2 VALCOUSTICS CANADA LTD. File: Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility TABLE OF CONTENTS 1. INTRODUCTION SITE AND AREA DESCRIPTION ENVIRONMENTAL NOISE ASSESSMENT TRANSPORTATION SOURCES TRANSPORTATION NOISE SOURCES Road Traffic Sources Rail Traffic Sources ENVIRONMENTAL GUIDELINES MOE - NPC CPR Standard Mitigation Requirements Region of Halton Town of Milton ROAD AND RAIL NOISE IMPACT ASSESSMENT NOISE CONTROL MEASURES Exterior Wall and Window Construction Ventilation Requirements Outdoors Grade Level OLA s Second Level Outdoor Decks (Block 74) Warning Clauses INDUSTRY NOISE INDUSTRY NOISE SOURCES Modatek & Karmax Plants Additional Industrial Lands at the East Side of Peru Road ENVIRONMENTAL GUIDELINES Outdoors Plane of a Window Ambient Sound Levels Applicable Guideline Limits Town of Milton Noise By-law D-1 and D-6 Land Use Compatibility Guidelines NOISE IMPACT ASSESSMENT Methodology Noise Control Measures Considered At Source Noise Control Measures Acoustical Screening From Existing and Future Developments Sound Level Prediction Scenarios Sound Level Prediction Results Impulse Scenario Non-Impulse Scenario Proposed Mitigation - Lots 9 to /cont d... 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

3 VALCOUSTICS CANADA LTD. File: Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility TABLE OF CONTENTS (continued) 4. GROUND VIBRATION CONCLUSIONS REFERENCES...12 LIST OF TABLES TABLE 1A FUTURE ROAD TRAFFIC DATA...14 TABLE 1B RAIL TRAFFIC DATA CPR GALT SUBDIVISION TABLE 2 PREDICTED SOUND LEVEL OUTDOORS ROAD TRAFFIC NOISE NO MITIGATION TABLE 3 NOISE ABATEMENT MEASURES TABLE 4 PREDICTED SOUND LEVEL OUTDOORS ROAD TRAFFIC NOISE WITH MITIGATION LIST OF FIGURES FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4 KEY PLAN SITE PLAN KARMAX + MODATEK FUTURE 2 AND NEW HYPOTHETICAL INDUSTRY NON-IMPULSE SCENARIO EXCESSES MODATEK - IMPULSE FUTURE 2A SCENARIO EXCESSES LIST OF APPENDICES APPENDIX A APPENDIX B APPENDIX C APPENDIX D APPENDIX E ROAD AND RAIL TRAFFIC DATA CORRESPONDENCE ENVIRONMENTAL NOISE GUIDELINES SAMPLE CALCULATION ROAD AND RAIL TRAFFIC SOURCES MODATEK AND KARMAX PLANT DESCRIPTIONS STATIONARY SOURCE ANALYSIS PARAMETERS AND ASSUMPTIONS /cont d... 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

4 VALCOUSTICS CANADA LTD. File: Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility LIST OF APPENDICES (continued) TABLE OF CONTENTS (continued) APPENDIX F APPENDIX G APPENDIX H AMBIENT SOUND LEVEL CALCULATION PROCEDURE DISCUSSIONS REGARDING D-1 AND D-6 GUIDELINES AND DISCUSSION OF LANDS AT 75 PERU ROAD KARMAX PRESS GROUND VIBRATION ASSESSMENT 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

5 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 1 UPDATE Environmental Noise Feasibility Assessment Milton Heights Neighbourhood Royal Park South Proposed Mixed-Use Development rd New Tremaine Road and 3 Line Sideroad Town of Milton 1. INTRODUCTION Valcoustics Canada Ltd. (VCL) previously prepared a Noise Feasibility Assessment for the overall Milton Heights Neighbourhood dated November 28, 26 (hereafter referred to as the November 28, 26 Report - Reference 5); and VCL also prepared noise feasability studies for the other three sites in the overall Milton Heights Neighbourhood, Royal Park North (RPN), Andrin Homes (Andrin) and Century Grove (References 6 to 8). This report has been prepared for the Royal Park South parcel. The assessment considers both the stationary and transportation noise sources in the vicinity. The predicted sound levels on site have been compared to the applicable sound level limits of the Ministry of the Environment (MOE) Publication NPC-3. This assessment concludes that the proposed residential uses are feasible, relative to ensuring compliance with the applicable environmental noise guidelines. 1.1 SITE AND AREA DESCRIPTION The site is generally located at the southwest corner of the intersection of New Tremaine Road and No. 3 Side Road except for a small portion (12 lots) located on the north side of No. 3 Sideroad. Not including these 12 lots, the site is bounded by: 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

6 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 2 No. 3 Sideroad and existing detached residential dwellings, with the future Royal Park North development beyond, to the north; the future New Tremaine Road, with the future Century Grove mixed-use site beyond, to the east; Greenland Area (Sixteen Mile Creek) along the south side, with some existing detached residential and future residential (Andrin site) beyond, to the south; and existing detached residential to the west. As part of the development New Tremaine Road will be realigned and will interchange with Highway 41. The realigned New Tremaine Road will border the east side of the site and will be elevated to accommodate a grade separation over Highway 41. The elevated section starts north of the site; north of No. 3 Sideroad. The application proposes two-storey detached dwellings, with three-storey townhouse blocks and a three storey condo block along the east side. There are two mixed-use blocks adjacent to the south side of No. 3 Sideroad and 12 lots adjacent on the north side. The concept design for the condo block is similar to that used for the northern most dwellings at the RPN subdivision. That is, there will be no grade level amenity spaces for these dwellings. The amenity spaces will be in the form of second floor rear decks over the garage areas. A Key Plan is shown as Figure 1. This report is based on the RPS Draft Plan of Subdivision prepared by Humphries Planning Group Inc. Dated November 14, 215 and the RPS Concept Plan prepared by Freeman Planning Solutions Inc., showing latest revised date of October 6, 214. The RPS Draft Plan is included as Figure 2. In addition the grading information from the Grading Concept plan prepared by Urbantech Consulting, received December 16, 214 was also considered. For ease of description VCL has added some additional numbering to the blocks. For example, Block 7 was divided into two townhouse blocks labelled 7A and 7B. See Figure ENVIRONMENTAL NOISE ASSESSMENT TRANSPORTATION SOURCES 2.1 TRANSPORTATION NOISE SOURCES The noise sources with the potential for impact on the proposed development are: Road traffic on: Highway 41; and the realigned New Tremaine Road. Rail traffic on the Canadian Pacific Railways (CPR) rail line. The existing Tremaine Road was reviewed but was found to be insignificant relative to the Highway 41 noise contribution, and therefore, is not included in the noise prediction summaries. 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

7 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 3 Traffic volumes on the existing Peru Road and No. 3 Sideroad are insignificant relative to the other (primary) traffic sources and have not been considered Road Traffic Sources Road traffic data used in this assessment is summarized in Table 1. Appendix A includes associated correspondence. The future (ultimate) traffic data for Highway 41 was obtained from Ministry of Transportation (MTO). The traffic data for the New Tremaine Road realignment (future condition) was obtained from the Region of Halton Rail Traffic Sources Rail traffic data used in this assessment is summarized in Table 1B. Appendix A includes associated correspondence. As part of the Peer Review process done for the other sites in the Milton Heights Neighbourhood, it is understood that GO train service may once again include the section of the CPR line opposite to the site. Subsequent clarification from GO Transit indicates that no specific plans are currently in place for expansion west of the Milton station and including the section in proximity to the site, but are under review as part of an upcoming Environmental Assessment (EA) looking at service expansion on this corridor. In the absence of specific data, the previous GO volume for this section of rail line of 1 trains per 24-hour day for the year 26 condition was considered to address this possibility, and escalated to the future design condition along with the other train types noted in the summary correspondence. The 1 trains per day assumes the same eight trains daytime/two trains nighttime split. 2.2 ENVIRONMENTAL GUIDELINES MOE - NPC 3 In October 213, the MOE released the Publication NPC-3 noise guideline (although it is dated August 213). NPC-3 replaces the four existing noise guidelines in Ontario (Publications LU-131, NPC-25 and NPC-232, as well as Noise Assessment Criteria in Land Use Planning: Requirements, Procedures and Implementation ). NPC-3 is now being used to assess the noise impacts from the transportation noise sources as well as the industrial sites. The site is a Class 1 area. The noise limits are the higher of the existing ambient or the minimum exclusion limits of 5 dba daytime and evening (7 to 23 hours) and 45 dba nighttime (23 to 7 hours). The MOE noise guidelines are summarized in Appendix B. 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

8 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page CPR Standard Mitigation Requirements The CPR line to the southwest is classified as a principal mainline. CPR has a set of "standard mitigation" measures to address both noise and vibration from through rail traffic. However, as the site is located almost half a kilometre away, and there are several intervening existing dwellings between, these standard mitigation requirements can be assumed not to apply Region of Halton The Region of Halton Noise Attenuation Technical Policy (Reference 12) sets a maximum 3. m height for sound barriers adjacent to Regional Roads. The acoustical consultant originally representing the Region of Halton (for this Milton Heights project) indicates that in practice up to 3.5 m can be allowable in some cases and that the minimum sound barrier height is 2.4 m (Reference 13). The policy speaks to the height of the noise barrier "wall", and does not appear to state or imply that the height is inclusive of a berm. In other words, the maximum height relates only to the wall or fence portion, and the overall height including an earth berm (or retaining wall) can exceed the 3. m height Town of Milton The sound barrier requirements from the Town of Milton are indicated in the Engineering and Parks Standards dated August 21 (Reference 14). The sound barrier requirements relate to sound barriers adjacent to municipal roads. Section indicates The maximum barrier height shall be 2. m, although greater heights can be obtained using a combination berm and wall. Maximum height adjacent to rail lines shall be 3. m. However, based on comments received during the preparation of the acoustic reports for the other developments within the Milton Heights neighbourhood, it is understood (via an , dated January 7, 214, from the Engineering Services department at the Town), a maximum allowable acoustic fence height of 2.4 m to mitigate road traffic noise can be used (Reference 15). 2.3 ROAD AND RAIL NOISE IMPACT ASSESSMENT Using the road traffic data in Table 1A and 1B, the sound energy exposures, in terms of L eq Day and L eq Night, were determined using STAMSON V5.4 ORNAMENT, the computerized road traffic noise prediction model of the MOE. The daytime and nighttime calculations were made at top storey heights for each dwelling representing the top storey windows, that is at 7.5 m above grade for the townhouse and condo townhouse dwellings and 4.5 m above grade for the single family dwellings. At the outdoor amenity areas (OLA s), the receptor height used was 1.5 m representing standing height at grade (for grade level OLA s) and 1.5 m above the garage height (3.6 m above grade) for the raised decks. Screening of the Highway 41 express lanes by the elevated realigned New Tremaine Road, as well as the elevated Highway 41 on-ramp, was not accounted for in the noise predictions. Screening from existing dwellings in the vicinity, those at the southwest corner of New Tremaine rd Road and 3 Side Road, were not accounted for. 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

9 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 5 The highest daytime and nighttime sound levels of 72 dba and 66 dba, respectively, are predicted at the east facade of the eastern most townhouse dwelling in Block 7 adjacent to New Tremaine Road. This is shown as Block 7B on Figure 2. The highest daytime sound level in an OLA of 68 dba also occurs at the eastern most townhouse dwelling in Block 7 (Block 7B). At the condo block, the second floor outdoor decks at the west side of these units are well shielded from road traffic on New Tremaine Road, except at the outer end units of Blocks 74A, 74B, 74C and 74D due to the lack of screening by the building structure at the one side. At these outer end units, the predicted daytime sound levels are up to 61 dba. Table 2 summarizes the predicted sound level calculations due to the transportation noise sources without mitigation. A sample calculation is included as Appendix C. 2.4 NOISE CONTROL MEASURES The noise control measures for transportation noise sources can generally be classified into two categories which are interrelated, but which can be treated separately for the most part: (a) (b) Architectural elements to achieve acceptable indoor noise guidelines; Design features to protect the OLA s. Figure 2, Table 3 and the Notes to Table 3 summarize the transportation noise abatement recommendations Exterior Wall and Window Construction Construction above the minimum requirements governed by the minimum Ontario Building Code (OBC) should be expected at the dwellings along the west side of New Tremaine Road. The required Sound Transmission Class (STC) ratings for the exterior facades were calculated assuming windows have a surface area equalling 3% of the associated room floor area, and exterior walls were assumed to have a surface area equal to 8% of the associated room floor area for walls carrying a window. The exterior wall and window requirements are based on standard assumptions and should be checked once detailed working drawings are available for the dwellings. For the two easternmost condo townhouse blocks in Block 74 (74A and 74B), Block 72 and the eastern most townhouse block in Block 7 (Block 7B) along the west side of New Tremaine Road, brick veneer exterior wall construction (or STC 54 equivalent) is recommended, and has been assumed when determining the exterior window STC requirements. Figure 2 shows the dwellings where the upgraded brick veneer wall construction is recommended. Assuming the brick veneer exterior wall construction is implemented at the above dwellings, windows meeting the minimum non-acoustical aspects of the OBC are predicted to be sufficient 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

10 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 6 for all dwellings in order to meet the MOE indoor sound level limits. Upgraded exterior window construction is not anticipated Ventilation Requirements Mandatory air conditioning is required for the first row of dwellings adjacent to New Tremaine Road, that is the eastern most townhouse block in Block 7 (Block 7B), Block 72 and the two easternmost condo townhouse blocks in Block 74 (74A and 74B). Beyond the first row requiring air conditioning, subsequent rows and locations will require the provision to allow the future installation of air conditioning, by the occupant. For low density development, the provision normally takes the form of a ducted ventilation system suitably sized to accommodate the addition of central air conditioning. Figure 2 and Table 3 show the ventilation requirements Outdoors The unmitigated daytime sound levels at the OLA s of the dwellings along the eastern and southern peripheries of the site with exposure to New Tremaine Road are predicted to be above the 55 dba MOE guideline and 6 dba MOE upper limit in some cases. Thus, sound barriers are required. The sound barrier requirements are shown on Figure 2, and summarized in Table 3. Table 4 summarizes the predicted sound levels with sound barriers, where applicable. The sound barrier requirements will need to be reviewed and confirmed once final development grading and dwelling sitings become available. Sound barriers must be of solid construction with no gaps, cracks or holes and must have a minimum surface density of 2 kg/m². A variety of materials are available including wood, masonry, earth berms, or a combination of materials Grade Level OLA s Block 7 Easternmost Townhouses (Block 7B) the Region s maximum 3. m high sound barrier will mitigate the daytime sound level at the easternmost lot to 59 dba. This is within the upper 6 dba limit of the MOE, provided warning clauses are registered on title. At all other lots in this block, the mitigated sound levels would be 55 dba or less. At Block 7A, the unmitigated daytime sound level is up to 58 dba. However, accounting for the attenuation provided by the required sound barrier at Block 7B, discussed above, the daytime sound levels are less than 55 dba. Therefore, sound barriers are not required here. Lots 45 to 52 - a 1.8 m high sound barrier will mitigate the daytime OLA sound levels to below 55 dba. However, the unmitigated daytime sound levels at the OLAs of these lots are 56 dba or 57 dba. This 1 or 2 dba excess over the MOE 55 dba objective is considered minor and would be insignificant in practice. Regardless, the unmitigated sound 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

11 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 7 levels are within the upper 6 dba limit of the MOE. Thus, sound barriers are not required at these dwellings with a warning clause registered on title. The railway to the south contributes to those small sound level excesses, which as noted, includes GO rail traffic that may not occur in the future. At all other grade level OLA s the unmitigated daytime sound levels are expected to be 55 dba or less Second Level Outdoor Decks (Block 74) The predicted daytime sound levels at the north and south (outer end) units of condo blocks 74A and 74B and the eastern (end) units of Blocks 74C and 74D exceed the 55 dba guideline limit. Relative to the deck surface, 2. m high sound barriers at the end units of Blocks 74A and 74B and 1.8 m high sound barriers at the end units of Blocks 74C and 74D would mitigate the daytime sound levels to 55 dba or below Warning Clauses Where the sound level guidelines are exceeded, appropriate warning clauses should be registered on title to make future occupants aware of the potential noise situation. See Table 3 and attached notes. 3. INDUSTRY NOISE 3.1 INDUSTRY NOISE SOURCES Modatek & Karmax Plants The current industry noise analysis is based on information for the Modatek and Karmax plants, as described in Appendices D and E, and the materials noted in Reference 9 to 11 as provided by Magna. Appendix D includes brief descriptions for the regular operations at the Modatek and Karmax plants, as provided to us with the Reference 9 materials. Appendix E describes the modelling parameters used in the assessment which were provided by the acoustical consultants for the Town of Milton, Granite Real Estate Inc. and Magna International Inc Additional Industrial Lands at the East Side of Peru Road As requested by the Town, a hypothetical industrial use was considered on the lands at 77 and 99 Peru Road. Details of the analysis are included as Appendix G. 3.2 ENVIRONMENTAL GUIDELINES The applicable environmental noise guidelines for new residential developments are given in MOE Publication NPC-3 and are summarized in Appendix B. 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

12 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page Outdoors The MOE guidelines set a (one-hour L eq) exclusion limit of 5 dba, or the ambient due to road traffic noise, if higher, during any hour of the daytime and evening (7 to 23 hours), for the sound level from a stationary source at any outdoor point of reception in any area amenable for use. Balconies under 4 m in depth are not considered points of reception Plane of a Window The applicable sound level limit is expressed in terms of one-hour L eq (as opposed to 16-hour [day] and 8-hour [night] as is used for ground transportation sources). The MOE guidelines provide minimum sound level limits that are called exclusion limits for stationary sources. The applicable receptor sound limits are the exclusion limits or the existing ambient sound level, whichever is higher. Stationary sources need not mitigate to below the exclusion limits, regardless of the ambient. The exclusion limits for a Class 1 area are: Daytime and Evening (7 to 23 hours): 5 dba (L eq 1); Nighttime (23 to 7 hours): 45 dba (L ). The same numerical guideline limits also apply to impulsive sources, based on the logarithmic mean impulse level (L ) description. LM The above sound level limits apply at the outdoor plane of window of a noise sensitive space. Noise sensitive spaces are defined as bedrooms, living rooms, dens, etc. Non noise sensitive spaces include washrooms, closets, etc. The sound level limits do not apply to non noise sensitive windows Ambient Sound Levels Minimum ambient sound levels, due to road traffic sources (Highway 41 and New Tremaine Road), were predicted at the proposed residential buildings. The procedure used is included as Appendix F Applicable Guideline Limits The predicted ambient sound levels are greater than the minimum exclusion limits at the peripheries of the site, where there is greater exposure to the nearby roadways. At the interior of the site, where more screening from the dwellings themselves occurs, the minimum exclusion limits apply Town of Milton Noise By-law Section 5 of the Town of Milton Noise By-law specifically encompasses the noise guidelines documented in MOE publication NPC D-1 and D-6 Land Use Compatibility Guidelines Discussions regarding the D-1 and D-6 guidelines are included here as Appendix G. eq 1 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

13 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page NOISE IMPACT ASSESSMENT Methodology The noise analysis was done using CadnaA V4.4 environmental acoustics modelling software. A 3-D model of each industrial plant and the surrounding lands was developed using the proposed draft plan and industrial building massing (as defined by recent aerial imagery from Google Earth). The site topography is based on the most recent grading plan. The noise modelling accounts for the parameters as described in Appendix E. The acoustical modelling follows the procedures of ISO 9613 Part 2 (except where variations were adopted from recommendations by the consultants working for the Town, Magna and Granite as noted in Appendix E we are not necessarily in full agreement with these variations but used them nonetheless). The sound level predictions were completed using the building evaluation method in the CadnaA acoustic model. This method calculates sound levels on a grid of points over each facade at each storey of the building. The ambient sound levels were also calculated in this way at each building in the model. Algorithms within the program were then used to subtract the applicable guideline limits from the predicted sound levels, to determine locations where sound level excesses may occur. The results below and shown on Figures 3 and 4 are presented in terms of the maximum sound level excesses (as opposed to identifying the industry attributable sound levels and ambient levels separately). For the three-storey townhouses, the building evaluations were set to assess sound levels at the mid point height of the first, second and third storey windows, 1.5 m, 4.5 m and 7.5 m above grade, respectively Noise Control Measures Considered At Source Noise Control Measures The sound level predictions account for the future noise control measures to be included at both industrial plants and as identified in Tables 1A and 2A of the Reference 11 materials and updated for Modatek in the most recent Noise Abatement Action Plan, which is Schedule B of the Amendment to ECA, issue date of July 17, Acoustical Screening From Existing and Future Developments It is understood that the RPS site will not have allocation until 217. At this time it is planned that Phase 1 of both RPN as well as the Century Grove will be constructed. Thus, the acoustic modelling accounts for screening effects from Phase 1 of these two developments. The RPN Phase 1 development includes both the 6.6 m high sound barrier/earthen berm on the east side of New Tremaine Road as well as the commercial buildings (9. m high Building A and 9.4 m high Building B) on Block 86 at the northwest corner of New Tremaine Road and No. 3 Sideroad. The Phase 1 developments of RPN and Century Grove can be seen on Figures 3 and 4. 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

14 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page Sound Level Prediction Scenarios Several source scenarios were presented by Magna as part of the Reference 9 to 11 materials. The two most significant (primary) source scenarios for the RPS site are: Impulse Modatek Future Impulse Scenario 2A; and Non-Impulse Hypothetical Industry Scenario (including cumulative impacts from Karmax, Modatek and the Hypothetical Industry). All source scenarios that were provided were assessed. However, the predicted sound levels in the scenarios other than those above are less than those predicted in the primary scenarios listed above. That is, satisfying the primary scenarios will also satisfy the other scenarios by default. Thus, these other scenarios have not been included in the discussion below, but have been assessed. Although the Modatek impulse scenarios are not discussed in detail here, the AAR prepared for Modatek considered the impulse sounds as infrequent. For the purposes of this assessment these impulse sounds have been considered frequent. This distinction significantly affects the applicable sound limit; infrequent having a much higher limit under both NPC-25 and NPC-3. Under NPC-3, frequent means nine or more impulses occurring in the scenario hour. See Appendix E Sound Level Prediction Results Impulse Scenario The results of the Modatek Impulse Future 2A Scenario are shown on Figure 3. The sound levels are predicted to be within the applicable guideline limits at all dwellings except Lots 9 to 12 on the north side of No. 3 Side Road. At these dwellings there are minor 1 dba sound level excesses predicted at the southern facades. The Modatek Impulse Existing and Future 1 Scenario also results in minor 1 dba excesses at the southern facades of Lots 11 and Non-Impulse Scenario The results of the non-impulse Hypothetical Industry Scenario are shown on Figure 4. The sound levels are predicted to be within the applicable guideline limits at all dwellings except Lots 11 and 12 on the north side of No. 3 Side Road. At these dwellings, there are minor 1 dba sound level excesses predicted at the southern facades Proposed Mitigation - Lots 9 to 12 The analysis predicts the potential for minor sound level excesses (1 dba) at Lots 9 to 12 on the north side of No. 3 Side Road. The minor excesses only occur at the southern facades of these dwellings. For these dwellings there are two options for mitigation. 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

15 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 11 1 Option 1 - Use site specific designs - By means of proper architectural design, the dwellings can be configured such that there would be no noise sensitive windows on the southern facades. Non noise sensitive windows are windows to spaces such as closets, washrooms, hallways (that are closed off from other sensitive spaces), etc. If the windows on the southern facades are not noise sensitive, then the sound level limits would not apply. As such, compliance with the applicable MOE noise guideline limits would be achieved at all locations on the site. 2 Option 2 - Use Class 4 Receptor. Under NPC-3, Lots 9 to 12 could be deemed a Class 4 receptor area by the land use approval authority (The Town). The Class 4 sound level limits are 1 dba higher than the sound level limits for a Class 1 area. If the Class 4 receptor is applied, the predicted sound levels at these dwellings would be below the applicable sound level limits. These lots are considered a good candidate for the Class 4 receptor status since: the excesses predicted are minor (1 dba) and would be insignificant in practice; the excesses result from a very conservative analysis, which would likely not occur in practice; due to the geometry of the site, it is not possible to eliminate the excesses using conventional methods (such as sound barriers); and there is precedent for the use of the Class 4 receptor in the Milton Heights area (at the full Century Grove site). It is noted that the assessment does not account for any acoustical screening from future development on the Century Grove commercial lands, which would be developed after Phase 1. It is likely that once these lands are developed, the building forms will provide additional screening and the sound levels excesses may be reduced (or eliminated). 4. GROUND VIBRATION Ground vibration from stamping presses at Karmax is not anticipated to exceed the applicable limits at the subject site. The subject site is well over 75 m from the CPR rail line and thus, a vibration assessment is not required. Ground vibration is not anticipated to be problematic. See Appendix H for details of the press vibration analysis for Karmax. 5. CONCLUSIONS The proposed development is considered as being feasible, based on demonstrating compliance with the applicable noise guidelines. In summary 1. Construction above the minimum requirements of the OBC should be expected at the dwellings closest to New Tremaine Road. 2. Brick veneer (or STC 54 equivalent) exterior wall construction is recommended for the dwellings along the eastern periphery closest to New Tremaine Road. See Figure 2. 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

16 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page Upgrade window construction is not anticipated, assuming the brick veneer exterior wall construction recommendations are met. 4. Mandatory air conditioning is required for the first row of dwellings on the eastern periphery of the site. 5. Beyond the first row requiring mandatory air conditioning, subsequent rows will require the provision to allow the future installation of air conditioning, by the occupant. For low density development, the provision normally takes the form of a ducted ventilation system suitably sized to accommodate the addition of central air conditioning. 6. Sound barriers (acoustical screening) are required for certain areas. This includes wing wall sound barriers along the side of the second floor decks of four outer end units (Blocks 74A, 74B, 74C and 74D), as well as grade level sound barriers at a few lots (Block 7B). 7. Warning clauses advising the occupants of the potential noise from the roadways are required at several lots. 8. A detailed noise impact study will be required once final site grading and dwelling sitings becomes available. This should also include an update for the exterior window and wall requirements, based on the proposed floor plans. 9. The analysis of the stationary source noise impacts has been updated based on the revised modelling parameters (as provided by others) and the current concept and grading plans. 1. The updated industry noise assessment shows compliance with the applicable MOE noise guidelines at all locations on the subject site except for minor (up to 2 dba excesses) at the southern facades of the dwellings on Lots 9 to 12, on the north side of No.3 Side Road. 11. Two options for mitigation at Lots 9 to 12 have been presented. Option 1 is to use site specific dwelling design methods which restrict noise sensitive windows on the southern facade. With no noise sensitive windows, the sound level limits would not apply. As a result, compliance with the applicable sound level limits would be achieved at all locations on the site. Option 2 is to deem these lots Class 4. With the Class 4 receptor area applied, the applicable sound level limits would be met without the need for physical noise control measures. Further to note, the predicted excess is unlikely to occur in practice and may be reduced or eliminated with the future construction on the commercial lands at the adjacent Century Grove site. 12. Warning clauses advising the occupants that the sounds from the nearby industrial uses may sometimes be audible, are recommended. 6. REFERENCES 1. PC STAMSON 5.4, Computer Program for Road Traffic Noise Assessment, Ontario Ministry of the Environment. 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

17 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page Building Practice Note No. 56: "Controlling Sound Transmission into Buildings", by J. D. Quirt, Division of Building Research, National Council of Canada, September "Road and Rail Noise: Effects on Housing", Canada Mortgage and Housing Corporation, Publication NHA 5156, 81/1. 4. Environmental Noise Guideline, Stationary and Transportation Sources - Approval and Planning, Ontario Ministry of the Environment, Publication NPC-3, October 21, "Environmental Noise Feasibility Assessment ", Milton Heights Neighbourhood, November 28, 26, Valcoustics Canada Ltd. Project Environmental Noise Feasibility Assessment, Milton Heights Neighbourhood, Royal Park North, March 1, 213, Valcoustics Canada Ltd. Project: Environmental Noise Feasibility Assessment, Update, Milton Heights Neighbourhood, Andrin Homes Parcel, January 24, 214, Valcoustics Canada Ltd. Project: Environmental Noise Feasibility Assessment, Milton Heights Neighbourhood, Century Grove Parcel, June 13, 213, Valcoustics Canada Ltd. Project: November 11, 211 Memorandum, RWDI Air Inc. 1. December 23, 211 Memorandum, RWDI Air Inc. 11. February 4, 212 transmission with attachments ( Updated Table 1A - Modatek, Updated Table 2A - Karmax, Updated Table 1D - Modatek, Table 2D), RWDI Air Inc. 12. Region of Halton Noise Attenuation Technical Policy for Regional Roads (Retrofit Locations) and New Developments. 13. Milton Heights - Review of VCL Noise Feasibility Assessments - Century Grove V2.2, Royal Park North V2., Andrin Homes V2." Dated May 17, 212, Swallow Acoustic Consultants Ltd. 14. Engineering And Parks Standards, Chapter 1 Design Criteria dated 21, Town Of Milton Noise fence Heights, Martin Bateson, Senior Manager, Development and Building, Engineering Services, Town of Milton, January 7, 214. ML\TH\mk\gks J:\22\12286\211 (Royal Park South Royal Park Homes)\Reports\Milton Meadows-Update RPS Fnl.wpd 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

18 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 14 TABLE 1A FUTURE ROAD TRAFFIC DATA (1) Roadway AADT (2) % Trucks (3) Medium Heavy Speed Limit (kph) % Grade Highway < 2 Tremaine Road (Realigned) Notes: (1) Highway 41 data obtained from the MTO for the ultimate condition. Tremaine Road data obtained from the Region of Halton for the year 231. See Appendix A. (2) AADT - Annual Average Daily Traffic. (3) Heavy/Medium ratio is assumed for Highway 41. TABLE 1B RAIL TRAFFIC DATA CPR GALT SUBDIVISION Period Train Type Average # of Trains Average # of Cars/Train Average # of Locos/Train Maximum Speed (kph) Daytime (7-23 hours) Nighttime (23-7 hours) (1) Freight 24 (38.4) (2) Commuter 8 (12.8 ) (1) Freight 12 (19.2) (2) Commuter 2 (3.2 ) Notes: (1) The data shown in brackets has been projected to the year 225 design condition with a 2.5% growth rate, compounded annually. The worst case data has been used for number of cars/train and locos/train from the range provided. (2) GO Transit has indicated that GO Train service west of Milton Station has ceased since 27. The subject site is west of Milton station but this rail traffic is included in the assessment. 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

19 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 15 TABLE 2 PREDICTED SOUND LEVEL OUTDOORS (1) ROAD TRAFFIC NOISE NO MITIGATION (2) (3) Location Source Distance (m) L (dba) L (dba) Block 7B (East Townhouse) East Facade Block 7A (West Townhouse) South Facade Block 72 East Facade Lot 45 South Facade Lot 12 East Facade Lot 69 North Facade Lot 13 East Facade Lot 19 East Facade eq Day eq Night Highway 41 Eastbound Highway 41 Westbound Tremaine Road Northbound Tremaine Road Southbound TOTAL Tremaine Road Northbound Tremaine Road Southbound TOTAL Highway 41 Eastbound Highway 41 Westbound Tremaine Road Northbound Tremaine Road Southbound TOTAL 7 63 Tremaine Road Northbound Tremaine Road Southbound CPR Galt Subdivision TOTAL Highway 41 Eastbound Highway 41 Westbound Tremaine Road Northbound Tremaine Road Southbound TOTAL 52 5 Tremaine Road Northbound Tremaine Road Southbound TOTAL Highway 41 Eastbound Highway 41 Westbound Tremaine Road Northbound Tremaine Road Southbound TOTAL Highway 41 Eastbound Highway 41 Westbound Tremaine Road Northbound Tremaine Road Southbound TOTAL /cont d 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

20 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 16 TABLE 2 (continued) PREDICTED SOUND LEVEL OUTDOORS (1) ROAD TRAFFIC NOISE NO MITIGATION (2) (3) Location Source Distance (m) L (dba) L (dba) Block 7B (East Townhouse) Rear Yard Block 7A (West Townhouse) Rear Yard Lot 69 Rear Yard Lot 13 Rear Yard Lot 52 Rear Yard Block 74A Deck Block 74D Deck eq Day eq Night Highway 41 Eastbound Highway 41 Westbound Tremaine Road Northbound Tremaine Road Southbound TOTAL 68 Tremaine Road Northbound Tremaine Road Southbound TOTAL 58 Tremaine Road Northbound Tremaine Road Southbound TOTAL 55 Highway 41 Eastbound Highway 41 Westbound Tremaine Road Northbound Tremaine Road Southbound TOTAL 55 Tremaine Road Northbound Tremaine Road Southbound CPR Galt Subdivision TOTAL 57 Tremaine Road Northbound 5 57 Tremaine Road Southbound TOTAL 61 Tremaine Road Northbound Tremaine Road Southbound TOTAL 59 Notes: (1) Daytime and nighttime facade sound levels apply to a 7.5 m high bedroom window at Blocks 7 to 74 and 4.5 m high elsewhere. Daytime OLA sound levels apply at a receptor height of 1.5 m high. (2) See Figure 2 for receptor locations. (3) Distance indicated is from the centreline of the noise source to facade. 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

21 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 17 TABLE 3 NOISE ABATEMENT MEASURES Building Air Conditioning (1) Exterior Wall (2) Exterior Warning Sound Barrier (4) Window (3) Clauses (5) Transportation Noise Sources Block 7, East Townhouse Block (7B) Mandatory Brick Veneer OBC 3. m High Sound Barrier A, B, C Block 72 Mandatory Brick Veneer OBC No A, B, C Block 74, East Condo Blocks (74A, 74B) Mandatory Brick Veneer OBC 2. m High Acoustic Screen at end units (see Figure 2) A, B, C Block 7, West Townhouse Block (7A) Blocks 71 and 73, Block 74, all other buildings (74E, 74F) Lots 13 to 18; and Lots 35 to 69 Provision for adding OBC OBC No A, B, D Block 74, second row (74C, 74D) Provision for adding OBC OBC 1.8 m High Acoustic Screen at end units (see Figure 2) A, B, D All other residential lots/units Industrial Noise Sources No special requirements OBC OBC No B Residential uses along the eastern periphery of the site Noise control measures proposed by operators of the Modatek and Karmax plants for rooftop and grade level plant sources and as part of environmental compliance requirements for existing residential uses. Slight excesses (up to 1 dba) are predicted at the southern facades of Lots 9 to 12. Two options to eliminate the excesses have been presented. See Section Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

22 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 18 NOTES TO TABLE 3 1. Central air conditioning allows windows to remain closed for noise control purposes. Provision for adding air conditioning typically takes the form of forced air ventilation system sized to accommodate the addition of central air conditioning by the occupant. 2. Masonry construction or acoustically equivalent construction to brick veneer meeting minimum STC 54. OBC - means any construction complying with the minimum non-acoustical requirements of the Ontario Building Code. 3. Upgraded means construction beyond that governed by the minimum non-acoustical requirements governed by the OBC (typically about STC 3). A sliding glass walkout door should be considered as a window and be included in the percentage of glazing. OBC - means any construction complying with the minimum non-acoustical requirements of the Ontario Building Code. 4. Earth berms, acoustic fences or combinations of berms and fences may be used, provided a minimum face density of at least 2 kg/ sq m is maintained, and the barrier is free of cracks, gaps and openings. 5. Standard example warning clauses to be registered on title and be included in Offers of Purchase and Sale and Leases on designated units: A. Purchasers are advised that despite the inclusion of noise control features in this development and within the building units, sound levels from increasing road traffic may occasionally interfere with some activities of the dwelling occupants as the sound level may exceed the noise guidelines of the Municipality and the Ministry of the Environment. B. Purchasers are advised that sounds from the area industrial uses may occasionally be audible. C. This dwelling unit has been supplied with a central air conditioning system which will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the Municipality s and the Ministry of the Environment s noise criteria. D. This dwelling unit has been fitted with a forced air heating system and the ducting, etc. was sized to accommodate central air conditioning. Installation of central air conditioning by the occupant will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the Municipality s and the Ministry of Environment s noise criteria. 6. Conventional roof construction meeting Ontario Building Code requirements is satisfactory in all cases. 7. All exterior doors shall be fully weatherstripped. 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

23 VALCOUSTICS CANADA LTD. Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility File: Page 19 TABLE 4 PREDICTED SOUND LEVEL OUTDOORS (1) ROAD TRAFFIC NOISE WITH MITIGATION (2) (3) Location Source Distance (m) L eq Day (dba) Mitigation Block 7B (East Townhouse) Rear Yard Block 7A (West Townhouse) Rear Yard Block 74A Deck Block 74A Deck Highway 41 Eastbound Highway 41 Westbound m High Tremaine Road Northbound Sound Barrier Tremaine Road Southbound TOTAL 59 Tremaine Road Northbound m High Tremaine Road Southbound Sound Barrier at TOTAL 54 Block 7B Tremaine Road Northbound m High Tremaine Road Southbound Acoustic Screen TOTAL 55 Tremaine Road Northbound m High Tremaine Road Southbound Acoustic Screen TOTAL 54 Notes: (1) Daytime and nighttime facade sound levels apply to a 7.5 m high bedroom window at Blocks 7 to 74 and 4.5 m high elsewhere. Daytime OLA sound levels apply at a receptor height of 1.5 m high. (2) See Figure 2 for receptor locations. (3) Distance indicated is from the centreline of the noise source to facade. 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

24

25

26 Condominium Townhouses Block Legend Point Source Line Source Excess: dba 1 dba 2 dba 3 dba 4 dba 5 dba > 5 dba STREET C STREET D Existing Residential POTENTIAL FUTURE STREET NO. 3 SIDE ROAD STREET A STREET D Existing Residential STREET B 65 STREET C Block 7A Block 7B Block 71 Block 73 STREET B 52 Block 72 Condominium Townhouses Block 74 NEW TREMAINE ROAD STREET A ROYAL PARK NORTH NEW TREMAINE ROAD HIGHWAY STREET C PHASE 2 PHASE STREET D Existing Residential 22 POTENTIAL FUTURE STREET NO. 3 SIDE ROAD STREET A 16 STREET D Existing Residential STREET C STREET B CPR GALT SUBDIVISION Block 7A Block 7B Block 71 Block 73 STREET B Block 72 NEW TREMAINE ROAD STREET A PHASE 1 PHASE 2 CENTURY GROVE Existing House MODATEK KARMAX Royal Park South Site Overview Title Karmax + Modatek Future 2 and New Hypothetical Industry Non-Impulse Scenario Excesses (dba) Project Name Milton Meadows/Royal Park South Date Project No Figure 3 J:\22\12286\4 (OMB)\Analysis\Cadna\ \ RPS.cna Date Plotted:

27 Condominium Townhouses Block Legend Point Source Line Source Excess: dbai 1 dbai 2 dbai 3 dbai 4 dbai 5 dbai > 5 dbai STREET C STREET D Existing Residential POTENTIAL FUTURE STREET NO. 3 SIDE ROAD STREET A STREET D Existing Residential STREET B 65 STREET C Block 7A Block 7B Block 71 Block 73 STREET B 52 Block 72 Condominium Townhouses Block 74 NEW TREMAINE ROAD STREET A ROYAL PARK NORTH NEW TREMAINE ROAD HIGHWAY STREET C PHASE 2 PHASE STREET D Existing Residential 22 POTENTIAL FUTURE STREET NO. 3 SIDE ROAD STREET A 16 STREET D Existing Residential STREET C STREET B CPR GALT SUBDIVISION Block 7A Block 7B Block 71 Block 73 STREET B Block 72 NEW TREMAINE ROAD STREET A PHASE 1 PHASE 2 CENTURY GROVE Existing House MODATEK KARMAX Royal Park South Site Overview Title Modatek - Impulse Future 2A Scenario Excesses (dbai) Project Name Milton Meadows/Royal Park South Date Project No Figure 4 J:\22\12286\4 (OMB)\Analysis\Cadna\ \ RPS.cna Date Plotted:

28 VALCOUSTICS CANADA LTD. File: Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility APPENDIX A ROAD AND RAIL TRAFFIC DATA CORRESPONDENCE 3 Wertheim Court, Unit 25, Richmond Hill, Ontario L4B 1B9 Tel: \ solutions@valcoustics.com

29

The content of this supplement is based upon the that described in our letter of May 28, 2012.

The content of this supplement is based upon the that described in our letter of May 28, 2012. September 20, 2012 30 Wertheim Court, Unit 25 Richmond Hill, Ontario, Canada L4B 1B9 email solutions@valcoustics.com web www.valcoustics.com telephone 905 764-5223 fax 905 764-6813 Davis Howe Partners

More information

2.0 April 18, 2017 Final - Issued to Client for Use

2.0 April 18, 2017 Final - Issued to Client for Use VALCOUSTICS CANADA LTD. File: 116-17 Villalago Residences/Bolton Environmental Noise Document Version Index: Version Date Description of Changes 2. April 18, 217 Final - Issued to Client for Use 3 Wertheim

More information

Noise Feasibility Study EMGO (North Oakville I) Ltd., Town of Oakville, Ontario

Noise Feasibility Study EMGO (North Oakville I) Ltd., Town of Oakville, Ontario Noise Feasibility Study EMGO (North Oakville I) Ltd., Town of Oakville, Ontario For Emgo (North Oakville I) Ltd. 2173 Turnberry Road Burlington, ON L7M 4P8 Prepared by Victor Garcia, BASc Reviewed by Sheeba

More information

Environmental Noise Assessment 1020, 1024, 1028, 1032 & 1042 Sixth Line Oakville, ON

Environmental Noise Assessment 1020, 1024, 1028, 1032 & 1042 Sixth Line Oakville, ON Environmental Noise Assessment 1020, 1024, 1028, 1032 & 1042 Sixth Line Oakville, ON Novus Reference No. 16-0173 Version No. 1.0 (Final) September 30, 2016 NOVUS PROJECT TEAM: Specialist: Marcus Li, P.Eng.

More information

Prepared for: Gapatas Inc Sherwoodtowne Boulevard, Unit 106 Mississauga, ON L4Z 1Y5. Our File No:

Prepared for: Gapatas Inc Sherwoodtowne Boulevard, Unit 106 Mississauga, ON L4Z 1Y5. Our File No: YARMOUTH HEIGHTS ESTATES PHASE IV PARTS 1,2,4,5 & 6 Plan 11R Being Part of Lot 9 Concession 8 Geographical Township of Yarmouth City of St. Thomas Prepared for: Gapatas Inc. 4255 Sherwoodtowne Boulevard,

More information

Noise Feasibility Study Proposed Residential Development, 361 Tanbark Road Niagara-on-the-Lake, Ontario

Noise Feasibility Study Proposed Residential Development, 361 Tanbark Road Niagara-on-the-Lake, Ontario Noise Feasibility Study Proposed Residential Development, 361 Tanbark Road Niagara-on-the-Lake, Ontario Prepared for: Blythwood Homes Inc. 7058 Ridgewood Crescent Niagara Falls, Ontario L2J 3H1 Prepared

More information

Table of Contents... ii 1. Introduction... 1

Table of Contents... ii 1. Introduction... 1 316 Somerset Street East SACL Project #SW18098 April 05, 2018 Page ii Table of Contents Table of Contents... ii 1. Introduction... 1 2. Noise Sources... 1 3. Noise Assessment Criteria... 1 3.1 Surface

More information

Merivale Road Residential Development 1683 Merivale Road Noise Control Study

Merivale Road Residential Development 1683 Merivale Road Noise Control Study Merivale Road Residential Development 1683 Merivale Road Noise Control Study Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Submitted:

More information

APPENDIX I. Environmental Noise Assessment Reports

APPENDIX I. Environmental Noise Assessment Reports APPENDIX I Environmental Noise Assessment Reports VALCOUSTICS CANADA LTD. File: 109-183 Derry Road Improvements Milburough to McNiven/Burlington Noise TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 ENVIRONMENTAL

More information

Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario

Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario Noise Feasibility Study Proposed Residential Development Old Barber ouse 5155 Mississauga Road City of Mississauga, Ontario Prepared for: City Park (Old Barber) omes Inc. 950 Nashville Road Kleinburg,

More information

Mann Avenue Development 87 Mann Avenue Noise Control Study

Mann Avenue Development 87 Mann Avenue Noise Control Study Mann Avenue Development 87 Mann Avenue Noise Control Study Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 August 13, 2013 Novatech File:

More information

Draft Noise Abatement Guidelines

Draft Noise Abatement Guidelines Document under Separate Cover refer to IMLC01-13 Draft Noise Abatement Guidelines April 2013 Legislative & Planning Services Table of Contents 1.0 Introduction...1 1.1 Key Definitions...1 2.0 Existing

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT THE MEADOWS IN HALF MOON BAY PHASE 5

ENVIRONMENTAL NOISE IMPACT ASSESSMENT THE MEADOWS IN HALF MOON BAY PHASE 5 REPORT PROJECT: 115496-5.2.2 ENVIRONMENTAL NOISE IMPACT ASSESSMENT THE MEADOWS IN HALF MOON BAY PHASE 5 Prepared for TAMARACK HOMES by IBI GROUP APRIL 2018 IBI GROUP ENVIRONMENTAL NOISE IMPACT ASSESSMENT

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT MCGANN 9a LANDS BANK STREET LEITRIM DEVELOPMENT AREA

ENVIRONMENTAL NOISE IMPACT ASSESSMENT MCGANN 9a LANDS BANK STREET LEITRIM DEVELOPMENT AREA REPORT Project: 105202-5.2.2 ENVIRONMENTAL NOISE IMPACT ASSESSMENT MCGANN 9a LANDS - 4747 BANK STREET LEITRIM DEVELOPMENT AREA Prepared for Claridge Homes by IBI GROUP NOVEMBER 2017 IBI GROUP REPORT ENVIRONMENTAL

More information

3.5.1 Outdoor Living Areas (OLAs) Indoor Sound Levels... 8

3.5.1 Outdoor Living Areas (OLAs) Indoor Sound Levels... 8 RWDI was retained by Manor Park Management to conduct a traffic noise feasibility study as part of the Site Plan Approval (SPA) for the proposed development, to be located at the northwest corner of Vanier

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT PROPOSED TOWNHOUSE BLOCKS 273 LIBERTY STREET BLOCKS 197 to 199, INCLUDSIVE REGISTERED PLAN 40M-2332 AND PART OF LOT 10, CONCESSION 2 MUNICIPALITY OF CLARINGTON (BOWMANVILLE)

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT 1208 OLD MONTREAL ROAD

ENVIRONMENTAL NOISE IMPACT ASSESSMENT 1208 OLD MONTREAL ROAD REPORT 109575-5.2.2.1 ENVIRONMENTAL NOISE IMPACT ASSESSMENT 1208 OLD MONTREAL ROAD CITY OF OTTAWA Prepared for DCR/PHOENIX HOMES by IBI Group February 9, 2018 IBI GROUP REPORT ENVIRONMENTAL NOISE IMPACT

More information

Noise Assessment Report

Noise Assessment Report Noise Assessment Report 176 Greenfield Avenue Prepared for: TC United Group Prepared by: Stantec Consulting Ltd. February 8, 2016 NOISE ASSESSMENT REPORT Introduction February 8, 2016 Table of Contents

More information

Guelph Curling Club Development Traffic Noise Impact Study

Guelph Curling Club Development Traffic Noise Impact Study Guelph Curling Club Development Traffic Noise Impact Study Development Location Prepared For: Guelph Curling Club Paradigm Transportation Solutions Ltd. 43 Forest Road Cambridge ON N1S 3B4 pgrubb@ptsl.com

More information

Noise Abatement Guidelines. Regional Official Plan Guidelines

Noise Abatement Guidelines. Regional Official Plan Guidelines Noise Abatement Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document for land use planning. It contains policies

More information

ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED RESIDENTIAL DEVELOPMENT 364 ST. PATRICK STREET

ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED RESIDENTIAL DEVELOPMENT 364 ST. PATRICK STREET Ottawa, Ontario ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED RESIDENTIAL DEVELOPMENT 364 ST. PATRICK STREET CITY OF OTTAWA Prepared for Prepared by Hugh Williamson Associates Inc. 7 th May 2013

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT 2055 BROCK ROAD PROPOSED TOWNHOUSE DEVELOPMENT PART OF LOT 18, CONCESSION 2 CITY OF PICKERING PREPARED FOR: BROCK ROAD DUFFINS FOREST INC. Revised October 2017 December 2014

More information

Avalon Encore Stage Tenth Line Road Infusion Terrace, Block 233 City of Ottawa Environmental Noise Impact Assessment

Avalon Encore Stage Tenth Line Road Infusion Terrace, Block 233 City of Ottawa Environmental Noise Impact Assessment Avalon Encore Stage 6 2336 Tenth Line Road Infusion Terrace, Block 233 City of Ottawa Environmental Noise Impact Assessment Prepared For: Minto Communities Inc. Prepared By: Robinson Land Development Our

More information

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. REVISED with ADDENDUM for ROOFTOP OUTDOOR LIVING AREA

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. REVISED with ADDENDUM for ROOFTOP OUTDOOR LIVING AREA NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. REVISED with ADDENDUM for ROOFTOP OUTDOOR LIVING AREA REPORT PREPARED FOR SURFACE DEVELOPMENTS 61 FOREST HILL AVE. OTTAWA,

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT CLARIDGE HOMES MAPLE GROVE LANDS 1981 MAPLE GROVE ROAD KANATA WEST

ENVIRONMENTAL NOISE IMPACT ASSESSMENT CLARIDGE HOMES MAPLE GROVE LANDS 1981 MAPLE GROVE ROAD KANATA WEST CLIENT LOGO REPORT PROJECT: 105205-5.2.2 ENVIRONMENTAL NOISE IMPACT ASSESSMENT CLARIDGE HOMES MAPLE GROVE LANDS 1981 MAPLE GROVE ROAD KANATA WEST Prepared for CLARIDGE HOMES by IBI GROUP FEBRUARY 2018

More information

Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON

Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON Novus Reference No. 12-0292C DRAFT (v2.2) February 7, 2014 NOVUS PROJECT TEAM: Specialist: Marcus Li, B.Sc., B.Eng.Sc.

More information

Noise Control Study. Proposed Mixed-use Development. 112 Montreal Road City of Ottawa. Prepared for: DCR Phoenix Developments

Noise Control Study. Proposed Mixed-use Development. 112 Montreal Road City of Ottawa. Prepared for: DCR Phoenix Developments Noise Control Study Proposed Mixed-use Development 112 Montreal Road City of Ottawa Prepared for: DCR Phoenix Developments August 2014 10-13081-001-N01 August 28, 2014 10-13081-001-N01 Michael Boucher

More information

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON.

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. REPORT PREPARED FOR SURFACE DEVELOPMENTS 61 FOREST HILL AVE. OTTAWA, ON, K2C 1P7 March 25, 2015 15078 1 NOISE IMPACT ASSESSMENT

More information

Noise Feasibility Study Stacked Townhouse Development Glenashton Drive (Block 55) Oakville, Ontario

Noise Feasibility Study Stacked Townhouse Development Glenashton Drive (Block 55) Oakville, Ontario Noise Feasibility Study Stacked Townhouse Development Glenashton Drive (Block 55) Oakville, Ontario Prepared for: Nathan Jamieson, P.Eng Senior Principal, Community Development Stantec Consulting Ltd 300W

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT 3171 LAKESHORE ROAD WEST PROPOSED RESIDENTIAL DEVELOPMENT PART OF LOT 32, CONCESSION 4 SOUTH OF DUNDAS STREET AND BLOCK 79 REGISTERED PLAN M-257 TOWN OF OAKVILLE PREPARED

More information

DRAFT REPORT. Boyne East Catholic Secondary School #3CSS. Noise Impact Study. Louis St. Laurent Avenue, Milton. SACL #SW18060A0 December 11, 2018

DRAFT REPORT. Boyne East Catholic Secondary School #3CSS. Noise Impact Study. Louis St. Laurent Avenue, Milton. SACL #SW18060A0 December 11, 2018 DRAFT REPORT Boyne East Catholic Secondary School #3CSS Louis St. Laurent Avenue, Milton Noise Impact Study SACL #SW18060A0 Submitted to: Jeff Kenny Partner Strategy 4 Inc. 2620 Bristol Circle, Unit 100

More information

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 12 HAMILTON AVENUE NORTH OTTAWA, ON.

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 12 HAMILTON AVENUE NORTH OTTAWA, ON. NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 12 HAMILTON AVENUE NORTH OTTAWA, ON. REPORT PREPARED FOR SURFACE DEVELOPMENTS 61 FOREST HILL AVE. OTTAWA, ON, K2C 1P7 September 15, 2016 16419 1 NOISE IMPACT

More information

Noise Feasibility Study Proposed Residential Building 103 Dundas Street West Oakville, Ontario

Noise Feasibility Study Proposed Residential Building 103 Dundas Street West Oakville, Ontario Noise Feasibility Study Proposed Residential Building 103 Dundas Street West Oakville, Ontario Prepared for: 103 Dundas Corporation Attn: Zaki Wahbeh 2184 Providence Road Oakville, ON L6H 6Z2 Prepared

More information

Fayez & Patrizia Ghadban

Fayez & Patrizia Ghadban Noise Impact Assessment Study 826 Pinecrest Road Type of Document Site Plan Submission Project Name 826 Pinecrest Road, Ottawa Project Number Prepared By: 100-2650 Queensview Drive Ottawa, ON K2B 8H6 Canada

More information

TABLE OF CONTENTS LIST OF TABLES

TABLE OF CONTENTS LIST OF TABLES TABLE OF CONTENTS INTRODUCTION... NOISE CRITERIA... Transportation Noise Sources... NOISE SOURCES... Transportation Sources... Stationary Noise Sources... PROJECTED SOUND LEVELS... VENTILATION AND WARNING

More information

Noise Feasibility Study Proposed Hospice 2050 University Avenue East, Waterloo, Ontario

Noise Feasibility Study Proposed Hospice 2050 University Avenue East, Waterloo, Ontario Noise Feasibility Study Proposed Hospice 2050 University Avenue East, Waterloo, Ontario Prepared for: Hospice of Waterloo Region 298 Lawrence Avenue Kitchener, ON N2M 1Y4 Prepared by Sheeba Paul, MEng,

More information

Noise Assessment Report

Noise Assessment Report Noise Assessment Report 19 & 23 Bachman Terrace Prepared for: Tega Homes Prepared by: Stantec Consulting Ltd. June 5, 2015 NOISE ASSESSMENT REPORT Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE OF

More information

Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario

Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario Prepared for: Madison Brock Limited 369 Rimrock Road Toronto, Ontario M3J 3G2 Prepared by: Jingyi Guo Reviewed by:

More information

Roadway Traffic Noise Assessment Montreal Road. Ottawa, Ontario

Roadway Traffic Noise Assessment Montreal Road. Ottawa, Ontario Roadway Traffic Noise Assessment 807-825 Montreal Road Ottawa, Ontario REPORT: GWE15-086-TRAFFIC NOISE Prepared For: Anthony Nicolini 183 Michael Cowpland Drive Ottawa, Ontario K2M 0M3 Prepared By: Michael

More information

Roadway Traffic Noise Assessment Chapel Street. Ottawa, Ontario

Roadway Traffic Noise Assessment Chapel Street. Ottawa, Ontario Roadway Traffic Noise Assessment 151-153 Chapel Street Ottawa, Ontario REPORT: GWE14-064 Noise Prepared For: Brad Caco Sun Life Financial Center, East Tower 3250 Bloor Street West, Suite 1000 Toronto,

More information

Orangeville railway development corporation (ordc)

Orangeville railway development corporation (ordc) POLICY ON THE ENVIRONMENTAL PROTECTION OF NEW RESIDENTIAL DEVELOPMENT ADJACENT TO THE ORANGEVILLE BRAMPTON RAILWAY Prepared by: Orangeville railway development corporation (ordc) JANUARY 2001 Revised:

More information

Noise Assessment Report Riverside Drive Phase I

Noise Assessment Report Riverside Drive Phase I Noise Assessment Report - 2887 Riverside Drive Phase I Project # 160401333 Prepared for: Youth Services Bureau Prepared by: Stantec Consulting Ltd. Introduction Table of Contents 1.0 INTRODUCTION... 1

More information

NOISE CONTROL STUDY FOR PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 TABLE OF CONTENTS 1.0 INTRODUCTION BACKGROUND...

NOISE CONTROL STUDY FOR PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 TABLE OF CONTENTS 1.0 INTRODUCTION BACKGROUND... NOISE CONTROL STUDY PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 NOISE CONTROL STUDY FOR PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Noise Feasibility Study, McGibbon Condominium 71 Main Street South Georgetown, Ontario

Noise Feasibility Study, McGibbon Condominium 71 Main Street South Georgetown, Ontario Noise Feasibility Study, McGibbon Condominium 71 Main Street South Georgetown, Ontario Prepared for: Attn: Don Jackson Silvercreek Commercial Builders Inc. 66 Mill Street Georgetown, Ontario L5C 1V8 Prepared

More information

Traffic Noise Assessment. 5 Orchard Drive. Stittsville, Ontario

Traffic Noise Assessment. 5 Orchard Drive. Stittsville, Ontario Traffic Noise Assessment 5 Orchard Drive Stittsville, Ontario REPORT: GWE18-014 - Traffic Noise Prepared For: Cody Campanale 1187 Bank Street, Suite 200 Ottawa, Ontario K1S 3X7 Prepared By: Joshua Foster,

More information

DCR Phoenix. Type of Document 1st Submission. Project Name 256 Rideau Street Ottawa, Ontario. Project Number OTT A0. Prepared By: Nicole Ruyf

DCR Phoenix. Type of Document 1st Submission. Project Name 256 Rideau Street Ottawa, Ontario. Project Number OTT A0. Prepared By: Nicole Ruyf DCR Phoenix Noise Impact Assessment Study Type of Document 1st Submission Project Name 256 Rideau Street Ottawa, Ontario Project Number OTT-00206641-A0 Prepared By: Nicole Ruyf Reviewed By: Alam Ansari,

More information

Noise Assessment Report Main Street, Residential Site Cambridge, ON

Noise Assessment Report Main Street, Residential Site Cambridge, ON Noise Assessment Report 825-875 Main Street, Residential Site Cambridge, ON Prepared for: 2536546 Ontario Inc. Prepared by: Stantec Consulting Ltd. 100-300 Hagey Boulevard Waterloo, ON N2L 0A4 Project:

More information

Traffic Noise Assessment. 333 Montreal Road. Ottawa, Ontario

Traffic Noise Assessment. 333 Montreal Road. Ottawa, Ontario Traffic Noise Assessment 333 Montreal Road Ottawa, Ontario REPORT: GWE17-045 - Traffic Noise Prepared For: Michaela Jones The Salvation Army 2 Overlea Blvd Toronto, ON M4H 1P4 Prepared By: Joshua Foster,

More information

Noise Assessment & Control Transportation Noise Assessment 303 Lebreton Street South, 460 St. Laurent Boulevard Ottawa, Ontario Ottawa, Ontario

Noise Assessment & Control Transportation Noise Assessment 303 Lebreton Street South, 460 St. Laurent Boulevard Ottawa, Ontario Ottawa, Ontario Noise Assessment & Control Transportation Noise Assessment 303 Lebreton Street South, 460 St. Laurent Boulevard Ottawa, Ontario Ottawa, Ontario REPORT: GmE 13-051 - Traffic Noise - Final Prepared For:

More information

ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED HOLIDAY INN DEVELOPMENT LOCATED AT 235 KING EDWARD AVENUE

ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED HOLIDAY INN DEVELOPMENT LOCATED AT 235 KING EDWARD AVENUE Ottawa, Ontario ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED HOLIDAY INN DEVELOPMENT LOCATED AT 235 KING EDWARD AVENUE CITY OF OTTAWA Prepared for Prepared by Hugh Williamson Associates Inc.

More information

Traffic Noise Assessment Baseline Road Ottawa, Ontario

Traffic Noise Assessment Baseline Road Ottawa, Ontario Traffic Noise Assessment 2140 Baseline Road Ottawa, Ontario REPORT: GWE18-047 Traffic Noise Prepared For: Joey Theberge 905 Lady Ellen Place Ottawa, Ontario K1Z 5L5 Canada Prepared By: Omar Daher, B.Eng.,

More information

TRAFFIC NOISE IMPACT ASSESSMENT FOR THE PROPOSED MULTI-UNIT RESIDENTIAL DEVELOPMENT AT 20 MARK AVENUE

TRAFFIC NOISE IMPACT ASSESSMENT FOR THE PROPOSED MULTI-UNIT RESIDENTIAL DEVELOPMENT AT 20 MARK AVENUE Ottawa, Ontario, Canada TRAFFIC NOISE IMPACT ASSESSMENT FOR THE PROPOSED MULTI-UNIT RESIDENTIAL DEVELOPMENT AT 20 MARK AVENUE CITY OF OTTAWA Prepared for Prepared by Freefield Ltd. Issued: Postal Address:

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT STONEPAY - PICKERING WEST OF BROCK ROAD AND SOUTH OF DERSAN STREET PART OF LOTS 19 AND 20, CONCESSION 3 PLAN 40R-28764 CITY OF PICKERING PREPARED FOR: STONEPAY 7603860 CANADA

More information

671 Victoria Road North City of Guelph Traffic Noise Study. Paradigm Transportation Solutions Limited

671 Victoria Road North City of Guelph Traffic Noise Study. Paradigm Transportation Solutions Limited 671 Victoria Road North City of Guelph Traffic Noise Study Paradigm Transportation Solutions Limited February 2016 Project Summary Project Number 152315 February 2016 Client 1830334 Ontario Limited Client

More information

DETAILED NOISE CONTROL STUDY OF PROPOSED PHASE 2 CONDOMINIUMS AT 655 & 755 ANAND PRIVATE OTTAWA Ontario Inc.

DETAILED NOISE CONTROL STUDY OF PROPOSED PHASE 2 CONDOMINIUMS AT 655 & 755 ANAND PRIVATE OTTAWA Ontario Inc. Ottawa, Ontario, Canada DETAILED NOISE CONTROL STUDY OF PROPOSED PHASE 2 CONDOMINIUMS AT 655 & 755 ANAND PRIVATE OTTAWA Prepared for Prepared by Hugh Williamson Associates Inc. 13 August 2015 Postal Address:

More information

UAL URBAN AERODYNAMICS LTD

UAL URBAN AERODYNAMICS LTD UAL URBAN AERODYNAMICS LTD 23 Waterford Drive Telephone (613) 225-6362 Ottawa, Ontario, Canada Facsimile (613) 225-3022 K2E 7V4 e-mail standen.ual@sympatico.ca website: http://www.urban-noise.ca 1.0 Background

More information

NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 13 CITY OF OTTAWA

NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 13 CITY OF OTTAWA NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 13 CITY OF OTTAWA February 2014 (Revised October 2014) (Revised December 2015) Prepared for: RIVERSIDE SOUTH DEVELOPMENT CORPORATION 2193 Arch Street Ottawa,

More information

Place Vanier Édifice AEFO

Place Vanier Édifice AEFO Place Vanier Édifice AEFO Martineau Architecture Inc. + Smith Carter Architects & Engineers Inc. TRAFFIC NOISE ASSESSMENT 250 Montreal Road Gradient Microclimate Engineering Inc. Prepared by Thomas Couper,

More information

Table of Contents. 174 Forward Avenue SACL Project #B7-170 Feb 22, Page ii

Table of Contents. 174 Forward Avenue SACL Project #B7-170 Feb 22, Page ii Page ii Table of Contents 1. Introduction... 1 2. Noise Assessment Criteria... 1 2.1. Surface Transportation Noise Assessment Criteria... 1 2.2. Neighbouring Stationary Source Noise Assessment Criteria...

More information

NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 9-4 CITY OF OTTAWA

NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 9-4 CITY OF OTTAWA NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 9-4 CITY OF OTTAWA November 2013 Prepared for: RIVERSIDE SOUTH DEVELOPMENT CORPORATION 2193 Arch Street Ottawa, Ontario K1G 2H5 Prepared by: J.L. RICHARDS

More information

Noise Control Feasibility Study 173 / 175 / 177 Preston Street Ottawa, Ontario

Noise Control Feasibility Study 173 / 175 / 177 Preston Street Ottawa, Ontario Noise Control Feasibility Study 173 / 175 / 177 Preston Street Ottawa, Ontario Type of Document Site Plan Application Client 1536 Prince of Wales Drive, Ottawa, Ontario K2C 1P1 Project Number Prepared

More information

MINTO COMMUNITIES INC GREENBANK ROAD NOISE CONTROL FEASIBILITY STUDY

MINTO COMMUNITIES INC GREENBANK ROAD NOISE CONTROL FEASIBILITY STUDY MINTO COMMUNITIES INC. 3311 GREENBANK ROAD NOISE CONTROL FEASIBILITY STUDY June 2017 Prepared for: MINTO COMMUNITIES INC. 180 Kent Street, Suite 200 Ottawa, Ontario K1P 0B6 Prepared by: J.L. RICHARDS &

More information

80 Carl Hall Road Class 4 Noise Area Classification (NPC-300) Final Report

80 Carl Hall Road Class 4 Noise Area Classification (NPC-300) Final Report STAFF REPORT ACTION REQUIRED 80 Carl Hall Road Class 4 Noise Area Classification (NPC-300) Final Report Date: December 14, 2017 To: From: Wards: Reference Number: North York Community Council Director,

More information

DRAFT Part 1: ENVIRONMENTAL NOISE CONTROL GUIDELINES FOR LAND USE PLANNING

DRAFT Part 1: ENVIRONMENTAL NOISE CONTROL GUIDELINES FOR LAND USE PLANNING DRAFT Part 1: ENVIRONMENTAL NOISE CONTROL GUIDELINES FOR LAND USE PLANNING For further information please contact: Robin van de Lande, Planner Planning and Growth Management 110 Laurier Avenue West, 4th

More information

Section O Noise Criteria

Section O Noise Criteria 01 INTRODUCTION Noise is recognized as an environmental impact and a type of pollution that can negatively affect public health and a community s quality of life. It can impact property values, disrupt

More information

Noise Feasibility Study Proposed Stacked Townhouse Development, 3060 and 3072 Sixth Line, Town of Oakville, Ontario

Noise Feasibility Study Proposed Stacked Townhouse Development, 3060 and 3072 Sixth Line, Town of Oakville, Ontario Noise Feasibility Study Proposed Stacked Townhouse Development, 3060 and 3072 Sixth Line, Town of Oakville, Ontario Prepared for: 2457667 Ontario Inc. 3219 Yonge Street, Suite 365 Toronto, Ontario M4N

More information

Environmental Noise Assessment 80 Thomas Street Mississauga, Ontario

Environmental Noise Assessment 80 Thomas Street Mississauga, Ontario Environmental Noise Assessment 80 Thomas Street Mississauga, Ontario Novus Reference No. 16-0219 Version No. 1.0 (Final) October 21, 2016 NOVUS PROJECT TEAM: Scientist: Senior Specialist: Project Manager:

More information

REP Fotenn Bank Phase 1 Feasibility Noise Study with Building Component AmendmentPage 1 of 21

REP Fotenn Bank Phase 1 Feasibility Noise Study with Building Component AmendmentPage 1 of 21 REP Fotenn 890-900 Bank Phase 1 Feasibility Noise Study with Building Component AmendmentPage 1 of 21 2018-02-28 Emilie Coyle, M.Pl Planner Fotenn Planning + Design 223 McLeod St, Ottawa, ON K2P 0Z8 Office:

More information

Environmental Noise Assessment Feasibility Assessment 92 Plains Road East

Environmental Noise Assessment Feasibility Assessment 92 Plains Road East Environmental Noise Assessment Feasibility Assessment 92 Plains Road East Novus Reference No. 16-0006 Version No. 1.1 (Final) February 26, 2016 NOVUS PROJECT TEAM: Specialist: Marcus Li, P.Eng. 16/02/26

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT LAKEVIEW BOULEVARD ENVIRONMENTAL ASSESSMENT LAKEVIEW BOULEVARD BETWEEN POPLAR AVENUE AND MAPLE AVENUE TOWN OF AJAX PREPARED FOR: TMIG February 2017 Y1610 TABLE OF CONTENTS

More information

Traffic and Stationary Noise Feasibility Study Proposed Lakeside Village Plaza 5353 Lakeshore Road Burlington, Ontario

Traffic and Stationary Noise Feasibility Study Proposed Lakeside Village Plaza 5353 Lakeshore Road Burlington, Ontario Traffic and Stationary Noise Feasibility Study Proposed Lakeside Village Plaza 5353 Lakeshore Road Burlington, Ontario Prepared for: United Burlington Retail Portfolio Inc. 986 St. Clair Ave. W. Toronto,

More information

Appendix F: Noise Report

Appendix F: Noise Report Appendix F: Noise Report HIGHWAY 404 HIGHWAY 407 TO GREEN LANE (W.O. 03-20024) REGIONAL MUNICIPALITY OF YORK NOISE REPORT Preliminary Design and Class Environmental Assessment Study Class Environmental

More information

Roadway Traffic Noise Feasibility Assessment. Ironwood Subdivision. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. Ironwood Subdivision. Ottawa, Ontario Ironwood Subdivision Ottawa, Ontario REPORT: GWE16-085 - Traffic Noise Prepared For: 2356349 Ontario Inc. 301 Moodie Drive, Suite 100 Ottawa, Ontario K2H 9C4 Prepared By: Joshua Foster, P.Eng., Partner

More information

Stationary Noise Feasibility Assessment. 315 Chapel Street Ottawa, Ontario

Stationary Noise Feasibility Assessment. 315 Chapel Street Ottawa, Ontario Stationary Noise Feasibility Assessment 315 Chapel Street Ottawa, Ontario REPORT: GWE17 002 Stationary Noise Prepared For: Leanne Moussa Allsaints 10 Blackburn Avenue K1N 6P8 Ottawa, Ontario Prepared By:

More information

NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO

NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO Prepared for: State Building Group Attn.: John Guanti 27 Dufferin Street, Unit 34 Toronto, Ontario M6B 4J3 Prepared

More information

NOISE IMPACT ASSESSMENT STUDY

NOISE IMPACT ASSESSMENT STUDY NOISE IMPACT ASSESSMENT STUDY Development Address: 765 Montreal Road Ottawa, Ontario City of Ottawa File Number: D07-12-18-0059 Client: Shepherds of Good Hope c/o: CSV Architects 402-1066 Somerset Street

More information

Stationary Noise Feasibility Assessment. 315 Chapel Street Ottawa, Ontario

Stationary Noise Feasibility Assessment. 315 Chapel Street Ottawa, Ontario Stationary Noise Feasibility Assessment 315 Chapel Street Ottawa, Ontario REPORT: GWE17-002 - Stationary Noise Prepared For: Leanne Moussa Allsaints 10 Blackburn Avenue K1N 6P8 Ottawa, Ontario Prepared

More information

SS WILSON ASSOCIATES Consulting Engineers

SS WILSON ASSOCIATES Consulting Engineers SS WILSON ASSOCIATES Consulting Engineers REPORT NO. WA10-089 DETAILED NOISE CONTROL STUDY PROPOSED 6-STOREY APARTMENT BUILDING 17, 19 & 23 ROBINSON AVENUE OTTAWA, ONTARIO SUBMITTED TO: ROBINSON PARK DEVELOPMENT

More information

Noise Feasibility Study Proposed Mixed-Use Development 3385 Dundas Street West City of Toronto, Ontario

Noise Feasibility Study Proposed Mixed-Use Development 3385 Dundas Street West City of Toronto, Ontario Noise Feasibility Study Proposed Mixed-Use Development 8 Dundas Street West City of Toronto, Ontario Prepared for: Terra Firma Homes Corp High Park Ave, Suite Toronto, Ontario M6P S7 Prepared by Rajjot

More information

NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6

NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 RESIDENTIAL / HOTEL DEVELOPMENT 141 GEORGE STREET / 325 DALHOUSIE STREET OTTAWA, ONTARIO Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6

More information

Appendix K. Environmental Noise Assessment

Appendix K. Environmental Noise Assessment Appendix K Environmental Noise Assessment ENVIRONMENTAL NOISE ASSESSMENT THORNTON ROAD NORTH TAUNTON ROAD WEST TO WINCHESTER ROAD WEST SCEDULE 'C' MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT CITY OF OSHAWA

More information

REP Atelier 292 OCH Phase 2 Noise Study Page 1 of 26

REP Atelier 292 OCH Phase 2 Noise Study Page 1 of 26 REP Atelier 292 OCH Phase 2 Noise Study Page 1 of 26 2016-10-13 Robert Matta Project Manager Atelier 292 Architect Inc. 292 Main Street, Ottawa, Ontario K1S 1E1 Tel: +1 (613) 231-2245 x154 Fax: +1 (613)

More information

Brigil Homes. Noise Impact Assessment. Type of Document Site Plan Submission. Project Name Petrie s Landing, Phase 2. Project Number OTT A0

Brigil Homes. Noise Impact Assessment. Type of Document Site Plan Submission. Project Name Petrie s Landing, Phase 2. Project Number OTT A0 Brigil Homes Noise Impact Assessment Type of Document Site Plan Submission Project Name Petrie s Landing, Phase 2 Project Number Prepared By: exp Services Inc. 100-2650 Queensview Drive Ottawa, ON K2B

More information

NOISE CONTROL FEASIBILITY STUDY. MINTO COMMUNITIES INC. Clarke Lands CITY OF OTTAWA

NOISE CONTROL FEASIBILITY STUDY. MINTO COMMUNITIES INC. Clarke Lands CITY OF OTTAWA NOISE CONTROL FEASIBILITY STUDY MINTO COMMUNITIES INC. Clarke Lands CITY OF OTTAWA March 2016 Prepared for: Minto Communities Inc. 200-180 Kent Street Ottawa, Ontario K1P 0B6 Prepared by: J.L. RICHARDS

More information

Noise Feasibility Study 2120 Hurontario Street and Grange Drive City of Mississauga, Ontario

Noise Feasibility Study 2120 Hurontario Street and Grange Drive City of Mississauga, Ontario Noise Feasibility Study 2120 Hurontario Street and Grange Drive City of Mississauga, Ontario For Gordon Woods Developments Limited c/o Edenshaw development Limited 260 Brunel Road Mississuaga, Ontairo

More information

Policy for the Assessment and Mitigation of Traffic Noise on County Roads

Policy for the Assessment and Mitigation of Traffic Noise on County Roads Lanark County Policy for the Assessment and Mitigation of Traffic Noise on County Roads d r a f t f o r d i s c u s s i o n Prepared by: AECOM Canada Ltd. 302 1150 Morrison Drive, Ottawa, ON, Canada K2H

More information

Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario

Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario Prepared for: New Horizon Development Group (Bronte) Inc. 69 John Street South, Suite 400 Hamilton, Ontario L8N 2B9 Prepared by Sheeba Paul,

More information

Noise Assessment Report

Noise Assessment Report Noise Assessment Report 19 & 23 Bachman Terrace Prepared for: Tega Homes Prepared by: Stantec Consulting Ltd. March 24, 2014 Draft Mar 7 2014 Final Mar 24, 2014 NOISE ASSESSMENT REPORT Table of Contents

More information

Stationary Noise Feasibility Study. The Shops of Tenth Line. Ottawa, Ontario

Stationary Noise Feasibility Study. The Shops of Tenth Line. Ottawa, Ontario Stationary Noise Feasibility Study The Shops of Tenth Line Ottawa, Ontario REPORT: GWE13-040 Stationary Noise Prepared For: Jeff Parks 225 Metcalfe Street Ottawa, Ontario K2P 1P9 Prepared By: Thomas Couper,

More information

8008 Wisconsin Avenue Phase I Noise Analysis

8008 Wisconsin Avenue Phase I Noise Analysis 14 August 2015 Phoenix Noise & Vibration, LLC 5216 Chairmans Court, Suite 107 Frederick, Maryland 21703 301.846.4227 (phone) 301.846.4355 (fax) www.phoenixnv.com 8008 Wisconsin Avenue Phase I Noise Analysis

More information

Noise Control Study. for. Avalon Public School Portobello Boulevard at Stormwind Avenue in Ottawa, Ontario. Revision 1

Noise Control Study. for. Avalon Public School Portobello Boulevard at Stormwind Avenue in Ottawa, Ontario. Revision 1 REP N45 Avalon School Traffic Noise Study - R1 Noise Control Study for Avalon Public School Portobello Boulevard at Stormwind Avenue in Ottawa, Ontario. Revision 1 Prepared for: N45 Architecture Inc. Prepared

More information

2.2. The intent of the Surface Transportation Noise Policy is to provide the following: The responsibility for providing noise attenuation.

2.2. The intent of the Surface Transportation Noise Policy is to provide the following: The responsibility for providing noise attenuation. Council Policy Policy Title: Policy Number: Report Number: Adopted by/date: Council / 2017 July 31 Effective Date: 2017 July 31 Surface Transportation Noise Policy TP003 TT2017-0512 Last Amended: 2000

More information

MOUNTAIN HOUSE SPECIFIC PLAN II

MOUNTAIN HOUSE SPECIFIC PLAN II CHAPTER ELEVEN: NOISE 11.1 INTRODUCTION 11.1 11.2 MOBILE SOURCE NOISE IMPACTS 11.1 11.2.1 Overall Mobile Noise Impacts 11.1 11.2.2 Arterial Roadways 11.3 11.2.3 Railroad 11.4 11.2.4 Byron Airport 11.4

More information

Attachment No. 1 Council Report Attachment

Attachment No. 1 Council Report Attachment Attachment No. 1 Council Report Attachment 19T-03E01 Part Lots 16 to 19, Concession 2, Town of East Gwillimbury Re: Draft Plan of Subdivision prepared by KLM Planning Partners Inc. Project No. P-466, dated

More information

APPENDIX 'G' Noise Attenuation Analysis

APPENDIX 'G' Noise Attenuation Analysis Our File: 6552 ENVIRONMENTAL STUDY REPORT ADDENDUM APPENDIX 'G' Noise Attenuation Analysis March 2008 McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500

More information

Stationary Noise Study. Stonebridge Golf and Country Club. Ottawa, Ontario

Stationary Noise Study. Stonebridge Golf and Country Club. Ottawa, Ontario Stationary Noise Study Stonebridge Golf and Country Club Ottawa, Ontario REPORT: GmE 09-042 Noise Prepared For: Kris Haynes 3584 Jockvale Road Ottawa, Ontario K2C 3H2 Prepared By: Thomas Couper, B.Eng.,

More information

Transportation Noise & Vibration Assessment Scott Street. Ottawa, Ontario

Transportation Noise & Vibration Assessment Scott Street. Ottawa, Ontario Transportation Noise & Vibration Assessment 1946 Scott Street Ottawa, Ontario REPORT: GWE17 136 Noise & Vibration Prepared For: Michael Martin Construction Manager 88 Spadina Avenue Ottawa, ON K1Y 2C1

More information

Noise Feasibility Study Proposed 4 Storey Apartment Building 226 Woolwich Street South Breslau, Regional Municipality of Waterloo

Noise Feasibility Study Proposed 4 Storey Apartment Building 226 Woolwich Street South Breslau, Regional Municipality of Waterloo Noise Feasibility Study Proposed 4 Storey Apartment Building 226 Woolwich Street South Breslau, Regional Municipality of Waterloo Prepared for: RHH Rental Properties Inc. 6783 Wellington Road 34, RR22

More information

Proposed Residential/Institutional Development Independent and Assisted Care Senior s Residence 190 Richmond Road Ottawa, ON K1Z 6W6

Proposed Residential/Institutional Development Independent and Assisted Care Senior s Residence 190 Richmond Road Ottawa, ON K1Z 6W6 PRELIMINARY ENVIRONMENTAL NOISE REPORT Project:. Proposed Residential/Institutional Development Independent and Assisted Care Senior s Residence Richmond Road Ottawa, ON KZ W Prepared for: Choice Properties

More information

Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario

Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario Prepared for: Mattamy Homes Ltd. 433 Steeles Avenue East, Suite 110 Milton,