1 1993 Specifications CSJ SPECIAL SPECIFICATION 4880 Bridge Equipment Cabinets 1. Description. This Item shall govern for furnishing and installation of Equipment Cabinets for the Bridge Collapse Detection System as shown on the plans, as detailed in this special specification and as directed by the Engineer. These cabinets shall house the various equipment required of the Programmable Logic Controller (PLC) and all necessary associated electrical devices. Each cabinet shall contain the specific equipment listed on the plan sheets and any minor parts not listed but necessary to make a complete installation. 2. Cabinet Design and Requirements. (1) The cabinets supplied and installed under this item shall be new and in strict accordance with the details shown on the plans and in this specification. Cabinets shall be 304 or 316L stainless steel, type 12, UL Listed, and conforming to UL 508. (2) Cabinet external dimensions shall be: Height - 72 inches Width inches Depth inches (3) The cabinet back panel shall be 32 in. by 60 in., constructed of the same material as the cabinet, and designed suitable to support all the listed equipment for the cabinet and 3 shelves. (4) Each shelf shall be minimum 32 in. long by 9 in. deep, and capable of supporting a static load of 200 lbs. (5) Each cabinet door shall be provided with a No. 2 Corbin lock and a cast aluminum or stainless steel handle with a 0.75 in. (minimum) diameter shaft (or equivalent crosssectional area for a square shaft) and a 3 point latch. The lock shall be located to be clear of the arc of the handle. The door handle shall be a minimum 5/8 in. diameter stainless steel to prevent rusting and shall be capable of being padlocked in the closed position. The lock and latch design shall be such that the handle cannot be released until the lock is released. The handle and lock unit shall also be designed to permit closing and locking of the door without the use of a key. Two (2) keys for the tumbler lock shall be provided for each cabinet. (6) A gasket shall be provided to act as a permanent dust and weather resistant seal at the equipment cabinet door facing. The gasket shall be located in a channel provided on the cabinet or on the door. The gasket material shall be of a nonabsorbent material, shall

2 maintain its resiliency after long term exposure to the outdoor environment, attached with an oil-resistant adhesive, and held in place with steel retaining strips. (7) A data pocket shall be mounted on the door. Data may be either suitable stainless steel or high-impact thermoplastic. 3. Cabinet Accessories. (1) The cabinet shall be vented and cooled by 2 thermostatically controlled fans mounted on opposite sides of the cabinet within 9 inches of the top. The fans shall be a commercially available model with a capacity of at least 95.3 cubic feet per minute. The thermostats shall have an adjustable range of 70ºF to 110ºF. A press-to-test switch shall be provided to test operation of the fans. (2) The intake for the vent system shall be located between 12 and 24 in. from the bottom of the cabinet, and filtered with a permanent air filter. The minimum filter dimensions shall be 16 in. wide x 12 in. high x 1 in. deep. The filter shall be securely mounted so that any air entering the cabinet must pass through the filter. The cabinet opening for intake of air shall be large enough to use the entire filter. The air intake and exhaust vents shall be screened to prevent entry of insects. The screen shall have openings no larger than square inches. The total free air opening of the exhaust vent shall be large enough to prevent excessive back pressure on the fan. (3) A light shall be installed in the cabinet above the door. The light shall be a relampable fluorescent fixture suitable for the occasion. The light switch shall be mounted on the right side of the cabinet, 36 to 48 in. above the bottom of the cabinet. (4) A convenience receptacle shall be installed as shown on the plans. The receptacle shall be a UL Listed 20 GFCI fed from a separate circuit in the electrical service. 4. Electrical Distribution. (1) All electrical conductors shall be neatly bundled or contained in non-metallic wireway mounted in the cabinet. All electrical conductors shall be insulated for 600 volts, and shall be of the size shown on the plans. (2) All conduits shall be bushed with grounding bushings. The conduits shall be bonded together and to the cabinet at two locations as shown on the plans. The bonding conductor shall be a #8 copper. (3) Grounding lugs shall be mounted directly to the back panel and the cabinet as shown on the plans. The contact surface between the cabinet and the back of the lug shall be coated with STL anti-seize screw thread lubricant/sealer (Crouse-Hinds, OZ/Gedney, or approved equal.) Grounding lugs shall be electro tin-plated high strength aluminum alloy, suitable for conductors #12 through #8 (Burndy K3A2U-2 or approved equal.) (4) Power distribution blocks shall be installed as shown on the plans. Power distribution blocks shall have a removable factory designed protective cover or be designed to provide touch protection

3 (a) The lower #8 power distribution block shall be rated for 120/240 volts, 3 poles minimum, #12 AWG through #8AWG. (Marathon #985GP3CU or approved equal.) (b) The upper #8 power distribution block shall be rated for 120 volts, 6 poles minimum, #12 AWG through #8AWG. (Marathon #985GP6CU or approved equal.) (c) The #2/0 power distribution blocks shall be rated for 120 volts, 3 conductors, #12 AWG though #2/0 AWG. (Burndy BDB-11-2/0-3 with cover, or approved equal.) (5) A UL Listed 15 or 20 amp, 120 volt powerstrip shall be mounted as shown on the plans. The powerstrip shall be unswitched and shall have at least 3 receptacles for the various assigned equipment in the cabinet. 5. Flasher Relay. The flasher relay shall be a 2 circuit, NEMA flasher, as specified under section 8, "Solid State Flasher," of the NEMA Standards Publication, TS 1. The flasher relay shall be provided with a standard flasher socket, mounted to the cabinet panel, for easy replacement by maintenance personnel. 6. Programmable Logic Controller. The Programmable Logic Controller (PLC) shall be an Allen-Bradley PLC-5 with the components as shown on the plan sheets.. Contractor shall supply 1 PMC1A style communications card (with 1784-PCC1 cable) for use with a laptop during programming which shall be surrendered to TxDOT at the completion of the job. (1) At a minimum, the PLC shall: (a) Monitor the UPS status and alarm TxDOT if any of the following conditions occur: battery low condition, inverter failure, and loss of utility power (b) Monitor the communications in the fiber optic cables and alarm TxDOT if one communication channel is lost; (c) Alarm selected emergency agencies and TxDOT if both channels are lost; and, (d) Activate the traffic gate, flashing beacons, and other emergency signals at both ends of the bridge if both channels are lost. (2) The Contractor shall program the PLC and shall provide all items shown on the plans as well as those necessary but not shown in order to complete and operate the system as intended. 7. Autodialer. The autodialer shall be fully PLC compatible, shall monitor 32 PLC addresses, shall have solid state message recording capabilities for at least 5 messages, and shall be capable of dialing up 8 different telephone numbers. The autodialer shall comply with UL Standards 1459 and 1950 (RACO Manufacturing Verbatim Gateway or approved equal.) 8. Uninterruptible Power Supply. The Uninterruptible Power Supply (UPS) shall power all items in the equipment cabinet (except the convenience receptacle and cabinet light), the traffic gate, and the flashing beacons

4 (1) The UPS shall be designed for continuous operation at temperatures of 0ºF to 165ºF and voltages from 85 to 135 volts, and shall provide transient voltage surge suppression. (2) The UPS shall be capable of supplying a regulated 120 volts (+3%), for a minimum of 8 amps continuously and 12 amps for 10 seconds once a minute. (3) The UPS shall contain, either internally or externally, a power interface module or transfer switch that will automatically switch to battery supply when required. (4) Battery pack for the UPS shall be an external string of AGM-VRLA batteries suitable for extreme temperatures (165ºF). The battery string shall provide enough power to operate the equipment cabinet, gate, and flashing beacons for at minimum of 30 minutes. (5) The battery string shall fit on the shelf provided on the cabinet. (6) The UPS shall communicate status with the PLC via a serial cable. Alarm functions shall include battery low condition, inverter failure, and loss of utility power. 9. Telephone Interconnect Box. The telephone interconnect box shall be supplied to the Contractor by the local telephone utility. The Contractor shall coordinate with the telephone company to mount the interconnect box in the equipment cabinet and install the telephone service cable Volt DC Power Supply. The 24 volt power supply shall be a DIN rail mount, 120 volt input, suitable for the environment, and UL Listed. The output shall be 10 amps DC at 22.5 to 28.5 volts adjustable. 11. Installation. (1) Each and every Contractor employee or subcontractor employee involved in the installation, programming, and testing of the PLC shall be factory certified to do those functions. The Contractor shall present to the Engineer full documentation of certification on each employee and that lead employee on site has at least 5 years experience installing and commissioning PLC systems. Documentation shall be presented for approval no less than 2 weeks prior to starting any specific work function. Any work performed without the certification approval may be rejected by the Engineer as a damaged installation. (NOTE: Operation and maintenance is not the same as installation and commissioning experience and shall not be substituted.) (2) The cabinet shall be set and mounted on a concrete foundation with an apron as detailed on the plan sheets. The concrete shall cure a minimum of 14 days prior to mounting the cabinet. (3) The bottom of the cabinet shall be sealed against water entry with a bead of silicone sealant. The sealant shall be applied to the cabinet base immediately prior to mounting the cabinet on the foundation. Also, any space between conduit entering the cabinet and foundation shall be sealed with silicone caulk. Silicone shall be RTV-133; no other formulation shall be used

5 12. Testing. The equipment cabinet shall be tested with the entire collapse detection system for correctness of operation. Any preliminary tests, no matter how accepted, shall not substitute for the final acceptance test of the entire system when completed. 13. Support Documentation. (1) Documentation supporting the manufacturer's claims shall be included with the bid package. Such documentation shall also include: (a) Appropriate and specific test data. (b) Certified performance data (including information on component ratings, heat rise and dissipation) (c) Specification data. (d) Detail drawings, including cabinet and/or rack face drawings, circuit drawings, and cable diagrams. (e) Product literature. (f) Installation instructions. (g) System configuration with single line drawings with all circuit breakers identified by number. (h) Functional relationship of various equipment comprising the UPS unit including weights and dimensions. (2) The Contractor shall provide a laminated copy of the as-built electrical plans and shall place them in the cabinet data pocket. 14. Training. The Contractor shall provide training as necessary, not to exceed 40 hours, to the designated TxDOT personnel on the operation and maintenance of the PLC. 15. Submittals. The Contractor shall submit catalog cut sheets on all items in the equipment cabinet including the cabinet itself. 16. Warranty. The Contractor shall assign, to TxDOT, all manufacturer's normal warranties or guarantees on the UPS. Defective equipment shall be repaired or replaced "on-site", (within 24 hours) at the manufacturer's option, during the warranty period at no cost to the Department. The manufacturer's representative shall have a locally established service outlet, prior to the award of the contract. Manufacturer shall submit representative's credentials through the Contractor within 60 working days from awarding of contract. The warranty coverage shall become effective on the date of the final acceptance of the equipment cabinet by TxDOT. 17. Measurement. The cabinet will be measured as each unit furnished, installed and tested in accordance with this Special Specification. 18. Payment. The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid for

6 "Equipment Cabinet". This price shall be full compensation for the foundation, cabinet, specified equipment, internal cables and connectors, cabinet mounting brackets and hardware, documentation and testing, all labor, materials, training, equipment and incidentals necessary to complete the work. Fiber optic cable leaving the cabinet shall be paid for under the Special Specification, Bridge Fiber Optic Cable and electrical conductors not contained within the cabinet shall be paid for under the Item 620, Electrical Conductors

SPECIAL SPECIFICATION 8810 Communication Hub Enclosure

SPECIAL SPECIFICATION 8810 Communication Hub Enclosure 2004 Specifications CSJ 0914-00-301 & 0914-00-314 SPECIAL SPECIFICATION 8810 Communication Hub Enclosure 1. Description. Provide Communication Hub Enclosures of various types and sizes, as shown on the

More information

MATERIAL SPECIFICATION FOR UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR LED TRAFFIC SIGNALS

MATERIAL SPECIFICATION FOR UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR LED TRAFFIC SIGNALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 2475 April 2017 MATERIAL SPECIFICATION FOR UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR LED TRAFFIC SIGNALS TABLE OF CONTENTS 2475.01 SCOPE 2475.02

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Digital Loop Carrier System

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Digital Loop Carrier System 1993 Specifications CSJ 0039-17-129 SPECIAL SPECIFICATION ITEM 6797 Digital Loop Carrier System 1.0 Description. This Item shall govern for the furnishing and installation of the Digital Loop Carrier System

More information

1995 Metric CSJ , etc. SPECIAL SPECIFICATION ITEM Communication Hub Cabinet

1995 Metric CSJ , etc. SPECIAL SPECIFICATION ITEM Communication Hub Cabinet 1995 Metric CSJ 0918-45-203, etc. SPECIAL SPECIFICATION ITEM 6423 Communication Hub Cabinet 1.0 Description This Item shall govern for the furnishing and installation of the Communication Hub as shown

More information

SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building

SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building 2004 Specifications CSJ 0720-03-095 SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building 1. Description. Furnish and install Environmentally Controlled Communications Building

More information

1993 Specifications CSJ , etc. SPECIAL SPECIFICATION ITEM Digital Loop Carrier System

1993 Specifications CSJ , etc. SPECIAL SPECIFICATION ITEM Digital Loop Carrier System 1993 Specifications CSJ 0072-12-153, etc. SPECIAL SPECIFICATION ITEM 6285 Digital Loop Carrier System 1.0 Description. This Item shall govern for the furnishing and installation of the Digital Loop Carrier

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control 1. DESCRIPTION 2. MATERIALS Furnish, install, relocate, or remove radar vehicle detection systems (RVDS) of

More information

SECTION AIR-TO-AIR ENERGY RECOVERY EQUIPMENT

SECTION AIR-TO-AIR ENERGY RECOVERY EQUIPMENT SECTION 23 72 00 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Fiber Optic Dynamic Lane Control Sign

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Fiber Optic Dynamic Lane Control Sign 1995 Metric CSJ 0353-03-077 SPECIAL SPECIFICATION ITEM 6143 Fiber Optic Dynamic Lane Control Sign 1.0 Description This Item shall govern for the furnishing and installation of Fiber Optic Dynamic Lane

More information

SPECIAL SPECIFICATION 8710 Decorative Pole Lighting Assembly

SPECIAL SPECIFICATION 8710 Decorative Pole Lighting Assembly 2004 Specifications CSJ 0902-48-682, 0902-48-825 & 0902-48-826 SPECIAL SPECIFICATION 8710 Decorative Lighting Assembly 1. Description. Furnish and install a Decorative Lighting Assembly (Type A) as shown

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,

More information

SPECIAL SPECIFICATION 1308 Fiber Hub

SPECIAL SPECIFICATION 1308 Fiber Hub 1993 Specifications CSJ 0072-12-130 SPECIAL SPECIFICATION 1308 Fiber Hub 1. Description. This Item shall govern for the furnishing and installation of the Fiber Hub as shown on the plans, as detailed in

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Fiber Communications Hub

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Fiber Communications Hub 1993 Specifications CSJ 2374-01-101 SPECIAL SPECIFICATION ITEM 6624 Fiber Communications Hub 1.0 Description This item shall govern for the furnishing and installation of the Fiber Communications Hub as

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Fiber Hub

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Fiber Hub 1993 Specifications CSJ 0072-12-102 SPECIAL SPECIFICATION ITEM 6982 Fiber Hub 1.0 Description. This Item shall govern for the furnishing and installation of the Fiber Hub as shown on the plans, as detailed

More information

Section 70 Airport Transformer Vault and Vault Equipment (FAA L-109)

Section 70 Airport Transformer Vault and Vault Equipment (FAA L-109) Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION 1. This item

More information

SECTION PATIENT BED SERVICE WALLS

SECTION PATIENT BED SERVICE WALLS PART 1 GENERAL 1.1 DESCRIPTION: SECTION 10 25 13 PATIENT BED SERVICE WALLS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. 2. Due to the very specialized nature of Patient Wall

More information

SECTION FIBERGLASS REINFORCED PLASTIC (FRP) ENCLOSURE

SECTION FIBERGLASS REINFORCED PLASTIC (FRP) ENCLOSURE SECTION 13121 FIBERGLASS REINFORCED PLASTIC (FRP) ENCLOSURE PART 1 - GENERAL 1.01 SUMMARY A. This section covers materials and accessories for provision of a pre-engineered fiberglass reinforced plastic

More information

IP-5(Dust-Solid Particles) 5(Liquid-Water Oil)

IP-5(Dust-Solid Particles) 5(Liquid-Water Oil) RAckOm- 6U Wall Mount/Pole mount IP55 Outdoor Rack IP-5(Dust-Solid Particles) 5(Liquid-Water Oil) IP55 enclosure provides protection from level of harmful dust and provide protection from low pressure

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

SPECIAL SPECIFICATION 6759 Communication Building

SPECIAL SPECIFICATION 6759 Communication Building 2004 Specifications CSJ 0196-03-244 SPECIAL SPECIFICATION 6759 Communication Building 1. Description. This Item will govern for the furnishing and installation of the Fiber Communications Hub as shown

More information

IP-5(Dust-Solid Particles) 5(Liquid-Water Oil)

IP-5(Dust-Solid Particles) 5(Liquid-Water Oil) RAckOm- 15U Wall Mount/Pole mount/free Standing IP55 Outdoor Rack IP-5(Dust-Solid Particles) 5(Liquid-Water Oil) IP55 enclosure provides protection from level of harmful dust and provide protection from

More information

SECTION HEAT TRACING FOR PLUMBING PIPING

SECTION HEAT TRACING FOR PLUMBING PIPING SECTION 22 05 33 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable in the section

More information

SPECIAL SPECIFICATION 6150 Fiber Communications HUB Building Replacement

SPECIAL SPECIFICATION 6150 Fiber Communications HUB Building Replacement 2004 Specifications Dallas District SPECIAL SPECIFICATION 6150 Fiber Communications HUB Building Replacement 1. Description. This specification shall govern for the replacement of a Fiber Communications

More information

CATHODIC PROTECTION SPECIFICATION

CATHODIC PROTECTION SPECIFICATION CATHODIC PROTECTION SPECIFICATION AUTOMATICALLY CONTROLLED IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM w/vertical ANODE SYSTEM FOR THE INTERIOR OF STEEL WATER TANKS A. SCOPE The cathodic protection design/install

More information

SECTION EXHAUST FANS PART 1 GENERAL

SECTION EXHAUST FANS PART 1 GENERAL SECTION 15800 EXHAUST FANS PART 1 GENERAL 1.01 DESCRIPTION A. The Contractor shall furnish all labor, materials, accessories and all incidentals required to install wet well and control building ventilation

More information

37-SDMS-01 REV. 03 SPECIFICATIONS FOR

37-SDMS-01 REV. 03 SPECIFICATIONS FOR 37-SDMS-01 REV. 03 SPECIFICATIONS FOR LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS FOR SERVICE CONNECTIONS This specification is property of SEC and subject to change or modification without any notice CLAUSE

More information

SECTION MOTOR CONTROL CENTER

SECTION MOTOR CONTROL CENTER SECTION 16445 MOTOR CONTROL CENTER PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Motor Control Center (MCC). The contract item includes demolition and removal of existing MCC;

More information

Pump Specifications 450 Series 1/2 hp Submersible Sump Pump

Pump Specifications 450 Series 1/2 hp Submersible Sump Pump Pump Specifications 450 Series 1/2 hp Submersible Sump Pump 450_P1 R1/27/2012 Copyright 2012 Liberty Pumps Inc. All rights reserved. Specifications subject to change without notice. 450-Series Dimensional

More information

SPECIAL SPECIFICATION 1276 Pedestrain Overpass Lighting

SPECIAL SPECIFICATION 1276 Pedestrain Overpass Lighting 1993 Specifications CSJ 0074-06-199 SPECIAL SPECIFICATION 1276 Pedestrain Overpass Lighting 1. Description. This Item shall govern for furnishing and installing the various types of lighting fixtures,

More information

SECTION ELECTRIC FOUR FOLD DOORS MODEL 46 FLAT SHEETED

SECTION ELECTRIC FOUR FOLD DOORS MODEL 46 FLAT SHEETED SECTION 08350 ELECTRIC FOUR FOLD DOORS MODEL 46 FLAT SHEETED PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

SECTION HEAT TRACING FOR PLUMBING PIPING

SECTION HEAT TRACING FOR PLUMBING PIPING SECTION 22 05 33 HEAT TRACING FOR PLUMBING PIPING PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not

More information

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator

More information

Architect s Project Number of 5 Decentralized HVAC Equipment District Master Specs 2013 Edition

Architect s Project Number of 5 Decentralized HVAC Equipment District Master Specs 2013 Edition PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 23 81 00 DECENTRALIZED HVAC EQUIPMENT A. The other Contract Documents complement the requirements of this section. The General requirements apply to the work

More information

SECTION AUTOMATIC TRANSFER SWITCH

SECTION AUTOMATIC TRANSFER SWITCH SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH PART 1: GENERAL 1.01 SCOPE A. Furnish all labor, materials, equipment and appurtenances, install and test electrically operated, automatic transfer switch (ATS)

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

Public Works Division Lighting District Supplemental Specifications For Solar School Flashing Beacon Installation March 2007

Public Works Division Lighting District Supplemental Specifications For Solar School Flashing Beacon Installation March 2007 Public Works Division Lighting District Supplemental Specifications For Solar School Flashing Beacon Installation March 2007 7000 Florida Street Punta Gorda, Florida 33950 Tele: 941.575.3600 Fax : 941.637.9265

More information

SECTION 512A ELECTRICAL. A. Electrical materials, installation, testing and miscellaneous.

SECTION 512A ELECTRICAL. A. Electrical materials, installation, testing and miscellaneous. SECTION 512A ELECTRICAL PART 1 GENERAL 1.1 SECTION INCLUDES A. Electrical materials, installation, testing and miscellaneous. 1.2 STANDARDS AND REFERENCES A. All electrical work shall be executed in strict

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

Section BUILDINGS, SHELTERS, ENCLOSURES

Section BUILDINGS, SHELTERS, ENCLOSURES Section 13121 BUILDINGS, SHELTERS, ENCLOSURES Part 1 GENERAL 1.1 SECTION INCLUDES 1.2 A. Pre-engineered buildings. B. Pre-engineered shelters. C. Pre-engineered enclosures. D. Electrical wiring and devices

More information

Repair Maintenance Hangar Phase II August 2010 SECTION LIGHTNING PROTECTION SYSTEM PART 1 GENERAL

Repair Maintenance Hangar Phase II August 2010 SECTION LIGHTNING PROTECTION SYSTEM PART 1 GENERAL SECTION 16601 LIGHTNING PROTECTION SYSTEM PART 1 GENERAL 1.1 SCOPE A. Furnish and install all materials and labor required to provide a complete functional lightning protection and common ground system

More information

Melhart Music Center Modular Music Practice Rooms - E3 Ready Specifications Section 13034

Melhart Music Center Modular Music Practice Rooms - E3 Ready Specifications Section 13034 Melhart Music Center Modular Music Practice Rooms - E3 Ready Specifications Section 13034 PART 1 - General 1.01 Summary A. Section includes labor, material, equipment, and other considerations required

More information

Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington

Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington Rev 062017 Provided by UNCW Physical Security and Access OVERVIEW... 3 CABLE INSTALLATION... 3

More information

A. Product Data shall be provided for each type of product indicated.

A. Product Data shall be provided for each type of product indicated. 32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical

More information

DIVISION 700 TRAFFIC CONTROL FACILITIES SECTION 701 ACTUATED CONTROLLER

DIVISION 700 TRAFFIC CONTROL FACILITIES SECTION 701 ACTUATED CONTROLLER DIVISION 700 TRAFFIC CONTROL FACILITIES SECTION 701 ACTUATED CONTROLLER 701 701.01 Description. This item shall consist of furnishing and installing an actuated controller and other associated equipment

More information

SECTION PACKAGED, SUBMERSIBLE, DRAINAGE PUMP UNITS

SECTION PACKAGED, SUBMERSIBLE, DRAINAGE PUMP UNITS SECTION 22 14 36 PACKAGED, SUBMERSIBLE, DRAINAGE PUMP UNITS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph

More information

B. Provide equipment complying with this specification and manufactured by one of the following:

B. Provide equipment complying with this specification and manufactured by one of the following: SECTION 230910 PAINT SPRAY BOOTH PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide Paint Spray Booth, Prep Booth and Paint Mix Room, and associated ventilation equipment, complying with the

More information

SECTION PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS

SECTION PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 22 13 33 PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph

More information

SECTION SPORTS FIELD LIGHTING

SECTION SPORTS FIELD LIGHTING SECTION 16500 SPORTS FIELD LIGHTING PART I - GENERAL 1.01 Related Documents Drawings and general provisions of the bid documents, including general and supplementary conditions apply to this section. 1.02

More information

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work 2004 Specifications CSJ 0027-12-134 SPECIAL PROVISION 000--2823 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,

More information

DIVISION 16. Electrical Specifications

DIVISION 16. Electrical Specifications DIVISION 16 Electrical Specifications 16.1 General - Provide all electrical materials and methods as shown on the Drawings, as specified herein, and as needed for a complete and proper installation, including

More information

SECTION INTEGRATED POWER ASSEMBLY (IPA)

SECTION INTEGRATED POWER ASSEMBLY (IPA) INTEGRATED POWER ASSEMBLY (IPA) PART 1 GENERAL 1.01 1.02 1.03 SCOPE The specification covers requirements applicable to the provision of Integrated Power Assembly (IPA). The IPA shall be environmentally

More information

SECTION The specification section is organized by placing information in three standard parts:

SECTION The specification section is organized by placing information in three standard parts: SECTION 14244 LIMITED USE HYDRAULIC ELEVATOR ***** Since 1982 Liftavator, Inc. has provided limited use/limited application (LU/LA) elevators, residential elevators, hydraulic vertical platform wheelchair

More information

SPECIAL SPECIFICATION 8336 Electric Underground Vault

SPECIAL SPECIFICATION 8336 Electric Underground Vault 2004 Specifications CSJ 0196-07-027 SPECIAL SPECIFICATION 8336 Electric Underground Vault 1. Description. This Item shall govern for the furnishing and construction of an Electric Underground Vault (EUV)

More information

Switch Rack Assemblies

Switch Rack Assemblies Switch Rack Assemblies Applications: Free-standing switch rack assemblies are used: To provide a complete motor control center in one integrated package Outdoors and indoors In damp, wet or corrosive locations

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

SPECIAL SPECIFICATION 1171 Camera Pole Structure

SPECIAL SPECIFICATION 1171 Camera Pole Structure 1993 Specifications CSJ 0074-05-086, etc. SPECIAL SPECIFICATION 1171 Camera Pole Structure 1. Scope. This Specification will supplement the camera pole details found on the plans. This Item shall govern

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Receptacles,

More information

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY SPECIFICATIONS FOR HIGH PRESSURE SODIUM LUMINAIRES, CUTOFF TYPE

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY SPECIFICATIONS FOR HIGH PRESSURE SODIUM LUMINAIRES, CUTOFF TYPE STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 SPECIFICATIONS FOR HIGH PRESSURE SODIUM LUMINAIRES, CUTOFF TYPE N.J. Specification No. Effective Date: July 1, 2001 New Jersey

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

SPECIAL SPECIFICATION 6683 Border Safety Inspection Facility Transponder Reader System

SPECIAL SPECIFICATION 6683 Border Safety Inspection Facility Transponder Reader System 2004 Specifications CSJ 0922-00-025 SPECIAL SPECIFICATION 6683 Border Safety Inspection Facility Transponder Reader System 1. Description. Furnish, install and test Transponder Reader System consisting

More information

SPECIAL SPECIFICATION 8772 Border Safety Inspection Facility Transponder Reader System

SPECIAL SPECIFICATION 8772 Border Safety Inspection Facility Transponder Reader System 2004 Specifications CSJ 0921-02-173 SPECIAL SPECIFICATION 8772 Border Safety Inspection Facility Transponder Reader System 1. Description. Furnish, install and test Transponder Reader System consisting

More information

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS 23 HEATING, VENTILATING AND AIR CONDITIONING TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING - Basic HVAC Requirements 238239.19 - Wall and Ceiling Unit Heaters

More information

SECTION WIRE AND CABLE Raceways and Conduit Motor Power and Control Wiring.

SECTION WIRE AND CABLE Raceways and Conduit Motor Power and Control Wiring. SECTION 16120 WIRE AND CABLE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 16112 - Raceways and Conduit. 2. 16155 - Motor Power and Control Wiring. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:

More information

SECTION SIGNAL SYSTEMS MISCELLANEOUS PRODUCTS

SECTION SIGNAL SYSTEMS MISCELLANEOUS PRODUCTS SECTION 18360 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for miscellaneous components and products for signal systems. 1.02 REFERENCE STANDARDS A. American National Standards Institute

More information

SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System

SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System 2004 Specifications Houston District SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System 1. Description. Furnish and place a Multi-Duct Conduit (MDC) system that is suitable for installation in an outdoor

More information

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes.

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes. SECTION 16111 CONDUITS AND BOXES 1.01 DESCRIPTION PART 1- GENERAL A. Work covered by this section includes the furnishing and installation of conduits and boxes. 1.02 SUBMITTALS A. The Contractor shall

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE NAVIGATION LIGHTING

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE NAVIGATION LIGHTING 809-1(a-e) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE NAVIGATION LIGHTING These special provisions amend and where in conflict, supersede applicable sections of the 2009 Standard

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section AUTOMATIC CONTROL VALVE INSULATED ENCLOSURE (HOT BOX)

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section AUTOMATIC CONTROL VALVE INSULATED ENCLOSURE (HOT BOX) Section 15959 PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and the installation of Automatic Control Valve Insulated Enclosures (Hot Boxes) for control valves installed on water lines

More information

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY METRIC SPECIFICATIONS FOR HIGH PRESSURE SODIUM LUMINAIRES OFFSET TYPE

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY METRIC SPECIFICATIONS FOR HIGH PRESSURE SODIUM LUMINAIRES OFFSET TYPE STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 METRIC SPECIFICATIONS FOR HIGH PRESSURE SODIUM LUMINAIRES OFFSET TYPE N.J. Specification No. Effective Date: July 1, 2001 New

More information

REA LISTED. Throughout the catalog you will notice blue highlighted items. These are the most frequently ordered BURNDY Products.

REA LISTED. Throughout the catalog you will notice blue highlighted items. These are the most frequently ordered BURNDY Products. Grounding BURNDY Products E-44 TYPE GRC HIGH STRENGTH GROUND ROD CLAMP For Copper Cable to Rod High copper alloy ground connector for joining a range of cable to copper clad, galvanized steel, and stainless

More information

SPECIAL SPECIFICATION 8783 Border Safety Inspection Facility Transponder Reader System

SPECIAL SPECIFICATION 8783 Border Safety Inspection Facility Transponder Reader System 2004 Specifications CSJ 0921-02-173 SPECIAL SPECIFICATION 8783 Border Safety Inspection Facility Transponder Reader System 1. Description. Furnish, install and test Transponder Reader System consisting

More information

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). 16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the

More information

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS 669.7403.001 West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS Page C-111 Advertisement for Bids 1-2 C-200 Instruction to Bidders 1-10 C-410 Bid Form for Construction Projects

More information

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS SECTION 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide labor, materials, equipment, and incidentals as shown, specified, and

More information

SECTION GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT

SECTION GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT SECTION 23 05 12 GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. Also delete

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 11 16 SECONDARY UNIT SUBSTATIONS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

1. Section , Gas and Vacuum systems for Laboratory and Healthcare Facilities

1. Section , Gas and Vacuum systems for Laboratory and Healthcare Facilities PART 1 - GENERAL 1.01 SUMMARY A. Section Includes 1. Pre-Fabricated Modular Futrus Headwall System a. Futrus Headwall as detailed on the drawings, including related components and accessories required

More information

Division 16 Sections for electrical service for elevators to and including disconnect and fused switches at machine room.

Division 16 Sections for electrical service for elevators to and including disconnect and fused switches at machine room. A+ ELEVATORS & LIFTS An A+ Connection Company Phone: 888-444-APLUS (2758) Fax: 888-444-9377 Email: info@aplusconnection.com Web: www.aplusconnection.com GEAR DRIVE An A+ Connection Company SECTION 14202

More information

OVERHEAD SERVICES - SECONDARY

OVERHEAD SERVICES - SECONDARY OVERHEAD SERVICES - SECONDARY Contents - Overhead Services... O-1 General Requirements for Overhead Service... O-2 Names of Parts for Overhead Service... O-3 Service Attachment on an Unguyed Service Mast...

More information

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies

More information

DIVISION 33 UTILITIES SECTION PACKAGED SEWAGE GRINDER PUMPING UNITS

DIVISION 33 UTILITIES SECTION PACKAGED SEWAGE GRINDER PUMPING UNITS DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: The work specified in this Section consists of providing an Environmental One grinder pump(s) unit with tank, internal piping and

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 35 33.00 40 (August 2016) --------------------------------- Preparing Activity: NASA Superseding UFGS-26 35 33.00 40 (August 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

PREMIER Low Profile Induced Draft Cooling Tower Specifications

PREMIER Low Profile Induced Draft Cooling Tower Specifications Fa Delta Cooling Towers, Inc. 185 US Highway 206 Roxbury Township, NJ 07836 973.586.2201 973.586.2243 fax www.deltacooling.com sales@deltacooling.com PREMIER Low Profile Induced Draft Cooling Tower Specifications

More information

WIRE AND CABLE Raceways and Conduit Motor Power and Control Wiring.

WIRE AND CABLE Raceways and Conduit Motor Power and Control Wiring. SECTION 16120 WIRE AND CABLE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 16112 - Raceways and Conduit. 2. 16155 - Motor Power and Control Wiring. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:

More information

SECTION SEALANTS AND CAULKING

SECTION SEALANTS AND CAULKING 07951-1 of 5 SECTION 07951 SEALANTS AND CAULKING 07951.01 GENERAL A. Description Sealants and caulking shall include, but not necessarily be limited to, furnishing and installing caulking, sealants, and

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

Special Specification 6031 Camera Pole Structure

Special Specification 6031 Camera Pole Structure Special Specification Camera Pole Structure 1. SCOPE This Specification supplements the camera pole details found on the plans. Fabricate, deliver, and install camera pole structures as shown on the plans.

More information

SECTION LOW-VOLTAGE TRANSFORMERS

SECTION LOW-VOLTAGE TRANSFORMERS PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not

More information

a) Line and load compartments must be separated by a stable barrier.

a) Line and load compartments must be separated by a stable barrier. 1.00 GENERAL 1.01 The electric utility shall furnish and connect all meters, instrument transformers, test switches, and meter control wiring necessary to complete the meter installation. 1.02 The customer

More information

Ontario Ministry of Transportation. Designated Sources of Material (DSM) Index

Ontario Ministry of Transportation. Designated Sources of Material (DSM) Index 2 GRADING 2.35 Fill 2.35.30 Lightweight Fill Material 3 PAVEMENTS 3.05 Asphalt 3.05.10 Anti-Stripping Treatments (formerly Anti-stripping Additives) 3.05.22 Asphalt Cement, Performance Graded (PGAC) 3.05.25

More information

SECTION 1101 TRAFFIC SIGNALS AND APPURTENANCES END OF SECTION

SECTION 1101 TRAFFIC SIGNALS AND APPURTENANCES END OF SECTION SECTION 1101 SIGNALS AND APPURTENANCES PART 1 GENERAL 1.4 SUBMITTALS E. Submit warranty for all supplied material and workmanship for a period of two years from final acceptance. The warranty must state

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

POOLS, SPAS AND HOT TUBS

POOLS, SPAS AND HOT TUBS POOLS, SPAS AND HOT TUBS City of San Juan Capistrano Development Services Department 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Phone: (949) 493-1171 Fax: (949) 661-5451 http://www.sanjuancapistrano.org/

More information

Specification Lightning Protection Systems

Specification Lightning Protection Systems Specification Lightning Protection Systems General: Summary A) This Section specifies the lightning protection system for the building(s) or structure(s). This system provides safety for the building and

More information

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails.

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails. SECTION 16714 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification. SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,

More information