1 BHARAT HEAVY ELECTRICALS LIMITED, BHOPM Pre- Qualification Requirement (PQR) Dated: 20/02/2015 The Pre-Qualification requirement for "Slip Ring" as per drg. " " are as under: SI. Description "Slip Ring" should be exactly as per drg. no. " ". Complied / Not complied Vendor to comment Supporting relevant document to be submitted Not required 5. Manufacturing and supply experience in preceding 2 years of same/similar item to some reputed traction or other alternator manufacturers or Indian Railway is mandatory. Proof of successful supply shall be provided. List of plant and machinery to be submitted as per format no. Document no. M&P/001 Rev00 Supplier to furnish QAP that shall be followed during manufacturing as per format "document no QAP/001" enclosed which has to be approved by BHEL before start of manufacturing. Approval of QAP by BHEL shall be responsibility of vendor. No extension on delivery shall be entertained on this account. Availability of Testing facilities required to conduct all the tests as per above specifications/drawing is desirable with the firm, preferably in-house. List of testing facilities to be submitted. All testing facilities have to be duly calibrated. List of outsourced facilities (if used) may be submitted. Outsourced labs/firms should necessarily be NABL accredited. Un-price PO copies. Drawing / photograph of similar component c. Supply proof (challan, invoice etc.) List of M&P as per Format "Document no. M&P/001" QAP as per Format "Document no. QAP/001" List of Testing facilities required.

2 BHARAT HEAVY ELECTRICALS LIMITED, BHOPAL Pre- Qualification Requirement (PQR) Dated: 20/02/2015 Vendor to provide the source of raw material such as Aluminum bronze casting, Casted hub, brass washers and studs, epoxy molding etc., proof of recent procurement, detailed specification from which material has been procured, latest test certificate of raw material used for manufacture of "Slip Ring". Successful tenderer to get their first lot approved by BHEL before start of bulk supply in case of PO placement. Source and details required. Not required 8. Financial standing through latest Income Tax I.T.C.C, Annual report Clearance Certificate (I.T.C.C.), Annual report (balance sheet and Profit& loss Account) of last 3 years of (balance sheet and profit & loss account) for last 3 years Note: Only Clause no. 1 is applicable to vendors who are already registered in BHEL for this item, and all the clauses are applicable for other vendors. (*): Slip Ring for alternator for traction or other application shall be considered as similar item. Compliance of above Technical PQR is mandatory. In absence of compliance of above vendor offer is liable to be rejected. Vendor to ensure that first lot to be sent to BHEL with sufficient time margin such that PO delivery schedule is not affected. Dimensional check/ material properties for approval of first lot may take approx. 2 weeks at BHEL. No delivery extension shall be entertained on the ground of any delay in first lot clearance by BHEL. THE TPTN-Plg. MNX K al Dugvekar Sr.DE/TME,,,,,n \- CA!,,L.H (S. -)

3 QA Plan Document no. QAP/001 Rev00 QUALITY ASSURANCE PLAN for "Name of item/components/material" Page 1 of PROCESS FLOW CHART OF MANUFACTURING PROCESS:

4 QA Plan Document no. QAP/001 Rev00 QUALITY ASSURANCE PLAN for "Name of item/components/material" Page 2 of INCOMING RAW MATERIALS/PARTS/SUB-ASSEMBLIES SL Incoming Materials / Parts / Sub-assemblies Name of the sources Sample Size & Frequency of Inspection Parameters for Inspection Mode of Inspection / Equipment used Acceptance Limits / Criteria / Specified value Rejection Details/ Reprocessed/scraped

5 QA Plan Document no. QAP/001 Rev00 QUALITY ASSURANCE PLAN for "Name of item/components/material" Page 3 of IN - PROCESS INSPECTION (OF THE PRODUCT) SI. Subject / Product / Process Sample Size & Frequency of Inspection Parameters for Inspection Mode of Inspection / Equipment used Acceptance Limits / Criteria / Specified value Rejection Details/ Reprocessed /scraped Traceability register no.

6 QA Plan Document no. QAP/001 Rev00 On QUALITY ASSURANCE PLAN for "Name of item/components/material" Page 4 of FINAL INSPECTION OF THE PRODUCT SI. Subject / Product / Process Sample Size & Frequency of Inspection Parameters for Inspection Mode of Inspection / Equipment used Acceptance Limits / Criteria / Specified value Rejection Details/ Reprocessed /scraped Traceability register no. Note - The compulsion to QAP does not absolve the supplier from all contractual obligation viz job's performance, its guarantee etc. PREPARED BY APPROVED BY Name & Signature Name & Signature

7 Document no. M&P/001 Rev00 Page 1 of ORGANISATION CHART

8 Document no. M&P/001 Rev00 Page 2 of QUALIFICATION / EXPERIENCE OF PERSONNEL Qualification of key personnel and the officials deployed SL No Name Designation Technical qualification Experience Responsibility

9 Document no. M&P/001 Rev00 Page 3 of AVAILABILITY OF MACHINERY & PLANTS ( M&P) AND TESTING FACILITIES WITH THE FIRM SI. Details of the M&P Name of M&P Model Make Machine Year of Built Range /Capacity Proof of owner ship PREPARED BY APPROVED BY Name & Signature Name & Signature