1 August, 2009

2 Popula)on: millions people GDP 2008: billions VND GDP growth: 4.59 % ( first 9 months of 2009 ) Q1: 3.11%; Q2: 4.46%; Q3: 5.76% GDP by sector: Agriculture 22.1%, Industry 39.73%, service 38.17% Vietnam s import turn over of the 9 first months 2009: $ billions (year on year decrease of 25.2%). Vietnam s export turn over of the 9 first months 2009 : $ 41.7 billions (year on year decrease of 14.3%). (Source: Vietnam s General Sta:s:c Office, Ministry of Planning and Investment s Report) Saigon Newport Holding Company 2

3 Visit for more informations. 3

4 Country LPI Customs Infrastruc Internatio ture nal shipments (1 is the lowest score, 5 is the highest) Logistics competen ce Tracking & tracing Domestic logistics costs Timelines s Malaysia China Thailand Indonesia Vietnam Philippines East Asia & Pacific (regio nal average) Cambodia Lao PDR Mongolia Myanmar (Visit for more informa)ons) Saigon Newport Holding Company 4

5 Key figure about Transporta:on competence 42.5 % Total Governed by the Government Source: General Sta:s:cs Office Divided by Governed by the Ci)es/Provinces Governed by the districts Road (Km) Asphalted Paved road Gravelled road Pathway Waterway (Km) Load<50 tons Load: tons Load: tons Load: tons Load>1001 tons Bridge Quan)ty Length (m) Saigon Newport Holding Company 5

6 Currently no real highway/expressway. Only 42,5% is covered with asphalt. Conges)ons in the rush hour in the ci)es. Saigon Newport Holding Company 6

7 Project Selected Expressway and Road projects Project Value (US$mn) Company name(s) Timeframe Status Hanoi Lao Cai Expressway 1,249 Vietnam Expressway Corp Construc)on underway Hanoi Haiphong Highway 1,450 Transporta:on Consulta:on and Design Company Construc:on underway since Apr 2009 Lang Hoa Lac Highway (30km) 331 Vinaconex % completed Dinh Vu Lach Huyen na na na Plan approve in Aug 2009 Upgrading Na)onal Road 25 (Gia Lai Phu Yen) 129 Vietnam Expressway Corp. 2010? At planning stage 700km road linking locali)es in the central region and Tay Nguyen 222 na Work underway Construc)on works on a 6.9km road linking the Mau Than area and Tra Noc airport 56.4 Hau Giang Construc)on Corp Complete in 2009 HCMC Trung Luong (62km) 630 PMU My Thuan Expected to complete in 2009

8 Highway project: new construc:on project Length: 72km, width: 34m ~ 06 lanes (phase 1: 48km), (phase 2: 24km) Enlargement project of the exis:ng Na:onal Road No. 51 BOT project. Length: 73.6km, width: 32.9m ~ 6 lanes Schedule: The start of construc)on ceremony held on August 2 nd Road No. 965 : enlargement project Length: 8.48km; width: 32m ~ 4 lanes Schedule: construc)on started in Oct. 2008; completed in 0ct Ho Chi Minh city Long Thanh Dau Giay highway Length: 55 km. Width: 36m ~ 06 lanes Start: 3rd Oct 2009; completed )me : Railway ( Bien hoa Vung Tau): new construc:on project Length: 100km; width: 1.435m (2 lanes); parallel to Na)onal Road No. 51 Saigon Newport Holding Company

9 Loca:ons of Ports and ICDs in the South Focal Economic Area SP-PSA Bien Hoa ICD TSM, TNM, PL, PL VICT SPCT

10 Road and Bridge Development Projects

11 Saigon Newport Holding Company 11

12

13 13

14 Airport Construc:on Projects Project Project Value Company name(s) Timeframe Status Likely to be partly Long Thanh Int' Airport 4500 mil US$ Central Airport Authority opera:onal by 2015 Quang Ninh Int' Airport 200 mil US$ Hoang Gia Int' Corp. na FS being carried out Upgrading Cam Ranh Airport in Khanh Hoa to an Int' Airport 188 mil US$ Vietnam Airlines, BIDV Seeking funding Da Nang Airport Passenger Terminal Upgrading the Lien Khuong Airport Can Tho Int' Airport 160 mil US$ 68 mil US$ Louis Berger Group, Airport Consultants B.V and Na)onal Construc)on Consultants Construc)on underway Southern Airport Authority and Lam Dong Authority Development plan finalised 50 mil US$ Airport Construc)on Company and Cienco Recently operated Modernisa)on of Rach Gia Airport 34.6 mil US$ Mekong Delta Province, the Southern Airports Authority Master plan declared Upgrading the Phu Bai Airport (Thua Thien Hue) na na na Plans approved Saigon Newport Holding Company 14

15 15

16 Project Construc)on for a 1,630 km North South railway link 33, km extra rail route 30,000 Rail Construc:on Project Value (US$mn) Company name(s) Timeframe Status Vietnam Railway Corpora)on (VRC) Currently underway Vietnam Railway Corpora)on (VRC) At designing stage Construc:on of a double track rail line between Hanoi and the Ha Tinh province 9,200 10,100 Korean Int' Coopera:on Agency (Koica) na FS being carried out Construc:on for a 15.2km underground railway in Hanoi 1,200 na Plans approved Construc:on of railway link links with Cambodia and Laos Vietnam Railway Dept, China Mechanical Equipment Import Export Corp. and China Railway Construc:on Corp. na At designing stage Saigon My Tho Railway Construc)on of railway lines connec)ng HCMC and the Binh Phuoc province 438 Vietnam Railway Corpora:on (VRC) At designing stage Na)onal Machinery Imp Exp Corp. and Railway Construc)on Corp. na At planning stage Upgrading of 1,000km railway sec)on linking Vinh city to Nha Trang City 243 HCMC Can Tho Express Railway 4,000 Dak Nong Di An Vung Tau na Vietnam Railway Corpora)on (VRC) Currently underway The Transport Engineering and Design Inc. South Plan proposed Vietnam Railway Corpora:on (VRC) At designing stage

17

18 Saigon Newport Holding Company 18

19 19

20 Source: VPA Saigon Newport Holding Company 20

21 Cai Lan port Cam Pha Town Hai Phong City Tan Cang-128 ICD Do Son Town Lach Huyen South Do Son Bach Long Vy

22 Location Hai Phong City (22km away from the city center; easily approachable to the Gulf of Tokin) Transportation infrastructure Inland road: existing Road No. 353 (6km) Railway: not linked to the port Inland waterway: mainly through the channel of Van Uc River ; linked to Northern Provinces by Thai Binh River, Luoc River & Red River. Airway: 15km away from Kien An Military Airport & Cat Bi Airport by road Transportation development projects: Hanoi-Hai Phong Highway: length: 106km; width: 70m (6 lanes) ~ 120km/h; construction started Feb & completed Nov Hanoi-Hai Phong Railway: 106km Other infrastructure Electricity network: 110KV & 35KV (existing) Water supply system: 5,000m3/day Communication system: available

23 Phase I ( ) Phase II ( ) Phase III ( ) Phase IV (After 2020) Area 10.4 ha 52 ha 129 ha ha No of berths Berth length 2 300m 5 1,400 m 2,945m 9,198m Channel length 4km 6.2 km 11.5km 11.5km Channel width 110m 150m 150m 200m Chart datum -5.5 m -6.8m -11.9m -13.4m Dredging 15m 15m 15m 15m Vessel capacity 10,000 DWT 15,000 DWT 50,000 DWT 100,000 DWT Estimated volume p.a 1mil tons 10 mil tons 30 mil tons 50.5 mil tons Schedule Feasibility study completed in Project documents now reviewed by Royal Haskoning (Holland) Construction to begin in 2010.

24 Loca)on: Dam Mon, Van Phong Bay, Van Ninh District, Khanh Hoa Province. Developer: Vinalines Started construc)on on Oct 31 st, st place ( ) Total area: ha Total berth length: m 2 nd phase (up to 2020) Total area: 405 ha Total berth length: m Saigon Newport Holding Company 24