1 I-17 and Happy Valley Road Diverging Diamond Interchange (DDI) Bharat Kandel (ADOT) and Jeremy Neuman (HDR) February 28, 2018

2 Project Purpose and Overview New interchange will accommodate current and future traffic projections and improve regional traffic flow and safety Construction Manager at Risk (CMAR) delivery method Contractor selected for pre-construction services (during design) Construction scheduled to begin in fall 2018 Current design and delivery schedule Approximately 20 months for construction

3 Happy Valley Road Existing Condition Spread diamond interchange 2-lane roundabouts with 1-lane in each direction within interchange area. Bridge is narrow and cannot accommodate future I-17 (5+1 lanes) expansion Does not accommodate bicyclist and pedestrians

4 Happy Valley Road New Construction Studied several interchange configurations DDI selected based on higher level of service, no design exceptions, fewer conflict points, pedestrian and bicycle treatment best value Remove Roundabouts 3 through lanes in each direction within Interchange area

5 New Construction New interchange accommodate future I-17 expansion (5+1 Lanes) DDI alignment improved construction phasing Constructing two TIs, both for design and construction (phasing), aesthetics and landscaping included, get in get out as a complete product CMAR so that the phasing and construction is seamless Construction Expertise CMAR delivery a good fit Contractor during the DDI design process

6 Design / Pre-construction Coordination with the City of Phoenix on: Aesthetics Crossroad impacts and restrictions Construction duration Project team collaboration on DDI as it is being designed Ensuring everyone is on the same page Fitting design elements in the design sidewalk, bicycle lanes, roadway signage Public Outreach, Communications ADOT Communications along with the design team Stakeholders, Residents, Businesses

7 Happy Valley Project History 30% Design 5 concepts evaluated Parclo selected as best performing Cost Risk Assessment Top Risks

8 Conventional DDI Benefits 2-phase signals Free flow lefts Fewer conflict points Difficult wrong way entry to ramps Shorter ped crossings BUT... not compatible with at-grade frontage roads

9 Rethinking the DDI as a Solution Happy Valley frontage roads volumes very low Spread diamond footprint provided ample space Developed a Modified DDI: Enhances Capacity Preserves 2-phase signal operation/progression Accommodates frontage roads Reduces cost and construction schedule Eliminates major ParClo risks

10 Modified DDI at Happy Valley Peak Traffic Patterns AM PM

11 Modified DDI at Happy Valley Frontage Roads

12 Modified DDI at Happy Valley MOT and Phasing

13 Happy Valley Signal Progression PH 1

14 Happy Valley Signal Progression PH 2

15 DDI - Signals & Signing

16 DDI Proven Performance with High Volume Traffic Generators

17 DDI - Safety Benefits Conflict Points Points 102 Crossing

18 DDI - Safety Benefits Angled Crossings Decrease Severity of Crashes

19 DDI - Safety Benefits Wrong Way Movement Prevention

20 DDI - Safety Benefits Reduced Conflict Points Restrict Wrong Way Movement Ability Reduced Speed Through Intersections FHWA Study Results 50% Overall Collision Reduction / 60% Reduction in Fatal Collisions

21 DDI - Pedestrians Happy Valley Pedestrian Travel Route

22 DDI - Pedestrians Center Running in Median Protected Crossings Shorter Crossings

23 DDI - Cyclists Happy Valley Cyclist Travel Route

24 DDI - Cyclists Right Side of Vehicles Crossing at Intersections Shorter

25 Survey and Community Input Public meeting in July 2017 with 300+ attendees

26 Survey and Community Input Online survey in October 2017 Gather input on how ADOT could reduce impacts during construction More than 600 responses from residents, businesses, service providers One-on-one interviews with local businesses, service providers and large employers

27 Survey Results Were Positive Overall positive response for project by community members Primary concern: Maintain traffic flow during construction Maintain access to businesses, schools, shopping Minimize delays, especially during peak travel times

28 Construction Preference Fewer Impact/Longer Schedule More Impacts/Shorter Schedule No Opinion

29 Stay Informed Web site: azdot.gov/i17trafficinterchanges Sign up to receive alerts!

30 Questions?

31 DDI - History & Existing Locations

32 DDI - Travel Patterns

UNION CENTRE BLVD AND I-75 INTERCHANGE WEST CHESTER, OHIO

UNION CENTRE BLVD AND I-75 INTERCHANGE WEST CHESTER, OHIO UNION CENTRE BLVD AND I-75 INTERCHANGE WEST CHESTER, OHIO New interchange Completed in 1997 Project coordinated by the Butler County TID Cooperation of local public and private sector entities Union

More information

BILLINGS BYPASS UPDATE

BILLINGS BYPASS UPDATE July 18, 2018 BILLINGS BYPASS UPDATE TEDD Steering Committee Monthly Meeting Project Update EIS and ROD Documents through Current Design Preliminary Design Completed preliminary design for full-build

More information

Diverging Diamond Interchanges and their Relation to Sustainable Design

Diverging Diamond Interchanges and their Relation to Sustainable Design Diverging Diamond Interchanges and their Relation to Sustainable Design FINAL SUBMITTAL MARCH 0 th, 0 Word Count:, (, Paper + Abstract + Title Page; Exhibits,,00 words) 0 Jason Starr, PE Associate HDR

More information

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project. MEMORANDUM TO: FROM: Highway 36/Rice Street PMT Mark Benson DATE: March 23, 2009 RE: Selection of a Preferred Alternative SEH No. 105803 The purpose of this memorandum is to document the process for selecting

More information

Interchange Improvements at the Queen Elizabeth Way and Glendale Avenue

Interchange Improvements at the Queen Elizabeth Way and Glendale Avenue Welcome to the Public Information Centre for the Interchange Improvements at the Queen Elizabeth Way and Glendale Avenue Class Environmental Assessment and Preliminary Design Study G.W.P. 2423-15-00 http://qew-glendale-interchange.ca

More information

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016 WELCOME IL 47 Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016 MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Range of Alternatives

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. Welcome Public Meeting August 2, 2017 5:00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. www.glenwoodsouthbridge.net Welcome to the South Bridge Environmental Assessment Public Meeting Why Are We Here Tonight?

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

VISION STATEMENT, MISSION STATEMENT, AND GOALS AND OBJECTIVES

VISION STATEMENT, MISSION STATEMENT, AND GOALS AND OBJECTIVES VISION STATEMENT, MISSION STATEMENT, AND GOALS AND OBJECTIVES Vision Statement: Our vision is to provide a high quality, safe, efficient, and cost-effective multi-modal transportation system that supports

More information

I-10 KENDALL EXTENSION. Open House

I-10 KENDALL EXTENSION. Open House I-10 KENDALL EXTENSION Open House The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT

More information

INNOVATIVE INTERSECTIONS. Terrell Hughes, PE Conceptual Planning Manager VDOT Transportation and Mobility Planning Division

INNOVATIVE INTERSECTIONS. Terrell Hughes, PE Conceptual Planning Manager VDOT Transportation and Mobility Planning Division INNOVATIVE INTERSECTIONS Terrell Hughes, PE Conceptual Planning Manager VDOT Transportation and Mobility Planning Division Current Tools Common Project Solutions Traffic Signalization Widening Projects

More information

INTERCHANGE SAFETY. Steve Allen. Houston Daugherty. Director, Strategic Transportation Investments Division (TDOT)

INTERCHANGE SAFETY. Steve Allen. Houston Daugherty. Director, Strategic Transportation Investments Division (TDOT) INTERCHANGE SAFETY Steve Allen Director, Strategic Transportation Investments Division (TDOT) Houston Daugherty Director of Transportation & Traffic (Cannon & Cannon Inc.) 2014 TSITE Summer Meeting August

More information

Diverging Diamond Interchanges in Michigan

Diverging Diamond Interchanges in Michigan 2015 MDOT / ACEC Partnering Workshop Diverging Diamond Interchanges in Michigan Lori Swanson MDOT Oakland TSC John Katers OHM Advisors Chris Van Norwick MDOT Grand Region Rob Leppala TranSystems Topics

More information

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico DDI s Can Move More Than Cars Alex Ariniello Presentation for the ITE Western District Annual Meeting July, 2016 in Albuquerque, New Mexico In January, 2016, a Diverging Diamond Interchange (DDI) opened

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

Managing Innovations First of its kind in many ways Innovative design Innovative delivery methods Step through h the project ti in connection to the P

Managing Innovations First of its kind in many ways Innovative design Innovative delivery methods Step through h the project ti in connection to the P Managing Innovations Adam T. Searcy, PE P.E. Project Manager Nevada Department of Transportation PMI Northern Nevada Chapter January 26, 2013 Managing Innovations First of its kind in many ways Innovative

More information

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables Highway 400 Improvements from 1 km South of Highway 89 to the Junction of Highway 11 Appendix C - Highway 400 Widening and Interchange Tables Prepared for: Ontario Ministry of Transportation Four General

More information

Project History Interchange Innovation Existing Conditions Proposed Design Approval Process Final Details PRESENTATION FOCUS

Project History Interchange Innovation Existing Conditions Proposed Design Approval Process Final Details PRESENTATION FOCUS DIVERGING DIAMOND INTERCHANGE State Route 120/Union Road Diverging Diamond Retrofit Presented by: Mark Houghton Sam Sherman Matt Brogan Aaron Silva City of Manteca Caltrans, District 10 Mark Thomas Mark

More information

Standard Performance Attributes for Transportation Projects

Standard Performance Attributes for Transportation Projects Standard s for Transportation Projects Mainline Operations Local Operations Maintainability Construction Impacts Environmental Impacts Project Schedule An assessment of traffic operations and safety on

More information

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center, Washington February 2015 FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center,

More information

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives. 4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.

More information

Conclusions & Lessons Learned

Conclusions & Lessons Learned What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County

More information

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA PUBLIC OFFICIALS MEETING MAY 11, 2016 AGENDA I. INTRODUCTIONS V. CURRENT PROJECT STATUS VI. PROJECT SCHEDULE VII. UPCOMING ACTIVITIES VOPEN DISCUSSION & QUESTIONS IX. ACTION ITEMS 1 A. Bridge Lighting

More information

Breaking the Diamond: DDIs, CFIs, and SPUIs

Breaking the Diamond: DDIs, CFIs, and SPUIs Breaking the Diamond: DDIs, CFIs, and SPUIs Smith Siromaskul, P.E. Abstract With a recent push towards innovative solutions in interchange design, the diverging diamond interchange has been the next big

More information

Consideration of a Diverging Diamond Interchange in Saskatchewan. Paul H. A. Steel, Project Manager, M. Eng., P.Eng., Tetra Tech EBA Inc.

Consideration of a Diverging Diamond Interchange in Saskatchewan. Paul H. A. Steel, Project Manager, M. Eng., P.Eng., Tetra Tech EBA Inc. Consideration of a Diverging Diamond Interchange in Saskatchewan Paul H. A. Steel, Project Manager, M. Eng., P.Eng., Tetra Tech EBA Inc. Terry Schmidt, P.Eng., MBA, Senior Project Director, Tetra Tech

More information

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016 Overall project Johnson County Gateway Interchange Project Improvements 87th Street The $288 million Phase 2 DesignBuild project starts construction this spring, with completion by December 31, 2016 Phase

More information

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical

More information

Joint Meeting- Stakeholder Committee & Technical Committee

Joint Meeting- Stakeholder Committee & Technical Committee Joint Meeting- Stakeholder Committee & Technical Committee Wednesday, February 26, 2014 Cobb County DOT Squad Room Cobb County Comprehensive Transportation Plan Update 2040 www.cobbinmotion.com - Guiding

More information

Glenmore Trail/Elbow Drive/5 Street SW Interchange Managing Traffic on Calgary s Largest Interchange Project

Glenmore Trail/Elbow Drive/5 Street SW Interchange Managing Traffic on Calgary s Largest Interchange Project Glenmore Trail/Elbow Drive/5 Street SW Interchange Managing Traffic on Calgary s Largest Interchange Project Jon Halford, P. Eng. City of Calgary Paper prepared for presentation at the Road Monitoring

More information

Route 7/15 Norwalk Project - Update Winter Route 7/15 Norwalk. Presentation to Silvermine January 30, 2017 CTDOT State Project #

Route 7/15 Norwalk Project - Update Winter Route 7/15 Norwalk. Presentation to Silvermine January 30, 2017 CTDOT State Project # Project - Update Winter 2017 Agenda Introductions Project Goals Update on Work Status Alternative Development Project Schedule Review Next Steps Project Goals Provide for increased mobility and connectivity

More information

TRAFFIC PLANNING & ENGINEERING. Part of a diversified family of solutions. jmt.com

TRAFFIC PLANNING & ENGINEERING. Part of a diversified family of solutions. jmt.com TRAFFIC PLANNING & ENGINEERING Part of a diversified family of solutions jmt.com Services Travel Demand Forecasting Traffic Analysis Modeling Traffic Data Collection Traffic Studies Traffic Signal Design

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No TS-03 December 5, 2016

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No TS-03 December 5, 2016 MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 16-07-TS-03 December 5, 2016 To: From: Subject: Electronic Distribution Recipients Nancy T. Daubenberger, P.E.

More information

CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives

CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives CHAPTER 5 TRANSPORTATION Introduction The transportation system forms the backbone of the community. I-74 provides the community with connections to larger metropolitan areas such as Indianapolis and Cincinnati.

More information

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018 What is the Carolina Crossroads Project? The South Carolina Department of Transportation (SCDOT), in cooperation with the Federal Highway Administration (FHWA), is proposing to upgrade and redesign a key

More information

Value Engineering Workshop. Highway 11 and Madill Church Road Interchange at Huntsville GWP

Value Engineering Workshop. Highway 11 and Madill Church Road Interchange at Huntsville GWP Value Engineering Workshop Road Interchange at Huntsville GWP 317-00-00 Rd Four-lane highway with at-grade access Eliminate at-grade access by providing an interchange, flyovers and service roads. Project

More information

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange Jeromy Grenard, PE, PTOE American Structurepoint Hardik Shah, PE, PTOE American Structurepoint Roundabouts

More information

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project 06/2014 PROJECT STUDY REPORT (Cal Poly Pomona Senior Project) For Conceptual Approval of an Interchange Improvement And Cooperative Agreement with The City of Lake Elsinore for completion of Project Approval

More information

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House SAN ANTONIO STREET BRIDGE AT COMAL RIVER Open House May 1, 2018 SAN ANTONIO STREET BRIDGE AT COMAL RIVER, NEW BRAUNFELS COMAL COUNTY OPEN HOUSE MAY 1, 2018 5:00 P.M 7:00 P.M. New Braunfels Civic/Convention

More information

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. Located in the heart of South Carolina, the I-20/26/126 Corridor is the crossroads of the state

More information

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance Functional classification identifies the role a highway or street plays in the transportation system. Some highways

More information

SAFETY ASSESSMENTS FOR LOCAL TRANSPORTATION FACILITIES IN NEW YORK STATE

SAFETY ASSESSMENTS FOR LOCAL TRANSPORTATION FACILITIES IN NEW YORK STATE SAFETY ASSESSMENTS FOR LOCAL TRANSPORTATION FACILITIES IN NEW YORK STATE Quick Reference Guide Safety Assessments can save lives in New York State. They have been proven effective in practice, easy to

More information

4/26/2013. I-435 and Front Street Diverging Diamond Interchange Missouri Department of Transportation. KCITE 2012 Excellence in Transportation Award

4/26/2013. I-435 and Front Street Diverging Diamond Interchange Missouri Department of Transportation. KCITE 2012 Excellence in Transportation Award 4/26/2013 I-435 and Front Street Diverging Diamond Interchange Missouri Department of Transportation KCITE 2012 Excellence in Transportation Award I-435 and Front Street Diverging Diamond Interchange Missouri

More information

Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study

Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study Florida Department of Transportation District Four KICK-OFF MEETING I-95 at Southern Boulevard (SR 80) Project Development and Environment Study Palm Beach County, Florida Financial Project ID No.: 435516-1-22-02

More information

Corridor Planning Standards + Potential Performance Measures

Corridor Planning Standards + Potential Performance Measures Corridor Planning Standards + Potential Performance Measures January 17, 2007 1. Transportation improvements should connect people with potential places of employment and regional activity centers, particularly

More information

PUBLIC INFORMATION MEETING TUESDAY MARCH 9, 2010

PUBLIC INFORMATION MEETING TUESDAY MARCH 9, 2010 St. Francis Drive Corridor Study Draft Phase B Review 1 PUBLIC INFORMATION MEETING TUESDAY MARCH 9, 2010 Objective Present Alternatives Evaluated Solicit Feedback On Selection of Recommended Projects 2

More information

TH 169/TH 494 DESIGN BUILD PROJECT

TH 169/TH 494 DESIGN BUILD PROJECT TH 169/TH 494 DESIGN BUILD PROJECT PROJECT OVERVIEW Eliminates traffic signals at Highwood/Townline, South Ramp termini, and North Ramp termini. Adds WB 494 to SB 169 flyover ramp. Adds direct NB 169 to

More information

Military Highway Interchange

Military Highway Interchange III. Military Highway Interchange Deficiencies Design Challenges Proposed Alternatives III.1.2 Volumes & Operations Figure III.2: Existing Volumes displays the existing volumes for the Military Highway

More information

Introduction. Performance Measurement. Pg. 01

Introduction. Performance Measurement. Pg. 01 Pg. 01 Introduction The Alamo Area recognizes the importance of transportation performance tracking, goal setting and measurement to provide greater accountability and transparency and to achieve a more

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

TRANSPORTATION BEYOND TOMORROW Sustainable Transportation Master Plan

TRANSPORTATION BEYOND TOMORROW Sustainable Transportation Master Plan TRANSPORTATION BEYOND TOMORROW 2031 Sustainable Transportation Master Plan PIC Meeting Itinerary: PIC #1 Doors open 6:00 Public views boards from 6:00 6:30 Presentation 6:30-6:50 Break-out groups with

More information

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM I-15 South, MP 0 to MP 16 Environmental Assessment Public Hearing August 7, 2012 5:00 PM to 7:00 PM 1 PROJECT OVERVIEW The Federal Highway Administration (FHWA) and the Utah Department of Transportation

More information

Broadway Grade Separation Study. Palo Alto Rail Committee Meeting November 29, 2017

Broadway Grade Separation Study. Palo Alto Rail Committee Meeting November 29, 2017 Palo Alto Rail Committee Meeting November 29, 2017 Slide 1 Project Area Millbrae Station City Limits Existing Railroad Crossing at Broadway Caltrain Operational Constraint Major Constraints Millbrae Station

More information

I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions

I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions General Overview What is the I-65/I-70 North Split Reconstruction Project? The I-65/I-70 North Split Reconstruction Project

More information

The Role of Transportation Systems Management & Operations in Supporting Livability and Sustainability

The Role of Transportation Systems Management & Operations in Supporting Livability and Sustainability The Role of Transportation Systems Management & Operations in Supporting Livability and Sustainability Michael Grant, ICF International February 7, 2012 NTOC Webinar Highlights of FHWA/FTA Primer Background:

More information

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM Tom Creasey, PE, PhD Principal, Stantec Consulting Services Inc. Chair, TRB Highway Capacity and Quality of Service Committee Presented

More information

Community Advisory Committee Meeting No. 2. June 22, 2006

Community Advisory Committee Meeting No. 2. June 22, 2006 Community Advisory Committee Meeting No. 2 June 22, 2006 Introductions The Study Team KDOT Wichita Partners Consultants CAC members Overview Today s Agenda Opinion Survey Study Status Starting Concept

More information

Reconstruction Project Update

Reconstruction Project Update I-65/I-70 North Split Interchange Reconstruction Project Update September 18, 2017 Agenda Welcome/introductions Project overview Scope and limits Need Environmental Assessment Maintenance of traffic Financial

More information

Livability 2050 Regional Transportation Plan Update. Transportation Policy Board (TPB) August 23, 2018

Livability 2050 Regional Transportation Plan Update. Transportation Policy Board (TPB) August 23, 2018 Livability 2050 Regional Transportation Plan Update Transportation Policy Board (TPB) August 23, 2018 1 Oct. 2017 Plan Kick-Off Sept. 2019 Plan Adoption Timeline Livability 2050 Regional Transportation

More information

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont)

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont) South Dakota Department of Transportation Interchange Modification Justification Report Interstate 90 Exit 44 (Bethlehem Road - Piedmont) February 28, 2014 Prepared By: SDDOT Office of Project Development

More information

TRAFFIC SAFETY EVALUATION. Using the Highway Safety Manual and the Interactive Highway Safety Design Model. I 15 Dry Lakes Design Exception

TRAFFIC SAFETY EVALUATION. Using the Highway Safety Manual and the Interactive Highway Safety Design Model. I 15 Dry Lakes Design Exception TRAFFIC SAFETY EVALUATION Using the Highway Safety Manual and the Interactive Highway Safety Design Model I 15 Dry Lakes Design Exception Prepared for: Nevada Department of Transportation Safety Engineering

More information

INSIGHTS INTO THE FIRST THREE DIVERGING DIAMOND INTERCHANGES IN MISSOURI. A Thesis presented to. the Faculty of the Graduate School

INSIGHTS INTO THE FIRST THREE DIVERGING DIAMOND INTERCHANGES IN MISSOURI. A Thesis presented to. the Faculty of the Graduate School INSIGHTS INTO THE FIRST THREE DIVERGING DIAMOND INTERCHANGES IN MISSOURI A Thesis presented to the Faculty of the Graduate School at the University of Missouri In Partial Fulfillment of the Requirements

More information

District of North Vancouver Construction Traffic Management Plan Guidelines

District of North Vancouver Construction Traffic Management Plan Guidelines District of North Vancouver Construction Traffic Management Plan Guidelines The District of North Vancouver is committed to ensuring that the disruptions to the community and traffic associated with construction

More information

BQE Atlantic to Sands Project Overview. 1. Project Background 2. Current Conditions & Findings 3. Upcoming Activities

BQE Atlantic to Sands Project Overview. 1. Project Background 2. Current Conditions & Findings 3. Upcoming Activities BQE Atlantic to Sands Project Overview 1. Project Background 2. Current Conditions & Findings 3. Upcoming Activities Commissioner Polly Trottenberg, New York City Department of Transportation June 29,

More information

C-TEP is pleased to present a short course; Innovative Intersections & Interchanges, March 14-16, 2016 in Calgary, Alberta.

C-TEP is pleased to present a short course; Innovative Intersections & Interchanges, March 14-16, 2016 in Calgary, Alberta. C-TEP (Centre for Transportation Engineering & Planning) is a leader in offering professional development training and supporting applied research in the areas of transportation engineering and planning.

More information

SPAGHETTI BOWL. RTC Workshop April 20, 2018

SPAGHETTI BOWL. RTC Workshop April 20, 2018 SPAGHETTI BOWL RTC Workshop April 20, 2018 EIS TIMELINE PLANNING NEPA FINAL DESIGN & ROW CONSTRUCTION ALTERNATIVES UPDATES We will review changes to the Alternatives Alternative 1 Alternative 2 Alternative

More information

Exit 73 I-29 Interchange Modification Justification Study

Exit 73 I-29 Interchange Modification Justification Study xit 73 I-29 Interchange Modification Justification tudy Introduction Figure 1 shows the location of xit 73. This interchange is proposed to be the connecting point of the ast and West Corridors to I-29.

More information

Section 11: Transportation Strategies Toolbox

Section 11: Transportation Strategies Toolbox Section 11: Transportation Strategies Toolbox A transportation strategies toolbox was developed to provide a systematic approach to identify potential strategies that address corridor transportation needs.

More information

Preliminary Assessment of Interchange Concepts. Seven Corners Task Force March 11, 2014

Preliminary Assessment of Interchange Concepts. Seven Corners Task Force March 11, 2014 Preliminary Assessment of Interchange Concepts Seven Corners Task Force March 11, 2014 Presentation overview Introduction Concept selection and refinement Future volume development and assignment Preliminary

More information

Central Phoenix Transportation Framework Study

Central Phoenix Transportation Framework Study Central Phoenix Transportation Framework Study Study Area 2013, All Rights Reserved. 1 Agenda Introductions Work Products Feedback on previous products Draft products for Planning Partner review SR-30

More information

Chapter 4: Transportation and Circulation

Chapter 4: Transportation and Circulation Chapter 4: Transportation and Circulation 4.1 Introduction Circulation improvements constructed for the West Valley Logistics Center will improve the functional efficiency of the circulation system in

More information

INTERCHANGE MODIFICATION REPORT

INTERCHANGE MODIFICATION REPORT INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation District One May 2017 Interchange

More information

2.0 ACCESS OBJECTIVES, PRINCIPLES AND STRATEGIES

2.0 ACCESS OBJECTIVES, PRINCIPLES AND STRATEGIES 2.0 ACCESS OBJECTIVES, PRINCIPLES AND STRATEGIES Early in the development of the Access Control Plan update project, it was important for the project team to develop initial objectives of what access management

More information

Greenhouse Gas Emission Reduction Strategies

Greenhouse Gas Emission Reduction Strategies Greenhouse Gas Emission Reduction Strategies 2011 ITE Quad Conference April 18 19, 2011, Embassy Suites; Lynnwood, WA Victor L. Sl Salemann, PE Senior Associate David Evans and Associates Bellevue, WA

More information

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018 Project Prioritization for Urban and Rural Projects 2018 TEAM CONFERENCE March 7, 2018 Challenge Limited funding for transportation improvements requires strategic selection of projects to ensure resource

More information

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100 JULY 2016 I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H.004100 FEDERAL AID PROJECT NUMBER H004100 EAST BATON ROUGE AND WEST BATON ROUGE PARISHES, LOUISIANA Section TABLE OF

More information

Roundabouts at Interchanges and High Speed Approaches

Roundabouts at Interchanges and High Speed Approaches Roundabouts at Interchanges and High Speed Approaches Jay VonAhsen, P.E. GHD, the home of Ourston Roundabout Engineering 972-331-5922 roundaboutresources.org TexITE Meeting Fort Worth, September 23, 2016

More information

Alternatives Evaluation Methodology

Alternatives Evaluation Methodology Alternatives Evaluation Methodology www.vision54 56.com B 1 Phase 2 Alternatives Evaluation Methodology PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph

More information

Frequently Asked Questions Connecting Palo Alto

Frequently Asked Questions Connecting Palo Alto Frequently Asked Questions Connecting Palo Alto www.cityofpaloalto.org/connectingpaloalto General Project Questions Q1: What is Connecting Palo Alto? A1: Connecting Palo Alto (formerly the Palo Alto Rail

More information

MOBILITY AND ALTERNATIVES ANALYSIS

MOBILITY AND ALTERNATIVES ANALYSIS 6 MOBILITY AND ALTERNATIVES ANALYSIS BACK OF SECTION DIVIDER 6.0 Mobility and Alternatives Analysis Travel demand analysis provides a framework for the identification of transportation facilities and services

More information

INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM)

INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM) INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM) TSITE 2016 Winter Meeting Nashville, TN February 25, 2016 AGENDA Project History IHSDM: Background & Overview IHSDM: Interstate 24 Model IHSDM: Interstate

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VIII. ENGINEERING AND ENVIRONMENTAL EVALUATION INTERSECTION IMPROVEMENTS SOUTHERN For the southern end of the corridor, traffic volumes are expected to increase over existing levels. The Phase A Report

More information

Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project

Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project NRITS & ITS AZ Annual Conference October 2018 Presented by: April Wire, P.E., PTOE ITS

More information

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS HPTER 5 PRLLEL PRKWY ORRIDOR IMPROVEMENTS nother key area within the Village West study area is the Parallel Parkway corridor. This chapter focuses on the segment of Parallel Parkway between 106 th Street

More information

CHAPTER 8 TRANSPORTATION ELEMENT

CHAPTER 8 TRANSPORTATION ELEMENT CHAPTER 8 TRANSPORTATION ELEMENT Section 8.01 Purpose: The purpose of this Chapter (element) is to establish the desired and projected transportation system within Niceville and to plan for future motorized

More information

Transportation Problems and Issues Excerpts from WWW Links

Transportation Problems and Issues Excerpts from WWW Links Transportation Problems and Issues Excerpts from WWW Links Reference Bok, D. (2018). Transportation policy and planning. https://www.hks.harvard.edu/courses/transportation-policy-and-planning Transportation

More information

Technical Memorandum#1A

Technical Memorandum#1A Technical Memorandum#1A Goals, Objectives, and Performance Measures AMATS 2040 Metropolitan Transportation Plan Prepared for: AMATS Prepared by: HDR Approved by AMATS PC September 28, 2017 This page intentionally

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 1 501.1 General... 1 501.2 Interchange Type... 1 501.2.1 General... 1 502 Interchange Design Considerations... 2 502.1 Determination of

More information

Placerville, a Unique Historical Past Forging into a Golden Future

Placerville, a Unique Historical Past Forging into a Golden Future Placerville, a Unique Historical Past Forging into a Golden Future City Manager s Report June 24, 2014 City Council Meeting Prepared by: Nathan Stong, City Engineer Item #: Subject: Adopt a Resolution:

More information

Comprehensive Transportation Study for Glencoe, MN

Comprehensive Transportation Study for Glencoe, MN Comprehensive Transportation Study for Glencoe, MN Introduction and Project Information Introduction There have been a number of planning and preliminary engineering studies completed in the Glencoe area

More information

Pottstown Pike Congestion Mitigation Feasibility Study

Pottstown Pike Congestion Mitigation Feasibility Study Pottstown Pike Congestion Mitigation Feasibility Study Study Advisory Committee Meeting #3 November 15, 2017 Transportation Solutions Building Better Communities Agenda 1. Background Information 2. Review

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

GENERAL PLAN UPDATE. Joint Study Session April 13, 2017

GENERAL PLAN UPDATE. Joint Study Session April 13, 2017 GENERAL PLAN UPDATE Joint Study Session April 13, 2017 Interrelated Issues and Topics Property Owner Requests Mobility: Efficiency and Safety Land Use Plan (in the City) Light Rail/ Transit Jobs/ Housing

More information

HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY

HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY DRAFT December 2017 Highway 71 Corridor Improvement Study Bella Vista Bypass to Missouri State Line BENTON COUNTY

More information

LANDSIDE FACILITIES AIRLINE TERMINAL FACILITIES INVENTORY 5.0 INTRODUCTION C H A P T E R 1 CHAPTER 5

LANDSIDE FACILITIES AIRLINE TERMINAL FACILITIES INVENTORY 5.0 INTRODUCTION C H A P T E R 1 CHAPTER 5 C H A P T E R 1 INVENTORY AIRLINE TERMINAL FACILITIES INVENTORY CHAPTER 5 LANDSIDE FACILITIES 5.0 INTRODUCTION This chapter focuses on the landside circulation and access system at the Spokane International

More information

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. Paper prepared for presentation at the Bridges in a Climate of Change

More information

VIII. LAND USE ISSUES

VIII. LAND USE ISSUES VIII. LAND USE ISSUES The & Route 57 Land Use and Circulation Study (Land Use Study, Figure 6) was completed for the Town of Clay in November 1999 (Clough, Harbour & Associates). This study investigated

More information

MEMORANDUM: INITIAL CONCEPTS SUMMARY

MEMORANDUM: INITIAL CONCEPTS SUMMARY MEMORANDUM: INITIAL CONCEPTS SUMMARY INTRODUCTION This memo presents a summary of initial concepts that have been identified as development of the project study has progressed, along with a recommendations

More information

2017 TIGER DISCRETIONARY GRANT APPLICATION

2017 TIGER DISCRETIONARY GRANT APPLICATION 2017 TIGER DISCRETIONARY GRANT APPLICATION Spokane International Airport Spokane, WA APPENDIX D 2015 Airport Drive Couplet at Spotted Road Airport Drive Couplet at Spotted Road April 2015 Prepared for:

More information