1 Smart Metering Program NSMP Business Requirements Work Stream Version number: Status: Author: Date published: File name: Version 1.0 Final for release to Vendors Stakeholder Steering Committee 31 May 2010 NSMP_SMI_VendorsRFI_V1.0.doc PLEASE NOTE THIS DOCUMENT MUST BE PRINTED ON A3 PAPER.

2 1 Document Control Table of Contents 1 DOCUMENT CONTROL VERSION CONTROL APPROVAL REFERENCES INTRODUCTION BACKGROUND OBJECTIVES REVIEW TIMETABLE INDEPENDENT VALIDATION OF RFI RESPONSES REQUEST FOR INFORMATION SMART METER CONFIGURATIONS SMART METER HARDWARE FUNCTION REQUIREMENTS SMART METER MANAGEMENT SYSTEM REQUIREMENTS SMART METER INFRASTRUCTURE PERFORMANCE LEVEL (INCLUDING COMMUNICATIONS) ELECTRICITY MARKET CONTEXT FOR SMART METERS IN AUSTRALIA VALIDATION TESTING OF THE SMI FUNCTIONALITY REQUIREMENTS TERMS AND CONDITIONS FURTHER INFORMATION AND QUERIES VENDORS BRIEFING LODGEMENT DETAILS APPENDIX A GLOSSARY APPENDIX B NATIONAL SMART METERING PROGRAM ACCESS AND CONTESTABILITY PRINCIPLES Version Control Version Date Description Amended by /3/2010 First Draft extracted from discussion paper version 0.3 Dr Martin Gill /4/2010 Insert new table Dr Martin Gill /4/2010 Included the three Clarification of vendor responses for 0.4 6/5/2010 Amended from BRWG inputs on 3 and 4 May /5/2010 Final edits based on BRWG feedback received from Energex, AEMO, Phil Perry, and ActewAGL /5/2010 Appendix B added Reformatted to A3 to provide room for responses. Add other new sections determined by NSSC: 2.4 Independent Validation of RFI Responses 3.5 Electricity market context for smart meters in Australia 4. Validation testing of the SMI Requirements Dr Martin Gill Dr Martin Gill Dr Martin Gill Dr Martin Gill /5/2010 No changes issue as version 1.0 to vendors Harry Koller 1.2 Approval Authorised by Signature Date NSSC Program Director 31 May References The following documents are referred to in this document. Document Name Version NSMP Smart Meter Infrastructure V0.26 ADVANCED METERING INFRASTRUCTURE Minimum AMI (Victoria) Release 1.1 September 2008 File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 2 of 37

3 2 Introduction 2.1 Background The Smart Metering Steering Committee (NSSC) has produced a Smart Meter Infrastructure that details the minimum functionality to be prescribed for delivery by Meter Providers (MP) in accordance with the Electricity Rules (NER). The NSSC has requested that the Smart Metering Business Requirements Working Group (BRWG) formally request smart meter vendors and smart meter communications network vendors to provide information in relation to the detail prescribed in Smart Metering Infrastructure (SMI F.S.) Version Objectives There are three objectives for requesting information from vendors: 1. For the Smart Metering Program (NSMP) to confirm that the functional requirements defined in the Smart Metering Infrastructure (SMI F.S.) are clearly understood and unambiguously stated 1 2. For the NSMP to determine cost implications to the smart meter and smart meter communications hardware and software that may be identified due to new requirements over and above the current Victorian Advanced Metering Infrastructure. 3. For the NSMP to consider the relative merits of potential. This will examine the need to separately specify levels for urban, rural and remote areas. It is also considered desirable to examine the impact of specifying Levels well above those outlined in the Victorian AMI specification. Note: This analysis will use the Victorian Advanced Metering Infrastructure as a baseline for both the meter costs and Levels discussions. The SMI has made incremental changes to the functions described in the Victorian AMI specification. Although a single vendor is not precluded from supplying all of the components for the SMI, it is not assumed that a single vendor will supply all the components of the SMI, as such meter functions and communications are presented in different sections. 2.3 Review timetable The NSSC has approved the following timetable for the vendors review: The NSSC reserves the right to independently conduct its own reference checks of your responses. 3 Request For Information 3.1 Smart Meter Configurations There are five potential smart meter configurations defined in the SMI F.S. These are shown in Table 1. For each metering configuration please detail if you offer a solution that meets the minimum requirements of the Victorian AMI and/or the SMIFS. If you do not currently provide a solution meeting the requirements, please detail when you intend to offer a solution meeting the requirements. Table 1: Smart Meter Configurations Ref No. Meter Configuration 1. Single Phase Single Element Meter 2. Single Phase Two Element meter 3. Three Phase Whole Current Meter 4. Three Phase CT connected meter 5. Three Phase CT connected meter supporting external Supply Contactor Intend to provide this configuration 3.2 Smart Meter Hardware Function Requirements Vendor Comments The SMI F.S. provides requirements for 21 functions. These are shown in Table 2 below. The column invites vendors to provide clarification where the stated requirements may lead to uncertainty or ambiguity in the specification. The column provides an opportunity for vendors to outline cost implications over and above meter hardware and software meeting the current Victorian AMI. Please note that the NSMP only requires the cost difference comparing the SMI F.S. to the Victorian AMI Requirements. For those items for which there is a material cost implication, please highlight the specific requirement that is impacting the cost. Vendors are invited to suggest changes to the wording which would provide similar functionality but at a lower cost. 31 May 2010: Issue RFI to vendors 7 June 2010: Vendors to lodge questions 10 June 2010: Vendors Briefing 10:00 am to 12:00 pm (PwC Offices, Freshwater Place, Melbourne) briefing session and answer any questions (NSMP overview, RFI objectives and answer vendor questions) 25 June 2010: RFI submissions due (20 business days from 31 May 2010) 2.4 Independent Validation of RFI Responses Please provide a means that the NSSC can employ to independently validate your responses to this RFI. 1 There is also a suggestion that it is desirable to capture recommendations and other comments for each function File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 3 of 37

4 Table 2: Smart Meter Requirements Section Implications for meter cost Vendor Comments For example how to meet functionality without increasing cost Measurement and Recording Remote Acquisition Local Acquisition Visual Display and Indicators on Meter Meter Clock Synchronisation Load Management through a Controlled Load Contactor Supply Contactor Operation Supply Capacity Control Home Area Network using Open Standard Quality of Supply and Other Event Recording Meter Loss of Supply Detection Remote Meter Service Checking Meter Settings Reconfiguration Software Upgrades Plug and Play Device Commissioning Communications and Data Security Tamper Detection Interoperability for meters/devices at Application Layer Hardware Component Interoperability Meter Communications: Issuing Messages and Commands Customer Supply Monitoring File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 4 of 37

5 It is assumed the majority of the differences between the SMI F.S. and Victorian AMI will require enhanced meter software. These enhancements have the potential to affect the spare processor capacity allocated for future software releases (under Requirement 7.14 Software Upgrades). Question Vendor Response Please estimate the reduction in head room (spare capacity) that has been included in your estimates, preferably indicating the current percentage utilisation and future utilisation of all processor resources in the meter. The NSMP would like to avoid differences between solutions deployed in jurisdictional areas. A desirable solution would provide reconfigurable settings allowing one meter to satisfy both the SMI F.S. and Victorian AMI Requirements. Question Vendor Response Is it possible for the same meter hardware to be used for both the SMI F.S. and Victorian AMI? If it is not possible to provide a solution meeting both requirements please describe which requirements prevent this from being possible. Version 0.26 of the SMI F.S. does not currently specify requirements for Interoperability for meters/devices at the Application Layer (7.18.1) or Hardware Component Interoperability (7.19.1). Interoperability at the application layer would allow a Smart Meter Management System (SMMS) to configure and control a range of different vendors smart meters. For this to work it would require the use of a common communications metering protocol. Interoperability at the hardware layer allows a single meter to be fitted with a range of communications options. Question Vendor Response Please discuss how your solution provides interoperability at the application layer. Please discuss how your solution provides interoperability at the hardware layer The NSMP is aware that some of the functionality that is being requested is unique to the Australian market. It invites vendors to suggest how aligning the SMI F.S. with other markets would provide access to a wider range of solutions. Table 3 invites vendors to suggest functionality that could be modified to enable the SMI F.S. to align with overseas markets. Please outline anticipated cost reduction by making these changes. File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 5 of 37

6 Table 3: Suggested Modifications to align with overseas markets Section Suggested change Potential cost reduction from making change Measurement and Recording Remote Acquisition Local Acquisition Visual Display and Indicators on Meter Meter Clock Synchronisation Load Management through a Controlled Load Contactor Supply Contactor Operation Supply Capacity Control Home Area Network using Open Standard Quality of Supply and Other Event Recording Meter Loss of Supply Detection Remote Meter Service Checking Meter Settings Reconfiguration Software Upgrades Plug and Play Device Commissioning Communications and Data Security Tamper Detection Interoperability for meters/devices at Application Layer Hardware Component Interoperability Meter Communications: Issuing Messages and Commands Customer Supply Monitoring File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 6 of 37

7 3.3 Smart Meter Management System Requirements Section 5 of the SMI F.S. details the Smart Metering Infrastructure components. The Smart Meter Management System (SMMS) is intimately involved in the delivery of the Infrastructure levels. This section aims to determine the vendor s ability to support the SMI requirements remotely. (Note that Levels are to be explored in Section 1.1 of this document). The column invites vendors to provide clarification where the stated requirements may lead to uncertainty or ambiguity in the specification. The column provides an opportunity for vendors to outline cost implications to meet the SMI F.S. compared to the Victorian AMI specification. Vendors are also invited to suggest changes to the requirements which would provide similar functionality but at a lower cost. Table 4: Vendor feedback on the Smart Meter Management System Section Implications for Smart Meter Management System potential cost reductions Measurement and Recording Remote Acquisition Visual Display and Indicators on Meter Meter Clock Synchronisation Load Management through a Controlled Load Contactor Supply Contactor Operation Supply Capacity Control Home Area Network using Open Standard Quality of Supply and Other Event Recording Meter Loss of Supply Detection Remote Meter Service Checking Meter Settings Reconfiguration Software Upgrades Plug and Play Device Commissioning Communications and Data Security Tamper Detection File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 7 of 37

8 Section Implications for Smart Meter Management System potential cost reductions Interoperability for meters/devices at Application Layer Hardware Component Interoperability Meter Communications: Issuing Messages and Commands Customer Supply Monitoring Question Vendor Response Interoperability at the application layer (7.19.1) is an active area of research. Please discuss how the offered SMMS satisfies the requirements for interoperability? Section requires the SMMS to provide Message prioritisation Please briefly explain the level of control provide in your solution File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 8 of 37

9 3.4 Smart Meter Infrastructure Level (including communications) Version 0.26 of the SMI functionality specification does not differentiate in different deployment scenarios. In the preparation of the NERA Cost Benefit Analysis the assumption was that different technologies would be deployed in different jurisdictions. The NERA analysis assumed: Urban: Mesh radio (97%) with GPRS (3% fill-in) Rural: PLC Remote: PLC In order to provide indicative percentages in each area, NERA also defined the distinction between urban and rural as notionally at a density of less than 100 customers per square kilometre. Their assumed allocation of customers nationally is: 86 per cent urban ; 10 per cent rural and 4 per cent remote. The NSSC would like to explore the feasibility of either setting a single performance level for all areas or for setting different for urban, rural and remote areas.. For the purposes of comparison the following theoretical deployment areas are provided: Urban Rural on grid Meter population of at least 200,000 meters with a density of up to 500 meters per square kilometre. Consider that the majority of meters are located inside metal meter boxes located at a height of 1.5m mounted on the side of domestic premise or in high rise buildings. The deployment can assume reliable 3G cellular telecommunications coverage and approximately 100 homes per distribution transformer. The terrain should be considered to be gently undulating with light coverage of trees. There is a mix of overhead and underground supply. Meter population of at least 5,000 with 80% located in town centre and the remainder spread around the town with a density 5-50 meters per square kilometre. In the town centre consider that the majority of meters are located inside metal meter boxes located at height of 1.5m on the side of domestic premise. In the town centre can assume reliable 3G cellular coverage, however out of town telecommunications coverage nominally requires higher performance handsets 2. In the township assume 100 homes per distribution transformer however this decreases to 10 homes outside the town centre. All electricity distribution is overhead. Remote on grid Meter population of 1,000 with meter density between 0.25 to 5 meters per square kilometre with no major meter concentrations. The terrain is flat with minimal tree coverage. All electricity distribution is overhead, includinga number of SWER lines. 3G cellular coverage is only available at distribution zone substations. Sample selection for Group Messaging For Group messaging the stated performance level should be achievable when the entire meter population in a distribution area is involved (note that the SMI F.S. has not assumed that the offered solution supports message broadcast. In the high level architectural summary please indicate if your solution is using message broadcast to achieve the performance level). Clarification of the assumed sample selection for Individual Levels In the response to the Levels vendors are requested to ensure that they are presenting results for a random selection of meters across the total meter population. Vendors should not assume a best case scenario. For clarification: this occurs for Levels relating to commands to individual meters which state x% of the number of. Where the vendor feels that the selection may influence the reported the response should clearly state the assumptions that have been made to meet the stated performance level. High level architecture Vendors are requested to provide a high level architecture describing their proposed solution. Please provide a separate high level architecture for each deployment area highlighting any assumptions made. For each deployment area please summarise the major differences in the high level architecture. If your solution is not viable in a deployment area then please suggest changes that would be required to enable you to offer your solution. The following Tables ask vendors to separately respond to three different in each of the assumed deployment areas. The Smart Metering Program would like to determine the feasibility and cost implications to meet the three in each of the deployment areas. The performance level attempts to provide all the information necessary to allow the Smart Meter Communications Network (SMCN) to be appropriately scaled. The Column invites vendors to Provide clarification where the stated performance level requirements may lead to uncertainty or ambiguity Suggest additional information that should be added to assist in the design of the SMCN? The tables present three, a lower performance level ( ), the performance level specified in the Victorian AMI specification ( Level B) and a higher performance level ( ). The Column invites vendors to: Compare the costs of meeting the three different Suggest changes to the proposed enabling a simpler implementation If the suggested Level is infeasible then this should be highlighted in the response Note: The stated are measured from the Smart Meter Management System to the meter and will therefore include the smart meter management system, smart meter communications network and the smart meter communications modem. As such the response provided in Column #2 provides the cost implications to meet each of the three including costs in the Smart Meter Management System, the Smart Meter Communications Network and the modems included in the Smart Meter. 2 For example handsets certified by Telstra with the Blue Tick File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 9 of 37

10 Table 5: Urban Infrastructure Levels 7.2 Remote Acquisition (daily) Daily Acquisition All data from 90% of meters in 3 hours All will be involved in Remote Acquisition in any 24 hour period Special Read Data successfully received from 90% of meters within 60 minutes The number of Special Reads of individual meters in any 60 minute period can be up to 0.25% of the number of operational SMI meters in a The number of Special Reads in 2% of the number of operational SMI meters in a distribution The applicable amount of data shall be the acquisition of one day of a single channel of interval energy data and the accumulated energy data Daily Acquisition All data from 99% of meters within 4 hours after midnight; and All data from 99.9% of meters within 24 hours after midnight. Individual Read Action performed at 90% of meters within 30 minutes; within 1 hour; and Action performed at 99.9% of meters within 6 hours. The total number of individual meters read in any 24 hour period can be up to 2% of the installed, operational AMI meter population. Daily Acquisition All data from 99% of meters within 4 hours after midnight; and All data from 99.9% of meters within 24 hours after midnight. Special Read Data successfully received from 95% of meters in 2 minutes; 99% of meters within 5 mins; and 99.9% of meters within 4 hours. The number of Special Reads of individual meters in any 2 minute period can be up to 0.002% of the number of operational SMI meters in a. The number of Special Reads in 0.5% of the number of operational SMI meters in a distribution The applicable amount of data shall be the acquisition of seven days of a single channel of interval energy data and accumulated energy data File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 10 of 37

11 7.6 Load Management through a Controlled Load Contactor or relay For Priority Override Commands Requested Load control action performed at 90% of meters within 30 minutes Up to four Priority Override commands can be sent in any 24 hour period to groups consisting of up to 50% of the operational SMI meter population The requested Priority Override command shall be acknowledged by 90% of meters within 10 minutes The number of Priority Override commands sent to individual meters in any 10 minute period can be up to 1% of the number of The number of Priority Override commands in any 24 hour period can be up to half the number of For commands to any primary, secondary or tertiary group of meters the performance level required is: within 1 minute 3. For commands sent to individual meters, the performance level required is: Action performed at 90% of meters within 30 minutes; within 1 hour; and Action performed at 99.9% of meters within 6 hours. The total number of load control commands to individual meters in 2% of the installed, operational AMI meter population For Priority Override Commands Requested Load control action acknowledged by 95% of meters within 1 minute 99% of meters within 5 minutes Up to 12 Priority Override commands can be sent in any 24 hour period to groups consisting of up to 25% of the operational SMI meter population For commands sent to individual meters the requested Priority Override command shall be acknowledged by 99% of meters within 1 minute The number of Priority Override commands sent to individual meters in any 1 minute period can be up to 0.42% of the number of The number of Priority Override commands in any 24 hour period can be up to 2 times the number of 3 It is noted that this requirement is considered by DBs in Victoria to be unreasonably demanding and they have requested a relaxation of this requirement to 90% in 10 minutes. File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 11 of 37

12 7.7 Supply Contactor Operation For individual meters, the supply contactor switch command will be acknowledged by 90% of meters within 10 minutes; The number of Supply Contactor commands sent to individual meters in any 10 minute period can be up to 0.01% of the number of The total number of supply contactor switch commands in any 24 hour period can be up to 0.5% of the number of operational SMI meters in a distribution network area. Action performed at 90% of meters within 10 minutes; within 1 hour; and Action performed at 99.9% of meters within 6 hours. The total number of connects/disconnects commands to individual meters in any 24 hour period can be up to 2% of the installed, operational AMI meter population. Supply Switch Command acknowledged by: 99% of meters within 1 minute 99.9% of meters within 5 minutes The number of Supply Contactor commands in any 1 minute period can be up to % of the number of operational SMI meters in a The total number of Supply Switch commands in any 24 hour period can be up to 1% of the number of. Exceeding the Monitor Supply settings shall be reported by the SMMS for 95% of meters within 10 minutes of the limit being exceeded The SMMS shall report exceeding the Monitor Supply settings within 1 minute of the supply contactor being switched for 99% of meters The SMI shall be designed to allow 10% of the SMI meters receiving supply contactor switch commands to subsequently report exceeding Monitor Supply settings in a 24 hour period The number of meters reporting exceeding Monitor Supply settings can be up to 10% of the meters receiving a supply contactor switch command in a 24 hour period File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 12 of 37

13 7.8 Supply Capacity Control For Emergency Supply Capacity Control The requested Emergency Supply Capacity Limiting Command shall be performed by 90% of meters within 30 minutes For Emergency Supply Capacity Control. For commands to any primary or secondary group of meters the performance level required is: Action performed at 90% of meters within 10 minutes; and For Emergency Supply Capacity Control The requested Emergency Supply Capacity Limiting Command shall be acknowledged by 99% of meters within 3 minutes Up to two Emergency Supply Capacity Limiting Commands can be sent in any 24 hour period to groups consisting of up to 100% of the operational SMI meter population The requested Emergency Supply Capacity Limit Command shall be acknowledged by 90% of meters within 10 minutes The number of Emergency Supply Capacity Limiting commands sent to individual meters in any 10 minute period can be up to 0.2% of the number of operational SMI meters in a distribution The number of Emergency Supply Capacity Limiting Commands in 10% of the number operational SMI meters in a distribution within 1 hour. For commands sent to individual meters, the performance level required is: Action performed at 90% of meters within 30 minutes; within 1 hour; and Action performed at 99.9% of meters within 6 hours. The total number of load control commands to individual meters in 2% of the installed, operational AMI meter population. Up to two Emergency Supply Capacity Limiting Commands can be sent in any 24 hour period to groups consisting of up to 100% of the operational SMI meter population The requested Emergency Supply Capacity Limit Command shall be acknowledged by 99% of meters within 1 minute The number of Emergency Supply Capacity Limiting commands to individual meters in any 1 minute period can be up to 0.02% of the number of operational SMI meters in a The total number of Emergency Supply Capacity Limiting Commands in any 24 hour period can be up to t10% of the number File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 13 of 37

14 7.9 Home Area Network using Open Standard For transmission to all meters the HAN instruction received by 90% of meters in 30 minutes The AMI system shall support up to 6 HAN instructions per day being sent to the ESP. Up to 24 groups of meters may receive a HAN interface instruction in any 24 hour period Up to six HAN instructions can be sent in any 24 hour period groups consisting of up to 80% of the operational SMI meter population The HAN interface instruction will be successfully acknowledged by 90% of meters within 10 minutes The performance level required for HAN instructions is: HAN instruction received by 98% of ESPs in 3 hours; HAN instruction received by 99.9% of ESPs in 12 hours Each group may contain all A HAN interface instruction shall be acknowledged by: 95% of the requested meters within 2 minutes of sending the instruction The number HAN interface instructions sent to individual meters in any 10 minute period can be up to 1.67% of the number of The number of HAN interface instructions in any 24 hour period can be up to 2.4 times the number of 99% of the requested meters within 5 minutes of sending the instruction The total number of meters receiving HAN interface instructions in any 1 minute period can be up to 0.167% of the installed, operational SMI meter population in a distribution network area The HAN interface instruction will be successfully acknowledged by 99% of meters within 1 minute The total number of HAN interface instructions in any 24 hour period can be up to 2.4 times the number of File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 14 of 37

15 7.11 Meter Loss of Supply Detection Meter loss of supply shall be reported by the SMMS for 0.5% of the meters within 5 minutes of the meter s detecting meter loss of supply. Power Restoration shall be reported by the SMMS for 90% of the meters within 60 minutes of the meter detecting power restoration. The SMI shall be designed to allow for 10% of the SMI meter population experiencing meter loss of supply and power restoration in a 24 hour period. 3.7 Meter Loss of Supply detection and outage detection (a) All AMI systems shall include a means of detecting loss of supply to meters including those at individual customer s premises. (b) When a meter loss of supply or outage is detected it is to be alarmed to the NMS as soon as possible. Alarms to be received within one hour for 90% of meters. Meter loss of supply shall be reported by the SMMS within 1 minute for 90% of the meters detecting meter loss of supply. Power Restoration shall be reported by the SMMS within 1 minute for 90% of the meters affected by meter loss of supply Remote Meter Service Checking Remote Meter Service Checking shall obtain service data from 90% meters within 10 minutes; The number of Remote Service check requests sent to individual meters in any 10 minute period can be up to 2% of the number of The number of Remote Meter Service Check commands in any 24 hour period can be up to two times the number of operational SMI meters in a distribution Function was not included in the Victorian Remote Meter Service Checking shall obtain service data from 95% meters within 1 minute The number of Remote Service check requests sent to individual meters in any 1 minute period up to 0.1% of the number of operational SMI meters in a distribution The number of Remote Service Check Commands to individual meters in any 24 hour period can be up to two times the number of File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 15 of 37

16 7.13 Meter Settings Reconfiguration Requested configuration or reconfiguration of a meter setting at an individual meter shall be acknowledged from 90% of meters within 30 minutes; The number of commands sent to alter meter settings at individual meters in any 30 minute period can be up to 0.125% of the number of The number of commands to alter settings at individual meters in any 24 hour period can be up to 2% of the number of. The performance level required for individual meters is: Action performed at 90% of meters within 30 minutes; within 1 hour; and Action performed at 99.9% of meters within 6 hours. The total number of commands to alter settings at individual meters in 2% of the installed, operational AMI meter population Meter groups Up to 15 groups of meters may receive group settings reconfiguration commands in any 24 hour period Each group may contain up to 20% of the installed operational SMI meter population in a distribution Groups setting reconfiguration shall be acknowledged for 95% of meters requested within 2 minutes of commencing the reconfiguration 99% of meters requested acknowledged within 10 minutes Requested configuration or reconfiguration of a meter setting at an individual meter shall be acknowledged from 95% of meters requested within 5 minutes The total number of commands to alter settings at individual meters in any 5 minute period can be up to 0.01% of the installed, operational SMI meter population in a The total number of commands to alter settings at individual meters in 1% of the installed, operational SMI meter population in a. File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 16 of 37

17 7.14 Software Upgrades 7.15 Plug and Play Device Commissionin g 7.17 Tamper Detection For transmission to all meters a software upgrade will be received by 90% of meters within 14 days Only one software upgrade can be sent in any 14 day period to a group of meters consisting of up to 50% of the operational SMI meter population Meter installation shall be reported by the SMMS for 90% of meters within 2 hours of power restoration; The SMI shall be designed to allow 0.01% of the anticipated SMI meter population in a distribution to be installed in any 24 hour period Tamper Detection shall be reported by the SMMS for 90% of meters within an hour The SMI shall be designed to allow for 0.5% of meters reporting tamper in a 24 hour period. level not specified A software upgrade will be successfully completed by 99.9% of meters within 7 days. One software upgrade can be undertaken in any 7 day period Software upgrade acknowledged received from 99.9% of meters within 2 days The total number of software upgrades in any two day period can be up to 2% of the number of level not Specified Meter installation shall be reported for 90% of meters within 30 minutes of power restoration; It should be assumed that in any 24 hour period 0.01% of the anticipated SMI meter population in a will be installed level not Specified Tamper Detection shall be reported by the SMMS for 90% of meters within 1 minute The SMI shall be designed to allow for 0.5% of meters reporting tamper in a 24 hour period 7.21 Customer Supply Monitoring Customer Supply Monitoring events shall be reported by the SMMS for 90% of meters within 10 minutes Function was not included in the Victorian Customer Supply Monitoring events shall be reported by the SMMS for 90% of meters within 1 minute The SMI shall be designed to allow for 0.5% of meters reporting Customer Supply Monitoring events in a 24 hour period. The SMI shall be designed to allow for 0.5% of meters reporting Customer Supply Monitoring events in a 24 hour period. File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 17 of 37

18 Table 6: Rural on Grid Infrastructure Levels 7.2 Remote Acquisition (daily) Daily Acquisition All data from 90% of meters in 3 hours All will be involved in Remote Acquisition in any 24 hour period Special Read Data successfully received from 90% of meters within 60 minutes The number of Special Reads of individual meters in any 60 minute period can be up to 0.25% of the number of operational SMI meters in a The number of Special Reads in 2% of the number of operational SMI meters in a distribution The applicable amount of data shall be the acquisition of one day of a single channel of interval energy data and the accumulated energy data Daily Acquisition All data from 99% of meters within 4 hours after midnight; and All data from 99.9% of meters within 24 hours after midnight. Individual Read Action performed at 90% of meters within 30 minutes; within 1 hour; and Action performed at 99.9% of meters within 6 hours. The total number of individual meters read in any 24 hour period can be up to 2% of the installed, operational AMI meter population. Daily Acquisition All data from 99% of meters within 4 hours after midnight; and All data from 99.9% of meters within 24 hours after midnight. Special Read Data successfully received from 95% of meters in 2 minutes; 99% of meters within 5 mins; and 99.9% of meters within 4 hours. The number of Special Reads of individual meters in any 2 minute period can be up to 0.002% of the number of operational SMI meters in a. The number of Special Reads in 0.5% of the number of operational SMI meters in a distribution The applicable amount of data shall be the acquisition of seven days of a single channel of interval energy data and accumulated energy data File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 18 of 37

19 7.6 Load Management through a Controlled Load Contactor or relay For Priority Override Commands Requested Load control action performed at 90% of meters within 30 minutes Up to four Priority Override commands can be sent in any 24 hour period to groups consisting of up to 50% of the operational SMI meter population The requested Priority Override command shall be acknowledged by 90% of meters within 10 minutes The number of Priority Override commands sent to individual meters in any 10 minute period can be up to 1% of the number of The number of Priority Override commands in any 24 hour period can be up to half the number of For commands to any primary, secondary or tertiary group of meters the performance level required is: within 1 minute 4. For commands sent to individual meters, the performance level required is: Action performed at 90% of meters within 30 minutes; within 1 hour; and Action performed at 99.9% of meters within 6 hours. The total number of load control commands to individual meters in 2% of the installed, operational AMI meter population For Priority Override Commands Requested Load control action acknowledged by 95% of meters within 1 minute 99% of meters within 5 minutes Up to 12 Priority Override commands can be sent in any 24 hour period to groups consisting of up to 25% of the operational SMI meter population For commands sent to individual meters the requested Priority Override command shall be acknowledged by 99% of meters within 1 minute The number of Priority Override commands sent to individual meters in any 1 minute period can be up to 0.42% of the number of The number of Priority Override commands in any 24 hour period can be up to 2 times the number of 4 It is noted that this requirement is considered by DBs in Victoria to be unreasonably demanding and they have requested a relaxation of this requirement to 90% in 10 minutes. File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 19 of 37

20 7.7 Supply Contactor Operation For individual meters, the supply contactor switch command will be acknowledged by 90% of meters within 10 minutes; The number of Supply Contactor commands sent to individual meters in any 10 minute period can be up to 0.01% of the number of The total number of supply contactor switch commands in any 24 hour period can be up to 0.5% of the number of operational SMI meters in a distribution network area. Action performed at 90% of meters within 10 minutes; within 1 hour; and Action performed at 99.9% of meters within 6 hours. The total number of connects/disconnects commands to individual meters in any 24 hour period can be up to 2% of the installed, operational AMI meter population. Supply Switch Command acknowledged by: 99% of meters within 1 minute 99.9% of meters within 5 minutes The number of Supply Contactor commands in any 1 minute period can be up to % of the number of operational SMI meters in a The total number of Supply Switch commands in any 24 hour period can be up to 1% of the number of. Exceeding the Monitor Supply settings shall be reported by the SMMS for 95% of meters within 10 minutes of the limit being exceeded The SMMS shall report exceeding the Monitor Supply settings within 1 minute of the supply contactor being switched for 99% of meters The SMI shall be designed to allow 10% of the SMI meters receiving supply contactor switch commands to subsequently report exceeding Monitor Supply settings in a 24 hour period The number of meters reporting exceeding Monitor Supply settings can be up to 10% of the meters receiving a supply contactor switch command in a 24 hour period File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 20 of 37

21 7.8 Supply Capacity Control For Emergency Supply Capacity Control The requested Emergency Supply Capacity Limiting Command shall be performed by 90% of meters within 30 minutes For Emergency Supply Capacity Control. For commands to any primary or secondary group of meters the performance level required is: Action performed at 90% of meters within 10 minutes; and For Emergency Supply Capacity Control The requested Emergency Supply Capacity Limiting Command shall be acknowledged by 99% of meters within 3 minutes Up to two Emergency Supply Capacity Limiting Commands can be sent in any 24 hour period to groups consisting of up to 100% of the operational SMI meter population The requested Emergency Supply Capacity Limit Command shall be acknowledged by 90% of meters within 10 minutes The number of Emergency Supply Capacity Limiting commands sent to individual meters in any 10 minute period can be up to 0.2% of the number of operational SMI meters in a distribution The number of Emergency Supply Capacity Limiting Commands in 10% of the number operational SMI meters in a distribution within 1 hour. For commands sent to individual meters, the performance level required is: Action performed at 90% of meters within 30 minutes; within 1 hour; and Action performed at 99.9% of meters within 6 hours. The total number of load control commands to individual meters in 2% of the installed, operational AMI meter population. Up to two Emergency Supply Capacity Limiting Commands can be sent in any 24 hour period to groups consisting of up to 100% of the operational SMI meter population The requested Emergency Supply Capacity Limit Command shall be acknowledged by 99% of meters within 1 minute The number of Emergency Supply Capacity Limiting commands to individual meters in any 1 minute period can be up to 0.02% of the number of operational SMI meters in a The total number of Emergency Supply Capacity Limiting Commands in any 24 hour period can be up to t10% of the number File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 21 of 37

22 7.9 Home Area Network using Open Standard For transmission to all meters the HAN instruction received by 90% of meters in 30 minutes The AMI system shall support up to 6 HAN instructions per day being sent to the ESP. Up to 24 groups of meters may receive a HAN interface instruction in any 24 hour period Up to six HAN instructions can be sent in any 24 hour period groups consisting of up to 80% of the operational SMI meter population The HAN interface instruction will be successfully acknowledged by 90% of meters within 10 minutes The performance level required for HAN instructions is: HAN instruction received by 98% of ESPs in 3 hours; HAN instruction received by 99.9% of ESPs in 12 hours Each group may contain all A HAN interface instruction shall be acknowledged by: 95% of the requested meters within 2 minutes of sending the instruction The number HAN interface instructions sent to individual meters in any 10 minute period can be up to 1.67% of the number of The number of HAN interface instructions in any 24 hour period can be up to 2.4 times the number of 99% of the requested meters within 5 minutes of sending the instruction The total number of meters receiving HAN interface instructions in any 1 minute period can be up to 0.167% of the installed, operational SMI meter population in a distribution network area The HAN interface instruction will be successfully acknowledged by 99% of meters within 1 minute The total number of HAN interface instructions in any 24 hour period can be up to 2.4 times the number of File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 22 of 37

23 7.11 Meter Loss of Supply Detection Meter loss of supply shall be reported by the SMMS for 0.5% of the meters within 5 minutes of the meter s detecting meter loss of supply. Power Restoration shall be reported by the SMMS for 90% of the meters within 60 minutes of the meter detecting power restoration. The SMI shall be designed to allow for 10% of the SMI meter population experiencing meter loss of supply and power restoration in a 24 hour period. 3.7 Meter Loss of Supply detection and outage detection (a) All AMI systems shall include a means of detecting loss of supply to meters including those at individual customer s premises. (b) When a meter loss of supply or outage is detected it is to be alarmed to the NMS as soon as possible. Alarms to be received within one hour for 90% of meters. Meter loss of supply shall be reported by the SMMS within 1 minute for 90% of the meters detecting meter loss of supply. Power Restoration shall be reported by the SMMS within 1 minute for 90% of the meters affected by meter loss of supply Remote Meter Service Checking Remote Meter Service Checking shall obtain service data from 90% meters within 10 minutes; The number of Remote Service check requests sent to individual meters in any 10 minute period can be up to 2% of the number of The number of Remote Meter Service Check commands in any 24 hour period can be up to two times the number of operational SMI meters in a distribution Function was not included in the Victorian Remote Meter Service Checking shall obtain service data from 95% meters within 1 minute The number of Remote Service check requests sent to individual meters in any 1 minute period up to 0.1% of the number of operational SMI meters in a distribution The number of Remote Service Check Commands to individual meters in any 24 hour period can be up to two times the number of File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 23 of 37

24 7.13 Meter Settings Reconfiguration Requested configuration or reconfiguration of a meter setting at an individual meter shall be acknowledged from 90% of meters within 30 minutes; The number of commands sent to alter meter settings at individual meters in any 30 minute period can be up to 0.125% of the number of The number of commands to alter settings at individual meters in any 24 hour period can be up to 2% of the number of. The performance level required for individual meters is: Action performed at 90% of meters within 30 minutes; within 1 hour; and Action performed at 99.9% of meters within 6 hours. The total number of commands to alter settings at individual meters in 2% of the installed, operational AMI meter population Meter groups Up to 15 groups of meters may receive group settings reconfiguration commands in any 24 hour period Each group may contain up to 20% of the installed operational SMI meter population in a distribution Groups setting reconfiguration shall be acknowledged for 95% of meters requested within 2 minutes of commencing the reconfiguration 99% of meters requested acknowledged within 10 minutes Requested configuration or reconfiguration of a meter setting at an individual meter shall be acknowledged from 95% of meters requested within 5 minutes The total number of commands to alter settings at individual meters in any 5 minute period can be up to 0.01% of the installed, operational SMI meter population in a The total number of commands to alter settings at individual meters in 1% of the installed, operational SMI meter population in a. File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 24 of 37

25 7.14 Software Upgrades 7.15 Plug and Play Device Commissionin g 7.17 Tamper Detection For transmission to all meters a software upgrade will be received by 90% of meters within 14 days Only one software upgrade can be sent in any 14 day period to a group of meters consisting of up to 50% of the operational SMI meter population Meter installation shall be reported by the SMMS for 90% of meters within 2 hours of power restoration; The SMI shall be designed to allow 0.01% of the anticipated SMI meter population in a distribution to be installed in any 24 hour period Tamper Detection shall be reported by the SMMS for 90% of meters within an hour The SMI shall be designed to allow for 0.5% of meters reporting tamper in a 24 hour period. level not specified A software upgrade will be successfully completed by 99.9% of meters within 7 days. One software upgrade can be undertaken in any 7 day period Software upgrade acknowledged received from 99.9% of meters within 2 days The total number of software upgrades in any two day period can be up to 2% of the number of level not Specified Meter installation shall be reported for 90% of meters within 30 minutes of power restoration; It should be assumed that in any 24 hour period 0.01% of the anticipated SMI meter population in a will be installed level not Specified Tamper Detection shall be reported by the SMMS for 90% of meters within 1 minute The SMI shall be designed to allow for 0.5% of meters reporting tamper in a 24 hour period 7.21 Customer Supply Monitoring Customer Supply Monitoring events shall be reported by the SMMS for 90% of meters within 10 minutes Function was not included in the Victorian Customer Supply Monitoring events shall be reported by the SMMS for 90% of meters within 1 minute The SMI shall be designed to allow for 0.5% of meters reporting Customer Supply Monitoring events in a 24 hour period. The SMI shall be designed to allow for 0.5% of meters reporting Customer Supply Monitoring events in a 24 hour period. File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 25 of 37

26 Table 7: Remote on Grid Infrastructure Levels 7.2 Remote Acquisition (daily) Daily Acquisition All data from 90% of meters in 3 hours All will be involved in Remote Acquisition in any 24 hour period Special Read Data successfully received from 90% of meters within 60 minutes The number of Special Reads of individual meters in any 60 minute period can be up to 0.25% of the number of operational SMI meters in a The number of Special Reads in 2% of the number of operational SMI meters in a distribution The applicable amount of data shall be the acquisition of one day of a single channel of interval energy data and the accumulated energy data Daily Acquisition All data from 99% of meters within 4 hours after midnight; and All data from 99.9% of meters within 24 hours after midnight. Individual Read Action performed at 90% of meters within 30 minutes; within 1 hour; and Action performed at 99.9% of meters within 6 hours. The total number of individual meters read in any 24 hour period can be up to 2% of the installed, operational AMI meter population. Daily Acquisition All data from 99% of meters within 4 hours after midnight; and All data from 99.9% of meters within 24 hours after midnight. Special Read Data successfully received from 95% of meters in 2 minutes; 99% of meters within 5 mins; and 99.9% of meters within 4 hours. The number of Special Reads of individual meters in any 2 minute period can be up to 0.002% of the number of operational SMI meters in a. The number of Special Reads in 0.5% of the number of operational SMI meters in a distribution The applicable amount of data shall be the acquisition of seven days of a single channel of interval energy data and accumulated energy data File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 26 of 37

27 7.6 Load Management through a Controlled Load Contactor or relay For Priority Override Commands Requested Load control action performed at 90% of meters within 30 minutes Up to four Priority Override commands can be sent in any 24 hour period to groups consisting of up to 50% of the operational SMI meter population The requested Priority Override command shall be acknowledged by 90% of meters within 10 minutes The number of Priority Override commands sent to individual meters in any 10 minute period can be up to 1% of the number of The number of Priority Override commands in any 24 hour period can be up to half the number of For commands to any primary, secondary or tertiary group of meters the performance level required is: within 1 minute 5. For commands sent to individual meters, the performance level required is: Action performed at 90% of meters within 30 minutes; within 1 hour; and Action performed at 99.9% of meters within 6 hours. The total number of load control commands to individual meters in 2% of the installed, operational AMI meter population For Priority Override Commands Requested Load control action acknowledged by 95% of meters within 1 minute 99% of meters within 5 minutes Up to 12 Priority Override commands can be sent in any 24 hour period to groups consisting of up to 25% of the operational SMI meter population For commands sent to individual meters the requested Priority Override command shall be acknowledged by 99% of meters within 1 minute The number of Priority Override commands sent to individual meters in any 1 minute period can be up to 0.42% of the number of The number of Priority Override commands in any 24 hour period can be up to 2 times the number of 5 It is noted that this requirement is considered by DBs in Victoria to be unreasonably demanding and they have requested a relaxation of this requirement to 90% in 10 minutes. File Name: NSMP_SMI_VendorsRFI_V1.0.doc Page 27 of 37

NSMP Business Requirements Work Stream Smart Metering Infrastructure Minimum Functionality Specification

NSMP Business Requirements Work Stream Smart Metering Infrastructure Minimum Functionality Specification National Smart Metering Program NSMP Business Requirements Work Stream Smart Metering Infrastructure Minimum Functionality Specification Version number: Version 0.24 Status: Author: Draft Business Requirements

More information

NSMP Pilots and Trials Work Stream Smart Metering Infrastructure Functionality Specification Validation Test Plan

NSMP Pilots and Trials Work Stream Smart Metering Infrastructure Functionality Specification Validation Test Plan National Smart Metering Program NSMP Pilots and Trials Work Stream Smart Metering Infrastructure Functionality Specification Validation Test Plan Version number: Status: Author: Date published: File name:

More information

Pilots and Trials Work Stream

Pilots and Trials Work Stream National Smart Metering Program Pilots and Trials Work Stream Pilots and Trials Retail Impact Reporting Framework Version number: Version 1.0 Status: Author Final Dianne Shields Date published 16 December

More information

Report for the Ministerial Council on Energy Smart Meter Working Group

Report for the Ministerial Council on Energy Smart Meter Working Group 17 September 2007 Cost Benefit Analysis of Smart Metering and Direct Load Control: Phase 1 Overview Report Report for the Ministerial Council on Energy Smart Meter Working Group Project Team Adrian Kemp

More information

NSMP Business Requirements Work Stream Interval Energy Data Channels

NSMP Business Requirements Work Stream Interval Energy Data Channels National Smart Metering Program NSMP Business Requirements Work Stream Version number: Version 1.0 Status: Author: Final Dr Martin Gill Date published: 6 th February 2011 File name: NSMP v1.0.doc Table

More information

MCE Decision paper. 13 December A National Minimum Functionality for Smart Meters

MCE Decision paper. 13 December A National Minimum Functionality for Smart Meters MCE Decision paper 13 December 2007 A National Minimum Functionality for Smart Meters In April 2007 COAG committed to a national mandated roll-out of electricity smart meters to areas where benefits outweigh

More information

Smart Metering Infrastructure (SMI)

Smart Metering Infrastructure (SMI) Smart Metering Infrastructure (SMI) Cover Page Customer Service Functions Please note: The following methodology has been utilised to analyse the customer service functions nominated below: Function #7.6:

More information

METERING COMPETITION EMBEDDED NETWORKS METER REPLACEMENT PROCESSES PROCEDURE CONSULTATION PARTICIPANT RESPONSE PACK. Participant: United Energy

METERING COMPETITION EMBEDDED NETWORKS METER REPLACEMENT PROCESSES PROCEDURE CONSULTATION PARTICIPANT RESPONSE PACK. Participant: United Energy UNITED ENERGY METERING COMPETITION EMBEDDED NETWORKS METER REPLACEMENT PROCESSES PROCEDURE CONSULTATION PARTICIPANT RESPONSE PACK Participant: United Energy Completion Date: 31 May 2016 3. Metrology Procedure:

More information

Cost Benefit Analysis of Smart Metering and Direct Load Control. Overview Report for Consultation

Cost Benefit Analysis of Smart Metering and Direct Load Control. Overview Report for Consultation 29 February 2008 Cost Benefit Analysis of Smart Metering and Direct Load Control Overview Report for Consultation Report for the Ministerial Council on Energy Smart Meter Working Group Project Team Adrian

More information

COST ALLOCATION POLICY FOR VICTORIAN TERMINAL STATIONS NEGOTIATED TRANSMISSION SERVICES

COST ALLOCATION POLICY FOR VICTORIAN TERMINAL STATIONS NEGOTIATED TRANSMISSION SERVICES COST ALLOCATION POLICY FOR VICTORIAN TERMINAL STATIONS NEGOTIATED PREPARED BY: Network Development VERSION: 2.0 RELEASE DATE: 30 May 2012 Version Release History Version Date By Changes 1.0 6 Oct 11 Transmission

More information

Advanced Metering Infrastructure in Victoria

Advanced Metering Infrastructure in Victoria 30 May 2006 Advanced Metering Infrastructure in Victoria 1 Contents 1. Background 2. CRA/Impaq Cost-Benefit Study 3. Government Policy Decisions 4. Governance 5. Legislation 6. Functionality 7. Summary

More information

Business Process and Procedures Working Group. Education Forum

Business Process and Procedures Working Group. Education Forum National Smart Metering Program Business Process and Procedures Working Group Education Forum The multiple business processes that have been developed to define NSMP Requirements (Peter Egger Working Group

More information

AEMC 2008, Victorian Jurisdictional Derogation, Advanced Metering Infrastructure Roll Out, Rule Determination, 29 January 2009, Sydney

AEMC 2008, Victorian Jurisdictional Derogation, Advanced Metering Infrastructure Roll Out, Rule Determination, 29 January 2009, Sydney Inquiries The Australian Energy Market Commission PO Box A2449 Sydney South NSW 1235 E: aemc@aemc.gov.au T: (02) 8296 7800 F: (02) 8296 7899 Citation AEMC 2008, Victorian Jurisdictional Derogation, Advanced

More information

SERVICE LEVEL PROCEDURE

SERVICE LEVEL PROCEDURE SERVICE LEVEL PROCEDURE METERING PROVIDER SERVICES PREPARED BY: AEMO MARKETS VERSION: 1.3 EFFECTIVE DATE: 01 DECEMBER 2017 STATUS: FINAL Approved for distribution and use by: APPROVED BY: PETER GEERS TITLE:

More information

PRYSM ADVANCED METERING INFRASTRUCTURE. Intelligent Digital Solutions for a Smarter India

PRYSM ADVANCED METERING INFRASTRUCTURE. Intelligent Digital Solutions for a Smarter India PRYSM ADVANCED METERING INFRASTRUCTURE Intelligent Digital Solutions for a Smarter India VELANKANI SMART GRID PRODUCTS DRIVING INNOVATIVE ENERGY EFFICIENT SOLUTIONS Smart metering essentially involves

More information

CER National Smart Metering Programme Steady State Model BGN Response to CER/13/151 Consultation

CER National Smart Metering Programme Steady State Model BGN Response to CER/13/151 Consultation CER National Smart Metering Programme Steady State Model BGN Response to CER/13/151 Consultation Table of Contents 1. Introduction... 3 2. BGN Responses to Consultation Questions:... 4 BGN Response to

More information

Itron Enterprise Edition Meter Data Management SMART METER / AMI ROADMAP

Itron Enterprise Edition Meter Data Management SMART METER / AMI ROADMAP Itron Enterprise Edition Meter Data Management SMART METER / AMI ROADMAP IEE AMI MDM Roadmap: 2007-2011 5.3 Q3 2007 6.0 Q2 2008 Q2 2009 8.0 2011 > AMI System Integration for Readings and Events > AMI Readings

More information

Knowledge Sharing. United Energy Demand Response Project Performance Report Milestone 1. Document No. G

Knowledge Sharing. United Energy Demand Response Project Performance Report Milestone 1. Document No. G United Energy Demand Response Project Performance Report Milestone 1 Document No. G00924 1 Knowledge Sharing This document is the United Energy Demand Response Project Performance Report for the ARENA

More information

SMART GRID SCENARIO. Marina Egea,

SMART GRID SCENARIO. Marina Egea, SMART GRID SCENARIO Marina Egea, What is Smart Grid is an electricity network that can integrate in a costefficient manner the behaviour and actions of all users connected to it - generators, consumers

More information

PREPAID WATER METERING SYSTEM

PREPAID WATER METERING SYSTEM PREPAID WATER METERING SYSTEM Walk in the desert, You will realize the cost of Water Utility Systems has developed the world s first commercially available prepaid water metering system that is approved

More information

Initial Enrolment Project Feasibility Draft Report Consultation Document

Initial Enrolment Project Feasibility Draft Report Consultation Document Initial Enrolment Project Feasibility Draft Report Consultation Document Date issued: 11/11/2016 Consultation closes: 20/01//2017 Classification: DCC Public Contents 1 Executive Summary... 4 2 Introduction...

More information

Costs and Benefits of Smart Metering in Off-Grid and Remote Areas

Costs and Benefits of Smart Metering in Off-Grid and Remote Areas 10 August 2010 Costs and Benefits of Smart Metering in A Final Report for the Ministerial Council on Energy s Smart Meter Working Group Project Team Adrian Kemp Brendan Quach Tom Graham NERA Economic Consulting

More information

1 Descriptions of Function

1 Descriptions of Function 1 Descriptions of Function Customer Communications Portal Management System Issues Issues confronting an Energy Company s Management Systems responsible for management of Telecommunications and Access

More information

ELECTRIC DISTRIBUTION UTILITIES. Investigation into Grid Modernization. Order on Scope and Process O R D E R N O. 25,877.

ELECTRIC DISTRIBUTION UTILITIES. Investigation into Grid Modernization. Order on Scope and Process O R D E R N O. 25,877. THE STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION IR 15-296 ELECTRIC DISTRIBUTION UTILITIES Investigation into Grid Modernization Order on Scope and Process O R D E R N O. 25,877 April 1, 2016 I.

More information

NRS049 ADVANCED METERING INFRASTRUCTURE (AMI) FOR RESIDENTAIL AND COMMERCIAL CUSTOMERS

NRS049 ADVANCED METERING INFRASTRUCTURE (AMI) FOR RESIDENTAIL AND COMMERCIAL CUSTOMERS NRS049 ADVANCED METERING INFRASTRUCTURE () FOR RESIDENTAIL AND COMMERCIAL CUSTOMERS Author and presenter: HPD Groenewald Pr. Eng. (E/E) Chief Engineer Measurements, Eskom, Industry Association Resource

More information

Draft Project Assessment Report. Dromana Supply Area. Project UE-DZA-S RIT-D Report

Draft Project Assessment Report. Dromana Supply Area. Project UE-DZA-S RIT-D Report Draft Project Assessment Report RIT-D Report This report presents the network limitations at Dromana zone substation and the distribution feeder network within the Dromana / Mornington supply areas, including

More information

UPDATING THE B2B FRAMEWORK

UPDATING THE B2B FRAMEWORK UPDATING THE B2B FRAMEWORK ENA submission to AEMC Draft Determination 19 May 2016 CONTENTS Executive Summary... 1 Recommendations... 1 Introduction... 3 Key Issues... 3 IEC... 3 Implementation... 4 Services

More information

Business Process and Procedures Workstream. Role Requirements Paper. SMI Network billing process. Version Number: Version 0.1. Status: Draft Author:

Business Process and Procedures Workstream. Role Requirements Paper. SMI Network billing process. Version Number: Version 0.1. Status: Draft Author: Business Process and Procedures Workstream Role Requirements Paper SMI Network billing process (BP13) Version Number: Version 0.1 Status: Draft Author: P Egger Date Published: 10 September 2010 File Name:

More information

Requirements Engineering for the Advance Metering Infrastructure and the Home Automation Network (AMI-HAN) Interface

Requirements Engineering for the Advance Metering Infrastructure and the Home Automation Network (AMI-HAN) Interface Requirements Engineering for the Advance Metering Infrastructure and the Home Automation Network (AMI-HAN) Interface Final Report Commission Contract No. 500-99-013 Commission Work Authorization No: 181-P-07

More information

Edison SmartConnect. The Role of IT in. John Bubb Southern California Edison Edison SmartConnect TM May 20, 2008

Edison SmartConnect. The Role of IT in. John Bubb Southern California Edison Edison SmartConnect TM May 20, 2008 Edison SmartConnect The Role of IT in Smart Grid Infrastructure John Bubb Southern California Edison Edison SmartConnect TM May 20, 2008 PG&E LADWP SCE SDG&E SCE Overview Serving over 13 million people

More information

CER National Smart Metering Programme Policy Implementation Roadmap

CER National Smart Metering Programme Policy Implementation Roadmap CER National Smart Metering Programme Policy Implementation Roadmap DOCUMENT TYPE: REFERENCE: Information Paper CER/15/055 DATE: 31 March 2015 The Commission for Energy Regulation, The Exchange, Belgard

More information

METERING GUIDE PART 1 METERING GENERAL

METERING GUIDE PART 1 METERING GENERAL 1 METERING GUIDE PART 1 METERING GENERAL 2 METERING GUIDE 1 INTRODUCTION 3 PURPOSE OF THIS GUIDE 3 METERING GENERAL 4 ELECTRICITY SUPPLY - INDUSTRY PLAYERS 4 1.1.2 Generators 4 1.1.3 Networks 4 1.1.4 Retailers

More information

AMI Use Case: D4 - Distribution Operator Locates Outage Using AMI Data and Restores Service January 05, 2009

AMI Use Case: D4 - Distribution Operator Locates Outage Using AMI Data and Restores Service January 05, 2009 AMI Use Case: D4 - Distribution Operator Locates Outage Using AMI Data and Restores Service January 05, 2009 Author: Edison SmartConnect Page 1 of 37 Document History Revision History Revision Number Revision

More information

RETAIL MARKET PROCEDURES (VICTORIA)

RETAIL MARKET PROCEDURES (VICTORIA) RETAIL MARKET PROCEDURES (VICTORIA) DOCUMENT NO: PROJECT-57-30 VERSION NO: 12.0 PROJECT-57-30 Retail Market Procedures (Victoria) Page i of 77 VERSION CONTROL VERSION NUMBER EFFECTIVE DATE PROCEDURES AFFECTED

More information

REVISED TARIFF STRUCTURE STATEMENT. ActewAGL Distribution Electricity Network

REVISED TARIFF STRUCTURE STATEMENT. ActewAGL Distribution Electricity Network REVISED TARIFF STRUCTURE STATEMENT ActewAGL Distribution Electricity Network 4 October 2016 Table of Contents 1 Introduction... 1 1.1 About ActewAGL Distribution... 1 1.2 Regulation... 3 1.3 Policy and

More information

POWER OF CHOICE IMPLEMENTATION PROGRAM MARKET TRIAL TEST PLAN (VERSION 1.2)

POWER OF CHOICE IMPLEMENTATION PROGRAM MARKET TRIAL TEST PLAN (VERSION 1.2) POWER OF CHOICE IMPLEMENTATION PROGRAM MARKET TRIAL TEST PLAN (VERSION 1.2) Published: July 2017 VERSION RELEASE HISTORY Version Date Summary of Changes 0.1 25/05/2017 First draft issued for discussion

More information

Western Power Metering Model SLA

Western Power Metering Model SLA Western Power Metering Model SLA Consultation on proposed Model SLA amendments 25 August 2017 An appropriate citation for this paper is: Western Power Metering Model SLA Western Power 363 Wellington Street

More information

Attachment G.7 SAPN_Reliability_Low reliability feeders 03 July, 2015

Attachment G.7 SAPN_Reliability_Low reliability feeders 03 July, 2015 Attachment G.7 SAPN_Reliability_Low reliability feeders 03 July, 2015 Rule requirement Table of Contents 1. Executive Summary... 3 2. Rule requirement... 5 3. Background... 6 3.1 Historical Performance...

More information

TARIFF STRUCTURE STATEMENT

TARIFF STRUCTURE STATEMENT TARIFF STRUCTURE STATEMENT Your power, your say 4 October 2016 TABLE OF CONTENTS LIST OF TABLES... 2 LIST OF FIGURES... 3 LIST OF ATTACHMENTS... 3 GLOSSARY... 4 ABOUT THIS... 5 1. EXECUTIVE SUMMARY...

More information

MAINTAINING RELIABLE ELECTRICITY SUPPLY TO PORT LINCOLN

MAINTAINING RELIABLE ELECTRICITY SUPPLY TO PORT LINCOLN MAINTAINING RELIABLE ELECTRICITY SUPPLY TO PORT LINCOLN APPLICATION NOTICE (ABN 41 094 482 416) December 2007 COPYRIGHT ElectraNet - All Rights Reserved This document is protected by copyright vested in

More information

Document Updated: 12/5/2018

Document Updated: 12/5/2018 Vice President Energy Delivery Document Updated: 12/5/2018 * Blue shading indicates a qualifying Transmission Function Employee Manager System Operations Manager Substation Supervisor System Control Supervisor

More information

INFORMATION TECHNOLOGY DEVELOPMENT FORUM (ITDF) TERMS OF REFERENCE

INFORMATION TECHNOLOGY DEVELOPMENT FORUM (ITDF) TERMS OF REFERENCE INFORMATION TECHNOLOGY DEVELOPMENT FORUM (ITDF) TERMS OF REFERENCE PREPARED BY: Market Development DOCUMENT NO: 290759 VERSION NO: 1 DRAFT Version Control VERSION DATE AUTHOR(S) CHANGES AND COMMENTS 0.1

More information

SINGLE INDUSTRY SPOKESPERSON PROTOCOL FOR ELECTRICITY IN VICTORIA

SINGLE INDUSTRY SPOKESPERSON PROTOCOL FOR ELECTRICITY IN VICTORIA SINGLE INDUSTRY SPOKESPERSON PROTOCOL FOR ELECTRICITY IN VICTORIA PREPARED BY: AEMO Public Affairs EFFECTIVE DATE: January 2019 STATUS: FINAL Approved for distribution and use by: APPROVED BY: TITLE: Stuart

More information

VALUE OF CUSTOMER RELIABILITY REVIEW FINAL REPORT

VALUE OF CUSTOMER RELIABILITY REVIEW FINAL REPORT VALUE OF CUSTOMER RELIABILITY REVIEW FINAL REPORT Published: September 2014 IMPORTANT NOTICE Purpose The purpose of this publication is to provide information about the outcomes of AEMO s 2013 14 Value

More information

Bridging the Gap between AMI and the Enterprise with MDM

Bridging the Gap between AMI and the Enterprise with MDM Bridging the Gap between AMI and the Enterprise with MDM Wendy Lohkamp Director, Product Marketing, Itron Kevin Walsh Industry Principal, SAP for Utilities Itron s History More than,00 customers in over

More information

Dalrymple Substation Upgrade

Dalrymple Substation Upgrade Dalrymple Substation Upgrade RIT-T: Project Assessment Conclusions Report Version 1 ElectraNet Corporate Headquarters 52-55 East Terrace, Adelaide, South Australia 5000 PO Box, 7096, Hutt Street Post Office,

More information

Victorian AMI Program Stephen Thomson, AMI Program Director Principal Consultant Marchment Hill Consulting

Victorian AMI Program Stephen Thomson, AMI Program Director Principal Consultant Marchment Hill Consulting Victorian AMI Program Stephen Thomson, AMI Program Director Principal Consultant Marchment Hill Consulting 21 January 2009 Victorian AMI Program Phases 2006 Jul 2007 May 2010 2013 Establishment Phase Involved

More information

Request For Information (RFI) For a. Spectrum Management & Monitoring System (SMMS)

Request For Information (RFI) For a. Spectrum Management & Monitoring System (SMMS) Request For Information (RFI) For a Spectrum Management & Monitoring System (SMMS) Table of Contents 1 Introduction... 3 1.1 About Iraq CMC... 3 1.2 The Iraq CMC Objectives... 3 1.3 RFI Process... 4 2

More information

GUIDANCE PAPER: CALCULATION METHODOLOGY FOR DISTRIBUTION LOSS FACTORS (DLFs) FOR THE VICTORIAN JURISDICTION

GUIDANCE PAPER: CALCULATION METHODOLOGY FOR DISTRIBUTION LOSS FACTORS (DLFs) FOR THE VICTORIAN JURISDICTION Level 2, 35 Spring St Melbourne 3000, Australia Telephone +61 3 9651 0222 +61 3 1300 664 969 Facsimile +61 3 9651 3688 GUIDANCE PAPER: FOR DISTRIBUTION LOSS FACTORS (DLFs) FOR THE N JURISDICTION 14 FEBRUARY

More information

ATTACHMENT A: BACKGROUND AND SCOPE OF WORK. Background

ATTACHMENT A: BACKGROUND AND SCOPE OF WORK. Background TECHNICAL SCOPE OF WORK (TechSc Endorsed; Final Draft, 2/22/18) ATTACHMENT A: BACKGROUND AND SCOPE OF WORK Background The District of Columbia Water and Sewer Authority (DC Water), Department of Engineering

More information

Advanced Metering Infrastructure for Seattle City Light

Advanced Metering Infrastructure for Seattle City Light Advanced Metering Infrastructure for Seattle City Light May 10, 2007 Linda Lockwood Seattle City Light 7 th Largest US Municipal Utility Customers kw Hours Residential 336,363 2,954,848 Non-Residential

More information

Chapter 5 Embedded Generation Information Pack

Chapter 5 Embedded Generation Information Pack Chapter 5 Embedded Generation Information Pack 27.04.18 27.04.18 1 Table of Contents 1. Connection Framework... 3 2. Negotiated Standards Chapter 5... 5 3. Connection Process... 6 4. Key Documents... 7

More information

Santa Clara 2008 PG&E. Associate Project Manager Energy Information Network

Santa Clara 2008 PG&E. Associate Project Manager Energy Information Network PG&E SmartMeter Program Overview Megan O Brien Associate Project Manager Energy Information Network The PG&E SmartMeter Program Automated meter reading for all customers 10 Million meter upgrades A network

More information

Uptime Maintenance and Support Services - Appendix. Dimension Data Australia Pty Limited. Uptime Support Services Agreement

Uptime Maintenance and Support Services - Appendix. Dimension Data Australia Pty Limited. Uptime Support Services Agreement Uptime Support Services Agreement Uptime Maintenance and Support Services - Appendix Dimension Data Australia Pty Limited 27 May 2013 Version 1-01 Appendix A. 1. Definitions and Interpretations 1.1 For

More information

AMI and the Customer: Priorities for Pepco Holdings Smart Metering Program

AMI and the Customer: Priorities for Pepco Holdings Smart Metering Program AMI and the Customer: Priorities for Pepco Holdings Smart Metering Program Michael Poncia Process Manager, CRM Smart Metering East Coast Conference Washington D.C., November 8, 2007 1 Business Overview

More information

Validation Planning SOP

Validation Planning SOP 1.0 Commercial in Confidence 03-Aug-2006 1 of 10 Validation Planning SOP Document No: SOP_0300 Prepared by: David Brown Date: 03-Aug-2006 Version: 1.0 1.0 Commercial in Confidence 03-Aug-2006 2 of 10 Document

More information

Meter Data Management Systems. Position. Vice President, Product Management. November 29 December 1, 2010 Santo Domingo Dominican Republic

Meter Data Management Systems. Position. Vice President, Product Management. November 29 December 1, 2010 Santo Domingo Dominican Republic Meter Data Management Systems Speakers Andy Zetlan name Position Company Aclara Country USA Vice President, Product Management November 29 December 1, 2010 Santo Domingo Dominican Republic Welcome Thank

More information

Zero Emission Neighbourhoods Encouraging Sustainable Communities

Zero Emission Neighbourhoods Encouraging Sustainable Communities Laing, W, Zero Emission Neighbourhoods-Encouraging Sustainable Communities 1 Zero Emission Neighbourhoods Encouraging Sustainable Communities Laing, W, Zero Emission Neighbourhoods-Encouraging Sustainable

More information

Year One Business Case. Information and Communications Technology (ICT)

Year One Business Case. Information and Communications Technology (ICT) Year One Business Case Information and Communications Technology (ICT) ICT Year One Business Case Projects 1E and 1F October 2016 Project 1E - Review IT qualifications that may not be fit for purpose &

More information

Jemena Electricity Networks (Vic) Ltd Tariff Structure Statement

Jemena Electricity Networks (Vic) Ltd Tariff Structure Statement Jemena Electricity Networks (Vic) Ltd Tariff Structure Statement Public 29 April 2016 TABLE OF CONTENTS TABLE OF CONTENTS Glossary... v 1. Introduction... 1 2. Making sense of our network tariffs... 5

More information

Value of Customer Reliability Review Update

Value of Customer Reliability Review Update Value of Customer Reliability Review Update The Australian Energy Market Operator (AEMO) was established in 2009 by the Ministerial Council for Energy (MCE), now the Standing Council for Energy and Resources

More information

EDISON SMARTCONNECT DEPLOYMENT FUNDING AND COST RECOVERY

EDISON SMARTCONNECT DEPLOYMENT FUNDING AND COST RECOVERY Application No.: 0-0- Exhibit No.: SCE- Witnesses: L. Cagnolatti P. Campbell P. De Martini J. Gregory E. Helm C. Hu S. Kiner L. Oliva (U -E) EDISON SMARTCONNECT DEPLOYMENT FUNDING AND COST RECOVERY Volume

More information

APPROVED GRID CODE EXEMPTIONS APRIL 2004

APPROVED GRID CODE EXEMPTIONS APRIL 2004 APPROVED GRID CODE EXEMPTIONS APRIL 2004 NETWORK CODE: (ESKOM GENERATION EXEMPTIONS) Requirement Comments Stations Requesting Exemptions 3.1.1 Pole Slipping Facility Facility not available. No value to

More information

Issues Paper on Review of the regulatory frameworks for stand-alone power systems. Energy Networks Australia response

Issues Paper on Review of the regulatory frameworks for stand-alone power systems. Energy Networks Australia response Issues Paper on Review of the regulatory frameworks for stand-alone power systems Energy Networks Australia response 9 October 2018 Contents 1 Executive summary 3 2 Scope of distributor-led SAPS 4 3 Pre-conditions

More information

What utilities must consider in implementing STS smart metering systems. Lawrence Juku PIESA - VICTORIA FALLS SEPTEMBER 2015

What utilities must consider in implementing STS smart metering systems. Lawrence Juku PIESA - VICTORIA FALLS SEPTEMBER 2015 What utilities must consider in implementing STS smart metering systems Lawrence Juku PIESA - VICTORIA FALLS SEPTEMBER 2015 The famous Africa at night picture This image represents different things to

More information

SUMMARY Table 1 presents the proposed 2010 Smart Grid costs for Operations and Information Technology. Operations Projects 3,

SUMMARY Table 1 presents the proposed 2010 Smart Grid costs for Operations and Information Technology. Operations Projects 3, EB-00-0 Exhibit G Tab Schedule Page of SMART GRID PLAN SUMMARY Table presents the proposed 00 Smart Grid costs for Operations and Information Technology. Table : 00 Smart Grid Projects Smart Grid Projects

More information

METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7

METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7 METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7 PREPARED BY: DOCUMENT NO: Market Development MT_MA80 VERSION NO: 5.30 EFFECTIVE DATE:

More information

Applications. Roadway Lighting. Pedestrian Lighting. Public Transportation Lighting FIREFLY

Applications. Roadway Lighting. Pedestrian Lighting. Public Transportation Lighting FIREFLY LED offers an exciting new option for lighting in public spaces, but deploying LED without considering adaptive control strategies may be wasting much of the technology's potential. Traditional fixed intensity

More information

ATTACHMENT 2 APPROVED GRID CODE EXEMPTIONS MAY 2005

ATTACHMENT 2 APPROVED GRID CODE EXEMPTIONS MAY 2005 ATTACHMENT 2 NERRegistry_18500 Page 1 of 14 APPROVED GRID CODE EXEMPTIONS MAY 2005 Page 2 of 14 NETWORK CODE: (ESKOM GENERATION EXEMPTIONS) Requirement Comments Stations Requesting Exemptions Exemption

More information

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) IN029/16 VIC, QLD, SA and NSW/ACT

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) IN029/16 VIC, QLD, SA and NSW/ACT IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) Issue Number Impacted Jurisdiction (s) IN029/16 VIC, QLD, SA and NSW/ACT Proponent Danny McGowan Company AEMO Affected

More information

Smart Distribution Applications and Technologies - Program 124

Smart Distribution Applications and Technologies - Program 124 Smart Distribution Applications and Technologies - Program 124 Program Description Program Overview New technologies will be critical to future smart grid operation. These technologies will include advanced

More information

Metrics for Addressing Smart Grid Issues, Including the Importance and Necessity of Protocols

Metrics for Addressing Smart Grid Issues, Including the Importance and Necessity of Protocols Metrics for Addressing Smart Grid Issues, Including the Importance and Necessity of Protocols Presentation to the U.S. Department of Energy by the IEEE Joint Task Force on QER U.S. DOE Requested Insights

More information

DLMS INSIGHTS GAINED BY TENAGA NASIONAL BERHAD IN AMI PROJECT ROLLOUTS

DLMS INSIGHTS GAINED BY TENAGA NASIONAL BERHAD IN AMI PROJECT ROLLOUTS DLMS INSIGHTS GAINED BY TENAGA NASIONAL BERHAD IN AMI PROJECT ROLLOUTS Sharmala Satiaseelan, Tenaga Nasional Berhad, +601 9331 8182, sharmalasa@tnb.com.my Balagopalan Mathoor, Kalkitech, +91 94975 94390,

More information

Identification of. 2 (25) - SOFTWARE ARCHITECTURE ATAM: Method for Architecture Evaluation - Sven Arne Andreasson - Computer Science and Engineering

Identification of. 2 (25) - SOFTWARE ARCHITECTURE ATAM: Method for Architecture Evaluation - Sven Arne Andreasson - Computer Science and Engineering ATAM: Method for Architecture Evaluation ATAM Focuses on quality attribute requirements. Critical to have precise characterizations for each quality attribute. Attribute-Based Architectural Styles The

More information

PROPOSAL EVALUATION: BWL ADVANCED DISTRIBUTION MANAGEMENT SYSTEM (ADMS)

PROPOSAL EVALUATION: BWL ADVANCED DISTRIBUTION MANAGEMENT SYSTEM (ADMS) November 28, 2016 PROPOSAL EVALUATION: BWL ADVANCED DISTRIBUTION MANAGEMENT SYSTEM (ADMS) The BWL has completed the evaluation for BWL Advanced Distribution Management System (ADMS) and the work has been

More information

A managed approach to the successful deployment of a cost effective residential and small commercial AMI, Demand Response, and Automatic Load Control

A managed approach to the successful deployment of a cost effective residential and small commercial AMI, Demand Response, and Automatic Load Control A managed approach to the successful deployment of a cost effective residential and small commercial AMI, Demand Response, and Automatic Load Control Prepared for Southern California Edison January 28,

More information

ICTSUS4183A Install and test renewable energy system for ICT networks

ICTSUS4183A Install and test renewable energy system for ICT networks ICTSUS4183A Install and test renewable energy system for ICT networks ICTSUS4183A Unit descriptor Employability skills Prerequisite units Install and test renewable energy system for ICT networks This

More information

EUROCONTROL Guidance Material for Approach Path Monitor Appendix B-2: Generic Safety Plan for APM Implementation

EUROCONTROL Guidance Material for Approach Path Monitor Appendix B-2: Generic Safety Plan for APM Implementation EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL EUROCONTROL Guidance Material for Approach Path Monitor Appendix B-2: Generic Safety Plan for APM Implementation Edition Number : 1.0

More information

Total Transmission Cost Estimate for the Maximum Reserve Capacity Price for 2018/19

Total Transmission Cost Estimate for the Maximum Reserve Capacity Price for 2018/19 Total Transmission Cost Estimate for the Maximum Reserve Capacity Price for 2018/19 Date: 19 October 2015 Prepared by: Regulation and Investment Management DM 12392512 Contents Introduction... 2 1.1 Revised

More information

Energy Industry Challenges

Energy Industry Challenges Energy Industry Challenges Global economic crisis; severe hurdles to capital-raising Extreme energy price volatility and uncertainty Backlash from energy consumers Urgent need to achieve energy independence

More information

Smart Meter Payment (Pay as You Go) Options

Smart Meter Payment (Pay as You Go) Options Smart Meter Payment (Pay as You Go) Options Purchase from a Vendor Online Purchase Via Home Display Via Phone Via Cash Machine Via 3 rd Parties No requirement for all Suppliers to offer all options each

More information

POWER OF CHOICE IMPLEMENTATION PROGRAM MARKET READINESS STRATEGY (VERSION 2.0)

POWER OF CHOICE IMPLEMENTATION PROGRAM MARKET READINESS STRATEGY (VERSION 2.0) POWER OF CHOICE IMPLEMENTATION PROGRAM MARKET READINESS STRATEGY (VERSION 2.0) Published: October 2017 VERSION RELEASE HISTORY Version Date Summary of Changes 0.1 15/06/2016 First draft issued for discussion

More information

US presence High quality software development Expertise in various technologies and methodologies Close cooperation of your company and TECOM staff

US presence High quality software development Expertise in various technologies and methodologies Close cooperation of your company and TECOM staff TECOM LLC 2a, Sechenov Str,. Nizhny Novgorod 603024, Russia Tel: +7-8312-32-66-87(8) E-mail : office@tecomgroup.ru WEB: www.tecomgroup.ru The main areas of activity of LLC TECOM include soft- and hardware

More information

Smart Metering Implementation Programme

Smart Metering Implementation Programme Smart Metering Implementation Programme Consultation on Smart Metering Rollout Strategy DCC response 19 th May 2015 DCC PUBLIC Page 1 of 14 1 Executive Summary 1.1 Introduction and background 1. DCC provides

More information

SCHEDULE 2F-2 VOICE COMMUNICATIONS SERVICES (FUTURE STATE SERVICES) for. Date TBD

SCHEDULE 2F-2 VOICE COMMUNICATIONS SERVICES (FUTURE STATE SERVICES) for. Date TBD SCHEDULE 2F-2 VOICE COMMUNICATIONS SERVICES (FUTURE STATE SERVICES) for COUNTY OF ORANGE, CA Date TBD Table of Contents 1.0 Voice Communications Services Overview and Objectives... 1 1.1 Voice Communications

More information

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment Concept of Operations prepared for Minnesota Department of (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment December 22, 2014 Table of Contents 1. Introduction and Concept Overview...1

More information

ABC AND AGC INTERFACE REQUIREMENTS TECHNICAL SPECIFICATION

ABC AND AGC INTERFACE REQUIREMENTS TECHNICAL SPECIFICATION ABC AND AGC INTERFACE REQUIREMENTS TECHNICAL SPECIFICATION Published: September 2018 IMPORTANT NOTICE Purpose AEMO has prepared this document to provide information about the requirements for interfacing

More information

Staffing Management Plan Template

Staffing Management Plan Template Staffing Management Plan Template Project Name: U.S. Department of Housing and Urban Development October, 2010 Staffing Management Plan Template (V1.0) VERSION HISTORY [Provide information on how the development

More information

Power of Choice Reforms

Power of Choice Reforms Power of Choice Reforms Energex Limited October 2017 Contents 1 Gentle introduction to PoC speak 2 Brief refresher on PoC reforms 2.1 PoC reforms and their meaning 2.2 What additional changes will electrical

More information

Utility Systems product overview

Utility Systems product overview Utility Systems product overview Utility Systems WMD, Bulk WMD, Aquadata and ancillary products form the basis of a configurable smart water metering system and prepayment water metering system. The components

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION : : INITIAL COMMENTS OF CONSTELLATION NEWENERGY, INC.

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION : : INITIAL COMMENTS OF CONSTELLATION NEWENERGY, INC. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION Smart Meter Procurement and Installation Plans : : Docket No. M-2009-2092655 INITIAL COMMENTS OF CONSTELLATION NEWENERGY, INC. In response to the Pennsylvania

More information

Metrology Procedure for Metering Installations on the Western Power Network

Metrology Procedure for Metering Installations on the Western Power Network Date: May 2015 Document Information Document prepared by: Western Power ABN 18540492861 363 Wellington Street Perth WA 6000 2015 Electricity Networks Corporation t/a Western Power Any use of this material

More information

Demand based network tariffs offering a new choice

Demand based network tariffs offering a new choice Version 1.1 30 September 2015 Demand based network tariffs offering a new choice Consultation paper September 2015 Table of Contents 1 Overview... 5 2 Background... 7 3 Purpose... 8 4 Network tariff strategy...

More information

ENTERPRISE VALET - PRODUCT SPECIFICATION

ENTERPRISE VALET - PRODUCT SPECIFICATION ENTERPRISE VALET - PRODUCT SPECIFICATION 1. INTRODUCTION This document contains information on the Enterprise Valet service. If you require more detailed technical information, please contact your Account

More information

Review of National Framework for Electricity Distribution Network Planning and Expansion

Review of National Framework for Electricity Distribution Network Planning and Expansion FINAL REPORT Review of National Framework for Electricity Distribution Network Planning and Expansion Commissioners Tamblyn Ryan Woodward 23 September 2009 Inquiries The Australian Energy Market Commission

More information

GOVERNANCE OF THE COMPLIANCE PROCESS Paper by National Grid

GOVERNANCE OF THE COMPLIANCE PROCESS Paper by National Grid Introduction GOVERNANCE OF THE COMPLIANCE PROCESS Paper by National Grid 1. At the 17 May 2007 GCRP meeting in context of a presentation of the life time compliance process, concerns were expressed about

More information

P302 Improving the Change of Supplier Meter read process for smart Meters

P302 Improving the Change of Supplier Meter read process for smart Meters Stage 01: What stage is this document in the process? Improving the Change of Supplier Meter read process for smart Meters This Modification proposal proposes changes to the Code and BSCPs to amend the

More information

WEM Demand Forecasting Methodology. October Issues Paper

WEM Demand Forecasting Methodology. October Issues Paper WEM Demand Forecasting Methodology October 2018 Issues Paper Important notice PURPOSE The purpose of this publication is to consult on the proposed scenarios, data sources and methodologies for forecasting

More information

Enabling Integration of Distributed Renewables - Program 174

Enabling Integration of Distributed Renewables - Program 174 Enabling Integration of Distributed Renewables - Program 174 Program Description Program Overview The integration of distributed renewable generation sources into the electricity grid poses a number of

More information

MARKET PROCESS DESIGN. MPD Data Aggregation