TABLE OF CONTENTS SITE OVERVIEW & LOCATION 2 PROPERTY INFORMATION 4 7 SITE PLAN PROPERTY SPECS WATER SUPPLY BARGE & RAIL PHOTOGRAPHY 8 UTILITIES 9

Size: px
Start display at page:

Download "TABLE OF CONTENTS SITE OVERVIEW & LOCATION 2 PROPERTY INFORMATION 4 7 SITE PLAN PROPERTY SPECS WATER SUPPLY BARGE & RAIL PHOTOGRAPHY 8 UTILITIES 9"

Transcription

1 1

2 TABLE OF CONTENTS SITE OVERVIEW & LOCATION 2 PROPERTY INFORMATION 4 7 SITE PLAN PROPERTY SPECS WATER SUPPLY BARGE & RAIL PHOTOGRAPHY 8 UTILITIES 9 1

3 SITE OVERVIEW & LOCATION ABOUT Located on the Ohio River in the heart of the Utica and Marcellus Shale plays, Trimodal Terminal is an 80 acre riverfront industrial community in Follansbee, West Virginia. Rail and barge infrastructure on-site allows for material transfer to or from trucks. The substantial acreage of vacant land is available to build industrial and warehouse facilities that require on-site barge and rail access. SERVICES HIGHWAY By road, Trimodal Terminal is located along West Virginia Route 2, just 3 miles south of U.S. Route 22 allowing our customers and resident businesses to be in Ohio or Pennsylvania in less than 10 minutes. We have a state certified truck scale on site. We are 30 minutes from Pittsburgh International Airport and 19 miles from the Pennsylvania Turnpike Southern Beltway, which crosses through Washington County, Pennsylvania to connect Route 22 with Interstate 79 just north of Southpointe in Canonsburg, PA. The Southern Beltway is scheduled for completion in BARGE Located at the Ohio River Mile 70.0, Trimodal Terminal has a barge facility that includes 3,000 feet of riverfront and 6 barge mooring clusters. Our U.S. Army Corps of Engineers barge facility permit allows us to load and unload material and to stage barges 3-wide along the full length of our riverfront, providing capacity to stage over 40 barges. RAIL Trimodal Terminal has over 20,000 feet of rail lines on-site served by Norfolk Southern (NS Location R021 DL4). We offer transloading access between truck and rail. Rail lines can also be included within a development site for businesses that require an exclusive rail line within their facility. Where the existing rail configuration is inadequate, we will invest in the site to expand rail infrastructure in connection with long term build to suit projects. 2

4 HIGHWAY ACCESS Immediate access to Route 2 26 miles to I-70 via OH Rt. 7 3 miles to US Route 22 PROXIMITY Pittsburgh International Airport 28 Miles Southpointe, Canonsburg, PA 33 Miles Cadiz, OH 29 Miles Monaca, PA 44 Miles Dilles Bottom, OH 38 Miles 25 miles 3 50 miles

5 SITE PLAN TE 2. RO U O L ES T 3 M I E 22 T RO U Legend TRIMODAL TERMINAL ± 80 ACRES EXISTING SIGNALIZED INTERSECTION NORFOLK SOUTHERN MAINLINE VE TE RA NS DR PRIMARY TRIMODAL SITE ACCESS WITH EXISTING BRIDGE T1 T1.1 T1 APPROX. 2.1 AC PARCEL T1.1 APPROX. 1.4 AC PARCEL T2 APPROX AC PARCEL T3 APPROX. 1.0 AC PARCEL T4 APPROX AC PARCEL T5 APPROX. 1.3 AC PARCEL T6 APPROX. 1.6 AC PARCEL T7 APPROX. 2.0 AC PARCEL T8 APPROX. 1.9 AC PARCEL T9 APPROX. 9.5 AC PARCEL T10 APPROX. 5.5 AC PARCEL T11 APPROX. 3.3 AC PARCEL T12 APPROX. 1.7 AC PARCEL T2 T5 T6 RO T7 T12 UT E2 T9 T4 T3 T8 T10 PERMITTED BARGE MOORING CELLS 41 MILES TO PROPOSED SHELL CRACKER PLANT 3,000 OHIO RIVER - MILE MARKER 70 T11 NS MAINLINE TERMINATES AT EAGLE MFG IN WELLSBURG 34 MILES TO PROPOSED PTT CRACKER SITE TRIMODAL TERMINAL 4 FOLLANSBEE, WV APRIL SCALE IN FEET SCALE: 1" = 150' 150

6 PROPERTY SPECS Property Address 600 Veterans Drive, Follansbee, WV Industrial Acreage Approximately 80 Acres Zoning No Zoning Restrictions Highway Access 26 Miles to I-70 via OH Rt. 7 3 Miles to US Route 22 Permits NPDES Discharge Permit U.S. Army Corps of Engineers Barge Facility Permit # U.S. Army Corps of Engineers Barge Facility Maintenance Dredging Permit valid through February 23, 2026 WVDEP Ohio River Water Withdrawal Facility #8056 WV Department of Health Water Well Permit #DW Truck Scale State certified truck scale on-site with staffed scale house during regular business hours 5

7 WATER SUPPLY Trimodal Terminal operates a water manifold to provide water to high volume users such as natural gas well drillers, pipeline drillers, and other industrial users. We can fill 10 standard water trucks simultaneously in about 10 minutes. The facility is available 24-7 and is weather-proofed to prevent freezing in cold weather. The manifold is fed from two 22,000 gallon tanks that are equipped with a water pressure transducer and filled by a river pump with a maximum flow rate of 4,500 gallons per minute. We maintain a water well as a back up water source that is connected to the manifold that can be turned on in a matter of minutes in the event of a problem with our primary water pump. WVDEP Water Facility #8056 no withdrawal limit WV Department of Health Water Well Permit #DW

8 BARGE & RAIL Barge Facility Ohio River Mile 70.0 with 3,000 feet of riverfront Permitted for barge loading and unloading 6 pile cluster mooring dolphins; permitted mooring width of 105 can accommodate up to approximately 45 barges USACE Permit Maintenance Dredging Permit through February 23, 2026 Rail On-Site Approximately 15,000 of rail available on-site Norfolk Southern service location RO21 DL4 Will construct additional rail for long term use commitment On-site crossings replaced with rubber crossings in 2017 Over $1 million invested in rail improvements since 2014 Spurs available for transloading and rail yards are available to rent for railcar storage 7

9 PHOTOGRAPHY 8

10 UTILITIES Power Provider: Mon Power (First Energy) Substation within 1,000 feet of site 50 + MVA MVA Gas Provider: Mountaineer Gas Company 3 line serving site Service available up to an estimated load of 100,000 cubic feet per hour Water Potable water provided by the City of Follansbee Wastewater service provided by the City of Follansbee Telecommunications Provider: Frontier Communications & Comcast Fiber optic service available 9

11 600 Veterans Drive Follansbee, WV