1 -Lorain Manufacturing Supplier Requirements Manual REVISION APPROVAL SHEET CAMACO-Lorain Manufacturing Vice President Assistant General Manager Quality Manager Accounting Manager Materials Manager Production Manager Tooling Manager Engineering Manager Human Resource Manager Maintenance Manager David Smith Mark Blair Danny Burgess Open Steph Fox Bill Glover Marshall Shreve Kevin Behm Cheryl Semmelroth Scott Hayes --Lorain Manufacturing 1
2 Supplier Requirements Manual INTRODUCTION The purpose of this manual is to establish a clear understanding of CAMACO-Lorain Manufacturing requirements regarding supplier quality and reliability. It is our Company policy to deliver defect-free products and services on time to our customers. So that we may consistently fulfill this obligation, our suppliers shall have control systems in place that are based on defect prevention, and are directed toward the philosophy of Continuous Improvement. To this end, CAMACO-Lorain Manufacturing requires all new suppliers to comply with the requirements set forth by our Corporate Office in Novi, MI. The requirements defined in this manual are provided as a supplement to, and do not replace or alter other terms and conditions covered by the purchase documents or included as requirements of engineering drawings or specifications. Suppliers are expected to conform to Global Working Conditions and federal, state, local, and other requirements, as applicable. CAMACO-Lorain Manufacturing 2
3 Accounting System Requirements 1. INVOICES The following is a brief description of CAMACO-Lorain Manufacturing, accounting practices as applied to invoices. Invoice shall cross-reference packing list, bill of lading, and purchase order number. Invoice shall include the CAMACO-Lorain Manufacturing part number Invoice pricing will not be changed until a CAMACO-Lorain Manufacturing purchase order amendment form is issued in writing by the Purchasing department. 2. PRICING ADJUSTMENTS All labor costs are firm for the life of the program. Material price adjustments will pass through a purchase order price amendment at the point in time when our customer grants a price increase. 3. TOOLING COSTS Payment for tooling costs incurred by the supplier will be handled as per agreed upon negotiations and as described on the Purchase Order. 4. CHARGEBACKS Suppliers are required by contract to provide CAMACO-Lorain Manufacturing with confirming product, shipped and delivered to the releases. CAMACO-Lorain Manufacturing specifies the scheduled timing and carriers unless the supplier is contracted prepaid delivery. Failure to comply will result in monetary penalty. Below is a list of non-compliances. The list includes, but is not limited to: DMN Processing Charge $ per occurrence Sort by CAMACO Employee $55.00 per hour per person Engineering Assistance, Warranty Investigation $55 per hour Reoccurring Issues, clean point break $1000 plus any customer related costs Shipping Discrepancies $2000 each occurrence Late/Missing ISF10+2 Filing $5000 each occurrence Shipping material without PPAP approval (1 st time) $30,000 o Includes Annual PPAP with $500 for the 1 st day Conflict Minerals Reporting $100 each additional day Customer Returns or charges Pass through Lack of valid, on time, written, Corrective Action $ first day $100 each additional day Machine downtime $75 per hour, per employee Assembly line downtime Minimum of $4000 plus detailed costs Failure to provide on site support for $2500 3
4 o Problem resolution Tow motor support $75 per hour 5. REJECTIONS Rejected material will be charged back to the supplier at current prices. The supplier will be responsible for all expenses incurred by CAMACO-Lorain Manufacturing resulting from their nonconformity, which shall include, but not be limited to: Sorting time Equipment downtime Premium freight costs Administrative costs CAMACO-Lorain Manufacturing customer charge backs and sort time Product recall costs MATERIALS SYSTEM REQUIREMENTS 1. PURCHASE ORDERS All purchased items are assigned a Purchase Order Number. The PO will reference all requirements or will reference where the information is available. When a Purchase Order is issued along with it is an acknowledgment that must be signed and returned to the buyer. All invoices, shippers, and material tags must reference the Purchase Order Number. 2. RELEASES Supplier releases are created every week. It is the responsibility of the supplier to notify CAMACO-Lorain Manufacturing if they do not receive their weekly release or if there is concern once the release is received. Releases are processed each Wednesday (unless delays occur from our customer), reviewed, and telecommunicated or ed on Wednesday. Suppliers must monitor current release with the previous week releases for increases/decreases that would affect weekly shipments. Suppliers must be able to react to a 15% increase in released quantities and requirements. Potential problems in meeting an increase in schedules must be immediately communicated to the plant Material Expediter. If Premium Freight is incurred because of a 15% or less increase, the supplier could be debited for that charge. Suppliers are expected to use First In/ First Out inventory control methods. Material Authorization CAMACO mirrors our customer s material authorization. All suppliers are authorized by CAMACO to the following Standard Release Authorization: 2 weeks Fabricated 6 weeks raw Any deviation from this time frame needs to be authorized (via a Purchase Order) by CAMACO Purchasing and Materials. A sign-off of the Purchase Order by both Corporate and Plant Management is required to validate any deviation from the above. 3. PACKAGING All products must be shipped in quality packaging unless otherwise requested by CAMACO-Lorain Manufacturing. Failure to comply may result in return of shipment and/or additional costs of warehousing and handling. Shipment of multiple part numbers in one container is not allowed (unless otherwise requested). This part number(s) must appear as the same part number referenced on our weekly releases. Reusable containers must be stripped of all old labels. 4. LABELS 4
5 All suppliers are required to ship with AIAG approved bar code labels. Automotive Industry Action Group Standard B-3 for purchased parts and Standard B-5 for steel and wire coils must be followed unless otherwise authorized by CAMACO-Lorain Manufacturing. 5. PACKING SLIPS Each shipment must be accompanied by a packing slip for both receipt and payment. The carrier (truck driver) must present the packing slip upon delivery to the receiving plant, unless prior agreement was finalized. It must contain the following information: Supplier name Supplier number Release number Part description Part quantity Notification of 1 st shipment of New Engineering Change Part accumulations (accums) shipped to date Packing slip number Purchasing order number Material release number Complete CAMACO part number with current engineering revision level 6. ISF10+2 FILLING Suppliers must comply with United States Customs and Boarder Protection. Completed ISF10+2 forms must be filed 72 hours prior to sailing. 7. OBSOLESCENCE Suppliers must submit their claims to the Purchasing Materials Buyer within fifteen (15) working days of final production date. All claims will be audited. Payments of claims will be dependent on remittance from our customer. It is the responsibility of the supplier to contact CAMACO-Lorain Manufacturing, in writing, if they have obsolescence to submit within the required time frame. We request that you comply with the following procedure for submitting your obsolescence: The form Supplier Cancellation Claim is to be used for claims that involve the purchased parts supplied to CAMACO-Lorain Manufacturing. Copies of this form are available from the buyer. Only one part number per form is allowed. A copy of the release schedule, which establishes your high points and verifies your final accum shipped into our plant, must accompany each claim form. The claim must exceed $ to be considered. A claim is for one part number All claims must be received on or before required due date, otherwise the claim will be denied and CAMACO-Lorain Manufacturing and or the customer will not be responsible for any costs. All pertinent information must be completed. This includes finished goods (purchased parts); work in process, and raw material. We must know the usage per assembly for each raw material and in process item claimed, as well as the material claimed for work in process, otherwise, the claim will be returned unprocessed. All claims must be in U.S.D. Incomplete or illegible forms will be returned unprocessed. All claims should be sent to: CAMACO-Lorain Manufacturing 3400 River Industrial Park Road Lorain, OH Attn: Materials Purchasing Buyer All materials must remain at the supplier until the Customer audit has been completed and written disposition for material has been received from our Accounting Department. 8. SERVICE PARTS It is the responsibility of each supplier to fulfill any service part order for CAMACO-Lorain Manufacturing. Service part orders must be fulfilled for seven (7) years or per Customer requirements, or after tools are declared obsolete by our customer. All components are eligible for service parts orders. The CAMACO- 5
6 Lorain Manufacturing, Lorain, Ohio Plant, will convey any service orders to the supplier upon receipt. All service parts must be produced from production tooling, therefore, continued preventative maintenance of tooling is required. Pricing parts for service will be at production prices for as long as any claimed obsolete inventory exists. Requirements for service parts will be communicated through the regular EDI transactions or phone contact followed by faxed transaction. QUALITY SYSTEMS REQUIREMENTS 1. PPAP & PRODUCT QUALITY All suppliers are required to submit a PPAP for new parts or revisions in compliance with the AIAG PPAP Manual. A Level 3 PPAP submittal is required, unless otherwise approved, in writing, by the CAMACO Lorain Manufacturing Quality Manager. In addition, an Annual Dimensional Layout will be provided along with current material certification (less than 12 months old). When deemed necessary the supplier will have the material used in their product tested by a certified lab and the results forwarded to the CAMACO Supplier Engineer. CAMACO Lorain Manufacturing reserves the right to request and / or attend a run at rate verification. 2. CONTAINMENT/CORRECTIVE ACTION If defective material is identified and/or a DMN issued, the supplier is responsible for adequate containment actions, including all product warehoused and/or in transit. When corrective action is taken, the supplier must notify the CAMACO Supplier Quality Engineer of the clean point, including the date, time and trailer of the conforming product. Corrective action requirements may include 100% sort with an appropriate charge-back, certification of shipments, a formal 8D, a visit/audit of the suppliers facility by CAMACO Supplier Quality Engineer or a require meeting at the CAMACO Lorain facility. When defective material is found, a Return Material Authorization must be issued within 24 hours or the material will be scrapped and the supplier debited accordingly. 3. ISO/TS16949 CERTIFICATION All suppliers are encouraged to be 3 rd party registered to ISO/TS16949, or self certified to ISO/TS CAMACO Lorain Manufacturing reserves the right to perform an on site audit regardless of third party certifications. 4. MATERIAL CERTIFICATION All products are required to have a certificate of conformance and material certification, where applicable, with every shipment or available upon request by CAMACO. 4.1 Conflict Minerals Reporting To be compliant with the U.S. Securities and Exchange Commission (SEC), Section 1502 of the Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010, Camaco is requiring all suppliers to submit documentation on an annual basis in regard to the use of Conflict Minerals. Currently there are 2 options to achieve compliance ti the requirements: Register your company for the ipoint Conflict Minerals Platform (ipcmp) tool, endorsed by General Motors and many tier one and OEM partners. This tool enhances the ability for information exchange up and down the supply chain and can found at If it is not possible to provide reports through the ipcmp tool, return a completed Electronic Industry Citizenship coalition and Global e-sustainability Initiative (EICC-GeSL) Conflict Minerals Reporting Template to smalone@lorain.camacollc.com. This template can be found at 6
7 5. NAFTA CERTIFICATES OF ORIGIN All suppliers are required to provide annual NAFTA Certificates of Origin prior to beginning of new calendar year. 6. IMDS All suppliers are required to provide IMDS declarations for end of vehicle life (ELV). 7. RATING SYSTEM Suppliers to the CAMACO Lorain facility are rated on performance monthly. Quality (PPM s) and On Time Delivery are the key components of the rating system. A MQR (Management Quality Review) at the CAMACO Lorain facility may be requested if PPM s exceed 25. The CAMACO Audit Team will perform audits of the Quality Systems of selected suppliers. Supplier performance can be used as a basis for the award of new business. 7
Global Supplier Manual Appendix B Supplier Delivery Standards. December 20, 2017
Global Supplier Manual Appendix B Supplier Delivery Standards December 20, 2017 TABLE OF CONTENTS Contents TABLE OF CONTENTS... 2 Supplier Delivery Standards... 3 Introduction... 3 Supply Standards...
More informationWestern Diversified Plastics, LLC. Supplier Requirements Manual
Western Diversified Plastics, LLC. Supplier Requirements Manual Revision Date: 12/10/2019 TABLE OF CONTENTS 1.0 Introduction.. 3 2.0 WDP Supplier Policy.. 4 3.0 Scope... 4 4.0 Launch Readiness Measures...
More informationSUPPLIER GUIDELINES MANUAL
1.0 INTRODUCTION 1.1 This guidelines manual defines the minimum requirements for Supreme Machined Products Co.; Inc. LTD (to be referenced as Supreme throughout the document) Supplier s and does not supersede
More informationSUPPLIER QUALITY MANUAL
SUPPLIER QUALITY MANUAL LM-QU-PA-008 Revision Date:7/13/18 LM-QU-PA-008 Revision Date:7/13/18 Table of Contents 1.0 Purpose 2.0 Scope 3.0 Quality System Requirements 4.0 Approved Supplier List 5.0 Supplier
More informationOPW Engineered Systems
1 of 5 1.0 Purpose 1.1 The purpose of this manual is to promote a clear understanding of OPW Engineered Systems (OPW-ES) expectations and requirements for suppliers. This manual explains the process OPW-
More informationTable of Contents. 1.0 Purpose. 2.0 Scope. 3.0 Quality System Requirements. 4.0 Approved Supplier List. 5.0 Supplier Assessments
Issued 2/6/2009 Revision: 2/13/2017 Table of Contents 1.0 Purpose 2.0 Scope 3.0 Quality System Requirements 4.0 Approved Supplier List 5.0 Supplier Assessments 6.0 Advance Product Quality Planning (APQP)
More informationCD Supplier Handbook. * Marine Canada Acquisition Limited Partnership DBA Teleflex Canada
* 2 / 8 TABLE OF CONTENTS 1. Section One Introduction 1.1. Objective 1.2. Scope 2. Section Two Quality Expectations 2.1 Change Notification 2.2 Quality Data & Records 2.3 Verification of Supplier's Products
More informationSupplier Resource Guide
Supplier Resource Guide The purpose of this Resource Guide is to strengthen our supplier s knowledge and understanding of General Fasteners Company (GFC) requirements. GFC aligns itself with supply chain
More informationSupplier Material Delivery and Logistics Requirements
Page 1 of 13 1.0) Scope/Purpose: This document defines the material, delivery, and logistics, requirements for a supplier conducting business with Lear. 2.0) Responsibility 2.1) It is the responsibility
More informationSection Table of Contents Page Number
Derby Fabricating Solutions Section Table of Contents Page Number 1.1 Introduction 2 1.2 Derby Quality Policy 2 1.3 Environmental Policy 2 1.4 Supplier Requirements Manual 2 1.5 Social Accountability 2
More informationSupplier Quality Manual
Supplier Quality Manual DuraTech Industries Supplier Quality Manual Page 2 of 13 Table of Contents 1.0 Introduction 1.1. Overview 1.2. Scope 1.3. Customer Responsibilities 3 3 3 2.0 Supplier Quality Expectations
More informationSupplier Quality Manual (QQS )
Monticello Spring Corporation Quality Management System Supplier Quality Manual (QQS 100.00) 1.0 Introduction 1.1 Scope The details stipulated in this manual are the minimum mandatory requirements for
More informationMetric Manufacturing Supplier Manual
Metric Manufacturing Supplier Manual This Manual applies to all suppliers of Metric Manufacturing Co. Compliance to all requirements within this manual, as well as the general terms and conditions, are
More informationSUPPLIER QUALITY MANUAL
SUPPLIER QUALITY MANUAL QD-SUPPLIER-QUALITYMANUAL 1 of 13 02.20.15 TABLE OF CONTENTS Page A. Goal 3 B. Purpose 3 C. Approach 3 D. Applicability 3 E. Implementation 3 F. Zero Defects Policy 3 Section 1:
More informationSupplier Quality Manual
Supplier Quality Manual 1 1. Introduction Scope Purpose Application Implementation 2. Purchasing Expectations Terms and Conditions Engineering / Technical Support Customer Support Resources Pricing Consistent
More informationSupplier Quality Manual
including subsidiaries of Mexico and Canada Supplier Quality Manual Issue date: March 1, 2010 Revised: April 7, 2011 Page 1 of 14 Corporate Quality Statement Quality plays a vital role in SCHOTT Gemtron
More informationALCO Plastics, Incorporated SUPPLIER QUALITY SYSTEM REQUIREMENTS MANUAL
INTRODUCTION Revision Level: A 5/3/06 Revision Level: This manual is provided to the Suppliers of ALCO Plastics, Inc. to communicate the Quality System Requirements and Assessment process. Purchased materials
More informationSupplier Requirement Manual. Preface
1 Preface This manual has been created to assist our suppliers in understanding the purchasing expectations and quality requirements for products supplied to RCO Engineering. The manual is also a tool
More informationSupplier Quality Requirements Manual
Supplier Quality Requirements Manual 1 TABLE OF CONTENTS Page Number 1.0 Forward 3 2.0 Introduction 4 3.0 Supplier Selection Requirements 5 4.0 Supplier Development 5 5.0 Supplier Quality Rating System
More informationCustomer Requirements Manual
1 of 7 Customer Requirements Manual 2 of 7 Index Section I - Introduction.... 3 Section II Quality & Environmental Management... 4 Section III - Delivery... 4 Section IV Quality... 7 3 of 7 SECTION I INTRODUCTION
More informationSupplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260
Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260 Firestone Industrial Products Quality Policy We will
More informationNSK Steering Systems America
PAGE NO: 1 of 13 NSK Steering Systems America Supplier Logistics and Packaging Manual PAGE NO: 2 of 13 Table of Contents 1 Scope... 3 1.1 General... 3 2 Communication... 3 2.1 Supplier contacts... 3 2.2
More informationSupplier Requirements Manual
Supplier Requirements Manual Revision Date: April 15, 2018 Table of Contents 1.0 Introduction 2.0 Safety 3.0 Environmental Policy 4.0 Quality Policy 5.0 Supplier Quality Requirements 6.0 Supplier Performance
More informationTable of Contents. 1 P age. Page
11/22/16 / Rev B Table of Contents Page 1.0 Overview 3 1.1 Application and Approach 3 1.2 Distribution 4 1.3 Introduction 4 1.3.1 Scope 4 1.3.1.1 Off The Shelf Items 4 1.3.1.2 Expected Quality System of
More informationSupplier Quality Specification 3DS Document P14 Rock Hill, South Carolina Revision A
Supplier Quality Specification 3DS Document 51000-P14 Rock Hill, South Carolina Revision A Revision History Change Description Revision Date All New Release 6/26/16 A Updated supplier classification section,
More informationSupplier Policies & Procedures
20.0 PERFORMANCE REQUIREMENTS Supplier Policies & Procedures True Value is committed to providing its Retailers with products that consistently meet or exceed their expectations for value and merchandise
More informationSpringdale Site Specific Requirements. Addendum to. DAYCO Global Supplier Policy Manual
Springdale Site Specific Requirements Addendum to DAYCO Global Supplier Policy Manual Uncontrolled if Printed 1 9/28/2017 TABLE OF CONTENTS 1. Purpose 3 2. Objectives 3 3. Scope 3 4. Supplier Sourcing
More informationSupplier Quality Manual
Supplier Quality Manual February 2010 Page 1 of 6 Table of Contents 1.0 Purpose 2.0 Scope 3.0 Quality System Requirements 4.0 Supplier Assessments 5.0 Advance Product Quality Planning 6.0 First Article
More informationSupplier Expectation Manual
Supplier Expectation Manual Page 1 Sterling Spring Supplier Philosophy Products and services from external providers (suppliers) are intended for incorporation into Sterling Spring s own products and services
More informationSUPPLIER QUALITY REQUIREMENTS MANUAL
SUPPLIER QUALITY REQUIREMENTS MANUAL Manufacturing Locations: Nyloncraft Nyloncraft 616 W. McKinley Ave. 1640 East Chicago Road Mishawaka, IN 46545 Jonesville, MI 49250 (574) 256-1521 (517) 849-9911 Document
More informationRev A. Vendor Compliance Manual
9004160 Rev A Vendor Compliance Manual Using the Vendor Compliance Manual This manual is designed to provide you with Automation Products Group, Inc. s (APG s) supply chain requirements. Please carefully
More informationSUPPLIER MANUAL Quality Policy
SUPPLIER MANUAL Quality Policy Prettl, Kurz Kasch is committed to providing our Customers with quality products. We will develop, maintain and continually improve our quality systems to ensure Customer
More informationBATES SUPPLIER MANUAL
BATES SUPPLIER MANUAL 1 Bates, LLC 118 Rose Street Lobelville, TN 37097 The Supplier Requirements Manual Is a Controlled Document Any copies made of this document, in its entirety or in part, must be marked
More informationMontaplast of North America, Inc.
Montaplast of North America, Inc. Supplier Quality Manual Page 1 of 20 Table of Contents 1.0 Purpose pg. 3 2.0 Scope pg. 3 3.0 Quality System Requirements pg. 3 4.0 Approved Supplier List pg. 4 5.0 Supplier
More informationSupplier Quality Systems Requirements Manual
Supplier Quality Systems Requirements Manual Brink Towing Systems Version: 2.4 Date: 23-07-2018 Changed text in blue Page 1 / 9 Table of Contents 1. Introduction 3 1.1 Scope 3 1.2 Purpose 3 1.3 Background
More informationSupplier Quality Manual
Classification: QMS Created By: Jeff Teel 06/07/2016 Document No.: Mark "X" where applies Firestone Controlled Document New First Issue Published: Revision X Supersedes Issue Published: 01/12/2007 Three-Year
More informationSUPPLIER MANUAL. Introduction
SUPPLIER MANUAL Introduction The Supplier Manual is a guide detailing mandatory requirements for suppliers of JD Norman Industries. In all cases, purchase orders or documented supplier agreements take
More informationSUPPLIER PAPERWORK QUALITY REQUIREMENTS. Packing Slips, Invoices, Bill of Ladings
SUPPLIER PAPERWORK QUALITY REQUIREMENTS Packing Slips, Invoices, Bill of Ladings February 2018 Regal Suppliers: Accuracy of your Packing Lists and Invoices is critical to timely processing of your receipts
More informationPURPOSE To establish a quality requirements and guidelines for Suppliers doing business with Orchid Monroe
Page 1 of 12 DOCUMENT TITLE Supplier Quality Assurance Manual PURPOSE To establish a quality requirements and guidelines for Suppliers doing business with Orchid Monroe REVISION HISTORY Revision Change
More informationSUPPLIER QUALITY MANUAL
SUPPLIER QUALITY MANUAL 2018 I N D E X Paragraph Subject Page 1.0 Introduction 3 2.0 Quality System Requirements Specific to JVS 3 2.1 ISO 14001:2015 Compliance Requirements 2.2 IATF16949:2016/ISO9001:2015
More informationSupplier. Quality. Manual
DEPARTMENT: Quality Assurance Title: Supplier - Quality Manual ISSUED ON: 29-Jul-09 PAGE 1 of 12 Supplier Quality Manual Distribution to: Electronically controlled. If this document is in hard copy it
More informationSUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016
SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016 TABLE OF CONTENTS 1.0 Introduction 1.1 Purpose of Supplier Requirements 1.2 Scope 2.0 Quoting 3.0 Advance Product Quality Planning (APQP) 3.1 APQP
More informationSUPPLIER QUALITY MANUAL Customer Specific Requirements
Quality Management System Even though it is preferred by AMC that all suppliers become registered to ISO/TS 16949, suppliers at a minimum will be expected to be third party registered to ISO 9001 by an
More information... Supplier Manual . REV 1. P d --KICKHAEFER MANUFACTURING COMPANY SUPPLIER MANUAL (PRINTED COPIES ARE UNCONTROLLED)
... Supplier Manual. REV 1 P-5.6.1 d --KICKHAEFER MANUFACTURING COMPANY SUPPLIER MANUAL (PRINTED COPIES ARE UNCONTROLLED) INTRODUCTION... 3 1.1 PURPOSE OF THIS SUPPLIER MANUAL... 3 1.2 SCOPE... 3 1.3 CONCEPT...
More informationSUPPLIER QUALITY MANUAL Customer Specific Requirements
Quality Management System Even though it is preferred by AMC that all suppliers become registered to ISO/TS 16949, suppliers at a minimum will be expected to be third party registered to ISO 9001 by an
More informationSupplier Requirements Manual
Supplier Requirements Manual Revision Date: January 12, 2017 (Added/changed text appears in Red) Table of Contents 1.0 Introduction 2.0 Safety 3.0 Environmental Policy 4.0 Quality Policy 5.0 Supplier Quality
More informationSQRs SUPPLIER QUALITY REQUIREMENTS
ALLOY DIE CASTING 6550 Caballero Blvd Buena Park, CA Telephone: (714) 521-9800 FAX: (714) 521-5510 www.alloydie.com SQRs SUPPLIER QUALITY REQUIREMENTS Revision K 5/2018 When specified on an Alloy Die Casting
More informationSQRs SUPPLIER QUALITY REQUIREMENTS
ALLOY DIE CASTING 6550 Caballero Blvd Buena Park, CA Telephone: (714) 521-9800 FAX: (714) 521-5510 www.alloydie.com SQRs SUPPLIER QUALITY REQUIREMENTS Revision K 5/2018 When specified on an Alloy Die Casting
More informationGLB QM 02. Supplier Quality Manual 05. 3/2/18 Supplier Quality 1 of 19. Issue Date Issuing Department Page
3/2/18 Supplier Quality 1 of 19 3/2/18 Supplier Quality 2 of 19 Table of Contents 1.0 Introduction 3 2.0 Manual 4 2.1 Application 4 2.2 Quality Management System of the Supplier 4 2.3 Quality Management
More informationSupplier Quality Assurance Manual
Supplier Quality Assurance Manual Revised: 0128 January Jul 2014 2010 1. Introduction The purpose of the Supplier Quality Assurance Manual is to straightforwardly communicate to our current and potential
More informationSUPPLIER MANUAL Revision B
SUPPLIER MANUAL Revision B I-8.4.2.3-C-PU-WI-001 Rev. B 12-5-2017 Page 1 Table of Contents Table of Contents Page ii Quality Statement / Quality Policy 3 Introduction / Purpose / Quality Assurance Agreement
More informationSUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM)
SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM) 11/3/2008 Page 1 of 12 PURPOSE The purpose of this manual is to provide Suppliers with the DeltaTech Control (DTC) requirements for various items related to the
More informationBlue Chip Engineered Products Supplier Quality Manual
Blue Chip Engineered Products Supplier Quality Manual Revision Date 07/09/2013 Page 1 Table of Contents A. Goal B. Purpose C. Approach D. Applicability E. Implementation F. Zero Defects Policy Section
More informationSupplier Requirements Retail Information Svcs LLC Fastener Division
Supplier Requirements Retail Information Svcs LLC Fastener Division REVISION : 1 PAGE 1 of 11 TABLE OF CONTENT SECTION PAGE Supplier Evaluation and Selection Process 3 Supplier Performance Evaluation 4
More informationSUPPLIER QUALITY MANUAL
Global Supplier of Automotive Tire Products & Refrigeration Components SUPPLIER QUALITY MANUAL Air Controls Products, LLC Oxford, NC Air Controls Products maintains sole control rights to the master copy
More informationINTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry.
INTRODUCTION Welcome to, New Mather Metal Inc. (NMMI) New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry. You can view
More information4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:
Approved By: Purchasing Manager Candice Lane (signature on file) Date: 5/26/17 Approved By: Process Owner James D. Moore (signature on file) Date: 5/26/17 1. PURPOSE 1.1. To define Cambridge Valley Machining,
More informationSUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210
SUPPLIER MANUAL Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210 TABLE OF CONTENTS Page Title 1... Introduction, Purpose, Scope Quality Policy, Certification & Exemptions
More informationPlease direct all questions to the Distribution Center s Vendor Compliance Specialist listed in page 1-1. (715)
Section 9- Vendor Compliance Program Chargebacks and Policies All vendors are required to comply with each point of the Vendor Standards Manual unless instructed otherwise by our purchase order. This section
More informationDocument Routing/Approval Record
Reason for Revisions and Sections Affected: Document Routing/Approval Record Revision A Initial Release Revision B 6.1 Paragraph 3: Added: new or, deleted: of the new facility. 6.1 Paragraph 4: Added:
More informationCharleston Metals Products, Inc.
350 Grant Street Waterloo, IN. 46793 (260) 837-8211 Charleston Metals Products, Inc. Revision 6 December 18 th, 2017 Table of Contents Charleston Metal Products, Inc. Charleston Metal Products Policy...
More informationGuardian Automotive Supplier Quality Manual
Table of Contents 1.0 Introduction 2.0 Quality System Requirements 3.0 Quality Performance 4.0 Code of Ethics 5.0 APQP 6.0 Guardian Automotive s Access to Supplier Facility 7.0 Production Part Approval
More informationSupplier Quality Agreement
Supplier Quality Agreement Clyde, OH Poplar Bluff, MO Brampton, Ontario Jeffersonville, IN Page 1 of 15 TABLE OF CONTENTS Table of Contents 1. Administrative Elements... 4 1.1. Scope... 4 1.2. Parties
More informationSupplier Quality Standard
Supplier Quality Standard Sherex Industries & Sherex Fastening Solutions "First Time Quality at the Source" Through Teamwork Supplier Quality Standard Edition: Rel. September 6, 2007 This document is controlled
More informationJSP Supplier Quality Assurance Manual
Changes to the Supplier Quality Assurance Manual: The 2011 has been reviewed for updates and revisions needed to keep our forms, policies and procedures current. The updates will be communicated to suppliers
More informationSupplier Quality Manual
Revised By: Global Supply Chain Analyst Signature: Akshay Poonia Date: May 18, 2016 Approved By: VP of Global Supply Chain Signature: Mark Bates Date: May 18, 2016 1. INTRODUCTION Hope Global Expectations:
More informationSupplier Quality Requirements Manual
Supplier Quality Requirements TABLE OF CONTENTS Page Number 1.0 Forward 3 2.0 Introduction 4-5 3.0 Supplier Selection Requirements 6 4.0 Supplier Quality Rating System 6 5.0 Corrective and Preventative
More informationSupplier Requirements Manual
Supplier Requirements Manual 1.0 Control Responsibility TABLE OF CONTENTS 1.1 Proprietary Information Sharing 1.2 Purpose & Approval 1.2.1 Scope 1.3 Quality Systems Management & Evaluation 1.3.1 QMS 1.3.2
More informationGlobal Supplier Development & Guidelines Manual
Carr. Qro-SLP Km 28.5 Lote 25-2 Mz. 1 Parque Industrial Querétaro Qro +011-52-442-211-3700 www.narmco.com Global Supplier Development & Guidelines Manual Rev. 3 Page 1 of 25 INTRODUCTION The Global Supplier
More informationRevcor Supplier Quality Manual
Revcor Supplier Quality Manual Documentation The Revcor is governed by comprehensive documentation as referenced herein. Procedures, work instructions, practices, forms, drawings, and similar documentation
More informationSupplier Quality Manual CHASSIX Inc.
Supplier Quality Manual CHASSIX Inc. SQM-001 rev 6/26/17 Page 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 CHASSIX QUALITY POLICY 1.2 CHASSIX SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS 1.3 CHASSIX SUPPLIER
More informationSupplier Quality Manual
Supplier Quality Manual Table of Contents Challenge Quality Policy... 4 Challenge Objectives... 4 Expectations & Philosophy... 5 SECTION 1- Introduction... 6 A. Policy and Vision... 6 B. Purpose... 6 C.
More informationSupplier Requirements Manual
Supplier Requirements Manual REVISION : 2 TABLE OF CONTENTS SECTION PAGE Supplier Definition, Evaluation and Selection Process 2 Supplier Performance Evaluation 3 Change Notification Requirements 4 Specifications
More informationIf certification is rescinded, the supplier must notify Theta Quality Manager in writing within five business days.
1.0 MANAGEMENT MESSAGE: Theta TTS Inc. (Theta) recognizes the Global IATF 16949:2016, ISO 9001:2015 and ISO14001 Standards and other Customer requirements as they apply to automotive production and relevant
More information(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION,
(A) GENERAL: (A.1) GENERAL ELECTRIC (GE) IS THE END USER. (A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION, ANALYSIS, AND
More informationAgreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier )
Global Supplier Quality Manual Revision 1 Agreement Between Cooper Standard (Hereafter referred to as the CS ) And (Hereafter referred to as the Supplier ) This agreement is made between the above named
More informationSupplier Quality Manual
Supplier Quality Manual SC-002 Revision: 09/24/2018 Table of Contents Challenge Quality Policy. 3 Challenge Quality Objectives..3 Expectations and Philosophy...4 Section 1- Introduction.... 5-6 A. Policy
More informationSupplier Quality Assurance Manual
Supplier Quality Assurance Manual General Aluminum Manufacturing Company Rev 4 02/02/18 QM0002 Page 1 of 15 TABLE OF CONTENTS Section Description Page 10 Introduction 3 20 Purpose 3 30 Scope 3 40 Quality
More informationSupplier Quality Manual
Supplier Quality Manual Approvals: Quality Manager: Patrick Eckrich Date: 08/18/2017 Materials Manager: Dennis Okocha Date: 08/18/2017 Supplier Quality Manual Rev. _E_, Dated _August 18, 2017 Page 1 of
More informationSupplier Quality Manual CHASSIX Inc.
Supplier Quality Manual CHASSIX Inc. SQM-001 rev 8/2/17 Page 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 CHASSIX QUALITY POLICY 1.2 CHASSIX SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS 1.3 CHASSIX SUPPLIER
More informationEdition: Revision 09, February 19, This document is controlled by: Mayco International, LLC. Edited by
Working together as a team QUALITY AT THE SOURCE Page: 2 of 24 Supplier Quality Standard Edition: Revision 09, February 19, 2018 This document is controlled by: Mayco International, LLC Edited by Mayco
More informationVU Manufacturing Supplier Quality Manual
Supplier Quality Manual Revision 08, February 26, 2018 Table of Contents Section Preface Page 3 A. Quality System Page 4 B. Advanced Quality Planning Page 4 C. Continuous Improvement Page 5 D. Production
More informationInvitation for Bid No Package Contents
Invitation for Bid No. 17-31 Package Contents Huntsville Utilities Invitation for Bid No. 17-31 contains various tools and tool accessories for annual bid. The bid package should include the following
More informationSupplier Requirements
Page 1 of 19 Supplier Requirements Quality, Purchasing and Material Control Systems Contents Section 1.0 Section 2.0 Section 3.0 Section 4.0 Section 5.0 Section 6.0 Section 7.0 Communication and Expectations
More informationSupplier Quality Manual
Supplier Quality Manual Document No. F-PM010 Rev 3 Owner Supplier Quality Page 1 OF 11 TABLE OF CONTENTS 1.0 Purpose 3 2.0 Scope... 3 3.0 Quality System Requirements... 3 4.0 Approved Supplier List (ASL).
More informationSupplier Quality Manual
QP #: 8.4.1.2 Rev. #:0 Date Issued: 12/19/17 Date Revised: Page 1 of 8 Supplier Quality Manual Approved by: Mike Cornwell ( VP of Materials) Date: 12/19/17 1.0 Purpose: To provide Suppliers of BRC Rubber
More informationSUPPLIER QUALITY MANUAL
SUPPLIER QUALITY MANUAL ASYST Technologies, LLC 5811 99TH AVENUE KENOSHA, WI 53144 PHONE (262) 857-2244 FAX (262) 857-3623 Approval Signatures APPROVAL SIGNATURES Name / Title Contact Information Approval
More informationAdient Automotive Experience Global Supplier Standards Manual Chapter 4 Quality October, 2017
Change Log Revision Date Description of Change Rev 1.0 October 2017 New Adient release Rev1.0 PURPOSE The purpose of the is to communicate Adient, Inc. (Adient) requirements to the suppliers in our Automotive
More informationDocument No: R62004.R00 Page 1 of 7 Process Owner: Kacy Williams Effective Date: May 16, 2008 Originating Dept.: Warehouse No. Copies Distributed: 0
Document No: R62004.R00 Page 1 of 7 Process Owner: Kacy Williams Effective Date: May 16, 2008 Originating Dept.: Warehouse No. Copies Distributed: 0 Title/Subject: Pallet/Shipping Requirements Panasonic
More informationSupplier Quality System Requirements Manual
Supplier Quality System Requirements Manual This manual available ON-LINE at www.axletech.com website Quality Policy "AxleTech International is committed to exceeding our customers expectations by continually
More informationInland Building Systems Field Policy
6/23/2011/Page 1 of 6 Inland Building Systems Field Policy General Statement Inland Building Systems goal is to provide prompt assistance for all field issues caused as a result of an Inland error. Documented
More informationTitle: SCM DEVELOPMENT - SUPPLIER MANUAL Number: CE WI. Cascade Engineering. Supplier Manual
Cascade Engineering Supplier Manual Page 1 of 20 Rev Date: 10/17/2017 Table of Contents Supplier Qualification... 3 Corporate Responsibility... 3 Policy On Business Gifts... 4 Grievance Process... 4 Conflict
More informationVisteon Corporation. Customer Specific Requirements Fifth Edition. For Use with ISO/TS 16949:2009
Visteon Corporation Customer Specific Requirements Fifth Edition For Use with ISO/TS 16949:2009 SP-WW-SG-1007 Page 1 of 9 Printed Copies of this I. Introduction Quality professionals from Visteon collaboratively
More informationGlobal Supplier Standards Manual - Quality Standard
Proprietary and Public 01-April-2018 Rev 1.0 Page 1 of 17 1.0 Purpose This standard communicates Adient s minimum set of requirements to suppliers. It is the expectation of Adient that all suppliers -
More informationSupplier Quality Manual
Revised By: Supplier Quality Development Signature: Ramón Ibarra Date: Aug 30, 2017 Approved By: VP of Global Supply Chain Signature: Mark Bates Date: Aug 30, 2017 1. INTRODUCTION Hope Global Expectations:
More informationSupplier Quality Manual
Supplier Quality Manual Revision History Rev. Date Description of Change 1 9/23/16 New Release 2 6/7/17 Added to 9.2: Notify G&W immediately of any potential non-conforming product or any similar product
More informationSupplier Quality Manual
Supplier Quality Manual Revision History Rev. Date Description of Change 1 9/23/16 New Release 2 6/7/17 Added to 9.2: Notify G&W immediately of any potential non-conforming product or any similar product
More informationSupplier Quality Manual
Table of Contents 1.0 Introduction 2.0 Quality System Requirements 3.0 Quality Performance 4.0 Code of Ethics 5.0 APQP 6.0 SRG Global Access to Supplier Facility 7.0 Production Part Approval Process 8.0
More informationFAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM
FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM 1 QA.101 rev. 3-2012 PURPOSE OF THIS STANDARD Fairfield is committed to continuous product quality improvement. Our management team is convinced that only with
More information