1 REPLACES D..5 04/25/2013 SUJECT PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PROJECT OFFICE MANUAL PART May 9, 201 MATERIALS ACCEPTED Y PROJECT SAMPLING 5-1 This subsection includes all of the materials specified to be accepted by project acceptance sampling. The samples, unless specified otherwise, are to be taken at the point of placement of the material. The testing can be accomplished directly on the project, in the vicinity of the project or at the Laboratory Testing Section (LTS) Laboratory in Harrisburg. The following guidelines are a minimum for sampling frequencies for acceptance testing of construction materials. The guidelines also list recommendations for sample sizes that should be sent into LTS. These sample sizes may differ from what is listed in the PTM's because the PTM's list the minimum sizes needed to complete that particular PTM. Department Representatives are required to monitor and maintain custody of any material samples collected on behalf of the Department from point of sampling through delivery. Frequencies may need to be increased as required by the level of construction. NOTE: Sampling Location is at the point of placement unless otherwise noted.

2 5-2 May 9, 201 Section I Materials Sampling Guidelines for Field Inspectors Material Embankment and Fill Subgrade Pipe ackfill Frequency In place density & moisture One acceptance test per lift for each 4,000 square yards placed; minimum one test per lift per day. In place density & moisture One acceptance test per lift for each 3,000 square yards placed; minimum one test per lift per day. In place density & moisture For every pipe run conduct one acceptance test for every 500 cubic yards of pipe backfill; minimum one test per lift per day. Size of Sample As per PTM 10 As per PTM 10 As per PTM 10 Test Method Proctors run initially and when material changes. PTM No. 402* Proctors run initially and when material changes. PTM No. 402* Proctors run initially and when material changes. PTM No. 402* Small Quantity Less than 1000 c.y. per project. N/A No nuclear testing is required for pipe extensions less than 20 ft. A maximum of 400 ft. of pipe per project. * Accepted by non-movement under compaction equipment if material meets the requirements of Pub 408, Section 20.2(a)1.c, 1.d, 1.e, or 1.f. Complete Form TR-478A.

3 5-3 May 9, 201 Section I Materials Sampling Guidelines for Field Inspectors Material Structure ackfill Subbase ase Courses Frequency Continuous Continuous See appropriate specification for type of base. Size of Sample N/A N/A See appropriate specification for type of base. Test Method * * Small Quantity N/A N/A Publication 408 Section 309 * Accepted by non-movement under compaction equipment. Complete Form TR-478A.

4 5-4 May 9, 201 Section I Materials Sampling Guidelines for Field Inspectors Material Frequency ase Repair See appropriate specification for type of base. Size of Sample See appropriate specification for type of base. Test Method Small Quantity Publication 408 Section 309 and Section 31

5 5-5 May 9, 201 Coarse Aggregate AASHTO No. 10 AASHTO No. 8 AASHTO No. 5, 57, AASHTO No. 3 7, and 7 Size of Sample 2 lb. 11 lb. 22 lb. 44 lb. Coarse Aggregate AASHTO No. 1 PA No. 2A and OGS Size of Sample Pub 408,Section 850.2(a)1&2 33 lb. Frequency Publication 408, Section 703.5(b)3, Table F. Test Method Grading PTM 1 Small Quantity

6 5- May 9, 201 Coarse Aggregate AASHTO No. 8 AASHTO No. 7 AASHTO No. 7 AASHTO No. 57 Size of Sample 2 lb. 5 lb. 5 lb. 7.7 lb. Coarse Aggregate AASHTO No. 5 AASHTO No. 3 PA No. 2A and OGS Size of Sample 10 lb. 10 lb. 8.8 lb. Frequency Publication 408, Section 703.5(b)3, Table F. Test Method Loss by Wash PTM 100 Small Quantity

7 5-7 May 9, 201 Coarse AASHTO No. 10 AASHTO No. 8 AASHTO No. 7 AASHTO No. 7 Aggregate Size of Sample 3 lb. 5 lb. 5 lb. 7 lb. Coarse Aggregate AASHTO No. 57 AASHTO No. 5 AASHTO No. 3 AASHTO No. 1 Size of Sample 10 lb. 10 lb. 18 lb. 37 lb. Frequency Publication 408, Section 703.5(b)3, Table F. Test Method Moisture AASHTO T 255 Small Quantity

8 5-8 May 9, 201 Coarse AASHTO No. AASHTO No. 7 AASHTO No. 7 AASHTO No. 57 Aggregate 8 Size of Sample 1 lb. 3.0 lb..5 lb..5 lb. Coarse Aggregate AASHTO No. 5 AASHTO No. 3 PA 2A and OGS Size of Sample.5 lb. 33 lb. 1.5 lb. Frequency Publication 408, Section 703.5(b)3, Table F. Test Method Crush Count ASTM D 5821 Small Quantity

9 5-9 May 9, 201 Fine Aggregate Type A Type Type C Frequency Publication 408, Section 703.5(b)3, Table F. Size of Sample 1 lb. Test Method Grading PTM 1, Loss by Wash PTM 100, Moisture AASHTO T 255, Fineness Modulus PTM 501 (Type A & Type C) Small Quantity Note: This page refers to gradation testing.

10 5-10 May 9, 201 Cement Concrete Structure * (RPS) ** Acceptance tests per Frequency Publication 408. Control tests per accepted quality control plan. Pavement * (RPS) ** Acceptance tests per Publication 408. Control tests per accepted quality control plan. Lean Cement Concrete ase * ** Air and Slump 1 per truck until control is established, then, every 200 c.y. thereafter. Cylinders A set of 4 cylinders molded at the same time from the same load for each 100 c.y. or fraction thereof daily. Size of Sample PTM 01 PTM 01 PTM 01 Test Method Air AASHTO T 19 or AASHTO T 152 Temperature ASTM C 104 Slump AASHTO T 119 Molding PTM 11 Compression PTM 04 Air AASHTO T 19 or AASHTO T 152 Temperature ASTM C 104 Slump AASHTO T 119 Molding PTM 11 Compression PTM 04 Surface Tolerance PTM 424 Core Thickness PTM 14 Air AASHTO T 19 AASHTO T 121 and C 13 AASHTO T 152 Slump AASHTO T 119 Molding PTM 11 Compression PTM 04 Small Quantity N/A N/A N/A * NOTE - Form CS-458A must be completed in order to document Department inspection of cylinder breaks. This form must be in the project records within 3 days of the breaks. Also, see page ** NOTE - Document the results of air meter calibrations in the Concrete Inspector's Diary.

11 5-11 May 9, 201 Cement Concrete (Standard) Frequency Structural * ** Air, Temp, and Slump 1 every 100 c.y. thereafter. Pavement * ** Air, Temp, and Slump 1 every 500 c.y. thereafter. Pavement Patching Concrete * ** Air, Temp, and Slump 1 every 200 c.y. thereafter. Incidental Work * ** Air, Temp, and Slump 1 every 100 c.y. thereafter. Cylinders A set of 4 cylinders molded at the same time from the same load for each 100 c.y. or fraction thereof daily. Cylinders A set of 4 cylinders molded at the same time from the same load for 500 c.y. or fraction thereof daily. Cylinders A set of 4 cylinders molded at the same time from the same load for each 200 c.y. or fraction thereof daily Cylinders A set of 4 cylinders molded at the same time from the same load for each 100 c.y. or fraction thereof daily. Size of Sample PTM 01 PTM 01 PTM 01 PTM 01 Test Method Air AASHTO T 19 or AASHTO T 152 Air AASHTO T 19 or AASHTO T 152 Air AASHTO T 19 or AASHTO T 152 Air AASHTO T 19 or AASHTO T 152 Temperature ASTM C 104 Temperature ASTM C 104 Temperature ASTM C 104 Temperature ASTM C 104 Slump AASHTO T 119 Slump AASHTO T 119 Slump AASHTO T 119 Slump AASHTO T 119 Small Quantity Molding PTM 11 Compression PTM 04 Molding PTM 11 Compression PTM 04 Molding PTM 11 Compression PTM 04 N/A N/A N/A Molding PTM 11 Compression PTM 04 Not to exceed 25 c.y.)/day, for each class of concrete/project for non-critical incidental items. * See Note on page ** See Note on page..5-10

12 5-12 May 9, 201 Material ituminous Concrete 409 (Standard) ituminous Concrete 409 (RPS) Stone Matrix Asphalt 419 Frequency Per Publication 408 Per Publication 408 Per Publication 408 Size of Sample Per Publication 408 Per Publication 408 Per Publication 408 Test Method Per Publication 408 Per Publication 408 Per Publication 408 Small Quantity Per Publication 408 N/A N/A

13 5-13 May 9, 201 Section II Materials Tested in the LTS Laboratory Material Admixtures earing Pads- Neoprene ituminous Concrete Frequency Each Lot As per PTM 312 Core Size of Sample 1 quart As per PTM 312 inches Shipping Container Plastic bottle Label ox, plastic concrete cylinder molds, or PVC pipe. Material ituminous Materials PG inders and Cutback Asphalts ituminous Materials Emulsified Asphalts lock, Concrete Frequency For Verification For Verification Each Lot Size of Sample 1 quart 1 quart 2 Shipping Container Metal Can Plastic Container ox

14 5-14 May 9, 201 Section II Materials Tested in the LTS Laboratory Material rick urlap Cement Frequency Each Lot Each lot For Verification and after Winter Storage Size of Sample 5 1 yard length 1 gallon Shipping Container ox Label Plastic ucket Material Calcium & Sodium Chloride Caulking Mastic Curing Compound Frequency For Verification Each Lot Each Lot Each Lot Size of Sample 1 quart 1 quart 1 quart Shipping Container Plastic Jar Can Jar or Can

15 5-15 May 9, 201 Section II Materials Tested in the LTS Laboratory Material Curing Protective Covers Epoxy Resin Material Gabions Frequency Each Shipment Each Lot Each Lot Size of Sample 1 yard 1 can each component 3 feet square Shipping Container Label Can Label Material Graphite Lubricant Geotextiles Glass eads Frequency Each Lot Each Lot Each Lot for Verification Size of Sample 1 quart 4 feet by full width 3 pounds Shipping Container Can or Jar Label Can

16 5-1 May 9, 201 Section II Materials Tested in the LTS Laboratory Material Grout: Mortar Guide Rail Joint Sealant Frequency Each Lot Each Lot Each Lot Size of Sample 1 gallon Rail & Post - 2 feet 1 gallon Hardware - 3 each Shipping Container Plastic Container Label Plastic Container Material Latex Emulsion Neoprene Comp. Seal Lubricant Frequency Each Lot Each Lot Each lot Size of Sample 1 quart 5 feet length 1 quart Shipping Container Plastic Jar Label Can or Jar

17 5-17 May 9, 201 Section II Materials Tested in the LTS Laboratory Material Premolded Joint Joint ackup-etha Foam Plank Etha Foam Filler 1/2 inch Frequency Each Shipment One per Project One per Project Size of Sample lineal feet 3 feet of plank 3 feet Shipping Container Label Label Label Material Paper Rope Paint Pipe, Plastic Frequency One per Project For Verification - Each Lot For Verification Each Lot Size of Sample 3 feet 1 quart 3 pieces 4 feet Shipping Container Envelope Can Label

18 5-18 May 9, 201 Section II Materials Tested in the LTS Laboratory Material Pozzolan Protective Coating Re-ar Frequency Each Shipment Each Lot For Verification Each Lot Size of Sample 1 gallon 1 quart 3 bars 4 feet Shipping Container Plastic ucket Can or Jar Label Material Re-ar, Wire Mesh Frequency For Verification Each Lot Right of Way Fence Fabric Each 150 Rolls or Fraction thereof. End Posts, Corner and Pull Posts, Line Posts, Steel Posts, races, Offset rackets, Splice and ase Plates, acking Plates, Etc. First 500 Lengths or Fraction thereof and One per each additional 2500 lengths. Size of Sample 3 feet square One each 3 feet full depth. One each 3 feet section. Shipping Container Label Label Label

19 5-19 May 9, 201 Section II Materials Tested in the LTS Laboratory Material Fasteners, Nuts, olts, etc. Stay-in-place-Form Waterproof Fabric Frequency Once if same type and material for entire project. 1 per each 200 Sections or less. Each Lot Size of Sample 3 each of all fittings and hardware, etc. 2 feet square section. Accessories - 2 feet lengths. 1 square yards Shipping Container Label Label Label Material Water Stop, Copper Flashing Water Stop, PVC Frequency Each Shipment Each Shipment Size of Sample 12 inches square 4 feet length Shipping Container Label Label