BAFE SP203-1 Assessment Check List

Size: px
Start display at page:

Download "BAFE SP203-1 Assessment Check List"

Transcription

1 BAFE SP203-1 Assessment Check List To be Read in conjunction with BAFE SP203-1 Version 5 May 2011 General A minimum of 2 projects, with all relevant documentation and certification are available for review. Access to the project sites has been confirmed with the customer and they understand the depth of testing and inspection required by the assessment. Sites are within 30 minutes travelling time of the office. A Principle Duty Holder, Sufficient Designer(s) and Key Responsible Person(s) are in place. Module1- System Design Competence of the designer is to be assessed Designer is named and has the authority to sign off designs on behalf of the company is evident Appropriate level of design resource available to the organisation If the designer(s) are not available to undertake their work, alternative arrangements are in place or design work to stop Designers actual designs will be assessed to demonstrate design competence Knowledge of product and system Knowledge of BAFE requirements for certification Sufficient information passed onto installer Ability to assess fire risks influencing design Knowledge of EU directives and associated U.K. legislation relevant national safety requirements Consideration shown to minimise false alarms/discharges 6.3 of specifications complying with recognised standards/codes of practice the company can safely connect to "mains" power and Interface with other systems (fireman's lift, smoke ventilation, etc) When designing to BS6266 ancillary systems are integrated correctly of records for all design projects Clear evidence that designs satisfy the specification requirements records are maintained and available for all projects. Guide 003 Date: Rev: 3 Certsure LLP 2013 Page 1 of 5

2 6.5.3 records are maintained and available for all projects of design control and sign off process is in place of provision for design process to continue to the end of project Design documentation should be prepared and recorded in a manner whereby design changes can be recognised during the course of the project. Module 2 - Installation a) 7.2.b) 7.2.c) 7.2.d) 7.2.e) 7.2.f) 7.2g)/7.2h) Installation work to be carried out by BAFE company or a company who area UKAS accredited certification body to BSEN the installer is competent and understands the requirements of BS Ability to correctly interpret design requirements Understanding of responsibility for BAFE module certification Satisfactory knowledge of relevant standards/cops of interface with others on project Installation safety issues (mechanical/electrical) Adequate competent supervision Equipment third party certified 7.4 BAFE certification issue 7.5 Records to be kept and made available to other organisations and BAFE companies 7.6 installation process has been completed. system installed as per requirements of BS 5839 Pt.1 and Pt. 6 Module 3 - Commissioning and Handover a) 8.4.1b) 8.4.1c) 8.4.1d) A review of test results carried out by the installer prior to the undertaking the commissioning The initial testing, commissioning and handover of the system to be carried out by a BAFE certified company. On handover a BAFE accredited company is to provide evidence that the final testing and commissioning has been carried out satisfactorily and variations are clearly identified (e.g. BS certificates). Knowledge of equipment and products installed. Ability to interpret design of system Understanding BAFE module certification A comprehensive understanding of the commissioning process as it relates to projects of varying complexity. Guide 003 Date: Rev: 3 Certsure LLP 2013 Page 2 of 5

3 8.4.1.e) 8.4.1f) Knowledge of interfacing with building services (where applicable) Understanding of safety issues during testing and commissioning 8.4.1g) Competency/adequacy of supervisory staff The organisation to have sufficient resources to undertake the projects to which it has 8.4.1h) been committed. Commissioning to be undertaken in two parts, testing the system to ensure the components work as anticipated, and to specification to ensure system is configured as per the requirements of the specification of training to others in the use of equipment of correct certification to specified requirements 8.4 of tests and commissioning records for each project 8.5 The installation shall be commissioned and handover to client as per agreed specified requirements. 8.6 Fire detection and fire alarm systems should utilise components and cables that meet the requirements of BS Requirements when a specification provided does not state the standard or code to which the standard should comply. 8.8 Procedure for when no one is representing the client during the commissioning process. 8.9 that all commissioning records are held for each project of formal completion of the commissioning/handover to client, to the point where the client takes over the ongoing responsibility for the installation that appropriate documentation given to client prior to handover and the client has been recommended to retain the records for the life time of the system Module 4 - Maintenance 9.1 Maintenance to be carried out by a BAFE accredited company a) 9.2.1b) 9.2.1c) 9.2.1d) 9.2.1e) Adequate knowledge of equipment to be maintained. An ability to interpret design requirements. A basic understanding of BAFE certification as it relates to design, installation, commissioning and handover modules. A comprehensive Knowledge of electrical safety issues involved in maintenance procedures Competency of adequacy of supervisory staff Sufficient resources and competence to undertake the work it is committed to and be able to investigate and rectify system related problems. 9.3 of agreement with relevant ARC for notification of F/A activation Guide 003 Date: Rev: 3 Certsure LLP 2013 Page 3 of 5

4 Adequate resources available to permit attendance on site to maintain faulty systems within the specified time. of arrangements in place to meet the call out arrangements, and evidence the arrangements work in practice. 9.6 the organisation has access to spare parts. 9.7 of additional work required to restore the system to full health has been specified to the client. 9.8 that comprehensive maintenance records are kept for each project If a BAFE certificated system is to be altered the work must be undertaken by certificated organisation with an appropriate scope. Appropriate information relating to repairs and changes undertaken at each maintenance visit shall be made available to the client. Maintenance shall be undertaken as per the relevant standard or code of practice depending on the type of system installed. System Verification 10.1 The system has been verified prior to completion of a BAFE certificate of compliance 10.2 Verification is to be carried out by a person with design competence Verification is to be carried out by a competent person and documented and passed onto the client. Verification to highlight problems in the system that is the result of interfaces between the modules. Any variation between the design specification and the installed system are to be reported to the client and solutions agreed by the interested parties. All installations require verification prior to the completion of a BAFE certificate of compliance The verification organisation must have the minimum scope listed in a) to c) of section Third Party Certification Bodies are required to assess the competence of organisations in relation to Verification. Clients to be informed that all BAFE modules and Verification of the system have to be completed before a BAFE certificate of compliance can be completed. Systems installed by non BAFE certificated organisations can be retrospectively assessed and verified by a certificated organisation, if the maintenance is carried out by a BAFE organisation. When BAFE verification is undertaken retrospectively and includes verification of non certificated modules, the verification will include an audit of acceptability. Management Systems 11 a) Records to provide evidence of preventative and corrective actions where process problems have been identified. 11 b) Complaints procedure and log. 11 c) A register of approved sub contractors Guide 003 Date: Rev: 3 Certsure LLP 2013 Page 4 of 5

5 11 d) A management structure of the organisation is documented. 11 e) The responsibilities of key personnel who are involved in each certificated module. 11 f) Holds the relevant procedures for modules applied for 11 g) Register of test instruments inc. calibration records 11 h) Register of standards/manufacturer's literature 11 i) Competency records of technical staff 11 j) Technical staff to have access to standards and other data 11 k) Management system is regularly reviewed and amended 11 l) i) Key performance indicators for routine maintenance 11 l) ii) Key performance indicators for emergency maintenance The organisation shall have available: a) Technical reference documents Certification Audit 14.1 b) Test instrumentation (where relevant) including records of assessment accuracy c) Configuration tools (when relevant) together with their operational handbooks d) A list of projects in progress and those completed in the last 12 months 14.1 e) Specifications, drawings, certificates, records and reports relating to work in progress and completed within the last 12 months f) Any other item that is relevant to the process and the TPCB reasonably require g) that adequate insurance cover is held for the categories of work undertaken h) A list of complaints received and actions taken to resolve the complaints Suitable Policies, procedures, audits in place to ensure personnel are competent for the work they undertake. On the maintenance module a register of those installations where there are ongoing problems and how they have been resolved. A safe system of storage is evident for important documentation and other data that is required for the protection of business continuity. Review business premises to ascertain whether or not they are adequate for the business being undertaken. NOTE 14.6 Outlines the minimum requirement for premises. This pre-assessment checklist has been designed to help applicants to interpret and be fully prepared for the assessment visit. Please take time to review each of the s and requirements and make sure that you are satisfied that you have answers and where necessary, documentary evidence to show to the Assessor. In working through the document you might find it useful to use the column to indicate how you have met the requirements. Guide 003 Date: Rev: 3 Certsure LLP 2013 Page 5 of 5

Hazardous. Scheme. the power behind your business

Hazardous. Scheme. the power behind your business Hazardous Areas Scheme YOUR GUIDE TO REGISTRATION the power behind your business GUIDE TO REGISTRATION REQUIREMENTS Electrical work in potentially explosive atmospheres (hazardous areas) is not included

More information

Document 2007 Rev 0 December 2005 Page 1 of 8

Document 2007 Rev 0 December 2005 Page 1 of 8 Document 2007 Rev 0 December 2005 Page 1 of 8 1. Scope... 2 2. Definitions... 2 a. LabTest...2 b. Factory Location/ Manufacturer's Premises...2 c. Manufacturer...2 d. Subcontractor...2 e. f. Out-Worker...2

More information

APPROVED CONTRACTOR SCHEME YOUR GUIDE TO REGISTRATION

APPROVED CONTRACTOR SCHEME YOUR GUIDE TO REGISTRATION APPROVED CONTRACTOR SCHEME YOUR GUIDE TO REGISTRATION the power behind your business WELCOME THANK YOU FOR APPLYING TO BECOME PART OF NICEIC NICEIC is the UK s leading voluntary regulatory body for the

More information

APPROVED CONTRACTOR SCHEME YOUR GUIDE TO REGISTRATION

APPROVED CONTRACTOR SCHEME YOUR GUIDE TO REGISTRATION APPROVED CONTRACTOR SCHEME YOUR GUIDE TO REGISTRATION the power behind your business WELCOME THANK YOU FOR APPLYING TO BECOME PART OF NICEIC NICEIC is the UK s leading voluntary regulatory body for the

More information

BS EN ISO 9001 QUALITY ASSURANCE MANUAL

BS EN ISO 9001 QUALITY ASSURANCE MANUAL PAC PRICE ARTHUR CONSULTANCY BS EN ISO 9001 QUALITY ASSURANCE MANUAL COPY NO: 025 ISSUE: 4 QUALITY ASSURANCE MANUAL BS EN ISO 9001 CONTENTS PAC Price Arthur Consultancy - Building Services Consulting Engineers

More information

Microgeneration Installation Standard: MCS 001. MCS Contractor certification Scheme requirements Issue 3.0

Microgeneration Installation Standard: MCS 001. MCS Contractor certification Scheme requirements Issue 3.0 Microgeneration Installation Standard: MCS 001 MCS Contractor certification Scheme requirements Issue 3.0 This Microgeneration Installation Standard is the property of Department of Energy and Climate

More information

UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009)

UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009) CIS 11 Edition 1 September 2016 UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009) CIS 11 / Edition: 1 Page 1 of 7 Contents

More information

MGD 001. Guidance Document for MCS 001. Version 1.0

MGD 001. Guidance Document for MCS 001. Version 1.0 MGD 001 Guidance Document for MCS 001 Version 1.0 This Microgeneration Installation Standard is the property of Department of Energy and Climate Change (DECC), 3 Whitehall Place, London,SW1A 2HH. DECC

More information

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality? Factory s Quality Assurance Ability 1 Responsibilities and Resources 1.1 Responsibilities a) Have the responsibilities and interrelation of various personnel involved in quality activities been defined?

More information

Microgeneration Installation Standard: MCS 001. MCS Contractor certification scheme requirements Issue 2.5

Microgeneration Installation Standard: MCS 001. MCS Contractor certification scheme requirements Issue 2.5 Microgeneration Installation Standard: MCS 001 MCS Contractor certification scheme requirements Issue 2.5 This Microgeneration Installation Standard is the property of Department of Energy and Climate

More information

WELMEC Application of module D Quality assurance Under directive 2014/32/EU (MID) or directive 2014/31/EU (NAWID)

WELMEC Application of module D Quality assurance Under directive 2014/32/EU (MID) or directive 2014/31/EU (NAWID) WELMEC 8.4 2017 Application of module D Quality assurance Under directive 2014/32/EU (MID) or directive 2014/31/EU (NAWID) WELMEC is a cooperation between the legal metrology authorities of the Member

More information

Guide to Part P and Registration

Guide to Part P and Registration Guide to Part P and Registration All you ll ever need for Part P www.elecsa.co.uk Welcome to the ELECSA Part P self-certification scheme If you are involved in domestic electrical installation work, you

More information

Guidelines on the Competence of Personnel Undertaking Engineering Inspections

Guidelines on the Competence of Personnel Undertaking Engineering Inspections RG 0 Edition 3 December 2018 Guidelines on the Competence of Personnel Undertaking Engineering Inspections RG 0 / Edition: 3 Page 1 of 15 Contents 1. Introduction 2 2. Terms and Definitions 3 3. General

More information

Guidelines on the Competence of Personnel Undertaking Engineering Inspections

Guidelines on the Competence of Personnel Undertaking Engineering Inspections RG 0 Edition 3 November 2018 Draft for Consultation Guidelines on the Competence of Personnel Undertaking Engineering Inspections RG 0 / Edition: 3 Page 1 of 15 Contents 1. Introduction 2 2. Terms and

More information

Assessment Strategy. for. NVQ Qualifications. in Rail Services. based on. GoSkills. National Occupational Standards

Assessment Strategy. for. NVQ Qualifications. in Rail Services. based on. GoSkills. National Occupational Standards Assessment Strategy for NVQ Qualifications in Rail Services based on GoSkills National Occupational Standards 1. Introduction GoSkills, as the Sector Skills Council for the Passenger Transport Sector,

More information

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction 9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of

More information

Procedure 14 Internal Audits

Procedure 14 Internal Audits Procedure 14 Internal Audits Table of Contents 1 Introduction... 2 2 Audit Planning... 2 2.1 Head Office... 2 2.2 Critical Locations... 3 3 Conducting the Audit... 3 4 Non-conformances... 3 5 Client file

More information

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock 1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles

More information

LEGIONELLA CONTROL ASSOCIATION STATEMENT OF COMPLIANCE

LEGIONELLA CONTROL ASSOCIATION STATEMENT OF COMPLIANCE INTRODUCTION The Company was founded in 1973, as a designer, manufacturer and installer of glass reinforced plastic water cooling towers. Services offered include the design and manufacture of cooling

More information

EN39 TUBE ASSESSMENT REPORT. Assessment Summary

EN39 TUBE ASSESSMENT REPORT. Assessment Summary EN39 TUBE ASSESSMENT REPORT : Category: Manufacturer Manufacturer Manufacturer Manufacturer Location: Name: Location Location Location Location Previous Assessment Category: N/A Meeting With: Assessment

More information

Health and Safety Policy Statement

Health and Safety Policy Statement Statement is committed to a programme of continual improvement in OH&S management and performance to all employees, contractors/subcontractors, visitors and anyone else who may be exposed to the Company

More information

Procedure 11 Recruitment and Training

Procedure 11 Recruitment and Training Procedure 11 Recruitment and Training Table of Contents 1 Introduction... 2 2 Head Office Personnel... 2 3 Auditors and Technical Expert Recruitment... 4 3.1 Flowchart of Recruitment Process... 4 3.2 Auditors

More information

WHS Change Management

WHS Change Management Page 1 of 6 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment for all persons in the mission / ministry

More information

MASS MANAGEMENT ACCREDITATION STANDARDS

MASS MANAGEMENT ACCREDITATION STANDARDS Mass Management Accreditation Standards June 2006 Page 1 MASS MANAGEMENT ACCREDITATION STANDARDS Introduction The Mass Management Accreditation Program forms one of the operational modules of the National

More information

TÜV SÜD BABT Production Quality Certification Scheme

TÜV SÜD BABT Production Quality Certification Scheme TÜV SÜD BABT Production Quality Certification Scheme The Production Quality Certification Scheme for Manufacturers A Certification Body of Copyright TÜV SÜD BABT 2014 Page 1 of 38 CONTENTS Page AMENDMENT

More information

WORK IN THE VICINITY OF UNDERGROUND ASSETS

WORK IN THE VICINITY OF UNDERGROUND ASSETS CONTRACTOR WHS HAZARD STANDARD WORK IN THE VICINITY OF UNDERGROUND ASSETS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD

More information

JOB DESCRIPTION. To provide technical expertise and project support across the full range of Hanover s asset management projects.

JOB DESCRIPTION. To provide technical expertise and project support across the full range of Hanover s asset management projects. Hanover (Scotland) Housing Association Ltd Position: Clerk of Works Department: Asset Management Reports to: Contracts Supervisor Band: F Date: May 2016 Purpose of Job JOB DESCRIPTION To provide technical

More information

TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME

TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME Copyright TUV SUD BABT 2017 A Certification Body of: Page 1 of 33 Contents AMENDMENT RECORD 3 0. INTRODUCTION 3 1. PRE-CONDITIONS TO SUPPORT PRODUCTION

More information

Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015)

Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015) Alcester Academy To be the best that we can be Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015) ALCESTER ACADEMY MANAGING CONTRACTORS POLICY REVIEW PROCEDURES The Managing Contractors

More information

GUIDANCE ON THE APPLICATION OF THE IRSE LICENSING SCHEME. July 2015

GUIDANCE ON THE APPLICATION OF THE IRSE LICENSING SCHEME. July 2015 GUIDANCE ON THE APPLICATION OF THE IRSE LICENSING SCHEME July 2015 Contents 1 About the Licensing Scheme 3 2 What is a Competence Management System? 5 3 What elements of a CMS does the IRSE Licensing

More information

This policy will define the requirements for the selection, induction, engagement and professional development of trainers and assessors.

This policy will define the requirements for the selection, induction, engagement and professional development of trainers and assessors. Staff Policy 1. Purpose Perth Technical College Pty Ltd (PTC) Trading as Australian Technical College Western Australia (ATCWA) is committed to providing quality training and assessment in accordance with

More information

DAYSAFE PTY LTD RTO Policy & Procedure Staff Skills

DAYSAFE PTY LTD RTO Policy & Procedure Staff Skills DAYSAFE PTY LTD RTO Policy & Procedure Staff Skills Purpose The purpose of this Policy & Procedure is to ensure all staff, particularly those involved in training and assessment, have the appropriate knowledge

More information

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary BS2482 TIMBER BOARDS ASSESSMENT REPORT : Category: Manufacturer Manufacturer Manufacturer Manufacturer Location: Name: Location Location Location Location Previous Assessment Category: N/A Meeting With:

More information

Building Standards Customer Journey

Building Standards Customer Journey Building Standards Customer Journey Are you doing building work or home improvements? If so, this guide is for you. Building Standards Customer Journey Contents 2 Contents Building Standards Customer Journey

More information

<Full Name> OHS Manual. Conforms to OHSAS 18001:2007. Revision Date Record of Changes Approved By

<Full Name> OHS Manual. Conforms to OHSAS 18001:2007. Revision Date Record of Changes Approved By Conforms to OHSAS 18001:2007 Revision history Revision Date Record of Changes Approved By 0.0 [Date of Issue] Initial Issue Control of hardcopy versions The digital version of this document

More information

Occupational Health and Safety Management Manual v2.2

Occupational Health and Safety Management Manual v2.2 Occupational Health and Safety Management Manual v2.2 Written: February 2013 Author: David Seymour, Director of Operations Co Author: Mathew Sprake, Operations Manager Approved: Board of Directors 1. Introduction

More information

qmbff1zj.zdg.docx Manage Work in Confined Spaces

qmbff1zj.zdg.docx Manage Work in Confined Spaces Overview This national occupational standard focuses on planning, organising and managing work safely in including legislative roles and responsibilities, health and safety considerations and equipment

More information

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX In completing your Documented Quality Management System Review, it is important that the following matrix be completed and returned to us as soon as possible. This will save time during the review and

More information

PACIFIC MARINE SERVICES

PACIFIC MARINE SERVICES APPR No : PMS/D.A.RSP/ Date : Pages : One (7) /UAE Data Sheet for Approval of Firms Issued within the scope of the Pacific Marine Services General Conditions - Radio Service Supplier for Inspection Services

More information

Understanding of Local Procurement for gaining accreditation

Understanding of Local Procurement for gaining accreditation Understanding of Local Procurement for gaining accreditation Specification This specification consists of the interpretation, four parts and two appendices. It details the requirements of Support Training

More information

Fire Protection Industry Scheme Reference SP101

Fire Protection Industry Scheme Reference SP101 BAFE Scheme: SP101 Version 1: April 2017 Fire Protection Industry Scheme Reference SP101 Competency of Portable Fire Extinguisher Organisations and Technicians BAFE (British Approvals for Fire Equipment)

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 6 NVQ Diploma in Construction Site Management (Construction) (6578) November 2013 Version 1.0 Qualification at a glance Subject area City & Guilds number 6578 Age group approved

More information

Health & Safety Policy

Health & Safety Policy Health & Safety Policy March 16_rev 1.0 Page 1 H&S Policy Manual Contents 1. INTRODUCTION 2. POLICY STATEMENT 3. OBJECTIVES SHORT TERM OBJECTIVES 4. OVERVIEW OF H&S POLICY SYSTEM FUNCTIONAL PRINCIPLES

More information

SERVICE LEVEL PROCEDURE

SERVICE LEVEL PROCEDURE SERVICE LEVEL PROCEDURE METERING PROVIDER SERVICES PREPARED BY: AEMO MARKETS VERSION: 1.3 EFFECTIVE DATE: 01 DECEMBER 2017 STATUS: FINAL Approved for distribution and use by: APPROVED BY: PETER GEERS TITLE:

More information

Improving the energy efficiency of our buildings

Improving the energy efficiency of our buildings Improving the energy efficiency of our buildings A guide to air conditioning inspections for buildings December, 2012 Department for Communities and Local Government Chapter 1 Air conditioning inspection

More information

Asbestos Management Policy

Asbestos Management Policy Asbestos Management Policy December 2017 1. Purpose Manningham Housing Association has a legal duty to ensure the health and safety of its employees, tenants, leaseholders and other stakeholders in relation

More information

Microgeneration Installation Standard MIS 3006

Microgeneration Installation Standard MIS 3006 Microgeneration Installation Standard MIS 3006 REQUIREMENTS FOR CONTRACTORS UNDERTAKING THE SUPPLY, DESIGN, INSTALLATION, SET TO WORK COMMISSIONING AND HANDOVER OF MICRO-HYDROPOWER SYSTEMS Issue 1.1 This

More information

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies Accreditation International Association for Certifying Bodies Guidance on the Application of ISO / IEC 17020 Guidance on the Application of ISO/IEC 17020 Page 1 of 16 Introduction This guidance document

More information

National self-insurer OHS management system audit tool. Version 3

National self-insurer OHS management system audit tool. Version 3 National self-insurer OHS management system audit tool Version 3 Release Date: 4 August 2014 Next Review Date: 2016 Approval Status: Prepared by: Approved by Heads of Workers Compensation Authorities WorkCover

More information

WHSE POL 1 WORK HEALTH, SAFETY & ENVIRONMENT MANAGEMENT POLICY

WHSE POL 1 WORK HEALTH, SAFETY & ENVIRONMENT MANAGEMENT POLICY Issue Number: 5 Prepared by (author): Greg McDonald, Group Manager WHSE Authorised by: Chen Wei Ng, Managing Director Date of release: 01 January 2014 Date of review 01 December 2015 WHSE POL 1 WORK HEALTH,

More information

Certificate IV Evidence & Assessment Guide MSL934002A Apply Quality Systems & Continuous Improvement Processes

Certificate IV Evidence & Assessment Guide MSL934002A Apply Quality Systems & Continuous Improvement Processes Certificate IV Laboratory Techniques (Road Industry) Evidence & Assessment Guide MSL934002A Apply Quality Systems & Continuous Improvement Processes Completion Summary Student Signature Assessment Result

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 11.12.2010 Official Journal of the European Union L 327/13 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 1169/2010 of 10 December 2010 on a common safety method for assessing conformity

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 2 NVQ Diploma in Controlling Lifting Operations - Slinger/Signaller (Construction) (6564-02) May 2013 Version 1.0 Qualification at a glance Subject area Controlling Lifting

More information

General Accreditation Guidance. ISO/IEC 17025:2017 Gap analysis. April 2018

General Accreditation Guidance. ISO/IEC 17025:2017 Gap analysis. April 2018 General Accreditation Guidance Gap analysis April 2018 Copyright National Association of Testing Authorities, Australia 2018 This publication is protected by copyright under the Commonwealth of Australia

More information

Level 6 NVQ Diploma in Construction Site Management (Construction)

Level 6 NVQ Diploma in Construction Site Management (Construction) Level 6 NVQ Diploma in Construction Site Management (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements

More information

ISCC Integrity Program

ISCC Integrity Program ISCC PLUS 254 Integrity Program ISCC Integrity Program ISCC PLUS 254 V 1.0 Copyright notice ISCC 2012 This ISCC document is protected by copyright. It is freely available from the ISCC website or upon

More information

CHECKLIST FOR PART 145 APPROVAL

CHECKLIST FOR PART 145 APPROVAL Section/division AIRWORTHINESS: AIRCRAFT MAINTENANCE ORGANISATION Form Number: CA 145-03 CHECKLIST FOR PART 145 APPROVAL AMO Number Name of organization Physical address Postal address Postal code Telephone

More information

Workshop Malmö Sweden June Improving Compliance with Building Regulations A Scottish Perspective. Bill Dodds Head of Building Standards

Workshop Malmö Sweden June Improving Compliance with Building Regulations A Scottish Perspective. Bill Dodds Head of Building Standards Workshop Malmö Sweden June 2014 Improving Compliance with Building Regulations A Scottish Perspective Bill Dodds Head of Building Standards Today's Presentation Background on why Scotland has been working

More information

Electricity at Work Regulations, Amendment 1 to BS 7671 and the in-service inspection and testing of electrical equipment

Electricity at Work Regulations, Amendment 1 to BS 7671 and the in-service inspection and testing of electrical equipment Electricity at Work Regulations, Amendment 1 to BS 7671 and the in-service inspection and testing of electrical equipment Chris Johnston Tutor Chief Examiner City & Guilds Slide 1 Electricity at Work Regulations

More information

4. General requirements 4.1 Impartiality and independence F Organisation s SANAS No/s. Date/s of evaluation

4. General requirements 4.1 Impartiality and independence F Organisation s SANAS No/s. Date/s of evaluation Generic Checklist for Accreditation of Measurements and Verification of Energy Savings Inspection Bodies to ISO/IEC 17020: 2012 incorporating TR 81: Technical Requirements for the application of SANS/ISO/IEC

More information

Protection Officer Training and Perpetual Accreditation QUEENSLAND RAIL OFFICIAL. Approved for public release

Protection Officer Training and Perpetual Accreditation QUEENSLAND RAIL OFFICIAL. Approved for public release Protection Officer Training and Perpetual Accreditation MD-11-309 QUEENSLAND RAIL OFFICIAL Version: 4.0 Updated: 02/03/2015 Policy: Safety Policy Document history Document Information Current Version 4.0

More information

Security Operations. BS EN ISO 9001: 2008 Issue 1.2: 21/10/2016. Quality Manual. Managing Director. Controlled / Uncontrolled when printed

Security Operations. BS EN ISO 9001: 2008 Issue 1.2: 21/10/2016. Quality Manual. Managing Director. Controlled / Uncontrolled when printed of Security Operations BS EN ISO 9001: 2008 : 21/10/2016 Manual No. 1 Issued to Managing Director Authorised By Date Issued 21/10/2016 Controlled / Uncontrolled when printed SECTION: 0 Index Page 2 Note

More information

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT Desk Audit of Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT-90-5001-02.1 Reviewed by: Element Requirements Applicable 1. Is a quality policy defined

More information

YOUR CERTIFICATION PROCESS EXPLAINED

YOUR CERTIFICATION PROCESS EXPLAINED ISO 22000 FOOD SAFETY MANAGEMENT SYSTEMS FSSC 22000 FOOD SAFETY SYSTEM CERTIFICATION This document outlines the audit process for the above referenced standard. It outlines the stages to audit and gives

More information

OHS Management of Contractors in Capital Works and Maintenance

OHS Management of Contractors in Capital Works and Maintenance OHS Management of Contractors in Capital Works and Maintenance Physical Resources/Risk, Health and Safety Prepared by: Physical Resources/Risk, Health and Safety Version: 08/04/2008 Contents Page 1. INTRODUCTION...

More information

NATIONAL HEAVY VEHICLE ACCREDITATION SCHEME BASIC FATIGUE MANAGEMENT AUDIT MATRIX

NATIONAL HEAVY VEHICLE ACCREDITATION SCHEME BASIC FATIGUE MANAGEMENT AUDIT MATRIX NATIONAL HEAVY VEHICLE ACCREDITATION SCHEME BASIC FATIGUE MANAGEMENT AUDIT MATRIX Operator name Location of audit Auditor name Audit Date: / / PURPOSE For the purposes of accreditation, the Basic Fatigue

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 2 NVQ Diploma in Plastering (Construction) (6573-22/24) March 2018 Version 1.0 Qualification at a glance Subject area Plastering (Construction) City & Guilds number 6573 Age

More information

Version 2 November Code of Practice. Consignment Based Conformity Assessment (CBCA) Services

Version 2 November Code of Practice. Consignment Based Conformity Assessment (CBCA) Services Code of Practice Consignment Based Conformity Assessment (CBCA) Services November 2012 PREFACE Many developed countries have strong National Standards and Technical Regulations supported internally with

More information

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip UHV SPUTTERING INC Page 1 of 18 ECO REVISION HISTORY ECO# REVISION DATE MGR QA 1001 A 2/25/2008 R.Clement J.Haislip 1017 B 6/17/2008 T.Finneran J.Haislip 1071 C 1/13/2011 R.Clement J.Haislip 1078 D 5/15/2013

More information

Microgeneration Installation Standard MIS 3006

Microgeneration Installation Standard MIS 3006 Microgeneration Installation Standard MIS 3006 REQUIREMENTS FOR CONTRACTORS UNDERTAKING THE SUPPLY, DESIGN, INSTALLATION, SET TO WORK COMMISSIONING AND HANDOVER OF MICRO-HYDROPOWER SYSTEMS Issue 2.0 This

More information

Pre-Qualification Questionnaire

Pre-Qualification Questionnaire K&B Builders (South West) Limited Grosvenor Lodge Peacemarsh Gillingham Dorset SP8 4EU T : 07841091559 E : kbbuilders.office@gmail.com Pre-Qualification Questionnaire K&B Builders work in a wide range

More information

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17 Quality Manual DRAFT Page 1 of 17 Document Acceptance and Release Notice This is Revision A1 of the East Coast Designer Builders Quality Manual. The Manual is a managed document. For identification of

More information

Covéa Finance. Permanent Internal Control and Compliance Policy

Covéa Finance. Permanent Internal Control and Compliance Policy Covéa Finance Permanent Internal Control and Compliance Policy 1. AMF Definition of Internal Control: Internal control is a system defined and implemented by companies' managers and personnel in order

More information

Safe planning and operation for Mobile Elevated Working Platforms (MEWPs)

Safe planning and operation for Mobile Elevated Working Platforms (MEWPs) Safe planning and operation for Mobile Elevated Working Platforms (MEWPs) This document sets out the Morgan Sindall standards for the control of Mobile Elevated Work Platforms (MEWP) on its projects. It

More information

Level 3 NVQ in Logistics Operations Management ( ) Qualification handbook

Level 3 NVQ in Logistics Operations Management ( ) Qualification handbook Level 3 NVQ in Logistics Operations Management (3292-03) Qualification handbook www.cityandguilds.com November 2008 Version 1.0 About City & Guilds City & Guilds is the UK s leading provider of vocational

More information

Level 2 NVQ Diploma in Formwork ( ) December 2015 Version 4.0

Level 2 NVQ Diploma in Formwork ( ) December 2015 Version 4.0 Level 2 NVQ Diploma in Formwork (6580-02) December 2015 Version 4.0 QUALIFICATION HANDBOOK Qualification at a glance Subject area City & Guilds number 6580 Formwork Age group approved 16-18, 19+ Entry

More information

UK WEIGHING FEDERATION. CODE OF PRACTICE for the CALIBRATION OF NON-AUTOMATIC WEIGHING INSTRUMENTS

UK WEIGHING FEDERATION. CODE OF PRACTICE for the CALIBRATION OF NON-AUTOMATIC WEIGHING INSTRUMENTS UK WEIGHING FEDERATION CODE OF PRACTICE for the CALIBRATION OF NON-AUTOMATIC WEIGHING INSTRUMENTS VERSION 6.0 AUGUST 2016 CONTENTS SECTION PAGE NO Amendment history 2 1. Introduction 3 2. Scope 4 3. Test

More information

Occupational Health and Safety. Improvement Standard

Occupational Health and Safety. Improvement Standard Premier s Department New South Wales Occupational Health and Safety Improvement Standard A tool for measuring OHS performance within NSW Government Agencies OHS IMPROVEMENT STANDARD NSW GOVERNMENT - REVIEW

More information

Self lay policy. Company specific addendum to Code of Practice for the self laying of Water Mains and Services England and Wales 2 nd Edition May 2009

Self lay policy. Company specific addendum to Code of Practice for the self laying of Water Mains and Services England and Wales 2 nd Edition May 2009 Self lay policy and Company specific addendum to Code of Practice for the self laying of Water Mains and Services England and Wales 2 nd Edition May 2009 Issue 2 - May 2013 Contents Introduction Page 3

More information

Contractor and Supplier Expectations

Contractor and Supplier Expectations Contractor and Supplier Expectations GUI/1548 Issue 15 Page 1 of 10 16 September 2016 Contents 1. INTRODUCTION AND SCOPE 3 2. RICARDO ENERGY & ENVIRONMENT POLICIES 3 3. SUSTAINABILITY 4 4. MANAGEMENT OF

More information

Contractor safety for schools and services. Guidance

Contractor safety for schools and services. Guidance Health and safety services Health and safety services Contractor safety for schools and services Guidance Updated September 2008 and amended March/May 2009 Contents 1.0 Planning the work 1.1 Minor alterations

More information

CHAS Assessment Standards

CHAS Assessment Standards CHAS Assessment Standards Section 1 - All Prosecutions or Enforcement Notices The Supplier has provided details of any enforcement notices or prosecutions served on them in the last three years by the

More information

ANNEX 5 -QUALITY OVERSIGHT 1. INTRODUCTION 2. SCOPE

ANNEX 5 -QUALITY OVERSIGHT 1. INTRODUCTION 2. SCOPE DSS/Support to CAA-NSA A5-1 Guidelines for NSAs for the Development of the ANSP Oversight Process 5-Quality Oversight ANNEX 5 -QUALITY OVERSIGHT 1. INTRODUCTION ANSP s quality oversight is a fundamental

More information

Work Health and Safety Management Systems and Auditing Guidelines

Work Health and Safety Management Systems and Auditing Guidelines Work Health and Safety Management Systems and Auditing Guidelines 5th edition, September 2013 (Updated May 2014) Work Health and Safety Management Systems and Auditing Guidelines These Guidelines are a

More information

Health and Safety Policy Standard

Health and Safety Policy Standard Health and Safety Policy Standard Issue Date: 1 st July 2010 Authority: Directors, AES Group Applicability: AES Group covering all business divisions, operating companies and business units throughout

More information

Verify Category A Audit Content

Verify Category A Audit Content Verify Category A Audit Content V10.0 Achilles Group Limited, 2014. All rights reserved. Objective The objective of this document is to provide suppliers who have registered for a Verify Category A (V10.0)

More information

Level 6 NVQ Diploma in Construction Site Management (Construction)

Level 6 NVQ Diploma in Construction Site Management (Construction) Level 6 NVQ Diploma in Construction Site Management (Construction) Qualification Specification ProQual 2014 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile

More information

LOSS PREVENTION STANDARD

LOSS PREVENTION STANDARD LOSS PREVENTION STANDARD LPS 1271: Issue 2.3 Companies installing fire and security doors, doorsets, shutters and active smoke/fire barriers This Loss Prevention Standard is the property of BRE Global

More information

Management of Contractors Procedure

Management of Contractors Procedure Management of Contractors Procedure Version Control Sheet Version Date Reviewed By Revision Details 1.0 28/08/2015 Louise Newsham Changes to job titles and roles. Reviewed to include recent legislative

More information

General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification

General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification January 2018 Copyright National Association of Testing Authorities, Australia 2009 This publication is

More information

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue Procedure Work Health and Safety Contractor Management Document number: PRO-00808 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority

More information

Contribute towards school decisions regarding the development and improvement of the premises.

Contribute towards school decisions regarding the development and improvement of the premises. JOB TITLE: Facilities Manager SCALE: Kent Range 10 RESPONSIBILITY TO: Business Development Manager RESPONSIBILITIES AND DUTIES To assist the Business Development Manager (BDM) in all aspects of The Beacon

More information

Contracts, Subcontracts, Purchasing and the Laboratory

Contracts, Subcontracts, Purchasing and the Laboratory Contracts, Subcontracts, Purchasing and the Laboratory ISO/IEC 17025 Standard www.aphl.org What does a laboratory need to do? Establish procedures for the review of: Requests Tenders Contracts ISO/IEC

More information

HEALTH, SAFETY AND ENVIRONMENT MANAGEMENT SYSTEM

HEALTH, SAFETY AND ENVIRONMENT MANAGEMENT SYSTEM HEALTH, SAFETY AND ENVIRONMENT MANAGEMENT SYSTEM CHAPTER 1 of 5.0 SCOPE The Company has established an internal and external audits and internal inspections program to ascertain both the general condition

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

QP 02 Audit and Certification Procedure

QP 02 Audit and Certification Procedure 1. AUDIT PROGRAMME [9.1.1] The audit programme shall be conducted in stages within a 3-year certification cycle as follows; Initial audit: Two stage process Surveillance audit: Conducted in the first and

More information

Health and Safety Management Standards

Health and Safety Management Standards Management Standards Curtin University Sept 2011 PAGE LEFT INTENTIONALLY BLANK Management Standards Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Documents... 4 2. Management System Model...

More information

The Construction (Design and Management) Regulations 2015 sets out the duties of Designers and Contractors.

The Construction (Design and Management) Regulations 2015 sets out the duties of Designers and Contractors. TEMPORARY WORKS AND DESIGN PROCEDURE. Legislation The Working at Height Regulations 2005, require Strength and Stability calculations for any arrangement of scaffolding that is not covered by a recognised

More information

Lucas UK Group Limited Quality Management System

Lucas UK Group Limited Quality Management System Lucas UK Group Limited Quality Management System Index Revision Log Register of Holders 1. Introduction and Scope 2. Quality Policy and Objectives 2.1 Key Quality Objectives 3. Lucas UK Group Organisation

More information

IMB Financial Planning CPD and Training Policy

IMB Financial Planning CPD and Training Policy IMB Financial Planning CPD and Training Policy Policy Statement IMB Financial Planning Pty Limited ( IMBFP) recognises the importance of training and developing its staff. IMBFP understands that its employees

More information