FREEWAY RESPONSIVE SYSTEM IH 10 TxDOT Houston. Steve Chiu, TxDOT Roma Stevens, P.E., PTOE, TTI
|
|
- Adele Watkins
- 5 years ago
- Views:
Transcription
1 FREEWAY RESPONSIVE SYSTEM IH 10 TxDOT Houston Steve Chiu, TxDOT Roma Stevens, P.E., PTOE, TTI Oct 14, 2015
2 FREEWAY MOBILITY Address Congestion
3 AIM Help alleviate freeway traffic through signalized intersections when freeway traffic level of service is deteriorating. 3
4 ISSUES Where to displace freeway traffic when freeway traffic is no longer free flowing. Due to : incident, constructions, and various things that slowdown free flowing condition. 4
5 CONCEPT Sensor Monitor Freeway Condition Output info to intersections Intersections respond 5
6 DESIGN Sensors monitor freeway conditions Sensors output contact when conditions met Sending contact information to intersections Intersections receive information Intersections react to the input 6
7 DESIGN Using the Wavetronix Radar sensor to monitor both direction of freeway. Monitoring freeway vehicle speed, volume, or occupancy. Using contact closure radio to send contact signals to traffic signal cabinets when preset freeway condition threshold is reached. Using two contact inputs to generate 3 timing plans. Ex: on-off plan 1 (inbound condition), off-on plan 2 (outbound condition), and on-on plan 3 (both). 7
8 DESIGN 8
9 DESIGN IH 10 - limits from west of SH 6 to Mason 9
10 EQUIPMENT Wavetronix HD Sensor with Criteria Signaling feature Click! 513 contact closure Intuicom 900 MHz radio with I/O contact closure Econolite ASC 3 traffic signal controller 10
11 INSTALLATION Adapt existing freeway sensors Installed additional equipment for responsive system-click 513! and Click 300! Install antennas and I/O communication equipment at sensor locations and at intersections. 11
12 INSTALLATION Sensors 12
13 INSTALLATION Sensors 13
14 INSTALLATION I/O or contact closure radio 14
15 INSTALLATION Intersection antenna 15
16 INSTALLATION Signal Cabinet 16
17 INSTALLATION Contact Closure Inputs - Test A&B West Bound Test A Input East Bound Test B Input 17
18 INSTALLATION Attach Logic Ground 18
19 SETUP AND OPERATION Sensor setup how many lanes and directions Contact closure interval criteria setup - speed, volume and/or occupancy. Program radio for contact closure inputs and outputs at sensor location and traffic signal cabinet. Connect the radio contact closure outputs at the intersection to the designated input terminals. 19
20 SETUP AND OPERATION 20
21 SETUP AND OPERATION 21
22 SETUP AND OPERATION 22
23 TRAFFIC PATTERN PM Traffic 23
24 FREEWAY INCIDENT 24
25 SETUP AND OPERATION Radio setup allows all intersections to receive all 3 sensor outputs 25
26 DATA COLLECTION All the data collection is done by the HD sensor at 30 seconds interval. Click 513 pulled data every 5 seconds. When all criteria are met then contact closure closed. 26
27 CONTROLLER LOGIC STATEMENT Inbound Statement Outbound Statement Both Statement IF: IF CIB CODE ON 160 AND CIB CODE OFF 161 THEN: SET ACTION PLAN ON 10 ELSE: IF: IF CIB CODE OFF 160 AND CIB CODE ON 161 THEN: SET ACTION PLAN ON 11 ELSE: IF: IF CIB CODE ON160 AND CIB CODE ON161 THEN: SET ACTION PLAN ON12 ELSE: Test A = CIB CODE 160 Test B = CIB CODE
28 CONTROLLER ACTION PLAN Action plan 10- Max 3 time is Checked for Phase 8 (West Bound Frontage Road) 28
29 RESULTS 29
30 DATA (01/16/2015 PM) Alarm Log For Barker Cypress intersection 30
31 DATA (02/12/15 AM) Alarm Log For Green House intersection 31
32 INCIDENT ON 05/08/2015 IH 10 WITH FREEWAY CLOSED 32
33 Freeway Condition Info\EFPlayer.exe _ (greenhouse).avr (AM) _ (correct data).avr (PM) 33
34 OTHER USES Monitor exit ramp condition. When the exit ramp traffic is backup, the sensor can trigger a low priority preemption, a TSP (Transit Signal Priority) input or an alternative timing plan to clear the exit ramp traffic. With Peer to Peer feature, adjacent intersection can also react to the new action plan. 34
35 COST HD SENSOR- 1 POWER SUPPLY- 1 CLICK! I/O RADIO- 2 ANTENNA- 2 Total : approx. $11,000.00/ location Additional intersection : $
36 BENEFITS What are the benefits? Can we quantify? What happens to cross-street traffic? Is it always the solution? 36
37 BENEFITS CALCULATIONS Install more sensors to collect VERY DETAILED travel time data and queue lengths More costs to document the benefits Micro-simulation using VISSIM to document the benefits Less expensive Collected exit and entry ramp volumes Collected turning movement counts at intersections Timing plans Mainlane volumes from Wavetronics Travel time data from travel map for model calibration 37
38 SIMULATION PROCESS Developed a VISSIM model Freeway segment between SH 6 and Mason Road Frontage between SH 6 and Greenhouse Road focus on Barker Cypress, WB direction and PM Peak Period Going outbound, Barker Cypress signal is the first TxDOT maintained signal for changing timing plans Barker Cypress Entry from Barker Cypress Exit to Greenhouse Road WB Exit to Barker Cypress 38
39 Typical Volumes in Study Segment
40 MEASURES OF EFFECTIVENESS PM Peak Hour Throughput Freeway throughput Cross street and EB Frontage throughput WB Frontage road throughput Delay Delay for freeway Delay for WB frontage approach Delay for SB approach Overall Intersection Delay 40
41 MEASURES OF EFFECTIVENESS PM Peak Hour (4:00 to 5:00) Throughput Freeway Increased by 500 vph Cross street and EB Frontage Decreased by 115 vph WB Frontage Increased by 380 vph Delay WB Freeway 64 Veh-hrs WB frontage approach 130 s/veh, 86 Veh-hrs SB approach Increased by 62 s/veh, 13 veh-hrs Total Intersection 68 veh-hrs 41
42 User Benefits of Delay Savings Value of Time - $21.90 per hour Delay savings for one hour of PM peak = 132 vehicle hours Delay savings for PM peak = 2*132 =264 vehicle hours Monetary value of delay savings/weekday = 264*21.90 = $5,780 System cost per intersection $11,000 Breakeven period 2 days PM peak 42
43 CONCLUSION Using frontage road to alleviate freeway traffic during less desirable level of service can be an alternative solution to freeway traffic congestion. 43
44 GOING FORWARD Do a sensitivity analysis to identify when and where it is most beneficial What happens if intersection is fully saturated Closely spaced intersections along X-street Off-peak incident condition Develop a guidance document Time of Day triggering 44
45 Questions??? 45
46 Contact Steve Chiu Texas Department of Transportation Houston District P: (713) Roma Stevens, P.E., PTOE Associate Research Engineer Texas A&M Transportation Institute P: (713)
Apply DynusT Model for Incident Management along Loop 101 Corridor
Apply DynusT Model for Incident Management along Loop 101 Corridor Lili(Leo) Luo, P.E. ITS/Safety Engineer Sarath Joshua, P.E. ITS/Safety Program Manager What do Transportation Models do? Help us answer
More informationA Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange
A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange Jeromy Grenard, PE, PTOE American Structurepoint Hardik Shah, PE, PTOE American Structurepoint Roundabouts
More informationAdvanced Transportation Management System (ATMS)
Advanced Transportation Management System (ATMS) Presentation to the ITS Technology Workshop for Municipalities February 15, 2017 ATMS Project Background Increasing traffic volumes Roadway network is near
More informationTransit Signal Priority in the Denver Metro. Bart Przybyl, P.E., PTOE
Transit Signal Priority in the Denver Metro Bart Przybyl, P.E., PTOE BACKGROUND DRCOG Denver Regional Council of Governments RTD Regional Transportation District (Transit Authority) 2007 DRCOG/RTD Transit
More informationRamp Reversal Research. Roy Parikh, P.E. TxDOT Fort Worth District
2007 WINTER TEXITE MEETING FEBRUARY 3,2007 Ramp Reversal Research Roy Parikh, P.E. TxDOT Fort Worth District Research Project 0-5105 RMC 4 Traffic Operations Project title Development of Guidelines for
More informationA Tutorial on Establishing Effective Work Zone Performance Measures
A Tutorial on Establishing Effective Work Zone Performance Measures Tracy Scriba, Federal Highway Administration and Gerald Ullman, Texas Transportation Institute Percent Increase in Injury Crashes Lane-Mile-
More informationThe Secrets to HCM Consistency Using Simulation Models
The Secrets to HCM Consistency Using Simulation Models Ronald T. Milam, AICP David Stanek, PE Chris Breiland Fehr & Peers 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 r.milam@fehrandpeers.com (916)
More informationEvaluation of Truck Signal Priority at N Columbia Blvd and Martin Luther King Jr. Blvd Intersection
Portland State University PDXScholar Civil and Environmental Engineering Master's Project Reports Civil and Environmental Engineering 2014 Evaluation of Truck Signal Priority at N Columbia Blvd and Martin
More informationThe New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM
The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM Tom Creasey, PE, PhD Principal, Stantec Consulting Services Inc. Chair, TRB Highway Capacity and Quality of Service Committee Presented
More informationTransportation Management Data:
Delaware Department of Transportation 2016 ITE Mid-Colonial District Annual Conference Transportation Management Data: Enhancing the Way We Do Business Gene Donaldson Alyssa May, PE Agenda Monitoring capabilities
More informationDRAFT. Draft Carbon Monoxide (CO) Traffic Air Quality Analysis
Draft Carbon Monoxide (CO) Traffic Air Quality Analysis North Houston Highway Improvement Project From US 59/I-69 at Spur 527 To I-45 at Beltway 8 North Harris County TxDOT Houston District CSJ: 0912-00-146
More informationAdaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project
Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project NRITS & ITS AZ Annual Conference October 2018 Presented by: April Wire, P.E., PTOE ITS
More informationDevelopment of TSP warrants. to-day variability in traffic demand
Development of TSP warrants considering vehicular emissions and day-to to-day variability in traffic demand Zeeshan Abdy Supervisor: Bruce R. Hellinga Dec 2006 Introduction Signalized intersections Traffic
More informationOPTIMIZING RAMP METERING STRATEGIES
OPTIMIZING RAMP METERING STRATEGIES Presented by Kouros Mohammadian, Ph.D. Saurav Chakrabarti. ITS Midwest Annual Meeting Chicago, Illinois February 7, 2006 Background Ramp control is the application of
More informationApplications of Microscopic Traffic Simulation Model for Integrated Networks
Applications of Microscopic Traffic Simulation Model for Integrated Networks by Steven I. Chien Dept. of Civil & Environmental Engineering New Jersey Institute of Technology January 13, 2006 Center for
More informationTexas Transportation Institute The Texas A&M University System College Station, Texas
1. Report No. FHWA/TX-01/4190-4 4. Title and Subtitle EMISSIONS DUE TO CONSTRUCTION EQUIPMENT AND TRAFFIC DELAYS TASK 6: CONTRIBUTION OF VEHICULAR EMISSIONS CAUSED BY REDUCTION IN CAPACITY DURING ROADWAY
More informationPottstown Pike Congestion Mitigation Feasibility Study
Pottstown Pike Congestion Mitigation Feasibility Study Study Advisory Committee Meeting #3 November 15, 2017 Transportation Solutions Building Better Communities Agenda 1. Background Information 2. Review
More informationTRANSFORM66: OUTSIDE THE BELTWAY
TRANSFORM66: OUTSIDE THE BELTWAY Concession Fee Project Eligibility *Required Entry PARTI GENERAL INFORMATION 1.1 Applicant Information Please indicate the jurisdiction or agency that is submitting this
More informationAutomating Variable Speeds and Traveler Information with Real-Time Traffic and Weather
Automating Variable Speeds and Traveler Information with Real-Time Traffic and Weather Joshua Crain, Jim Peters, P.E., PTOE, and Carl S. Olson ABSTRACT The Highway 217 freeway in Portland, Oregon was the
More informationAGENCY MEETING. I-10E Planning & Environmental Linkages Meeting #1 TxDOT Houston District
AGENCY MEETING I-10E Planning & Environmental Linkages Meeting #1 TxDOT Houston District January 25, 2018 WELCOME TxDOT Project Manager: Grant Chim, P.E. Agenda 1 Introductions / Purpose of Meeting 2 What
More informationUrban Street Safety, Operation, and Reliability
Urban Street Safety, Operation, and Reliability March 2012 Overview Background Urban Street Operation Urban Street Safety Combined Operation and Safety Evaluation Reliability Evaluation 2 1 Background
More informationRamp Metering District
Ramp Metering District 6-0 Agenda District 6-0 TIMS Program Overview Ramp Metering History and Initial Deployment Ongoing operations Future Concepts 2015 RTMC Operations Overview ITS Deployments at a Glance
More informationGoleta Ramp Metering Study
DRAFT Technical Memorandum Goleta Ramp Metering Study Subtasks 2.1 and 2.2: Data Collection and Existing Baseline Analysis June 5, 2017 DRAFT Technical Memorandum Goleta Ramp Metering Study Subtasks 2.1
More informationCorpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:
Introduction: Traffic congestion in the Corpus Christi Metropolitan area is not as much a function of population growth as the function of the increase in single occupant trips. Using census data, the
More informationIH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013
IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange Public Meeting Thursday April 4, 2013 1 Project Contacts: TxDOT-Fort Worth District John R. Tillinghast, P.E. IH 820 Project
More informationFlorida International University; University of Central Florida. Mohammed Hadi, Ph.D., PE (Dr. Haitham Al-Deek from UCF is Co-PI)
Project Information Form Project Title University Principal Investigator PI Contact Information Performance Measurements of Transportation Systems based on Fine- Grained Data Collected by AVI and AVL Systems
More informationEvaluation of Freeway Work Zone Merge Concepts
Evaluation of Freeway Work Zone Merge Concepts Michael Kurker University of Texas at Austin Research in conjunction with Ruoyu Liu, Shoupeng Tang, Chris Fournier Jen Duthie, Natalia Ruiz Juri, Randy Machemehl,
More informationSECTION II CONTROLLED ACCESS FACILITIES
SECTION II CONTROLLED ACCESS FACILITIES SYSTEM IDENTIFICATION A critical component of the Dallas-Fort Worth (DFW) Metropolitan Transportation System is the regional freeway and tollway systems, which are
More informationScienceDirect. Metering with Traffic Signal Control Development and Evaluation of an Algorithm
Available online at www.sciencedirect.com ScienceDirect Transportation Research Procedia 8 (215 ) 24 214 European Transport Conference 214 from Sept-29 to Oct-1, 214 Metering with Traffic Signal Control
More informationNatural Diversion At Temporary Work Zone Lane Closures on November 1992 Urban Freeways In Texas. G.L. Ullman Research Report
1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. FHWA/TX-92/1108-6 4. Tiiie and Subtitle 5. Report Date Technical Report Documentation Page Natural Diversion At Temporary Work Zone
More informationTraffic/Mobility Analytics
Daniel P. Farley Section Chief Traffic Operations Deployment and Maintenance dfarley@pa.gov 717-783-0333 How PennDOT is using large vehicle probe and crowd source information to begin to better plan, design,
More informationTRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT
TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM #4 T/T MTG: 092616 DATE: SEPTEMBER 26, 2016 TO: TRAFFIC & TRANSPORTATION COMMISSION FROM: BENJAMIN CHAN, P.E, T.E., DEPUTY PUBLIC WORKS DIRECTOR
More informationDynamic Lane Merge Systems
Dynamic Lane Merge Systems Acknowledgements Maryland State Highway Administration University of Maryland, College Park Michigan Department of Transportation Wayne State University Lane Merging Issues Merging
More informationDallas Integrated Corridor Management (ICM) Update
Dallas Integrated Corridor Management (ICM) Update North Central Texas Council of Governments Surface Transportation Technical Committee April 26, 2013 What is ICM? The integrated management of freeway,
More informationActive Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc.
Active Traffic Management in Michigan Patrick Johnson, P.E. HNTB Michigan Inc. Active Traffic Management (ATM) Active Traffic Management Strategies: Dynamic Lane Use Dynamic Shoulder Use Queue Warning
More informationAutomatic Vehicle Identification (AVI) Versus Anonymous Wireless Address Matching (AWAM) also known as Bluetooth
Automatic Vehicle Identification (AVI) Versus Anonymous Wireless Address Matching (AWAM) also known as Bluetooth Magdy Kozman,P.E. Texas Department of Transportation Transportation Operation Engineer Texas
More informationFREEWAY PERFORMANCE MEASUREMENT SYSTEM (PeMS): AN OPERATIONAL ANALYSIS TOOL
FREEWAY PERFORMANCE MEASUREMENT SYSTEM (PeMS): AN OPERATIONAL ANALYSIS TOOL Tom Choe Office of Freeway Operations California Department of Transportation District 7 120 S Spring Street Los Angeles, CA
More informationUS 75 Integrated Corridor Management System Using Technology and Partnership to Maximize Transportation System Capacity
US 75 Integrated Corridor Management System Using Technology and Partnership to Maximize Transportation System Capacity Ahmad Sadegh, Ph.D. Schneider Electric US 75 Corridor Networks Freeway with continuous
More informationAdaptive Traffic Control OCTEC Meeting
PRESENTATION FOR THE Adaptive Traffic Control OCTEC Meeting June 21, 2012 VPH (vehicles per hour) Traditional Signal TIming PEAK 15 Min 4000 3500 3000 2500 2000 1500 1000 500 0 AM 12:00 AM 2:00 AM 4:00
More informationDeveloping a Successful ICM Project. Christopher Poe, Ph.D., P.E. Assistant Director Texas A&M Transportation Institute
Developing a Successful ICM Project Christopher Poe, Ph.D., P.E. Assistant Director Texas A&M Transportation Institute What is ICM? What is ICM? The integrated management of freeway, arterial, transit,
More informationLoop 289 Corridor Study Phase I
2008 Loop 289 Corridor Study Phase I Hongchao Liu, Pavan Evuri, and Hao Xu Multidisciplinary Research in Transportation Texas Tech University August 2008 TABLE OF CONTENTS LIST OF TABLES... III LIST OF
More informationI-90 ALLSTON INTERCHANGE
I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT TASK FORCE MEETING March 10, 2016 FIORENTINO COMMUNITY CENTER 1 Meeting Agenda Welcome & Introductions Urban Interchange Concept 3K-4c with
More informationSIEMENS CONCERT: City of Seattle
SIEMENS CONCERT: City of Seattle Use of ATMS to Enhance and Extend Signal Operations Abstract: Today s signal systems are part of a complex environment that includes varied and disparate data sources and
More informationCITY OF CLOVIS Traffic Impact Study Guidelines
CITY OF CLOVIS Traffic Impact Study Guidelines CLOVIS, A WAY OF LIFE Approved August 25, 2014 City Council Resolution 2014-79 Prepared by City of Clovis Engineering Division Steve White, City Engineer
More informationConclusions & Lessons Learned
What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County
More informationRegional Cashless Tolling Planning Study ASSESSMENT OF FUTURE IMPACTS TO I-76 INTERCHANGES AND ADJACENT ROADWAYS
Regional Cashless Tolling Planning Study ASSESSMENT OF FUTURE IMPACTS TO I-76 INTERCHANGES AND ADJACENT ROADWAYS September 15, 2016 Prepared by: In association with: SPC would like to thank our Technical
More informationWoodburn Interchange Project Transportation Technical Report
Final Report Woodburn Interchange Project Transportation Technical Report Prepared for Oregon Department of Transportation April 212 Prepared by DKS Associates Contents Methodologies... 4 Volume Development...
More informationUPTOWN TRAFFIC IMPACT ANALYSIS
UPTOWN TRAFFIC IMPACT ANALYSIS This memorandum summarizes the results of the traffic analysis conducted to evaluate the traffic operations of the intersections along Post Oak Boulevard within Uptown Houston
More informationLow-Cost Improvements for Recurring Freeway Bottlenecks
NCHRP 3-83 Low-Cost Improvements for Recurring Freeway Bottlenecks Draft Technical Guide November 2012 TRANSPORTATION RESEARCH BOARD NAS - NRC LIMITED USE DOCUMENT This report, not released for publication,
More informationScope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four
Scope of Services Traffic Signal Retiming Contract FM NO. 230017-8-32-01 Florida Department of Transportation District Four A-1 Contents 1. Background... 3 2. Summary of Services... 3 3. Consultant Requirements...
More informationCHAPTER 2: MODELING METHODOLOGY
CHAPTER 2: MODELING METHODOLOGY 2.1 PROCESS OVERVIEW The methodology used to forecast future conditions consisted of traditional traffic engineering practices and tools with enhancements to more accurately
More informationApplying Micro-simulation i tools for Project Development- University of Florida Traffic Seminar Jaimison Sloboden, PE RS&H
Applying Micro-simulation i tools for Project Development- Documentation ti & QA/QC University of Florida Traffic Seminar Jaimison Sloboden, PE RS&H Overview Principles Types of Projects Correctly Scoping
More informationASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION
ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION Dr. Arun Chatterjee Professor Emeritus Dept of Civil & Environmental Engineering The University of Tennessee Knoxville,
More informationBCEO TRAFFIC IMPACT STUDY GUIDELINES
BCEO TRAFFIC IMPACT STUDY GUIDELINES February 2006 TABLE OF CONTENTS INTRODUCTION..... i TRAFFIC IMPACT STUDY STRUCTURE... 1 WHEN IS A TRAFFIC IMPACT STUDY NEEDED?..... 1 STUDY AREA, SITE PLAN & HORIZON
More informationCity of Berkeley. Guidelines for Development of Traffic Impact Reports
Office of Transportation (OOT) City of Berkeley Guidelines for Development of Traffic Impact Reports Office of Transportation, City of Berkeley 1 1. Overview These guidelines provide a framework to help
More informationPolicy Research CENTER
TRANSPORTATION Policy Research CENTER New Approaches to Transportation Management (Task 1) Congestion continues to be a challenge in Texas and throughout the United States, and it is increasing, leading
More informationAtherton Street Traffic Signal & ITS Improvements
SR 3014 Section N11 Evaluation October 1, 2012 Agenda Project Team Introductions Goals & Objectives Project Overview Travel Time CATA Schedule Adherence Benefit-Cost Analysis Project Challenges Project
More information1. Controlling the number of vehicles that are allowed to enter the freeway,
Chapter 25 Ramp Metering 25.1 Introduction Ramp metering can be defined as a method by which traffic seeking to gain access to a busy highway is controlled at the access point via traffic signals. This
More informationSPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work
2004 Specifications CSJ 0027-12-134 SPECIAL PROVISION 000--2823 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,
More informationAnalytical Tools and Decision Support Systems SANDAG I-15 ICM. ITS PA January 30 th, 2014
Analytical Tools and Decision Support Systems SANDAG I-15 ICM ITS PA January 30 th, 2014 Project Partners/Stakeholders National ICM Evaluator National AMS Contractor 2 San Diego I-15 Corridor 21 mile corridor
More informationTelling the Freight (trucking/goods movement) story:
Telling the Freight (trucking/goods movement) story: Urban Mobility Report truck elements Trucks in Texas 100 Connection to Texas Freight Network Improving data for truck analyses Solutions/uses Observations
More information3.6 GROUND TRANSPORTATION
3.6.1 Environmental Setting 3.6.1.1 Area of Influence The area of influence for ground transportation consists of the streets and intersections that could be affected by automobile or truck traffic to
More informationMonitoring and Assessing Arterial Traffic Performance
Monitoring and Assessing Arterial Traffic Performance Stanley E. Young, P.E. Ph.D. University of Maryland Center for Advanced Transportation Technology Traffax Inc. National Renewable Energy Laboratory
More informationTraffic Data Quality Analysis. James Sturrock, PE, PTOE, FHWA Resource Center Operations Team
Traffic Analysis James Sturrock, PE, PTOE, FHWA Resource Center Operations Team Source Material Traffic Measurement http://ntl.bts.gov/lib/jpodocs/repts_te/14058.htm Seven DEADLY Misconceptions about Information
More informationby Melisa D. Finley, P.E. Transportation Short Course October 11, 2017
by Melisa D. Finley, P.E. Transportation Short Course October 11, 2017 Acknowledgements Texas Department of Transportation (TxDOT) Project 0-6769 Project 0-6867 (Phase I) Project 0-6867-01 (Phase II) Southwest
More informationRoute 7 Connector Ramp MODIF IE D I N T ER C H A N G E M OD IFICATIO N R E PO RT TRA N S F O R M I : I N S ID E THE BE LTWAY
STATE PROJECT NUMBER: 0066-96A-493,P101, C501, B686; UPC: 110629 FEDERAL PROJECT NUMBER: NHPP-066-1(356) FAIRFAX COUNTY, VIRGINIA TRA N S F O R M I - 6 6 : I N S ID E THE BE LTWAY Route 7 Connector Ramp
More informationVISSIM PROTOCOL FOR SIMULATION ON FREEWAYS
VISSIM PROTOCOL FOR SIMULATION ON FREEWAYS Oregon Department of Transportation Region 1 Prepared by: Steven B. Speth, P.E., P.T.O.E. 24954 Highway 395 South Canyon City, OR 97820 In cooperation with: DKS
More informationEvaluation Study of Inflow Traffic Control by Ramp Metering on Tokyo Metropolitan Expressway
Evaluation Study of Inflow Traffic Control by Ramp Metering on Tokyo Metropolitan Expressway 1 Tsubota, Y., 2 M. Iwata and 2 H. Kawashima 1 Obirin University, 2 Keio University, E-Mail: masafumi@ae.keio.ac.jp
More informationCOMPARISON OF SPUI & TUDI INTERCHANGE ALTERNATIVES WITH COMPUTER SIMULATION MODELING
COMPARISO OF SPUI & TUDI ITERCHAGE ALTERATIVES WITH COMPUTER SIMULATIO MODELIG Matthew J. Selinger, PTOE William H. Sharp, PTOE ABSTRACT There are numerous technical papers and reports discussing the operations
More informationDeveloping a Large Scale Hybrid Simulation Model of the Minneapolis Metropolitan Area
Developing a Large Scale Hybrid Simulation Model of the Minneapolis Metropolitan Area Derek Lehrke Minnesota Traffic Observatory, University of Minnesota 26th Annual Transportation Research Conference,
More informationSIMULATION OF TRUCK SAFETY INSPECTION PROCEDURES AT THE TEXAS/MEXICO BORDER
SIMULATION OF TRUCK SAFETY INSPECTION PROCEDURES AT THE TEXAS/MEXICO BORDER José Weissmann 1 and, Angela J. Weissmann 2 ABSTRACT The transportation funding bill approved by the US Congress in November
More informationTecNote Modeling 4-Phase Diamond Interchange Operation With Synchro / SimTraffic
TecNote 7001 - Modeling 4-Phase Diamond Interchange Operation With Synchro / SimTraffic Various phasing schemes can be used to optimize signal operations at a diamond interchange and closely spaced intersections.
More informationINTERSTATE HIGHWAY (IH) 635
INTERSTATE HIGHWAY (IH) 635 FROM: WEST OF GREENVILLE AVE TO: NORTH OF TOWN EAST BLVD DALLAS COUNTY CSJ: 2374-01-127 & 2374-02-053 ACCESS JUSTIFICATION IH 635 CORRIDOR EAST SECTION October 3, 2002 Texas
More informationJim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project
Memorandum Date: January 15, 2014 To: CC: From: Subject: Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Paul Danielson, P.E. Project Manager, Southwest Light Rail
More informationMulti-Resolution Traffic Modeling for Transform 66 Inside the Beltway Projects. Prepared by George Lu, Shankar Natarajan
Multi-Resolution Traffic Modeling for Transform 66 Inside the Beltway Projects Prepared by George Lu, Shankar Natarajan 2017 VASITE Annual Meeting, June 29, 2017 Outline Transform I-66 Inside the Beltway
More informationUS 75 Integrated Corridor Management
US 75 Integrated Corridor Management Koorosh Olyai,, P.E. Assistant Vice President Dallas Area Rapid Transit ITS Texas September 5, 2008 Why ICM is needed in the US 75 Corridor DFW 5 th most congested
More informationIntelligent Movement of Goods Will Trucks/Trains be able to Operate More Efficiently?
Intelligent Movement of Goods Will Trucks/Trains be able to Operate More Efficiently? UCLA Lake Arrowhead Symposium October 2008 Lawrence Jesse Glazer FHWA Calif. Division Office Jesse.Glazer@fhwa.dot.gov
More informationRamp Metering. Chapter Introduction Metering strategies Benefits Objectives
Chapter 46 Ramp Metering Traffic signal on merge ramp Direction of travel Merge lane Vehicle detectors monitoring traffic density through lane occupancy Figure 46.1: Schematic diagram of ramp metering
More informationBILLINGS BYPASS UPDATE
July 18, 2018 BILLINGS BYPASS UPDATE TEDD Steering Committee Monthly Meeting Project Update EIS and ROD Documents through Current Design Preliminary Design Completed preliminary design for full-build
More informationTHE EFFECTS OF ENTRANCE RAMP CLOSURE ON FREEWAY OPERATION DURING MORNING PEAK PERIODS. Roy C. Lautzenheiser Engineering Research Associate
THE EFFECTS OF ENTRANCE RAMP CLOSURE ON FREEWAY OPERATION DURING MORNING PEAK PERIODS by Roy C. Lautzenheiser Engineering Research Associate Research Report 139-9 Freeway Control and Information Systems
More informationVariable Speed Advisory/Limit and Coordinated Ramp Metering for Freeway Traffic Control
Variable Speed Advisory/Limit and Coordinated Ramp Metering for Freeway Traffic Control Project Meeting Caltrans DRI Xiao-Yun Lu and Steven Shladover California PATH Program, U. C. Berkeley Sept 7, 2012
More informationSERPM 7/DTA Application FSUTMS Users Group Meeting
SERPM 7/DTA Application FSUTMS Users Group Meeting Ana Elias, PhD, PE, PTOE Leigh Ann White, PE, PTOE June, 2015 www.jacobs.com worldwide Agenda 1. Mesoscopic Modelling and Cube Avenue Principles 2. Background
More informationThe Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges
The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares
More informationINTERIM ADVICE NOTE 103/08. Advice Regarding the Assessment of Sites for Ramp Metering
INTERIM ADVICE NOTE 103/08 Advice Regarding the Assessment of Sites for Ramp Metering Summary This document provides advice on identifying on-slip locations that are likely to be suitable for the implementation
More informationDEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)
2013 ITE Western District Annual Meeting COCEPT DEVELOPMET, AALYSIS, AD DESIG OF A EW PARKWAY AT GRADE ITERSECTIO (PAGI) Lead Author: James M. Witkowski, PhD Supporting Author: Darrell Truitt, PE The Pima
More informationEvaluation of A Dynamic Late Merge System PART I EVALUATION OF A DYNAMIC LATE MEREGE SYSTEM
PART I EVALUATION OF A DYNAMIC LATE MEREGE SYSTEM 3 1. Overview of Dynamic Late Merge Systems 1.1 Core concept of Dynamic Late Merge control PCMS 1 PCMS 2 PCMS 3 PCMS 4 TAKE YOUR TURN USE BOTH LANES USE
More informationI 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT
I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT February 2016 INTERSTATE 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION PROJECT Commonwealth of Virginia Virginia
More informationUse of TMC Data for Performance Measurement and Improving Operations. National Rural ITS Conference August 25, 2014 Ming Shiun Lee URS Corporation
Use of TMC Data for Performance Measurement and Improving Operations National Rural ITS Conference August 25, 2014 Ming Shiun Lee URS Corporation 1 Presentation Outline Motivations Performance Measures
More informationOKI Congestion Management System Analysis. Data Collection Report Year 1
OKI Congestion Management System Analysis Data Collection Report Year 1 May 2002 Prepared by the Ohio-Kentucky-Indiana Regional Council of Governments Acknowledgments Title OKI Congestion Management System
More informationFinding a Reliable Route between Two Points in a Transportation Network Using GIS
Finding a Reliable Route between Two Points in a Transportation Network Using GIS A Project Report Submitted for partial fulfillment of course requirements for CVEN658 Civil Engineering Applications of
More informationUNIT V TRAFFIC MANAGEMENT
UNIT V TRAFFIC MANAGEMENT TRANSPORTATION SYSTEM MANAGEMENT Transportation System Management (TSM) is a package of short term measures to make the most productive and cost-effective use of existing transportation
More informationVolume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning. Hiron Fernando, BSCE. A Thesis CIVIL ENGINEERING
Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning by Hiron Fernando, BSCE A Thesis In CIVIL ENGINEERING Submitted to the Graduate Faculty of Texas Tech
More informationASCT Systems Engineering
ASCT Systems Engineering ITE Regional Meeting June 2014 Rapid City Paul R. Olson, P.E., PTOE FHWA Resource Center Agenda First steps Operational objectives Planning and operations Systems engineering basics
More informationEvaluation of Rural Interstate Work Zone Traffic Management Plans in Iowa Using Simulation
184 MID-CONTINENT TRANSPORTATION SYMPOSIUM 2000 PROCEEDINGS Evaluation of Rural Interstate Work Zone Traffic Management Plans in Iowa Using Simulation STEVEN D. SCHROCK AND T. H. MAZE Traffic levels on
More informationExamining the Differences between Travelers Revealed versus Actual Travel Time Savings
1 1 1 1 1 1 1 0 1 0 1 Examining the Differences between Travelers Revealed versus Actual Travel Time Savings Prem Chand Devarasetty, Ph.D. Zachry Department of Civil Engineering Texas A&M University CE/TTI
More informationCONNECTED CORRIDORS ICM CALIFORNIA AND THE NEXT 20 YEARS
CONNECTED CORRIDORS ICM CALIFORNIA AND THE NEXT 20 YEARS 8/16/2013 Vehicles are getting connected 2 1 Get in your car 2 Plug in MirrorLink: almost everybody is in it This week: number of smartphone sales
More informationAppendix G Analysis of Project Impacts Compared to Existing Conditions
Appendix G Analysis of Project Impacts Compared to Existing Conditions This page intentionally left blank. Analysis of Project Impacts Compared to Existing Conditions Introduction The analysis scenarios
More informationPensacola RTMC Operator Quiz
Pensacola RTMC Operator Quiz 1. Acronyms A. ITS Intelligent Transportation Systems B. TMC Traffic or Transportation Management Center_ C. CCTV Closed Circuit Television D. DMS Dynamic Message Sign E. MVDS
More informationNCDOT I-540 Ramp Metering in Raleigh, Lessons Learned. Meredith McDiarmid NCDOT Transportation Mobility and Safety October 2018
NCDOT I-540 Ramp Metering in Raleigh, Lessons Learned Meredith McDiarmid NCDOT Transportation Mobility and Safety October 2018 What is Ramp Metering? Traffic signals on the freeway onramp Controls flow
More informationTechnical Memorandum Work Order #4-F. Prepared for. Metropolitan Transit Authority of Harris County
DEMAND MANAGEMENT FOR AM AND PM OPERATONS 1-10 KA1Y FREEWAY TRANS'WAY Technical Memorandum Work Order #4-F Prepared for Metropolitan Transit Authority of Harris County Texas Transportation nstitute The
More information