure Options Mangesh Patankar (Head of Business Development Galway Group) 28 th April 2016 www.galwaygroup.com Agenda Introduction to Galway Group Types of Regas terminals

More information

Managing Contraction and Stress in an Ambient Pressure Insulated 9%Ni Subsea Cryogenic Pipeline

Managing Contraction and Stress in an Ambient Pressure Insulated 9%Ni Subsea Cryogenic Pipeline Rice Global E&C Forum, Houston, Texas Managing Contraction and Stress in an Ambient Pressure Insulated 9%Ni Subsea Cryogenic Pipeline C. Neal Prescott, Jeff Zhang Fluor Offshore Solutions, USA 14 November

More information

Flex-lay solutions for the global subsea industry

Flex-lay solutions for the global subsea industry Flex-lay solutions for the global subsea industry CAPABILITY OVERVIEW Aquatic, an Acteon company, continues to build a strong global reputation for its ability to lay and retrieve flexible and semi-rigid

More information

INPEX Ichthys LNG Project

INPEX Ichthys LNG Project INPEX Ichthys LNG Project INPEX Ichthys LNG Project McDermott is delivering an engineering, procurement, construction and installation (EPCI) solution for one of the world s largest subsea gas field developments

More information

YOUR GROUND DRILLING PARTNERS.

YOUR GROUND DRILLING PARTNERS. YOUR GROUND DRILLING PARTNERS INDEX 2. ABOUT US 3. OUR SERVICES 4. OUR LOCATION 5. HORIZONTAL DRILLING 6. DIRECTIONAL BORING PROCESS 9. HDD DRILLING METHOD 12. MACHINE DETAILS 13. POLYETHYLENE PIPE CONDUIT

More information

We deliver gas infrastructure

We deliver gas infrastructure We deliver gas infrastructure We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio of modern

More information

PetroVietnam Cooperate Structure

PetroVietnam Cooperate Structure PetroVietnam Cooperate Structure PetroVietnam Refinery Petrochemical, Bio-fuel Oil & Gas Exploration And Production Petroleum Services (PTSC) Power Generation Gas Industry Marine Services Offshore Services

More information

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Final Scoping Report - Non-Technical Summary Presentation Structure of the Presentation Introduction to the Tema LNG Project

More information

ASX/MEDIA RELEASE 23 APRIL 2015 MAGNOLIA LNG PROJECT TOLLING AGREEMENT UPDATE WITH MERIDIAN LNG

ASX/MEDIA RELEASE 23 APRIL 2015 MAGNOLIA LNG PROJECT TOLLING AGREEMENT UPDATE WITH MERIDIAN LNG ASX/MEDIA RELEASE 23 APRIL 2015 MAGNOLIA LNG PROJECT TOLLING AGREEMENT UPDATE WITH MERIDIAN LNG The Directors of Liquefied Natural Gas Limited (the Company, ASX Code: LNG) are pleased to advise that its

More information

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

More information

GeoPro FLOATING BAFFLE USER GUIDE

GeoPro FLOATING BAFFLE USER GUIDE GeoPro FLOATING BAFFLE USER GUIDE INTRODUCTION GeoPro Floating helps to improve the operation efficiency of a waste water treatment system. GeoPro Floating Baffles are using in sewage treatment plant,

More information

TVU CCS Pre FEED Study Outline Execution Strategy for delivery of SSI Anchor Project including CO 2 Transportation & Storage Infrastructure

TVU CCS Pre FEED Study Outline Execution Strategy for delivery of SSI Anchor Project including CO 2 Transportation & Storage Infrastructure TVU CCS Pre FEED Study Outline Execution Strategy for delivery of SSI Anchor Project including CO 2 Transportation & Storage Infrastructure Additional Information Regarding The Implementation Programme

More information

6th Annual LNG Transport Handling & Storage 2016 Forum. FSRU as The Pivotal Point for Effective LNG Distribution

6th Annual LNG Transport Handling & Storage 2016 Forum. FSRU as The Pivotal Point for Effective LNG Distribution 6th Annual LNG Transport Handling & Storage 2016 Forum FSRU as The Pivotal Point for Effective LNG Distribution Bali, 15 th September 2016 PGN LNG Business at FSRU Lampung Maximum capacity of sales gas:

More information

Fendercare Marine Products Capability Statement

Fendercare Marine Products Capability Statement marine Fendercare Marine Products Capability Statement Fendercare Marine Company Details Main Office: Enterprise House, Harveys Lane, Seething, Norfolk, NR15 1EN Telephone: +44 1508 482691 Fax: +44 1508

More information

Joanna C. Martin Ziegenfuss BERKELEY RESEARCH GROUP, LLC 1800 M Street, 2 nd Floor Washington, DC

Joanna C. Martin Ziegenfuss BERKELEY RESEARCH GROUP, LLC 1800 M Street, 2 nd Floor Washington, DC Joanna C. Martin Ziegenfuss BERKELEY RESEARCH GROUP, LLC 1800 M Street, 2 nd Floor Washington, DC 20036 jmartinziegenfuss@thinkbrg.com SUMMARY Ms Joanna Martin Ziegenfuss, Associate Director of BRG s Energy

More information

About Cortland in Australia

About Cortland in Australia Marine Services Mooring and Marine Systems Solutions, Mooring Systems, Engineering and Support, Plasma Rope and Specialty Rope Products, Anchors, Chain and Fittings, Mooring and Navigation Buoys, Fenders,

More information

Saudi Aramco General Bid Slates (GBS)

Saudi Aramco General Bid Slates (GBS) Saudi Aramco General Bid Slates (GBS) Copyright 2015, Saudi Aramco. All rights reserved. Agenda Saudi Aramco Contracting Strategy Saudi Aramco General Bid Slate (GBS) General Bid Slate Work Types 2 Saudi

More information

1) 2) 3) 4) 5) The oil and gas cycle. Life cycle of oil and gas (time) Potential requirement on ground

1) 2) 3) 4) 5) The oil and gas cycle. Life cycle of oil and gas (time) Potential requirement on ground The oil and gas cycle Life cycle of oil and gas (time) 1) 2) 3) 4) 5) 6) Activity Desk study and get licens: Find areas with favorable geological conditions Seismic survey: Provide detailed information

More information

Enabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions

Enabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions Enabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions Executive Summary Moving liquefied natural gas (LNG)

More information

For NGTL to file calculation of operating condition on pull back stress analysis.

For NGTL to file calculation of operating condition on pull back stress analysis. NOVA Gas Transmission Ltd. Exhibit No. B85 National Energy Board Hearing Order GH-001-2014 Undertaking U-10 Submitted November 25, 2014 Response to Undertaking given by Mr. Trout to Chairman Vergette at

More information

CAT Submarine Network (CSN)

CAT Submarine Network (CSN) CAT Submarine Network (CSN) A Study Case Presenter: Tirayut Sakvilastrakul & Marc Génot Company: CAT Telecom PCL & Alcatel-Lucent Submarine Network Presenter Profile Background in electrical engineering

More information

CORRIB GAS ONSHORE PIPELINE COMMUNITY INFORMATION

CORRIB GAS ONSHORE PIPELINE COMMUNITY INFORMATION CORRIB GAS ONSHORE PIPELINE COMMUNITY INFORMATION September 2015 Corrib Gas Onshore Pipeline p1 CORRIB GAS ONSHORE PIPELINE COMMUNITY INFORMATION CONTENTS Introduction Background of this document 3 Onshore

More information

A BULK LOGISTICS SOLUTION FOR OK TEDI MINING LIMITED (OTML) IN PAPUA NEW GUINEA

A BULK LOGISTICS SOLUTION FOR OK TEDI MINING LIMITED (OTML) IN PAPUA NEW GUINEA A BULK LOGISTICS SOLUTION FOR OK TEDI MINING LIMITED (OTML) IN PAPUA NEW GUINEA THE CUSTOMER A BULK LOGISTICS SOLUTION FOR OK TEDI MINING LIMITED (OTML) IN PAPUA NEW GUINEA The Ok Tedi mine, owned and

More information

Refurbishment of the Pant yr Afon Hydro Scheme By Matt Palmer and John Howarth, Dulas Ltd. September 2007

Refurbishment of the Pant yr Afon Hydro Scheme By Matt Palmer and John Howarth, Dulas Ltd. September 2007 Refurbishment of the Pant yr Afon Hydro Scheme By Matt Palmer and John Howarth, Dulas Ltd. September 2007 Abstract Pant yr Afon was one of the first hydroelectric stations in North Wales, originally commissioned

More information

Conversion of Kurnell refinery to a fuel import terminal

Conversion of Kurnell refinery to a fuel import terminal Conversion of Kurnell refinery to a fuel import terminal Dr Jos Kusters 1 May 2014 AGENDA Background Kurnell site conversion Management of environmental and community impacts Operation as a terminal 2

More information

La Taboada (Lima-Peru) outfall

La Taboada (Lima-Peru) outfall La Taboada (Lima-Peru) outfall E. Pita (1), I. Sierra (2) 1. Civil Engineer and General Manager, Ingeniería Creativa Pita, S.L..(INCREA), calle Buganvilla 6, p1, 1ºA. Madrid 28036-Spain (E-mail: epita@increa.eu;

More information

THE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND

THE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND THE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND Leendert Poldervaart Business Development Manager James Ellis Business Development Manager Single Buoy Moorings Gas Business Development

More information

PIPELINE ENGINEERING Engineered Solutions for the Pipeline Pigging and Flow Assurance Industry

PIPELINE ENGINEERING Engineered Solutions for the Pipeline Pigging and Flow Assurance Industry FLOW ASSURANCE MANAGEMENT 1 4 2 3 5 PIPELINE ENGINEERING Engineered Solutions for the Pipeline Pigging and Flow Assurance Industry FLOW ASSURANCE MANAGEMENT Project Management and Engineering Consultancy

More information

Tel: Neil: Tony: Website:

Tel: Neil: Tony: Website: Australian Tunnelling Services are a consortium that has been formed to offer specialist underground services to both clients and contractors in the Civil Engineering, Mining & Building Industries. The

More information

Appendix A: Project Characteristics

Appendix A: Project Characteristics Gorgon Fourth Train Expansion Proposal Appendix A: Project Characteristics Appendices Project Characteristics A Key Characteristics table has been prepared to describe the elements of the Foundation Project

More information

MARITIME REPORTER AND ENGINEERING NEWS. Offshore Energy. Arctic Operations Finland Breaks the Ice. Markets Fishing Fleet Americas

MARITIME REPORTER AND ENGINEERING NEWS. Offshore Energy. Arctic Operations Finland Breaks the Ice. Markets Fishing Fleet Americas The World s Largest Circulation Marine Industry Publication The Information Authority for the Global Marine Industry since 1939 Number 4 Volume 78 MARITIME April 2016 REPORTER AND ENGINEERING NEWS M A

More information

The Eastern Mediterranean and European Energy Landscape: Trends and Opportunities

The Eastern Mediterranean and European Energy Landscape: Trends and Opportunities The Eastern Mediterranean and European Energy Landscape: Trends and Opportunities by Prof. Yannis Maniatis Greek Minister of Environment, Energy and Climate Change COLUMBIA SIPA Center on Global Energy

More information

Offshore installation operations in Arctic waters. Igor Kopsov, Region Manger SURF Russia and Kazakhstan

Offshore installation operations in Arctic waters. Igor Kopsov, Region Manger SURF Russia and Kazakhstan Offshore installation operations in Arctic waters Igor Kopsov, Region Manger SURF Russia and Kazakhstan Table of contents 1. Offshore operations in remote and harsh environment Snow White (Norway) 2. Offshore

More information

Survey Operations Pipeline Inspection

Survey Operations Pipeline Inspection Survey Operations Pipeline Inspection Hydrofest 31.03.2010 Prepared by Maria Papadopoulou Agenda Definition of pipeline Why inspect? Regulations The IMR cycle How to Data Acquisition Data Processing Reporting

More information

The changing landscape of gas pipelines in SE Europe & the

The changing landscape of gas pipelines in SE Europe & the The changing landscape of gas pipelines in SE Europe & the New landscape in the transportation of Natural Gas to Europe via pipelines The routes from East to West The South Corridor SCPx, TANAP, TAP: Moving

More information

CHAPTER 3: GENERAL DESCRIPTION OF THE PROPOSED COEGA INTEGRATED POWER PROJECT

CHAPTER 3: GENERAL DESCRIPTION OF THE PROPOSED COEGA INTEGRATED POWER PROJECT : GENERAL DESCRIPTION OF THE PROPOSED COEGA INTEGRATED POWER PROJECT CONTENTS 3. GENERAL DESCRIPTION OF THE PROPOSED COEGA 3-1 3.1 Overview of the Coega Integrated Power Project 3-1 3.2 Description of

More information

Corrib Onshore Pipeline

Corrib Onshore Pipeline Case Study: Corrib Onshore Pipeline Ciarán Butler Engineers Ireland Permitting of Energy Projects Seminar Engineers Ireland Permitting of Energy Projects Seminar 20 th October, 2014 20 th October, 2014

More information

Background story: Coating and Logistics. Nord Stream 2 AG Jul-17

Background story: Coating and Logistics. Nord Stream 2 AG Jul-17 Nord Stream 2 AG Jul-17 Table of Contents Introduction... 3 1. What is concrete weight coating, and why is it necessary?... 4 How it works... 4 Why it s necessary... 6 2. Nord Stream 2 partners with Wasco...

More information

CONTACT DETAILS :- WEBSITE :- 01/08 UNITED ARAB EMIRATES (U.A.E). QATAR. SINGAPORE.

CONTACT DETAILS :- WEBSITE :-  01/08 UNITED ARAB EMIRATES (U.A.E).   QATAR.   SINGAPORE. CONTACT DETAILS :- UNITED ARAB EMIRATES (U.A.E). E-mail: ajhl@eim.ae QATAR. Email: ajcheavylift@qatar.net.qa SINGAPORE. Email: ajhl@singnet.com.sg WEBSITE :- www.ajhl.com Demag CC8800-1 Twin Crawler crane

More information

Strainstall Middle East L.L.C. INTRODUCTION Strainstall M.E. L.L.C. Corporate Profile OIL & GAS/ENERGY

Strainstall Middle East L.L.C. INTRODUCTION Strainstall M.E. L.L.C. Corporate Profile OIL & GAS/ENERGY Oil & Gas Directory Middle East - 2013 205 Strainstall Middle East Corporate Profile INTRODUCTION Strainstall is a world leader in all areas of load measurement, strain and stress determination across

More information

Status of first generation of FLNG and trend and perspective for the next generation

Status of first generation of FLNG and trend and perspective for the next generation Status of first generation of FLNG and trend and perspective for the next generation TITRE DE LA PRESENTATION Dominique Gadelle SOUS TITRE Technip DE LA Vice President PRESENTATION Upstream / LNG Atelier

More information

Stratus Development in Joint Venture with Middle East Petroleum Services (Offshore) SAL

Stratus Development in Joint Venture with Middle East Petroleum Services (Offshore) SAL Stratus Development in Joint Venture with Middle East Petroleum Services (Offshore) SAL Stratus Development in Joint Venture with Middle East Petroleum Services (Offshore) SAL is a service, general trading

More information

Technical Innovation for Floating LNG. Bengt Olav Neeraas & Jostein Pettersen, Statoil ASA

Technical Innovation for Floating LNG. Bengt Olav Neeraas & Jostein Pettersen, Statoil ASA Technical Innovation for Floating LNG Bengt Olav Neeraas & Jostein Pettersen, Statoil ASA Table of contents Relevant know how for FLNG FLNG concept development Technology development & innovation Conclusions

More information

Construction of Offshore Stormwater Discharges using HDD Technologies

Construction of Offshore Stormwater Discharges using HDD Technologies TM2-T2-04 Construction of Offshore Stormwater Discharges using HDD Technologies Karyn Erickson, PE, Erickson Consulting Engineers, Sarasota FL Bobbi Claybrooke, EI, Erickson Consulting Engineers, Sarasota

More information

Gas Access To Europe

Gas Access To Europe Gas Access To Europe 2 3 LNG is cool and hot Import- and throughput of LNG at Gate terminal Close to the port entrance on the Maasvlakte, right at the corner of the North Sea, an LNG import and throughput

More information

MARINE LIFECYCLE SOLUTIONS

MARINE LIFECYCLE SOLUTIONS MARINE LIFECYCLE SOLUTIONS OUR PARENT COMPANIES Clough Murray & Roberts Marine has been established to leverage the significant synergies across two leading engineering and construction businesses Clough

More information

DUCTILE IRON PIPE SUBAQUEOUS CROSSINGS

DUCTILE IRON PIPE SUBAQUEOUS CROSSINGS DUCTILE IRON PIPE SUBAQUEOUS CROSSINGS DUCTILE IRON PIPE SUBAQUEOUS CROSSINGS Introduction DUCTILE IRON pipe with boltless ball and socket joints is an extremely versatile product for use in subaqueous

More information

AMERON PRESTRESSED CONCRETE CYLINDER PIPE

AMERON PRESTRESSED CONCRETE CYLINDER PIPE AMERON PRESTRESSED CONCRETE CYLINDER PIPE Specify prestressed concrete cylinder pipe and Prestressed concrete cylinder pipe (PCCP) is a rigid pipe designed to take optimum advantage of the tensile strength

More information

Marine Terminals Capability statement. April 2010 LWI

Marine Terminals Capability statement. April 2010 LWI Marine Terminals Capability statement April 2010 LWI About LWI Lanier Wallingford International (LWI) is a strategic alliance between: Lanier & Associates Inc HR Wallingford Ltd. As a specialist marine

More information

Small Scale LNG From Concept to Reality. Chris Johnson, General Manager, LNG New Markets, Shell

Small Scale LNG From Concept to Reality. Chris Johnson, General Manager, LNG New Markets, Shell Small Scale LNG From Concept to Reality Chris Johnson, General Manager, LNG New Markets, Shell 0 Table of Contents Table of Contents... 1 Background... 1 Aims... 4 Methods... 5 Results... 11 Conclusions...

More information

When bigger is better Prelude FLNG, the world s biggest floating structure

When bigger is better Prelude FLNG, the world s biggest floating structure When bigger is better Prelude FLNG, the world s biggest floating structure Photo: Shell Global Solutions International Imagine the largest LNG carrier in the world then multiply the size by a factor of

More information

Design Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit)

Design Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit) 7 Design Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit) YOSHIKAZU FUJINO *1 AKIRA ZAITSU *1 YASUHIKO HINATA *2 HIROTOMO OTSUKA *1 In recent years, floating

More information

About Cortland in Australia

About Cortland in Australia Marine Services Mooring and Marine Systems Solutions, Mooring Systems, Engineering and Support, Plasma Rope and Specialty Rope Products, Anchors, Chain and Fittings, Mooring and Navigation Buoys, Fenders,

More information

E N G I N E E R E D S O L U T I O N S

E N G I N E E R E D S O L U T I O N S Durham Lifting Engineered Solutions 210mm x 210mm.qxp_Layout 1 22/11/2017 15:07 Page 2 ENGINEERED SOLUTIONS OFFSHORE ENGINEERING MANUFACTURE CONSTRUCTION POWER GENERATION MINING RENEWABLE ENERGY MARITIME

More information

FPSO. installation and offloading

FPSO. installation and offloading FPSO installation and offloading Contents Market Market 3 Floating production systems Royal IHC FPSO installation and offloading 4 Reliable partner for efficient FPSO installation and offloading solutions

More information

INNOVATIVE MARINE TERMINAL CONFIGURATIONS

INNOVATIVE MARINE TERMINAL CONFIGURATIONS INNOVATIVE MARINE TERMINAL CONFIGURATIONS Phillip Cox Virginie Lehning Raul Risi Technip France ABSTRACT The significant increase in LNG production, both present and future has seen the need for larger

More information

Admiralty Inlet Pilot Tidal Project FERC No Appendix D. Water Quality Monitoring Plan

Admiralty Inlet Pilot Tidal Project FERC No Appendix D. Water Quality Monitoring Plan Appendix D Water Quality Monitoring Plan ADMIRALTY INLET PILOT TIDAL PROJECT FERC PROJECT NO. 12690 WATER QUALITY MONITORING PLAN (submitted with the Final Application for a New Pilot Project License)

More information

Capability Statement Gas and liquid bulk terminals Delta Marine Consultants

Capability Statement Gas and liquid bulk terminals Delta Marine Consultants Capability Statement Gas and liquid bulk terminals Delta Marine Consultants Delta Marine Consultants Delta Marine Consultants provides comprehensive maritime engineering services for gas and liquid bulk

More information

9.6 Interfield Pipeline Installation and Commissioning and Operation

9.6 Interfield Pipeline Installation and Commissioning and Operation 9.6 Interfield Pipeline Installation and Commissioning and Operation As described in the Project Description (Chapter 5.7), Phase 3 will tie-in to the existing Azeri Project marine export pipeline infrastructure

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY S1 INTRODUCTION This Environmental Statement (ES) Addendum presents the findings of the Environment Impact Assessment (EIA) conducted by TOTAL E&P UK Limited (TOTAL) for the development

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

Moncton Watermain Relocation Moncton, New Brunswick. TRS 2010 Dr Mark Knight University of Waterloo

Moncton Watermain Relocation Moncton, New Brunswick. TRS 2010 Dr Mark Knight University of Waterloo Moncton Watermain Relocation Moncton, New Brunswick TRS 2010 Dr Mark Knight University of Waterloo Presentation Outline Overview of the project Design and construction Issues Trenchless construction Lessons

More information

Preferred Elevated Tank Site

Preferred Elevated Tank Site Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access

More information

URS- EIA- REP Date of Issue 19th November 2012

URS- EIA- REP Date of Issue 19th November 2012 DocID: External DocID: URS-EIA-REP-201040 46369085_Doc020_REP_Rev03 Date of Issue 19th November 2012 This report has been prepared by URS Infrastructure & Environment UK Limited on behalf of South Stream

More information

Nearshore Regasification Terminals and FSRUs

Nearshore Regasification Terminals and FSRUs Nearshore Regasification Terminals and FSRUs Results for our customers As the worldwide demand for natural gas imports increases, the technical and regulatory challenges and the scale of the investment

More information

For personal use only

For personal use only ASX Announcement November 2013 PORT SPENCER General Manager 21 st November 2013 The Company Announcements Office Australian Securities Exchange Electronic Lodgement System Dear Sir/Madam CENTREX COMPLETES

More information

17 OTHER SEA USERS 17-4

17 OTHER SEA USERS 17-4 OTHER SEA USERS Table of Contents 17 OTHER SEA USERS 17-4 17.1 Introduction 17-4 17.2 Scoping and consultation 17-4 17.3 Baseline description 17-5 17.3.1 Introduction 17-5 17.3.2 Oil and gas activities

More information

B.C. TOWBOAT INDUSTRY CONFERENCE

B.C. TOWBOAT INDUSTRY CONFERENCE LN G T erm inals on C ana da s W est C oast Kitimat LNG LN G T erm inals on C ana da s W est C oast Presentation to 17 th B.C. TOWBOAT INDUSTRY CONFERENCE Whistler, BC Kitimat LNG Alfred Sorensen Kitimat

More information

Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options

Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options Introduction: The following is in response to the Environmental Assessment Office request for the Society of International

More information

Construction Simulation An Introduction

Construction Simulation An Introduction Construction Simulation An Introduction Tim O Leary Construction Solutions Europe & Africa Solutions BRIDGES BUILDINGS CADASTRE AND LAND DEVELOPMENT CAMPUSES COMMUNICATION S ELECTRIC AND GAS UTILITIES

More information

Joshua Ritti. Professional Profile. Academic Credentials & Professional Honors

Joshua Ritti. Professional Profile. Academic Credentials & Professional Honors Joshua Ritti Corporate Vice President, Principal & Practice Director Construction Consulting 475 14th Street, Suite 400 Oakland, CA 94612 (510) 268-5036 tel jritti@exponent.com Professional Profile Mr.

More information

SHAPING THE NATURAL GAS MARKET OF CYPRUS

SHAPING THE NATURAL GAS MARKET OF CYPRUS NATURAL GAS PUBLIC COMPANY (DEFA) SHAPING THE NATURAL GAS MARKET OF CYPRUS Dr. Symeon Kassianides Chairman Natural Gas Public Company New York 11/29/2017 SHAPING THE NATURAL GAS MARKET OF CYPRUS 1. Current

More information

Alaska South Central LNG (SCLNG) Project

Alaska South Central LNG (SCLNG) Project Alaska South Central LNG (SCLNG) Project Overview for Alaska Legislators February, 2013 - Overview BP, ConocoPhillips, ExxonMobil and TransCanada are working together to progress an Alaska LNG project:

More information

BUSAN-GEOJE FIXED LINK PROJECT

BUSAN-GEOJE FIXED LINK PROJECT BUSAN-GEOJE FIXED LINK PROJECT Koo, Im-Sig Director, GK Project Management Daewoo E&C Koois7101@dwconst.co.kr Yang, Bo-hyun Site Director, GK Immersed Tunnel Site Daewoo E&C A009485@dwconst.co.kr Kim,

More information

Product Line FGS FLOATING GAS SOLUTIONS OVERVIEW

Product Line FGS FLOATING GAS SOLUTIONS OVERVIEW Project Discipline Product Line FGS FLOATING GAS SOLUTIONS OVERVIEW FLOATING GAS SOLUTIONS AT A GLANCE SBM Offshore offers a catalogue of solutions, spanning the entire floating gas value chain, from small

More information

Air Products Supports Large U.S. Energy Producer Restart LNG Terminal

Air Products Supports Large U.S. Energy Producer Restart LNG Terminal Air Products Supports Large U.S. Energy Producer Restart LNG Terminal Air Products APEX Services made it happen safely and on time while saving the customer money. 1 Everything s cool with Air Products

More information

LNG Importation Initiative. Saldanha Cape Town Corridor. Fossil Fuel Foundation 21 May 2014

LNG Importation Initiative. Saldanha Cape Town Corridor. Fossil Fuel Foundation 21 May 2014 LNG Importation Initiative Saldanha Cape Town Corridor Fossil Fuel Foundation 21 May 2014 Cape West Coast Gas Development Western Cape Provincial Cabinet defined natural gas as a strategic priority (May

More information

Nord Stream Extension Project >

Nord Stream Extension Project > Nord Stream Extension Project > Public Hearing on the Finnish Environmental Impact Assessment Programme Helsinki 16.4.2013, Turku 17.4.2013, Hanko 18.4.2013, Kotka 22.4.2013, Mariehamn 24.4.2013 1 Project

More information

Plant, Seawater Intake &Discharge(1/7)

Plant, Seawater Intake &Discharge(1/7) Plant, Seawater Intake &Discharge(1/7) YEAR PROJECT NAME PROJECT DESCRIPTION CONTRACTOR 2013 for Zwitina Combined Cycle Add-On PJ 250MW Combined cycle power plant Intake & Discharge facilities for Algeria

More information

Need For The Project

Need For The Project Need For The Project Supply According to the EIA s AEO 2005, natural gas consumption in the U.S. is currently about 23 trillion cubic feet (tcf ) per year and is expected to increase to about 31 tcf per

More information

FALCONARA OIL TERMINALS INFORMATIONS = API REFINERY = S.P.M. abt 8 miles

FALCONARA OIL TERMINALS INFORMATIONS = API REFINERY = S.P.M. abt 8 miles FALCONARA OIL TERMINALS INFORMATIONS = API REFINERY = Position : Lat. 43 40' 06" North. Long. 13 24' 24" East. Distance from Ancona Port Signals Prevalent winds Prevalent currents : Oil jetty - Sea Island

More information

Horizontal Directional Drilling

Horizontal Directional Drilling Horizontal Directional Drilling Horizontal Directional Drilling Why HDD Surface is neither broken nor damaged Restoration and repair are not required No public hazard or traffic disturbance Low social

More information

GRAIN LNG Challenges & benefits for the deployment of LNG in ports. October 2017 BPA Conference, Poole, UK

GRAIN LNG Challenges & benefits for the deployment of LNG in ports. October 2017 BPA Conference, Poole, UK GRAIN LNG Challenges & benefits for the deployment of LNG in ports October 2017 BPA Conference, Poole, UK What is LNG? LNG is Liquefied Natural Gas Identical to the gas at home Stored as a liquid at 161oC

More information

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST EXPRESSION OF INTEREST White Rose Extension Project (WREP) EOI / Prequalification Wellhead Control Panel EOI-101414-702.0 Mustang Canada, Inc. is seeking prequalification responses from interested companies

More information

HDPE PIPE FROM BEAD TO INSTALLATION, A COMPLETE SOLUTION

HDPE PIPE FROM BEAD TO INSTALLATION, A COMPLETE SOLUTION HDPE PIPE FROM BEAD TO INSTALLATION, A COMPLETE SOLUTION SEAMLESS SOLUTION HISTORY, SAFETY, QUALITY & ENVIRONMENT Tubi manufactures and provides solutions for HDPE Pipe. Tubi provides seamless solutions

More information

Expert in Tunneling Systems & Trenchless Technology (HDD, Microtunneling, Pipe Jacking, Thrustboring, Sheet Piling)

Expert in Tunneling Systems & Trenchless Technology (HDD, Microtunneling, Pipe Jacking, Thrustboring, Sheet Piling) INDEX 2 Company Profile 4 Technical Description 13 Organization Chart 6 Quality & HSE 19 Services Offered 8 Certification 22 COMPANY PROFILE Company Profile 4 Thrustboring Technology Contracting Company

More information

Floating LNG: Origins and Future Impact on the LNG Industry

Floating LNG: Origins and Future Impact on the LNG Industry Floating LNG: Origins and Future Impact on the LNG Industry SPE Gulf Coast Region Ing. Paul Sullivan SVP Global LNG + FLNG - Worley Parsons 13 th July 2016 WP LNG Centres Vancouver LNG Marine I&E Houston

More information

Chapter 10 PETROLEUM PIPELINES AND STORAGE FACILITIES

Chapter 10 PETROLEUM PIPELINES AND STORAGE FACILITIES Chapter 10 PETROLEUM PIPELINES AND STORAGE FACILITIES FM 5-104 T he AirLand battlefield is a highly mechanized and mobile environment, increasingly dependent on petroleum products, In the European Theater

More information