1 Appendix E-3 CLECO POWER LLC 2012 RFP FOR LONG-TERM CAPACITY AND ENERGY RESOURCES Bid Option Power Purchase Agreement APPENDIX E-3 POWER PURCHASE AGREEMENT EVALUATION FORM 2012 RFP for Long-Term Capacity and Energy Resources Cleco Power LLC Warning! You do not currently have Word Macros enabled. You must have Word Macros enabled to complete this form. Please contact your IT department for assistance in enabling Word Macros. PD Page 1 of 10

2 An original signed copy of this page must be received by Cleco Power by the applicable RFP schedule deadlines. All proposals must be submitted in accordance with Section 4.13 of the RFP document and the instructions on the form(s) provided in this Appendix. Bidders should note that Cleco Power will only accept electronically submitted notices and proposals, with the additional requirement of original signature pages, as noted. Bidders are required to submit all completed forms by the specified deadlines to the RFP Submitting Address at: and completed original signature pages to the RFP Administrator at the address shown below by the specified deadline. Mail To: Richard Sharp Director, Capacity Planning Cleco Power LLC 2030 Donahue Ferry Road Pineville, LA Phone: (318) Note: The symbol denotes required fields. Press [F1] and/or read the text in the status bar for more information on the selected field. Bidder Code: B Proposal Code: P Generator Code: U Name of Bidder: (to be used by Cleco Power in the RFP process) Signed: (Signature of Authorized Representative of Bidder) Name: Title: Date Signed: mm/dd/yyyy Page 2 of 10

3 Mutually exclusive with the following proposals: PROPOSAL SUMMARY Name of Generating Facility Size of Generating Facility (MW) Ownership of Generating Facility Location (County or Parish, and State) Describe Generating Facility Age of Generating Facility Remaining Life of Facility % Page 3 of 10

4 Capacity Volume (MW) Net Capacity of Generator ECONOMIC AND OPERATIONAL DATA Capacity Price $/kw-year Start Date May 1, 2015 $ Capacity Price Escalation (Annual, 0% if same for all years) % Delivery Term Start Date End Date Heat Rate (Minimum and Maximum values are required) Proposed Option MW MMBtu/MWh Breakpoint 1 (min) Breakpoint 2 Breakpoint 3 Breakpoint 4 Breakpoint 5 (max) Describe energy scheduling and ramping capabilities Minimum Run Requirements Minimum Up Time Minimum Down Time hours Starts maximum starts per CT per day maximum starts per CT per year Variable O&M ($/MWh) $ % Escalation Rate (0 if price is for all years) Gas Price (Henry Hub) $ $/MMBtu adder % Taxes % multiplier (losses, etc.) Fixed Startup Cost $ per Start % Escalation Rate (0 if price is for all years) Describe how costs are applied $ per Run Hour % Escalation Rate (0 if price is for all years) Startup Gas MMBtu for hours Hot Start MMBtu for hours Warm Start MMBtu for hours Cold Start NOx Emission Coefficient (lbs/mmbtu) Ramp Rate (MW per minute) Is unit AGC Capable Is unit AGC Active/Enabled Page 4 of 10

5 FUEL INFORMATION Bidders are encouraged to provide as much information as possible regarding fuel supply associated with the specific generating resource to allow Cleco Power to adequately evaluate each proposal. In addition to providing detailed information on the items mentioned below, please detail any other fuel supply considerations that are relevant to Cleco Power s consideration of the proposal. Interconnected Pipelines and interconnection zone, area, and/or segment Supply pipelines capacity and operational limitations Page 5 of 10

6 TRANSMISSION INFORMATION Bidders are encouraged to provide as much information as possible regarding transmission service associated with the specific generating resource to allow Cleco Power to adequately evaluate each proposal. In addition to the items mentioned below, please detail any other transmission considerations (known constraints, delivery flexibility, etc.) pertinent to the proposed product. Regional Power Flow Model Bus Name Bus Number Interconnection Point Delivery Point Path to Cleco Power (Provide a list of each transmission provider along the entire delivery path from the source generator to the Cleco balancing area, if applicable.) Evidence of Delivery (Bidder responsible for submitting transmission request to Transmission Provider) Describe in detail, any items that Cleco Power should take into consideration regarding transmission service. POR: POD: CLECO Provide as attachment, or transmission service request number. Page 6 of 10

7 ORIS ID ENVIRONMENTAL ORIS Unit ID CAMD Unit ID Title V Permit ID Describe emission control equipment, installed and operational Describe plan to meet current and proposed environmental rules and requirements (Including CSAPR and MATS) Environmental Credits included in Bid (List by type or parameter) Affirm that Bidder is Responsible for Environmental Costs Related to CSAPR and MATS Describe in detail, any items that Cleco Power should take into consideration regarding environmental requirements. Page 7 of 10

8 MISO/GADS Is resource a network resource or energy resource per the generator interconnection agreement for the resource Provide GADS data as identified below. SH = Service hours, RSH = Reserve shutdown hours, AH = Available hours, EFDH = Equivalent forced de-rated hours, FOH = Full forced outage hours, FO = Forced Outage Explain any forced outages lasting more than 6 months Fully explain any forced outages that were outside of management s control, such as a hurricane. Describe in detail, any items that Cleco Power should take into consideration regarding GADS or the generator interconnection agreement. Period SH RSH AH Actual Starts Attempted Starts EFDH FOH FO Events Jun-12 May-12 Apr-12 Mar-12 Feb-12 Jan-12 Dec-11 Nov-11 Oct-11 Sep-11 Aug-11 Jul-11 Jun-11 May-11 Apr-11 Mar-11 Feb-11 Jan-11 Dec-10 Nov-10 Oct-10 Sep-10 Page 8 of 10

9 Aug-10 Jul-10 Jun-10 May-10 Apr-10 Mar-10 Feb-10 Jan-10 Dec-09 Nov-09 Oct-09 Sep-09 Aug-09 Jul-09 Page 9 of 10

10 Additional Benefits or Compensation (Please describe any additional benefits or compensation of this bid not expressly documented elsewhere in the bid. Example: transfer of transmission credits, cash, etc.) Comments / Exceptions to related principal terms: Page 10 of 10