Technical Advisory Committee / Policy Advisory Committee. Solution Assessment 5/25/2017. Photo: City of Richmond COMMERCE CORRIDOR STUDY 1

Size: px
Start display at page:

Download "Technical Advisory Committee / Policy Advisory Committee. Solution Assessment 5/25/2017. Photo: City of Richmond COMMERCE CORRIDOR STUDY 1"

Transcription

1 COMMERCE CORRIDOR STUDY Technical Advisory Committee / Policy Advisory Committee Solution Assessment 5/25/2017 Photo: City of Richmond COMMERCE CORRIDOR STUDY 1

2 Agenda Welcome and Roll Call Barbara Nelson, RRTPO Webinar objectives Paul Prideaux, P.E., Michael Baker International Summary Bundled Solutions Prideaux Transportation Assessment Prideaux & Zach Harris, Michael Baker Int l Economic Assessment Paul Bingham, EDR Group Short-, Medium-, & Long-Term grouping and cost estimates Prideaux Shortlisting of solutions Prideaux Solution profile sheets Krista Goodin, CDM Smith Next Steps / Homework Prideaux Wrap Up Paul Prideaux / Barbara Nelson 2 COMMERCE CORRIDOR STUDY 2

3 Summary of Bundled Solutions COMMERCE CORRIDOR STUDY 3

4 Bundle 1 Bundle 2 Bundle 4 Bundle 3 Bundling of Solutions Approach Four Discrete Bundles Fully Funded Construction Projects Projects not fully funded but in Constrained Long Range Plan Assessed with modeling tools Projects not fully funded & not in Constrained Long Range Plan Studies, Policies & Programs Treated separately. Not assessed with modeling tools COMMERCE CORRIDOR STUDY 4

5 Bundling of Solutions Approach Transportation and Economic Modeling Projects not funded and not in Constrained Long Range Plan Projects not fully funded but in Constrained Long Range Plan Fully funded construction projects Assessment / modeling of each bundle will include subsets as shown COMMERCE CORRIDOR STUDY 5

6 Bundling of Solutions Bundle 1 Commerce Corridor Preliminary Projects - Funded in FY SYIP and/or FY 18 SmartScale recommendation H2.3.1 H2.5 H2.6 Improve access from I-95 to industrial corridor within project study area Improve access from I-95 to industrial corridor within project study area Improve access from I-95 to industrial corridor within project study area Phase 1 improvements to interchange function at I-95 / Route 10. Improve curve radius on I-95 NB to Rte 10 EB offramp. Add lane on Rte 10 EB from I-95 NB off-ramp to Old Stage Rd to allow free-flow. Add lane on Rte 10 EB to I-95 NB ramp. Add 1,800' acceleration lane on I-95 NB. Improve interchange function at I-95 / Maury Street. Improve and shift the ramps to Maury Street from I-95 and construct single-lane roundabout at the convergence of the ramps, Maury Street and 4th Street consistent with project fully funded in VDOT SYIP. The addition of auxiliary lanes on I-95 on both the northbound and southbound travel lanes between Route 288 and Route 10, or for approximately 1.2 miles. H3.2 Improve ability to bring larger / oversized cargo to RMT via truck Construct 0.7 mile Deepwater Terminal Road extension to Goodes Street H5. Improve function and capacity of Commerce Road Reconstruct roadway including protected turn lanes, improved entrance curb radii for industrial traffic, bicycle and pedestrian facilities, corridor-wide access management, and a bridge replacement. H6.2 Maintain and enhance I-95 mainline capacity Implement ITS solutions including cameras and variable message signs along I-95 to improve operations, congestion mitigation and incident management. H10.1 Improve truck / auto capacity into and out of Site 4 (Meadowville area) Construct project to improve safety & operations along Route 10 from Bermuda Triangle Road through Meadowville Road / Old Bermuda Hundred Road. R2.1 Improvements to Deepwater Terminal Industrial Track lead Improve physical condition and operational speed of existing Deepwater Terminal Industrial Track lead. P5. Improve intermodal transfer performance at RMT Re-pave north wharf area, repair dilapidated at-grade rail crossings, replace fender along wharf wall COMMERCE CORRIDOR STUDY 6

7 Bundling of Solutions Bundle 2 Commerce Corridor Preliminary Projects - Included in plan2040 Constrained Long Range Plan H1.2 Improved connection from Commerce Corridor to I-64 east corridor and RIC / White Oak area Improve the existing two lane section of New Market Rd between S. Laburnum Ave & Osborne Tpke to a 4-lane divided roadway section H2.1 H2.3.2 H10.2 H10.3 Improve access from I-95 to industrial corridor within project study area Improve access from I-95 to industrial corridor within project study area Improve truck / auto capacity into and out of Site 4 (Meadowville area) Improve truck / auto capacity into and out of Site 4 (Meadowville area) Improve Interchange function at I-95 / Willis Road. Construct roundabout interchange consistent with preferred alternative in I-95 at Willis Road Interchange Modification Report Phase 2 improvements to interchange function at I-95 / Route 10. Removal of loops, signalize ramps, NB & SB I-95 auxiliary lanes between Route 10 & Route 288 (accomplished by H2.6), construct 249-space Park & Ride lot at Exit 58. Widen Meadowville Technology Parkway to four lanes at the interchange of I-295 to include the construction of a new bridge over I-295. Sidewalk will be built on a portion of the project Widen North Enon Church Road to four lanes from Meadowville Technology Parkway to Route 10 / East Hundred Road COMMERCE CORRIDOR STUDY 7

8 H1.1 H2.2 H2.4.2 H2.7 H3.1 H4. H6.1 H7.2 Bundling of Solutions Bundle 3, Slide 1 of 2 Commerce Corridor Preliminary Projects - Unfunded and Not Included in plan2040 Constrained Long Range Plan Improved connection from Commerce Corridor to I-64 east corridor and RIC / White Oak area Improve access from I-95 to industrial corridor within project study area Improve access from I-95 to industrial corridor within project study area Improve access from I-95 to industrial corridor within project study area Improve ability to bring larger / oversized cargo to RMT via truck Address poor pavement condition in key locations in study area Maintain and enhance I-95 mainline capacity Improve truck / auto capacity into and out of Site 1 (Altria / DuPont) Construct missing SB to EB movement at I-95 / Rte 895 Improved arterial access to James River Industrial Park from I-95 / Willis Road Interchange. Construct arterial improvements consistent with preferred alternative in I-95 at Willis Road Interchange Modification Report Construct interchange modifications at I-95 / Bells Road area to improve operational performance. Address deficient design of identified ramps and ramp termini approaching Commerce Road as defined by the IMR proposed in solution H Construct I-95 interchange (new access point) in Bellemeade Road / Commerce Road area Increase horizontal and vertical clearance at two I-95 underpass locations that connect Commerce Road to Deepwater Terminal Rd. Pavement rehabilitation or resurfacing of Bells Road Access Road, Deepwater Terminal Road, and Commerce Road Access. Conduct operational study of I-95 through the Commerce Corridor Study area to identify improvements that are needed beyond those identified for Need H2. Such solutions can include physical improvements as well as strategies to help divert thru traffic to parallel facilities (I-295) to preserve existing I-95 capacity. Construct missing link of Walmsley Boulevard with grade separated crossing of CSX Bellwood Subdivision Line. H10.5 H10.6 Improve truck / auto capacity into and out of Site 4 (Meadowville area) Improve truck / auto capacity into and out of Site 4 (Meadowville area) Improve East Hundred Road from Appomattox River bridge to I-295 Improve Allied Road from Bermuda Hundred Road to Route 10 H10.7 H11 R1.2 R2.2 R3.1 Improve truck / auto capacity into and out of Site 4 (Meadowville area) Improve development potential of Site 1 Enhance cost-competitiveness of rail access to Richmond Marine Terminal Improvements to Deepwater Terminal Industrial Track lead Improvements to CSX Bellwood Sub (S-Line) Improve Meadowville Road from Meadowville Technology Pkwy to North Enon Church Road Relocation of Commerce Road to be adjacent to I-95 between Walmsley Blvd and Trenton Avenue to allow for a larger contiguous land mass for development at Site 1. Extend existing rail lead north of current connection to CSX South Yard to provide additional rail access to industrial sites as well as connect to an existing Norfolk Southern rail spur (Rocketts Spur). Extend existing or construct new siding along Deepwater Terminal Industrial Track approximately 1-mile north of Port in vicinity of Kinder Morgan / Richmond Auto Auction / Sims Metal. Construct additional trackage along CSX Bellwood Sub (S-Line) and bridge over James River as contemplated in the Tier II EIS for Richmond-to-Raleigh High Speed Rail and DC2RVA High Speed Rail. COMMERCE CORRIDOR STUDY 8

9 R3.2 R3.3 R4. R5. R6. R7. R8. P1.3 P1.4 P4. M1. M5.3 M6.1 M6.2 Bundling of Solutions Bundle 3, Slide 2 of 2 Commerce Corridor Preliminary Projects - Unfunded and Not Included in plan2040 Constrained Long Range Plan Improvements to CSX Bellwood Sub (S-Line) Improvements to CSX Bellwood Sub (S-Line) Improvements to CSX Peninsula Sub line Improvements to CSX Bermuda Hundred Lead Improvements to NS Burkeville to West Point line Limit at-grade rail crossings along key freight roadways and railways Ability to bring larger / oversized cargo to RMT via rail Improve access to Richmond Marine Terminal Improve access to Richmond Marine Terminal Improve ability for RMT to interact with longer unit trains Improve image & competitiveness of Commerce Corridor for industrial development Improve Multimodal Workforce Access to Jobs Reduce community impacts of rail and highway traffic through surrounding residential areas Reduce community impacts of rail and highway traffic through surrounding residential areas Construct improvements to CSX South Yard (east of Manchester area) to allow for increased ability to break up long trains and store rail cars and tankers until industrial customers are ready. Construct sidings and leads as needed to provide rail access to Site 2 (Alleghany Warehouse) and Site 1 (Altria / DuPont) development areas along Commerce Road. Construct sidings and leads as needed to provide rail access to select parcels within Site 3 (RIC/White Oak area). Construct sidings and leads as needed to provide rail access to select parcels within Site 4 (Meadowville area). Construct sidings and leads as needed to provide rail access to select parcels within Site 3 (RIC/White Oak area). Grade separate key crossings as they relate to increased usage of the CSX Bellwood Sub (S-line) for both freight & future high-speed rail. Increase horizontal and vertical clearance at triple crossing to allow transport of high cube box cars. Construct vehicle access under I-95 at current utility crossing to allow flow of select traffic from Commerce Road to RMT property. See solution P1.2. Conduct study of gate operations with goal of improving gate capacity during times of increased activity via truck Possible short-line solution. Also see Need R1.1 & R2.2 Tax incentives. Visual improvements (overlay) along corridor. Broadband connectivity throughout area. More restaurants & services. Improved signage and wayfinding. Improve multimodal connectivity including not only transit but also walk and bike modes Truck Routing: Designate by signing and wayfinding preferred truck routes to guide heavy vehicles toward roadways better equipped to accommodate their size and to minimize residential interaction/community impacts Noise Reduction: Implement strategies to minimize freight-generated noise pollution, including technology improvements at at-grade rail crossings to allow trains to advance without sounding horns in or near residential areas COMMERCE CORRIDOR STUDY 9

10 H2.4.1 H7.1 H8. H9.1 H9.2 H10.4 R1.1 R9. Bundling of Solutions Bundle 4 Improve access from I-95 to industrial corridor within project study area Improve truck / auto capacity into and out of Site 1 (Altria / DuPont) Improve truck / auto capacity into and out of Site 2 (Alleghany Warehouse) Improve truck / auto capacity into and out of Site 3 (RIC / White Oak area) Improve truck / auto capacity into and out of Site 3 (RIC / White Oak area) Improve truck / auto capacity into and out of Site 4 (Meadowville area) Enhance cost-competitiveness of rail access to Richmond Marine Terminal Increased ability for Class 1 railroads to accommodate future peak demand Commerce Corridor Preliminary Projects - Studies, Policies, Programs Conduct study to support an Interchange Modification Request (IMR) to document operational deficiencies and identify potential improvements at I-95 / Bells Road area, including evaluation of alternative new access point in the Bellemeade Road / Commerce Road area (Solution H2.7) Upon specific redevelopment details at Site 1, perform necessary traffic study to determine what improvements are needed beyond that included in Need H5 above. This includes function of Bells Road Access Rd. Upon specific redevelopment details at Site 2, perform necessary traffic study to determine what improvements are needed beyond that included in Need H5 above. This includes function of Commerce Access Rd. Upon specific industrial development details at Site 3, perform traffic impact study of the following roadways near the site: East Williamsburg Road, Technology Blvd, Elko Road, Airport Drive. Upon specific industrial development details at Site 3, perform traffic impact study of the I-295 facility and four nearby interchanges in close proximity to the RIC/White Oak area Upon specific redevelopment details at Site 4, perform necessary traffic study to determine what improvements are needed beyond that included in Need H10.1 above to address Route 10 needs west of I-295. Implement dual Class I rail access to RMT via short-line service or other legal agreement(s) Add more 'locals' and crews as needed to serve future rail demand along industrial corridor(s) P1.1 Improve access to RMT Increase RMT business hours and / or establish off-hours secure laydown yard(s) P1.2 Improve access to RMT Conduct study of proposal to allow vehicle traffic to utilize existing underpass of I-95 adjacent to RMT property. Study would document and propose mitigation for engineering, environmental and legal challenges. P2. Increase rail capacity inside the gates of Conduct rail operations study inside the RMT facility to identify most cost-effective investment to improve rail capacity Richmond Marine Terminal & operations P3. Increase port activity via on-site tenants Develop vacant 14-acres for users that rely on barge, truck, rail. Long-term lease of existing warehouses. P6. Maximize use of Port M2. Increase grant funding M3. M4. M5.1 M5.2 M6.3 Facilitate Transload opportunities between truck and rail Comprehensive Industrial Master Plan for Richmond Marine Terminal & surrounding area Improve Multimodal Workforce Access to Jobs Improve Multimodal Workforce Access to Jobs Reduce community impacts of rail and highway traffic through surrounding residential areas Seek more balanced and diversified mix of RMT users / modes (e.g. more rail, customers that keep port busy during slower seasons) Increase ceiling of Industrial Access Grant program to allow for Class I railroads to respond quickly to development proposals Encourage and/or incentivize rail operators to offload at RMT and barge to POV facilities in Hampton Roads Implement master land use planning process to integrate near-terminal development efforts with on-terminal activities, and to inventory rail accessible development and redevelopment sites not currently utilizing rail. Work with local jurisdictions and transit agencies, respectively, to plan for increased housing and / or transit service closer to our four sites of increased job activity Promote the importance of workforce training opportunities in advance of new jobs arriving Community Engagement: Develop Community Impacts Analysis for the Commerce Corridor study area to analyze population characteristics, propose community and health impacts mitigation strategies, and identify public engagement strategies for vulnerable communities. COMMERCE CORRIDOR STUDY 10

11 Transportation Assessment COMMERCE CORRIDOR STUDY 11

12 Study team performed a qualitative assessment of each individual solution to report anticipated multimodal benefits in the areas of: Congestion relief and travel time improvement Transportation network connectivity improvements Enhancements to intermodal performance Improve last mile access to or transportation function of RMT Improve travel safety Improve workforce or image / marketability of corridor COMMERCE CORRIDOR STUDY 12

13 Ref # Need Solution H1.1 Improved connection from Construct missing SB to EB movement at I-95 / Rte 895 H1.2 Commerce Corridor to I-64 east corridor and RIC / White Oak area Improve the existing two lane section of New Market Rd between S. Laburnum Ave & Osborne Tpke to a 4-lane divided roadway section H2.1 Improve Interchange function at I-95 / Willis Road. Construct roundabout interchange consistent with preferred alternative in I-95 at Willis Road Interchange Modification Report H2.2 H2.3.1 H2.3.2 H2.4.1 H2.4.2 H2.5 Improve access from I-95 to industrial corridor within project study area Provide Congestion Relief or reduce travel time (highway or rail) Improve Transportation Network Connectivity Enhance Intermodal Performance Improve local (last mile) access to or function of RMT Improved arterial access to James River Industrial Park from I-95 / Willis Road Interchange. Construct arterial improvements consistent with preferred alternative in I-95 at Willis Road Interchange Modification Report Phase 1 improvements to interchange function at I-95 / Route 10. Improve curve radius on I-95 NB to Rte 10 EB off-ramp. Add lane on Rte 10 EB from I-95 NB off-ramp to Old Stage Rd to allow free-flow. Add lane on Rte 10 EB to I-95 NB ramp. Add 1,800' acceleration lane on I-95 NB Phase 2 improvements to interchange function at I-95 / Route 10. Removal of loops, signalize ramps, NB & SB I-95 auxiliary lanes between Route 10 & Route 288 (accomplished by H2.6), construct 249-space Park & Ride lot at Exit 58. Conduct study to support an Interchange Modification Request (IMR) to document operational deficiencies and identify potential improvements at I-95 / Bells Road area, including evaluation of alternative new access point in the Bellemeade Road/Commerce Road area (solution H2.7) Construct interchange modifications at I-95 / Bells Road area to improve operational performance. Address deficient design of identified ramps and ramp termini approaching Commerce Road as defined by the IMR proposed in solution H DRAFT Improve interchange function at I-95 / Maury Street. Improve and shift the ramps to Maury Street from I-95 and construct single-lane roundabout at the convergence of the ramps, Maury Street and 4th Street consistent with project fully funded in VDOT SYIP. H2.6 The addition of auxiliary lanes on I-95 on both the northbound and southbound travel lanes between Route 288 and Route 10, or for approximately 1.2 miles. H2.7 Construct I-95 interchange (new access point) in Bellemeade Road / Commerce Road area H3.1 Increase horizontal and vertical clearance at two I-95 underpass locations that Improve ability to bring larger / connect Commerce Road to Deepwater Terminal Rd. H3.2 oversized cargo to RMT via truck Construct 0.7 mile Deepwater Terminal Road extension to Goodes Street H4. Address poor pavement condition Pavement rehabilitation or resurfacing of Bells Road Access Road, Deepwater COMMERCE CORRIDOR STUDY 13 at key locations in study area Terminal Road, and Commerce Road Access. STUDY Improve travel safety Improve industrial community (workforce or Image/marketability)

14 Ref # Need Solution H5. H6.1 H6.2 H7.1 H7.2 H8 H9.1 H9.2 H10.1 H10.2 H10.3 H10.4 Improve function and capacity of Commerce Road Improve truck / auto capacity into and out of Site 2 (Alleghany Warehouse) Provide Congestion Relief or reduce travel time (highway or rail) Improve Transportation Network Connectivity Enhance Intermodal Performance Improve local (last mile) access to or function of RMT Reconstruct roadway including protected turn lanes, improved entrance curb radii for industrial traffic, bicycle and pedestrian facilities, corridor-wide access management, and a bridge replacement. Conduct operational study of I-95 through the Commerce Corridor Study area to identify improvements that are needed beyond those identified for Need H2. Such solutions can include physical improvements as well as strategies to help divert thru traffic to parallel facilities (I-295) to preserve existing I-95 capacity. Implement ITS solutions including cameras and variable message signs along I-95 to improve operations, congestion mitigation and incident management. Upon specific redevelopment details at Site 1, perform necessary traffic study to determine what improvements are needed beyond that included in Need H5 above. This includes function of Bells Road Access Rd. Construct missing link of Walmsley Boulevard with grade separated crossing of CSX Bellwood Subdivision Line. Upon specific redevelopment details at Site 2, perform necessary traffic study to determine what improvements are needed beyond that included in Need H5 above. This includes function of Commerce Access Rd. Upon specific industrial development details at Site 3, perform traffic impact study of the following roadways near the site: East Williamsburg Rd, Technology Blvd, Elko Rd, Airport Dr. Upon specific industrial development details at Site 3, perform traffic impact study of the I-295 facility and four nearby interchanges in close proximity to the RIC/White Oak area. Construct project to improve safety & operations along Route 10 from Bermuda Triangle Road through Meadowville Road / Old Bermuda Hundred Road. Widen Meadowville Technology Parkway to four lanes at the interchange of I-295 to include the construction of a new bridge over I-295. Sidewalk will be built on a portion of the project Widen North Enon Church Road to four lanes from Meadowville Technology Parkway to Route 10 / East Hundred Road. Upon specific redevelopment details at Site 4, perform necessary traffic study to determine what improvements are needed beyond that included in Need H10.1 above to address Route 10 needs west of I-295. H10.5 Improve East Hundred Road from Appomattox River bridge to I-295 H10.6 Improve Allied Road from Bermuda Hundred Road to Route 10 Improve Meadowville Road from Meadowville Technology Pkwy to North Enon H10.7 Church Road H11 Maintain and enhance I-95 mainline capacity Improve truck / auto capacity into and out of Site 1 (Altria / DuPont) Improve truck / auto capacity into and out of Site 3 (RIC / White Oak area) Improve truck / auto capacity into and out of Site 4 (Meadowville area) Improve development potential of Site 1 DRAFT Relocation of Commerce Road to be adjacent to I-95 between Walmsley Blvd and Trenton Avenue to allow for a larger contiguous land mass for development at Site 1. STUDY STUDY STUDY STUDY STUDY STUDY Improve travel safety Improve industrial community (workforce or Image/marketability) COMMERCE CORRIDOR STUDY 14

15 Ref # Need Solution R1.1 R1.2 R2.1 R2.2 R3.1 R3.2 R3.3 R4. R5. R6. R7. R8 R9. Enhance cost-competitiveness of rail access to Richmond Marine Terminal Improvements to Deepwater Terminal Industrial Track lead Improvements to CSX Bellwood Sub (S-Line) Improvements to CSX Peninsula Sub line Improvements to CSX Bermuda Hundred Lead Improvements to NS Burkeville to West Point line Limit at-grade rail crossings along key freight roadways and railways Ability to bring larger / oversized cargo to RMT via rail Increased ability for Class 1 railroads to accommodate future peak demand Provide Congestion Relief or reduce travel time (highway or rail) Improve Transportation Network Connectivity Enhance Intermodal Performance Improve local (last mile) access to or function of RMT Implement dual Class I rail access to RMT via short-line service or other legal agreement(s) Extend existing rail lead north of current connection to CSX South Yard to provide additional rail access to industrial sites as well as connect to an existing Norfolk Southern rail spur (Rocketts Spur). Improve physical condition and operational speed of existing Deepwater Terminal Industrial Track lead. Extend existing or construct new siding along Deepwater Terminal Industrial Track approximately 1-mile north of Port in vicinity of Kinder Morgan / Richmond Auto Auction / Sims Metal. Construct additional trackage along CSX Bellwood Sub (S-Line) and bridge over James River as contemplated in the Tier II EIS for Richmond-to-Raleigh High Speed Rail and DC2RVA High Speed Rail. Construct improvements to CSX South Yard (east of Manchester area) to allow for increased ability to break up long trains and store rail cars and tankers until industrial customers are ready. Construct sidings and leads as needed to provide rail access to Site 2 (Alleghany Warehouse) and Site 1 (Altria / DuPont) development areas along Commerce Road. Construct sidings and leads as needed to provide rail access to select parcels within Site 3 (RIC/White Oak area). Construct sidings and leads as needed to provide rail access to select parcels within Site 4 (Meadowville area). Construct sidings and leads as needed to provide rail access to select parcels within Site 3 (RIC/White Oak area). DRAFT Grade separate key crossings as they relate to increased usage of the CSX Bellwood Sub (S-line) for both freight & future high-speed rail Increase horizontal and vertical clearance at triple crossing to allow transport of high cube box cars. Add more 'locals' and crews as needed to serve future rail demand along industrial corridor(s) P1.1 Increase RMT business hours and / or establish off-hours secure laydown yard(s) Improve travel safety Improve industrial community (workforce or Image/marketability) P1.2 P1.3 P1.4 Improve access to Richmond Marine Terminal Conduct study of proposal to allow vehicle traffic to utilize existing underpass of I-95 adjacent to RMT property. Study would document and propose mitigation for engineering, environmental and legal challenges. Construct vehicle access under I-95 at current utility crossing to allow flow of select traffic from Commerce Road to RMT property. See solution P1.2. Conduct study of gate operations with goal of improving gate capacity during times of increased activity via truck STUDY COMMERCE CORRIDOR STUDY 15 STUDY

16 Ref # Need Solution P2. P3. P4. P5. Increase rail capacity inside the gates of RMT Increase port activity via on-site tenants Improve ability for RMT to interact with longer unit trains Improve intermodal transfer performance at RMT P6. Maximize use of Port M1. Improve image & competitiveness of Commerce Corridor for industrial development M2. Increase grant funding M3. M4. M5.1 Facilitate Transload opportunities between truck and rail Comprehensive Industrial Master Plan for Richmond Marine Terminal & surrounding area Conduct rail operations study inside the RMT facility to identify most cost-effective investment to improve rail capacity & operations Provide Congestion Relief or reduce travel time (highway or rail) Improve Transportation Network Connectivity Enhance Intermodal Performance Improve local (last mile) access to or function of RMT Develop vacant 14-acres for users that rely on barge, truck, rail. Long-term lease of existing warehouses. Possible short-line solution. Also see Need R1.1 & R2.2 Re-pave north wharf area, repair dilapidated at-grade rail crossings, replace fender along wharf wall Seek more balanced and diversified mix of RMT users / modes (e.g. more rail, customers that keep port busy during slower seasons) Tax incentives. Visual improvements (overlay) along corridor. Broadband connectivity throughout area. More restaurants & services. Improved signage and wayfinding. Increase ceiling of Industrial Access Grant program to allow for Class I railroads to respond quickly to development proposals Encourage and/or incentivize rail operators to offload at RMT and barge to POV facilities in Hampton Roads Implement master land use planning process to integrate near-terminal development efforts with on-terminal activities, and to inventory rail accessible development and redevelopment sites not currently utilizing rail. DRAFT Work with local jurisdictions and transit agencies, respectively, to plan for increased housing and / or transit service closer to our four sites of increased job activity Improve Multimodal Workforce M5.2 Promote the importance of workforce training opportunities in advance of new jobs arriving Access to Jobs M5.3 Improve multimodal connectivity including not only transit but also walk and bike modes STUDY STUDY Improve travel safety Improve industrial community (workforce or Image/marketability) M6.1 M6.2 M6.3 Reduce community impacts of rail and highway traffic through surrounding residential areas Truck Routing: Designate by signing and wayfinding preferred truck routes to guide heavy vehicles toward roadways better equipped to accommodate their size and to minimize residential interaction/community impacts. Noise Reduction: Implement strategies to minimize freight-generated noise pollution, including technology improvements at at-grade rail crossings to allow trains to advance without sounding horns in or near residential areas. Community Engagement: Develop Community Impacts Analysis for the Commerce Corridor study area to analyze population characteristics, propose community and health impacts mitigation strategies, and identify public engagement strategies for vulnerable communities. COMMERCE CORRIDOR STUDY STUDY 16

17 The study team performed a quantitative assessment of the multimodal solutions using the regional model and operational models at spot locations to report anticipated travel impacts. This analysis was performed for each of the three bundles of improvements compared to the future baseline scenario. COMMERCE CORRIDOR STUDY 17

18 Spot locations selected to report changes in travel operations across three bundles of improvements COMMERCE CORRIDOR STUDY 18

19 Location Facility From To Type No-Build Bundle 1 Bundle 2 Bundle 3 Comment 1 Maury Street I-95 Jefferson Davis Hwy Roadway link Poor Poor Poor Good 2 I-95 Maury Street Route 288 Roadway link Poor Poor Poor Poor ITS strategies cannot be coded into the regional model. It is not expected that ITS improvements will greatly improve I-95 operations 3 I-95 Route 288 Route 10 Roadway link Poor Fair Fair Fair 4 W Hundred Road (Route 10) Rivers Bend Old Stage Rd Roadway link Poor Good Good Good 5 W Williamsburg Rd (Route 60) Airport Drive Beulah Rd Roadway link Poor Fair Fair Fair 6 E Williamsburg Rd (Route 60) I-295 Technology Blvd Roadway link Poor Poor Poor Poor 7 E Williamsburg Rd (Route 60) Medow Road Route 33 Roadway link Poor Poor Poor Poor 8 Elko Road Route 60 Elko Tract Road Roadway link Poor Poor Poor Poor 9 I-64 I-295 Route 33 Roadway link Poor Poor Poor Poor Universe of Needs Study (H9.1) will develop recommendations to improve operations Universe of Needs Study (H9.1) will develop recommendations to improve operations Universe of Needs Study (H9.1) will develop recommendations to improve operations I-64 does not have sufficient capacity for the vehicles generated by regional growth which includes increased development at Site #3 10 Memorial Drive Technology Blvd Portugee Rd Roadway link Poor Poor Good Good 11 I-295 Through Route 60 Interchange Roadway link Poor Poor Poor Poor I-295 does not have sufficient capacity for the vehicles generated by regional growth which includes increased development at Site #4 12 Commerce Road Maury Street Trenton Ave Roadway link Fair Good Good Good 13 I-95 / Willis Road Interchange movements Interchange Poor Poor Good Good 14 I-95 / Route 10 Interchange movements Interchange Poor Fair Good Good 15 I-95 / Bells Rd Interchange Interchange movements Interchange Poor Poor Poor Good 16 I-95 / Maury Street Interchange Interchange movements Interchange Poor Good Good Good 17 CSX Bellwood Sub (S-Line) Rail improvements Rail Fair Fair Fair Good Commerce Road / Bells Rd Access Rd Deepwater Terminal Road / Bells Rd Access Rd Intersection movements Intersection movements Intersection Fair Good Good Good Intersection Fair Good Good Good 20 Bells Road / Jefferson Davis Hwy Intersection movements Intersection Poor Poor Poor Fair 21 Bells Road / Ruffin Road Intersection movements Intersection Good Good Good Good Commerce Road / Bellmeade Rd W Hundred Road (Route 10) / Rivers Bend Blvd Meadowville Road / Meadowville Technology Pkwy E Williamsburg Road (Route 60) / Technology Blvd E Williamsburg Road (Route 60) / Elko Rd E Williamsburg Road (Route 60) / Airport Drive Intersection movements Intersection movements Intersection movements Intersection movements Intersection movements Intersection movements Intersection Fair Good Good Good Intersection Poor Good Good Good Intersection Good Good Good Good Intersection Poor Poor Poor Poor Intersection Poor Poor Poor Poor Intersection Poor Fair Fair Fair Universe of Needs Study (H9.1) will develop recommendations to improve operations Universe of Needs Study (H9.1) will develop recommendations to improve operations COMMERCE CORRIDOR STUDY 19

20 Location Facility From To Type No-Build Bundle 1 Bundle 2 Bundle 3 Comment 1 Maury Street I-95 Jefferson Davis Hwy Roadway link Poor Poor Poor Good 2 I-95 Maury Street Route 288 Roadway link Poor Poor Poor Poor ITS strategies cannot be coded into the regional model. It is not expected that ITS improvements will greatly improve I-95 operations 3 I-95 Route 288 Route 10 Roadway link Poor Fair Fair Fair 4 W Hundred Road (Route 10) Rivers Bend Old Stage Rd Roadway link Poor Good Good Good 5 W Williamsburg Rd (Route 60) Airport Drive Beulah Rd Roadway link Poor Fair Fair Fair 6 E Williamsburg Rd (Route 60) I-295 Technology Blvd Roadway link Poor Poor Poor Poor 7 E Williamsburg Rd (Route 60) Medow Road Route 33 Roadway link Poor Poor Poor Poor 8 Elko Road Route 60 Elko Tract Road Roadway link Poor Poor Poor Poor 9 I-64 I-295 Route 33 Roadway link Poor Poor Poor Poor Universe of Needs Study (H9.1) will develop recommendations to improve operations Universe of Needs Study (H9.1) will develop recommendations to improve operations Universe of Needs Study (H9.1) will develop recommendations to improve operations I-64 does not have sufficient capacity for the vehicles generated by regional growth which includes increased development at Site #3 10 Memorial Drive Technology Blvd Portugee Rd Roadway link Poor Poor Good Good 11 I-295 Through Route 60 Interchange Roadway link Poor Poor Poor Poor I-295 does not have sufficient capacity for the vehicles generated by regional growth which includes increased development at Site #4 12 Commerce Road Maury Street Trenton Ave Roadway link Fair Good Good Good 13 I-95 / Willis Road Interchange movements Interchange Poor Poor Good Good 14 I-95 / Route 10 Interchange movements Interchange Poor Fair Good Good 15 I-95 / Bells Rd Interchange Interchange movements Interchange Poor Poor Poor Good 16 I-95 / Maury Street Interchange Interchange movements Interchange Poor Good Good Good 17 CSX Bellwood Sub (S-Line) Rail improvements Rail Fair Fair Fair Good Commerce Road / Bells Rd Access Rd Deepwater Terminal Road / Bells Rd Access Rd Intersection movements Intersection movements Intersection Fair Good Good Good Intersection Fair Good Good Good 20 Bells Road / Jefferson Davis Hwy Intersection movements Intersection Poor Poor Poor Fair 21 Bells Road / Ruffin Road Intersection movements Intersection Good Good Good Good Commerce Road / Bellmeade Rd W Hundred Road (Route 10) / Rivers Bend Blvd Meadowville Road / Meadowville Technology Pkwy E Williamsburg Road (Route 60) / Technology Blvd E Williamsburg Road (Route 60) / Elko Rd E Williamsburg Road (Route 60) / Airport Drive Intersection movements Intersection movements Intersection movements Intersection movements Intersection movements Intersection movements Intersection Fair Good Good Good Intersection Poor Good Good Good Intersection Good Good Good Good Intersection Poor Poor Poor Poor Intersection Poor Poor Poor Poor Intersection Poor Fair Fair Fair Universe of Needs Study (H9.1) will develop recommendations to improve operations Universe of Needs Study (H9.1) will develop recommendations to improve operations COMMERCE CORRIDOR STUDY 20

21 Economic Assessment COMMERCE CORRIDOR STUDY 21

22 Assessment of Bundled Improvements To quantify improvement economic impacts, the bundles of improvements have been assessed for how the projected changes in transportation activity and improvement expenditures affect the economy. Before the economic assessment was performed, data were obtained from the Transportation Assessment modeling of network impacts and the expenditures for the bundled improvement projects. The economic assessment translates the changes to the transportation network in terms of miles and time into dollars and job impacts due to resulting performance changes. Mechanism for the economic impact analysis modeling is how project bundles affect the economy through cost savings 22 and/or new expenditures as consequences of their adoption. COMMERCE CORRIDOR STUDY 22

23 Bundled Project Impacts Evaluation Bundled projects with modeled network impacts are better able to be modeled for their economic impacts Projects which together as a bundle generate greater improvements in travel time savings, safety improvements, and travel time reliability are those most likely to generate significant economic impact results. Wider-area economic benefits of productivity gains can matter too, but not likely in insolation. Projects serving a higher volume of traffic and providing more travel improvement benefits at the margin are likely to be those with greater economic impacts. Economic impacts were therefore modeled for the three bundled investment packages. 23 COMMERCE CORRIDOR STUDY 23

24 What was done? the Economic Assessment Process Modeling 1. Define baseline future network (existing + committed) 2. Define (incremental) alternative investment packages E.g. Mid-level versus aggressive investment Travel Demand Modelling Network performance under base and alternative investment packages: TRIPS VMT VHT % Congested (By Mode/Purpose) (Investigate changes in Labor/Delivery Market Access, Intermodal Access) Economic Modelling (TREDIS) Construction and O&M costs Economic impact of investment packages relative to baseline: Jobs Sales Income GRP (Including industry/occupation detail) 24 COMMERCE CORRIDOR STUDY 24

25 Economic Assessment Process Understanding Economic Impacts Industry & household responses to cost savings: Households: Businesses: Decrease in spending on transportation Decrease in spending on transportation Increase in spending on other consumer goods Retained as profit Passed on to customers (reduced prices) Changes in industry sales (output) by sector Invested in workers, equipment, and R&D Additional broader productivity effects: Effect of improved reliability on logistics costs and industry sales Effect of access/connectivity on productivity, by industry 25 COMMERCE CORRIDOR STUDY 25

26 Millions of dollars Economic Assessment Results Economic Impact of Construction Expenditure Bundle 1 Bundle 2 Bundle 3 Construction impacts are temporary and will be spread across all years of a construction program. 26 COMMERCE CORRIDOR STUDY 26

27 Millions of dollars Economic Assessment Results Economic Impact of Travel Improvements in 2040 Bundle 1 Bundle 2 Bundle 3 The number of jobs supported by a more efficient transportation system is likely to be similar in COMMERCE CORRIDOR STUDY 27

28 Economic Assessment Results Long-term Job Impacts Impacts Vary by Industry Sector Transport Savings Job Impacts Mostly in Service Sectors Shown here for Bundle 2 28 COMMERCE CORRIDOR STUDY 28

29 Economic Assessment Results Long-term Gross Regional Product Change Impacts also vary by industry sector The value-added measure shows benefits for capital intensive and high productivity sectors like manufacturing 29 COMMERCE CORRIDOR STUDY 29

30 Short-, Medium-, & Long-Term Grouping and Cost estimates COMMERCE CORRIDOR STUDY 30

31 Study team is looking for input from TAC & PAC regarding cost estimates for the various solutions and the grouping of those solutions into Short-, Medium-, and Long-Term categories. COMMERCE CORRIDOR STUDY 31

32 The study team is showing a draft cost for each solution. These costs either come from published documents, the VDOT Planning Level Cost Estimating tool, or were estimated using professional judgment. When previous cost estimates were for a year other than 2017, adjustments were made to allow all cost estimates to reflect 2017 dollars. COMMERCE CORRIDOR STUDY 32

33 Study team has also developed a first-cut at grouping the solutions into Short-, Medium-, and Long-Term categories. The following slides document the general criteria used for this initial grouping. COMMERCE CORRIDOR STUDY 33

34 Short-Term: Solutions are marked as short-term if the activity could generally be completed within a 10-year timeframe and has at least three of the following attributes: Relatively low cost (generally $0 to $50m) There exists a current need Funding is in place We re not waiting for something else to occur before we can proceed (e.g. not waiting on development to occur, federal, state or local approvals required) The action would help to market the area for industrial redevelopment COMMERCE CORRIDOR STUDY 34

35 Medium-Term: Solutions are marked as medium-term if the activity could generally occur in the 10 to 20-year timeframe and has at least three of the following attributes: Higher cost than short-term solutions & generally up to $100m Solution is not fully funded Solution is based on needs identified in the 10 to 20-year timeframe Requires more complex project delivery such a multijurisdiction, public and private infrastructure, multiple funding sources, federal, state or local approvals Waiting for other activities to occur before it makes sense to pursue (e.g. waiting for clarity on nature & intensity of industrial redevelopment, increased rail demand at port) COMMERCE CORRIDOR STUDY 35

36 Long-Term: Solutions are marked as long-term if the activity would realistically occur beyond the 20-year timeframe and has at least two of the following attributes: Higher cost than short-term and medium-term solutions and generally above $100m Solution is not fully funded Solution is based on needs identified in the 20+ year timeframe Requires very complex project delivery such a multijurisdiction, public and private infrastructure, multiple funding sources, or significant federal, state or local approvals Waiting for other activities to occur before it makes sense to pursue (e.g. waiting for clarity on nature & intensity of industrial redevelopment, increased rail demand at port) DRAFT COMMERCE CORRIDOR STUDY 36

37 Ref # Need Solution H1.1 Improved connection from Construct missing SB to EB movement at I-95 / Rte 895 Commerce Corridor to I-64 east Improve the existing two lane section of New Market Rd between S. Laburnum H1.2 corridor and RIC / White Oak area Ave & Osborne Tpke to a 4-lane divided roadway section H2.1 H2.2 H2.3.1 H2.3.2 H2.4.1 H2.4.2 H2.5 H2.6 H2.7 Improve Interchange function at I-95 / Willis Road. Construct roundabout interchange consistent with preferred alternative in I-95 at Willis Road Interchange Modification Report Improved arterial access to James River Industrial Park from I-95 / Willis Road Interchange. Construct arterial improvements consistent with preferred alternative in I-95 at Willis Road Interchange Modification Report Phase 1 improvements to interchange function at I-95 / Route 10. Improve curve radius on I-95 NB to Rte 10 EB off-ramp. Add lane on Rte 10 EB from I-95 NB off-ramp to Old Stage Rd to allow free-flow. Add lane on Rte 10 EB to I-95 NB ramp. Add 1,800' acceleration lane on I-95 NB Phase 2 improvements to interchange function at I-95 / Route 10. Removal of loops, signalize ramps, NB & SB I-95 auxiliary lanes between Route 10 & Route 288 (accomplished by H2.6), construct 249-space Park & Ride lot at Exit 58. Conduct study to support an Interchange Modification Request (IMR) to document operational deficiencies and identify potential improvements at I-95 / Bells Road area, including evaluation of alternative new access point in the Bellemeade Road/Commerce Road area (solution H2.7) Construct interchange modifications at I-95 / Bells Road area to improve operational performance. Address deficient design of identified ramps and ramp termini approaching Commerce Road as defined by the IMR proposed in solution H Improve interchange function at I-95 / Maury Street. Improve and shift the ramps to Maury Street from I-95 and construct single-lane roundabout at the convergence of the ramps, Maury Street and 4th Street consistent with project fully funded in VDOT SYIP. The addition of auxiliary lanes on I-95 on both the northbound and southbound travel lanes between Route 288 and Route 10, or for approximately 1.2 miles. Construct I-95 interchange (new access point) in Bellemeade Road / Commerce Road area Increase horizontal and vertical clearance at two I-95 underpass locations that H3.1 Improve ability to bring larger / connect Commerce Road to Deepwater Terminal Rd. oversized cargo to RMT via truck H3.2 Construct 0.7 mile Deepwater Terminal Road extension to Goodes Street H4. Improve access from I-95 to industrial corridor within project study area Address poor pavement condition at key locations in study area DRAFT Pavement rehabilitation or resurfacing of Bells Road Access Road, Deepwater Terminal Road, and Commerce Road Access. (1) Cost estimates were pulled from existing documents, estimated using VDOT's Planning Level Cost estimate tool or professional judgment. If documented estimates were for a year other than 2017, the estimate was adjusted such that all entries reflect 2017 dollars. (2) Estimating costs for this line item is not possible without additional information Cost Estimate (1) (2017 Dollars) $23,309,000 $18,400,000 (documented estimate) $42,286,000 (documented estimate) $11,471,000 (documented estimate) $10,000,000 (documented estimate) $42,258,000 (documented estimate) $250,000 (documented estimate) $3,210,000 $8,491,000 (documented estimate) $28,206,000 (documented estimate) $250,000,000 $20,000,000 $3,785,000 $2,000,000 Short-Term Medium-Term COMMERCE CORRIDOR STUDY 37 Long-Term

38 Ref # Need Solution H5. H6.1 H6.2 H7.1 H7.2 H8 H9.1 H9.2 H10.1 H10.2 H10.3 H10.4 Improve function and capacity of Commerce Road Improve truck / auto capacity into and out of Site 2 (Alleghany Warehouse) Reconstruct roadway including protected turn lanes, improved entrance curb radii for industrial traffic, bicycle and pedestrian facilities, corridor-wide access management, and a bridge replacement. Conduct operational study of I-95 through the Commerce Corridor Study area to identify improvements that are needed beyond those identified for Need H2. Such solutions can include physical improvements as well as strategies to help divert thru traffic to parallel facilities (I-295) to preserve existing I-95 capacity. Implement ITS solutions including cameras and variable message signs along I-95 to improve operations, congestion mitigation and incident management. Upon specific redevelopment details at Site 1, perform necessary traffic study to determine what improvements are needed beyond that included in Need H5 above. This includes function of Bells Road Access Rd. Construct missing link of Walmsley Boulevard with grade separated crossing of CSX Bellwood Subdivision Line. Upon specific redevelopment details at Site 2, perform necessary traffic study to determine what improvements are needed beyond that included in Need H5 above. This includes function of Commerce Access Rd. Upon specific industrial development details at Site 3, perform traffic impact study of the following roadways near the site: East Williamsburg Rd, Technology Blvd, Elko Rd, Airport Dr. Upon specific industrial development details at Site 3, perform traffic impact study of the I-295 facility and four nearby interchanges in close proximity to the RIC/White Oak area. Construct project to improve safety & operations along Route 10 from Bermuda Triangle Road through Meadowville Road / Old Bermuda Hundred Road. Widen Meadowville Technology Parkway to four lanes at the interchange of I-295 to include the construction of a new bridge over I-295. Sidewalk will be built on a portion of the project Widen North Enon Church Road to four lanes from Meadowville Technology Parkway to Route 10 / East Hundred Road. Upon specific redevelopment details at Site 4, perform necessary traffic study to determine what improvements are needed beyond that included in Need H10.1 above to address Route 10 needs west of I-295. H10.5 Improve East Hundred Road from Appomattox River bridge to I-295 H10.6 Improve Allied Road from Bermuda Hundred Road to Route 10 H10.7 H11 Maintain and enhance I-95 mainline capacity Improve truck / auto capacity into and out of Site 1 (Altria / DuPont) Improve truck / auto capacity into and out of Site 3 (RIC / White Oak area) Improve truck / auto capacity into and out of Site 4 (Meadowville area) Improve development potential of Site 1 DRAFT Improve Meadowville Road from Meadowville Technology Pkwy to North Enon Church Road Relocation of Commerce Road to be adjacent to I-95 between Walmsley Blvd and Trenton Avenue to allow for a larger contiguous land mass for development at Site 1. (1) Cost estimates were pulled from existing documents, estimated using VDOT's Planning Level Cost estimate tool or professional judgment. If documented estimates were for a year other than 2017, the estimate was adjusted such that all entries reflect 2017 dollars. (2) Estimating costs for this line item is not possible without additional information Cost Estimate (1) (2017 Dollars) $13,899,000 (documented estimate) $250,000 $1,650,000 (documented estimate) $500,000 $12,628,000 $500,000 $100,000 $500,000 $48,539,000 (documented estimate) $18,477,000 (documented estimate) $12,305,000 (documented estimate) $500,000 $50,149,000 $16,124,000 $2,799,000 $2,592,000 Short-Term Medium-Term COMMERCE CORRIDOR STUDY 38 Long-Term

39 Ref # Need Solution R1.1 R1.2 R2.1 R2.2 R3.1 R3.2 R3.3 R4. R5. R6. R7. R8 R9. Improvements to CSX Peninsula Sub line Improvements to CSX Bermuda Hundred Lead Improvements to NS Burkeville to West Point line Limit at-grade rail crossings along key freight roadways and railways Ability to bring larger / oversized cargo to RMT via rail Increased ability for Class 1 railroads to accommodate future peak demand Implement dual Class I rail access to RMT via short-line service or other legal agreement(s) Extend existing rail lead north of current connection to CSX South Yard to provide additional rail access to industrial sites as well as connect to an existing Norfolk Southern rail spur (Rocketts Spur). Improve physical condition and operational speed of existing Deepwater Terminal Industrial Track lead. Extend existing or construct new siding along Deepwater Terminal Industrial Track approximately 1-mile north of Port in vicinity of Kinder Morgan / Richmond Auto Auction / Sims Metal. Construct additional trackage along CSX Bellwood Sub (S-Line) and bridge over James River as contemplated in the Tier II EIS for Richmond-to-Raleigh High Speed Rail and DC2RVA High Speed Rail. Construct improvements to CSX South Yard (east of Manchester area) to allow for increased ability to break up long trains and store rail cars and tankers until industrial customers are ready. Construct sidings and leads as needed to provide rail access to Site 2 (Alleghany Warehouse) and Site 1 (Altria / DuPont) development areas along Commerce Road. Construct sidings and leads as needed to provide rail access to select parcels within Site 3 (RIC/White Oak area). Construct sidings and leads as needed to provide rail access to select parcels within Site 4 (Meadowville area). Construct sidings and leads as needed to provide rail access to select parcels within Site 3 (RIC/White Oak area). Grade separate key crossings as they relate to increased usage of the CSX Bellwood Sub (S-line) for both freight & future high-speed rail Increase horizontal and vertical clearance at triple crossing to allow transport of high cube box cars. Add more 'locals' and crews as needed to serve future rail demand along industrial corridor(s) (1) Cost estimates were pulled from existing documents, estimated using VDOT's Planning Level Cost estimate tool or professional judgment. If documented estimates were for a year other than 2017, the estimate was adjusted such that all entries reflect 2017 dollars. (2) Estimating costs for this line item is not possible without additional information Cost Estimate (1) (2017 Dollars) Short-Term Medium-Term (2) $1,950,000 $1,500,000 $1,500,000 $18,000,000 $1,800,000 $2,690,000 $6,000,000 $3,600,000 $3,000,000 $90,000,000 $50,000,000 (2) P1.1 Increase RMT business hours and / or establish off-hours secure laydown yard(s) (2) P1.2 P1.3 P1.4 Enhance cost-competitiveness of rail access to Richmond Marine Terminal Improvements to Deepwater Terminal Industrial Track lead Improvements to CSX Bellwood Sub (S-Line) Improve access to Richmond Marine Terminal DRAFT Conduct study of proposal to allow vehicle traffic to utilize existing underpass of I-95 adjacent to RMT property. Study would document and propose mitigation for engineering, environmental and legal challenges. Construct vehicle access under I-95 at current utility crossing to allow flow of select traffic from Commerce Road to RMT property. See solution P1.2. Conduct study of gate operations with goal of improving gate capacity during times of increased activity via truck $250,000 $10,000,000 $100,000 COMMERCE CORRIDOR STUDY 39 Long-Term

40 Ref # Need Solution P2. P3. P4. P5. Increase rail capacity inside the gates of RMT Increase port activity via on-site tenants Improve ability for RMT to interact with longer unit trains Improve intermodal transfer performance at RMT P6. Maximize use of Port M1. Improve image & competitiveness of Commerce Corridor for industrial development M2. Increase grant funding M3. M4. Facilitate Transload opportunities between truck and rail Comprehensive Industrial Master Plan for Richmond Marine Terminal & surrounding area (1) Cost estimates were pulled from existing documents, estimated using VDOT's Planning Level Cost estimate tool or professional judgment. If documented estimates were for a year other than 2017, the estimate was adjusted such that all entries reflect 2017 dollars. (2) Estimating costs for this line item is not possible without additional information Cost Estimate (1) (2017 Dollars) Conduct rail operations study inside the RMT facility to identify most cost-effective investment to $250,000 improve rail capacity & operations Develop vacant 14-acres for users that rely on barge, truck, rail. Long-term lease of existing warehouses. (2) Possible short-line solution. Also see Need R1.1 & R2.2 (2) Re-pave north wharf area, repair dilapidated at-grade rail crossings, replace fender along wharf wall $2,050,000 (documented estimate) Seek more balanced and diversified mix of RMT users / modes (e.g. more rail, customers that keep port busy during slower seasons) (2) Tax incentives. Visual improvements (overlay) along corridor. Broadband connectivity throughout area. More restaurants & services. Improved signage and wayfinding. $4,000,000 Increase ceiling of Industrial Access Grant program to allow for Class I railroads to respond quickly to development proposals (2) Encourage and/or incentivize rail operators to offload at RMT and barge to POV facilities in Hampton Roads (2) Implement master land use planning process to integrate near-terminal development efforts with on-terminal activities, and to inventory rail accessible development and redevelopment sites not currently utilizing rail. $300,000 M5.1 Work with local jurisdictions and transit agencies, respectively, to plan for increased housing and / or transit service closer to our four sites of increased job activity (2) M5.2 Improve Multimodal Workforce Access to Jobs Promote the importance of workforce training opportunities in advance of new jobs arriving (2) M5.3 Improve multimodal connectivity including not only transit but also walk and bike modes M6.1 M6.2 M6.3 Reduce community impacts of rail and highway traffic through surrounding residential areas DRAFT Truck Routing: Designate by signing and wayfinding preferred truck routes to guide heavy vehicles toward roadways better equipped to accommodate their size and to minimize residential interaction/community impacts. Noise Reduction: Implement strategies to minimize freight-generated noise pollution, including technology improvements at at-grade rail crossings to allow trains to advance without sounding horns in or near residential areas. Community Engagement: Develop Community Impacts Analysis for the Commerce Corridor study area to analyze population characteristics, propose community and health impacts mitigation strategies, and identify public engagement strategies for vulnerable communities. $5,000,000 $1,000,000 $9,500,000 $200,000 Short-Term Medium-Term COMMERCE CORRIDOR STUDY 40 Long-Term

41 Shortlisting of solutions COMMERCE CORRIDOR STUDY 41

42 With the information developed thus far in the study, the project team sees opportunities to make informed eliminations among the list of 62-solutions. We are looking for input from the TAC/PAC in this area. Any eliminations could be made based on a number of factors including but not limited to: 1) Is the solution redundant with a more economical solution? 2) Is the anticipated performance from an economic and/or transportation perspective relatively low The following slide offers a qualitative perspective about considering solution performance. COMMERCE CORRIDOR STUDY 42

43 Higher direct transportation & economic benefits (e.g. congestion relief, travel time savings, change in VMT Quadrant 1 Quadrant 2 Lower cost solutions Higher cost solutions Quadrant 3 Quadrant 4 Lower direct transportation & economic benefits (e.g. congestion relief, travel time savings, change in VMT COMMERCE CORRIDOR STUDY 43

44 When considering the criteria listed on a previous slide relating to redundancy and solution performance, below is an example elimination that comes to mind: Ref # Need Solution Increase horizontal and vertical clearance at two I-95 underpass locations that H3.1 Improve ability to bring larger / connect Commerce Road to Deepwater Terminal Rd. oversized cargo to RMT via truck H3.2 Construct 0.7 mile Deepwater Terminal Road extension to Goodes Street Cost Estimate (2017 Dollars) $20,000,000 $3,785,000 Short-Term Medium-Term Long-Term In this example, H3.2 effectively accomplishes the Need in a much more economical way, thus allowing the elimination of H3.1 Following this same logic, it s likely that several more solutions could be taken off the list. We re looking for TAC/PAC feedback in the next few weeks on this subject. COMMERCE CORRIDOR STUDY 44

45 Solution Profile Sheets COMMERCE CORRIDOR STUDY 45

46 Need & Solution Profile: H2.3.1 Updated: May 23, 2017 Solution Summary Solution Reference #: H2.3.1 Need Description: Improve access from I-95 to industrial corridor within project study area. Solution Description: Phase 1 improvements to interchange function at I-95/Route 10. Local Jurisdiction: Chesterfield County Timeline: Short-Term Medium-Term Long-Term Project Champion (Individual, Board, Council, or Organization): Solution Features Mode: Highway Rail Port-Oriented Other: Type of Asset: Public Private Both ROW Required: No Yes Unknown Detailed Description: Phase 1 improvements to interchange function at I-95/Route 10. Improve curve radius on I-95 NB to Route 10 EB off-ramp. Add lane on Route 10 EB from I-95 NB off-ramp to Old Stage Rd to allow free-flow. Add lane on Route 10 EB to I-95 NB ramp. Add 1,800' acceleration lane on I-95 NB. Solution Location Funding Information and Project Development Details Estimated 2017 Total Cost (in $1,000s): $9, Funding Status: Funded Unfunded Partially Funded Adopted in Plans: TPO Vision TPO CLRP VDOT SYIP Potential Funding Source for non-fully funded solutions (mark all that may apply): Smart Scale Local CMAQ HSIP Rail Industrial Access Fund TIGER FASTLANE Other: RSTP N/A Fully Funded Permits and approvals likely needed: NEPA IJR/IMR Class 1 RR City/County Other: Implementation Next Steps: Chesterfield County and VDOT have completed an IMR study at this location. These Phase 1 elements are fully funded in the VDOT FY SYIP with a total cost of $10,000,000 (2022 dollars). UPC # COMMERCE CORRIDOR: Transportation, Connectivity, Accessibility & Economic Opportunity Study 46

47 Need & Solution Profile: H2.4.2 Updated: May 23, 2017 Solution Summary Solution Reference #: H2.4.2 Need Description: Improve access from I-95 to industrial corridor within project study area. Solution Description: Construct interchange modifications at I-95/Bells Road. Local Jurisdiction: City of Richmond Timeline: Short-Term Medium-Term Long-Term Project Champion (Individual, Board, Council, or Organization): Solution Features Mode: Highway Rail Port-Oriented Other: Type of Asset: Public Private Both ROW Required: No Yes Unknown Detailed Description: Construct interchange modifications at I-95/Bells Road area to improve operational performance. Address deficient design of identified ramps and ramp termini approaching Commerce Road as defined by the IMR proposed in solution H Solution Location Funding Information and Project Development Details Estimated 2017 Total Cost (in $1,000s): $3, Funding Status: Funded Unfunded Partially Funded Adopted in Plans: TPO Vision TPO CLRP VDOT SYIP Potential Funding Source for non-fully funded solutions (mark all that may apply): Smart Scale Local CMAQ HSIP Rail Industrial Access Fund TIGER FASTLANE Other: RSTP N/A Fully Funded Permits and approvals likely needed: NEPA IJR/IMR Class 1 RR City/County Other: Implementation Next Steps: The suggested modifications to interstate access points will require additional study through an Interchange Modification Report process. See solution H COMMERCE CORRIDOR: Transportation, Connectivity, Accessibility & Economic Opportunity Study 47

48 Need & Solution Profile: H9.1 Updated: May 23, 2017 Solution Summary Solution Reference #: H9.1 Need Description: Improve truck / auto capacity into and out of Site 3 (RIC / White Oak area) Solution Description: Perform traffic impact study of roadways near Site 3. Local Jurisdiction: Henrico County Timeline: Short-Term Medium-Term Long-Term Project Champion (Individual, Board, Council, or Organization): Solution Features Mode: Highway Rail Port-Oriented Other: Type of Asset: Public Private Both ROW Required: No Yes Unknown Detailed Description: Upon specific industrial development details at Site 3, perform traffic impact study of the following roadways near the site: East Williamsburg Road, Technology Blvd, Elko Road, and Airport Drive. Solution Location Funding Information and Project Development Details Estimated 2017 Total Cost (in $1,000s): $100 Funding Status: Funded Unfunded Partially Funded Adopted in Plans: TPO Vision TPO CLRP VDOT SYIP Potential Funding Source for non-fully funded solutions (mark all that may apply): Smart Scale Local CMAQ HSIP Rail Industrial Access Fund TIGER FASTLANE Other: RSTP N/A Fully Funded Permits and approvals likely needed: NEPA IJR/IMR Class 1 RR City/County Other: Implementation Next Steps: COMMERCE CORRIDOR: Transportation, Connectivity, Accessibility & Economic Opportunity Study 48

49 Need & Solution Profile: R3.2 Updated: May 23, 2017 Solution Summary Solution Reference #: R3.2 Need Description: Improvements to CSX Bellwood Sub (S-Line) Solution Description: Construct capacity improvements to CSX South Yard. Local Jurisdiction: City of Richmond Timeline: Short-Term Medium-Term Long-Term Project Champion (Individual, Board, Council, or Organization): Solution Features Mode: Highway Rail Port-Oriented Other: Type of Asset: Public Private Both ROW Required: No Yes Unknown Detailed Description: Construct improvements to CSX South Yard (east of Manchester area) to allow for increased ability to break up long trains and store rail cars and tankers until industrial customers are ready. Current yard is at capacity. These improvements will also allow South Yard to serve as better reliever to Acca (Richmond Yard). Solution Location Funding Information and Project Development Details Estimated 2017 Total Cost (in $1,000s): $1,800 Funding Status: Funded Unfunded Partially Funded Adopted in Plans: TPO Vision TPO CLRP VDOT SYIP Potential Funding Source for non-fully funded solutions (mark all that may apply): Smart Scale Local CMAQ HSIP Rail Industrial Access Fund TIGER FASTLANE Other: RSTP N/A Fully Funded Permits and approvals likely needed: NEPA IJR/IMR Class 1 RR City/County Other: Implementation Next Steps: COMMERCE CORRIDOR: Transportation, Connectivity, Accessibility & Economic Opportunity Study 49

50 Need & Solution Profile: P1.2 Updated: May 23, 2017 Solution Summary Solution Reference #: P1.2 Need Description: Improve access to Richmond Marine Terminal. Solution Description: Study vehicle access to RMT using existing adjacent I-95 underpass. Local Jurisdiction: City of Richmond Timeline: Short-Term Medium-Term Long-Term Project Champion (Individual, Board, Council, or Organization): Solution Features Mode: Highway Rail Port-Oriented Other: Type of Asset: Public Private Both ROW Required: No Yes Unknown Detailed Description: Conduct study of proposal to allow vehicle traffic to utilize existing underpass of I-95 adjacent to RMT property. This underpass is currently used as a utility corridor and might be able to support vehicle movement if improved. 'Low-clearance' freight movers may be part of solution here. See Solution H3.1. Solution Location Funding Information and Project Development Details Estimated 2017 Total Cost (in $1,000s): $250 Funding Status: Funded Unfunded Partially Funded Adopted in Plans: TPO Vision TPO CLRP VDOT SYIP Potential Funding Source for non-fully funded solutions (mark all that may apply): Smart Scale Local CMAQ HSIP Rail Industrial Access Fund TIGER FASTLANE Other: RSTP N/A Fully Funded Permits and approvals likely needed: NEPA IJR/IMR Class 1 RR City/County Other: Implementation Next Steps: Study would document and propose mitigation for engineering, environmental, and legal challenges. COMMERCE CORRIDOR: Transportation, Connectivity, Accessibility & Economic Opportunity Study 50

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

Chapter 3 - Goals, Objectives, & Strategies

Chapter 3 - Goals, Objectives, & Strategies Chapter 3 - This chapter presents goals, objectives, and strategies that have been developed as part of the Richmond Area MPO 2026 Long-Range Transportation Plan (LRTP) update. Strategies have been developed

More information

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives. 4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.

More information

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR July 12, 2002 A Paper Submitted for the AREMA Annual Conference by: Paul B. Satterly, P.E. HNTB CORPORATION 111 Monument Circle, Suite 1200 Indianapolis,

More information

Project Initiation Form

Project Initiation Form Meeting Date: The Project Initiation Form should be completed in conjunction with the Level 2 Screening Form. Process Leads and/or Planners should complete the Project Initiation Form to document coordination

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014 2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

Niagara s Transportation Strategy 1. Introduction:

Niagara s Transportation Strategy 1. Introduction: Niagara s Transportation Strategy May 8, 2002 Niagara s Transportation Strategy 1. Introduction: Transportation is of pivotal importance in the development of Niagara. This, Niagara s first comprehensive

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012 2030 Transportation Policy Plan SUMMARY PRESENTATION Land Use Advisory Committee November 15, 2012 Today s Topics Transportation Policy Plan (TPP) Requirements and Background Current TPP Policies, Issues

More information

Mobility and System Reliability Goal

Mobility and System Reliability Goal Mobility and System Reliability Goal Provide surface transportation infrastructure and services that will advance the efficient and reliable movement of people and goods throughout the state. Background:

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

Tier 1 Recommendations October 30, 2017

Tier 1 Recommendations October 30, 2017 Tier 1 Recommendations October 30, 2017 Page Left Intentionally Blank Bristol District B.2 B.9 Need Tier 1 District Needs Need Description Within the Bristol MPO, the I-81 interchanges in Abingdon have

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form

More information

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES The City Engineer, under the authority of the Public Works Director and recommendations from the Traffic Engineer, will make the final decision on the need for a traffic study. The purpose of the traffic

More information

Chapter 10 Goals, Objectives + Policies

Chapter 10 Goals, Objectives + Policies Chapter 10 Goals, + Policies Warehouse on Nestle Way near I-78 114 115 10.1 ESTABLISHMENT OF CONSISTENT GOALS 10.2 NATIONAL FREIGHT GOALS The Lehigh Valley s freight transportation investment decisions

More information

3.0 REVIEW OF PREVIOUS STUDIES

3.0 REVIEW OF PREVIOUS STUDIES 3.0 REVIEW OF PREVIOUS STUDIES This section of the highlights the significant features from previous plans and studies that could impact the development of the I-20 East Transit Initiative. Much of the

More information

TRANSPORTATION MOBILITY PLAN GUIDELINES

TRANSPORTATION MOBILITY PLAN GUIDELINES TRANSPORTATION MOBILITY PLAN GUIDELINES for Development Applications November 2016 Executive Summary The Regional Municipality of York (the Region) is located in the heart of the Greater Toronto Area (GTA)

More information

Exit 73 I-29 Interchange Modification Justification Study

Exit 73 I-29 Interchange Modification Justification Study xit 73 I-29 Interchange Modification Justification tudy Introduction Figure 1 shows the location of xit 73. This interchange is proposed to be the connecting point of the ast and West Corridors to I-29.

More information

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Memorandum Date: January 15, 2014 To: CC: From: Subject: Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Paul Danielson, P.E. Project Manager, Southwest Light Rail

More information

TEXAS FREIGHT MOBILITY PLAN 2017

TEXAS FREIGHT MOBILITY PLAN 2017 TEXAS FREIGHT MOBILITY PLAN 2017 Texas Transportation Commission September 28, 2017 Overview of the Texas Freight Mobility Plan 2016 Plan First multimodal freight mobility plan Identified freight network,

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally

More information

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement 2 Purpose and Need 2.1 Study Area Interstate 81 (I-81) is relied upon for local and regional travel and interstate travel in the eastern United States. It extends 855 miles from Tennessee to New York at

More information

September Public Meetings. Developing a Blueprint for the Corridor

September Public Meetings. Developing a Blueprint for the Corridor September Public Meetings Developing a Blueprint for the Corridor Study Background Study initiated by the Commonwealth Transportation Board (CTB) and administered by VDOT in association with VDRPT. Addresses

More information

PROJECTS. The KIPDA MPO s Central Location

PROJECTS. The KIPDA MPO s Central Location PROJECTS Freight The economy of the Louisville KY-IN) Metropolitan Planning Area MPA), similar to that of the United States as a whole, is largely dependent on the efficient, reliable, and safe movement

More information

Logistics Park Kansas City (LPKC) Edgerton, KS. Infrastructure, Development And Transportation. September 30, 2013

Logistics Park Kansas City (LPKC) Edgerton, KS. Infrastructure, Development And Transportation. September 30, 2013 Logistics Park Kansas City (LPKC) Edgerton, KS Infrastructure, Development And Transportation September 30, 2013 LPKC Location LPKC Intermodal Facility Progress Photo courtesy of Superior Bowen Asphalt.

More information

Chapter 4: Developing the Recommendations

Chapter 4: Developing the Recommendations Virginia s continued investment in its transportation system is vital to the safe and efficient movement of people and goods and to the entire Commonwealth s economic wellbeing. Every element of Virginia

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016 Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb

More information

TRANSPORTATION PLAN Donald Vary

TRANSPORTATION PLAN Donald Vary LOUISIANA STATEWIDE TRANSPORTATION PLAN Donald Vary March 2, 2016 AGENDA Plan Development Decision-Making Process Outreach Activities Vision and Goals Transportation Needs Financial Analysis (revenue scenarios

More information

I-80 Integrated Corridor Mobility (ICM) Project Corridor System Management Plan (CSMP)

I-80 Integrated Corridor Mobility (ICM) Project Corridor System Management Plan (CSMP) I-80 Integrated Corridor Mobility (ICM) Project Corridor System Management Plan (CSMP) WCCTAC TAC Presentation June 10, 2010 DRAFT 1 Study Corridor Existing Conditions I-80 Corridor CSMP Near-Term Conditions

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 9 September 13, 2017 Agenda Welcome and Presenter Introductions Update on Construction and Demolition

More information

South Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

South Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan

NEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan NEW JERSEY DEPARTMENT OF TRANSPORTATION New Jersey Statewide Strategic Freight Rail Plan OVER-ARCHING PROJECT PURPOSE In short, the plan is intended to: Identify Issues That Constrain Freight Rail Operations

More information

LAND USE POLICIES BY COMMUNITY DESIGNATION

LAND USE POLICIES BY COMMUNITY DESIGNATION 137 2040 138 Land Use Policies by Community Designation As discussed earlier in Thrive MSP 2040, the Council assigns a community designation to each city and township. This designation indicates the overall

More information

VDOT Land Use Overview. Brad Shelton, AICP Transportation and Mobility Planning Division June 2015

VDOT Land Use Overview. Brad Shelton, AICP Transportation and Mobility Planning Division June 2015 VDOT Land Use Overview Brad Shelton, AICP Transportation and Mobility Planning Division June 2015 VDOT Land Development Programs Local/State Plan and Program Consistency Review local comp plan transportation

More information

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY PUBLIC INFORMATION MEETING # October, 0 LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY AGENDA :00 to :0pm: Open House :0 to :pm: Presentation : to :00pm: Individual paced workshop with the Study Team PUBLIC

More information

GUIDING PRINCIPLES MEMORANDUM

GUIDING PRINCIPLES MEMORANDUM M E T R O P O L I TAN TRA NS P O RTATI O N PLAN GUIDING PRINCIPLES MEMORANDUM El Paso Metropolitan Planning Organization INTRODUCTION The guiding principles for development of the El Paso MPO s Destino

More information

Congestion Management Process Update

Congestion Management Process Update report Congestion Management Process Update prepared for Houston-Galveston Area Council prepared by Cambridge Systematics, Inc. 10415 Morado Circle, Building II, Suite 340 Austin, TX 78759 with Alliance

More information

Woodburn Interchange Project Transportation Technical Report

Woodburn Interchange Project Transportation Technical Report Final Report Woodburn Interchange Project Transportation Technical Report Prepared for Oregon Department of Transportation April 212 Prepared by DKS Associates Contents Methodologies... 4 Volume Development...

More information

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT District 2 1109 South Marion Avenue Lake City, FL 32025-5874 INTERSTATE 10 (SR 8) / SR

More information

Chapter 4: Transportation and Land Use

Chapter 4: Transportation and Land Use Chapter 4: Transportation and Land Use Transportation and land use together make possible the wide range of destination opportunities in the region. Transportation provides the connections, and, in turn,

More information

C. Alternatives There are a number of possible solutions to address the need for improvements along the I-64 corridor. The goals of the study

C. Alternatives There are a number of possible solutions to address the need for improvements along the I-64 corridor. The goals of the study A. Description of the Proposed Action The Virginia Department of Transportation (VDOT), in cooperation with Federal Highway Administration (FHWA), has evaluated options to improve the 75 mile long Interstate

More information

A MODAL COMPARISON OF DOMESTIC FREIGHT TRANSPORTATION EFFECTS ON THE GENERAL PUBLIC EXECUTIVE SUMMARY. November 2007

A MODAL COMPARISON OF DOMESTIC FREIGHT TRANSPORTATION EFFECTS ON THE GENERAL PUBLIC EXECUTIVE SUMMARY. November 2007 A MODAL COMPARISON OF DOMESTIC FREIGHT TRANSPORTATION EFFECTS ON THE GENERAL PUBLIC EXECUTIVE SUMMARY November 2007 Prepared by CENTER FOR PORTS AND WATERWAYS TEXAS TRANSPORTATION INSTITUTE 701 NORTH POST

More information

I-710 Project Committee Meeting

I-710 Project Committee Meeting Los Angeles County Metropolitan Transportation Authority I-710 Project Committee Meeting January 29, 2009 Meeting Expectations Review I-710 planning context Concur on a port cargo forecast scenario to

More information

Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN. Draft

Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN. Draft 2 0 4 0 Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN Draft 2040 Long Range Transportation Plan Amendment 1 DRAFT January 2018 Background The JUMPO 2040 LRTP

More information

Freight Movement Element

Freight Movement Element Freight Movement Element Planning for mobility includes more than just moving people it means moving freight and services as well. The Salem Transportation System Plan places a greater emphasis on planning

More information

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES 1 st Edition City of San Luis Obispo 2035 Circulation Element 1 Table of Contents Introduction... 2 Process... 2 When Impact Studies Are Required... 3

More information

KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY

KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY April 2013 Alignments Alignments Magnolia Ave Northeast corridor Knoxville Transit Center Hall of Fame Dr Magnolia Ave Prosser Rd. Corridor contains commercial,

More information

ARKANSAS. Long Range Intermodal Transportation Plan. LRITP Stakeholder Meetings. June 27-30, 2016

ARKANSAS. Long Range Intermodal Transportation Plan. LRITP Stakeholder Meetings. June 27-30, 2016 ARKANSAS Long Range Intermodal Transportation Plan LRITP Stakeholder Meetings June 27-30, 2016 Agenda Overview of 2040 LRITP Highway Needs Non-Highway Needs Revenue Forecast Funding Gap Alternative Future

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

3.6 GROUND TRANSPORTATION

3.6 GROUND TRANSPORTATION 3.6.1 Environmental Setting 3.6.1.1 Area of Influence The area of influence for ground transportation consists of the streets and intersections that could be affected by automobile or truck traffic to

More information

TRANSPORTATION IMPACT STUDIES

TRANSPORTATION IMPACT STUDIES January 28, 2009 POLICIES AND PROCEDURES FOR TRANSPORTATION IMPACT STUDIES Related to Highway Occupancy Permits Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering

More information

Executive Summary. Overview

Executive Summary. Overview Executive Summary Overview The Genesee-Finger Lakes Diversion Route Initiative identifies the most suitable diversion routes for Principal Arterial roads in the nine-county Genesee-Finger Lakes Region.

More information

Rail Service at Brookley Aeroplex

Rail Service at Brookley Aeroplex WHAT The Mobile Airport Authority, hopes to attain improved rail infrastructure to advance economic performance and job growth. I. Background The Mobile Airport Authority s goal for Brookley Aeroplex is

More information

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES 3.20.2017 PREPARED FOR: CITY OF JACKSONVILLE 55 Railroad Row White River Junction, VT 05001 802.295.4999

More information

REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES. TAB September 20, 2017

REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES. TAB September 20, 2017 REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES TAB September 20, 2017 2 2016 Application Categories Bridge Incorporate Highway Truck Corridor Study Tiers instead of Freight Project Elements

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Introduction KEY POINTS The amount and value of freight are critical components of the overall economic health of Missouri. Missouri s multimodal freight system supports the movement of trucks,

More information

ITEM 8 Action May 17, 2017

ITEM 8 Action May 17, 2017 ITEM 8 Action May 17, 2017 Approval of Maryland Department of Transportation (MDOT) Additional Project Submission for the Out-Of-Cycle Air Quality Conformity Analysis for the Amendment to the 2016 CLRP

More information

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012 I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings Tier II June 11 th & 13 th, 2012 Agenda Introduction & Background Study Area Purpose & Need Project Status Tier Methodology & Tier I Evaluation

More information

ATTACHMENT A. Detailed Study Scope. I-66 (Inside) Multi-modal Study Scope

ATTACHMENT A. Detailed Study Scope. I-66 (Inside) Multi-modal Study Scope ATTACHMENT A Detailed Study Scope I-66 (Inside) Multi-modal Study Scope EXECUTIVE SUMMARY The Virginia Department of Transportation (VDOT) seeks consultant assistance in identifying and evaluating a range

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown

More information

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical

More information

Interchange Workshop Report (August 2004)

Interchange Workshop Report (August 2004) U.S. Highway 14 Corridor Study New Ulm to North Mankato Table of Contents Section Interchange Workshop Report (August 2004) Page 1. Introduction and Next Steps 1 2. Interchange Workshop Participants &

More information

TRANSPORTATION 101 Today and Tomorrow. Moving People and Goods

TRANSPORTATION 101 Today and Tomorrow. Moving People and Goods TRANSPORTATION 101 Today and Tomorrow Moving People and Goods What is the Transportation Commission? An independent, seven-member body of citizens appointed by the Governor for six-year terms and representing

More information

Intelligent Transportation Systems Master Plan

Intelligent Transportation Systems Master Plan Space Coast Transportation Planning Organization Intelligent Transportation Systems Master Plan April 15, 2014 Version 1.0 Prepared for: Space Coast Transportation Planning Organization 2725 Judge Fran

More information

THE REGION S PLAN POLICY FRAMEWORK. August 2015

THE REGION S PLAN POLICY FRAMEWORK. August 2015 THE REGION S PLAN POLICY FRAMEWORK August 2015 2 What is The Policy Framework? Cover photo credit: Sinan Sinharoy for Atlanta BeltLine, Inc. Atlanta is one of the world s most dynamic metropolitan areas,

More information

TECHNICAL MEMORANDUM I-710 EIR/EIS INITIAL FEASIBILITY ANALYSIS (IFA) TECHNICAL APPENDIX WBS TASK ID:

TECHNICAL MEMORANDUM I-710 EIR/EIS INITIAL FEASIBILITY ANALYSIS (IFA) TECHNICAL APPENDIX WBS TASK ID: FINAL REPORT TECHNICAL MEMORANDUM I-710 EIR/EIS INITIAL FEASIBILITY ANALYSIS (IFA) TECHNICAL APPENDIX WBS TASK ID: 165.10.09 Prepared for Los Angeles County Metropolitan Transportation Authority December

More information

TEXAS FREIGHT MOBILITY PLAN. Greater Houston Freight Committee Kick-Off Meeting

TEXAS FREIGHT MOBILITY PLAN. Greater Houston Freight Committee Kick-Off Meeting TEXAS FREIGHT MOBILITY PLAN Greater Houston Freight Committee Kick-Off Meeting July 11, 2016 Overview of Texas Freight Mobility Plan The Freight Plan is TxDOT's first multimodal transportation plan that

More information

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Discourage future development of rural residential patterns

More information

IOWA TRANSPORTATION BY THE NUMBERS:

IOWA TRANSPORTATION BY THE NUMBERS: IOWA TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility MARCH 2013 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

MAINE TRANSPORTATION BY THE NUMBERS:

MAINE TRANSPORTATION BY THE NUMBERS: MAINE TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility OCTOBER 2012 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 5-1 July 2015 501.1 General... 5-1 501.2 Interchange Type... 5-1 501.2.1 General... 5-1 502 Interchange Design Considerations... 5-2 502.1

More information

High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project

High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal May 2012 Draft Report: Alternatives Screening Version 1.0 1.0 Introduction This document outlines the alternatives screening process used

More information

APPENDIX A TIER 1 ANALYSIS

APPENDIX A TIER 1 ANALYSIS SPN H.004100 FEASIBILITY STUDY APPENDIX A TIER 1 ANALYSIS 040-012-042AH Appendices Lead Sheets PROVIDENCE STATE PROJECT. H.004100 The following worksheets analyze various project alternatives at various

More information

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange Jeromy Grenard, PE, PTOE American Structurepoint Hardik Shah, PE, PTOE American Structurepoint Roundabouts

More information

Integrating Intermodalism and Multimodalism

Integrating Intermodalism and Multimodalism Forest Hills Gardens, NY, station area, c.1916 Working Definitions Multimodal means multiple modes of transportation. Multimodal systems enhance capacity across modes. Linden Hills neighborhood, Mpls.

More information

City of Brantford Chapter 3 TABLE OF CONTENTS

City of Brantford Chapter 3 TABLE OF CONTENTS Chapter 3 The Land Use & Transportation Connection TABLE OF CONTENTS 3.1 THE LAND USE & TRANSPORTATION LINK... 1 3.2 POPULATION & EMPLOYMENT GROWTH FORECASTS... 3 3.2.1 Proposed Places to Grow Plan Forecasts

More information

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm Goal Development Workshop TCATS October 12- Works 5:30-7pm NATS October 19-Niles District Library 6-7:30pm SAFETEA-LU Goals 2035 TwinCATS Goals 2030 TwinCATS Goals 1. Support the economic vitality of the

More information

Regional Transportation Studies Regional Council

Regional Transportation Studies Regional Council Pima Association of Governments 1 E. Broadway, Tucson, Arizona Santa Rita Conference Room Regional Transportation Studies Regional Council September 28, 2017 I-11 Tier 1 Environmental Impact Statement

More information

MULTIMODAL NEEDS ASSESSMENT

MULTIMODAL NEEDS ASSESSMENT 6. FREIGHT INTRODUCTION Transportation systems not only move people throughout a region, but they also support the movement of goods in the form of freight, which is a vital component of the region s economy

More information

PPTA Project Pipeline

PPTA Project Pipeline PPTA Project Pipeline Commonwealth of Virginia May 2012 Opening Remarks The Commonwealth of Virginia was developed in the 17 th century as a risky, but ultimately highly successful business venture between

More information

Submitted to: Mr. Jim Dunn Chesterfield County Economic Development Department 9401 Courthouse Road - Suite B Chesterfield, VA 23830

Submitted to: Mr. Jim Dunn Chesterfield County Economic Development Department 9401 Courthouse Road - Suite B Chesterfield, VA 23830 THE TIMMONS REPORT Draft Executive Summary of Preliminary Engineering, Environmental and Master Planning Report for Meadowville Technology Park Chesterfield County, Virginia Submitted to: Mr. Jim Dunn

More information

3. STATION SPACING AND SITING GUIDELINES

3. STATION SPACING AND SITING GUIDELINES 3. STATION SPACING AND SITING GUIDELINES The station spacing and siting guidelines are summarized in Table 3-1. Table 3-1 also includes benchmark information for local transit service and express bus as

More information

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont)

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont) South Dakota Department of Transportation Interchange Modification Justification Report Interstate 90 Exit 44 (Bethlehem Road - Piedmont) February 28, 2014 Prepared By: SDDOT Office of Project Development

More information

LA 23 NOGC Railway Relocation PE/NEPA Project

LA 23 NOGC Railway Relocation PE/NEPA Project LA 23 NOGC Railway Relocation PE/NEPA Project LA 23/New Orleans & Gulf Coast Railway Relocation Preliminary Engineering (PE) / National Environmental Policy Act (NEPA) Project Kevin Keller, PE HDR Engineering,

More information

URBAN CENTER COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES URBAN CENTER

URBAN CENTER COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES URBAN CENTER Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan for forecasted population and household growth at average

More information

Marine Highway System A Multimodal Short Sea Freight Shipping System

Marine Highway System A Multimodal Short Sea Freight Shipping System Marine Highway System A Multimodal Short Sea Freight Shipping System 22 April 2010 Draft Final Brief Surface Congestion Reduction Analysis & Modeling (SCRAM) Team: Karen Davis Greg Haubner James Hingst

More information

CDTC NEW VISIONS FREIGHT & GOODS MOVEMENT

CDTC NEW VISIONS FREIGHT & GOODS MOVEMENT CDTC NEW VISIONS FREIGHT & GOODS MOVEMENT White Paper January 2015 Draft Capital District Transportation Committee One Park Place Albany NY 12205 518-458-2161 www.cdtcmpo.org Contents Introduction... 2

More information

LARKSPUR SMART STATION AREA PLAN. Public Workshop December 3, 2013

LARKSPUR SMART STATION AREA PLAN. Public Workshop December 3, 2013 LARKSPUR SMART STATION AREA PLAN Public Workshop December 3, 2013 0 PURPOSE OF Provide information about the regional planning context for the Larkspur Station Area, including Plan Bay Area, SMART, and

More information

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations Hampton Roads Bridge-Tunnel Expansion Feasibility Study Tunnels Design Considerations The proposed location for the new tunnel crossing is about 250 feet away from the existing westbound tunnel. This matches

More information

Inland Port Cargo Complex

Inland Port Cargo Complex Inland Port Cargo Complex Regional Approach for Ports A statewide improvement Connects five plus seaports Promotes connectivity utilizing existing transportation network Improves rail efficiencies Relocates

More information

District of North Vancouver Construction Traffic Management Plan Guidelines

District of North Vancouver Construction Traffic Management Plan Guidelines District of North Vancouver Construction Traffic Management Plan Guidelines The District of North Vancouver is committed to ensuring that the disruptions to the community and traffic associated with construction

More information

HB2 Implementation Policy Guide

HB2 Implementation Policy Guide report HB2 Implementation Policy Guide prepared for Commonwealth Transportation Board date August 1, 2015 6.0 Appendix A: Safety Measures Table 6.1 Safety Factor Measures Summary ID Measure Name Weight

More information

Delaware State Rail Plan. October 12,2011 DVRPC Freight Committee

Delaware State Rail Plan. October 12,2011 DVRPC Freight Committee Delaware State Rail Plan October 12,2011 DVRPC Freight Committee Delaware State Rail Plan Developed in compliance with Federal regulations FRA s National Rail Plan (2011, ant.) Planned public involvement

More information

TRANSPORTATION IMPACT ANALYSIS GUIDELINES

TRANSPORTATION IMPACT ANALYSIS GUIDELINES TRANSPORTATION IMPACT ANALYSIS GUIDELINES SANTA CLARA COUNTY TRANSPORTATION AUTHORITY CONGESTION MANAGEMENT PROGRAM ADOPTED MARCH 2009 TABLE OF CONTENTS PART I - STATUTE AND AUTHORITY...1 CHAPTER 1. CMP

More information

Chapter 8. Transportation Element

Chapter 8. Transportation Element Chapter 8. Transportation Element Introduction/Overview Element Requirements Transportation is a key issue and priority in Longview. State highways, local roads, transit, railroads, and the port are lifelines

More information