DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HOUSTON DALLAS HIGH SPEED RAIL (TEXAS CENTRAL)

Size: px
Start display at page:

Download "DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HOUSTON DALLAS HIGH SPEED RAIL (TEXAS CENTRAL)"

Transcription

1 DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HOUSTON DALLAS HIGH SPEED RAIL (TEXAS CENTRAL) Background On June 25, 2014, the Federal Railroad Administration (FRA) issued a Notice of Intent to Prepare an Environmental Impact Statement (EIS) for the 240-mile-long Dallas-Houston High Speed Passenger Rail Corridor. In preparation for an EIS, FRA conducted an independent environmental analysis of corridor level alignment alternatives previously identified in Texas Rail Plan (2010) as well as by Texas Central. This analysis can be found in the Dallas to Houston High-Speed Rail Project Corridor Alternatives Analysis Report (2015). Corridor alternatives under consideration included the Burlington Northern Santa Fe (BNSF) Corridor, Union Pacific Railroad (UPRR) Corridor, I-45 Greenfield Corridor, and the Utility Corridor, which follows Centerpoint Energy and Oncor Electric Delivery s high voltage electrical transmission lines. In addition to corridor level alternatives, FRA also evaluated other transportation modes such as higher speed and conventional rail service, direct bus service, and expansion of I-45. Through screening of corridor and transportation alternatives against the project s stated purpose and need 1, alternative transportation modes (other than passenger rail transportation) were eliminated from further consideration. The remaining corridor alternatives were evaluated based on human and natural environment constraints, operational feasibility, and physical characteristics. FRA s analysis concluded that the Utility Corridor (See Figure 1-1 in this background paper) was the most suitable alternative for end-to-end travel between Dallas and Houston. The inability to secure shared right-of-way with freight for long distances, in addition to the inability to safely run higher speed passenger rail service on existing freight rail tracks were critical to the elimination of BNSF and UPRR corridors from evaluation. However, this elimination does not rule out potential future agreement with private railroads for shorter high-speed rail segments. Regarding the I-45 Greenfield Corridor, it was eliminated due to right-of-way limitations within the corridor and a high cost to acquire necessary right-of-way through freeway expansion. Moving forward with the Utility Corridor and Texas Central s work regarding route alternatives, FRA independently evaluated 21 alignment (route) alternatives in its Dallas to Houston High- Speed Rail Project Alignment Alternatives Analysis Report (2015). The 21 alternatives underwent two levels of screening that considered alignment with the project purpose and need, environmental constraints, and cost and construction. FRA s alternatives screening resulted in the identification of six end-to-end alignment alternatives that will be examined further in the Draft Environmental Impact Statement. Figure 1-2 of this document shows segmentation of routing alternatives, varying combinations of which form the six end-to-end alignment alternatives for the high-speed rail project. Those combinations are shown in Table 1-1. Individual maps can be viewed in FRA s report. 1 The purpose of the Dallas-Houston High Speed Passenger Rail Project is to provide reliable, safe and economically viable passenger rail transportation using proven high speed rail technology between Dallas and Houston. It would provide a convenient and competitive alternative to automobile travel on IH 45 or air travel between the two major metropolitan areas and introduce rail capacity in the vicinity of the corridor. Source:

2 Station Locations Texas Central performed its own analysis of feasible stations and determined that US 290/IH 610 in Houston and Downtown Dallas are the preferred and recommended locations. Current Situation FRA is in the process of developing a Draft Environmental Impact Statement for the project. It is anticipated that the DEIS will be issued in September or October 2016; however, this timeline is subject to change. The Draft EIS will present FRA s environmental analysis of the six draft alignment alternatives and open the Draft EIS for public input. Alignment alternatives will continue to be refined in this process as they are evaluated for potential impacts to the human and natural environment. Action Requested For information only ITEM-10-Update-DEIS-TCR-High Speed Rail July 06, 2016

3 Figure 1-1. Utility Corridor Alternative Source: FRA - Dallas to Houston High-Speed Rail Project Alignment Alternatives Analysis Report (2015)

4 Figure 1-2. Segmented Route Alternatives within Utility Corridor Source: FRA - Dallas to Houston High-Speed Rail Project Alignment Alternatives Analysis Report (2015) ITEM-10-Update-DEIS-TCR-High Speed Rail July 06, 2016

5 Table 1-1 Draft EIS End-to-End Alignment Alternatives Draft Alignment Alternative Segments Alternative A 1, 2a, 3a, 4, 5 Alternative B 1, 2a, 3b, 4, 5 Alternative C (IH 45A) 1, 2a, 3c, 5 Alternative D 1, 2b, 3a, 4, 5 Alternative E 1, 2b, 3b, 4, 5 Alternative F (IH 45B) 1, 2b, 3c, 5 Source: FRA - Dallas to Houston High-Speed Rail Project Alignment Alternatives Analysis Report (2015)

Environmental Impact Statement; Lone Star Regional Rail Project Williamson, Travis, Bastrop, Hays, Caldwell, Comal, Guadalupe, and Bexar Counties, TX

Environmental Impact Statement; Lone Star Regional Rail Project Williamson, Travis, Bastrop, Hays, Caldwell, Comal, Guadalupe, and Bexar Counties, TX This document is scheduled to be published in the Federal Register on 10/06/2014 and available online at http://federalregister.gov/a/2014-23711, and on FDsys.gov [4910-22] DEPARTMENT OF TRANSPORTATION

More information

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT TAC Agenda Item 09 Mailout 7/12/17 APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT Background The Texas Department of Transportation, in cooperation with the Federal Highway

More information

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL OCTOBER 2014 Cover photographs courtesy of Top left - Mike Bates TABLE OF CONTENTS MISSION... 1 INTRODUCTION... 1 VISION STATEMENT... 1 BACKGROUND... 2

More information

CHAPTER 5: TRANSPORTATION

CHAPTER 5: TRANSPORTATION CHAPTER 5: TRANSPORTATION GOAL 12: TRANSPORTATION BACKGROUND SUMMARY INTRODUCTION Albany s location and transportation facilities provide excellent advantages for commerce and economic development. Albany

More information

TEXAS-OKLAHOMA PASSENGER RAIL STUDY. TPP Planning Conference 2014

TEXAS-OKLAHOMA PASSENGER RAIL STUDY. TPP Planning Conference 2014 TEXAS-OKLAHOMA PASSENGER RAIL STUDY TPP Planning Conference 2014 Funding for the Project Study is funded through a Federal Railroad Administration (FRA) Grant. Original grant application for the corridor

More information

DRAFT PURPOSE AND NEED STATEMENT

DRAFT PURPOSE AND NEED STATEMENT DRAFT PURPOSE AND NEED STATEMENT Cotton Belt Corridor Regional Rail Project July 2010 Version 1 TABLE OF CONTENTS 1.0 PURPOSE AND NEED... 2 1.1 Project Overview... 2 1.2 Goals and Objectives... 3 1.3 Relevant

More information

Mobility 2025 Update: The Metropolitan Transportation Plan

Mobility 2025 Update: The Metropolitan Transportation Plan Mobility 2025 Update: The Metropolitan Transportation Plan May, 2001 North Central Texas Council of Governments Transportation Department MOBILITY 2025 UPDATE FINANCIAL SUMMARY Metropolitan Transportation

More information

MEETING DATE: July 28, 2017 ITEM 20. Update on Coordination with the California High Speed Rail, Link US Projects, and Freight Railroads

MEETING DATE: July 28, 2017 ITEM 20. Update on Coordination with the California High Speed Rail, Link US Projects, and Freight Railroads REVISED July 25, 2017 Page 4 TRANSMITTAL DATE: July 21, 2017 MEETING DATE: July 28, 2017 ITEM 20 TO: FROM: SUBJECT: Board of Directors Arthur T. Leahy Update on Coordination with the California High Speed

More information

E2 D0 U 1 C 3 A E T D IUOCNA A T IL O S N E A R L I E S S E R I E S HUB/DBE/SBE R A I L

E2 D0 U 1 C 3 A E T D IUOCNA A T IL O S N E A R L I E S S E R I E S HUB/DBE/SBE R A I L 2E 0D1U3CEAT D UI O CN ATAI LO NSAELR ISEESR I E S R AIL HUB/DBE/SBE RAIL IN TEXAS OVERVIEW Since its inception, the Texas Department of Transportation (TxDOT) has focused on meeting the transportation

More information

TEXAS-OKLAHOMA PASSENGER RAIL STUDY

TEXAS-OKLAHOMA PASSENGER RAIL STUDY TEXAS-OKLAHOMA PASSENGER RAIL STUDY Jennifer Moczygemba, P.E. Rail Division Texas-Oklahoma Passenger Rail Study (TOPRS) Study of the feasibility of various passenger rail options that will result in a

More information

SH 35 Public Meeting

SH 35 Public Meeting SH 35 Public Meeting Major Corridor Feasibility Study Environmental Impact Statement March 27 and 28, 2007 Good evening and welcome to the State Highway 35 Public Meeting. This meeting is being conducted

More information

Trans-Texas Corridor-35 Update

Trans-Texas Corridor-35 Update Trans-Texas Corridor-35 Update TTC-35 Regional Briefing July 13, 2006 North Central Texas Council of Governments Transportation Department Trans-Texas Corridor-35 Is there a need? 6 Lanes 12 Lanes 20 Lanes

More information

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7 TRANSPORTATION Like many growing western counties, Douglas County focuses on one of the most integral elements in land-use planning: transportation. The primary purpose of a transportation network is to

More information

Rail Division 2012 Annual Summary

Rail Division 2012 Annual Summary Rail Division 2012 Annual Summary Overview The Rail Division oversees rail planning and inspection, highway rail crossings, management of stateowned lines (such as the South Orient Rail line (SORR) and

More information

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.1 MODEL RUN SUMMARY NOTEBOOK The Model Run Summary Notebook (under separate cover) provides documentation of the multiple

More information

STATEWIDE ANALYSIS MODEL (SAM-V3) June 5, 2014 Janie Temple

STATEWIDE ANALYSIS MODEL (SAM-V3) June 5, 2014 Janie Temple STATEWIDE ANALYSIS MODEL (SAM-V3) June 5, 2014 Janie Temple Introduction Brief SAM History Intro to SAM-V3 functionality Past and Current SAM projects Future additions to SAM Suggestions from model users

More information

Texas A&M Transportation Short Course

Texas A&M Transportation Short Course Texas A&M Transportation Short Course Joseph Black Rail Director October 16, 2013 What are the Challenges? Public Safety Issues with trains of up to 2 miles in length running through the urban cores of

More information

INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP

INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP Presented By Ken Galt, Caltrans Division of Rail John Fleming, Burlington Northern Santa Fe Railway William Brewster, Hanson-Wilson

More information

Final Quiet Zone Work Plan

Final Quiet Zone Work Plan Executive Summary Recognizing the impacts of commuter train horns on the communities they serve, RTD will assist and facilitate the local jurisdictions Quiet Zone applications along the Gold Line, Northwest

More information

Stockton Freight & Passenger Rail Mobility Enhancement

Stockton Freight & Passenger Rail Mobility Enhancement Stockton Freight & Passenger Rail Mobility Enhancement 2017 $10.34 million in 2017 FASTLANE Grant funding to complete engineering design, permitting, and construction of the Stockton Track Extension and

More information

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Interagency Meeting June 19, 2017

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Interagency Meeting June 19, 2017 West Santa Ana Branch Transit Corridor Draft EIS/EIR Scoping Interagency Meeting June 19, 2017 Agenda > Welcome and Introductions > Purpose of Interagency Scoping > Timeline and Process > Agency Coordination

More information

Assessment of Current Status, Plans, and Preliminary Alternatives for High Capacity Transportation in the I-5 Corridor

Assessment of Current Status, Plans, and Preliminary Alternatives for High Capacity Transportation in the I-5 Corridor CONNECTING THURSTON COUNTY AND THE CENTRAL PUGET SOUND Alternatives to Meet Transportation Needs in the I-5 Corridor Working Paper #1 June 2011 Assessment of Current Status, Plans, and Preliminary Alternatives

More information

Status Report on the 3 Rail Priorities

Status Report on the 3 Rail Priorities Status Report on the 3 Rail Priorities Presented to the Fort Worth City Council November 16, 2010 1 Review In August/September, the Mayor appointed the Rail Funding Strategies Committee to: Formulate funding

More information

Rail Division. Riding the Rails

Rail Division. Riding the Rails Rail Division Riding the Rails Amtrak Ridership within Texas Remains Strong The annual ridership within Texas on all three services (Heartland Flyer, Texas Eagle and Sunset Limited) continues to soar.

More information

Subject: Southwest Light Rail Transit (Green Line Extension) Memorandum of Understanding with BNSF Railway

Subject: Southwest Light Rail Transit (Green Line Extension) Memorandum of Understanding with BNSF Railway Committee Report Business Item No. 2017-162 SW Transportation Committee For the Metropolitan Council meeting of August 16, 2017 Subject: Southwest Light Rail Transit (Green Line Extension) Memorandum of

More information

Regional Transportation Studies Management Committee

Regional Transportation Studies Management Committee Pima Association of Governments 1 E. Broadway, Tucson, Arizona Santa Rita Conference Room Regional Transportation Studies Management Committee March 8, 2017 North-South Corridor Study (Pinal County) Staff

More information

South Sounder Capital Improvements Program

South Sounder Capital Improvements Program Subarea South King/Pierce Primary Mode Commuter Rail Facility Type Infrastructure Improvement Length Date Last Modified July 1, 2016 PROJECT AREA AND REP RESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION

More information

Tier 2 Environmental Impact Statement for the High-Speed Rail Project from Granite

Tier 2 Environmental Impact Statement for the High-Speed Rail Project from Granite This document is scheduled to be published in the Federal Register on 02/18/2014 and available online at http://federalregister.gov/a/2014-03324, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

FOR IMMEDIATE RELEASE June 7, ATK Contact: Media Relations

FOR IMMEDIATE RELEASE June 7, ATK Contact: Media Relations FOR IMMEDIATE RELEASE June 7, 2010 ATK-10-080 Contact: Media Relations 202 906.3860 NATIONAL RAIL PLAN NEEDS TO RECOGNIZE THE VALUE OF AMTRAK S INTERCITY PASSENGER RAIL NETWORK Serves as foundation to

More information

CHAPTER 1 PURPOSE AND NEED

CHAPTER 1 PURPOSE AND NEED CHAPTER 1 PURPOSE AND NEED 1. PURPOSE AND NEED The Metropolitan Transit Authority (METRO) 1 of Harris County, Texas, in cooperation with the Federal Transit Administration (FTA), has initiated the Environmental

More information

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY? WHAT IS AN INTERMODAL TRANSIT FACILITY? An intermodal transit facility gathers many modes of transportation together and is strategically located to increase destination alternatives. Intermodal facilities

More information

Illiana Corridor. Stakeholder Alternatives Summary PHASE I STUDY. October 25, 2011

Illiana Corridor. Stakeholder Alternatives Summary PHASE I STUDY. October 25, 2011 Illiana Corridor PHASE I STUDY Stakeholder Alternatives Summary October 25, 2011 Alternative Development Summary Potential irst Round Major Corridors Stakeholder Suggested Alternatives Potential Conceptual

More information

Regional Transportation Studies Regional Council

Regional Transportation Studies Regional Council Pima Association of Governments 1 E. Broadway, Tucson, Arizona Santa Rita Conference Room Regional Transportation Studies Regional Council September 28, 2017 I-11 Tier 1 Environmental Impact Statement

More information

Dallas City Council Transportation & Environment Committee. May 13, 2013

Dallas City Council Transportation & Environment Committee. May 13, 2013 Dallas City Council Transportation & Environment Committee May 13, 2013 Presentation Outline Technology Definitions Current RTC Policy Families of Alignment/Station Options RTC/NCTCOG Role in Statewide

More information

Multi-State Planning Proposal

Multi-State Planning Proposal High Speed Intercity Passenger Rail (HSIPR) Program Multi-State Planning Proposal Groups of states seeking FRA-led corridor planning must submit this Proposal Form and other documents as outlined in Section

More information

APPENDIX N East King County Subarea High Capacity Transit (HCT) Analysis: Approach to Assessing System-Level Alternatives

APPENDIX N East King County Subarea High Capacity Transit (HCT) Analysis: Approach to Assessing System-Level Alternatives Sound Transit Regional Transit Long-Range Plan Draft Supplemental Environmental Impact Statement APPENDIX N East King County Subarea High Capacity Transit (HCT) Analysis: Approach to Assessing System-Level

More information

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

SOUTHWEST LRT (METRO GREEN LINE EXTENSION) 8 Evaluation of Alternatives This chapter evaluates the effectiveness of the No Build Alternative and the Southwest Light Rail Transit (LRT) Project (the Project) based on the information contained in

More information

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need Environmental Impact Statement (EIS) Revised Purpose and Need November 9, 2017 1.0 What is the Proposed Action? The consists of potential improvements to the Long Bridge and related railroad infrastructure

More information

SUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT. ACEforward Notice of Additional Project Element Niles Junction Connections

SUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT. ACEforward Notice of Additional Project Element Niles Junction Connections SUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT DATE: May 9, 2016 FROM: TO: SUBJECT: San Joaquin Regional Rail Commission Agencies, Organizations, and Interested Parties ACEforward

More information

Section IMPLEMENTATION PLAN. 7. Implementation Plan

Section IMPLEMENTATION PLAN. 7. Implementation Plan Section 7 IMPLEMENTATION PLAN 7. Implementation Plan 7.0 Implementation Plan The Tier 1 Final EIS has presented several improvements along the Chicago to St. Louis corridor to meet the purpose and need

More information

11. PHASED IMPLEMENTATION STRATEGY

11. PHASED IMPLEMENTATION STRATEGY 11. PHASED IMPLEMENTATION STRATEGY 11.1. ALTERNATIVES ANALYSIS SUMMARY The Harbor Subdivision AA Study analyzed both existing and forecast transportation conditions within the Study Area and identified

More information

Statewide Model Application Using the Texas SAM

Statewide Model Application Using the Texas SAM Statewide Model Application Using the Texas SAM Presented by: William Smithson Wilbur Smith Associates September 2008 Texas Statewide Analysis Model Application Presentation Outline Brief Model Description

More information

summary report West Texas Rail Feasibility Study Texas Department of Transportation Cambridge Systematics, Inc. HNTB August 2011

summary report West Texas Rail Feasibility Study Texas Department of Transportation Cambridge Systematics, Inc. HNTB August 2011 summary report prepared for Texas Department of Transportation prepared by Cambridge Systematics, Inc. with HNTB August 2011 www.camsys.com summary report West Texas Rail Feasibility Study prepared for

More information

Media Briefing. February 7, 2011

Media Briefing. February 7, 2011 1 Media Briefing February 7, 2011 2 3 4 NEPA Process NOTICE OF INTENT Start of Federal Process for an EIS SCOPING Define the Range of Alternatives We are Here DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS)

More information

2004 FEASIBILITY STUDY UPDATE

2004 FEASIBILITY STUDY UPDATE Austin-San Antonio Intermunicipal Commuter Rail District 2004 FEASIBILITY STUDY UPDATE December 2004 EXECUTIVE SUMMARY INTRODUCTION Almost 3 million people in Central Texas, living and working between

More information

December 5, 2016 The Honorable Anthony R. Foxx Secretary U.S. Department of Transportation 1200 New Jersey Avenue SE Washington, DC 20590 RE: TxDOT s FY2017 FASTLANE application for Grand Parkway Dear

More information

Outer Loop/Rail Bypass Study

Outer Loop/Rail Bypass Study Outer Loop/Rail Bypass Study Outer Loop Stakeholder Roundtable Southwest Segment Joshua City Hall April 16, 2008 North Central Texas Council of Governments Transportation Department Stakeholder Roundtable

More information

Rail Freight and Passenger

Rail Freight and Passenger Take Care of the System Critical Investments in the areas of: Rail Freight rehabilitate rail bridges o Rail Bridge Inventory Database... $0.5 - $1.0 million (one time) Rail Freight rail replacement and

More information

Appendix C Presentation Slides with Script

Appendix C Presentation Slides with Script Appendix C Presentation Slides with Script 32 Grand Crossing Rail Project 10 S. Riverside Plaza, Suite 400 Chicago, IL 60606 www.grandcrossingrail.com info@grandcrossingrail.com [title slide no narration]

More information

Gateway Corridor Transitway

Gateway Corridor Transitway Locally Preferred Alternative Summary Gateway Corridor Transitway 1 Metropolitan Council, Nov. 12, 2014 Gateway Corridor Transitway Proposed highcapacity transit improvement connecting east metro suburbs

More information

Networks Modes CNU Transportation Summit Charlotte, NC November 6-8, 2008

Networks Modes CNU Transportation Summit Charlotte, NC November 6-8, 2008 Networks Modes Nodes Connectors Networks Our topic is the connections among nodes in the network of human communities; that is, the means and ability people have in order to gain access to other people,

More information

12 Evaluation of Alternatives

12 Evaluation of Alternatives 12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information

More information

Tier 1 Draft Environmental Impact Statement. Prepared by

Tier 1 Draft Environmental Impact Statement. Prepared by Tier 1 Draft Environmental Impact Statement Prepared by October 2018 This page intentionally left blank. This page intentionally left blank. Executive Summary The U.S. Department of Transportation s (USDOT)

More information

DECEMBER P R O G R E S S R E P O R T

DECEMBER P R O G R E S S R E P O R T DECEMBER 201 2 P R O G R E S S R E P O R T The My 35 Plan is a dynamic document and will continue to be re-evaluated and updated by the Committee as needed. The My 35 Plan contains the ideas and recommendations

More information

PERSPECTIVES ON FRONT RANGE PASSENGER RAIL

PERSPECTIVES ON FRONT RANGE PASSENGER RAIL PERSPECTIVES ON FRONT RANGE PASSENGER RAIL Rocky Mountain Railroad Heritage Society Englewood, Colorado September 30, 2017 Jim Souby Colorado Rail Passenger Association www.colorail.org ABOUT COLORAIL

More information

NAFTA at 20 Infrastructure Overview. Tamara A. Nelsen Senior Director of Commodities Illinois Farm Bureau

NAFTA at 20 Infrastructure Overview. Tamara A. Nelsen Senior Director of Commodities Illinois Farm Bureau NAFTA at 20 Infrastructure Overview Tamara A. Nelsen Senior Director of Commodities Illinois Farm Bureau Overview U.S. infrastructure overview NAFTA s impact on trade and trade corridors NAFTA freight

More information

Agency Scoping Meeting

Agency Scoping Meeting Agency Scoping Meeting Dallas Fort Worth Core Express Service Drop-in Public Information Open House Tuesday, June 30, 2015 1 WELCOME AND THANK YOU FOR COMING TODAY 2 Meeting Format Open House 3 Purpose

More information

Background. Purpose of This Phase of Project Development

Background. Purpose of This Phase of Project Development Background Purpose of This Phase of Project Development Analyze costs and benefits of commuter rail and bus rapid transit in corridor Refine and update alternatives considered to date Update costs and

More information

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff Quade & Douglas, Inc. FINAL March 2005 Foreword

More information

2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan. Minnesota Department of Transportation

2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan. Minnesota Department of Transportation 2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan Minnesota Department of Transportation ! First Statewide Comprehensive Rail Plan for MN! Commissioned by 2008 Legislature! Compliant

More information

LONG BRIDGE CAPACITY NEEDS. Oscar J. Gonzalez Virginia Railway Express Project Manager Alexandria, VA

LONG BRIDGE CAPACITY NEEDS. Oscar J. Gonzalez Virginia Railway Express Project Manager Alexandria, VA LONG BRIDGE CAPACITY NEEDS Oscar J. Gonzalez Virginia Railway Express Project Manager Alexandria, VA 1 TODAY S PRESENTATION VRE Overview Project Location and Partners Challenges and Opportunities Funding

More information

3. STATION SPACING AND SITING GUIDELINES

3. STATION SPACING AND SITING GUIDELINES 3. STATION SPACING AND SITING GUIDELINES The station spacing and siting guidelines are summarized in Table 3-1. Table 3-1 also includes benchmark information for local transit service and express bus as

More information

LA 23 NOGC Railway Relocation PE/NEPA Project. Public Meeting

LA 23 NOGC Railway Relocation PE/NEPA Project. Public Meeting LA 23 NOGC Railway Relocation PE/NEPA Project Public Meeting LA 23 New Orleans & Gulf Coast Railway (NOGC) Relocation Preliminary Engineering (PE) / National Environmental Policy Act (NEPA) Project RPC/FRA

More information

ARIZONA STATE RAIL PLAN

ARIZONA STATE RAIL PLAN ARIZONA STATE RAIL PLAN AzTA / ADOT Transit Conference April 11 th, 2011 Statewide Planning Process ADOT Planning Process Evolution Accepted by State Transportation Board on March 18 th Final Document

More information

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report Notice of Preparation For Link Union Station (Link US) Project Joint Environmental Impact Statement and Environmental Impact Report Date: May 27, 2016 To: Subject: Project Title: From: All Interested Agencies,

More information

Twin Cities-Milwaukee-Chicago Intercity Passenger Rail Phase I Study Twin Cities- Milwaukee High Speed Rail to Chicago Corridor Study

Twin Cities-Milwaukee-Chicago Intercity Passenger Rail Phase I Study Twin Cities- Milwaukee High Speed Rail to Chicago Corridor Study Twin Cities-Milwaukee-Chicago Intercity Passenger Rail Phase I Study Twin Cities- Milwaukee High Speed Rail to Chicago Corridor Study Rail Modeling Update May 4, 2017 www.dot.state.mn.us/passengerrail/tc-mil-chi/

More information

I-35 Corridor Segment Committee Bagby Ave. Waco, Texas. March 9, :00 AM to Noon

I-35 Corridor Segment Committee Bagby Ave. Waco, Texas. March 9, :00 AM to Noon I-35 Corridor Segment Committee 2 7479 Bagby Ave. Waco, Texas March 9, 2010 9:00 AM to Noon Welcome Bruce Byron Facilitator Presentations Presentation on the Texas State Rail Plan Presentation on Regional

More information

LA 23 NOGC Railway Relocation PE/NEPA Project

LA 23 NOGC Railway Relocation PE/NEPA Project LA 23 NOGC Railway Relocation PE/NEPA Project LA 23/New Orleans & Gulf Coast Railway Relocation Preliminary Engineering (PE) / National Environmental Policy Act (NEPA) Project Kevin Keller, PE HDR Engineering,

More information

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need Environmental Impact Statement (EIS) Revised Purpose and Need June 23, 2017 1.0 What is the Proposed Action? The consists of potential improvements to the Long Bridge and related railroad infrastructure

More information

2017 Educational Series RAIL

2017 Educational Series RAIL 2017 Educational Series RAIL RAIL OVERVIEW The state of Texas has the most rail lines of any state with a total of 10,469 miles of track, and the most public highway-rail grade crossings with a total of

More information

Environmental Considerations

Environmental Considerations Environmental Considerations Reduction of adverse environmental impacts is one of seven goals for mobility improvements in the Cook DuPage Corridor. All major capital investments identified in each of

More information

NEW JERSEY STATE RAIL PLAN NJ TRANSIT New Jersey Department of Transportation

NEW JERSEY STATE RAIL PLAN NJ TRANSIT New Jersey Department of Transportation NJ TRANSIT New Jersey Department of Transportation NJ TRANSIT AND NJDOT TEAM Developing State Rail Plan NJ TRANSIT contract Over the next six months Most planning information already exists Data must be

More information

Sandpoint Junction Connector

Sandpoint Junction Connector Sandpoint Junction Connector BNSF Railway MAY 23, 2018 BNSF is a Leading Railroad A Berkshire Hathaway, Inc. company 32,500 route miles in 28 states and 3 Canadian provinces 42,000 employees Approximately

More information

1. Evaluation of route and service alternatives; 2. Tier 1 Environmental Impact Analysis; and 3. Service Development Plan.

1. Evaluation of route and service alternatives; 2. Tier 1 Environmental Impact Analysis; and 3. Service Development Plan. Rail Rail plays a significant role in transportation planning, especially when considering economic development, safety, freight, and intermodal connectivity. Jackson has two rail lines serving the area,

More information

DART Capital Program Symposium WELCOME

DART Capital Program Symposium WELCOME DART Capital Program Symposium WELCOME DART Capital Program Symposium Project Narrative Dallas CBD Second Light Rail Alignment (D2): Will be the 2nd light rail line through Downtown Dallas Will connect

More information

California High-Speed Train Program FEIR/EIS

California High-Speed Train Program FEIR/EIS Page 2-30 Page 2-31 Page 2-32 Page 2-33 Page 2-34 Page 2-35 Page 2-36 of Enrique Manzanilla, Director U.S. Environmental Protection Agency, August 31, 2004 (Letter AF008) AF008-1 Acknowledged. AF008-2

More information

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Meeting June 2017

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Meeting June 2017 West Santa Ana Branch Transit Corridor Draft EIS/EIR Scoping Meeting June 2017 Agenda > Welcome and Introductions > Purpose of Scoping > Timeline and Process > Environmental Approach and Methodology >

More information

Appendix W Energy Technical Memorandum DRAFT ENVIRONMENTAL IMPACT STATEMENT

Appendix W Energy Technical Memorandum DRAFT ENVIRONMENTAL IMPACT STATEMENT Appendix W Energy Technical Memorandum DRAFT ENVIRONMENTAL IMPACT STATEMENT Chicago Red Line Extension Project Energy Technical Memorandum July 10, 2013 Updated July 28, 2015 Prepared for: Chicago Transit

More information

Environmental Impact Statement for the California High-Speed Rail System Burbank to Los Angeles Section, CA

Environmental Impact Statement for the California High-Speed Rail System Burbank to Los Angeles Section, CA This document is scheduled to be published in the Federal Register on 07/24/2014 and available online at http://federalregister.gov/a/2014-17384, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

MULTIMODAL NEEDS ASSESSMENT

MULTIMODAL NEEDS ASSESSMENT 6. FREIGHT INTRODUCTION Transportation systems not only move people throughout a region, but they also support the movement of goods in the form of freight, which is a vital component of the region s economy

More information

S-16: Sounder Rail Extension from Puyallup to Orting

S-16: Sounder Rail Extension from Puyallup to Orting Project Number S-16 Subarea Pierce Primary Mode Commuter Rail Facility Type Corridor Length 5.7 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT

More information

Cumulative and Secondary Impacts

Cumulative and Secondary Impacts Chapter 14: Cumulative and Secondary Impacts A. INTRODUCTION SEQRA regulations require the consideration of the Proposed Project s potential to result in cumulative impacts (6 NYCRR 617.9(b)(5)(a)) and

More information

Successful Partnerships in Innovative Project Delivery

Successful Partnerships in Innovative Project Delivery Successful Partnerships in Innovative Project Delivery Introductions Eddie Valtier Director of Transportation Planning and Development (El Paso District) Ismael Hernandez ROW Supervisor, West ROW Project

More information

INDUSTRIAL LAND FOR SALE. 280 Acres

INDUSTRIAL LAND FOR SALE. 280 Acres An opportunity to acquire 280 Acres of land. This large development site located on the east side of SCLA a 8,500 acre industrial freight hub with a proposed 3,500 acre rail-served multi-modal facility

More information

Appendix C Scoping Meeting Materials

Appendix C Scoping Meeting Materials Appendix C Scoping Meeting Materials Appendix C - Contents Sign-in Sheet for Agency Scoping Meeting Sign-in Sheet for Public Scoping Meeting Scoping Information Booklet Scoping Presentation Scoping Brochure/Comment

More information

Texas Freight Mobility Plan. Chapter 1: Introduction

Texas Freight Mobility Plan. Chapter 1: Introduction Texas Freight Mobility Plan Chapter 1: Introduction Draft August 8, 2014 The Texas Freight Mobility Plan (the Freight Plan) gives Texas a road map for boosting our economic growth potential through a solid

More information

2040 Transportation Policy Plan Amendment #1

2040 Transportation Policy Plan Amendment #1 2040 Transportation Policy Plan Amendment #1 Overview Amendment Purpose This 2040 Transportation Policy Plan amendment adds the Riverview Modern Streetcar transitway project to the Current Revenue Scenario.

More information

Re: Docket No. DOT-OST , Establishment of Interim National Multimodal Freight Network

Re: Docket No. DOT-OST , Establishment of Interim National Multimodal Freight Network az September 6, 2016 Re: Docket No. DOT-OST-2016-0053, Establishment of Interim National Multimodal The Colorado Department of Transportation (CDOT) appreciates the opportunity to provide input to the

More information

Great Lakes Basin Transportation, Inc. Railroad Proposal

Great Lakes Basin Transportation, Inc. Railroad Proposal Great Lakes Basin Transportation, Inc. Railroad Proposal A Kankakee County Perspective June 15, 2016 Kankakee County Planning Department 189 E. Court St, Room 201 Kankakee, IL 60901 815-937-2940 Delbert

More information

Preparation of an Environmental Impact Statement for High Capacity Transit

Preparation of an Environmental Impact Statement for High Capacity Transit This document is scheduled to be published in the Federal Register on 11/19/2013 and available online at http://federalregister.gov/a/2013-27583, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit

More information

RIDGE LOGISTICS CENTER.

RIDGE LOGISTICS CENTER. RIDGE LOGISTICS CENTER www.ridgelogisticscenter.com RIDGE LOGISTICS CENTER is located off Dallas Avenue in the city of Dallas, about one mile south of I-20, equidistant from I-35E and I-45. This 125-acre

More information

STUDY OVERVIEW. Federal Railroad Administration Southeast Regional Rail Planning Study. Stakeholder Group Workshop 1 Columbia, South Carolina

STUDY OVERVIEW. Federal Railroad Administration Southeast Regional Rail Planning Study. Stakeholder Group Workshop 1 Columbia, South Carolina Federal Railroad Administration Southeast Regional Rail Planning Study Stakeholder Group Workshop 1 Columbia, South Carolina STUDY OVERVIEW SEPTEMBER 20, 2016 1 CONNECT What is CONNECT? Features of CONNECT

More information

PURPOSE AND NEED FOR ACTION

PURPOSE AND NEED FOR ACTION Section 2 PURPOSE AND NEED FOR ACTION 2. Purpose and Need for Action 2.0 Purpose and Need for Action This chapter describes the purpose and need for improved high speed passenger rail on the Chicago to

More information

Southwest LRT Update Freight Rail Technical Issue #21 City of St. Louis Park Council Study Session

Southwest LRT Update Freight Rail Technical Issue #21 City of St. Louis Park Council Study Session Southwest LRT Update Freight Rail Technical Issue #21 City of St. Louis Park Council Study Session Mark Fuhrmann Jim Alexander May 28, 2013 2 Today s Topics Project Overview and Timeline Freight Rail Update

More information

Intent to Prepare an Environmental Impact Statement for the South Bay Metro

Intent to Prepare an Environmental Impact Statement for the South Bay Metro DEPARTMENT OF TRANSPORTATION Federal Transit Administration Intent to Prepare an Environmental Impact Statement for the South Bay Metro Green Line Extension Transit Corridor, Southwestern Portion of Los

More information

EIGHT PLANNING FACTORS

EIGHT PLANNING FACTORS EIGHT PLANNING FACTORS Under the provisions of SAFETEA-LU, all Metropolitan Planning Organizations (MPOs) are required to consider eight (8) broad planning factors in the development of multi-modal transportation

More information

Adoption of New DART Service Standards

Adoption of New DART Service Standards Adoption of New DART Service Standards Operations, Safety & Security Committee September 11, 2018 Rob Smith, AVP Service Planning & Scheduling 1 Background DART Service Standards are a policy document

More information

Tier 1 Environmental Impact Statement for the Chicago, Illinois, to Detroit-Pontiac,

Tier 1 Environmental Impact Statement for the Chicago, Illinois, to Detroit-Pontiac, This document is scheduled to be published in the Federal Register on 08/31/2012 and available online at http://federalregister.gov/a/2012-21587, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

I A JOINTLY-OWNED RAILROAD PROPERTY. Transmittal 2 - cont'd. August 4, 2017

I A JOINTLY-OWNED RAILROAD PROPERTY. Transmittal 2 - cont'd. August 4, 2017 Transmittal 2 JOINTLY-OWNED RAILROAD PROPERTY I A THE.PORT or,01 AIIGllH August 4, 2017 Fanny Pan Project Manager, Metro One Gateway Plaza, MIS 99-22-4 LM Ahgeles, CA 90012 RE: Comments on Metro's West

More information

3.6 GROUND TRANSPORTATION

3.6 GROUND TRANSPORTATION 3.6.1 Environmental Setting 3.6.1.1 Area of Influence The area of influence for ground transportation consists of the streets and intersections that could be affected by automobile or truck traffic to

More information