Issued February 21, Haynesville Global Access Pipeline LLC. Notice of Non-Binding Open Season
|
|
- Julianna McKenzie
- 5 years ago
- Views:
Transcription
1 Issued February 21, 2018 Haynesville Global Access Pipeline LLC Notice of Non-Binding Open Season
2 Notice of Non-Binding Open Season Haynesville Global Access Pipeline LLC ( HGAP ), a wholly-owned subsidiary of Tellurian Inc., hereby announces a Non-Binding Open Season for transportation services for the Haynesville Global Access Pipeline ( Project or Pipeline ). HGAP is proposing to construct, own and operate the Project, an approximate 200-mile long, 42-inch diameter interstate natural gas pipeline originating in the heart of the prolific Haynesville natural gas production region and facilitating connections to natural gas markets in the U.S. Gulf Coast and around the world through proposed interconnections with pipelines that supply natural gas to LNG export facilities. HGAP is part of Tellurian s previously announced proposed Tellurian Pipeline Network that represents a $7.0 billion investment in U.S. infrastructure, creating approximately 15,000 jobs in Texas and Louisiana. The investment is incremental to the $15.2 billion investment that Tellurian plans for Driftwood LNG, a proposed liquefied natural gas (LNG) export facility near Lake Charles, Louisiana. The proposed Pipeline will aggregate natural gas production indirectly from the Barnett and Anadarko Basin, Marcellus and Utica basin shales, and directly from the Haynesville shale. It will link this natural gas production directly to the high growth markets of Southwest Louisiana, which could grow to 8.0 Bcf/d by 2025 and bypass increasingly constrained locations in and around Perryville, Louisiana. As proposed, HGAP intends to put the Project in-service no later than April 2023 or earlier as determined by the needs of its shippers. Map of proposed HGAP pipeline route 1201 Louisiana Street Suite 3100 Houston, TX TEL
3 Overview HGAP is announcing this Non-Binding Open Season to solicit participation in its proposed Pipeline on a firm basis, for terms ranging from 10 to 20 years and for shipper classes ranging from Standard to Foundation. The Pipeline is anticipated to have as many as 18 meter locations, one mainline compressor station and lateral lines of varying diameters to connect to other third-party pipelines located in the Haynesville production region to the growing market located near Lake Charles, Louisiana. Participation in the Open Season will be considered Non-Binding on all participants, including Tellurian and HGAP, until such parties have executed a binding precedent agreement ( PA ). Once HGAP more precisely determines the scope of the proposed facilities and the participating shippers, the participating shippers will be asked to sign a binding PA after they are notified of the award of capacity. The Pipeline is proposed to have three rate zones: Zone 1 or the North Louisiana Zone would provide transportation service originating from points as far north as Claiborne Parish, Louisiana, on the Gulf Crossing Pipeline system ( Gulf Crossing ) and Mid- Continent Express Pipeline ( MEP ), and to the Regency Intrastate Gas System ( RIGS ) located in Webster Parish, Louisiana. A stand-alone rate is proposed for this zone and would include all points/interconnects within the zone. As proposed, Zone 1 would consist of a minimum 30-inch diameter pipeline capable of transporting a minimum of 400 million standard cubic feet per day. Depending upon shipper interests, this section can be expanded to a 42-inch pipeline and 2 Bcf/d of capacity. Execution of this zone is contingent upon sufficient shipper interest. Zone 2 or the Haynesville Zone would originate near RIGS and would terminate at the proposed Tennessee Gas interconnect located in Sabine Parish, Louisiana. As proposed, Zone 2 would consist of a 42- inch diameter pipeline with a capacity of up to 2 Bcf/d. Zone 3 or the Market Zone would originate south of Tennessee Gas in Sabine Parish, Louisiana, and then traverse Vernon, Beauregard, Allen, and Jefferson Davis Parishes, and terminate at delivery points located near Gillis, Louisiana in Jefferson Davis and Calcasieu Parishes, Louisiana. Zone 3 would consist of a 42-inch diameter pipe capable of transporting up to 2 Bcf/d Louisiana Street Suite 3100 Houston, TX TEL
4 Zone map of proposed HGAP pipeline route 1201 Louisiana Street Suite 3100 Houston, TX TEL
5 HGAP may implement up to 11 receipt meter stations along the proposed Pipeline route. Each meter is intended to provide connectivity to existing or proposed plants in the Haynesville region and to potential thirdparty pipelines located in Webster, Bossier, Caddo, Red River, De Soto and Sabine Parishes, Louisiana. The potential receipt points may include the locations illustrated below. Prospective shippers are encouraged to suggest additional receipt points with other third-party pipes, cryogenic gas plants or gathering system common points. HGAP is also proposing up to 7 delivery points. These could include a connection with the pipelines as identified below located near Gillis, Louisiana, or just northeast of Lake Charles, Louisiana, as illustrated below. Similar to the receipt points, HGAP encourages the shippers to provide alternate delivery points for consideration Louisiana Street Suite 3100 Houston, TX TEL
6 Foundation shipper status Shippers who: enter into a binding PA; commit to a minimum capacity of 500,000 mmbtu/d of natural gas that is directed to be delivered to or near Gillis, Louisiana; commit to a term of at least 20 years; and meet the credit provisions as provided in the PA, shall receive Foundation Shipper status. Foundation Shippers will enjoy benefits such as negotiated rates, contract extension rights, most favored nations benefits, pooling and wheeling rights for a negotiated fee, a right of refusal for short-term firm or seasonal capacity that becomes available as a result of ambient conditions, and other benefits negotiated on a not-unduly discriminatory basis. Anchor shipper status Shippers who: enter into a binding PA; commit to a minimum capacity of 250,000 mmbtu/d of natural gas that is directed to be delivered to or near Gillis, Louisiana; commit to a term of at least 10 years; and meet the credit provisions as provided in the PA, shall receive Anchor Shipper status. Anchor Shippers will enjoy benefits such as negotiated rates for their volumes, contract extension rights, access to secondary pooling and wheeling rights for a negotiated fee, secondary rights to short-term firm or seasonal capacity that becomes available as a result of environmental conditions and other benefits negotiated on a not-unduly discriminatory basis. Standard shipper status Shippers who: enter into a binding PA; commit to a minimum capacity of 100,000 mmbtu/d of natural gas that is directed to be delivered to or near Gillis, Louisiana; commit to a term of at least 10 years; and meet the credit provisions as provided in the PA, shall receive Standard Shipper status. Standard shippers will enjoy benefits such as negotiated rates for their volumes, contract extension rights, and other benefits negotiated on a not-unduly discriminatory basis. Contract term HGAP reserves the right to reject bids that provide a contract term of less than 20 years for Foundation Shippers and less than 10 years for Anchor and Standard Shippers Louisiana Street Suite 3100 Houston, TX TEL
7 Length of open season Beginning of open season: 12:00 PM CST, Wednesday, February 21, 2018 Close of open season: 4:00 PM CST, Friday, April 6, 2018 Transportation Rates HGAP will provide a cost of service-based, daily reservation recourse rate, which will be available for firm transportation service under the Project. While the ultimate recourse rate for firm transportation service will be a function of the final Project scope and definitive agreements (and dependent on firm path(s) and subscription levels), indicative firm recourse transportation rates projected for transportation and deliveries in each Zone are provided below: Zone 1 or the North Louisiana Zone ~$0.13 mmbtu/d Zone 2 or the Haynesville Zone ~$0.14 mmbtu/d Zone 3 or the Market Zone ~$0.25 mmbtu/d HGAP also will provide service on a negotiated daily reservation rate(s) basis, as negotiated and documented in a binding PA and based upon the facilities installed to meet the terms of the service. HGAP may, depending upon shipper interest, provide seasonal, short haul, wheeling or pooling services and other capacity arrangements on a short-term firm or on an interruptible basis, as available and based upon a priority basis in accordance with the shipper class. Short-term firm service is defined as the potential capacity above the nominal or summer day design case and the capacity that results from ambient conditions (e.g. up to the peak or winter design case) that could allow for system capacities to exceed the nominal or summer day design case. Any short-term firm service above the interruptible capacity would be limited to 1 year in duration under the terms of a Short-Term Firm Transportation Service Agreement at the posted rate or long-term shipper s negotiated commodity rate. Priority for the potentially available additional services will be based upon shipper status, with priority given to: 1 Foundation Shippers; then 2 Anchor Shippers; then 3 Standard Shippers; and then 4 non-long term or interruptible shippers based upon the highest NPV to HGAP. Retainage, surcharges and fuel In addition to the above indicated transportation rates, shippers will pay the applicable surcharges as allowed and approved by the Federal Energy Regulatory Commission ( FERC ), will be responsible for the applicable compressor fuel which is estimated to be less than 0.5% and/or electric power charges, and provide the applicable company use, loss and unaccounted for gas associated with transportation under HGAP s Rate Schedule as provided in HGAP s then effective FERC Gas Tariff Louisiana Street Suite 3100 Houston, TX TEL
8 Participation in the open season To participate in this Open Season, interested parties desiring firm transportation service or additional information about the Project should submit an Open Season Transportation Request Form (attached), by 4:00 PM CST, Friday, April 6, Specific attention should be paid to the primary term of service, total firm capacity requested (Maximum Daily Transportation Quantity or MDTQ ), and desired receipt and delivery point(s) combination or the desired receipt and delivery locations if not included in the proposed receipt or delivery locations. During this Non-Binding Open Season process, HGAP will follow-up with interested parties to enter into a Confidentiality Agreement and to initiate the negotiation of either a Letter of Intent ( LOI ) or a binding PA as well as to determine next steps with respect to development and design of the Project. Bid evaluation criteria HGAP will evaluate the prospective interest and/or any bids on a net present value ( NPV ) basis and take into consideration the total scope and cost impact on the Project economics as determined by HGAP. HGAP reserves the right to reject and remove from consideration non-conforming bids, bids that have a delayed inservice requirement beyond what is acceptable to HGAP including bids that require a contract with a partialyear term, or bids that fail to meet the minimum terms set forth above with regard to rate, contract term, credit, or any other economic criteria which could adversely affect the economics or operational viability of the Project. HGAP reserves the right to define and maintain the economic viability of the Project in its sole discretion. If HGAP receives acceptable bids for capacity in excess of the actual amount of available capacity and beyond the initial scope as defined herein, then the capacity may be allocated based on shipper status or as further defined below. Any modifications to the Project may be implemented and agreed upon as part of this initial Non-Binding Open Season, whereas any future modifications by the successful shippers may require a rate adjustment as agreed upon prior to implementing the change. Upon receipt of all timely submitted Open Season Transportation Request Forms, HGAP will evaluate the total capacity requested and if necessary make an initial allocation under the process described below. HGAP, in its sole discretion, may: revise the scope and/or capacity of the Project; evaluate and award capacity based upon the shipper status, with priority given to those shippers whose bids qualify them to be Foundation, Anchor and Standard Shippers; in the event of equal bids, work with the shippers to voluntarily reduce or revise their requested reservation volume and Project path quantities, as applicable; allocate the available firm transportation capacity under the Project; or determine not to pursue the Project. If HGAP allocates the available firm transportation capacity under the Project, then the capacity will be allocated first to those who qualify as Foundation Shippers, then to the Anchor Shippers, then to the Standard Shippers and ultimately, on a non-discriminatory basis, to the remaining shippers. Any remaining capacity beyond the Standard Shipper allotment will be allocated to other requesting shippers providing bids with the highest NPV Louisiana Street Suite 3100 Houston, TX TEL
9 If two or more acceptable bids are of equivalent NPV and shipper status, then the capacity will be allocated pro rata among those bidders, unless the affected bidders have elected not to have their bids prorated (as indicated on their Open Season Transportation Request Form(s)). Requests received by HGAP after the close of the Open Season period may be accepted or rejected by HGAP on a not-unduly discriminatory basis. Shippers are responsible for securing their own transportation arrangements on pipelines upstream and downstream of the designated receipt and delivery points and to facilitate any interconnect agreements with the final delivery point operators. Shippers will also be responsible for confirming the availability of their requested receipt and delivery points with the point operators. Please note that the individual receipt and delivery meter capacities in most cases could be more or less than the firm transportation capacity under the Project. HGAP reserves the right to reject any requests for service under the Project on a not-unduly discriminatory basis. HGAP reserves the right, in its sole discretion, to consider requests for capacity received after the close of the Open Season period but before the start of construction or rely upon this Non-Binding Open Season for any capacity arrangements as part of any PAs, including requests to modify a participant s validly submitted bid, but shall be under no obligation to do so. These procedures and the attached Open Season Transportation Request Form are provided solely to enable interested parties to participate and attempt to obtain an award of capacity or to help frame the design and capability of the proposed pipeline system. HGAP s decision to proceed with the proposed Project is subject to HGAP receiving a level of transportation interest, that in its sole discretion, HGAP determines to be acceptable and based upon HGAP securing Final Investment Decision from its parent company s Board of Directors Louisiana Street Suite 3100 Houston, TX TEL
Issued March 21, Permian Global Access Pipeline LLC. Notice of Non-Binding Open Season
Issued March 21, 2018 Permian Global Access Pipeline LLC Notice of Non-Binding Open Season Notice of Non-Binding Open Season Permian Global Access Pipeline LLC ( PGAP ), a wholly-owned subsidiary of Tellurian
More informationPermian to Katy Pipeline. Non-Binding Open Season
August - September 2017 TABLE OF CONTENTS Notice of Open Season and Project Overview...3 P2K Katy Hub...4 Anchor Shipper Status...6 Length of Open Season...6 Participation in the...6 Bid Evaluation Criteria...7
More informationCheyenne Connector Binding Open Season
Cheyenne Connector Binding Open Season Page 1 of 9 Cheyenne Connector Description Tallgrass Energy Partners, LP ( Tallgrass ) is pleased to announce a binding open season ( Open Season ) for the Cheyenne
More informationBINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement
BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement Page 1 of 8 REX Cheyenne Hub Enhancement Rockies Express Pipeline LLC ( REX ) is pleased to announce a binding open season ( Open Season
More informationHGAP. Haynesville Global Access Pipeline. Tellurian Midstream Group April 2018
HGAP Haynesville Global Access Pipeline Tellurian Midstream Group April 2018 Cautionary statements Forward looking statements The information in this presentation includes forward-looking statements within
More informationTransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018
TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018 Proposing firm service from Empress to the Chicago market area, including
More informationWBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, Binding Open Season
WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, 2014 Binding Open Season WBI Energy Wind Ridge Pipeline, LLC announces a Binding Open
More informationLOCKRIDGE TO WAHA PROJECT NOTICE OF BINDING OPEN SEASON
Announcement of Open Season Natural Gas Pipeline Company of America LLC ( NGPL ) has entered into a binding transaction with a third party ( Prearranged Shipper ) to develop a project to provide 500,000
More informationTexas Eastern Appalachiaa to Market Expansion Project (TEAM
Texas Eastern Appalachiaa to Market Expansion Project (TEAM 2014) Moving emerging natural gas supplies from the Appalachian region to diverse market destinations along the existing Texas Eastern footprint
More informationAugust 20 th, 2018 Notice of Non-Binding Open Season. CJ Express Pipeline. Midcoast Energy, LLC An affiliate of ArcLight Capital, LLC
1 August 20 th, 2018 Notice of Non-Binding Open Season CJ Express Pipeline Midcoast Energy, LLC An affiliate of ArcLight Capital, LLC 2 Midcoast Energy, LLC Midcoast Energy, LLC is a large-scale natural
More informationNotice Text. Notice 17238/Previous Notice 17236
TSP Name: El Paso Natural Gas Company,L.L.C TSP: 00-800-1703 Notice ID: 17238 Critical: N Notice Type Desc: Other Notice Stat Desc: Initiate Subject: Revised Line 1600 to Waha Open Season (17238) Prior
More informationEl Paso Natural Gas Company Binding Open Season. Delaware Basin to Waha
INTRODUCTION El Paso Natural Gas Company Binding Open Season Delaware Basin to Waha In response to increasing demand for take-away capacity from the Delaware Basin with deliveries to the Waha area interconnections,
More informationNOTICE OF NON-BINDING OPEN SEASON AG LINE EXPANSION PROJECT
Announcement of Non-Binding Open Season Natural Gas Pipeline Company of America LLC ( NGPL ) is soliciting interest from the market in developing a project to provide approximately 200,000 Dth/d of firm
More informationOpen Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG)
Open Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG) Bid Deadline 2:00 PM Mountain Time, March 22, 2018 Portable Document Format (.pdf) file of Open
More informationFERC GAS TARIFF. Second Revised Volume No. 1 CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF Second Revised Volume No. 1 Of CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: James R. Downs,
More informationFERC GAS TARIFF. Third Revised Volume No. 1. (Superseding Second Revised Volume No. 1) COLUMBIA GULF TRANSMISSION, LLC FILED WITH
FERC GAS TARIFF (Superseding Second Revised Volume No. 1) of COLUMBIA GULF TRANSMISSION, LLC FILED WITH FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this tariff should be addressed to:
More informationTrailblazer Pipeline Company LLC Docket No. RP Exhibit No. TPC-0080
Trailblazer Pipeline Company LLC Docket No. RP- -000 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Trailblazer Pipeline Company LLC ) ) ) Docket No. RP- -000 SUMMARY OF PREPARED
More informationKinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1
Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 RATE SCHEDULE FTS FIRM TRANSPORTATION SERVICE 1. AVAILABILITY This Rate Schedule FTS is available to any entity (hereinafter called Shipper) which:
More informationNatural Gas Pipelines
Natural Gas Pipelines Tom Martin President Natural Gas Pipeline Group Overview Market Environment Shale activity providing excellent growth opportunities Transport spreads remain flat Storage spreads softer
More informationCORNERSTONE PIPELINE & UTICA BUILD-OUT PROJECTS
NOTICE OF BINDING OPEN SEASON AND INFORMATION MEMORANDUM Issued By MARATHON PIPE LINE LLC & OHIO RIVER PIPE LINE LLC SUBSIDIARIES OF MPLX LP CORNERSTONE PIPELINE & UTICA BUILD-OUT PROJECTS On FEBRUARY
More informationOPEN SEASON
OPEN SEASON 2012-2014 Rooted in Tradition, Branching to New Opportunities E astern Shore Natural Gas Company ( Eastern Shore ) is pleased to announce its Open Season 2012-2014. Eastern Shore has been serving
More informationINFORMATION MEMORANDUM AND BINDING OPEN SEASON NOTICE
INFORMATION MEMORANDUM AND BINDING OPEN SEASON NOTICE I. The Rangeland RIO Pipeline On April 12, 2016, Rangeland RIO Pipeline, LLC ( Rangeland ) issued a press release announcing this open season ( Open
More informationTable of Contents. Trailblazer Pipeline Company LLC 6th Revised Volume No. 1. Rate Schedules. Rate Schedule FTS. Rate Schedule ITS.
6th Revised Volume No. 1 Table of Contents Rate Schedules Rate Schedule FTS Rate Schedule ITS Rate Schedule FTB Rate Schedule Wheeling Service Rate Schedule PALS Rate Schedules 6th Revised Volume No. 1
More informationOPEN SEASON. I. The BKEP Condensate Pipeline Project
OPEN SEASON I. The BKEP Condensate Pipeline Project Blueknight Energy Partners, L.P. ( BKEP ) is pleased to announce the commencement of an Open Season for the BKEP Condensate Pipeline Project. The BKEP
More informationTennessee Gas Pipeline Co, L.L.C. Northeast Energy and Commerce Association September 27, 2012
Tennessee Gas Pipeline Co, L.L.C. Northeast Energy and Commerce Association September 27, 2012 The Kinder Morgan System 4 th largest energy company in North America Enterprise value ~ $95 billion Largest
More informationOpen Season Market-Based Storage in the Heart of the PA Marcellus Shale Region
Open Season Market-Based Storage in the Heart of the PA Marcellus Shale Region Open Season starts 8:00AM Feb 12, 2018 Open Season bids due 12:00PM Feb 21, 2018 Contracts awarded on 12:00PM Feb 23, 2018
More informationCorporate Presentation
Corporate Presentation Enercom Conference Denver, Colorado August 2018 John Howie, President Tellurian Production Company Cautionary statements Forward-looking statements The information in this presentation
More informationKinder Morgan Louisiana Pipeline LLC First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS
Kinder Morgan Louisiana Pipeline LLC First Revised Sheet No. 100 First Revised Volume No. 1 Original Sheet No. 100 1. DEFINITIONS 1.1 AGREEMENT "Agreement" shall mean a transportation agreement subject
More informationSheet No. 5 - Currently Effective Rates - Rate Schedules FTS and ITS. Sheet No. 6 - Statement of Negotiated Rate Transactions
Kinder Morgan Illinois Pipeline LLC Table of Contents Sheet No. 1 - Table of Contents Sheet No. 3 - Preliminary Statement Sheet No. 4 - System Map Sheet No. 5 - Currently Effective Rates - Rate Schedules
More informationFERC GAS TARIFF. First Revised Volume No. 1 MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF First Revised Volume No. 1 Of MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: John
More information6th Revised Volume No. 1 Section Version: TABLE OF CONTENTS
Table of Contents TABLE OF CONTENTS Sixth Revised Volume No. 1 Table of Contents Preliminary Statement System Map Section Name Table of Contents Preliminary Statement System Map Currently Effective Rates
More informationTennessee Gas Pipeline Company, L.L.C. Market Area Pooling Area Revisions and Other Tariff Changes Docket No. RP
July 12, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Tennessee Gas Pipeline Company, L.L.C. Market Area Pooling Area Revisions
More informationWachovia LNG Conference
Wachovia LNG Conference November 13, 007 Forward Looking Statements This presentation contains forward looking statements, including these, within the meaning of Section 7A of the Securities Act of 1933,
More informationSpectra Energy: Moving Ahead, Gaining Momentum
8 th ANNUAL PLATTS PIPELINE EXPANSION & DEVELOPMENT CONFERENCE HOUSTON, TX SEPTEMBER 17, 2013 Spectra Energy: Greg Crisp Director, Business Development Safe Harbor Statement Some of the statements in this
More informationTable of Contents/Section Index With Links
Boardwalk Storage Company, LLC Third Revised Volume No. 1 Table of Contents/Section Index With Links Third Revised Volume No. 1 1. Table of Contents 2. Preliminary Statement 3. System Map 4. Currently
More informationVector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE
Vector Pipeline L.P. Original Sheet No. 30 1. AVAILABILITY RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE This FT-1 Rate Schedule is available to any party (hereinafter called "Shipper"), for firm transportation
More informationFERC NGA GAS TARIFF. THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) SEA ROBIN PIPELINE COMPANY, LLC.
FERC NGA GAS TARIFF THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) of SEA ROBIN PIPELINE COMPANY, LLC Filed With The Federal Energy Regulatory Commission Communications Concerning
More informationFERC GAS TARIFF. First Revised Volume No. 1 NORTHERN BORDER PIPELINE COMPANY. Filed with. Federal Energy Regulatory Commission
FERC GAS TARIFF of NORTHERN BORDER PIPELINE COMPANY Filed with Federal Energy Regulatory Commission Communications Concerning This Tariff Should Be Addressed To: Joan Collins Manager, Tariffs and Compliance
More informationEMPIRE PIPELINE, INC. FERC GAS TARIFF FIRST REVISED VOLUME NO. 1
EMPIRE PIPELINE, INC. FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 (Superseding Original Volume No. 1) Communication concerning this tariff should be addressed to: Randy C. Rucinski, Esq. Empire Pipeline,
More informationALLIANCE PIPELINE LIMITED PARTNERSHIP by its General Partner, ALLIANCE PIPELINE LTD. ( Alliance Canada or Alliance )
ALLIANCE PIPELINE LIMITED PARTNERSHIP by its General Partner, ALLIANCE PIPELINE LTD. ( Alliance Canada or Alliance ) BINDING OPEN SEASON March 28 May 30, 2018 For: Capacity Expansion, Capacity Turn Backs,
More informationWestern Oklahoma Residue Takeaway Impact of Growing SCOOP/STACK Supply
Western Oklahoma Residue Takeaway Impact of Growing SCOOP/STACK Supply Craig Harris Executive Vice President & Chief Commercial Officer October 28, 2016 Forward-looking Statements This presentation and
More informationNOTICE OF NON-BINDING OPEN SEASON Kinder Morgan Texas Pipeline LLC Permian Highway Pipeline Project August 10, 2018
NOTICE OF NON-BINDING OPEN SEASON Kinder Morgan Texas Pipeline LLC Permian Highway Pipeline Project August 10, 2018 Announcement of Open Season In order to serve the growing needs for Permian Basin gas
More informationNortheast Energy Direct
Northeast Energy Direct The Northeast Pipeline Expansion Solution for Lower Energy Costs and Enhanced Electric Reliability Open Season for Firm Service www.northeastenergyfuture.com @NEDEnergy Open Season
More informationFERC GAS TARIFF VOLUME NO. 1 KO TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
KO Transmission Company Filing Category: Amendment Filing Date: 07/27/2016 FERC Docket: RP16-01097-001 FERC Action: Accept FERC Order: 156 FERC 61,147 Order Date: 08/31/2016 Effective Date: 02/01/2017
More informationHorizon Pipeline Company, L.L.C. First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS
Horizon Pipeline Company, L.L.C. First Revised Sheet No. 100 Superseding Original Sheet No. 100 1. DEFINITIONS 1.1 AGREEMENT "Agreement" shall mean a transportation agreement subject to, as applicable,
More informationImpact of Shale Gas on Transmission
Impact of Shale Gas on Transmission February, 08 2012 February, 2012 1 Transco System Overview System Summary 2,000 Mainline Miles from Texas to New York. Approximately 11,000 Miles of Pipeline. Extensive
More informationASX/MEDIA RELEASE 30 APRIL 2015 MAGNOLIA LNG PROJECT FERC NOTICE OF SCHEDULE FOR ENVIRONMENTAL REVIEW RECEIVED
ASX/MEDIA RELEASE 30 APRIL 2015 MAGNOLIA LNG PROJECT FERC NOTICE OF SCHEDULE FOR ENVIRONMENTAL REVIEW RECEIVED The Directors of Liquefied Natural Gas Limited (the Company, ASX Code: LNG, OTC: LNGLY) are
More informationMARATHON PIPE LINE LLC
F.E.R.C. ICA Oil Tariff F.E.R.C. No. 333.4.0 (cancels F.E.R.C. No. 333.3.0) MARATHON PIPE LINE LLC In Connection with Ohio River Pipe Line LLC JOINT TARIFF Containing Incentive s, Non-Contract s and Contract
More informationOctober 23, 2018 Harrisburg, PA
Pennsylvania Public Utility Commission Annual Winter Reliability Assessment Terrance J. Fitzpatrick President & Chief Executive Officer Energy Association of Pennsylvania October 23, 2018 Harrisburg, PA
More informationFebruary 10, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426
February 10, 2011 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Northern Border Pipeline Company 717 Texas Street, Suite 2400 Houston, TX
More informationMARATHON PIPE LINE LLC
OHIO RATE SHEET No. 1.2.0 Cancels Ohio Sheet No. 1.1.0 In Connection with Ohio River Pipe Line LLC JOINT TARIFF Containing Non-Contract s and Contract s The rates named in this tariff for the intrastate
More information1.0.0 Rate Schedule GPS Gas Parking Service GT&C Section 7. Operational Balancing Agreements
September 28, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Trunkline Gas Company, LLC Docket No. RP16- Revision to Term Provision
More informationTable of Contents. Great Lakes Gas Transmission Limited Partnership. Third Revised Volume No. 1. Third Revised Volume No. 1 1 TABLE OF CONTENTS
Great Lakes Gas Transmission Limited Partnership Table of Contents 1 TABLE OF CONTENTS 2 PRELIMINARY STATEMENT 3 MAPS 4 STATEMENT OF RATES 4.1 Rate Schedules FT, LFT & EFT 4.2 Reserved for Future Use 4.3
More informationMagnum Gas Storage, LLC
September 2016 Non-Binding Open Season Providing the Western US with Critical Energy Infrastructure www.westernenergyhub.com/natural-gas-midstream.php MAGNUM GAS STORAGE PROJECT OPEN SEASON FOR FIRM INTERSTATE
More informationTransportation. Tariff. Vector Pipeline Limited Partnership
Transportation Tariff of Vector Pipeline Limited Partnership (Effective April 1, 2004 Unless Indicated Otherwise) Communications Concerning this Tariff Should be Addressed to: Vector Pipeline Limited 38705
More informationCopyright 2018 RBN Energy. Permian Global Access Pipeline (PGAP) Natural Gas Market Analysis
Permian Global Access Pipeline (PGAP) Natural Gas Market Analysis Permian Global Access Pipeline (PGAP)» Natural gas production growth in the Permian will continue to accelerate, resulting in outbound
More informationFERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 OF CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: Stanley
More informationStatement of Nature, Reasons, and Basis for Proposed Changes
November 25, 2008 The Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First St., N.E. Washington, D.C. 20426 Dear Ms. Bose: RE: Great Lakes Gas Transmission Limited Partnership
More information151 FERC 61,140 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
151 FERC 61,140 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller, Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.
More informationDOMINION EAST OHIO CASE NO GA-EXM APRIL 2014 THROUGH MARCH 2015 STANDARD SERVICE OFFER/STANDARD CHOICE OFFER
DOMINION EAST OHIO CASE NO. 07-1224-GA-EXM APRIL 2014 THROUGH MARCH 2015 STANDARD SERVICE OFFER/STANDARD CHOICE OFFER CAPACITY RELEASE INFORMATION PACKAGE Disclaimer The information presented in this information
More informationDOMINION EAST OHIO CASE NO GA-EXM STANDARD SERVICE OFFER/STANDARD CHOICE OFFER CAPACITY RELEASE INFORMATION PACKAGE
DOMINION EAST OHIO CASE NO. 07-1224-GA-EXM STANDARD SERVICE OFFER/STANDARD CHOICE OFFER CAPACITY RELEASE INFORMATION PACKAGE Disclaimer The information presented in this information package, at the information
More informationI Saw Miles and Miles of Texas
A RBN Energy Drill Down Report Copyright 2016 RBN Energy I Saw Miles and Miles of Texas Mexican Demand, LNG Exports Pull Marcellus/Utica Gas to Lone Star State Favorable production economics will drive
More informationUS LNG Export Growth and the Benefits to Midstream
US LNG Export Growth and the Benefits to Midstream July 2018 The US is on the brink of adding significant LNG export capacity in 2019 and becoming a sizable player in the global LNG market. In 2017, the
More information141 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
141 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony T. Clark. Oxy
More informationCHEVRON PIPE LINE COMPANY
F.E.R.C. I.C.A. OIL TARIFF (Cancels F.E.R.C. No. 1155.19.0) CHEVRON PIPE LINE COMPANY LOCAL TARIFF Applying on the Transportation of CRUDE PETROLEUM (As Defined Herein) FOURCHON TERMINAL CHARGES and FOURCHON
More informationMagnum Gas Storage, LLC
MAGNUM GAS STORAGE PROJECT OPEN SEASON FOR INTERSTATE NATURAL GAS STORAGE SERVICES Response Due By July 31, 2009, at 5:00 MDT June 9, 2009 Magnum Gas Storage, LLC (Magnum), invites your company to participate
More information146 FERC 61,182 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
146 FERC 61,182 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Acting Chairman; Philip D. Moeller, John R. Norris, and Tony Clark. Crosstex NGL Pipeline,
More informationOpen Season Guidelines
C04-ANA 2.4 (a) Attachment Maritimes & Northeast Pipeline Expansion Project Open Season Guidelines February 15 to March 31, 2005 Maritimes & Northeast Pipeline is ideally situated to expand in order to
More informationIn Response to the New York Energy Highway RFI Spectra Energy Corp s Comments May 30, 2012
In Response to the New York Energy Highway RFI Spectra Energy Corp s Comments May 30, 2012 Spectra Energy Corp ( Spectra Energy ) appreciates the opportunity to provide comments to the New York Energy
More informationDominion Energy Transmission, Inc. FERC Gas Tariff Tariff Record No. 20. Fifth Revised Volume No. 1 Version TARIFF RATE SCHEDULES
Rate Schedules FERC Gas Tariff Tariff Record No. 20. TARIFF RATE SCHEDULES TARIFF RATE RECORD SCHEDULE SERVICE NO. FT Firm Transportation Service 20.1 FTNN Firm Transportation, No-Notice Service 20.2 IT
More informationCurrently Effective Rates - FTS and FTB Existing System. Currently Effective Rates FTS and FTB Expansion System
6th Revised Volume No. 1 Table of Contents Table of Contents Preliminary Statement System Map Currently Effective Rates Currently Effective Rates - FTS and FTB Existing System Currently Effective Rates
More information144 FERC 61,130 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
144 FERC 61,130 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony Clark. CenterPoint
More informationDocket No. CP Responses to OEMR Date Request Issued December 21, 2016
625 Liberty Avenue, Suite 1700 Pittsburgh, PA 15222 844-MVP-TALK mail@mountainvalleypipeline.info www.mountainvalleypipeline.info January 6, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory
More informationDirector TGP Facility Planning and Gas Control June 3, Prepared for the Harvard Electricity Policy Group
www.elpaso.com NYSE:EP Anders Johnson Director TGP Facility Planning and Gas Control June 3, 2011 Prepared for the Harvard Electricity Policy Group D E P E N D A B L E N A T U R A L G A S El Paso Corporation
More informationFERC GAS TARIFF THIRD REVISED VOLUME NO. 2. (Superseding Second Revised Volume No. 2) WYOMING INTERSTATE COMPANY, L.L.C.
FERC GAS TARIFF THIRD REVISED VOLUME NO. 2 (Superseding Second Revised Volume No. 2) of WYOMING INTERSTATE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION Communication Covering This
More informationCBIA Energy Conference Natural Gas- Coming to Your Neighborhood Soon October 10, 2013 Cromwell, Connecticut Michael Dirrane Director, Northeast
CBIA Energy Conference Natural Gas- Coming to Your Neighborhood Soon October 10, 2013 Cromwell, Connecticut Michael Dirrane Director, Northeast Marketing Spectra Energy U.S. Transmission Map Miles of Pipe
More informationNatural Gas Market Outlook FGU Conference, June 2017 Shelley Corman
Natural Gas Market Outlook FGU Conference, June 217 Shelley Corman Important Information Forward-looking statements disclosure Statements made at this conference or in the materials distributed in conjunction
More informationUGI Storage Company Market-Based Storage in the Heart of the PA Marcellus Shale Region
UGI Storage Company Market-Based Storage in the Heart of the PA Marcellus Shale Region Tioga: 3,739,980 Dth of MSQ with 60 day service open April 1, 2019 Meeker: 990,000 Dth of MSQ with 100 day service
More informationNational Association of Publicly Traded Partnerships MLP Conference Presentation New York, New York May 21, 2008
National Association of Publicly Traded Partnerships MLP Conference Presentation New York, New York May 21, 2008 Safe Harbor Statement Some of the statements in this document concerning future company
More informationPLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )
PIPELINE SYSTEMS (as of 9-22-17) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and
More informationTransCanada s GTN System Notice of Available Multi-Month Parking Service. November 17, 2009
TransCanada s GTN System Notice of Available Multi-Month Parking Service November 17, 2009 TransCanada s GTN System ( GTN ) is providing notice of the availability of multi-month Parking Service, offered
More informationChris Helms CEO NGT&S
Chris Helms CEO NGT&S Pipeline Safety: Looking to the Future While Resolving the Past OGA Market Conditions Conference July 19, 2011 1 SYSTEM OVERVIEW Pipeline More than 15,000 miles Delivers approximately
More informationNovember 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426
November 20, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Gas Transmission Northwest LLC 700 Louisiana Street, Suite 700 Houston,
More informationFloating Liquefaction Project Overview February 2016
Floating Liquefaction Project Overview February 2016 Project Overview Delfin LNG is poised to become the first floating liquefaction project in the United States Location Planned Capacity Brownfield Project
More informationFirst Revised Sheet No. 42
Patricia S. Francis Associate General Counsel Legal June 7, 2010 Ms. Kimberly Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D. C. 20426 Re: Southern LNG Company,
More informationFERC GAS TARIFF FIRST REVISED VOLUME NO. 1. (Superseding Original Volume No. 1) SOUTHERN STAR CENTRAL GAS PIPELINE, INC.
FERC Gas Tariff FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 ( Original Volume No. 1) Of SOUTHERN STAR CENTRAL GAS PIPELINE, INC. Filed With FEDERAL ENERGY REGULATORY COMMISSION Communications Covering Rates
More informationColumbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: October 25, 2018 Service Agreement No.
Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective : October 25, 2018 Service Agreement No. 176680 Noble Energy, Inc. Option Code A FTS SERVICE AGREEMENT Service Agreement
More informationFERC GAS TARIFF FOURTH REVISED VOLUME NO. 1. (Superseding Third Revised Volume No. 1) COLUMBIA GAS TRANSMISSION, LLC FILED WITH
FERC GAS TARIFF FOURTH REVISED VOLUME NO. 1 (Superseding Third Revised Volume No. 1) of COLUMBIA GAS TRANSMISSION, LLC FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this
More informationConnecting Supply Options GasMart May 21, 2008, Chicago
Connecting Supply Options GasMart May 21, 2008, Chicago Dean Ferguson, VP Marketing, Business Development & Regulatory Affairs, U.S. Pipeline Central Forward-Looking Information 2 This presentation may
More informationDelivering Supply Options LDC Forum June 1, 2008, Boston. Tim Stringer Manager, U.S. Northeast Markets
Delivering Supply Options LDC Forum June 1, 2008, Boston Tim Stringer Manager, U.S. Northeast Markets Forward-Looking Information 2 This presentation may contain certain information that is forward looking
More informationEPL PIPELINE, L.L.C.
F.E.R.C. ICA Oil Tariff F.E.R.C. No. 4.4.0 (Cancels F.E.R.C. No. 4.3.0) EPL PIPELINE, L.L.C. Local Tariff Applying on the Transportation of CRUDE PETROLEUM (As Defined Herein) Subject to the Rules and
More informationColorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day
Colorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day Portable Document Format (.pdf) file of Open Season: https://pipeportal.kindermorgan.com/portalui/openseasondocs.aspx?tsp=cigd
More informationNatural Gas Market Update
Natural Gas Market Update John Jicha - MGE Director - Energy Supply and Trading Madison Gas and Electric Company Agenda What a difference ten years can make Low prices Fundamental factors impacting the
More information140 FERC 61,098 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON PETITION FOR DECLARATORY ORDER. (Issued August 1, 2012)
140 FERC 61,098 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony T. Clark. Explorer
More informationExpanding Existing Pipeline Capacity to Meet New England s Energy Needs. Mike Dirrane Director, Marketing
Expanding Existing Pipeline Capacity to Meet New England s Energy Needs Mike Dirrane Director, Marketing January 27, 2015 Spectra Energy s Portfolio of Assets Based in Houston, TX with operations in 30
More informationRate Schedule FT Firm Transportation Service
Rate Schedule FT Firm Transportation Service 1. Availability This Rate Schedule is available for the transportation of natural gas by Heartland Gas Pipeline for any Customer: 1.1 Where Customer: a) Has
More informationEnergy Security, Economic & Environmental
NEW ENGLAND CANADA BUSINESS COUNCIL 11.13.15 Important Role of Natural Gas Pipelines: Energy Security, Economic & Environmental William T. Yardley President, U.S Transmission NEW ENGLAND CANADA BUSINESS
More informationPLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )
PIPELINE SYSTEMS (as of 1-22-18) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and
More informationPLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )
PIPELINE SYSTEMS (as of 5-4-18) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and
More informationColumbia Gas Transmission, LLC Section Original Volume No. 1.1 Version Non-Conforming Service Agreement No
Columbia Gas Transmission, LLC Section 4.23 FERC NGA Gas Tariff Non-Conf Neg Rate Svc Agmts Original Volume No. 1.1 Version 0.0.0 Non-Conforming Service Agreement No. 161137 Cabot Oil & Gas Corporation
More information