1 The New Jersey Clean Energy Conference September 26, 2005 PJM Overview Kenneth W. Laughlin VP Markets Coordination PJM PJM PJM 1

2 PJM as Part of the Eastern Interconnection KEY STATISTICS PJM member companies 350+ millions of people served 51 peak load in megawatts 131,330 MWs of generating capacity 165,738 miles of transmission lines 56,070 GWh of annual energy 700,000 generation sources 1,082 square miles of territory 164,260 area served 13 states + DC 2005 PJM PJM

3 Real Information Government Physics Real Time Real Relationships Real Requirements Owners, Users (i.e. the public) PJM PJM 3

4 The Economics Of Power In Balance Meet the Demand By Supply side Meet the Demand at Any Price Supply and Demand Respond to Price PJM PJM 4

5 PJM PJM 5 Providing Data to the Market

6 PJM PJM 6

7 Interface Prices LMP ($) PJM/MISO Real-Time Interface Prices Average for 4/01-8/28, Hour Ending PJM's Interface for MISO-RT MISO's Interface for PJM-RT Hr. Diff. Average-RT On average, PJM and MISO interface prices are tracking very closely. Correlation of interface prices has been increasing month-tomonth. LMP ($) PJM/MISO Day-Ahead Interface Prices Average for 4/01-8/28, Hour Ending PJM's Interface for MISO-DA MISO's Interface for PJM-DA Hr. Diff. Average Day-ahead prices have been more highly correlated than Realtime. Off-peak prices have been more highly correlated than on-peak PJM PJM 7

8 Retail Price Change ( ) RTO and Non-RTO Eastern Interconnection, US 16.0% 14.0% 14.1% 12.0% 10.0% 8.0% 10.4% 10.4% 8.9% 9.4% 7.1% 10.5% 7.7% 6.0% 4.0% 3.0% 2.0% 0.0% *DOE Energy Information Administration Electric Power Monthly (April 1996, March 2005) Residential Commercial Industrial RTO Average Non-RTO Average Average PJM PJM 8

9 PJM s Operational Markets Day-Ahead Energy Market Real-Time Energy Market Capacity Financial Transmission Rights Ancillary Services Markets Regulation Spinning Reserve Market Black Start Services Reactive Services PJM PJM 9

10 PJM PJM 10

11 Dollars per Million Btu $16 $14 $12 $10 $8 $6 $4 $2 $0 NYMEX Natural Gas Futures Near-Month Contract Settlement Price, West Texas Intermediate Crude Oil Spot Price, and Henry Hub Natural Gas Spot Price NYMEX Natural Gas Settlement Price WTI Spot Price Henry Hub Spot Price Nymex Closing Dates 6/28/2005 7/27/2005 8/29/2005 5/27/2005 6/3/2005 6/10/2005 6/17/ PJM PJM 11 6/24/2005 7/1/2005 7/8/2005 7/15/2005 7/22/2005 Note:The West Texas Intermediate crude oil price, in dollars per barrel, is converted to $/MMBtu using a conversion factor of 5.80 MMBtu per barrel. The dates marked by vertical lines are the NYMEX near-month contract settlement dates. Source: NGI's Daily Gas Price Index ( 7/29/2005 8/5/2005 8/12/2005 8/19/2005 8/26/2005 9/2/2005 9/9/2005 9/16/2005

12 PJM PJM 12

13 NYMEX Forward Contract Prices (September 22, 2005) $200 $180 $160 $140 $120 $100 $80 $60 $40 $20 $- Sep-05 Nov-05 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 Jan-07 Mar-07 May-07 Jul-07 Sep-07 Forward Month Nov-07 Jan-08 Mar-08 May-08 Jul-08 Sep-08 Nov-08 PJM NYISO-A NYISO G NYISO-J PJM PJM 13

14 NYMEX PJM Western Hub Contract Open Interest Value $1,000 $900 $800 $700 Million $ $600 $500 $400 $300 $200 $100 $0 4/11/2003 4/25/2003 5/9/2003 5/23/2003 6/6/2003 6/20/2003 7/4/2003 7/18/2003 8/1/2003 Using Average value of $35/MWH PJM PJM 14 8/15/2003 8/29/2003 9/12/2003 9/26/ /10/ /24/ /7/ /21/ /5/ /19/2003 1/2/2004 1/16/2004 1/30/2004 2/13/2004 2/27/2004 3/12/2004 3/26/2004 4/9/2004 4/23/2004 5/7/2004 5/21/2004 6/4/2004 6/18/2004

15 PJM Fuel Sources (2004) 60% 50% 40% 30% 20% 10% 0% Coal Gas Nuclear Oil Hydro Other Energy Capacity PJM PJM 15

16 PJM PJM 16

17 PJM Installed Reserve Requirement 24.0% 22.0% 22.0% 20.0% 18.0% 16.0% 14.0% 15.0% 12.0% 10.0% PJM PJM 17

18 Figure Trends in PJM equivalent demand forced outage rate (EFORd): Calendar years 1994 to PJM PJM 18

19 PJM Generation Additions 6,000 25,000 5,000 20,000 4,000 MW 3,000 15,000 10,000 Cumulative MW GAS Wind Oil Waste Coal Total 2,000 1,000 5, PJM PJM 19

20 Liquidity at U.S. Hubs 2004 January ,000 80,000 70,000 60,000 GWH 50,000 40,000 30,000 20,000 10,000 0 PJM-W Hub** Mid Columbia* * Dow Jones Electricity Index ** PJM Settlements Data Palo Verde* Cinergy* COB* Four Corners* Mead/Marketplace* PJM PJM 20

21 PJM PJM 21

22 PJM Fuel Sources (2004) 250,000 Capacity (MW), Energy (GWH) 200, , ,000 50,000 - Coal Gas Nuclear Oil Hydro Other Energy Capacity PJM PJM 22

23 2004 PJM Energy Market Self-Supplied 4% Net Imports 5% Spot Market 38% Bilateral Transactions 53% Capacity by Fuel Type PJM PJM 23

24 NYMEX Forward Contract Prices (September 17, 2005) $ $ $ $ $ $ $80.00 $60.00 $40.00 $20.00 $- Sep-05 Nov-05 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 Jan-07 Mar-07 May-07 Forward Month PJM NYISO A NYISO G NYISO J Jul-07 Sep-07 Nov-07 Jan-08 Mar-08 May-08 Jul-08 Sep-08 Nov PJM PJM 24

25 Generation By Fuel Source 2003 (312,000 GWH) Oil 2% Solid Waste 1% Nuclear 33% Coal 53% Hydro 2% Gas 9% PJM PJM 25

26 PJM generation by fuel source (GWh): Calendar year 2004 Hydro, 10,303, 2.3% Solid Waste, 2,781, 0.6% Wind, 379, 0.1% Nuclear, 165,128, 36.9% Coal, 233,217, 52.1% Gas, 31,411, 7.0% PJM PJM 26 Oil, 4,738, 1.1%

27 Joint and Common Market Initiatives Commercial 1 2 Price Rationalization and Convergence at the Border 3 Reduce Hurdle Rate FTR Market Convergence Broader Price Transparency and Common Reporting Increased Market Opportunities Operational Consistancy Alignment of FTR Timelines and Products (Note: All MISO cost) PJM implementation of marginal losses (Note: All PJM costs) Alignment of PJM Operating Reserves and MISO Revenue Sufficiency Guarantee (Note: All MISO cost) Existing MISO & PJM Websites Linking of sites Common Search Capabilities Data Available at Both Sites (LMPs, Tie Flows, Loads) New Joint Website to Host Joint meeting and Events Calendar, Joint Documents and Reports $600,000 $600,000 $600,000 $500,000 $200,000 $600,000 Alternative Border Pricing Point Calculation $200,000 Depancaking of PTP ancillary services (Control Area Services, T.O. Control Center Services, Reactive, Black Start) $400,000 Standard Data Exchange (Web Services) LMPs, Contingencies, Loads, Dispatch Signals, Outages, Emergency Event/Notifications $3,000, Cross Border FTRs in the allocations $4,000,000 Cross border FTRs in auctions $8,000,000 Implementation of single MISO & PJM Website (Websites for individual RTOs go away) $750,000 Moving JOUs between markets $100,000 Shared Regulation Market $8,000,000 Common Long Term Transmission Queue $200,000 MISO Ramp Viewer (under way) Alignment of OASIS Business Practices Coordinated OASIS $1,200,000 Common Time Zones (Note: All PJM cost) $5,000,000 Central location to view both ramp viewers $500,000 Reserve Sharing $8,000,000 Standard Data Visualization and Reporting Portal Create a single MISO & PJM Data and Report Portal $8,500,000 Single Resource Adequacy Solution $8,000,000 $100,000 Common Ramp Portal $750,000 Reliability 7 Single Market 1 Emergency Energy Agreement Single OASIS $8,000,000 Common Treatment of Dynamic Schedules/Pseudo-Ties $200,000 Year 1 - Rule Alignment & Market Portal Design $15,000,000 Alignment of Agreements and Practices $100,000 Year 2 - Initial Market Portal Implementation $40,000,000 Black Start and 2 Alignment of Agreements and Practices $500,000 Restoration Year Implementation of Single Market $50,000,000 Plan 1 Joint Expansion Planning and Common Deliverability Studies Alignment of Agreements and Practices $120,000 Total 2006 $4,320, $600, $750, PJM PJM 27

28 Public Benefits of PJM Consumer Goals Supported by Thriving Wholesale Markets Enabled by PJM Reliable Supply of Power Fair Price for Electricity Customer Choice Regional Scope Many Buyers and Sellers Participant Choices: Futures Contract Financial Hedge Self-Schedule Resources Long Term Contracts Day Ahead Market Real-Time Market Retail Adjustments Reliability Assurance Collaborative Stakeholder Process for Improvement Independence and Neutrality Infrastructure for Business 11 etools Retail Market Wholesale Market Market Information PJM PJM 28

PJM s Experience with the RPM Capacity Market

PJM s Experience with the RPM Capacity Market PJM s Experience with the RPM Capacity Market 2013 Austin Electricity Conference Panel 1: Are Capacity Market Necessary to Ensure Adequate Generating Reserve Paul M. Sotkiewicz, Ph.D. Chief Economist PJM

More information

Results and Assumptions For Single Economic Dispatch Production Cost Study PROMOD Component

Results and Assumptions For Single Economic Dispatch Production Cost Study PROMOD Component Results and Assumptions For Single Economic Dispatch Production Cost Study PROMOD Component Last Revised: May 25, 26 Disclaimer: "MIDWEST ISO MAKES NO REPRESENTATIONS OR WARRANTIES OF ANY KIND, EXPRESS

More information

An Introduction to PJM: Focus on its Markets and Opportunities for Demand Resources OHA Annual Energy & Sustainability Conference

An Introduction to PJM: Focus on its Markets and Opportunities for Demand Resources OHA Annual Energy & Sustainability Conference An Introduction to PJM: Focus on its Markets and Opportunities for Demand Resources OHA Annual Energy & Sustainability Conference Andrew Ott Sr. Vice President, Markets March 5, 2013 26% of power generation

More information

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation. Section 3 Operating Reserve Operating Reserve Day-ahead and real-time operating reserve credits are paid to market participants under specified conditions in order to ensure that resources are not required

More information

Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit

Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit Craig Glazer Vice President, Federal Government Policy PJM Interconnection June, 2018 Topics 1. PJM Overview 2. Evolution of PJM

More information

The Evolution of the PJM Market in the United States: Looking Back to Look Forward

The Evolution of the PJM Market in the United States: Looking Back to Look Forward The Evolution of the PJM Market in the United States: Looking Back to Look Forward Feasibility Study for ASEAN Multilateral Power Trade September 5-6, 2018 Jakarta, Indonesia Craig Glazer Vice President

More information

RTO Overview and Day 2 Markets. EAI Technical Conference May 26, 2011

RTO Overview and Day 2 Markets. EAI Technical Conference May 26, 2011 RTO Overview and Day 2 Markets EAI Technical Conference May 26, 2011 1 Agenda RTO Day 2 markets and Locational Marginal Pricing (LMP) Why RTO Day 2 markets may benefit Entergy s customers Quantifiable

More information

Energy Uplift (Operating Reserves)

Energy Uplift (Operating Reserves) Section 4 Energy Uplift Energy Uplift (Operating Reserves) Energy uplift is paid to market participants under specified conditions in order to ensure that resources are not required to operate for the

More information

STATE OF THE MARKET REPORT 2005

STATE OF THE MARKET REPORT 2005 STATE OF THE MARKET REPORT 2005 MRC Baltimore, MD March 15, 2006 Joseph E. Bowring Market Monitor Figure 4-4 - PJM s evolving footprint and its interfaces 1 PJM Market Monitoring Unit Independent Internal

More information

CURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION

CURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION CURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION Randy Rismiller Manager, Federal Energy Program Illinois Commerce Commission 1 THE FEDERAL ENERGY REGULATORY COMMISSION

More information

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission Wholesale Electricity Markets and New England Independent System Operator Commissioner Mark Vannoy Maine Public Utilities Commission March 26, 2014 Overview and Background 2 Wholesale Electricity Markets

More information

During 2009, the PJM geographic footprint encompassed 17 control zones located in Delaware,

During 2009, the PJM geographic footprint encompassed 17 control zones located in Delaware, SECTION SECTION SECTION SECTION SECTION SECTION VOLUME SECTION 1 2 3 4 5 6 7 8 A B PJM GEOGRAPHY C D E F G Tennessee, Virginia, West Virginia and the District of Columbia. Figure A-1 PJM s footprint and

More information

PJM Overview: PJM Structure and Cross-Border Examples PJM 2010

PJM Overview: PJM Structure and Cross-Border Examples PJM 2010 PJM Overview: PJM Structure and Cross-Border Examples 1 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 614 millions of people served 51 peak load in megawatts

More information

2015 ISO/RTO Metrics Report. Summary. November 2015

2015 ISO/RTO Metrics Report. Summary. November 2015 2015 ISO/RTO Metrics Report Summary November 2015 ISO/RTO Metrics Report Background Independent system operators (ISOs) and regional transmission organizations (RTOs) that are regulated by the Federal

More information

California ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Q4 2013 Report on Market Issues and Performance February 10, 2014 Prepared by: Department of Market Monitoring Department of Market Monitoring

More information

Energy Uplift (Operating Reserves)

Energy Uplift (Operating Reserves) Section 4 Energy Uplift Energy Uplift (Operating Reserves) Energy uplift is paid to market participants under specified conditions in order to ensure that resources are not required to operate for the

More information

State of the Market Report 2006

State of the Market Report 2006 State of the Market Report 2006 PIEOUG March 12, 2007 Joseph Bowring Market Monitor www.pjm.com PJM Market Monitoring Unit Independent Internal Market Monitoring Independent System Operator ISO/RTO has

More information

PJM Organization and Markets. Saudi Delegation Columbus Ohio May 22, 2012

PJM Organization and Markets. Saudi Delegation Columbus Ohio May 22, 2012 PJM Organization and Markets Saudi Delegation Columbus Ohio May 22, 2012 Agenda Introduction & Governance Energy Markets LMP FTRs/ARRs Two Settlement Virtual Bids Ancillary Capacity - Reliability Pricing

More information

JCM Drill Down Report -- Draft. March 21, 2014

JCM Drill Down Report -- Draft. March 21, 2014 JCM Drill Down Report -- Draft March 21, 2014 The purpose of this document is to provide a brief description of each component listed on the JCM Work Plan Timeline compiled by PJM and MISO. This Drill

More information

The Year to Date in PJM: Operations and Markets

The Year to Date in PJM: Operations and Markets The Year to Date in PJM: Operations and Markets Kerry Stroup Manager, State Government Policy PJM Interconnection OMA Energy Committee July 30, 2014 OMA Energy Committee Presentation Outline PJM s mission:

More information

Joint and Common Market PSEUDO TIE UPDATE AUGUST 22, 2017

Joint and Common Market PSEUDO TIE UPDATE AUGUST 22, 2017 Joint and Common Market PSEUDO TIE UPDATE AUGUST 22, 2017 Agenda 1. Overview 2. MISO Update 3. PJM Update 4. JOA Changes Joint Filing 5. Congestion Overlap 6. Next Steps Appendix 2 Overview Purpose Provide

More information

MISO PJM Cross-Border Planning

MISO PJM Cross-Border Planning MISO PJM Cross-Border Planning July 24, 2014 MISO-PJM JCM Planning Coordination Issues 2 At a previous JCM meeting, several issues related to planning coordination were raised: Market Efficiency Planning

More information

Two Settlement PJM /06/2016

Two Settlement PJM /06/2016 Two Settlement PJM 2016 Objectives Describe Two-Settlement process Day-Ahead Market Balancing Market Explain Virtual Transactions and their settlement Inc Offers Dec Bids Up-to Congestion Transactions

More information

PJM/MISO Joint and Common Market Stakeholder Meeting. June 2, 2005 Wilmington, DE

PJM/MISO Joint and Common Market Stakeholder Meeting. June 2, 2005 Wilmington, DE PJM/MISO Joint and Common Market Stakeholder Meeting June 2, 25 Wilmington, DE Agenda Morning Meeting Objectives Review of March 3, 25 FERC Order Market-to-Market Coordination Update Stakeholder Process

More information

Key Issues and Consideration in Market Design, Operational and Oversight

Key Issues and Consideration in Market Design, Operational and Oversight Key Issues and Consideration in Market Design, Operational and Oversight Patrick Donlon Amanda Gordon Kathryn Sophy Kenneth Villwock Public Utilities Commission of Ohio & Pennsylvania Public Utilities

More information

Interchange Transactions

Interchange Transactions Section 9 Interchange Transactions Interchange Transactions PJM market participants import energy from, and export energy to, external regions continuously. The transactions involved may fulfill long-term

More information

Net Revenue. Overview Net Revenue. Net Revenue. Conclusion

Net Revenue. Overview Net Revenue. Net Revenue. Conclusion Section 7 Net Revenue Net Revenue The Market Monitoring Unit (MMU) analyzed measures of PJM energy market structure, participant conduct and market performance. As part of the review of market performance,

More information

JCM Drill Down Report. February 19, 2015

JCM Drill Down Report. February 19, 2015 JCM Drill Down Report February 19, 2015 The purpose of this document is to provide a brief description of each component listed on the JCM Work Plan Timeline compiled by PJM and MISO. This Drill Down Report

More information

PJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia

PJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia PJM Wholesale Markets Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia PJM RTO Functions Grid Operation Non-discriminatory treatment Monitoring transmission system Reliability

More information

Congestion and Marginal Losses

Congestion and Marginal Losses Section 11 Congestion and Marginal Losses Congestion and Marginal Losses The locational marginal price (LMP) is the incremental price of energy at a bus. The LMP at a bus is made up of three components:

More information

PJM PROMOD Overview. August 1, PJM

PJM PROMOD Overview. August 1, PJM PJM PROMOD Overview August 1, 2017 Market Analysis Software PROMOD PROMOD is a fundamental electric market simulation solution It incorporates future demand, generating unit operating characteristics,

More information

2007 State of the Market Report Midwest ISO. Midwest ISO

2007 State of the Market Report Midwest ISO. Midwest ISO 2007 State of the Market Report Midwest ISO Prepared by: Midwest ISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics June 2008 Executive Summary: Introduction As the Independent Market

More information

Energy Market. Table 3 1 The Energy Market results were competitive

Energy Market. Table 3 1 The Energy Market results were competitive Section 3 Energy Market Energy Market The PJM Energy Market comprises all types of energy transactions, including the sale or purchase of energy in PJM s Day-Ahead and Real-Time Energy Markets, bilateral

More information

America s Future Natural Gas Economy: Promoting the Next Energy Breakthrough

America s Future Natural Gas Economy: Promoting the Next Energy Breakthrough America s Future Natural Gas Economy: Promoting the Next Energy Breakthrough Hudson Institute April 6, 2016 Washington, D.C. Michelle Bloodworth Executive Director, External Affairs Introduction / Executive

More information

Virtual Workshop on PJM ARR and FTR Market 2017/2018

Virtual Workshop on PJM ARR and FTR Market 2017/2018 Virtual Workshop on PJM ARR and FTR Market 2017/2018 PJM State & Member Training Dept. Webex February 10, 2017 PJM 2017 Disclaimer: PJM has made all efforts possible to accurately document all information

More information

PJM Analysis of the EPA Clean Power Plan

PJM Analysis of the EPA Clean Power Plan PJM Analysis of the EPA Clean Power Plan PJM Interconnection October 6, 2016 PJM CPP Study Objectives Evaluate potential impacts to: Resource adequacy Transmission system operations PJM energy and capacity

More information

Congestion and Marginal Losses

Congestion and Marginal Losses Section 10 Congestion and Marginal Losses Congestion and Marginal Losses The Locational Marginal Price (LMP) is the incremental price of energy at a bus. The LMP at any bus is made up of three components:

More information

Markets Report. Jennifer Warner-Freeman Senior Economist, Market Analysis January 22, PJM 2018

Markets Report. Jennifer Warner-Freeman Senior Economist, Market Analysis January 22, PJM 2018 Markets Report Jennifer Warner-Freeman Senior Economist, Market Analysis January 22, 2018 www.pjm.com Executive Summary PJM Wholesale Cost for 2017 was $49.64/MWh, up from full-year 2016 costs of $47.49/MWh.

More information

Maintaining Baseload Generation Capacity

Maintaining Baseload Generation Capacity Maintaining Baseload Generation Capacity Frank A. Wolak Director, Program on Energy Sustainable Development Professor, Department of Economics Stanford University wolak@stanford.edu http://www.stanford.edu/~wolak

More information

2007 State of the Market Report

2007 State of the Market Report Volume 2: Detailed Analysis Market Monitoring Unit March 11, 2008 printed: 04/24/08 Preface The Market Monitoring Unit of PJM Interconnection publishes an annual state of the market report that assesses

More information

CUSTOMER GUIDE TO PJM BILLING

CUSTOMER GUIDE TO PJM BILLING CUSTOMER GUIDE TO PJM BILLING Billing Line Items include PJM Open Access Tariff (OATT) references, PJM Operating Agreement (OpAgr) references, and PJM Manual references. Reports are available for viewing,

More information

Energy Markets - The Basics

Energy Markets - The Basics Disclaimer This training presentation is provided as a reference for preparing for the PJM Certification Exam. Note that the following information may not reflect current PJM rules and operating procedures.

More information

Wind Power Forecasting Process Development

Wind Power Forecasting Process Development Wind Power Forecasting Process Development Data Management Working Group (DMWG) Generation and Transmission Valley Forge, PA Thursday, August 20, 2009 Sanjay Patil PJM Interconnection Table of Contents

More information

Recent Development in Reliable Energy Market in the US and Singapore

Recent Development in Reliable Energy Market in the US and Singapore Recent Development in Reliable Energy Market in the US and Singapore 18-19 th June 2008 Electrical Engineering and Maintenance Forum World Engineering Congress, Bangkok, Thailand Dr. Panida Jirutitijaroen

More information

Future Market Implementation

Future Market Implementation SPP.org 1 Future Market Implementation Requirements - way forward MWG June 29 th, 2009 SPP.org WebEx Instructions Please submit questions to host. If it is a long question you can type a summary until

More information

PJM ARR and FTR Market

PJM ARR and FTR Market PJM ARR and FTR Market PJM State & Member Training Dept. PJM 2017 Objectives At the completion of this training, you should be able to describe the concepts and principles of Auction Revenue Rights and

More information

Draft Whitepaper to Platte River Board of Directors

Draft Whitepaper to Platte River Board of Directors Draft Whitepaper to Platte River Board of Directors Report on Organized Power Markets RTOs and ISOs Presented for the October 2016 Board Meeting Overview This report on the potential formation of a regional

More information

SECTION 6 - ANCILLARY SERVICE MARKETS

SECTION 6 - ANCILLARY SERVICE MARKETS 2010 Quarterly State of the Market Report for PJM: January through March ANCILLARY SERVICES 6 SECTION SECTION 6 - ANCILLARY SERVICE MARKETS The United States Federal Energy Regulatory Commission (FERC)

More information

Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017

Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017 Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017 This FAQ document was first provided in 2016 and has periodically been updated since that time. The document

More information

JCM Drill Down Report. May 27, 2015

JCM Drill Down Report. May 27, 2015 JCM Drill Down Report May 27, 2015 The purpose of this document is to provide a brief description of each component listed on the JCM Work Plan Timeline compiled by PJM and MISO. This Drill Down Report

More information

1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Durgesh Manjure, MISO Energy September 6, 2017

1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Durgesh Manjure, MISO Energy September 6, 2017 Centralized Energy & Operating Reserves Markets: A MISO perspective 1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Durgesh Manjure, MISO Energy September 6, 2017

More information

Markets Report. Jennifer Warner-Freeman Senior Economist, Market Analysis March 19, PJM 2018

Markets Report. Jennifer Warner-Freeman Senior Economist, Market Analysis March 19, PJM 2018 Markets Report Jennifer Warner-Freeman Senior Economist, Market Analysis March 19, 2018 www.pjm.com Executive Summary PJM Wholesale Cost through February 2018 was $77.41/MWh, up from full-year 2017 costs

More information

Joanne Flynn David Cormie NFAT Technical Conference July 15, 2013

Joanne Flynn David Cormie NFAT Technical Conference July 15, 2013 Joanne Flynn David Cormie NFAT Technical Conference July 15, 2013 1 Who is MISO? Midwest Independent Transmission System Operator, Inc. Changing name to the Midcontinent t Independent d tsystem Operator,

More information

Impact of Convergence Bidding on Interties. Draft Final Proposal

Impact of Convergence Bidding on Interties. Draft Final Proposal Impact of Convergence Bidding on Interties Draft Final Proposal July 29, 2011 Impact of Convergence Bidding on Interties Table of Contents 1 Introduction... 3 2 Plan for Stakeholder Engagement... 3 3 Issue

More information

Capacity Deliverability. May 27, 2015 MISO-PJM JCM

Capacity Deliverability. May 27, 2015 MISO-PJM JCM Capacity Deliverability May 27, 2015 MISO-PJM JCM Key Takeaways and Objective Capacity deliverability seeks to eliminate barriers for capacity transactions across the seam MISO is evaluating options to

More information

Joint and Common Market ITEM 4 PSEUDO TIES

Joint and Common Market ITEM 4 PSEUDO TIES Joint and Common Market ITEM 4 PSEUDO TIES Agenda 1. Overview 2. Background 3. PJM Update 4. MISO Update 5. Congestion Overlap Solution 6. Next Steps 2 Overview Purpose Provide a status update on MISO-PJM

More information

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh) For the first quarter of 2015, Ontario experienced overall demand that was typical for the province in winter, and strong generator output. Demand for Ontario electricity increased as a result of cold

More information

Congestion and Marginal Losses

Congestion and Marginal Losses Section 11 Congestion and Marginal Losses Congestion and Marginal Losses The locational marginal price (LMP) is the incremental price of energy at a bus. The LMP at a bus is the sum of three components:

More information

NEW YORK INDEPENDENT SYSTEM OPERATOR

NEW YORK INDEPENDENT SYSTEM OPERATOR Rate Schedule 1 Study Status Update Review of Other ISO/RTO s March 2011 TABLE OF CONTENTS 1.0 RATE STRUCTURES AT OTHER ISO S/RTO S...1 1.1 PJM...1 1.2 ISO-New England...3 1.3 California ISO...6 1.4 Midwest

More information

Midwest ISO EIM Start-up and Exiting Issues Todd Ramey, Executive Director Market Administration. March 7-8, 2011

Midwest ISO EIM Start-up and Exiting Issues Todd Ramey, Executive Director Market Administration. March 7-8, 2011 Midwest ISO EIM Start-up and Exiting Issues Todd Ramey, Executive Director Market Administration March 7-8, 2011 Agenda Greetings and Introductions Introduction of the Midwest ISO Overview of the Midwest

More information

FirstEnergy Solutions Energy Market Update AEE Meeting March 20, John Ogurchak PE/CEM Manager, Commercial/Industrial Energy Sales

FirstEnergy Solutions Energy Market Update AEE Meeting March 20, John Ogurchak PE/CEM Manager, Commercial/Industrial Energy Sales FirstEnergy Solutions Energy Market Update AEE Meeting John Ogurchak PE/CEM Manager, Commercial/Industrial Energy Sales FirstEnergy Solutions Corp. (FES) Retail subsidiary of FirstEnergy Corp. and headquartered

More information

PJM Manual 29: Billing. Revision: 23 Effective Date: January 1, Prepared by Strategic Market Services Department

PJM Manual 29: Billing. Revision: 23 Effective Date: January 1, Prepared by Strategic Market Services Department PJM Manual 29: Billing Revision: 23 Effective Date: January 1, 2012 Prepared by Strategic Market Services Department PJM 2012 Table of Contents PJM Manual 29: Billing Table of Contents Table of Contents...

More information

U. S. SPOT MARKET REGULATION

U. S. SPOT MARKET REGULATION U. S. SPOT MARKET REGULATION NARUC ENERGY REGULATORY PARTNERSHIP WITH GEORGIAN NATIONAL ENERGY AND WATER SUPPLY REGULATORY COMMISSION & MICHIGAN PUBLIC SERVICE COMMISSION TBILISI, GEORGIA November 30,

More information

Illinois State Institute for Regulatory Policy Studies Conference

Illinois State Institute for Regulatory Policy Studies Conference Illinois State Institute for Regulatory Policy Studies Conference Rob Berntsen 10/20/2011 Overview MISO RTOs What We Do FERC Order 1000 MISO s View of FERC Order 1000 MISO s Planning Process MVPs Benefits

More information

PJM ARR and FTR Market

PJM ARR and FTR Market PJM ARR and FTR Market PJM State & Member Training Dept. PJM 2016 Objectives Explain the concepts and principles of Auction Revenue Rights and Financial Transmission Rights Describe how to participate

More information

Comprehensive Shortage Pricing

Comprehensive Shortage Pricing Comprehensive Shortage Pricing Mike DeSocio Manager, Energy Market Design New York Independent System Operator Management Committee December 17, 2014 Krey Corporate Center 2014 New York Independent System

More information

Billing Line Items PJM /23/2017

Billing Line Items PJM /23/2017 Billing Line Items PJM 2017 Billing Line Items (BLI) PJM 2017 2 Billing Line Items (BLI) ID # Weekly BLI CHARGES ID # 1000 Amount Due for Interest on Past Due Charges Weekly BLI 1100 1 Network Integration

More information

2010 RTO Metrics Report: NESCOE Data Summary

2010 RTO Metrics Report: NESCOE Data Summary New England States Committee on Electricity NESCOE Phone: 23-38-1477 E-Mail: AllisonSmith@nescoe.com Web: www.nescoe.com 21 RTO Metrics Report: NESCOE Data Summary Allison Smith ABSTRACT Summary of comparative

More information

PJM M2M Market Flow Proposal. October 2014

PJM M2M Market Flow Proposal. October 2014 PJM M2M Market Flow Proposal October 2014 Table of Contents 1. Introduction... 1 2. M2M Market Flow... 1 3. Real-Time Balancing Congestion and M2M payments... 3 4. Firm Flow Entitlement Impact of Market

More information

Electric Forward Market Report

Electric Forward Market Report Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08

More information

Ancillary Service Markets

Ancillary Service Markets Section 9 Ancillary Services Ancillary Service Markets The United States Federal Energy Regulatory Commission (FERC) defined six ancillary services in Order No. 888: 1) scheduling, system control and dispatch;

More information

PJM Markets. Energy and Ancillary Services. PJM State & Member Training Dept. PJM /29/2014

PJM Markets. Energy and Ancillary Services. PJM State & Member Training Dept. PJM /29/2014 PJM Markets Energy and Ancillary Services PJM State & Member Training Dept. LMP Basics 2 7/17/2013 What is LMP? Locational Marginal Price Pricing method PJM uses to: price energy purchases and sales in

More information

Markets Report. Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar March 23, 2015 PJM 2015

Markets Report. Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar March 23, 2015 PJM 2015 Markets Report Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar March 23, 2015 Executive Summary PJM Wholesale Cost for the first two months of 2015 was $71.04/MWh, up from $54.29 in January.

More information

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017 PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017 Prepared by Market Settlements Development Department PJM 2017 Table of Contents Table of Contents

More information

MISO-PJM Interface Pricing Post Implementation Metrics and Criteria

MISO-PJM Interface Pricing Post Implementation Metrics and Criteria MISO-PJM Interface Pricing Post Implementation Metrics and Criteria Contents 1 Introduction... 2 2 Real-Time Market Interchange Price Signal Effectiveness Metrics... 2 2.1 Post Implementation Pricing Monitoring

More information

Congestion and Marginal Losses

Congestion and Marginal Losses Section 10 Congestion and Marginal Losses Congestion and Marginal Losses The Locational Marginal Price (LMP) is the incremental price of energy at a bus. The LMP at a bus is made up of three components:

More information

2750 Monroe Blvd Audubon, PA

2750 Monroe Blvd Audubon, PA 2750 Monroe Blvd Audubon, PA 19403-2497 October 21, 2014 Mr. Jonathan Feipel Executive Director Illinois Commerce Commission 527 East Capitol Avenue Springfield, Illinois 62701 Dear Mr. Feipel: This report

More information

MISO-PJM Joint and Common Market Drill Down Report

MISO-PJM Joint and Common Market Drill Down Report MISO-PJM Joint and Common Market Drill Down Report February 28, 2017 The purpose of this document is to provide a brief description of each component listed on the Joint and Common Market (JCM) Work Plan

More information

Congestion and Marginal Losses

Congestion and Marginal Losses Section 10 Congestion and Marginal Losses Congestion and Marginal Losses The Locational Marginal Price (LMP) is the incremental price of energy at a bus. The LMP at any bus is made up of three components:

More information

Congestion Revenue Rights Auction Efficiency Track 1B Straw Proposal

Congestion Revenue Rights Auction Efficiency Track 1B Straw Proposal Congestion Revenue Rights Auction Efficiency April 19, 2018 Prepared by: M&IP California Independent System Operator Table of Contents 1 Executive Summary... 3 2 Scope of this proposal... 5 3 Initiative

More information

Markets Report. Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar January 20, 2015 PJM 2015

Markets Report. Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar January 20, 2015 PJM 2015 Markets Report Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar January 20, 2015 Executive Summary PJM Wholesale Cost for calendar year 2014 was $70.40/MWh, and increase of 47% and 33% over

More information

Net Revenue. Overview Net Revenue. Conclusion. Historical New Entrant CT and CC Revenue Adequacy

Net Revenue. Overview Net Revenue. Conclusion. Historical New Entrant CT and CC Revenue Adequacy Section 7 Net Revenue Net Revenue The Market Monitoring Unit (MMU) analyzed measures of PJM energy market structure, participant conduct and market performance. As part of the review of market performance,

More information

3.2 Market Settlements.

3.2 Market Settlements. 3.2 Market Settlements. If a dollar-per-mw-hour value is applied in a calculation under this section 3.2 where the interval of the value produced in that calculation is less than an hour, then for purposes

More information

Ancillary Services Matrix

Ancillary Services Matrix Ancillary Services Matrix ERCOT Primary frequency response is not an Ancillary Service Market Product. All online Generation Resources must have their turbine governors in service and unblocked. is deployed

More information

3.2 Market Buyers Spot Market Energy Charges.

3.2 Market Buyers Spot Market Energy Charges. 3.2 Market Buyers. 3.2.1 Spot Market Energy Charges. (a) The Office of the Interconnection shall calculate System Energy Prices in the form of Day-ahead System Energy Prices and Real-time System Energy

More information

Interchange Transactions

Interchange Transactions Section 9 Interchange Transactions Interchange Transactions PJM market participants import energy from, and export energy to, external regions continuously. The transactions involved may fulfill long-term

More information

PJM Wind Integration Initiatives

PJM Wind Integration Initiatives PJM Wind Integration Initiatives West Virginia Wind Forum Davis, WV September 25, 2012 Ken Schuyler Renewable Services PJM Interconnection 1 26% of generation in Eastern Interconnection 28% of load in

More information

The Texas Experience: Implications of 8,000+ MW Wind Generation Resources In ERCOT. David Campbell CEO, Luminant 2009 Summer Seminar August 3, 2009

The Texas Experience: Implications of 8,000+ MW Wind Generation Resources In ERCOT. David Campbell CEO, Luminant 2009 Summer Seminar August 3, 2009 The Texas Experience: Implications of 8,000+ MW Wind Generation Resources In ERCOT David Campbell CEO, Luminant 2009 Summer Seminar August 3, 2009 Growth of Wind Generation in ERCOT MW 12,000 10,000 8,000

More information

Market Monitoring Dr. Robert Sinclair Georgian Energy Policy Delegation

Market Monitoring Dr. Robert Sinclair Georgian Energy Policy Delegation Market Monitoring Presented by: Dr. Robert Sinclair Presented to: Georgian Energy Policy Delegation April 30, 2012 Kentucky Public Service Commission Potomac Economics Potomac Economics is a leading provider

More information

Interregional Coordination Update

Interregional Coordination Update Interregional Coordination Update Phil D Antonio Manager, Interregional Market Operations MC Webinar June 18, 2018 Recent PJM-MISO Joint Stakeholder Meetings MISO and PJM began hosting a series of Joint

More information

Electricity Price Outlook for December By John Howley Senior Economist

Electricity Price Outlook for December By John Howley Senior Economist Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Electricity Price Outlook for December 2017 By John Howley Senior Economist Office of Technical and Regulatory Analysis

More information

IMM Quarterly Report: Fall 2017

IMM Quarterly Report: Fall 2017 IMM Quarterly Report: Fall 2017 MISO Independent Market Monitor David Patton, Ph.D. Potomac Economics December 5, 2017 Highlights and Findings: Fall 2017 The MISO markets performed competitively this fall,

More information

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development www.fourcornerswind.org Photo courtesy of Avangrid Renewables, LLC UNDERSTANDING REGIONAL ELECTRICITY

More information

PJM Manual 29: Billing Revision: 28 Effective Date: April 1, Prepared by Market Settlements Department

PJM Manual 29: Billing Revision: 28 Effective Date: April 1, Prepared by Market Settlements Department PJM Manual 29: Billing Revision: 28 Effective Date: April 1, 2018 Prepared by Market Settlements Department PJM 2018 Table of Contents Table of Contents Approval...3 Current Revision...4 Introduction...

More information

PJM Manual 29: Billing Revision: 28 Effective Date: April 1, Prepared by Market Settlements Department

PJM Manual 29: Billing Revision: 28 Effective Date: April 1, Prepared by Market Settlements Department PJM Manual 29: Billing Revision: 28 Effective Date: April 1, 2018 Prepared by Market Settlements Department PJM 2018 Table of Contents Table of Contents Approval...3 Current Revision...4 Introduction...

More information

Regional Transmission Organizations. D. William VanderLaan Illinois Commerce Commission January 30, 2014

Regional Transmission Organizations. D. William VanderLaan Illinois Commerce Commission January 30, 2014 Regional Transmission Organizations D. William VanderLaan Illinois Commerce Commission January 30, 2014 History of Regional Transmission Organizations (RTOs) RTOs grew out of FERC Order Nos. 888/889 where

More information

Integrating High Levels of Variable Renewable Energy Sources

Integrating High Levels of Variable Renewable Energy Sources Integrating High Levels of Variable Renewable Energy Sources Erik Ela EPRI Grid Ops and Planning eela@epri.com NYISO Environmental Advisory Council Troy, NY May 6, 2016 EPRI Grid Operations & Planning

More information

PJM Fixed Transmission Rights (FTRs)

PJM Fixed Transmission Rights (FTRs) PJM Fixed Transmission Rights (FTRs) Andrew Ott Manager, Market Development 1 What Are FTRs? Fixed Transmission Rights are a financial contract that entitles holder to a stream of revenues (or charges)

More information

5.1 Transmission Congestion Charge Calculation Calculation by Office of the Interconnection.

5.1 Transmission Congestion Charge Calculation Calculation by Office of the Interconnection. 5.1 Transmission Congestion Calculation. 5.1.1 Calculation by Office of the Interconnection. When the transmission system is operating under constrained conditions, or as necessary to provide third-party