Roadway Worker Protection (RWP) 49 CFR Part 214 Subpart C and Railroad Communications

Size: px
Start display at page:

Download "Roadway Worker Protection (RWP) 49 CFR Part 214 Subpart C and Railroad Communications"

Transcription

1 Federal Railroad Administration Roadway Worker Protection (RWP) 49 CFR Part 214 Subpart C and Railroad Communications RWP 2010 Federal Railroad Administration 1

2 Presentation Notes This presentation is intended to provide guidance in broad terms. It is not intended to serve as a complete explanation of the regulations or as a substitute for application of the regulations to specific facts. Each section shown in this presentation are brief summaries of the regulation text. User must consult the complete regulation documentation when necessary. This presentation does not provide any information about specific procedures on any railroad nor may it be used to qualify any person. Roadway workers are required to be trained and/or qualified on the specific rules and procedures of each railroad that they are to perform work as defined by this regulation. RWP 2010 Federal Railroad Administration 2

3 Fouling a Track FOULING A TRACK - the placement of an individual or an item of equipment in such proximity to a track that the individual or equipment could be struck by a moving train or on-track equipment, or in any case is within four feet of the field side of the near running rail. RWP 2010 Federal Railroad Administration 3

4 On-Track Safety On-Track Safety - a state of freedom from the danger of being struck by a moving train or other railroad equipment, provided by operating and safety rules that govern track occupancy by personnel, trains and ontrack equipment. RWP 2010 Federal Railroad Administration 4

5 On-Track Safety Hierarchy Track Type Hierarchy Type OTS Non-Controlled Inaccessible Track (327) Controlled Foul Time (323) Flagmen (321 a 2) Exclusive Track Occupancy (321) Authority (321 a 1) Train Coordination (325) Local Signal Control (321 a 3)l Stop Movements (Working Limits) Non-Controlled or Controlled Train Approach Warning (329) Individual Train Detection (337) Depart on Approach RWP 2010 Federal Railroad Administration 5

6 Railroad On-Track Safety Programs Generally (a) Each railroad shall adopt and implement a program to provide protection to roadway workers. (b) Each railroad s program shall include monitoring procedures. RWP 2010 Federal Railroad Administration 6

7 On-Track Safety Program Documents Rules and procedures shall be maintained together in one manual and be readily available to all roadway workers. Each roadway worker in charge and lone worker shall be provided and maintain a copy of the program. RWP 2010 Federal Railroad Administration 7

8 Employer EMPLOYER - a railroad, or a contractor to a railroad, that directly engages or compensates individuals to perform any of the duties defined in this part. RWP 2010 Federal Railroad Administration 8

9 Responsibility of Employers (a) Responsible for understanding and compliance by its employees. (b) Shall guarantee that each employee has the right to challenge safety procedures and remain clear of the track(s) until challenge is resolved. (c) Shall have a written procedure to achieve a resolution to challenges. RWP 2010 Federal Railroad Administration 9

10 Employee EMPLOYEE - means an individual who is engaged or compensated by a railroad or a contractor to a railroad to perform any of the duties defined in this part. RWP 2010 Federal Railroad Administration 10

11 Roadway Worker ROADWAY WORKER - any Employee of a railroad, or of a contractor to a railroad, whose duties include inspection, construction, maintenance or repair of railroad track, bridges, roadway, signal and communication systems, electric traction systems, roadway facilities or Roadway Maintenance Machines on or near track or with the potential of fouling a track, and Flagman and Watchmen/Lookouts defined in this part. RWP 2010 Federal Railroad Administration 11

12 Roadway Work Group/Lone Worker ROADWAY WORK GROUP - two or more Roadway Workers organized to work together on a common task. LONE WORKER - an individual Roadway Worker who is not being afforded On-Track Safety by another Roadway Worker, who is not a member of a Roadway Work Group, and who is not engaged in a common task with another Roadway Worker. RWP 2010 Federal Railroad Administration 12

13 Responsibility of Individual Roadway Workers (a) Follow the railroad s On-Track Safety rules. (b) Shall not foul track except when necessary for the performance of duty. (c) Responsible to ascertain that On-Track Safety is being provided before fouling. (d) Notify employer of improper On-Track Safety. RWP 2010 Federal Railroad Administration 13

14 Supervision and Communication (Continued) (d) The roadway worker in charge shall indicate the On-Track Safety and inform workers of changes. When not informed of changes in advance, they shall clear the track. (e) Lone workers shall have an On-Track Safety briefing with a supervisor or another designated employee. When communication is disabled, the briefing shall be conducted as soon as possible. RWP 2010 Federal Railroad Administration 14

15 On-Track Safety Procedures Generally Each Employer shall provide On-Track Safety for roadway workers by adopting a program that contains the specific procedures that comply with the provisions of sections through Note - This regulation does not affect Roadway Maintenance Machine movements that are conducted under the authority of a Train Dispatcher, a Control Operator, or the operating rules of the railroad [ (C)]. RWP 2010 Federal Railroad Administration 15

16 Controlled/Non-Controlled Track CONTROLLED TRACK - track upon which the railroad s operating rules require that all movements of trains must be authorized by a Train Dispatcher or Control Operator. NON-CONTROLLED TRACK - track upon which trains are permitted by railroad rule or special instruction to move without receiving authorization from a Train Dispatcher or Control Operator. RWP 2010 Federal Railroad Administration 16

17 Train Dispatcher/Control Operator TRAIN DISPATCHER - the railroad Employee assigned to control and issue orders governing the movement of trains on a specific segment of railroad track in accordance with the operating rules of the railroad that apply to that segment of track. CONTROL OPERATOR - the railroad Employee in charge of a remotely controlled switch or derail, an interlocking, or a controlled point, or a segment of Controlled Track. RWP 2010 Federal Railroad Administration 17

18 Supervision and Communication (a) (b) (c) When assigned duties to foul a track, employer shall provide an On-Track Safety briefing. Each briefing will be deemed complete only when each roadway worker has acknowledged and understood the briefing. Each roadway work group shall have a designated person to provide On-Track Safety. RWP 2010 Federal Railroad Administration 18

19 Controlled Track Working Limits WORKING LIMITS - a segment of track with defined boundaries established in accordance with this rule upon which trains and engines may move only as authorized by the roadway worker in charge having control over that defined segment of track. Working Limits may be established through Exclusive Track Occupancy, Foul Time, Train Coordination, or Inaccessible Track. Non-Controlled Track RWP 2010 Federal Railroad Administration 19

20 Working Limits Generally (a) Only a qualified roadway worker in charge shall establish or have control over Working Limits. (b) Only one roadway worker in charge shall have control over Working Limits on any one segment of track. (c) Roadway workers shall be notified before working limits are released. Train Approach Warning shall be substituted. RWP 2010 Federal Railroad Administration 20

21 Exclusive Track Occupancy EXCLUSIVE TRACK OCCUPANCY (ETO) - a method of establishing Working Limits on Controlled Track in which movement authority of trains and other equipment is withheld by the Train Dispatcher or Control Operator, or restricted by Flagman, as prescribed in (Exclusive Track Occupancy). RWP 2010 Federal Railroad Administration 21

22 Flagman FLAGMAN - when used in relation to Roadway Worker safety, means an Employee designated by the railroad to direct or restrict the movement of trains past a point on a track to provide On-Track Safety for Roadway Workers, while engaged solely in performing that function. RWP 2010 Federal Railroad Administration 22

23 Exclusive Track Occupancy (a) The track within Working Limits shall be placed under the control of one roadway worker in charge by one of the following: RWP 2010 Federal Railroad Administration 23

24 Exclusive Track Occupancy 321(c)(1) Authority/Flagman Authority (Smith) Smith MP11 Authority issued to Smith from MP 11 to MP 20 MP 20 Train informed working limits in effect MP20 to MP11. RWP 2010 Federal Railroad Administration 24

25 Exclusive Track Occupancy 321(c)(2) Stop Signal CP 10 Authority (Smith) Smith CP 30 Dispatcher holds train at stop signal RWP 2010 Federal Railroad Administration 25

26 Exclusive Track Occupancy 321(c)(3) Station Signs Smith with authority between Snikle and Boro Train with movement authority Land to Alpha with instructions Working Limits in effect between Boro and Snikle Alpha Snikle Boro Land Working Limits RWP 2010 Federal Railroad Administration 26

27 Exclusive Track Occupancy 321(c)(4) Milepost Train with movement authority Land to Alpha with instructions Working Limits in effect between MP10 and MP11 Alpha Smith with authority between MP11 and MP 10 MP11 MP10 Land Working Limits RWP 2010 Federal Railroad Administration 27

28 Exclusive Track Occupancy 321(c)(5) Clearly Identifiable Location Alpha Smith with authority Podunk E MP11.4 and Podunk W MP12.6 Train with movement authority Land to Alpha with instructions Working Limits in effect Podunk E switch MP11.4 and Podunk W switch MP12.6 Land Working Limits Podunk West Switch MP 12.6 Podunk East Switch MP 11.4 RWP 2010 Federal Railroad Administration 28

29 Exclusive Track Occupancy 321(a)(2) Flagman Flagmen located with capability to withhold movements from work group Train withheld by flagman RWP 2010 Federal Railroad Administration 29

30 Exclusive Track Occupancy (a)(3) Local Control Working Limits CP 10 Before fouling track, roadway worker sets all home signals to absolute stop by manipulating the system in the signal case RWP 2010 Federal Railroad Administration 30

31 Exclusive Track Occupancy (Continued) (b) An authority shall be transmitted on a written or printed document or by oral communication. (1) Where authority is transmitted orally, it shall be written as received and repeated. (2) Roadway worker in charge shall maintain possession of the authority while it is in effect. (3) Train Dispatcher or Control Operator shall make a written or electronic record. RWP 2010 Federal Railroad Administration 31

32 Restricted Speed RESTRICTED SPEED - a speed that will permit a train or other equipment to stop within one-half the range of vision of the person operating the train or other equipment, but not exceeding 20 miles per hour, unless further restricted by the operating rules of the railroad. RWP 2010 Federal Railroad Administration 32

33 Exclusive Track Occupancy (Continued) (d) Movements of trains and machines within exclusive track occupancy shall be made only under the direction of the roadway worker in charge. Such movements shall be restricted speed unless a higher speed has been specifically authorized by the roadway worker in charge. Note: Paragraph C covered in previous slides with illustrations RWP 2010 Federal Railroad Administration 33

34 Foul Time FOUL TIME - a method of establishing Working Limits on Controlled Track in which a Roadway Worker is notified by the Train Dispatcher or Control Operator that no trains will operate within a specific segment of Controlled Track until the Roadway Worker In Charge reports clear of the track as prescribed by (Foul Time). RWP 2010 Federal Railroad Administration 34

35 Foul Time (a) Foul Time may be given orally or in writing after the Train Dispatcher has withheld authority of trains to move into or within the Working Limits. (b) Each roadway worker in charge to whom foul time is transmitted orally shall repeat it back to the issuing employee before it becomes effective. (c) Train Dispatcher shall not permit the movement of trains or other on-track equipment onto foul time limits until the roadway worker in charge who obtained the foul time has reported clear. RWP 2010 Federal Railroad Administration 35

36 Foul Time (Example) CP139 Train dispatcher withholds movements (foul time) on number 2 track between CP139 and CP149 by placing blocking devices on the controls that establish traffic into the affected track. Track 2 CP149 Track 1 A worker is directing the activities of an on-track crane on number 1 track with an exclusive track occupancy between CP139 and CP149. In order to swing the crane boom over number 2 track for a short interval, the worker requests foul time for that track. RWP 2010 Federal Railroad Administration 36

37 Train Coordination TRAIN COORDINATION - a method of establishing Working Limits on track which a train holds exclusive authority to move whereby the crew of that train yields that authority to a Roadway Worker. RWP 2010 Federal Railroad Administration 37

38 Train Coordination (a) Working Limits established by train coordination shall be within the segments of track or tracks upon which only one train holds exclusive authority to move. (b) The roadway worker in charge shall communicate with a member of the crew of the train holding the exclusive authority to move, and shall determine: RWP 2010 Federal Railroad Administration 38

39 Train Coordination (Continued) (1) The train is visible to the roadway worker in charge establishing the Working Limits, (2) The train is stopped, (3) Further movements will be made only as permitted by the roadway worker in charge, and (4) The crew of the train will not give up its exclusive authority to move until the Working Limits have been released to the train crew by the roadway worker in charge. RWP 2010 Federal Railroad Administration 39

40 Train Coordination Example Alpha block limit MP 120 Omega block limit MP 145 Controlled main track Maintenance gang is riding with extra 2124 to clear snow from switches. Prior to working on the switch at MP 135.1, the roadway worker in charge coordinates with the train crew. Extra 2124, engine 2124, has an exclusive Track Warrant Control (TWC) authority on single main (controlled track) between Alpha and Omega and is stopped short of the switch. RWP 2010 Federal Railroad Administration 40

41 Inaccessible Track INACCESSIBLE TRACK - a method of establishing Working Limits on Non-Controlled track by physically preventing entry and movement of trains and equipment. RWP 2010 Federal Railroad Administration 41

42 Inaccessible Track (a) Working Limits on Non-Controlled track shall be established by rendering the track inaccessible to trains by one of the following features: RWP 2010 Federal Railroad Administration 42

43 Inaccessible Track (Continued) (1) A Flagman with instructions and capability to stop movements - Main track Additional unannounced movements Engine 2124, working in yard with no movement authority Worker with locomotive to clearing snow from switch. Working Limits Rear of locomotive with train crew (flagman) preventing movements Flagman must have capability of withholding movements. If free rolling cars are expected, watchman would be required. RWP 2010 Federal Railroad Administration 43

44 Effective Securing Device EFFECTIVE SECURING DEVICE - when used in relation to a manually operated switch or derail means one which is: (a) Vandal resistant; (b) Tamper resistant; and (c) Designed to be applied, secured, uniquely tagged and removed only by the class, craft or group of employees for whom the protection is being provided. RWP 2010 Federal Railroad Administration 44

45 Inaccessible Track (Continued) (2) A switch or derail lined to prevent access and secured with an Effective Securing Device, Single main track Inaccessible limits End of track Hand throw switch lined with effective securing device Non-controlled yard tracks Track inspector tightening joints Maintenance gang replacing rail Car on lead ready for pick up by switcher Inaccessible limits Derail with effective securing device End of track RWP 2010 Federal Railroad Administration 45

46 Inaccessible Track (Continued) (3) A discontinuity in the rail, Single main track Switch removed Adjacent track protection: Large scale work - mandatory Small scale - required if work is going to foul No rail Crew removing materials from abandoned side track Inaccessible limits End of track RWP 2010 Federal Railroad Administration 46

47 Inaccessible Track (Continued) (4) Working Limits on the entrance Controlled Track obtained by the roadway worker in charge, or Alpha block limit MP 120 Omega block limit MP 145 Controlled main track Snikle yard switch MP Roadway worker in charge has foul time on main tack on single main (controlled track) between Alpha and Omega. Maintenance gang arrives at Snikle yard and establishes inaccessible track because of the entrance controlled track working limits in the form of foul time. RWP 2010 Federal Railroad Administration 47

48 Inaccessible Track (Continued) (5) Remotely controlled switch aligned to prevent movement secured by the control operator - (i) (ii) (iii) Applying a blocking device; and Notifying the roadway worker in charge that protection has been provided; and The control operator shall not remove the blocking device until receiving permission from the roadway worker in charge. Hump yard lead Remote switch lined with blocking device Inaccessible limits Maintenance crew Derail with effective securing device RWP 2010 Federal Railroad Administration 48

49 Inaccessible Track (Continued) (b) Trains or machines within inaccessible track shall move only under the direction of the roadway worker in charge and shall move at Restricted Speed. Main track No. 1 No. 2 No. 3 No. 4 Locomotive within limits directed by roadway worker in charge to keep off No. 4 track. Inaccessible limits Switch lined with effective securing device End of tracks RWP 2010 Federal Railroad Administration 49

50 Inaccessible Track (Continued) (c) No operable locomotives or on-track equipment, except those present or moving under the direction of the roadway worker in charge shall be located within inaccessible track. Main track Unmanned locomotive locked wheel chock Inaccessible limits Switch lined with effective securing device End of tracks RWP 2010 Federal Railroad Administration 50

51 Train Approach Warning TRAIN APPROACH WARNING - a method of establishing On-Track Safety by warning Roadway Workers of the approach of trains in ample time for them to move to or remain in a place of safety in accordance with the requirements of this part. RWP 2010 Federal Railroad Administration 51

52 Watchman/Lookout WATCHMAN/LOOKOUT - an Employee who has been annually trained & qualified to provide warning to Roadway Workers of approaching trains or ontrack equipment. Watchman/Lookout shall be properly equipped to provide visual and auditory warning such as whistle, air horn, white disk, red flag, lantern, fusee. A Watchman/Lookout s sole duty is to look out for approaching trains/on-track equipment and provide at least 15 seconds warning to employees before the arrival of trains/on-track equipment. RWP 2010 Federal Railroad Administration 52

53 Train Approach Warning Roadway workers in a group who foul track outside of working limits shall be given warning of approaching trains in accordance with the following - (a) Warning shall be given to enable each worker to move to a place of safety not less than 15 seconds before a train passes. (b) Watchmen shall devote full attention to detecting trains and shall not be assigned any other duties. RWP 2010 Federal Railroad Administration 53

54 Train Approach Warning (Continued) (c) (d) (e) The means used by Watchman to communicate the approach of a train or on-track equipment shall be distinctive and clear. Every worker who depends on train approach warning shall maintain a position that will enable them to receive the warning. Watchmen shall communicate train approach warning by a means that does not require workers to be looking in a particular direction and can be detected regardless of noise or distraction of work. RWP 2010 Federal Railroad Administration 54

55 Train Approach Warning (Continued) (f) Watchmen shall be trained, qualified, and designated in accordance training & qualification requirements. (g) Watchmen shall be provided the necessary equipment. RWP 2010 Federal Railroad Administration 55

56 Train Approach Warning (Travel Table) 15 Second Travel Distance Speed (m.p.h) Distance Ft. Speed (m.p.h.) Distance Ft Note: clearing time must be added to the above figures RWP 2010 Federal Railroad Administration 56

57 Train Approach Warning (Example) Watchman and advance watchman must be able to communicate visually and audibly. Radios to solely communicate the approach of trains is prohibited. Unobstructed view Advance watchman Small maintenance gang using train approach warning Building within 1100 obstructing view Watchman Single main track 50 MPH maximum timetable speed - work group must clear before train is 1100 Ft. from gang Unobstructed view RWP 2010 Federal Railroad Administration 57

58 Roadway Work Group Safety (Continued) (b) No worker in a group shall foul a track without first being informed by the roadway worker in charge that On-Track Safety is provided. (c) Groups engaged in large scale maintenance or construction shall be provided with Train Approach Warning on Adjacent Tracks not included in Working Limits. Note Notice of Proposed Rulemaking is revising the adjacent track provisions. RWP 2010 Federal Railroad Administration 58

59 Individual Train Detection INDIVIDUAL TRAIN DETECTION - a procedure by which a Lone Worker acquires On-Track Safety by seeing approaching trains and leaving the track before they arrive and which may be used only under circumstances strictly defined in this part. A Lone Worker retains an absolute right to use On-Track Safety other than Individual Train Detection if they deem it necessary. RWP 2010 Federal Railroad Administration 59

60 Individual train detection On-Track Safety Procedures for Lone Workers Attended required training Received job briefing [ (e)] Performing routine inspection/minor correction work Outside manual interlocking, CP, or remote hump Can be in a place of safety 15 sec. before train arrival No power tools or machinery within hearing range Vision and hearing not impaired Can clear track to a protected area Can maintain vigilant lookout On-Track Safety statement completed RWP 2010 Federal Railroad Administration 60

61 On-Track Safety Procedures for Lone Workers Interlocking Limits Individual Train Detection not permitted 1. Train Individual Train Detection permitted. Unless working limits established on number 3 and 1 tracks, lone worker must clear all tracks upon approach of the train on 2 track. RWP 2010 Federal Railroad Administration 61

62 Audible Warning From Trains Each railroad shall require that the locomotive whistle be sounded, and the bell be rung, by trains approaching workers. Such warning shall not substitute for On-Track Safety procedures. RWP 2010 Federal Railroad Administration 62

63 Roadway Maintenance Machine ROADWAY MAINTENANCE MACHINE - a device powered by any means of energy other than hand power which is being used on or near railroad track for maintenance, repair, construction or inspection of track, bridges, roadway, signal, communications, or electric traction systems. Roadway maintenance machine may have road or rail wheels or may be stationary. RWP 2010 Federal Railroad Administration 63

64 Roadway Maintenance Machines (a) Each employer shall include the following provisions for the safety of workers who operate or work near machines - (1) Training & qualification of operators. (2) Establishment and issuance of procedures for general and specific machines. (3) Communication between operators and workers assigned to work near or on machines. RWP 2010 Federal Railroad Administration 64

65 Roadway Maintenance Machines (Continued) (4) Spacing between machines to prevent collisions. (5) Space between machines and workers. (6) Maximum working and travel speeds for machines dependent on weather, visibility, and stopping distances. RWP 2010 Federal Railroad Administration 65

66 Roadway Maintenance Machines (Continued) (b) Instructions for safe operation shall be maintained in each machine large enough to carry the instruction document. (1) No worker shall operate a machine without being trained. (2) No worker shall operate a machine without having complete knowledge of the safety procedures. (3) Workers shall be informed of the safety procedures regarding work near machines. RWP 2010 Federal Railroad Administration 66

67 Roadway Maintenance Machines (Continued) (c) Components of machines shall be kept clear of trains on adjacent tracks. Where operating conditions permit machines to be less than four feet from the rail of an adjacent track, the railroad shall include instructions to provide adequate clearances. RWP 2010 Federal Railroad Administration 67

68 Qualified QUALIFIED - a status attained by an Employee who has successfully completed any required training for, has demonstrated proficiency in, and has been authorized by the Employer to perform the duties of a particular position or function. RWP 2010 Federal Railroad Administration 68

69 Training & Qualification General (a) (b) (c) (d) No Employer shall assign an employee to perform roadway worker duties, and no employee shall accept such assignment, unless training has been completed. Each Employer shall provide initial or recurrent training once every calendar year. Other than Roadway Workers associated with On- Track Safety shall be trained through their craft. Employers are required to retain written or electronic records of qualifications. RWP 2010 Federal Railroad Administration 69

70 Training & Qualification (Summary) Type Worker Section Understand Track Function of Others Compliance Signals by Watchmen Hazards Train Detection Detection Distances ITD/Working Limits OTS of Territory Proficiency Warning of Workers Flagging Rules Working Limits Rules TAW Rules TAW Application Physical Characteristics Recorded Exam Machine Safety All Workers 345 Lone Worker 347 Watchman 349 Flagman 351 RWIC 353 Machine Operator 355 RWP 2010 Federal Railroad Administration 70

71 Railroad Communications Roadway Worker Requirements ( ) Required Communication Working Radio Intra-equipment communication Intra-group communication Railroads that have 400,000 or more annual employee work hours (1) MW operating between locations Without Locomotive On at least one unit, in each multiple group of MW equipment traveling together under the same movement authority must have a working radio Operators of each additional piece of equipment shall have communications capability with each other Not applicable With Locomotive Not required on MW equipment Not applicable Not applicable RWIC Work Locations Lone Worker Required (2) Required (2) Not applicable Required Not required Not required (1) This table does not apply if the work location is physically inaccessible to trains, or has no through traffic or adjacent track traffic when roadway workers are present, i.e., there are no communication equipment requirements under these circumstances. (2) When immediate access to working radio is not available, the employee responsible for on track safety or lone worker shall be equipped with a radio that can communicate with trains in the area. RWP 2010 Federal Railroad Administration 71

72 Railroad Communications Roadway Worker Requirements ( ) Speed Speeds greater than 25 m.p.h Railroads with fewer than 400,000 annual work hours Through traffic or adjacent track traffic Working radio or wireless required for roadway worker in charge or lone worker No through traffic or adjacent track traffic Working radio or wireless not required Track physically inaccessible Working radio or wireless not required Speeds 25 m.p.h. and less Working radio or wireless not required Working radio or wireless not required Working radio or wireless not required RWP 2010 Federal Railroad Administration 72

73 On-Track Safety Life Tips 1. Is it necessary for you to foul the track? 2. Who is the roadway worker in charge? 3. What type of on-track safety (OTS) do you have on the track(s) you are fouling? 4. Is the OTS appropriate for the work that you are performing? 5. What type of OTS do you have on adjacent tracks? 6. What are the specific working limits? Otherwise, what tracks are protected by train approach warning and when clearing the track, where is the designated place of safety? Can you be clear of the track before a train is 15 seconds away from your position in the track? 7. If you are a lone worker using individual train detection, is the OTS statement completed? RWP 2010 Federal Railroad Administration 73

74 On-Track Safety Life Tips 8. If you are a lone worker, do you know that you have the absolute right to use an alternate form of OTS other than individual train detection? 9. If you are using individual train detection, are you working where there is no noise or other impairments interfering with your ability to detect the approach of trains? Are you outside a manual interlocking, controlled point, or remote hump yard facility? Do you have the ability to clear to a protected area? Do you have the required sight distance to be in the clear before a train is 15 seconds away from your position in the track? Are you performing only minor repair or correction work that does not interfere with your ability to detect the approach of trains? 10. Is a copy of the railroad s OTS rules readily available? RWP 2010 Federal Railroad Administration 74

75 On-Track Safety Life Tips 11. Was a briefing conducted and do you understand all aspects of your OTS and feel you are adequately protected? 12. Do you have the required OTS training or qualification to perform your duties? 13. What are the roadway maintenance machine procedures that you must know for your safety if machines are involved in the work? 14. If required, is railroad communication (Radio) available? 15. Have you been keeping alert of OTS procedures and changes throughout the entire day? 16. Did you remember to stop, look, and listen before crossing any track regardless of the OTS status of the track(s) and to expect any movements of trains and roadway maintenance machines on any track, in either direction, and at any time? RWP 2010 Federal Railroad Administration 75

Subpart C_Roadway Worker Protection

Subpart C_Roadway Worker Protection [Code of Federal Regulations] [Title 49, Volume 4] [Revised as of October 1, 2007] From the U.S. Government Printing Office via GPO Access [CITE: 49CFR214] [Page 168-177] TITLE 49--TRANSPORTATION CHAPTER

More information

ROADWAY WORKER PROTECTION

ROADWAY WORKER PROTECTION ROADWAY WORKER PROTECTION 1 TRAINING This training explains the ON-Track Safety requirements for ALL roadway workers and is presented in two (2) modules: Basic Requirements EIC Qualification All instructions

More information

ON TRACK SAFETY MANUAL

ON TRACK SAFETY MANUAL RIO GRANDE PACIFIC CORPORATION ON TRACK SAFETY MANUAL Idaho Northern & Pacific Railroad Nebraska Central Railroad New Orleans & Gulf Coast Railway Wichita, Tillman & Jackson Railway Effective July 9, 2009

More information

Federal Railroad Administration

Federal Railroad Administration Federal Railroad Administration September 19, 2006 Regulatory Activities Roadway Worker Protection Continuous Welded Rail 2006 Annual Conference Railroad Safety Advisory Committee The Railroad Safety Advisory

More information

WMATA s Revised Roadway Worker Protection Program

WMATA s Revised Roadway Worker Protection Program Washington Metropolitan Area Transit Authority WMATA s Revised Roadway Worker Protection Program APTA Annual Conference Presentation October 2012 Purpose Review the initiative for WMATA s decision to redesign

More information

Contractor Safety Rules: Issued to all North American Subsidiaries of Genesee & Wyoming Inc. Effective April 1, 2002 Revised Dec.

Contractor Safety Rules: Issued to all North American Subsidiaries of Genesee & Wyoming Inc. Effective April 1, 2002 Revised Dec. CONTRACTOR SAFETY RULES Contractor Safety Rules: Issued to all North American Subsidiaries of Genesee & Wyoming Inc. Effective April 1, 2002 Revised Dec. 31, 2006 Introduction: These rules apply to contractors

More information

Contractor-in-Charge Requirements

Contractor-in-Charge Requirements Contractor-in-Charge Requirements UPRR has adopted a Contractor-In-Charge (CIC) policy exception (see attached letter dated May 8, 2009). If the contractor plans on utilizing this exception the contractor

More information

MetroLink Operations 700 South Ewing Street Saint Louis, Missouri

MetroLink Operations 700 South Ewing Street Saint Louis, Missouri Operating Procedure SOP # Date: Page 1 of 10 Classifications: OCC Rail Dispatchers Maintenance of Way - Contractors Other Departments: Real Estate Operation Safety - Risk Management - Engineering & New

More information

NORAC OPERATING RULES Eighth Edition January 1, 2003 Northeast Operating Rules Advisory Committee SPEEDS

NORAC OPERATING RULES Eighth Edition January 1, 2003 Northeast Operating Rules Advisory Committee SPEEDS NAC OPERATING RULES Eighth Edition January 1, 2003 Northeast Operating Rules Advisory Committee The Definitions and Rules Listed Apply to Operating in the Chicago Area AUTOMATIC BLOCK SIGNAL SYSTEM (ABS)

More information

UTAH TRANSIT AUTHORITY Rail Services

UTAH TRANSIT AUTHORITY Rail Services UTAH TRANSIT AUTHORITY Rail Services TRAX Light Rail Transit System FrontRunner Commuter Rail System Based upon the provisions of 49 CFR 214 Updated 1 August 2014 UTA Rail Services August 2014 Roadway

More information

SOUTHERN PACIFIC RAILROAD RULES OF OPERATION

SOUTHERN PACIFIC RAILROAD RULES OF OPERATION Contents 2.0 RAILROAD RADIO RULES... 3 2.1 Transmitting... 3 2.2 Required Identification... 3 2.3 Repetition... 3 2.4 Over... 3 2.5 Out... 3 2.6 Communication Not Understood Incomplete... 4 2.8 Acknowledgment...

More information

BNSF OPERATIONS TESTING REFERENCE GUIDE Remote Operations Testing /Audit Supplement April 01, 2008

BNSF OPERATIONS TESTING REFERENCE GUIDE Remote Operations Testing /Audit Supplement April 01, 2008 BNSF OPERATIONS TESTING REFERENCE GUIDE Remote Operations Testing /Audit Supplement April 01, 2008 INTRODUCTION Operations testing is mandated by federal regulation and BNSF policy to determine extent

More information

NJ TRANSIT STANDARD MAINTENANCE PROCEDURE MECHANICAL DEPARTMENT. The following approvals were obtained prior to the issuance of this procedure:

NJ TRANSIT STANDARD MAINTENANCE PROCEDURE MECHANICAL DEPARTMENT. The following approvals were obtained prior to the issuance of this procedure: NJ TRANSIT STANDARD MAINTENANCE PROCEDURE MECHANICAL DEPARTMENT Subject: Blue Signal Protection Long Branch Yard Number: 398010 Revision: 2 Effective: July 3, 2014 Supersedes: Rev. 1 of August 5, 2013

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary for this Rule... 4... 7... 7... 7... 8... 9... 9... 10... 10... 10... 10...

More information

METRA Contractor Safety Orientation

METRA Contractor Safety Orientation Page 1 of 29 METRA Contractor Safety Orientation Course Test Link is at the bottom of this document. Metra Engineering Contractor Orientation Course 2013 Contractor Operating Guidelines pdf/fullcourse.pdf

More information

Roadway Worker Protection Program Requirements

Roadway Worker Protection Program Requirements A P T A S T A N D A R D S D E V E L O P M E N T P R O G R A M STANDARD American Public Transportation Association 1666 K Street, NW, Washington, DC, 20006-1215 APTA RT-OP-S -016-11 Rev 1 Published November

More information

ROADWAY WORKER PROTECTION (RWP) SAFETY PLAN

ROADWAY WORKER PROTECTION (RWP) SAFETY PLAN ROADWAY WORKER PROTECTION (RWP) SAFETY PLAN DISTRICT 5 EFFECTIVE: TUESDAY, APRIL 1, 2014 AT 0001 HOURS Revision Log Revision # Revised By Date Issue / Revision Description -- -- 08/09/11 Original 1.0 LE

More information

Guideline for Bridge Safety Management February 2012

Guideline for Bridge Safety Management February 2012 Guideline for Bridge Safety Management February 2012 Table of Contents Foreword Part A General 0.1 Definitions 0.2 Scope 0.3 Application 0.4 Responsibility Part B Bridge Safety Assurance 1.1 Scope 1.2

More information

INDIANA HARBOR BELT RAILROAD COMPANY

INDIANA HARBOR BELT RAILROAD COMPANY Page 1 of 7 INDIANA HARBOR BELT RAILROAD COMPANY BULLETIN ORDER NO. S-25 December 30, 2015 Effective 0001, Sunday, January 3, 2016 Last General Order in effect: 301 A) Operating Manuals 1. Timetable Authority

More information

GCOR. General Code of Operating Rules. Transition Guide. Effective April 1, 2015

GCOR. General Code of Operating Rules. Transition Guide. Effective April 1, 2015 GCOR General Code of Operating Rules Transition Guide Effective April 1, 2015 This guide contains changes from the GCOR Sixth Edition to the GCOR Seventh Edition in effect April 1, 2015 These rules herein

More information

[Federal Register: January 26, 2007 (Volume 72, Number 17)] [Notices] [Page 3907-3911] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr26ja07-172] -----------------------------------------------------------------------

More information

Safety Bulletin. Federal Transit Administration. Office of Safety and Security JOB SAFETY BRIEFING. Federal Transit Administration

Safety Bulletin. Federal Transit Administration. Office of Safety and Security JOB SAFETY BRIEFING. Federal Transit Administration JOB SAFETY BRIEFING Since October 2004, 18 rail transit wayside workers have been struck and killed by trains or rail maintenance machines or electrocuted. The In Memoriam table below identifies each of

More information

Overhead Power Lines. Corporate Safety Policy Overhead Power Lines. (Cont.)

Overhead Power Lines. Corporate Safety Policy Overhead Power Lines. (Cont.) Corporate Safety Policy Overhead Power Lines Last Modified: JAN 2013 1 of 6 Overhead Power Lines I Purpose To provide procedures, for working on overhead power lines or in their vicinity on COMPANY sites,

More information

CORA REVISION: AMTRAK

CORA REVISION: AMTRAK THE BELT RAILWAY COMPANY OF CHICAGO Office of General Manager Transportation May 31, 2006 Notice No. 4 **In Effect 12:01 AM June 1, 2006** TO ALL CONCERNED: All Notices issued from January 1, 2004 through

More information

Rocky Top Materials, Inc.

Rocky Top Materials, Inc. Rocky Top Materials, Inc. 2707 John Deere Dr. Knoxville, TN 37917 (865) 522-0060 1806 Middlecreek Rd. Pigeon Forge, TN 37863 (865) 453-3723 Disclaimer: This document contains brief descriptions of Rocky

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201883 Resolution: Yes No TITLE: Roadway Worker Protection Program PRESENTATION SUMMARY:

More information

Trackside Safety Curriculum. For Queensland Rail Rail Industry Workers

Trackside Safety Curriculum. For Queensland Rail Rail Industry Workers Trackside Safety Curriculum For Queensland Rail Rail Industry Workers Version Date of Review Description V1.0 11/11/2013 Draft for comment V1.1 25/03/2014 Draft for comment V1.2 13/03/2015 Final V1.3 30/10/2017

More information

4. Stationary scaffolds over 125 ft. in height and rolling towers over 60 ft. in height must be designed by a professional engineer.

4. Stationary scaffolds over 125 ft. in height and rolling towers over 60 ft. in height must be designed by a professional engineer. Section C.16 University of South Carolina Safety Program Guide SCAFFOLDS Introduction University of South Carolina recognizes that the scaffold industry is considered "inherently dangerous". These guidelines

More information

Job ID: CAAA09 DOP LOCOMOTIVE ENGINEER CONDUCTOR

Job ID: CAAA09 DOP LOCOMOTIVE ENGINEER CONDUCTOR Job ID: CAAA09 DOP LOCOMOTIVE ENGINEER CONDUCTOR Crane Army Ammunition Activity Depot Operations Division Job Posting Information Job Title: Program Type: Number of Positions Available: Targeted Programs

More information

Fall Protection Safety Program and Training Materials

Fall Protection Safety Program and Training Materials Prepared by Built Insurance Brokerage Fall Protection Safety Program and Training Materials Fall Protection Program... 1 Employee Fall Protection Flyer... 7 Fall Hazard Survey... 8 Requirements for Industrial

More information

Network Safeworking Rules and Procedures. Glossary

Network Safeworking Rules and Procedures. Glossary Network Safeworking Rules and Procedures Glossary Version 1.0, 31 March 2016 Glossary Document Control Identification Document title Number Version Date Glossary 1.0 31 March 2016 Document History Publication

More information

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-32 August 31, 2018

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-32 August 31, 2018 Page 1 of 6 INDIANA HARBOR BELT RAILROAD COMPANY BULLETIN ORDER NO. S-32 August 31, 2018 Effective: 0600 Sunday September 02, 2018 General Orders in effect: NONE A. Operating Manuals 1. Timetable Authority:

More information

Employers' Guide to Road Safety Requirements

Employers' Guide to Road Safety Requirements Employers' Guide to Road Safety Requirements The Occupational Health and Safety Regulation (OHSR) sets out requirements that apply to road safety and workrelated driving. Tables below identify measures

More information

SECTION III -- RESPONSIBILITIES

SECTION III -- RESPONSIBILITIES SECTION III -- RESPONSIBILITIES 3.0 Management Staff direction and management of the Comprehensive Safety and Health Program will be accomplished by the Superintendent with authority delegated from the

More information

THE BELT RAILWAY COMPANY OF CHICAGO. Train Dispatcher Rules & Instructions

THE BELT RAILWAY COMPANY OF CHICAGO. Train Dispatcher Rules & Instructions THE BELT RAILWAY COMPANY OF CHICAGO Train Dispatcher Rules & Instructions EFFECTIVE 00:01, June 1, 2006 TABLE OF CONTENTS Supervision 3 Duties of Train Dispatchers 3 Records Kept 3 Notification of Clerical

More information

BOOM-SUPPORTED ELEVATING WORK PLATFORM PROGRAM

BOOM-SUPPORTED ELEVATING WORK PLATFORM PROGRAM Page: 1 of 7 1.0 PURPOSE and APPLICABILITY 1.1 It is the policy of the University of Pennsylvania in coordination with the Office of Environmental Health and Radiation Safety to provide the University

More information

The Use of E-ATC as a PTC System By

The Use of E-ATC as a PTC System By The Use of E-ATC as a PTC System By Dale Hein, P.Eng. Hatch Mott MacDonald 840 7 th Avenue SW, Suite 1250 Calgary, AB, Canada T2P-3G2 (587) 293-6224 dale.hein@hatchmott.com And Richard Morris Hatch Mott

More information

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT 1 This General Guide provides information on how to manage traffic risks at a workplace. It is supported by specific guidance material on traffic management for shopping centres, construction workplaces,

More information

Timetable and Trainorder TT&TO. An Overview and american Adaptation

Timetable and Trainorder TT&TO. An Overview and american Adaptation Timetable and Trainorder TT&TO An Overview and american Adaptation Inhaltsverzeichnis / Table of Content 1. Overview of TT&TO Operation 2. FREMO american TT&TO guide 2.1 Timetable 2.2 Extra Trains 2.3

More information

Union Pacific Railroad. Rail Train Operating Instructions

Union Pacific Railroad. Rail Train Operating Instructions Union Pacific Railroad Rail Train Operating Instructions REVISED: March 8, 2010 1 Table of Contents Section Page No. Introduction 3 Job Briefing 5 Manpower 8 Communication 9 Train and Equipment Consist

More information

EXHIBIT C OPERATING SYSTEM INTERFACE (OSI)

EXHIBIT C OPERATING SYSTEM INTERFACE (OSI) EXHIBIT C OPERATING SYSTEM INTERFACE (OSI) PART 1 - GENERAL 1.01 DESCRIPTION Outline for Contractor s interface with Caltrain s operating system, including track work, train control, and communications.

More information

Appendix - Guideline for Bridge Safety Management with Clarification Comments on Grey Background February 2012

Appendix - Guideline for Bridge Safety Management with Clarification Comments on Grey Background February 2012 Appendix - Guideline for Bridge Safety Management with Clarification Comments on Grey Background February 2012 Table of Contents Foreword Part A General 0.1 Definitions 0.2 Scope 0.3 Application 0.4 Responsibility

More information

ESSENTIAL SAFETY RESOURCES

ESSENTIAL SAFETY RESOURCES ESSENTIAL SAFETY RESOURCES GS-3023 LOCKOUT / TAGOUT PROGRAM Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations Manager s Signature: Type

More information

Canadian National Contractor Safety Orientation Canadian Based Operating Companies Course Exam

Canadian National Contractor Safety Orientation Canadian Based Operating Companies Course Exam Canadian National Contractor Safety Orientation Canadian Based Operating Companies Course Exam Question 1: Before working on CN property, the contractor must: A. Have a valid right of entry agreement.

More information

FCX Department of Occupational Health and Safety Policy

FCX Department of Occupational Health and Safety Policy FCX Department of Occupational Health and Safety Policy Lockout/Tagout/Tryout (LOTOTO) (Control of Hazardous Energy Sources) Approval Date: 08/29/2014 Original Date: 03/09/2009 Policy # FCX-04 Revision

More information

Identification and Mitigation of Hazards Through Job Safety Briefings and Hazard

Identification and Mitigation of Hazards Through Job Safety Briefings and Hazard This document is scheduled to be published in the Federal Register on 11/28/2016 and available online at https://federalregister.gov/d/2016-28558, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice) Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice) Version 3 June 2014 Authorised by Arrium Safety Council TOOL75.WHS.COP.001 Critical Elements from the Code

More information

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY NHMFL LOCKOUT/TAGOUT SAFETY PROCEDURE SP-1

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY NHMFL LOCKOUT/TAGOUT SAFETY PROCEDURE SP-1 NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY NHMFL LOCKOUT/TAGOUT SAFETY PROCEDURE SP-1 TITLE: SAFETY CLEARANCE PROCEDURE LOCKOUT/TAGOUT HEAD of MAGNET OPERATIONS Bryon Dalton

More information

Train Dispatcher Rules

Train Dispatcher Rules Union Pacific Rules Train Dispatcher Rules Includes Updates as of May 13, 2009 PB-20319 List of Rules deployed since 08/01/2008. RULE RULE DEPLOY DATE 20.6 05/05/09 20.8 1/26/09 22.4.4 05/13/09 22.5.2

More information

Employee Discipline & Accountability Process. (For all Canadian Pacific (Canada) Unionized Employees)

Employee Discipline & Accountability Process. (For all Canadian Pacific (Canada) Unionized Employees) Employee Discipline & Accountability Process (For all Canadian Pacific (Canada) Unionized Employees) June 23, 2017 Guiding Principles 1. Why are the Progressive Discipline Steps not ranges of suspension

More information

SCAFFOLDING PROCEDURE

SCAFFOLDING PROCEDURE SCAFFOLDING PROCEDURE 1 Table of Contents 1 PURPOSE... 3 2 PROGRAM COMPLIANCE... 3 3 SCOPE... 3 4 DEFINITIONS... 3 5 RESPONSIBILITES... 4 6 SCAFFOLD INSPECTION... 5 7 SCAFFOLD USE... 5 8 SCAFFOLD REQUIREMENTS...

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Track Occupancy Authority Rule Number: 3005 Version 1.02, 1 April 2017 Track Occupancy Authority Rule Number: 3005 Document Control Identification Document title

More information

1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY

1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY 1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY Purpose and Applicability The purpose of this Program is to ensure that Imhoff Custom Services Inc. employees who operate aerial or scissor lifts have the

More information

LOCKOUT / TAGOUT PURPOSE SCOPE DEFINITIONS. Applicable OSHA Standards: 29 CFR

LOCKOUT / TAGOUT PURPOSE SCOPE DEFINITIONS. Applicable OSHA Standards: 29 CFR LOCKOUT / TAGOUT Applicable OSHA Standards: 29 CFR 1910.147 PURPOSE SCOPE The purpose of this policy is to comply with the OSHA standard when working on equipment from injury caused by unexpected release

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Responsibilities of Rail Traffic Crews Rule Number: 2027 Version 1.0, 31 March 2016 Responsibilities of Rail Traffic Crews Rule Number: 2027 Document Control Identification

More information

LOCKOUT TAGOUT SAFETY PROGRAM

LOCKOUT TAGOUT SAFETY PROGRAM 1. PURPOSE To establish procedures for affixing appropriate lockout/tagout equipment to energy isolating devices and to otherwise disable machines or equipment to prevent unexpected energization, start

More information

FCX Department of Occupational Health and Safety. Contents. Open-Hole Policy

FCX Department of Occupational Health and Safety. Contents. Open-Hole Policy FCX Department of Occupational Health and Safety Open-Hole Policy Approval Date: 12/09/13 Original Date: 03/30/09 SOP # FCX-01 Revision # 6 Supersedes X High Medium Task Risk Low NA Contents 1.0 Policy...2

More information

Title: Lockout/Tagout Policy. University Division/Department: Environmental Health & Safety Effective Date : May, 1996 Revised: July, 2017

Title: Lockout/Tagout Policy. University Division/Department: Environmental Health & Safety Effective Date : May, 1996 Revised: July, 2017 Page: 1 of 15 Table of Contents I. Purpose 2 II. Scope 2 III. Definitions 2 IV. Policy Statement 4 V. Procedures 5 VI. Related Information 11 VII. History 11 VIII. Responsible University Division/Department

More information

Passenger Handling Safety Guidelines for British Columbia s Heritage Railways

Passenger Handling Safety Guidelines for British Columbia s Heritage Railways Passenger Handling Safety Guidelines for British Columbia s Heritage Railways 1. Short title 1.1 For ease of reference, these Guidelines may be referred to as the "Passenger Handling Safety Guidelines".

More information

Document Revision Change Table Revision Number

Document Revision Change Table Revision Number Beaumont Site Procedure No.: BMEHS-002.025 Reviewed: 01/17 Page: 1 of 7 Document Revision Change Table Revision Number Revision Description Revised By Revision Date Rev. 03 Considered as starting document

More information

Table of Contents 26L Locomotive Air Brake Apprenticeship Training Program (ATP) Basic Operating Rules and Safe Railway Practices

Table of Contents 26L Locomotive Air Brake Apprenticeship Training Program (ATP) Basic Operating Rules and Safe Railway Practices Classroom Training Course Catalogue Table of Contents 26L Locomotive Air Brake 1 Apprenticeship Training Program (ATP) 2 Basic Operating Rules and Safe Railway Practices 3 Car Inspection Train/Yard - Initial

More information

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-38 March 01, 2019

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-38 March 01, 2019 Page 1 of 14 INDIANA HARBOR BELT RAILROAD COMPANY BULLETIN ORDER NO. S-38 March 01, 2019 Effective: 0600 Sunday March 3, 2019 General Orders in effect: NONE A. Operating Manuals 1. Timetable Authority:

More information

Rail Safety Management Procedure General Engineering and Operational Systems Railway Track Signals - Detonators

Rail Safety Management Procedure General Engineering and Operational Systems Railway Track Signals - Detonators 1/12 General Engineering and Operational Systems Railway Track Signals - Detonators Revision Date Comments 1 January 2007 Initial Document 2 May 2007 Review and Update to incorporate associated forms 3

More information

Aerial and Scissor Lift

Aerial and Scissor Lift This document is intended to provide basic safety guidelines for the Physical Plant Department at Community College of Allegheny County. The information provided in this guide may vary by site. Version

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Passing Fixed Signals at Stop Rule Number: 6013 Version 1.02, 1 April 2017 Passing Fixed Signals at Stop Rule Number: 6013 Document Control Identification Document

More information

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-31 August 03, 2018

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-31 August 03, 2018 Page 1 of 5 INDIANA HARBOR BELT RAILROAD COMPANY BULLETIN ORDER NO. S-31 August 03, 2018 Effective: 0001 Sunday August 5, 2018 General Orders in effect: NONE A. Operating Manuals 1. Timetable Authority:

More information

Technical Standards and Safety Authority. Interpretation, Policy and Procedure

Technical Standards and Safety Authority. Interpretation, Policy and Procedure Page 1 of 7 1.0 Issue: The following interpretation, policy, and procedures are intended to provide clarity and consistency in regards to: The appropriate level of sign off received from the contractor

More information

Millersville University Finance and Administration Division Management Directive

Millersville University Finance and Administration Division Management Directive Millersville University Finance and Administration Division Management Directive Department(s) Subject: By Direction of: Roger V. Bruszewski Vice President for Finance and Administration Maintenance Operations

More information

DIVISION 9 TRAM TECHNICAL

DIVISION 9 TRAM TECHNICAL Revision 0 Specification: Division 9 DIVISION 9 TRAM TECHNICAL Contents: Part 910 Tramway Provisions Part 920 Tram Track Part 930 Overhead Catenary Part 940 Tram Platforms DTEI XXCxxx Page 1 PART 910 TRAMWAY

More information

CODE OF PRACTICE Transportation of Employees by Vessel to or from a Workplace in the Offshore Petroleum Industry - Newfoundland and Labrador

CODE OF PRACTICE Transportation of Employees by Vessel to or from a Workplace in the Offshore Petroleum Industry - Newfoundland and Labrador CODE OF PRACTICE Transportation of Employees by Vessel to or from a Workplace in the Offshore Petroleum Industry - Newfoundland and Labrador March 2017 2017-0023 The Canadian Association of Petroleum Producers

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Track Access Accreditation Rule Number: 1004 Version 1.02, 1 April 2017 Track Access Accreditation Rule Number: 1004 Document Control Identification Document title

More information

KENORA DISTRICT SERVICES BOARD POLICY and PROCEDURE Page 1 of 8

KENORA DISTRICT SERVICES BOARD POLICY and PROCEDURE Page 1 of 8 POLICY and PROCEDURE Page 1 of 8 DATE: August 9, 2001 POLICY NO.: KDSB-LAS-V-07 APPROVED BY: Resolution No. 2001-102 REVISED: Res. No. 2008-150 - October 2, 2008 1. POLICY STATEMENT Land Ambulance and

More information

Procedure. Procedure

Procedure. Procedure Procedure 4.1501 LOCK, TAG, AND TRY-ENERGY ISOLATION PROCEDURE A. Scope... 1 B. General... 1 C. Applicability... 2 D. Definitions... 2 E. Procedure... 3 F. Energy Control Program... 4 G. Revision History...

More information

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE PART I - GENERAL 56.01 SCOPE: The Contractor shall furnish all labor, material, equipment and supplies and shall perform all work necessary for the

More information

ADDENDUM TO THE CODE OF PRACTICE (VOLUME 3) FOR THE AUSTRALIAN RAIL NETWORK

ADDENDUM TO THE CODE OF PRACTICE (VOLUME 3) FOR THE AUSTRALIAN RAIL NETWORK Australia Southern Railroad : Rail Safety Document Operations Code of Practice Issue 2.0 Australia Southern Railroad Australian Railroad Group (SA & NT) ADDENDUM TO THE CODE OF PRACTICE (VOLUME 3) FOR

More information

24 Construction. Engineering Instructions. 24 Construction

24 Construction. Engineering Instructions. 24 Construction Engineering Instructions 24.1 Contractor Safety... 24-5 24.1.1 Roadway Worker Protection/On-Track Safety Program and Training... 24-5 24.1.2 Training Certification... 24-5 24.1.3 Contractor Safety Briefing

More information

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-39 April 6, 2019

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-39 April 6, 2019 Page 1 of 17 INDIANA HARBOR BELT RAILROAD COMPANY BULLETIN ORDER NO. S-39 April 6, 2019 Effective: 0600 Sunday April 7, 2019 General Orders in effect: NONE A. Operating Manuals 1. Timetable Authority:

More information

Training, Qualification, and Oversight for Safety-Related Railroad Employees. 49 CFR Part 243

Training, Qualification, and Oversight for Safety-Related Railroad Employees. 49 CFR Part 243 Training, Qualification, and Oversight for Safety-Related Railroad Employees 49 CFR Part 243 Objectives Understand the purpose of the regulation Explain who a safety-related employee is Review key provisions

More information

Title: Lockout / Tagout Effective Date: 11/28/2014 Control Number: THG_0008 Revision Number: 1 Date: 10/8/2015 Annual Review Completed: 5/13/2015

Title: Lockout / Tagout Effective Date: 11/28/2014 Control Number: THG_0008 Revision Number: 1 Date: 10/8/2015 Annual Review Completed: 5/13/2015 Title: Lockout / Tagout Effective Date: 11/28/2014 Control Number: THG_0008 Revision Number: 1 Date: 10/8/2015 Annual Review Completed: 5/13/2015 Lockout / Tagout CONTENTS I. PURPOSE II. SCOPE III. DEFINITIONS

More information

FEDERAL REGISTER <66> <FR> <10340> NOTICE Feb. 14, 2001

FEDERAL REGISTER <66> <FR> <10340> NOTICE Feb. 14, 2001 FEDERAL REGISTER NOTICE Feb. 14, 2001 DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Notice of Safety Advisory 2001-01 AGENCY: Federal Railroad Administration (FRA), Department

More information

LOADING UNLOADING OPERATIONS

LOADING UNLOADING OPERATIONS CONTRACTOR WHS HAZARD STANDARD LOADING UNLOADING OPERATIONS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION

More information

Traffic Management Procedure

Traffic Management Procedure Traffic Management Procedure HSEQ Management System Procedure What this procedure describes: To assist managing the risks associated with pedestrian and vehicular traffic interactions. Why it is required

More information

UPRR - General Code of Operating Rules

UPRR - General Code of Operating Rules Union Pacific Rules UPRR - General Code of Operating Rules Seventh Edition Effective April 1, 2015 Includes Updates as of December 29, 2017 PB-20280 1.0: GENERAL RESPONSIBILITIES 2.0: RAILROAD RADIO AND

More information

Operating Rules. Making multiple tail room moves. For holding tail room at an

Operating Rules. Making multiple tail room moves. For holding tail room at an 1.0 Definitions BUFFALO LINE Operating Rules 1.0a Prototype derived definitions. Term head room holding head room tail room holding tail room foul double drilling set out pick up constrained restricted

More information

Burnt Hills and Big Flats Railroad Employee Training MAYFIELD YARDMASTER

Burnt Hills and Big Flats Railroad Employee Training MAYFIELD YARDMASTER Burnt Hills and Big Flats Railroad Employee Training MAYFIELD YARDMASTER Railroad Yardmaster Duties Tulsa, OK Frisco Yard Office http://www.loc.gov/pictures/resource/fs a.8d44978/ Railroad yardmasters

More information

THE BELT RAILWAY COMPANY OF CHICAGO TRANSPORTATION GENERAL ORDER #

THE BELT RAILWAY COMPANY OF CHICAGO TRANSPORTATION GENERAL ORDER # THE BELT RAILWAY COMPANY OF CHICAGO TRANSPORTATION GENERAL ORDER #2019-001 Effective 0001, Wednesday, January 16, 2019 To: ALL CONCERNED Subject: 2019, Transportation Summary General Order Transportation

More information

Health and safety representatives

Health and safety representatives OHS information for workers, employers, and prime contractors KEY INFORMATION A health and safety representative (HS representative) is required on work sites where there are 5 to 19 workers and the work

More information

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP VALLEY LATERAL PROJECT RESOURCE REPORT 11 Reliability and Safety FERC Docket No. CP16- -000 November 2015 Section TABLE OF CONTENTS Page 11.0 RELIABILITY AND SAFETY... 11-1 11.1 NATURAL GAS PIPELINE INDUSTRY

More information

City of Martinsburg 1. TASK & DUTIES LIST AND MEASURES OF PERFORMANCE FOR: PUBLIC WORKS LABORER

City of Martinsburg 1. TASK & DUTIES LIST AND MEASURES OF PERFORMANCE FOR: PUBLIC WORKS LABORER PAGE 1 OF 5 1. TASK & DUTIES LIST AND MEASURES OF PERFORMANCE FOR: PUBLIC WORKS LABORER PAY STATUS: NON-EXEMPT 2. REQUIREMENTS: Education: Licensing, Registration or Certification: Experience Skills, Knowledge

More information

Crane & Derrick Operation Procedures for Construction

Crane & Derrick Operation Procedures for Construction Crane & Derrick Operation Procedures for Construction The written Crane & Derrick Operation Procedures establish guidelines to be followed whenever any of our employees work with cranes or derricks at

More information

TABLE OF CONTENTS. NiCon Terminal HS&E

TABLE OF CONTENTS. NiCon Terminal HS&E This Terminal Safety Plan outlines many of the safety policies and processes utilized at the NiCon Terminal. Additional safety rules and policies may be introduced or utilized by ARB Midstream, or the

More information

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision 1. Intent This program has been developed to reduce the risk of physical injury or property

More information

Classified Employee Pipefitter, Sprinkler System JOB DESCRIPTION

Classified Employee Pipefitter, Sprinkler System JOB DESCRIPTION Palos Verdes Peninsula Unified School District Human Resources Department 375 Via Almar Palos Verdes Estates, CA 90274 (310) 896-3417 Classified Employee Pipefitter, Sprinkler System JOB DESCRIPTION Supervisor

More information

Load Handling (Hoisting) Policy

Load Handling (Hoisting) Policy 1.0 PURPOSE This policy is to promote safe load handling (hoisting) practices and reduce the frequency and severity of incidents. The purpose is to protect personnel from injury, the environment from harm,

More information

Rail Carrier Minimum-Security Criteria

Rail Carrier Minimum-Security Criteria Rail Carrier Minimum-Security Criteria (08/28/2006) Rail carriers must conduct a comprehensive assessment of their security practices based upon the following C-TPAT minimum-security criteria. Recognizing

More information

TEXAS DEPARTMENT OF TRANSPORTATION STATEWIDE RAILROAD FLAGGING SERVICES

TEXAS DEPARTMENT OF TRANSPORTATION STATEWIDE RAILROAD FLAGGING SERVICES TEXAS DEPARTMENT OF TRANSPORTATION STATEWIDE RAILROAD FLAGGING SERVICES SPECIFICATION NO. PUBLICATION This specification is a product of the Texas Department of Transportation (TxDOT). This specification

More information

Barricades. Preparer: Owner: Approver: EHS Specialist EHS Team Leader Site Director J. Walker (Electronic Signature on File)

Barricades. Preparer: Owner: Approver: EHS Specialist EHS Team Leader Site Director J. Walker (Electronic Signature on File) Number: HAN-EHS-SPI-0274 Page: e 1 of 6 Preparer: Owner: Approver: EHS Specialist EHS Team Leader Site Director J. Walker (Electronic Signature on File) J. Hooker (Electronic Signature on File) P. Waddington

More information

Issue Rule Book Briefing Leaflet

Issue Rule Book Briefing Leaflet Rule Book Briefing Leaflet Issue 30.2 March 2018 The following modules were re-issued and came into force on 02 December 2017: Glossary Handbook 8 Handbook 9 Handbook 11 Handbook 12 Handbook 15 Handbook

More information

The following is Queen's Printer for Ontario, Occupational Health and Safety Act - R.R.O. 1990, Reg. 851

The following is Queen's Printer for Ontario, Occupational Health and Safety Act - R.R.O. 1990, Reg. 851 Ontario Lift Truck - Chariot de levage industriel This material has been extracted from the Acts and Regulations of the Province to help students understand the subject. It is not an official source of

More information

[Docket No. FRA ; Notice No. 1] [Draft Safety Advisory ] Draft Safety Advisory Related to Temporary Signal Suspensions

[Docket No. FRA ; Notice No. 1] [Draft Safety Advisory ] Draft Safety Advisory Related to Temporary Signal Suspensions This document is scheduled to be published in the Federal Register on 04/23/2018 and available online at https://federalregister.gov/d/2018-08406, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information