VITAMIN GAS - GAS FORM C

Size: px
Start display at page:

Download "VITAMIN GAS - GAS FORM C"

Transcription

1 VITAMIN GAS - GAS FORM C SPECIFICATION OF THE VESSEL AND THE GAS INSTALLATION PREAMBLE 2,811 CBM LPG/VCM GAS CARRIER OWNERS : FGAS PETROL JOINT STOCK COMPANY FLAG : PANAMA BUILT : JAN/27TH/1988 TERAOKA ZOSEN K.K,HYOUGO,JAPAN JUNE/30TH 1988 CLASS : KR KRS 1 LIQUEFIED GAS CARRIER 2PG 1C (P)/1.77MPa, 0 DEGREE C (IGC) GRT : 2,848 NRT:854 DWT : TONS COMPLEMENT : 16 PERSONS INCLUDING SPARE ROOM HULL LOA : METRES LPB : METRES BREATH: 14.80METRES DEPTH : 7.00 METRES DRAFT (SUMMER) : METRES CORRESPONDING DEADWEIGHT : 2,997 METRIC TONS ESTIMATED DRAFT WITH FULL BUNKERS AND FULL CARGO OF LPG : ABT METRES (BUTADIENE/PROPANE/VCM : ABT 5.53 METRES IMMERSION : ABT 11.5 TONS PER CENTIMETRES IN SALT WATER COMMUNICATION EQUIPMENT CALL LETTERS : 3EKF4 SATELLITE NORMALLY USED : WW RADIO EQUIPMENT : FURUNO RC803T-2T VHF EQUIPMENT : FURUNO FM-80MARK II NUMBER OF INTERNATIONAL CHANNELS : 57 CHANNELS INMARSAT : FITTED IMO NO.: MACHINERY

2 MAIN ENGINE : HANSHIN 6LF46 MAX. CONT. OUTPUT : 3,600 PS X 245 RPM GRADE FUEL USED : 180 CST AUXILIARY ENG. : YANMAR DIESEL S165L-DN CONT. OUTPUT : 420 PS X RPM X 2 SETS GRADE FUEL USED : GAS OIL AUXILIARY BOILER : OIL SIDE : EX. GAS ECONOMY : GRADE FUEL USED : SPEEDS/CONSUMPTIONS (BASIS UP TO AND INCLUDING BEAUFORT 4) : ABOUT 12.5 KNOTS ON ABOUT 7.3 MTS FUEL OIL MAX 180 CST PLUS 0.85 MT GAS OIL PER DAY FUEL OIL CAPACITY (100PCT) F.O. : 434 CBM D.O. : 133 CBM CARGO TANK CAPACITY (100 PCT) AT ROOM TEMPERATURE NO. 1 TANK : 1, K/L NO. 2 TANK : 1, K/L TOTAL :2, K/L CARGO INSTALLATION TRANSPORTABLE PRODUCTS AND RESPECTIVE QUANTITIES MARVS PRODUCTS SPECIFIC GRAVITY REFERENCE CORRES. KG/CM2 AT REF. TEMP. TEMPERATURE WEIGHT(T) 18.0 PROPYLENE C PROPANE B/F MIXTURE (NOTE 1) 7.0 N BUTANE ISO-BUTANE BUTADIENE VINYL CHLORIDE C4 NOTE 1) NOTE 3

3 NOTE 1: FILLING LIMIT OF MIXTURES VARIED ACCORDING TO THE PROPORTION. NOTE 2: FIGURES ARE DETERMINED ON THE BASIS OF THE CHARACTERISTICS OF MAIN COMPONENT HAVING THE HIGHEST VAPOUR PRESSURE IN THE PRODUCT. NOTE 3: ONLY MAIN COMPONENTS IN C4, RAFFINATE 1 AND 2 WILL BE LISTED ON INTERNATIONAL CERTIFICATE OF FITNESS. MARVS : MAXIMUM ALLOWABLE RELIEF VALVE SETTING (AS PER IGC CODE) 2. TANKS LOCATION EACH TANK : IN THE CARGO HOLD 2.2. WORKING PRESSURE : 17.6 KG/CM VALVE SETTING : HIGH PRESSURE 18.0 KG/CM2 LOW PRESSURE 7.0 KG/CM MAXIMUM VACUUM OBTAINABLE : 0.1 KG/CM2 ABS 2.5. MAXIMUM SPECIFIC GRAVITY : MINIMUM TEMPERATURE ACCEPTABLE IN TANKS DEGREES C 4. LOADING RATE- 210TONS/HOURS (2 TANKS) EX. ATMOSPHERIC STORAGE WITH VAPOUR RETURN LINE BUTANE : ABT 300 M3/H AT ATMOSPHERIC PRESSURE PROPANE : ABT 300 M3/H AT ATMOSPHERIC PRESSURE VCM : ABT 250 M3/H AT ATMOSPHERIC PRESSURE (CALCULATED BASED ON 5 M/SEC. IN LIQUID VELOCITY HEAD) EX. PRESSURIZED STORAGE WITH VAPOUR RETURN LIN 30 DEG.C 20 DEG.C 10 DEG.C 0 DEG. C BUTANE : M3/H ABT PROPANE: M3/H ABT VCM : M3/H ABT (CALCULATION BASED ON 5.5 M/SEC IN VELOCITY HEAD AT 8 C OF LIQUID LINE) EX. PRESSURIZED STORAGE WITHOUT A GAS RETURN LINE BUTANE PROPANE VCM 5. CARGO PUMP NUMBER AND TYPE : 2 FIXED DEEPWELL PUMPS 14m NIGATA WORTHINGTON

4 LOCATION : 1 DEEPWELL PUMP IN EACH TANK. PUMP CAPACITY : DEEPWELL PUMP 250 M3 /HRX 120KW/120 M MAX.SPECIFIC GRAVITY PERMISSIBLE : 0.94 (VCM) MAX. BACK PRESSURE WHEN WORKING : ABT 13.8 KG/CM 2 (BASED ON 250 CBM/H) CORRESPONDING HEAD 147 METRE EMERGENCY PUMPING DEVICE ONBOARD : NO (CARGO COMPRESSOR STIPULATED IN HERE WILL BE USABLE CARGO REMAINING ON BOARD IN CARGO TANKS AFTER COMPLETION OF PUMPING: ABT 0.65 CBM IN LIQUID UNDER FAVOURABLE RECEIVING CONDITION AT SHORE INSTALLATION MAX. DISCHARGING RATE WHEN WORKING : LPG250 CBM/H VESSEL IS NOT EQUIPPED WITH SPECIAL STRIPPING PUMP : YES 6. CARGO COMPRESSOR NUMBER AND TYPE : 2 FIXED COMPRESSORS DNL-710HB2G2ST21 MIKUNI JUKOGYO CO.,LTD CAPACITY : 467 M3/HR (PISTON DISPLACEMENT) AIR COMPRESSOR OIL FREE : YES LOCATION : 2 COMPRESSORS IN COMPRESSOR ROOM 7. INERT GAS SYSTEM NO 8. GAS FREEING CAN THIS OPERATION BE CARRIED OUT AT SEA : YES STATE METHOD USED INCL. ALL DETAIL : FOR LPG : DISPLACING LPG VAPOURS BY FORCING GAS AND THE HEAVIER LPG VAPOURS ARE COLLECTED IN THE LIQUID LINE AND DISCHARGED TO SHORE FLARE OR ATMOSPHERE THROUGH VENT STACK WHEN THE VESSEL IN THE OCEAN ADVICE TIME REQUIRED AND CONSUMPTION OF INERT GAS IF ANY : FOR LPG : FOR VCM : SAME METHOD AS LPG 9. CHANGING GRADE CAN THIS OPERATION BE CARRIED OUT AT SEA : NO STATE METHOD USED AND TIMER REQUIRED FOR CHANGING FROM LPG TO VCM AND VICERVERSE TO REACH 1.00 PPM OF PREVIOUS CARGO IN ANY ATMOSPHERE THE TANKS BEING DRIED AND FREE OF MOISTURE. LPG TO VCM 1) DISPLACING LPG VAPOUR BY N2 GAS

5 2) DISPLACING N2 GAS BY VCM VAPOUR 3) TIME REQUIRED HRS. 4) DEW POINT LOWER THAN MINUS 20 DEG. C VCM TO LPG 1) DISPLACING VCM VAPOUR BY N2 GAS 2) VENTING N2 GAS WITH LPG VAPOUR 3) TIME REQUIRED 36 HRS. 4) DEW POINT LOWER THAN MINUS 20 DEG. C (FIGURES E.G CALCULATION ONLY AND HAVE NO PRACTICAL VALUE) CAN VESSEL REDUCE IN TANK ATMOSPHERE AND GAS INSTALLATION CONCENTRATION OF PREVIOUS CARGO BELOW 100 PPM : YES BUT TIME CONSUMED AND EXPENSES INCURRED TO REDUCE CONCENTRATIONS OF PREVIOUS CARGO BELOW 100 PPM IN TANKS AND CARGO INSTALLATION ARE TO BE FOR TIME CHARTERER'S ACCOUNT. METHOD USED : THE SAME METHOD OF GAS FREEING. HOW CAN IT BE CHECKED THAT NO LIQUID GAS REMAIN ON BOARD : TAKING SAMPLE OUT OF DRAIN NOZZLE WHICH IS EXTENDED TO TANK BOTTOM. 10. CARGO REHEATER STATE LOADING RATE FOR PROPANE TO BE BROUGHT FROM ATMOSPHERIC PRESSURE TO 0 DEG.C AT SEA WATER TEMPERATURE 18 C : 150 M3/H 11. CARGO VAPOURIZER : NO REFRIGERATING APPARATUS: NO SAMPLING WHERE CAN SAMPLE BE TAKEN : FROM SLIP TUBE AND DRAIN PIPE ARE SAMPLE BOTTLES AVAILABLE ON BOARD AND WHAT NUMBER : NO FLANGE CONNECTION FOR SAMPLING : SLIP TUBE AND DRAIN PIPE 5Ø X 25A 14. CARGO LINES DISTANCE CARGO MANIFOLD TO STEM : MTR

6 DISTANCE CARGO MANIFOLD TO STERN : ABT MTR HEIGHT CARGO MANIFOLD ABOVE DECK : ABT. 0.90MTR HEIGHT CARGO MANIFOLD ABOVE WATERLINE WHEN LIGHT : 4.10MTR HEIGHT CARGO MANIFOLD ABOVE WATERLINE WHEN LOADED : 2.37 MTR DISTANCE CARGO MANIFOLD FROM SHIP'S RAIL : 2.30 MTR IS VESSEL FITTED STERN DISCHARGE : NO LIQUID LINE : DIAMETER 8 INCH : FLANGES ANSI 300 PSI (8") GAS LINE : DIAMETER 5 INCH : FLANGES ANSI 300 PSI (5") WHAT REDUCER ON BOARD : 8"/6", 8"/5", 8"/3", 6"/5", 5"/4", 5"/3", 5"/2" (ANSI 300 LB AND 150 LBS - ONE OF EACH 8"/8", 5"/5" 15. DERRICKS WHERE SITUATED : NEAR THE CARGO MANIFOLD NUMBER AND LIFTING CAPACITY : ONE EACH SIDE 2.00 TONS 16. HOSES NUMBER AND SIZES : 30FT LENGTH/DIA 6 /FLANGE 6B ANSI 150 PSI PP/MIN 0DEGREE/10 KG/CM2 FOR VCM, PROPANE PROPYLENE BUTANE 17. SPECIAL FACILITIES CAN VESSEL LOAD / DISCHARGE TWO OR MORE GRADES SIMULTANEOUSLY : NO ALL FIGURES 'ABOUT' AND WITHOUT GUARANTEE. ===========================================

Dr. Konstantinos Galanis

Dr. Konstantinos Galanis Dr. Konstantinos Galanis Operations & Technical Senior Manager Seanergy Maritime Holdings Corp. To describe the different kinds of ships that are in common use The employment they are engaged in The kind

More information

EMERALD 548,718 cbft / 6,244 sqm / 6,650 pallets

EMERALD 548,718 cbft / 6,244 sqm / 6,650 pallets General Built Flag Port of Registry Callsign IMO/Lloyds nr Length over all [m] Beam [m] Depth [m] Bowthruster(s) January-2000 Malta Valletta 9HA3770 9202857 151.99 23.00 13.00 - International Panama Canal

More information

Gas - the energy source of the future. Small scale LNG - the regional solution for gas distribution. Oslo 31 May 2013

Gas - the energy source of the future. Small scale LNG - the regional solution for gas distribution. Oslo 31 May 2013 Gas - the energy source of the future Small scale LNG - the regional solution for gas distribution Oslo 31 May 2013 I.M. Skaugen SE a company with a hundred years of history Incorporated in 1916 Skaugen

More information

HELLAS REEFER 645,586 cbft / 7,565 sqm / 8,611 pallets

HELLAS REEFER 645,586 cbft / 7,565 sqm / 8,611 pallets General Built Flag Port of Registry Callsign IMO/Lloyds nr Length over all [m] Beam [m] Depth [m] Bowthruster(s) September-1991 Bahamas Nassau C6KD8 9015187 158.13 24.40 15.70 - International Panama Canal

More information

Revised Ship Inspection Report (SIRE) Programme

Revised Ship Inspection Report (SIRE) Programme Revised Ship Inspection Report (SIRE) Programme Report umber BHMM-9367-9812-4850 Report Template BIQ5 - USA v2.0 (2205) Vessel ame MMI 3023 IMO umber Date of Inspection 21 Jan 2017 Port of Inspection Inspecting

More information

ANNEXES. to the Commission Implementing Regulation

ANNEXES. to the Commission Implementing Regulation Ref. Ares(2016)3985800-28/07/2016 EUROPEAN COMMISSION Brussels, XXX [ ](2016) XXX draft ANNEXES 1 to 3 ANNEXES to the Commission Implementing Regulation on templates for monitoring plans, emissions reports

More information

Cargo Handling Sheet. Non-Shell Product. KLK Oleo PALMERA G997U (Glycerin USP 99.7%) Document Date: 22 December 2017 Revision 1

Cargo Handling Sheet. Non-Shell Product. KLK Oleo PALMERA G997U (Glycerin USP 99.7%) Document Date: 22 December 2017 Revision 1 Cargo Handling Sheet n-shell Product KLK Oleo PALMERA G997U (Glycerin USP 99.7%) Cargo Handling Sheets are for the use of vessels chartered by Shell Chemicals Information is obtained from supplier s SDS

More information

LNG Terminal Equipment. Juan Manuel Martín Ordax

LNG Terminal Equipment. Juan Manuel Martín Ordax LNG Terminal Equipment Juan Manuel Martín Ordax Terminal equipment. General aspects The aspects considered are: o Main equipment used for cargo transfer are loading arms or hard arms, which are jetty based.

More information

Cargo Handling Sheet. Propylene Glycol MPG USP. Document date: 13 October 2014 Revision 4

Cargo Handling Sheet. Propylene Glycol MPG USP. Document date: 13 October 2014 Revision 4 Cargo Handling Sheet Propylene Glycol MPG USP Product Details: Product Name: Shipping Name: Chemical Family: Product Code: SDS: Monopropylene Glycol (MPG) USP grade Propylene Glycol Glycol U1512 http://www.shell.com/chemicals/responsible-energy/msds-search.html

More information

Development of Efficient, Environmentally Friendly and Flexible Shipboard Regasification Vessel

Development of Efficient, Environmentally Friendly and Flexible Shipboard Regasification Vessel 13 Development of Efficient, Environmentally Friendly and Flexible Shipboard Regasification Vessel KENJI TSUMURA *1 MASARU OKA *1 TOSHIO OGATA *2 MAKOTO TABIRA *2 Mitsubishi Heavy Industries, Ltd., (MHI)

More information

CROWN EMMA 547,680 cbft / 6,228 sqm / 6,638 pallets

CROWN EMMA 547,680 cbft / 6,228 sqm / 6,638 pallets General Built Flag Port of Registry Callsign IMO/Lloyds nr Length over all [m] Beam [m] Depth [m] Bowthruster(s) March-1996 Barbados Bridgetown 8PLI 9128037 151.99 23.00 13.00 - International Panama Canal

More information

Braemar Technical Services

Braemar Technical Services Braemar Technical Services Cargo Handling and Emergency Shutdown Systems in an LNG cargo vessel - What is the Connection? By Ray Martyn 20 th April 2017 Overview Introduction to the Cargo Handling System

More information

Appendix 4. Standard format for the Procedures and Arrangements Manual. Annex II

Appendix 4. Standard format for the Procedures and Arrangements Manual. Annex II Appendix 4 : Regulations for the Control of Pollution by NLS Standard format for the Procedures and Arrangements Manual Note 1: The format consists of a standardized introduction and index of the leading

More information

Panama Canal Authority Toll Tariffs approved by Cabinet Council and published on the Official Gazzette Implementation: April 1, 2016

Panama Canal Authority Toll Tariffs approved by Cabinet Council and published on the Official Gazzette Implementation: April 1, 2016 Panama Canal Authority Toll Tariffs approved by Cabinet Council and published on the Official Gazzette Implementation: April 1, 2016 Reformulation for full container vessels 2/ Neopanamax locks: for vessels

More information

CFD Based Simulation of LNG Release during Bunkering and Cargo Loading/Unloading Simultaneous Operations of a Containership

CFD Based Simulation of LNG Release during Bunkering and Cargo Loading/Unloading Simultaneous Operations of a Containership Journal of Shipping and Ocean Engineering 7 (2017) 51-58 doi 10.17265/2159-5879/2017.02.001 D DAVID PUBLISHING CFD Based Simulation of LNG Release during Bunkering and Cargo Loading/Unloading Simultaneous

More information

ezng Solutions LLC for Maritime Fuel and Transport Nested Liquefied Natural Gas Tank Concept

ezng Solutions LLC for Maritime Fuel and Transport Nested Liquefied Natural Gas Tank Concept Nested Liquefied Natural Gas Tank Concept for Maritime Fuel and Transport ASME/USCG Maritime Workshop, 16 October 2017 Scott C. McClure, PE (TX) SNAME Fellow C. Nick White, LP SDP, Ch. Marine Engineer/Fellow

More information

REPSOL MARINE SAFETY CRITERIA

REPSOL MARINE SAFETY CRITERIA APPLICABLE TO SIRE VESSELS (TANKERS, BARGES AND TUGS) AND BULK CARRIERS For vessels under OCIMF-OVID program, refer to Offshore Vessel Vetting Process. For all river transportation used in E&P projects

More information

Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers

Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers Closed loop unloading systems are designed to minimize solvent vapor emissions during transfer by exchanging the liquid solvent in the

More information

Why LNG? LNG is mainly produced for transportation purposes. More economical to transport gas as LNG compared to pipelines over long distances

Why LNG? LNG is mainly produced for transportation purposes. More economical to transport gas as LNG compared to pipelines over long distances Classification: Internal Status: Draft LNG Shipping TEP 10 Gas Processing and LNG - 2008 Trygve G. Egge 2 Topics Why LNG? Historic overview Commercial fundamentals Technical aspects Operational aspects

More information

MSC Guidelines for the Review of Oceangoing Tank Barge Cargo Authority Procedure Number: C1-42 Revision Date: March 16, 2012

MSC Guidelines for the Review of Oceangoing Tank Barge Cargo Authority Procedure Number: C1-42 Revision Date: March 16, 2012 R. J. LECHNER, CDR, Tank Vessel and Offshore Division Purpose: To establish the procedures for reviewing ocean going tank barges for the carriage of bulk liquid cargoes, generating the appropriate cargo

More information

Cargo Handling Sheet Neodene 6 Document Date: 01 April 2018 Revision 9 Cargo Handling Sheets are for the use of vessels chartered by Shel Chemicals

Cargo Handling Sheet Neodene 6 Document Date: 01 April 2018 Revision 9 Cargo Handling Sheets are for the use of vessels chartered by Shel Chemicals Cargo Handling Sheet Neodene 6 Cargo Handling Sheets are for the use of vessels chartered by Shell Chemicals Product Details Product Name: Shipping Name: Chemical Family: Product Code: Neodene C6-XHP Alpha

More information

Noriyuki Kokubun a, Kiyohiko Ko b and Masahiko Ozaki c *

Noriyuki Kokubun a, Kiyohiko Ko b and Masahiko Ozaki c * Available online at www.sciencedirect.com Energy Procedia 37 (2013 ) 3160 3167 GHGT-11 Noriyuki Kokubun a, Kiyohiko Ko b and Masahiko Ozaki c * a Chiyoda Corporation, 4-6-2, Minatomirai, nishi-ku, Yokohama

More information

FALCONARA OIL TERMINALS INFORMATIONS = API REFINERY = S.P.M. abt 8 miles

FALCONARA OIL TERMINALS INFORMATIONS = API REFINERY = S.P.M. abt 8 miles FALCONARA OIL TERMINALS INFORMATIONS = API REFINERY = Position : Lat. 43 40' 06" North. Long. 13 24' 24" East. Distance from Ancona Port Signals Prevalent winds Prevalent currents : Oil jetty - Sea Island

More information

DECLARATION OF INSPECTION

DECLARATION OF INSPECTION DOI DECLARATION OF INSPECTION CHECKLIST: (EXAMPLE: The Following Document is an example of a Declaration of Inspection. Other forms such as ISGOTT (International Oil Tanker and Terminal Safety Guide)-Type

More information

Oil Companies International Marine Forum MTIS Programme Terminal TPQ

Oil Companies International Marine Forum MTIS Programme Terminal TPQ Oil Companies International Marine Forum MTIS Programme Terminal TPQ Terminal TPQ: TERMINAL MUELLE QUIMICOS ReportName 7ab9b7-cab-0ee-a67-d8e08cffd Terminal Name: TERMINAL MUELLE QUIMICOS Terminal Port:

More information

Inland Technologies Inc

Inland Technologies Inc Inc Evaluation of the Mono-ethylene Glycol [MEG] Concentrator to Recycle MEG used in Hydrate Prevention March 2007 Document Nr 0035_INL-OPT-REP-001 Client : Inland Technologies Inc Project : Evaluation

More information

Alternative approaches to monitoring - 'Digital Twin' of vessel performance -

Alternative approaches to monitoring - 'Digital Twin' of vessel performance - Green Ship Technology 2017 Copenhagen, Denmark Alternative approaches to monitoring - 'Digital Twin' of vessel performance - 24 th March 2017 Hideyuki Ando MTI, NYK Group Monohakobi Outline 1. Introduction

More information

The latest issues on gas fuelled ship (including New IGF Code)

The latest issues on gas fuelled ship (including New IGF Code) The latest issues on gas fuelled ship (including New IGF Code) S. S. LEE December 2015 Contents 1. How to decide gas fuelled ship for new shipbuilding? 2. Selection of gas fuel tanks 3. Use LNG as fuel

More information

Matthias Ritters

Matthias Ritters LNG as alternative ti fuel -status t and outlook Matthias Ritters 2013-06-19 Content Why LNG as ship fuel? Regulatory development Overview on activities and technologies LNG supply chain and bunkering

More information

GENERAL COMPANY FOR CHEMICAL INDUSTRIES

GENERAL COMPANY FOR CHEMICAL INDUSTRIES GENERAL COMPANY FOR CHEMICAL INDUSTRIES A PANORAMIC VIEW OF GCCI INTRODUCTION TO GCCI The construction of the GCCI at Abu Kammash is one of the largest industrial projects carried out in the LIBYAN Jamahiriya.

More information

MRV Verification Process

MRV Verification Process MRV Verification Process Trafi Ballast Water and MRV seminar 15 June 2017 Niklas Rönnberg Working together for a safer world Implementation schedule EIF: Entry into force 1. EIF 3. Monitoring plans to

More information

MSC Guidelines for the Review of Inland Tank Barge Cargo Authority

MSC Guidelines for the Review of Inland Tank Barge Cargo Authority T. O. Phillips, CDR, Tank Vessel and Offshore Division Purpose To establish the procedures for reviewing inland tank barges for the carriage of bulk liquid hazardous material cargoes, generating the appropriate

More information

Masoneilan * Series Control Valve

Masoneilan * Series Control Valve GE Oil & Gas Masoneilan * 72000 Series Control Valve Large Mass Flow Energy Management Control Valves Technical Specifications 05/2013 Table of Contents Introduction...3 Product Features...3 General Data...5

More information

IGTPL will release container only after verifying following documents.

IGTPL will release container only after verifying following documents. By road Movement - General Procedure: All trucks entering ICTT have to enter through Gate No 2 only Only driver is allowed inside ICTT. Driver shall have, valid HMV license All truck drivers must strictly

More information

Natural Gas Processing

Natural Gas Processing Natural Gas Processing Technology and Engineering Design Alireza Bahadori, Ph.D. School of Environment, Science and Engineering, Southern Cross University, Lismore, NSW, Australia AMSTERDAM BOSTON HEIDELBERG

More information

LNG bunkering Why, How and When. Nigel Draffin Technical Manager LQM Petroleum Services Inc.

LNG bunkering Why, How and When. Nigel Draffin Technical Manager LQM Petroleum Services Inc. LNG bunkering Why, How and When Nigel Draffin Technical Manager LQM Petroleum Services Inc. SOx, NOx,CO 2 and PM Environmental protection legislation is targeting atmospheric pollution. Sulphur oxides

More information

Cargo Handling Sheet. Methyl Alcohol (Methanol) Document Date: 01 April 2018 Revision 6

Cargo Handling Sheet. Methyl Alcohol (Methanol) Document Date: 01 April 2018 Revision 6 Cargo Handling Sheet Methyl Alcohol (Methanol) Cargo Handling Sheets are for the use of vessels chartered by Shell Chemicals Product Details Product Name: Shipping Name: Chemical Family: Product Code:

More information

Commonwealth of Dominica. Office of the Maritime Administrator

Commonwealth of Dominica. Office of the Maritime Administrator Marine Safety Circular CD-MSC 08-03 Rev01 Commonwealth of Dominica Office of the Maritime Administrator TO: SUBJECT: PURPOSE: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED

More information

The World First Ever Very Large Ethane Carrier (VLEC)

The World First Ever Very Large Ethane Carrier (VLEC) The World First Ever Very Large Ethane Carrier (VLEC) Gastech 2017, Tokyo 4 th April 2017 This document contains information resulting from testing, experience and know-how of GTT, which are protected

More information

ITEM 404 DRIVING STEEL PILING

ITEM 404 DRIVING STEEL PILING AFTER MARCH 1, 2012 ITEM 404 DRIVING STEEL PILING 404.1 Description. This Item shall govern the driving of steel piling. The piling shall be of the size and weight shown on the plans and shall be in accordance

More information

Peerless Pump Company Handbook of Engineering Data

Peerless Pump Company Handbook of Engineering Data Peerless Pump Company Handbook of Engineering Data Brochure EM77 DEFINITION OF PUMP TERMS A.1 A line shaft vertical turbine pump is a vertical-shaft centrifugal or mixed-flow pump with rotating impeller

More information

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile Contents Power Plants Steam Power plants Binary Power plants Geothermal Power Plants Single flash systems Binary systems 1 Equipment Well head Gathering piping system Steam separators and moisture separators

More information

Design study of ship LNG storage and engine feeding system. Gerasimos Theotokatos NAOME, University of Strathclyde

Design study of ship LNG storage and engine feeding system. Gerasimos Theotokatos NAOME, University of Strathclyde Design study of ship LNG storage and engine feeding system Gerasimos Theotokatos NAOME, University of Strathclyde Introduction This study focuses on the design of the LNG storage and feeding system of

More information

Environmentally Superior Vessels with LNG as Fuel; Achievements and Prospects for the Near Future

Environmentally Superior Vessels with LNG as Fuel; Achievements and Prospects for the Near Future Environmentally Superior Vessels with LNG as Fuel; Achievements and Prospects for the Near Future The 7 th Asian shipbuilding Experts Forum (ASEF) 7 Nov. 2013 Takashi Unseki Ship & Ocean Engineering Department

More information

LNG systems for natural gas propelled ships

LNG systems for natural gas propelled ships IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS LNG systems for natural gas propelled ships To cite this article: M Chorowski et al 2015 IOP Conf. Ser.: Mater. Sci. Eng. 101

More information

HPC-30 Specifications

HPC-30 Specifications HPC-30 Specifications For additional information please email us at info@extrac-tec.com Applications Capacity Drive System Electrical Supply Requirements Water Supply Requirements Feed material Trommel

More information

Enviro Voraxial Technology

Enviro Voraxial Technology 1.0 Introduction Enviro Voraxial Technology 821 NW 57 th Place, Fort Lauderdale, FL 33309 Phone 954.958.9968 Fax: 954.958.8057 sales@evtn.com www.evtn.com Case Study Voraxial 4000 Separator On Offshore

More information

System-50 Material Flow

System-50 Material Flow System-50 Material Flow 1) Run of Mine material (-600mm) is dumped onto the VF-50 Grizzly positioned above the HPC-50 Trommel Feed Chute. (*) HPC-50 Screen sizes are selected to suit each operation. Typical

More information

Current Development of Shipbuilding Technology - Japan. Dave (Hiroshi) IWAMOTO Chairman of International sub-committee, SAJ

Current Development of Shipbuilding Technology - Japan. Dave (Hiroshi) IWAMOTO Chairman of International sub-committee, SAJ Current Development of Shipbuilding Technology - Japan Dave (Hiroshi) IWAMOTO Chairman of International sub-committee, SAJ Contents : - Environmentally Friendly Ship e Future Series (IHIMU) - LNG-Fuelled

More information

Risk Assessment of Operation of LNG Tankers. LNG Conference Copenhagen

Risk Assessment of Operation of LNG Tankers. LNG Conference Copenhagen Risk Assessment of Operation of LNG Tankers LNG Conference Copenhagen Risk Assessment of LNG Tanker Operations Liquefied Gas ships are unlike any other in the risks that they pose to the ship and environment.

More information

Thames and Medway Physical Supply. Cockett Marine Oil Group web

Thames and Medway Physical Supply. Cockett Marine Oil Group web Physical Supply Cockett Marine Oil Group web www.cockettgroup.com The Cockett Marine Group Key Facts } Est. 1978 to provide an independent specialist marine fuel service to the shipping industry. } As

More information

United States of America Department of Homeland Security United States Coast Guard Certificate of Inspection

United States of America Department of Homeland Security United States Coast Guard Certificate of Inspection United States of America Department of Homeland Security United States Coast Guard Certificate of Inspection Certification Date: 28 Apr 2016 Expiration Date: 28 Apr 2021 For ships on international voyages

More information

HYSYS WORKBOOK By: Eng. Ahmed Deyab Fares.

HYSYS WORKBOOK By: Eng. Ahmed Deyab Fares. HYSYS WORKBOOK 2013 By: Eng. Ahmed Deyab Fares eng.a.deab@gmail.com adeyab@adeyab.com Mobile: 002-01227549943 - Email: adeyab@adeyab.com 1 Flash Separation We have a stream containing 15% ethane, 20% propane,

More information

Part 1. Potentially hazardous materials in the ship's structure and equipment. 1A Asbestos & Asbestos Containing Materials (ACMs)

Part 1. Potentially hazardous materials in the ship's structure and equipment. 1A Asbestos & Asbestos Containing Materials (ACMs) Part 1. Potentially ous materials in the 's structure and equipment 1A Asbestos & Asbestos Containing s (ACMs) * Asbestos Steam supply piping and hangers Asbestos Steam exhaust piping and hangers Asbestos

More information

Qualitative Phase Behavior and Vapor Liquid Equilibrium Core

Qualitative Phase Behavior and Vapor Liquid Equilibrium Core 2/22/2017 Qualitative Phase Behavior and Qualitative Phase Behavior Introduction There are three different phases: solid, liquid, and gas (vapor) Energy must be added to melt a solid to form liquid If

More information

CROSBY H-SERIES DIRECT SPRING SAFETY VALVES

CROSBY H-SERIES DIRECT SPRING SAFETY VALVES DIRECT SPRING SAFETY VALVES Direct spring safety valves that provide comprehensive overpressure protection for ASME Boiler and Pressure Vessel Code Section I, and Section VIII steam safety applications

More information

04 November LNG Ready Capabilities

04 November LNG Ready Capabilities 04 November 2015 LNG Ready Capabilities Ships Fuel in Transition? Reminiscent of coal to oil. could it be oil to LNG next? Conventional wisdom: status quo (i.e. LSFO in ECA only) until IMO decides when

More information

CITGO PETROLEUM CORPORATION CORPUS CHRISTI MARINE FACILITY REGULATIONS FOR VESSELS

CITGO PETROLEUM CORPORATION CORPUS CHRISTI MARINE FACILITY REGULATIONS FOR VESSELS CITGO PETROLEUM CORPORATION CORPUS CHRISTI MARINE FACILITY REGULATIONS FOR VESSELS THE EMERGENCY SIGNAL FOR THIS TERMINAL IS TWO LONG BLASTS SEPARATED BY A SHORT PAUSE ON THE DOCKSIDE PORTABLE AIR HORN.

More information

Definition of Terms. Anchorage A place with sufficient depth of water where vessels anchor within the harbour. (QMS 2016)

Definition of Terms. Anchorage A place with sufficient depth of water where vessels anchor within the harbour. (QMS 2016) Definition of Terms Anchorage A place with sufficient depth of water where vessels anchor within the harbour. (QMS 2016) Arrastre - A person/entity who/which performs portside cargo handling operations,

More information

ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL

ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL International Gas Union Research Conference 2011 ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL Youngchul.Eum Seunghyuk.Kim Kyoungmin.Doh MunKeun.Ha SAMSUNG HEAVY INDUSTRIES, Geoje-Si, Gyeongsangnam-do,

More information

NUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A

NUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 DATA SHEET A ANNEXURE - A Sr. Item Description Sr. Item Description A. GENERAL DATA B. PUMP DUTY PARAMETERS 1. System Name 1. Rated capacity,

More information

Christopher R Clucas. Current Position at CWA

Christopher R Clucas. Current Position at CWA Christopher R Clucas Qualifications Affiliations Chartered Engineer BSc (Sp Hons) Chemistry (1970/73), University of Sheffield MSc Cryogenic Engineering (1978/79), University of Southampton Member of the

More information

How we tackle IoT of Ship - Data Utilization and Standardization -

How we tackle IoT of Ship - Data Utilization and Standardization - International Seminar on Practical Use of Maritime Big Data ~ for creating new business opportunities ~ How we tackle IoT of Ship - Data Utilization and Standardization - 24 th June 2015 Hideyuki Ando,

More information

Application for a recommendation on the use of membrane tanks for transport of liquefied natural gas on the tank vessel Argos-GL

Application for a recommendation on the use of membrane tanks for transport of liquefied natural gas on the tank vessel Argos-GL Economic Commission for Europe Inland Transport Committee Working Party on the Transport of Dangerous Goods Joint Meeting of Experts on the Regulations annexed to the European Agreement concerning the

More information

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET 1. A vessel of volume 0.04m 3 contains a mixture of saturated water and steam at a temperature of 250 0 C. The mass of the liquid present is 9 kg. Find the pressure, mass, specific volume, enthalpy, entropy

More information

OPTIMA SLS. Ultra Low Emissions Burner

OPTIMA SLS. Ultra Low Emissions Burner OPTIMA SLS Ultra Low Emissions Burner 1-1.9-1 E-i - 04/16 Extremely clean, reliable heat with ultra low NO x and CO production for ease of air permitting and environmental compliance Large capacity heat

More information

AIR JAMMER : CUTTING AMD COSTS AT WARWICK MINE ON A LIMITED BUDGET

AIR JAMMER : CUTTING AMD COSTS AT WARWICK MINE ON A LIMITED BUDGET AIR JAMMER : CUTTING AMD COSTS AT WARWICK MINE ON A LIMITED BUDGET Charles K. Blankenship, P.E. Duquesne Light Company A. Robert Marmo, P.E. Marmo & Associates PRESENTED AT THE WEST VIRGINIA MINE DRAINAGE

More information

Applications LPG. Solutions. Expert. for LPG APPLICATIONS. Product Brochure.

Applications LPG. Solutions. Expert. for LPG APPLICATIONS. Product Brochure. Expert Solutions LPG for LPG APPLICATIONS Product Brochure W h e r e I n n o v a t i o n F l o w s www.ebsraypumps.com.au REGENERATIVE TURBINE PUMPS SUBMERSIBLE REGENERATIVE TURBINE PUMPS BYPASS VALVES

More information

Petronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations

Petronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations Petronet LNG Ltd., India LNG Terminal Design- Major Design Considerations OVERVIEW 1. What is LNG and LNG Chain 2. Project Development & Site Selection 3. Studies Required 4. Marine Facilities 5. Storage

More information

Connected Ships a Future Reality

Connected Ships a Future Reality Norway Japan Maritime Seminar New Technologies in Shipping and Ship building Connected Ships a Future Reality 24 th January 2017 Hideyuki Ando MTI () The era of connected ships - Use assets more efficiently

More information

Introduction of Gas Turbine- Powered, LPG Fueled Ship. Byeongyeol Baek Advanced Lead Engineer GE s Marine Solutions March 6 to 7, 2018

Introduction of Gas Turbine- Powered, LPG Fueled Ship. Byeongyeol Baek Advanced Lead Engineer GE s Marine Solutions March 6 to 7, 2018 Introduction of Gas Turbine- Powered, LPG Fueled Ship Byeongyeol Baek Advanced Lead Engineer GE s Marine Solutions March 6 to 7, 2018 Presentation Title February 9, 2 GE s Marine Solutions +1,400 Vessel

More information

NEW BUILD m Deck Cargo Barge Listing ID: 3022

NEW BUILD m Deck Cargo Barge Listing ID: 3022 Australia - Chile - Indonesia - Great Britain - New Zealand - Panama - Philippines - South Korea - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) NEW BUILD - 82.3m Deck

More information

SHADEED IRON & STEEL OMAN, SOHAR PORT THE FIRST HOTLINK STEEL PLANT

SHADEED IRON & STEEL OMAN, SOHAR PORT THE FIRST HOTLINK STEEL PLANT OMAN, SOHAR PORT THE FIRST HOTLINK STEEL PLANT 1 TOPICS Introduction SHADEED Project History SHADEED Design Basis DRI Hotlink Technology Advantages of Hotlink Melt shop Design basis Conclusions 2 SHADEED

More information

Ship to Ship Transfer (POAC/Superintendent) for Liquefied Natural Gas and Liquefied Petroleum Gas (LNG or LPG) (3 days) (OCIMF)

Ship to Ship Transfer (POAC/Superintendent) for Liquefied Natural Gas and Liquefied Petroleum Gas (LNG or LPG) (3 days) (OCIMF) 2017-2018 Ship to Ship Transfer (POAC/Superintendent) for Liquefied Natural Gas and Liquefied Petroleum Gas (LNG or LPG) (3 days) (OCIMF) This training program was created based on the 2013 OCIMF, CDI,

More information

Marine Protection Rules Part 100 Port Reception Facilities Oil, Noxious Liquid Substances and Garbage

Marine Protection Rules Part 100 Port Reception Facilities Oil, Noxious Liquid Substances and Garbage Marine Protection Rules Part 100 Port Reception Facilities Oil, Noxious Liquid Substances and Garbage MNZ Consolidation Marine Protection Rules ISBN 978-0-947527-29-7 Published by Maritime New Zealand,

More information

LNG FUEL PROPULSION IN RMDC PROJECTS

LNG FUEL PROPULSION IN RMDC PROJECTS LNG FUEL PROPULSION IN RMDC PROJECTS GDAŃSK 2014 Why LNG? Reasons: increasingly strict environmental regulations increased pressure to use alternative fuel for transportation (goal of reducing petroleum

More information

Geothermal Power Plant

Geothermal Power Plant Geothermal Power Plant The Tokyo Electric Power Co., Inc., Japan Hachijo-jima Geothermal Power Plant 3,300kW 0A3-E-009 Outline All equipment and system except for the civil work and geothermal wells were

More information

BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS

BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS 1. Crop Feedstocks for Bio-Ethanol 2. Cellulose Feedstocks for Bio-Ethanol 3. Wood Feedstocks

More information

POWER PLANT- BOILER OPERATIONS SIMULATOR

POWER PLANT- BOILER OPERATIONS SIMULATOR POWER PLANT- BOILER OPERATIONS SIMULATOR The PS-5030 is a simulation software package is rigorous and detailed simulation models of POWER PLANT-Boiler Operations and processing facilities. The package

More information

LNG conversions for marine installations

LNG conversions for marine installations WÄRTSILÄ TECHNICAL JOURNAL 01.2012 LNG conversions for marine installations AUTHORS: Sören Karlsson, General Manager, Ship Power Technology Mathias Jansson, LNGPac Product Manager, Ship Power Technology

More information

BUILDING AN INDEPENDENT TRANSPORT CHAIN NORILSK NICKEL

BUILDING AN INDEPENDENT TRANSPORT CHAIN NORILSK NICKEL BUILDING AN INDEPENDENT TRANSPORT CHAIN NORILSK NICKEL Alexey Tyukavin MINING AND METALLURGICAL COMPANY NORILSK NICKEL NORILSK NICKEL is Russia s leading mining company and the world s largest producer

More information

Eduardo Perez

Eduardo Perez JUSTIFYING SMALL LNG SHIPPING FOR INTER-ISLAND TRANSPORTATION AND DISTRIBUTION: FACTORS AND PRACTICAL APPLICATIONS FOR A BUSINESS CASE Eduardo Perez www.small-lng.com small-lng.com 1 Intro Why me? Dow

More information

Structural and Containment System Design Aspects of Large LNG Ships

Structural and Containment System Design Aspects of Large LNG Ships Structural and Containment System Design Aspects of Large LNG Ships by Jim MacDonald LNG Ship Maximum Capacity Progression 250000 200000 150000 100000 50000 0 1950 1960 1970 1980 1990 2000 2010 Mid 1970

More information

SECTION 1000 ENGINEERING SPECIFICATION: AIR STRIPPER (REMOVABLE TRAY)

SECTION 1000 ENGINEERING SPECIFICATION: AIR STRIPPER (REMOVABLE TRAY) SECTION 1000 ENGINEERING SPECIFICATION: AIR STRIPPER (REMOVABLE TRAY) PART 1 GENERAL 1.1 SCOPE 1.1.1 The manufacturer shall furnish a low profile, multi-tray Air Stripper for removal of volatile organic

More information

SMALL LNG SOLUTIONS FOR INDONESIA

SMALL LNG SOLUTIONS FOR INDONESIA SMALL LNG SOLUTIONS FOR INDONESIA P.T GoLNG Indonesia January 2017 believes in Corporate Social Responsibilities. We are Committed to our firm belief that there is no job so URGENT that it cannot be done

More information

Experience In Motion. SIHI Side Channel Pumps High Head at Low Flow

Experience In Motion. SIHI Side Channel Pumps High Head at Low Flow Experience In Motion SIHI Side Channel Pumps High Head at Low Flow Pump Supplier to the World 2 Flowserve is the driving force in the global industrial pump marketplace. No other pump company in the world

More information

Resolution MEPC.11(18) adopted on 25 March 1983 GUIDELINES FOR SURVEYS UNDER ANNEX I OF THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION

Resolution MEPC.11(18) adopted on 25 March 1983 GUIDELINES FOR SURVEYS UNDER ANNEX I OF THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION MEPC 18/18 Resolution MEPC.ll(18) OF ~978 RELATING THERETO THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 39 of the Convention of the International Maritime Organization concerning the

More information

Experience In Motion. SIHI Gas separation by using membranes

Experience In Motion. SIHI Gas separation by using membranes Experience In Motion SIHI Gas separation by using membranes Pump Supplier to the World 2 Flowserve is the driving force in the global industrial pump marketplace. No other pump company in the world has

More information

Honeywell Thermal Solutions. Engineering Guide

Honeywell Thermal Solutions. Engineering Guide Engineering Guide Honeywell Thermal Solutions Engineering Guide Copyright 2017 by Honeywell Thermal Solutions All Rights Reserved CONTENTS 1. Orifices & Flows Coefficients of Discharge for Various Types

More information

Item Hydrogen Gas Plant

Item Hydrogen Gas Plant Item 6530. Hydrogen Gas Plant Hydro-Chem Hydrogen Generating Plant 90,000 scfh @ 200 psig. Purity 99.99% Hydrogen generating plant engineered by Hydro-Chem built in 1980. Design capacity is 90,000 scfh

More information

CHEMICAL INJECTION METHODS Pros & Cons

CHEMICAL INJECTION METHODS Pros & Cons CHEMICAL INJECTION METHODS Pros & Cons 1 Chemical injection is an integral component of any pipeline integrity program. The petroleum, chemical, and water treatment industries require chemical treatments

More information

OVERALL EFFICIENCY CONSIDERATION OF PNEUMATIC SYSTEMS INCLUDING COMPRESSOR, DRYER, PIPE AND ACTUATOR

OVERALL EFFICIENCY CONSIDERATION OF PNEUMATIC SYSTEMS INCLUDING COMPRESSOR, DRYER, PIPE AND ACTUATOR OVERALL EFFICIENCY CONSIDERATION OF PNEUMATIC SYSTEMS INCLUDING COMPRESSOR, DRYER, PIPE AND ACTUATOR Toshiharu KAGAWA*, Maolin CAI*, Hirotaka KAMEYA** *P recision and Intelligence Laboratory, Tokyo Institute

More information

IACS Technical Resolutions adopted from January to June 2013

IACS Technical Resolutions adopted from January to June 2013 External Affairs Division Vol.5 (1 August 2013) IACS Technical Resolutions adopted from January to June 2013 ClassNK is delighted to inform you of the recent information related to the International Association

More information

Equipment Design. Detailed Plant Conceptual Design. Version 9.0

Equipment Design.  Detailed Plant Conceptual Design. Version 9.0 Equipment Design Version 9.0 Detailed Plant Conceptual Design SOAPP CT sizes all major plant equipment, based on your Project Input, the process configuration derived from this input, and the results of

More information

STORM DRAINAGE CHAPTER 11

STORM DRAINAGE CHAPTER 11 CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

Experience of DNVGL with LNG fuelled vessels and the IGF code in our rules

Experience of DNVGL with LNG fuelled vessels and the IGF code in our rules Experience of DNVGL with LNG fuelled vessels and the IGF code in our rules Benjamin Scholz 1 SAFER, SMARTER, GREENER Content Background Experience with LNG as fuel some indications Bunkering of LNG IGF-Code

More information

Project Overview Sapia

Project Overview Sapia Project Overview Sapia 12 November 2013 LPG import and storage terminal cleaner energy reliable supply modular design affordable energy job creation local suppliers environmental and health benefits promotion

More information

Autogas Series. Regenerative Turbine Coro-Flo Pumps. For LPG High Differential Pressure Applications

Autogas Series. Regenerative Turbine Coro-Flo Pumps. For LPG High Differential Pressure Applications Autogas Series Regenerative Turbine Coro-Flo Pumps For LPG High Differential Pressure Applications A Tradition of Excellence Corken, Inc. is recognized as a world leader in the manufacture of LPG pumps

More information

Maritime Energy Transport Regulatory Overview and Status

Maritime Energy Transport Regulatory Overview and Status Maritime Energy Transport Regulatory Overview and Status CAPT B. J. Hawkins, P.E. Office of Design and Engineering Standards (CG-ENG) US Coast Guard Headquarters Washington, DC Office of Design and Engineering

More information