Feasibility Study on HCMC UMRT Line-2 (Ben Thanh An Suong Section) E&M System : Rolling Stock MARCH 2008 JAPAN RAILWAY TECHNICAL SERVICE (JARTS)
|
|
- Jodie Wilson
- 5 years ago
- Views:
Transcription
1 Line2 (Ben Thanh An Suong Section) Feasibility Study on HCMC UMRT Line2 (Ben Thanh An Suong Section) E&M System : Rolling Stock Tsukuba Express (Japan) Odakyu Line (Tokyo, Japan) MARCH 2008 JAPAN RAILWAY TECHNICAL SERVICE (JARTS) Under Financial Assistance by METI, JAPAN Definition of The Study The Study was conducted by JARTS under METI FS scheme, JAPAN The Study Period was 2months, February March 2008 The Collaboration with ADB Study Team for Lines 2 and 3 was made, based on the discussion between METI and ADB in January METI Study Team was provided the demand forecast results, inventory of buildings, and other information from ADB Study Team. iii
2 Line2 (Ben Thanh An Suong Section) Objectives of The Study To assess the possibility to apply Japanese Railway Technology to the rail system for HCMC UMRT Line2. To assess integration of the operation and maintenance of the rail system as UMRT Network with Line1 system, which has been financed by JBIC and to be applied STRASYA specification. Overall Route and Alignment of Line2 Route Length : 11.4km Number of Station: 10 Stations Gauge: 1,435 mm Electrification system: DC 1,500V Overhead Catenaries iv
3 Line2 (Ben Thanh An Suong Section) Basic Concept of Civil Engineering Design 1. Eastern Terminal is Ben Thanh Station for Phase1 for flexible extension route for Phase2 to Thu Thiem New Urban Center. 2. Access Track between Line1 and Line2 is proposed, which become possible to utilize the workshop of Suoi Tien (Line1) for full inspection of Line2 rolling stocks. 3. Location of Platform of Ben Thanh is arranged just below the Line1 platform for convenience of transfer passengers 4. Applied Multiface Shield Tunneling Method with required width of 11m only. 5. Distance between stations is adjusted around 1km for all the residents along the route to be convenient to access to Line2. Keep flexibility to access to Thu Thiem New Urban Center Thu Thiem Urban Development Master Plan Ben Thanh Station Viewed from A point End of Phase1 section A For flexible Access to Thu Thiem New Urban Center Viewed from B point C B Viewed from C point Access to Thu Thiem New Urban Center v
4 Line2 (Ben Thanh An Suong Section) Ben Thanh Junction Station Line2 plat form should be at below Line1 platform for convenience of transfer passengers Connecting Line between Line1 and Line2 is provided for common use of Suoi Tien Workshop for full inspection/maintenance Ben Thanh Junction Station shall be implemented together with Line1 construction works. Ben Thanh Terminal Line2 platform to be located just below the Line1 Platform Access Track Application of Multiface Shield Machine Mutliface shield tunnel to apply Narrow section of Cach Mang Thang Tam Street. No affected buildings above the shield tunnel except cut & cover sections for station construction. vi
5 Line2 (Ben Thanh An Suong Section) Application of STRASYA Specification The urban railway in Japan transport 50 million passengers daily with an average delay time of less than one (1) minute. STRASYA has been compiled by Japanese Railway Operators using their own specifications. It is unlike the systems proposed by manufactures. STRASYA emphasized to apply advanced signaling system to minimize the potential for train collision, and the train designed to be light weight which requires less energy to operate, less noise, and less deterioration to the track. Standardization of the size and basic structure of the cars is the key to the STRASYA specification. The profile and interior of the cars can be designed respectively. Philosophy for Integration with Line1 Common use of Workshop Access track between Line1 and Line2 to be provided Demension of Rolling Stocks should be same as Line1 Unification of Passenger Service Facilities Ticket system, Fare adjustment rule, Passenger information manners Integration of OCC in Suoi Tien Depot at Line1 To reduce backup staff Same O&M Company to manage the both Lines To reduce O&M Staff about 120. vii
6 Line2 (Ben Thanh An Suong Section) EIA and RAP Note serious negative impact is expected negative impact is expected in some extent limited impact / negligible impact Environmental items Preconstruction phase Construction phase Operation phase Pollution Air pollution Surface water pollution Groundwater pollution Waste Soil contamination Vibration Noise Ground subsidence Social Environment Land acquisition and Resettlement Living and livelihood (including economic activities) Traffic (congestion and accident) and public facility Number of Affected Buildings Line2: 306 buildings for Phase1 No Natural Environmental Issues are encountered except to trees lining Cach Mang Than Tam Street Project Cost Estimate Total Project Cost: 1,241 mil US$ (including VAT and Price Escalation) Civil work cost shares 63% of total project cost, and E&M works shares 37%. Item No. Description Amount Component (US$) Foreign Local Total(US$) 1 Civil Works 246,951, ,016, ,967, Depot 19,773, ,890, ,664, Track Works 20,478, ,075, ,553, Rolling Stock 104,525, ,135, ,660, E & M Works 110,774, ,830, ,605, Platform Screen Door Total of Direct Works 502,503, ,947, ,451, General Items (3%) 15,075, ,848, ,923, A Total Construction Cost 517,578, ,796, ,375, Remarks B Land Acquisition / Compensation ,039, ,039, C Engineering Cost 49,282, ,320, ,603, (A x 7.5%) D Contingency 17,278, ,141, ,420, (A+B+C) x 3 % E Total ( A+B+C+D ) 584,140, ,298, ,438, F Owner's Expense ((E) x 3%) ,243, ,243, Provisional Total Cost (E+F) 584,140, ,541, ,681, Base Cost (100%) G VAT(10%) 0 96,968, ,968, % H Price Adjustment (Escalation) Total Project Cost (E+F+G+H) 61,933, ,461, ,394, % 646,073, ,971, ,241,045, % viii
7 Line2 (Ben Thanh An Suong Section) Project Implementation Plan Work Item Consultancy Service Year Selection of General Consultant Preparation of Tender Design & Document Tender Assistance Coordination of Design Development Construction Supervision Implementation Land Acquisition & Relocation of Services Detailed Design (by Contractor) Civil Works (incl. Finishing Work) E & M Rolling Stock Depot Construction / Procurement Civil Works (incl. Finishing Work) E & M Rolling Stock Depot Testing & Commissioning Testing & Commissioning Commercial Operation L/A LeterofCommencement Commercial PQ Tender Award Operation This could be squeezed if GC is appointed directly. By shortening 1 year of Project Implementation Period, the cost saving for Price escalation is about 60. Institutional Plan (O&M Company) O&M Company for HCMC UMRT Network is under preparation by Line1 Project, with 470 staff considering outsourcing the maintenance staff. If the same O&M company takes management activities for Line2, about 365 additional staff for Line2 O&M will be required. Assuming 120 staff would be saved if compared with the case that a separate O&M company be set up for managing Line2. ix
8 Line2 (Ben Thanh An Suong Section) Economic and Financial Evaluation Economic Evaluation Financial Evaluation IRR EIRR = 16.0% FIRR = 1.3% NPV NPV=327.3 NPV=744.9 Very high economic viability of Line2, but critical condition in financial viability, due to low setting of ridership and fare. The results indicates that the project should implemenent as early as possible for economic development of HCMC, but the financial back up for the government should be essential. It is desireble that Vietnamese Government shall apply foreign soft loan such as JBIC STEP Loan with very low interest and long grace period. Loan Repay ability Option A:JBIC STEP Loan: Interest: 0.2% Repayment :40 years (10 years grace Period) B: Other Loan: Interest: 4.0% Repayment: 25 year (8 years grace period) Total Balance 939 1,726 Maximum deficit ,792 Turning year to be positive annual balance Turning year to be positive cumulative balance 2043 Loan condition is much affected to financial condition of O&M implementation. The difference of total balance for 50 years are more than 2,700, by which two more MRT Lines could be developed in HCMC. ー x
9 Line2 (Ben Thanh An Suong Section) Conclusions of METIFS for Line2 STRASYA is applicable for Line2, which can be flexible to change in the detailed specifications, Demand forecast for Line2 is reasonable, with 14,700 pax/hour/direction in 2015, which is about 1.5 times of Line1. Phase1 of Line2 shall be Ben Thanh Tan Thoi Nhat of 11.4 km, but the cost should be further reviewed base on the detail geological and topographic investigations. Project Implementation period is set up with 6.5 years after signing of Loan Agreement with donors, if direct order of GC is conducted by HCMCPC. The loan condition is highly affected to the financial conditions of O&M bodies. It might be two more MRT Lines can be constructed by saving expenses if JBIC STEP Loan of 0.2% interest, 40 years repayment period, and 10 years grace period, is applied. Recommendations by METIFS Team 1. Inter operability of Line1 and Line2 should be secured for common use of workshop and other facilities, 2. Detailed topo survey, geological investigation, utility survey should be conducted by MAUR to grade up the accuracy of cost estimation and project implementation program, 3. EIA and RAP formulation should be done by MAUR to apply soft loan, such as JBIC STEP Loan. It is required to complete the EIA and RAP at least 4 months before appraisal of the loan. 4. MAUR shall request JBIC to conduct SAPROF to follow up the Line2 technical issues, which will be included field investigation, designing of Ben Thanh Stations, standard design of undergroud and elevated stations, details cost estimate of underground works and etc. xi
10 Line2 (Ben Thanh An Suong Section) Thank you! xii
11 Line2 (Ben Thanh An Suong Section) Main Text 1
Ex-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Dhaka Mass Rapid Transit Development Project (Line 5) (E/S) Loan
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People's Republic of Bangladesh Project: Dhaka Urban Transport Development Project (I) Loan Agreement: February
More informationStudy on Private-Initiative Infrastructure Projects. in Developing Countries in FY2008. Study on the Improvement Project of Rail Freight
Study on Private-Initiative Infrastructure Projects in Developing Countries in FY2008 Study on the Improvement Project of Rail Freight Transport for Hanoi - Hai Phong in the Socialist Republic of Viet
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Ex-Ante Evaluation (for Japanese ODA Loan) Southeast Asia Division 1, Southeast Asia and Pacific Department, JICA 1. Basic Information Country: The Republic of Indonesia Project: Construction of Jakarta
More information1. Name of the Project
Japan ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: India Project: Mumbai Metro Line III Project Loan Agreement: September 17, 2013 Loan Amount: 71,000 million yen
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Indonesia Project: Construction of Jakarta Mass Rapid Transit Project (II) Loan Agreement: December
More informationJapanese ODA loan. Ex-ante Evaluation
Japanese ODA loan Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Viet Nam Project: North-South Expressway Construction Project (Ben Luc Long Thanh Section)(II) L/A signed
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Dhaka Mass Rapid Transit Development Project (Line 1) (E/S) Loan Agreement: June
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Indonesia Project: Engineering Services (E/S) for Construction of Jakarta Mass Rapid Transit East-West
More informationJapanese ODA. Ex-ante Evaluation
Japanese ODA Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: North-South Expressway Construction Project (Da Nang Quang Ngai Section) (I) (II) (III) L/A signed
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People's Republic of Bangladesh Project: Kanchpur, Meghna and Gumti 2 nd Bridges Construction and Existing
More information1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives 4. Project Description
Ex-ante Evaluation 1. Name of the Project Country: India Project: Delhi Mass Rapid Transport System Project Phase 2 (III) (Loan Agreement: March 10, 2008; Loan Amount: 72,100 million yen; Borrower: The
More informationStudy on Economic Partnership Projects. in Developing Countries in FY2009. Da Nang City in Socialist Republic of Viet Nam SUMMARY.
Study on Economic Partnership Projects in Developing Countries in FY2009 Study on the Water Environment Improvement Project for Da Nang City in Socialist Republic of Viet Nam SUMMARY March 2010 NIHON SUIDO
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country:Mongolia Project:New Ulaanbaatar International Airport Construction Project (II) Loan Agreement:April 16, 2015
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: The Kanchpur, Meghna and Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation
More informationSTUDY ON FINAL REPORT SUMMARY. February 2013
STUDY ON ECONOMIC PARTNERSHIP PROJECTS IN DEVELOPING COUNTRIES IN FY2012 STUDY ON THE SECOND JAKARTA-CIKAMPEK TOLL-ROAD PROJECT IN THE REPUBLIC OF INDONESIA FINAL REPORT SUMMARY February 2013 Prepared
More informationSummary of Environmental and Social Consideration in Development Study (Preparatory Study)
Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Full title of the Project The Study on Integrated Development Strategy for Danang City and Its Neighboring
More informationStudy on Economic Partnership Projects. in Developing Countries in FY2007. Project for the Improvement of Distribution Efficiency in the
Study on Economic Partnership Projects in Developing Countries in FY2007 Study on Railway Freight Transport System Construction Project for the Improvement of Distribution Efficiency in the Southern Focal
More informationStudy on Economic Partnership Projects. in Developing Countries in FY2009. Study on Ho Chi Minh Elevated Railway Project in Socialist
Study on Economic Partnership Projects in Developing Countries in FY2009 Study on Ho Chi Minh Elevated Railway Project in Socialist Republic of Viet Nam SUMMARY March 2010 Japan Transportation Consultants,
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Democratic Socialist Republic of Sri Lanka Project: Greater Colombo Urban Transport Development Project Phase 2 (II) Loan
More informationEx-ante Evaluation - 1 -
Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: The North-South Expressway Construction Project (Ho Chi Minh City Dau Giay) (I) (Loan Agreement: March 31,
More informationJapanese ODA loan. Ex-ante Evaluation
Japanese ODA loan Ex-ante Evaluation 1.Name of the Project Country: The Socialist Republic of Vietnam Project: North-South Expressway Construction Project (Da Nang Quang Ngai Section)(I) L/A signed on:
More information1. Name of the Project 2. Necessity and Relevance of JBIC Assistance 1. Situation and issues of the road sector in Sri Lanka
Ex-ante Evaluation 1. Name of the Project Country: The Democratic Socialist Republic of Sri Lanka Project: Southern Highway Construction Project II Loan Agreement: July 29, 2008 Loan Amount: 17,499 million
More informationSection 7. Terms of Reference. Table of Contents
Section 7 - Terms of Reference - Package CS-4 7-1 Abbreviation 1. Background Section 7. Terms of Reference Table of Contents 1.1 Overview of the Project 1.1.1 Key Information 1.1.2 Objectives of the Project
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: Socialist Republic of Vietnam Project: Cai Mep - Thi Vai International Port Construction Project (II) Loan Agreement:
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1.Name of the Project Country: Socialist Republic of Viet Nam Project: O Mon Thermal Power Plant Unit No.2 Construction Project (II) Loan Agreement:
More informationSummary of Preliminary Study Result for Technical Cooperation Project. Date: 2008/10/8
Summary of Preliminary Study Result for Technical Cooperation Project Date: 2008/10/8 1. Full title of the Project The Project on Integrated UMRT and Urban Development for Hanoi 2. Type of the study Feasibility
More informationEx-Ante Evaluation (for Japanese ODA Loan)
1. Name of the Project Ex-Ante Evaluation (for Japanese ODA Loan) Country: India Project: Dedicated Freight Corridor Project (Procurement of Electric Locomotives) Loan Agreement: September 15, 2017 Loan
More information1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives
Ex-ante Evaluation 1. Name of the Project Country: The Democratic Socialist Republic of Sri Lanka Project: The Galle Port Development Project (I) Loan Agreement: March 28, 2006 Loan Amount: 14,495 million
More informationJapanese ODA Loan. Ex-Ante evaluation
Japanese ODA Loan Ex-Ante evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Matarbari Ultra Super Critical Coal-Fired Power Project (I) Loan Agreement: June 16, 2014 Loan
More informationStudy on Economic Partnership Projects. in Developing Countries in FY2007. Study on Construction of Underground Flood Retention. Ponds in DKI Jakarta
Study on Economic Partnership Projects in Developing Countries in FY2007 Study on Construction of Underground Flood Retention Ponds in DKI Jakarta SUMMARY March 2008 Nippon Koei Co., Ltd. Ebara Corporation
More information5.2 Civil Structure and Track Structures between Stations. 2) Elevated Structure
5.2 Civil Structure and Track 5.2.1 Structures between Stations (1) Type of Structures Typical structure between stations is classified into three categories in the previous study SAPROF (I) as follows.
More informationPreliminary Project Evaluation Sheet JICA, Southeast Asia and Pacific Department, Southeast Asia Division 4
Preliminary Project Evaluation Sheet JICA, Southeast Asia and Pacific Department, Southeast Asia Division 4 1. Project name Country: Republic of the Union of Myanmar (Myanmar) Project name: Yangon-Mandalay
More informationJapanese ODA Loan. Ex-Ante Evaluation
Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan
More informationPREPARATORY SURVEY REPORT ON DHAKA URBAN TRANSPORT NETWORK DEVELOPMENT PROJECT PHASE 2
DHAKA TRANSPORT COORDINATION BOARD (DTCB) MINISTRY OF COMMUNICATIONS (MOC) GOVERNMENT OF THE PEOPLE S REPUBLIC OF BANGLADESH PREPARATORY SURVEY REPORT ON DHAKA URBAN TRANSPORT NETWORK DEVELOPMENT PROJECT
More informationBotswana Trans-Kalahari Road Construction Project. Report date: March 2001 Field survey: August Project Profile and Japan s ODA Loan
Botswana Trans-Kalahari Road Construction Project 1. Project Profile and Japan s ODA Loan Report date: March 2001 Field survey: August 2000 Project road section: Ghanzi to Mamuno Site map: The Republic
More informationStudy on Economic Partnership Projects. in Developing Countries in FY2007. Socialist Republic of Vietnam. ( Project Operation Approach )
Study on Economic Partnership Projects in Developing Countries in FY2007 Study on Da Nang-Quang Ngai Expressway Project in the Socialist Republic of Vietnam ( Project Operation Approach ) SUMMARY March
More informationQuestions to be responded to by the firm submitting the application
Questions to be responded to by the firm submitting the application Why do you think this project should receive an award? How does it demonstrate: innovation, quality, and professional excellence transparency
More informationMaharashtra Rail Infrastructure Development Limited. Pune Nasik Double Line
Maharashtra Rail Infrastructure Development Limited (MRIDL) Name of the project Pune Nasik Double Line (With electrification) Term of Reference For Traffic Study and Financial Analysis for Green Field
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of the Union of Myanmar Project: Yangon-Mandalay Railway Improvement Project Phase I (II) Loan
More informationEx-ante Evaluation. Indonesia have one of the important strategic programs of increasing stable water supply and
Ex-ante Evaluation 1. Name of the Project Country: The Republic of Indonesia Project: Integrated Water Resources and Flood Management Project for Semarang (Loan Agreement: March 29, 2006; Loan Amount:
More informationIndonesia Ex-Post Evaluation of Japanese ODA Loan Project Railway Double Tracking on Java South Line (1) (2)
Indonesia Ex-Post Evaluation of Japanese ODA Loan Project Railway Double Tracking on Java South Line (1) (2) External Evaluator: Takako Haraguchi, International Development Associates 0. Summary The double
More informationNEPAL ELECTRICITY AUTHORITY ENGINEERING SERVICES PROJECT DEVELOPMENT DEPARTMENT
JAPAN INTERNATIONAL COOPERATION AGENCY NEPAL ELECTRICITY AUTHORITY ENGINEERING SERVICES PROJECT DEVELOPMENT DEPARTMENT THE UPGRADING FEASIBILITY STUDY ON THE DEVELOPMENT OF THE KULEKHANI III HYDROPOWER
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: Federative Republic of Brazil Project: Belem Metropolitan Trunk Bus System Project Loan Agreement: September
More informationEx-ante Evaluation 1. Name of the Project 2. Background and Necessity of the Project
Ex-ante Evaluation 1. Name of the Project Country: India Project Title: Hyderabad Outer Ring Road Project (Phase 2) Loan Agreement: November 21, 2008 Loan Amount: 42,027 million Yen Borrower: The President
More informationJapanese ODA. Ex-ante Evaluation
Japanese ODA Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: Second Ho Chi Minh City Water Environment Improvement Project (I) (II) (III) L/A signed on: March
More informationStudy on Economic Partnership Projects. in Developing Countries in FY2009. India SUMMARY. March 2010
Study on Economic Partnership Projects in Developing Countries in FY2009 Study on Geothermal Power Project at Uttrakhand State in India SUMMARY March 2010 West Japan Engineering Consultants, INC. Mitsubishi
More informationFerrovie dello Stato
Ferrovie dello Stato Ferrovie dello Stato Italiane Group Organizational structure Ministry of Economy and Finance Ferrovie dello Stato Italiane Trenitalia * RFI Italferr Mercitalia Group* Operator of passenger
More informationCDM in Urban Railway Sector and JICA s Cooperation
CDM in Urban Railway Sector and JICA s Cooperation February 25, 29 The 4th Regional EST Forum in Asia Seoul, Republic of Korea Tomonori SUDO, Ph.D., Office for Climate Change Japan International Cooperation
More informationVALUES ADOPTED FOR SOME IMPORTANT VARIABLES
CHAPTER 20 ECONOMIC APPRAISAL 20.1 INTRODUCTION 20.2 VALUES ADOPTED FOR SOME IMPORTANT VARIABLES 20.3 ECONOMIC BENEFIT STREAM 20.4 METRO CONSTRUCTION COST 20.5 ECONOMIC PERFORMANCE INDICATORS 20.6 SENSITIVITY
More informationThailand Dao Kanong - Klong Toey Port Expressway Project (Stage I) (Construction of bridge section of the Chao Phya River Crossing)
Thailand Dao Kanong - Klong Toey Port Expressway Project (Stage I) (Construction of bridge section of the Chao Phya River Crossing) 1. Project Profile and Japan s ODA loan Report Date: October 2002 Field
More informationRAILWAY ECONOMICS BY K. G. FENELON, M.A., PH.D. METHUEN & CO. LTD. 36 ESSEX STREET W.C. LONDON
RAILWAY ECONOMICS BY K. G. FENELON, M.A., PH.D. METHUEN & CO. LTD. 36 ESSEX STREET W.C. LONDON CONTENTS PAGE PBEFACE.... vii CHAPTER I INTRODUCTION The economic importance of railways The demand for railway
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Indonesia Project: Patimban Port Development Project (I) Loan Agreement: November 15, 2017 Loan
More informationTERMS OF REFERENCE FOR CONSULTING SERVICES FOR ENGINEERING AND CONSTRUCTION SUPERVISION CONSULTANT
TERMS OF REFERENCE FOR CONSULTING SERVICES FOR ENGINEERING AND CONSTRUCTION SUPERVISION CONSULTANT 1. Background The Asian Development Bank (ADB) has assisted the Kyrgyz Republic in the rehabilitation
More informationSUMMARY OF PROJECT PERFORMANCE
Additional Financing of Ha Noi Metro Rail System Project (Line 3: Nhon Ha Noi Station Section) (RRP VIE 40080) A. Background SUMMARY OF PROJECT PERFORMANCE 1. The Ha Noi Metro Rail System Project (Line
More informationJapanese ODA Loan. Ex-ante Evaluation
Japanese ODA Loan Ex-ante Evaluation 1.Name of the Project Country:Republic of El Salvador Project:San Miguel Bypass Construction Project Loan Agreement:20 August 2014 Loan Amount:12,595 million yen Borrower:Government
More informationWorkshop on enabling Inclusive Cities ADB 29 October PAKISTAN: Karachi Mass-Transit Project (KMTP)
Workshop on enabling Inclusive Cities ADB 29 October 2013 PAKISTAN: Karachi Mass-Transit Project (KMTP) Agenda 1. Karachi - Context 2. Rapid Project Description 3. Urban Transport and Inclusiveness: Different
More informationJapanese ODA Loan. Ex-ante Evaluation
Japanese ODA Loan Ex-ante Evaluation 1.Name of the Project Country:Republic of the Philippines Project:New Bohol Airport Construction and Sustainable Environment Protection Project Loan Agreement:27 March
More informationJapanese ODA Loan Ex-ante Evaluation
Japanese ODA Loan Ex-ante Evaluation 1.Name of the Project Country: Republic of the Philippines Project: Pasig-Marikina River Channel Improvement Project (Phase III) Loan Agreement: 30 March 2012 Loan
More informationFinancial Sustainability of Regional Transit - RRTS. National Capital Region Transport Corporation Limited (NCRTC)
Financial Sustainability of Regional Transit - RRTS National Capital Region Transport Corporation Limited (NCRTC) 9 th November 2016 1 What is RRTS? Outline 2 3 4 Why RRTS? How is it different from MRTS?
More informationUNITED REPUBLIC OF TANZANIA
UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE PUBLIC SERVICE RECRUITMENT SECRETARIAT Ref.No.EA.7/96/01/J/193 13 nd September, 2018 VACANCIES ANNOUNCEMENT On behalf of the Tanzania Railways Corporation
More informationEx-Ante Evaluation. Japanese ODA Loan
Japanese ODA Loan Ex-Ante Evaluation 1. Name of the Project Country: Kingdom of Cambodia Project: Phnom Penh City Transmission and Distribution System Expansion Project (Phase 2) (I) Loan Agreement: March
More informationJapanese ODA loan. Ex-ante Evaluation
Japanese ODA loan Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Viet Nam Project: Lach Huyen Port Infrastructure Construction Project (I) L/A signed on: November 2, 2011
More informationIndonesia North Java Line Track Rehabilitation Project Report Date August, 2002 Field Survey July, Project Profile and Japan s ODA Loan
Indonesia North Java Line Track Rehabilitation Project Report Date August, 2002 Field Survey July, 2001 1. Project Profile and Japan s ODA Loan Project Location Map North Java Line (Cikampek - Cirebon)
More informationThe safety measures against deformation of the track
The safety measures against deformation of the track 1 2 1 2 S. Chang, K. Y. Chang, R. J. T. Chen & L.-C. Wang 1 China Engineering Consultants, Inc., Taiwan 2 Technology Dept. of Civil Engineer, National
More informationBangkok Chonburi Highway Construction Project (1)
Thailand Bangkok Chonburi Highway Construction Project (1) 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 Myanmar Loas Thailand Bangkok Chonburi Cambodia Project
More informationEx-ante Evaluation. (1) Current Status and Issues of the Transportation Sector in the Republic of Kazakhstan
Ex-ante Evaluation 1. Name of the Project Country: Kazakhstan Project: CAREC Transport Corridor (Zhambyl Oblast) Improvement Project Loan Agreement: August 23, 2010 Loan Amount: 6,361 million yen Borrower:
More informationTelecommunication Expansion Project (II)
Ghana Telecommunication Expansion Project (II) Report Date: October, 2002 Field Survey: July, 2001 1. Project Profile and Japan s ODA Loan Project Site Switchboard System (Accra Station) 1.1 Background
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Mozambique Project: Mandimba Lichinga Road Upgrading Project Loan Agreement: November 29, 2013
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of the Philippines Project: Flood Risk Management Project for Cagayan de Oro River Loan Agreement:
More informationEnvironmental Assessment Report
Environmental Assessment Report TA 7892 June 2014 VIE: Sustainable Urban Transport for Ho Chi Minh City Metro Line 2 Project Prepared by the People s Committee of Ho Chi Minh City for the Asian Development
More informationSAPI for Ho Chi Minh City Urban Railway Construction Project (Line 1) (Preparation of Management System)
Socialist Republic of Vietnam Ho Chi Minh City People`s Committee(HCMC-PC) Management Authority for Urban Railways(MAUR) SAPI for Ho Chi Minh City Urban Railway Construction Project (Line 1) (Preparation
More informationStudy on Economic Partnership Projects. in Developing Countries in FY2008. Study on Geothermal Power Development Projects
Study on Economic Partnership Projects in Developing Countries in FY2008 Study on Geothermal Power Development Projects in Scattered Islands of East Indonesia SUMMARY March 2009 West Japan Engineering
More informationPreparatory Survey for Hanoi City Urban Railway Construction Project (Line 1) Final Report (Simple Binding)
Socialist Republic of Vietnam Vietnam Railways Preparatory Survey for Hanoi City Urban Railway Construction Project (Line 1) Final Report (Simple Binding) April 2012 Japan International Cooperation Agency
More informationInformation on Rail Baltica Planned Procurements for the Global Project (indicative)
Information on Planned Procurements for the Global Project (indicative) 21.04.2017 No Procurement Title (English) Procurement Title (original language) Short Description of the Procurement Subject (in
More informationSHIA Rail Link: a showcase PPP project. EU Indonesia Business Dialogue 2013 Infrastructure Sector
SHIA Rail Link: a showcase PPP project EU Indonesia Business Dialogue 2013 Infrastructure Sector High growth at SHIA Pax m 90 Design Capacity: 22 m pax p.a. 83.7 Int'l Forecast 80 Dom Existing: ± 58 m
More informationSECTOR ASSESSMENT (SUMMARY): URBAN TRANSPORT 1
Greater Dhaka Sustainable Urban Transport Project (RRP BAN 42169) Sector Road Map SECTOR ASSESSMENT (SUMMARY): URBAN TRANSPORT 1 1. Sector Performance, Problems, and Opportunities 1. Dhaka, the capital
More informationEx-Ante Evaluation (for Japanese ODA Loan)
1. Name of the Project Ex-Ante Evaluation (for Japanese ODA Loan) Country: India Project: Project for the Construction of Training Institute for Mumbai-Ahmedabad High Speed Rail Loan Agreement: September
More informationThis project will support the development of a sewerage service targeting districts not
Ex-Ante Evaluation 1. Name of Project Country: The Republic of Indonesia Project: Denpasar Sewerage Development Project (II) Loan Agreement: March 28, 2008 Loan Amount: 6,004 million yen Borrower: The
More informationThailand Traffic Planning and Management Sector Loan
Thailand Traffic Planning and Management Sector Loan 1. Project Profile and Japan s ODA Loan External Evaluator: Hiroyasu Otsu, Graduate School of Kyoto University Field Survey: August 2007 March 2008
More informationUPDATED RAILWAY REFORM PROGRESS REPORT
Railway Rolling Stock Operations Improvement Project (RRP BAN 50312-003) A. Background UPDATED RAILWAY REFORM PROGRESS REPORT 1. In 2006 ADB approved the Railway Sector Investment Program Multitranche
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Uzbekistan Project: Talimarjan Thermal Power Station Extension Project Loan Agreement: May 1,
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Democratic Socialist Republic of Sri Lanka Project: Landslide Disaster Protection Project of the National
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1015. Project Name. Region. Country. Sector(s) Urban Transport (100%) Theme(s)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1015 Project Name
More informationSOCIALIST REPUBLIC OF VIETNAM Socialist Republic of Vietnam Vietnam
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6048 Expressway
More informationTrends and Topics in Research and Development Related to Transportation and Traffic Planning Technology
PERSPECTIVE Trends and Topics in Research and Development Related to Transportation and Traffic Planning Technology Kunihiro KAWASAKI Signalling and Transport Information Technology Division Noriko FUKASAWA
More informationEx-ante Project Evaluation
Ex-ante Project Evaluation 1. Name of project Country: Socialist Republic of Vietnam Name of project: Hai Phong City Environmental Improvement Project (II) L/A signing date: March 31, 2009 Loan amount:
More informationUpdated Environmental Impact Assessment
Updated Environmental Impact Assessment June 2017 (Part I) VIE: Ho Chi Minh City Urban Mass Rapid Transit Line 2 PFR2: Tham Luong Depot to Ben Thanh Station Prepared by for the Asian Development Bank.
More information(iii) Senior Management Course, lasting not less than 4 weeks from a recognized Institution;
VACANT POSTS V/No. 01/2018 PRINCIPAL HOUSING OFFICER, JOB GROUP N, TEN (10) POSTS Salary Scale: Kshs.51,660 69,990 p.m. (a) Duties and Responsibilities Duties and responsibilities at this level involve
More informationMODEL TRAINING GUIDE
THE HONG KONG INSTITUTION OF ENGINEERS ENGINEERING GRADUATE TRAINING SCHEME A MODEL TRAINING GUIDE LOGISTICS AND TRANSPORTATION ENGINEERING Model Training Guide (MTG) The Model Training Guide is a guide
More informationSTUDY FOR THE FORMULATION OF HIGH SPEED RAILWAY PROJECTS ON HANOI VINH AND HO CHI MINH NHA TRANG SECTION
JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) VIETNAM RAILWAYS (VR) STUDY FOR THE FORMULATION OF HIGH SPEED RAILWAY PROJECTS ON HANOI VINH AND HO CHI MINH NHA TRANG SECTION TECHNICAL REPORT 6 QUESTIONS
More informationEx-Post Monitoring of Completed ODA Loan Projects
(On-site evaluation: June 2007) Evaluator: Kenji Momota (IC Net Limited) Project Name: Chile Railway Rehabilitation Project (L/A No. CH-P3) Ex-Post Monitoring of Completed ODA Loan Projects Loan Outline
More informationLRTC Light Rail and Road based Transit Consultants
LRTC Light Rail and Road based Transit Consultants Company presentation Urban mobility. Solutions for tomorrow. Today. LRTC at a glance Founded in 1985 JV of major public transit consultants Fully independent
More informationMillennium Line Broadway Extension
Millennium Line Broadway Extension Environmental and Socio-Economic Review Process Description Technical Summary Technical Summary The Millennium Line Broadway Extension will be an approximately 6 kilometre
More informationEx-ante Evaluation (for Japanese ODA Loan)
Ex-ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: India Project: Kerala Water Supply Project (III) Loan Agreement: March 31, 2009 Loan Amount: 12,727 million Yen Borrower: The
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1.Name of the Project Country: The Republic of the Union of Myanmar Project: Bago River Bridge Construction Project Loan Agreement: March 1,
More informationEmerging Opportunities in Mass Rapid Transit System (MRTS) in. Uttar Pradesh
Emerging Opportunities in Mass Rapid Transit System (MRTS) in Uttar Pradesh Mahendra Kumar Director (RS & S) Technical Presentation on Rolling Stock, Signalling, Electrical and other system infrastructures
More informationStudy on Private-Initiative Infrastructure Projects. in Developing Countries in FY2008. System in the Socialist Repubic of Viet Nam SUMMARY
Study on Private-Initiative Infrastructure Projects in Developing Countries in FY2008 Study on the PPP Project Formation for Hanoi Water Supply System in the Socialist Repubic of Viet Nam SUMMARY March
More informationJapanese ODA Loan. Ex-Ante Evaluation
Japanese ODA Loan Ex-Ante Evaluation 1. Name of the Project Country: Republic of Costa Rica Project: Las Pailas II Geothermal Project (Guanacaste Geothermal Development Sector Loan) Loan Agreement: August
More information