Nemko Direct - Key Info

Size: px
Start display at page:

Download "Nemko Direct - Key Info"

Transcription

1 Nemko Direct Key Info International market access for electrical September 2017

2 CENTRAL EAST EUROPE EAEU (Russia, Belarus, Kazakhstan, Armenia and Kirgizstan (180 mill) UKRAINE (52 mill) UZBEKISTAN (27 mill) MOLDOVA (4.5 mill) SERBIA (10 mill) 3) National for electrical or/ and declaration or/ and declaration Certification CUbodies. Ukraine GOSTbodies Uzbekistan GOSTbodies OCP RATEL, KVALITET, NIS Cert. mark mandatory 4) Declaration mark Certification mark/ logo EMC testing Emission only Separate radio cert. scheme for each of the countries Safety + EMC + Radio + EMF + RoHS (Sept. 2017) Separate radio cert. scheme Separate radio cert. scheme for telecom /RF Sample. ****), in Russian and the official language in each of the countries, in Ukrainian and Russian, in Russian (but for ITE, English OK), in Moldavian or Russian (but for ITE, English OK), in Serbian, for equipment containing radio for telecom/rf safety/emc Factory insp. for 1), for mark, for 1 year validity cert. national 4 weeks 35 weeks 48 weeks (telecom) 34 weeks 34 weeks 816 weeks from Ratel 2 weeks from Kvalitet Energy Efficiency enforced in Belarus Aligning with EU directives Aligning with EU directives 2 September 2017

3 CENTRAL EAST EUROPE (CONT.) + MIDDLE EAST TURKEY (70 mill) ISRAEL (6 mill) JORDAN (4 mill) KUWAIT (2.3 mill) SAUDI ARABIA (26 mill) GSO Saudi Arabia, Kuwait, Bahrain, Oman, Qatar, Yemen, United Arab Emirates (UAE). Can handle, Nemko notified National for electrical (As EU, CE but TCF might be requested) Type cert. or Mark cert., but strongly recommended to get through customs, for most electric and electronic. TER (registration) + Shipment COC, (registration) + Shipment COC, for in List 2 Certification TSE SII JSMO PAI KUCAS SASO Riyadh (Nemko) Nemko Cert. mark mandatory, only for mark for COC, but yes for SASOQM + QR code Certification mark/ logo EMC testing For IT selfdecl. allowed. Energy, standby mode Sample Pending on product cat. Pre ship insp. TIR Shipment COC ****), in Turkish, in Arabic (but for ITE, English OK), in Arabic (but for ITE, English OK), in Arabic (but for ITE, English OK), in Arabic, but local importer info. on package Factory insp. for (for mark ), (but initial by SII for mark ) national 25 weeks 46 weeks but longer when incountry EE test 2 weeks 24 weeks 4 weeks 24 weeks Aligning with EU directives Currently Shipment COC needed also for under the GSO mark Currently Shipment COC needed also for under the GSO mark Special voltage, frequency, plug and sockets requirement September

4 ASIA CHINA MAINLAND (1300 mill) TAIWAN (23 mill) CAMBODIA (10 mill) SINGAPORE (3 mill) MALAYSIA (24 mill) THAILAND (64 mill) 3) t for EMC, but as a CB for safety _ 2) National for electrical, for some, for some, for some Certification CQC, CESI, ISCCC etc. BSMI ISC Spring (PSB) SIRIM TISI Cert. mark mandatory Certification mark/logo (+ letters S and E for safety/emc) E With R/D no. for RPC/DOC scheme & RoHS With identified number For mandatory For voluntary EMC testing, in county testing Emission only China Energy Label RoHS DoC Sample t normally ****), in simplified Chinese, in traditional Chinese English OK English OK English OK English OK, any foreign or domestic company can be a CCC applicant for ST (EC import permit) Factory insp. for, ISO 9000 Cert or Factory Inspection, for product For some, for followup inspection (per CQC request). SIRIM performs FI national 38 weeks (if factory inspected) 610 weeks 34 weeks 45 weeks 46 weeks 34 months 4 September 2017

5 ASIA (CONT D) AND AUSTRALIA INDIA (1270 mill) JAPAN (127 mill) KOREA South (48 mill) VIETNAM AUSTRALIA (20 mill) t applicable In process Specified National for electrical For some, new BIS CRS scheme for 44 require diamond PSE/ nonspecified require circle PSE (see METI website for Regulation for some IT For some uptodate product list) Certification BIS Designated PSE Lab by METI MOTIEKTC, KTL, KTR, MSIPRRA Ministry of Posts and Telematics QUATEST 3 SAI ACA SAA Approval Cert. mark mandatory For some Certification mark/logo KC Mark RCM (Regulatory Compliance Mark) Incountry testing EMC testing Emission only Emission only Emission only Energy test depending on the Sample t always. Some oversea designated labs, (but not for Safety/EMC if accred. lab) ****) English OK, in Japanese, in Korean English OK English OK, responsible for notification Factory insp. for, for Diamond PSE mark ***) for certain Safety only, for standards mark t applicable national 46 weeks 26 weeks 4 weeks 4 weeks 23 weeks September

6 AFRICA / USA CANADA KENYA (24 mill) NIGERIA (129 mill) SOUTH AFRICA (44 mill) MEXICO (106 mill) USA / CANADA Can handle Can handle, Nemko s own cert bodies National for electrical, for most electric and electronic. Shipment COC or Diamond Mark scheme. For some (ref SONCAP program) for EMC (CoC) and safety (LoA), for working places in USA (OSHA regulations and some state/ local jurisdictions)., for many in Canada (Provincial/ Territorial electrical regulations) Certification KEBS SON SABS NRCS NYCE / ANCE Mexico City and NRTL cert accepted for some Nemko Cert. mark mandatory Certification mark/logo mark, but NOM standards UL/ANSI/CSA std. EMC testing, FCC and ISED (emissions only) Energy efficiency for some Energy efficiency for some Energy efficiency, telecom/wireless rules may also apply for US and Canada under separate schemes Sample (for some ) (if tested by Nemko qualified lab), for external CB report ****) English OK English OK English OK English, OK for ITE. Spanish is for HOUS USA: English Canada: English or French (plus mandatory warnings in both English and French ), for safety reg. Factory insp. for t for, but preshipment insp t for, but preshipment insp, for mark (but insp. of market samples), (but initial by SABS) for mark. 1) national 4 weeks 4 weeks 26 weeks LOA EMC unknown 4 weeks 23 weeks 6 September 2017

7 LATIN AMERICA PERU (30 mill) ARGENTINA (39 mill) BRAZIL (186 mill) COLOMBIA (43 mill) ECUADOR (15 mill) CHILE (16 mill) requirements yet 2) National for electrical, Type or Safety Mark For most. ITE is voluntary, but needed for government bids/contracts Installation materials and some HOUS Adapters/PSUs Some HOUS and LUM for safety and energy efficiency Installation materials. Printers, some HOUS, A/V and LUM for safety and energy efficiency Certification IRAM and others IEx Lenor ICONTEC Lenor Lenor CESMEC Cert. mark mandatory, (S mark) mostly used Certification mark/logo EMC testing for HOUS, but yes for ITE Energy efficiency for some IEC61204/ Power supplies Sample, market surveillance testing rmally not, but for Energy ****), in Spanish, in Portuguese, in Spanish, In Spanish, for getting the import permit Factory insp. for (for mark ) Depending on scheme chosen 1) national 58 weeks, and pending on surveillance testing 48 weeks To be determined To be determined To be determined September

8 Footnotes: *) For special electrical equipment, certain installation accessories, medical appliances, and explosion protected equipment other requirements and procedures may apply. For these items please contact Nemko. For telecom and radio/wireless equipment, see also separate Key Info matrix under Nemko Telecom Direct. **) Sample not needed for testing or identification in the target country as per the terms of Nemko s agreement or recognition in that country. ***) Factory inspection must be performed by the designated. ****) User manual in the local language will always be needed for formal shipment. 1) The partner reserves the right to perform their occasional inspections/audits, joint visits with Nemko, or require special reports. 2) Local handling by Nemko subsidiary or local partner. 3) In general, the CB test certificate with test report documents compliance with applicable IEC standards * any national differences. 4) , CU mark, EAC was enforced under the new customs union scheme to substitute local s in Russia, Belarus and Kazakhstan. Armenia and Kirgizstan added to the scheme in The information in this document is provided by Nemko as general guidance and is offering general information. We have made an effort to ensure that the information is accurate and reliable. Regulatory changes are however updated frequently and we can therefore not guarantee that the information provided is always up to date. Nemko shall not be liable for any direct, indirect or consequential loss or damage arising from the use of the information in the document. For the most up to date information or detailed application guidelines, please contact us at info@nemko.com 8 September 2017