D23- Floor Transitions PM Callouts

Size: px
Start display at page:

Download "D23- Floor Transitions PM Callouts"

Transcription

1 D23- Floor Transitions PM Callouts EXECUTION The project is called Floor Transitions which contains modified SOW happening in: Vinyl bays Laminate bays Hardwood bays Store specific C&E to make room for the Floor Transitions Bay You are responsible to ensure your crew follows the specific SOW for each bay Be prepared and create a critical path for this project before beginning, this includes printing: ALL POGs (filter by department and store if you cannot locate a POG) Layout (in color if possible) RIG instructions MES sheets (Use white paper for Floor Transitions and appropriate colors for other store specific MES) o Rent and expense a Circ. Saw from Tool Rental to cut MES transitions larger than 4ft Inform MEAS Transitions have already been written off and need to be discarded in the compactor and not donated o Expense under Tents and Flags on Concur Sign POGs Article Cheat Sheet (uploaded to THDCR under Floor Transitions) D23 Floor Transitions SOW excel file uploaded to THDCR under Floor Transitions Filter to your store for details on your SOW for C&E bays including exiting programs Vendor Fixture for Floor Transitions is shipped on the BOM in 2 individual shipments PAGE 2 contains a detailed break down of what is in each shipment. Verify that all components in the two shipments are on site. You do not need to validate the hardware If needed, purchase and expense any hardware BEFORE the store closes The lock plates for the divider arms are strapped to the bottom of the skid (hard to spot) YOU MUST use the vendor installation instructions that come with the fixture for correct installation English and French instructions are on the same document If you are missing instructions, a copy has been uploaded to THDCR Pouch the following for each bay type and include POG notes for each POG pouched Floor transitions: POG, SIGN POG, and GSG Hardwood and Laminate: POG, SIGN POG A Vinyl: SIGN POG C&E: POG, SIGN POG (if applicable) Product for majority is shipped in clear wrap (A) it is a large skid with long product and should be easy to spot Stores (7005, 7076, 7171, 7223, 7227, 7252, 7268, 7032, 7037, 7053, 7074, 7117, 7119, 7250) product is shipped direct to store, wrapped in yellow shrink wrap and labeled for CR (B) tracking will be shared as it s made available B POP is on BOM Page 1

2 D23- Floor Transitions PM Callouts - Shipment Details Page 2

3 D23- Floor Transitions Execution WHAT IFs.. WHAT IF. What if product does not arrive, but everything for the vendor fixture is on site DO NOT EXECUTE -Floor Transitions Product EXECUTE -FULL SOW for ALL bays (includes everything below) -FULL Floor Transitions SOW minus the product -FULL C&E SOW (including MES for C&E bay) -FULL MES SOW -FULL SOW in Vinyl, Laminate or Hardwood bays REPORTING -Follow normal protocol for product deficiencies (log ALL product holes) What if components of the fixture are missing or damaged to the point they would compromise the safe installation of the fixture (Eg. Adjustable mounting arms missing ) Any SOW for any bays N/A -Log CRT- Unable to complete reset of activity deficiency for All bays highlighted including any C&E (with the details in the comments and pictures) -Log and order the necessary part(s) What if some hardware is missing but I have all the other components of the vendor fixture. N/A -FULL SOW for ALL bays -Purchase and expense hardware under Tents and Flags on Concur - DO NOT LOG any deficiencies What if critical components ordered (i.e. new peg board) at pre-walk for my store C&E do not arrive but I have everything I need for the vendor fixture Any SOW for any bays N/A -Log CRT- Unable to complete reset of activity deficiency for All bays highlighted including any C&E (with the details in the comments and pictures) Page 3

4 D23- Floor Transitions Reporting Instructions Initiative Bay Description(s) Floor Transitions Floor Transitions Use the appropriate bay descriptions for Vinyl, Laminate and Hardwood Bays Use the appropriate bay description for any cause and effect bays Bay(S) What to log How To Log What not to Log Vinyl, Laminate AND Hardwood 1. POP/Signage Vinyl: Beam Label Only Laminate: Beam Label and smoke stack POP Only Hardwood: Beam Label and Belly Beam Sign Only Reporting Refer to Floor Transitions Ordering Guide for all components DEFICIENCY: VM - POP not on site/missing some elements/hardware LOCATION: 1. Signage Floor Transitions DO NOT LOG/ORDER POP if it has small smudges or scratches from shipping DO NOT LOG steel, IPR or CRT deficiencies for product (holes), displays, POP on displays or fixtures in the bays Floor Transitions 1. Vendor Fixture 2. Steel Order steel based on store setup as needed (bay width, color and size) Ensure Tek bolts/appropriate decking is ordered for each elevation 3. POP/Signage 4. All IPR/CRT deficiencies Refer to Floor Transitions Ordering Guide for Vendor and POP components DEFICIENCY: CRT - Additional Components Required night of reset LOCATION: 1. Steel/Fixtures -> Vendor Fixtures -> Floor Transitions 2. Steel/Fixtures -> Beams DEFICIENCY: VM - POP not on site/missing some elements/hardware missing LOCATION: 3. Signage -> Floor Transitions DO NOT LOG/ORDER POP if it has small smudges or scratches from shipping Page 4

5 D30 Screen Doors and Screening PM Callouts EXECUTION There are 2 variations to this reset with a potential for store specific Cause and Effects, the RIG includes the SOW for the following: ONLY print and share with your crew the pages that are applicable to you 1. 1 bay Set: PAGES bay set: PAGES Labeling Standards for 1 and two bay sets: PAGE Cause and Effect: PAGES Execution MUST take place in all circumstances (See reporting page to log and order any components that are missing and/or damaged) Vendor Fixtures ( 48 or 36 Screen wire rack) will be shipped on BOM (which comes with M hoop dividers) EXECUTE with existing divider arms as best you can New product will be shipped in yellow shrink wrap and labeled for CR EXECUTE if the product is not on site Retrofit Kit will be shipped on the BOM EXECUTE if this is missing or damaged 2 bay sets: A kit of 4 display door hinges will be shipped with the vendor fixtures EXECUTE if this is missing or damaged Take display doors from stock and inform the MEAS to place in blocked status o If there is no stock LOG an IPR deficiency for both the stock and the display POP for Week 1 will ship direct to store, with a potential for week 2 as well (tracking will be provided as needed) All others will be on the BOM Important information: Clearance product is removed from bays through MES 1 bay stores: One vendor fixture with M Divider Hoops should be existing In stores (7053, 7227, 7132, 7106 and 7002) an additional 36 Screen wire rack will need to be installed (arriving on the BOM) 2 bay stores: Will be shipped Screen door Displays for bay 2.2 AND door hinges to install the screen door displays to the H-Frames (two top hinges and two bottom hinges) LOG is missing or damaged (comes as KIT of 4, details on reporting page ) Include POG notes with ALL POGs when printing and pouching POGs If there are issuing sequencing labels, inform MEAS and print label through Ad-hoc Store assistance will be required to remove the waterfall decking at 141 in the screen doors and screen repair bay Ensure you communicate this in your prep Sign POGs are loaded under Bay description Screen Drs and Repair AV is new and will need to be notched LOG if missing or damaged Vendor supplied instructions for retrofit kit and the screen door repair vendor fixture have been uploaded to THD. (English and French) Instructions for Hinges for the display doors in a 2 bay set are provided on the POG notes Page 5

6 D30 Screen Doors and Screening Reporting Instructions Item What to log How To Log Steel Order steel based on store setup as needed (bay width, color and size) Ensure Tek bolts/appropriate decking is ordered for each elevation logged Vendor Fixtures, Displays AND Components 7659/48 Screen Wire Rack (4ft unit, ordered as one) 429/Replacement M Divider Hoop 7653/Screen 4-Door Bay Hinge Set (for screen door displays) 7664/36" Screen Wire Rack 7654/Retrofit Kit Perf Decking CAN /32" X 48"PERF DECK Only needed in a 1 bay set Restrainer Cable w/ brackets Initiative Match your Bay size - Restrainer Cable w/2 Brckt &Bolt Bay Description(s) Screen Doors and Screening Screen Doors and Repair Use the appropriate bay description for Cause and Effects LOG/ORDER LOCATION: Steel/Fixtures Beams LOCATION: Steel/Fixtures -> Vendor Fixtures -> Screen Doors and Screening LOCATION: Steel/Fixtures -> Perforated Decking LOCATION: Steel/Fixtures -> Accessories Rod Dividers Rod Divider Vary by length (e.g. 4 x 33 ROD DIVIDER CHROME) Capscrew and Wingnut for Rod dividers CAN /CN -B /8 X 3 1/2 CAPSCREW CAN /CN - B , 3/8 WING NUT POP/Signage Refer to Sign POG for individual item numbers and descriptions. LOCATION: Steel/Fixtures -> Rod Dividers LOCATION: Steel/Fixtures -> Hardware Pieces DEFICIENCY: VM - POP not on site/missing some elements/hardware missing LOCATION: Signage -> Screen Doors &Repair Page 6

7 D25 Pneumatics Nails & Guns PM Callouts IMPORTANT EXECUTION INFORMATION: 30 new articles (27 coming in for CR reset, 3 to be set by MET few months after) are expected for execution Not all NEW product will make execution There are 14 new articles detailed in the RIG that will have specific modified direction until the new product arrives) You will need to sequence to what is in the bay and not to POG DO NOT log an SPA deficiency - NOTE in the BSR and inform MEAS that this will be a JUNE MET project to correct New product will arrive to store shrink wrapped in yellow and labeled for CR 2 and 3 bays will receive the same POP Kit Use the POP Cheat Sheet loaded to THDCR to determine which Beam Label and Sticker to use for each article Extra POP can be handed off to MET Take new displays from stock and inform MEAS to place in blocked status If there is no stock of new product: Log IPR deficiency for stock Note in the BSR and inform MEAS for the display (do not log IPR for display) If there is only one stock of new product: Note in the BSR and inform MEAS 3 bay stores: Will have elevation changes and need to be set to POG 2 bay stores: Will NOT have elevation changes, just the removal of the 2 toe kick from bays Display Walls (Metal peg wall): Remain where they are set today, if heights differ from POG, log a SPA deficiency to have the POG updated Nailers are merchandised on the overhead elevations at 114 and 93 : Communicate to store in your prep , the movement of the 114 overhead elevation ONLY DO NOT adjust the 93 elevation if not set to POG - LOG a POG update Purchase and expense a large bag of black 11 zip ties (article # ) BEFORE the store closes, to attach displays without tethers and to secure perf decking. Use the category Tents and Flags on Concur If there are issuing sequencing labels, inform MEAS and print label through Ad-hoc Page 7

8 D25 Pneumatics Nails & Guns Reporting Instructions Initiative Bay Description(s) Pneumatics Nails and Guns Pneumatic Nailers + Nails Christmas Tree Clip Item What to log How To Log Pneumatic Nail Gun Bracket (this is the tool holder which comes with tether and Christmas tree clip) LOG/ORDER CAN /Pneumatic Nail Gun Bracket Perf Decking CAN /32" X 48"PERF DECK POP/Signage Refer to Sign POG for individual item numbers and descriptions. ONLY POP with item numbers on the sign POG are to be logged/ordered Steel Order base beams and overhead elevations only DEFICIENCY: LOCATION: Steel/Fixtures -> Accessories LOCATION: Steel/Fixtures -> Perforated Decking DEFICIENCY: VM - POP not on site/missing some elements/hardware missing LOCATION: Signage -> Pneumatics Nails and Guns LOCATION: Steel/Fixtures -> Beams Item DO NOT LOG/ORDER Action Required Steel DO NOT log beam height deficiencies (eg. 2 used instead of 4 etc.) POP/Signage DO NOT log any deficiency for existing AV that is missing or damaged Note in the BSR and inform MEAS Page 8

9 D24 Spray Paint Initiative Bay Description(s) Spray Paint Spray Paint (log all bays under this) REPORTING INSTRUCTIONS Item How To Log Important Call Outs Spray Can Liners DEFICIENCY: CRT - Additional Components Required night of reset LOCATION: Vendor Fixtures -> Spray Paint Only a kit of 6 can be ordered which is acceptable. Even if only 1 tray is missing, order an entire kit. Item Number / description: / Spray Liners (6pk) Gravity Feed Displayer 1 DEFICIENCY: CRT - Additional Components Required night of reset LOCATION: Vendor Fixtures -> Spray Paint Item Number / description: / Gravity Feed Displayer (1 per box) Gravity Feed Displayer 2 DEFICIENCY: CRT - Additional Components Required night of reset LOCATION: Vendor Fixtures -> Spray Paint Only a kit of 2 can be ordered which is acceptable. Even if only 1 rack is missing, order an entire kit. Item Number / description: / Gravity Feed Displayer (2 per box) Page 9