1 DRAFT Report ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY Navajo Tribal Utility Authority August 2007

2 DRAFT NAVAJO TRIBAL UTILITY AUTHORITY ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY Table of Contents Table of Contents List of Tables List of Figures Section 1 INTRODUCTION Phase I: Test Year Revenue Requirement Phase II: Cost of Service Model Step 1: Functionalization of Test Year Revenue Requirement Step 2: Classification of Test Year Revenue Requirement Step 3: Allocation of Test Year Revenue Requirement Phase III: Rate Design Section 2 REVENUE REQUIREMENT NTUA Policy Subsidization among Utilities Subsidization among Customer Classes Operations & Maintenance Expense Audited O&M Expense Accounting Data Combined System O&M Adjustments Capital Expenditures Common Plant Budget Capital Expenditures Electric Utility Capital Expenditures Electric Utility Capital Improvement Plan Funding of Capital Expenditures Debt Service - Existing Other Adjustments Cash to meet TIER Working Capital Fund Other Income & Expenses System Growth Test Year Revenue Requirement Section 3 COST OF SERVICE MODEL Step 1: Functionalization H:\004330\ \WP\R1083 DRAFTREPORTrv doc

3 Table of Contents DRAFT Allocation Factors Direct Assignment Labor O&M Expense Total O&M Expense Plant in Service Electric Capital Improvement Plan Functionalization Results Step 2: Classification Power Supply Transmission Distribution Customer Classification Results Step 3: Allocation of the Test Year Revenue Requirement Customer Rate Classes Allocation Factors Demand Allocation Factors Energy Allocation Factors Customer Allocation Factors Direct Assignment Subsidization among Customer Classes Allocation Results Section 4 RATE DESIGN Proposed Rate Design Options Residential Class Residential Electric Heat Class General Service Class Oil & Gas Field Service Large Power Service Class Public Street Highway and Private Area Lighting Class Irrigation Class NAPI SRP BISTI Customer Class Summary Section 5 CONCLUSIONS AND RECOMMENDATIONS ii H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

4 DRAFT Table of Contents List of Tables Table 2-1 Projected Electric Utility Capital Improvement Plan Table 2-2 Test Year Revenue Requirement Table 3-1 Unbundled Electric Utility Test Year Revenue Requirement Table 3-2 Test Year Revenue Requirement Cost Classifications Table 3-3 Cost of Service by Customer Class Table 4-1 Proposed Rates - Residential Table 4-2 Example of Average Monthly Bills - Residential Table 4-3 Example of Average Monthly Bills - Residential Life Support / Senior Citizens Discount Program Table 4-4 Proposed Rates Residential Electric Heat Table 4-5 Example of Average Monthly Bills Residential-Electric Heat Table 4-6 Example of Average Monthly Bills - Residential Electric Heat Life Support / Senior Citizens Discount Program Table 4-7 Proposed Rates General Service Table 4-8 Example of Average Monthly Bills - General Service 15 kw Demand Customer Table 4-9 Proposed Rates Oil & Gas Table 4-10 Example of Average Monthly Bills - Oil & Gas 80 kw Demand Customer Table 4-11 Proposed Rates Large Power Service Table 4-12 Example of Average Monthly Bills - Large Power Service 20,000 kw Demand Customer Table 4-13 Proposed Rates Public Street Highway and Private Area Lighting Table 4-14 Proposed Rates Irrigation Table 4-15 Example of Average Monthly Bills - Irrigation 220 kw Demand Customer Table 4-16 Test Year Revenue Requirement Combined Results List of Figures Figure 1-1: Development of Test Year Revenue Requirement Figure 1-2: Functionalization of Test Year Revenue Requirement to Business Functions Figure 1-3: Allocation of Business Function Costs to Customer Classes Figure 1-4: General Service Class Rate Design Example Figure 4-1: Residential Average Monthly Bill Figure 4-2: Residential Average $/kwh Figure 4-3: Residential Life Support / Senior Citizens Discount Program Average Monthly Bill Figure 4-4: Residential Life Support / Senior Citizens Discount Program Average $/kwh Figure 4-5: Residential Electric Heat Average Monthly Bill Figure 4-6: Residential Electric Heat Average $/kwh Figure 4-7: Residential Electric Heat Life Support / Senior Citizens Discount Program Average Monthly Bill H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07 iii

5 Table of Contents DRAFT Figure 4-8: Residential Electric Heat Life Support / Senior Citizens Discount Program Average $/kwh Figure 4-9: General Service Average Monthly Bill Figure 4-10: General Service Average $/kwh Figure 4-11: Oil & Gas Average Monthly Bill Figure 4-12: Oil & Gas Average $/kwh Figure 4-13: Large Power Service Average Monthly Bill Figure 4-14: Large Power Service Average $/kwh Figure 4-15: Irrigation Average Monthly Bill Figure 4-16: Irrigation Average $/kwh This Study has been prepared for the use of the client for the specific purposes identified in the Study. The conclusions, observations and recommendations contained herein attributed to R. W. Beck, Inc. (R. W. Beck) constitute the opinions of R. W. Beck. To the extent that statements, information and opinions provided by the client or others have been used in the preparation of this Study, R. W. Beck has relied upon the same to be accurate, and for which no assurances are intended and no representations or warranties are made. R. W. Beck makes no certification and gives no assurances except as explicitly set forth in this Study. Copyright 2007, R. W. Beck, Inc. All rights reserved. iv H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

6 DRAFT Section 1 INTRODUCTION The Navajo Tribal Utility Authority ( NTUA ) owns, operates, and maintains a combined Electric, Natural Gas, Water, Wastewater, and Photovoltaic ( PV ) Utilities system, collectively ( Combined System ), providing service to the Navajo Nation and its customers. In February 2007, NTUA retained R. W. Beck Inc. ( R. W. Beck ) to perform a Cost of Service and Rate Design Study ( COS Study ). The scope of services for the COS Study included the development of a Test Year Revenue Requirement, functionalization of the cost of business functions, allocation of the business function costs to customer classes, and development of proposed rates for the Electric Utility. For this COS Study, a three-phase process was undertaken as described below. The description and figures are meant to provide a generalized description of the Cost of Service and Rate Design process. This section provides an overview of the methodology and process involved in the COS Study. Sections 2 through 4 describe the process in detail and provide the results of the study. Section 5 outlines our recommendations based on the results of this COS Study. Phase I: Test Year Revenue Requirement The term Revenue Requirement refers to the amount of revenue required from rates to meet the utility s financial obligations. We began with the audited 2006 accounting data by utility (Separation of Services) provided by NTUA. Known and measurable adjustments were made to the 2006 data. The adjustments to the 2006 accounting data were developed in conjunction with NTUA staff and were based on anticipated changes in utility operation and maintenance ( O&M ) expenditures, capital expenditures, and system growth. Figure 1-1 displays the process of developing the Test Year Revenue Requirement. H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

7 Section 1 DRAFT Utility Expense Description 2006 Accounting Data Known and Measurable Adjustments Test Year Revenue Requirement O&M Expenses Other Expenses Debt Service Rate Funded Capital Revenue Requirement Figure 1-1: Development of Test Year Revenue Requirement Phase II: Cost of Service Model Step 1: Functionalization of Test Year Revenue Requirement To the extent information was available; costs were unbundled into four separate business functions: Power Supply, Transmission, Distribution and Customer Service. Allocation factors were developed based on available information from NTUA and used to allocate the Test Year Revenue Requirement among the business functions for the Electric Utility. Figure 1-2 illustrates the unbundling of the Test Year Revenue Requirements among the business functions. Test Year Revenue Requirement Power Supply Related Service Category Transmission Related Service Category Distribution Related Service Category Customer Service Related Service Category O&M Expenses Other Expenses Debt Service Rate Funded Capital Revenue Requirement Figure 1-2: Functionalization of Test Year Revenue Requirement to Business Functions 1-2 R. W. Beck H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

8 DRAFT INTRODUCTION Step 2: Classification of Test Year Revenue Requirement After functionalization to business functions, the costs within each business function are classified to the specific services that NTUA provides its customers. Common cost classifications include demand related or fixed costs, energy related or variable costs and customer related costs. These services influence utility cost and must be understood for a utility to appropriately price its product. Whenever possible, we directly assigned costs to specific classifications. Step 3: Allocation of Test Year Revenue Requirement Once costs (i.e., Test Year Revenue Requirement) are functionalized and classified, they are allocated to the individual customer classes based on customer usage characteristics. For this COS Study, we developed demand-related, energy-related, customer-related, and direct assignment allocation factors. Allocation factors represent class coincident peak and non coincident peak, class energy usage requirements and class number of customers. Allocation factors were developed based on available information from NTUA. Figure 1-3 shows the allocation of the classified costs from each business function to the general classes such as residential, general service, etc. The customer classes used for the COS Study are Residential, Residential Electric Heat, General Service, Oil & Gas Field Service, Large Power, Public and Street Highway & Private Area Lighting, Irrigation. Due to the nature of their special contracts, NAPI, SRP and BISTI were not included in the study. Test Year Revenue Requirement Residential Customer Class General Service Class Large Power Service Class Power Supply Demand Energy Transmission Demand Distribution Demand Customer Customer Customer Revenue Requirement Figure 1-3: Allocation of Business Function Costs to Customer Classes H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07 R. W. Beck 1-3

9 Section 1 DRAFT Phase III: Rate Design For the Electric Utility s customer classes, rates were designed to recover the Test Year Revenue Requirement, be fair and equitable and send the proper pricing signal to customers. Figure 1-4 displays how the Cost of Service allocations were used to design rates for the General Service Class. For a General Service customer, rates typically include a monthly customer or service charge, a demand charge and an energy charge. General Service Class Revenue Requirement Monthly Service Charge Demand Charge Energy Usage Charge Customer Demand Energy Figure 1-4: General Service Class Rate Design Example The remaining sections of the report discuss in detail the Cost of Service and Rate Design process. 1-4 R. W. Beck H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

10 DRAFT Section 2 REVENUE REQUIREMENT The various components of costs associated with operating, maintaining, and financing of improvements, renewals, and replacement of facilities are generally referred to as the Revenue Requirements of a utility. Revenue Requirement projections must consider changes in operating practices, proposed new facilities, expected cost increases and other factors that may affect the overall cost of operating and maintaining the Electric Utility. A Test Year is a common term that is a representation of a system s total actual operating costs that are to be recovered by rates. The Test Year for this COS Study represents an average year over the next five-year time period of An important objective of a Test Year is to provide the means to establish rates and rate levels that will reflect the known future costs of providing service to ensure continuity and adequate service to meet the future period requirements. The determination of the Test Year Revenue Requirement as it relates to NTUA includes the various components of the costs discussed within this section for the year ending December 31, To establish a basis for developing a Test Year Revenue Requirement, NTUA provided the audited operating results for the year ending, December 31, Adjustments were then made to the 2006 data based on known or anticipated changes in system operation based on data provided by NTUA including the Common Plant Budget and the Electric Utility Capital Improvement Plan. The assumptions and adjustments related to the development of the Test Year Revenue Requirement are discussed in detail below. A summary of the Test Year Revenue Requirement is provided at the end of this section in Table 2-2. The components that make up the Revenue Requirement include operations and maintenance expense, debt service, capital paid from cash, any fund deposits and other operating income and expenses. NTUA Policy Subsidization among Utilities NTUA Management and the Board has directed that each utility (Electric, PV, Water, Wastewater, and Natural Gas) should be financially self sufficient with no subsidization among the utilities. In other words, Electric Utility revenues should pay for Electric Utility costs. For this study, a small amount of subsidization from the Electric Utility to the PV Utility was included. PV is anticipated to have rate adjustments during 2008 to minimize the level of subsidization from the Electric Utility. H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

11 Section 2 DRAFT Subsidization among Customer Classes NTUA Management and the Board has directed that subsidization may exist across customer classes within the Electric Utility. For example, General Service class may be set to collect revenues beyond their Cost of Service and the Residential class rates may be set to under collect revenues compared to the class Cost of Service. As a result, the excess revenues from the General Service class may be used to subsidize the Residential class. Operations & Maintenance Expense O&M expenses were approximately 82 percent of the Test Year Revenue Requirement as shown in Table 2-2. Test Year O&M expenses were based on 2006 NTUA O&M expenses. Adjustments to the 2006 O&M expenses were based on data provided by and discussions with NTUA. Details of the 2006 O&M data and the adjustments are described below Audited O&M Expense Accounting Data Electric Utility O&M expenses of $40.1 million were based on 2006 audited accounting data provided by NTUA. Combined System Evaluating the unbundled Cost of Service for any one particular utility requires the examination of costs for all five utilities (Electric, Natural Gas, Water, Wastewater, and PV). This examination is required as NTUA operates in a manner such that certain departments are responsible for all five utilities. The operating cost of these departments with joint responsibility was reviewed and allocated to each of the five utilities based on how costs were incurred. NTUA provided this data in their Separation of Services. O&M Adjustments 1. O&M Plan Moderate Level The existing O&M expenses were estimated to increase by approximately $3,055,473 because the 2006 level of O&M expenditures was below average. 2. Labor Contract Expense NTUA plans on a labor cost increase of approximately $610,646 due to employees unionizing. 3. Consultant Fees - The Test Year Revenue Requirement includes a reduction related to outside services including consultant and accounting fees. This adjustment was already accounted for in the data provided by NTUA 4. PV Utility the Electric Utility was assumed to fund the PV Utility by approximately $400,000 annually. 5. Inflation Inflation rates for O&M were approximately 2.3 percent as provided by the Blue Chip Economic Indicators Inc. published in March R. W. Beck H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

12 DRAFT REVENUE REQUIREMENT Capital Expenditures Common Plant Budget Capital Expenditures The Common Plant Budget of $5.1 million annually was provided by NTUA. The Common Plant Budget items were directly allocated to a specific utility if possible. Items that were not directly related to a specific utility were allocated based on labor (number of employees). Approximately $2.7 million of the $5.1 million capital expenditures were assumed to be provided by the Electric Utility. The Common Plant Budget expenses were assumed to be paid for with debt. Electric Utility Capital Expenditures Electric Utility Capital Improvement Plan The Electric Utility Capital Improvement Plan was provided by NTUA for years The Electric Utility Capital Improvement Plan annual expenditures for years are provided below in Table 2-1. Table 2-1 Projected Electric Utility Capital Improvement Plan Year Projected Capital Expenditure 2007 $14,245, ,730, ,222, ,913, ,793, ,215,181 Total $107,119,721 The projected Electric Utility major capital expenditures for the period total approximately $93 million in 2007 dollars. Inflation for capital was approximately 3.0 percent as provided by NTUA. In addition to capital requirements related to system, the Electric Utility Capital Improvement Plan includes funding for ongoing renewal and replacement projects. Funding of Capital Expenditures The COS Study incorporates a policy assumption that capital expenditures will be funded by a combination of customer contributions, cash and debt. NTUA expects to H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07 R. W. Beck 2-3

13 Section 2 DRAFT receive approximately 46 percent of the capital expenditures in contributions from customers and 54 percent will be paid for with long-term debt and cash. We assumed that NTUA will issue new debt each year, as construction funds are needed for capital projects. The estimated average debt service payment for the study period was included in the Test Year Revenue Requirement. Debt Service - Existing Debt service payments of $3.2 million were assumed for the period based amortization schedules provided by NTUA. Other Adjustments Cash to meet TIER Additional margin was required to maintain a Times Interest Earned Ratio ( TIER ) or Debt Service Coverage Ratio ( DSCR ) ratio. Working Capital Fund Based on discussions with NTUA, we have assumed that NTUA will build working capital reserves by approximately $1.2 million per year in the development of the Test Year Revenue Requirement. In the near term, NTUA has assumed to use short-term borrowing to meet cash requirements. Other Income & Expenses Other Income & Expenses include interest earned on funds, surcharge and penalty income and other miscellaneous items. NTUA reports that it earns approximately three percent return annually on its cash reserves. Other Income & Expenses were estimated based on information provided by NTUA. System Growth System growth adjustments were three percent per year based on data provided by NTUA. Test Year Revenue Requirement Table 2-2 shows the components of the Test Year Revenue Requirement. The major components of the Test Year Revenue Requirement are outlined below: O&M Expenses - approximately 81.6 percent of the total. Debt Service payments (existing and proposed) - approximately 7.4 percent of the total. 2-4 R. W. Beck H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

14 DRAFT REVENUE REQUIREMENT Cash for capital from TIER 10.3 percent Working Capital percent Capital paid from Current Earnings 2.9 percent Photovoltaic 0.7 percent Other Income and Expenses decreases Revenue Requirement by 5.0 percent Table 2-2 Test Year Revenue Requirement Revenue Requirement Components Revenue Requirement Operations & Maintenance Expense O&M - Purchased Power $27,780,914 O&M - Labor 10,149,407 O&M - Non Labor 10,699,345 O&M - Total $48,629,666 Debt Service Existing - Principal $ 1,559,897 Existing - Interest 1,609,680 Proposed - Principal 309,011 Proposed - Interest 917,071 Debt Service Total $ 4,395,659 Capital Paid from Current Earnings $1,746,167 Cash for Capital from TIER 6,149,700 PV 395,615 Working Capital Fund Deposit 1,215,742 Subtotal Revenue Requirement $62,532,549 Less Other Income & Expenses 2,962,157 Test Year Revenue Requirement $59,570,392 NTUA s financial goals include a minimum DSCR of 2.00 and a TIER of 2.00 for years 2008, 2009 and 2010 for the Electric Utility. For years 2011 and 2012, the ratio could fall below a 2.00 but must remain above a 1.25 according to Rural Utilities Service ( RUS ) requirements. The Test Year Revenue Requirement results in an average DSCR of 2.49 and a TIER of H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07 R. W. Beck 2-5

15

16 DRAFT Section 3 COST OF SERVICE MODEL Step 1: Functionalization We begin the unbundling process by functionalizing the Test Year Revenue Requirement (Cost of Service) to utility business functions. It is important to note that unbundled services described herein reflect the full cost of providing such services including direct costs, overhead costs, other income or expenses and capital costs associated with each function. The Test Year Revenue Requirement as described in Section 2 was unbundled into the following four business functions: Power Supply Transmission Distribution Customer Service Allocation Factors For each business function, the Test Year Revenue Requirement was unbundled through the application of the following allocation factors: Direct Assignment Labor O&M Expense Total O&M Expense Plant in Service Electric Capital Improvement Plan Direct Assignment Direct assignment of cost to functions was used whenever possible, and as its name implies, directly assigns certain costs to a specific business function. For example, purchased power cost is directly related to the Power Supply function. Labor O&M Expense Labor was used to allocate certain joint costs among the business functions. For example, administrative and general ( A&G ) costs were allocated to the various functions using labor O&M as an allocation factor. This is due to a primary function of A&G is to support managers and the labor force. H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

17 Section 3 DRAFT Total O&M Expense Total O&M Expense was used to allocate the Working Capital Fund deposits among the business functions. This is due to the primary function of Working Capital to provide cash for O&M expenses. Plant in Service Plant in service (assets) was used to allocate NTUA s existing debt service. A record of how the historical loan funds were spent was not available; therefore, plant in service was the best allocator available for debt service. Electric Capital Improvement Plan The plant placed into service as a result of the Electric Capital Improvement Plan was used to allocate NTUA s proposed debt service. Functionalization Results The unbundled Cost of Service is shown in Table 3-1. Table 3-1 Unbundled Electric Utility Test Year Revenue Requirement Percent of Business Function Amount Total Power Supply 27,706, % Transmission 3,380, % Distribution 26,983, % Customer 1,500, % Test Year Revenue Requirement 59,570, % Power Supply cost is approximately 46.5 percent of the Electric Utility Test Year Revenue Requirement. Transmission expenses represent 5.7 percent of the Test Year Revenue Requirement NTUA owns very little transmission assets relative to other business functions. Step 2: Classification Once costs were unbundled into functions, they were classified as demand related, energy related, customer related or direct assignment. Demand related costs are generally fixed and do not vary with customer usage. Demand related costs represent the cost incurred by NTUA to meet system demands. Energy related costs are costs that very with customer usage. Theses costs typically include purchased power or fuel usage. Customer related costs are costs that are incurred in serving customers including accounting, billing and meter reading. These costs vary based on the number of customers. Finally, direct assignments are costs related directly and assigned directly to a customer class. By function, the classifications are listed below: 3-2 R. W. Beck H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

18 DRAFT COST OF SERVICE MODEL Power Supply Power supply includes the demand, energy, and wheeling charges for purchased power. The cost to NTUA varies with NTUA s demand and energy. However, the majority of NTUA s purchased power contracts are under fixed demand payments. Therefore, Power Supply costs were allocated according to: Energy Transmission Transmission plant is fixed assets in the ground built to meet the peak demands of NTUA. Transmission plant costs do not vary with the level of generation or customers. Therefore Transmission costs were allocated according to: Demand Distribution Distribution plant is fixed assets in the ground built to meet the demands of NTUA. Distribution plant costs do not vary with the level of generation, but do vary with the number of customers. Therefore, Distribution costs were allocated to: Demand Customer Customer Customer expenses were classified based on NTUA staff expenses related to supporting the accounting, meter reading, and sales functions. Therefore, customer costs were allocated to: Customer Classification Results For the Test Year, NTUA s costs are classified as follows in Table 3-2: Table 3-2 Test Year Revenue Requirement Cost Classifications Business Function Amount Percent of Total Demand Related $24,691, % Energy Related 27,706, % Customer Related 7,172, % Test Year Revenue Requirement $49,570, % H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07 R. W. Beck 3-3

19 Section 3 DRAFT Step 3: Allocation of the Test Year Revenue Requirement For each business function, the cost of providing services to NTUA customers was identified and allocated to the customer classes as described in Section 1. In Table 3-3 at the end of this section, the Test Year Revenue Requirement is compared to the estimated Test Year Rate Revenues to determine the estimated over or under collection by class. Test Year Rate Revenues are the revenues calculated based on the current rates and the Test Year electricity sales. Customer Rate Classes For the purposes of performing the COS Study, the following customer classes were utilized: Residential Residential Electric Heat General Service Oil & Gas Field Service Large Power Service Irrigation Public Street Highway & Private Area Lighting Customers under special contracts that were not included in the study are: NAPI SRP BISTI Allocation Factors Allocation factors were developed based on available information from NTUA and number of customers used to allocate the costs among customer classes including billed energy, demand, and service voltage level. Allocation factors assign costs to each rate class based on 2006 customer usage information for each class. Allocation factors take into consideration wholesale contracts, infrastructure costs and customer care requirements to serve customers in each rate class. Without specific allocation factors, all costs for the Electric Utility could be shared equally between all customers. Although this approach is straight forward, it does not recognize that different customers create different costs on the system. Depending upon the service requirements of a particular customer, the actual cost incurred by NTUA to service these loads may vary substantially. Therefore, specific allocation factors that recognize these cost differentials were developed in an effort to equitably assign NTUA s actual costs. 3-4 R. W. Beck H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

20 DRAFT COST OF SERVICE MODEL The following paragraphs discuss development of allocation factors utilized to allocate fixed, variable and customer related costs among NTUA's various rate classes. Demand Allocation Factors Capacity (fixed- or demand-related) costs are those costs incurred to maintain a utility system in a state of readiness to serve, enabling it to meet the total combined demands of its customers. Capacity costs include the portion of operating and maintenance expenses, debt service, capital expenditures, and other costs that do not vary materially with the quantity of usage or which cannot be designated specifically as a customer or variable costs. Demand allocation factors used include: Class Non-Coincident Peak ( NCP ) the non-coincident peak represents the peak demand the class places on the system. The demand related components of distribution expense were allocated to the various customers classes based on the average annual non-coincident peak. Distribution facilities are typically sized based on system localized demands. Therefore, class peaks, regardless of the timing of their occurrence are equitable allocators of these types of fixed costs. Class Coincident Peak ( CP ) the coincident peak for each class represents the class demand at the time of the system peak. CP for peak season ( 4CP ) fixed costs related to transmission expense were generally allocated on a 4 CP basis reflecting the size of these facilities to meet the system load. The four peak months used to develop the 4CP were November, December, January, and February based on NTUA s monthly load profiles. Energy Allocation Factors Energy or variable costs are costs that vary directly with energy usage, including such items as fuel, energy-related purchased power, and a portion of maintenance expenses. Energy allocation factors used include: Net Energy for Load Net Energy for Load is the load at NTUA s transmission delivery points required to meet the needs of the system. For NTUA, it can be defined as the total power purchases or retail sales plus losses. Net Energy for Load was used to allocate the purchased power energy costs among the rate classes with the exception of NAPI, SRP and BISTI. NAPI, SRP and BISTI s exact purchased power costs are known and those costs were directly assigned and removed from the COS Study. Customer Allocation Factors Customer costs are defined as those costs that are related to the number of customers. Included in the customer-related costs are the costs associated with meter reading, billing and other customer-related accounting services. The customer allocation factors were based on the average number of customers in each class. H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07 R. W. Beck 3-5

21 Section 3 DRAFT In apportioning certain customer-related costs to the various customer classifications, weighted customer allocation factors were utilized. Weighting customer classes recognizes that servicing certain types of customers requires more effort than other types of customers. Weighting factors were developed upon discussion with NTUA staff. Customer allocation factors used include: Number of Customers In the Customer business function, Sales expense was allocated using the number of customers in each of the rate classes. Sales expense is incurred as a result of having and maintaining customers. Meter Reading In the Customer business function, Meter Reading expense was allocated using the number of customers in each of the rate classes and the types of meters each customer class uses. Large General Service and industrial classes typically have more sophisticated meters or multiple meters that require effort beyond just an energy reading. Therefore, typically large General Service or industrial meters are weighted heavier than residential meters thereby allocating more meter reading expenses per customer to these classes. This allocation factor takes into account those customers that have automatic meter reading (AMR) meters. Billing - In the Customer business function, billing expense was allocated using the number of customers in each of the rate classes and the level of effort involved in billing each customer in the rate class. Direct Assignment Costs that are directly assigned are those costs that are directly attributable to a customer or customer class. Directly Assignable costs include: PV to Residential The PV related expense is passed directly through the Cost of Service study and allocated to the Residential class. PV s customers are only residential customers and therefore the PV expense allocated fully to the Residential customer class as shown in the next section. Subsidization among Customer Classes NTUA Management has directed that subsidization may exist across customer classes within the Electric Utility. For example, General Service class may be set to collect revenues beyond their Cost of Service and the Residential class rates may be set to under collect revenues compared to the class Cost of Service. As a result, the excess revenues from the General Service class may be used to subsidize the Residential class. NTUA Management assumptions: Residential rate increase capped at 20 percent for the average 400 kwh use customer 3-6 R. W. Beck H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

22 DRAFT COST OF SERVICE MODEL Residential Electric Heat rate increase capped at 22 percent for the average 1,000 kwh use customer Discounted rates for the Life Support / Senior Citizen Residential and Residential Electric Heat customers Irrigation (for crops) average rate increase for the class overall capped at 20 percent. Allocation Results The results of the Cost of Service analysis by rate class are summarized in Table H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07 R. W. Beck 3-7

23 Section 3 DRAFT Table 3-3 Cost of Service by Customer Class Class 2006 Revenue Less PCA (1) 2006 Sales Test Year Less PCA Test Year Sales 2006 Revenue Less PCA Test Year Revenue Less PCA Revenue Change Adjusted Test Year (4) Adjusted Test Year Revenue Change from 2006 ($) (MWh) ($) (MWh) ($/MWh) ($/MWh) (%) ($) ($/MWh) (%) Residential (ER-01) 11,416, ,614 18,393, , % 15,393, % Residential Electric Heat (ER-02) 1,515,274 23,139 2,249,736 26, % 2,079, % General Service (EG-03) 16,981, ,161 21,723, , % 23,766, % Oil & Gas Field Service (EL-04) 140,192 1, ,708 2, % 174, % Large Power Service (EL-05) 6,408, ,537 8,792, , % 9,827, % Public Street Highway & Private Area Lighting (EL-06) (2) (3) 1,549,981 13,031 1,594,582 14, % 1,672, % Irrigation (EL-10) 50, , % 60, % NAPI (Special Contract) 63,469 1,564 63,469 1, % SRP (Special Contract) 2,030,902 22,606 2,030,902 22, % BISTI (Special Contract) 2,432,752 43,620 2,432,752 43, % Total 42,589, ,980 57,501, , % 52,974, % (1) Purchased Power Cost Adjustment ( PCA ) (2) Street Lighting is shown on a number of bulbs and a $/light basis (3) PCA does not apply (4) Adjustments include a $2.2 million credit to the Residential customers for the Colorado River Storage Project ( CRSP ) energy allocation to NTUA due to Native customers. It also includes subsidization for the Residential and Irrigation (crops) classes. (Note: Excluding NAPI, SRP and BISTI, the revenue change is 23.7%) 3-8 R. W. Beck H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

24 DRAFT Section 4 RATE DESIGN Rate Design is the culmination of a COS Study where the rates and charges for each customer classification are established in such a manner that the total Test Year Revenue Requirement of the utility will be recovered in the most equitable manner, consistent to the extent reasonable and practical in accordance with specific NTUA Board policy. In general, proposed rate structures that are developed and submitted for consideration and adoption should meet the following objectives: Rates should be simple and understandable. Rates should be equitable among customer classes and individuals within classes, taking into consideration the costs incurred to serve each customer class. Rates should be designed to encourage the most efficient use of the utility s system. Rates may take into other important factors such as competitive concerns, conservation, etc. In addition, utilities may review or set their policy objectives regarding rates and rate making based on many objectives including the following: Promote or maintain subsidization across utilities. For example, one utility may over collect revenues to help support another utility that is under collecting revenues. NTUA has made the policy decision to eliminate subsidization across utilities. Promote or maintain subsidization within a utility, but across different customer classes. For example, the Utility s policy might be to promote subsidization of the residential customers by the General Service customers. In this case, the General Service customers rate would be higher than their Cost of Service and the Residential rate would be lower than their Cost of Service. The over collection of revenues from the General Service class would be used to balance the under collection of revenues from the Residential class. NTUA policy has been to promote and maintain subsidization across the customer classes. Specifically, general service and industrial customers subsidize the residential customers. Promote or maintain subsidization within a customer class. For example, the utility may want to charge the customers that are high energy users more to over collect revenues. These excess revenues could then be used to assist customers that utilize less energy such as retired persons, fixed income customers, etc. NTUA currently has subsidization within customer classes. Because NTUA H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

25 Section 4 DRAFT prefers not to raise the monthly service charge to the level that would reduce subsidization, the subsidization within the customer classes will continue. Promote conservation or promote more consumption. For example, a utility may have a contracted volume for power purchases from a wholesaler and any purchases over this set amount are charged at a much higher rate. Therefore, if its customers use more than this contract amount, the utility experiences higher unit costs to serve its customers. As a result, the utility may want to introduce inclining blocked or tiered rates. These block or tier rates send a signal to the customer that as their usage increases, so does the unit price. This pricing strategy promotes conservation. A utility may want to level the receipt of revenues from customers over the year. Seasonal usage utilities, like electric, may bring the utility high revenues in the winter months and low revenues in the summer months. If the utility wants to help balance out the variations of the revenues, the utility may decide to increase the fixed portion, or Service Charge, of the tariff rate. By shifting more of the costs into a fixed rate that is collected each month and not based on usage, the utility can help level out the revenues received over the year. NTUA prefers not to raise the monthly service charge to smooth out the receipt of revenues. Current NTUA electric rates reflect the following design elements: A monthly service charge All customer classes except Large Power Service have a monthly service charge An energy charge based on usage Residential, Oil & Gas, Large Power Service and Irrigation have a flat energy rate General Service has a declining block rate where the unit cost decreases with increasing electricity use A demand charge based on peak demand General Service has a declining block rate where the unit cost decreases with increasing electric demand Oil & Gas, Large Power Service and Irrigation have a flat demand rate A PCA charge. Currently the PCA is adjusted monthly to collect any purchased power costs not already collected through rates. All customer classes except Public Street Highway and Private Area Lighting pay the monthly PCA charges Based on discussions with NTUA, it was determined that the structure of the rates should be updated to reflect the following: Maintain the $ per kwh in the base rate. The PCA rate should continue to be adjusted monthly to ensure NTUA collects the revenues in a timely manner. Service charges were adjusted for inflation for 20 years by NTUA. 4-2 R. W. Beck H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

26 DRAFT RATE DESIGN Proposed Rate Design Options The Rate Design information is organized by NTUA customer class. For each customer class, two rate options were designed: Option A: recover revenues with pre-determined subsidization levels for the Residential and Irrigation customers. Therefore, under Option A proposed rates, over and under collection among rate classes is apparent. Option B: recover the Test Year Revenue Requirement based on the Cost of Service results. This option does not consider NTUA policy decisions. For each customer class, the proposed rates and example monthly customer bills are presented. In addition, graphs were included to provide a visual understanding of how current rates and proposed rates compare to the COS Study results based on energy usage and load factor. Proposed rates compared with current rates are shown in the following tables. Residential Class The Cost of Service results show that the Residential class is projected to under-collect by approximately 43 percent as shown in Table 3-3. Option A was designed to achieve a specified level of subsidization for the Residential customers. The Residential class was estimated to under-collect by approximately $3 million under Option A. Option B reflects the proposed rates based on the Cost of Service results. Energy related expenses were assumed to be recovered through the base rate as well as the PCA charge. Demand related expenses were assumed to be recovered through the Energy Charge since Residential customers do not have demand meters and are not charged a demand rate. All customer related expenses were assumed to be recovered through the Service Charge. Table 4-1 Proposed Rates - Residential Current Rates Option A Proposed Rates Change (%) Option B Cost of Service Change (%) Service Charge $3.00 $ % $ % Energy Charge $ $ % $ % Revenue $15,313,289 $18,400,702 Cost of Service (2) 18,393,913 18,393,913 Difference (1) ($3,080,625) $6,789 (1) The Cost of Service results do not equal zero. Rates were designed using four decimal places to match Cost of Service results as closely as possible. (2) Does not reflect CRSP adjustment. H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07 R. W. Beck 4-3

27 Section 4 DRAFT Table 4-2 presents example monthly bills for Residential customers. Based on a customer s energy usage, the estimated monthly bill was calculated using the current rates. The Option A proposed rate levels the Residential rate increase across all customers usage patterns. In effect, Option A proposed rates allow high energy users to subsidize the low energy users within the Residential class. Option A rates were designed to limit the average Residential customer at 400 kwh usage per month a 20 percent rate increase. Option B proposed rates were developed based on the cost of providing service to each customer. As shown in Figures 4-1 and 4-2, the low energy user customers are charged significantly below their Cost of Service. Table 4-2 Example of Average Monthly Bills - Residential Average Monthly Energy (kwh) Current Rate ($/month) Option A Proposed Rates ($/month) Option A Proposed Rates Bill Change (%) Option B Cost of Service Average Bill ($/month) Option B Cost of Service Bill Change (%) 300 (1) % % % % % % 600 (2) % % % % % % % % 1, % % 1, % % 1, % % 1, % % 1, % % (1) Summer usage levels (2) Winter usage levels Figure 4-1 represents the average monthly bills for different usage levels. Figure 4-2 represents the average energy price for various energy usage levels within the Residential class. As the figure shows, the cost of serving low energy usage customer is significantly higher than what the existing and proposed tariffs charge. 4-4 R. W. Beck H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

28 DRAFT RATE DESIGN Residential Average Monthly Bill $120 $90 $60 $30 Current Rate Option A - NTUA Proposal Option B - COS $ ,000 1,100 1,200 1,300 1,400 1,500 kwh Usage per Month Figure 4-1: Residential Average Monthly Bill Residential Average $/kwh $0.15 $0.14 Current Rate $0.13 Option A - NTUA Proposal $0.12 Option B - COS $0.11 $0.10 $0.09 $0.08 $0.07 $0.06 $ ,000 1,100 1,200 1,300 1,400 1,500 kwh Usage per Month Figure 4-2: Residential Average $/kwh H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07 R. W. Beck 4-5

29 Section 4 DRAFT Table 4-3 presents example monthly bills for Life Support / Senior Citizens Discount Program customers in the Residential class. Life Support / Senior Citizens Discount Program customers receive the following discounts: Service Charge: $0 Energy Charge: 10 percent below the Residential class PCA Charge: no discount As a result, Option A proposed rates offer the Life Support / Senior Citizens Discount Program customers in the Residential class the largest discount because many of the fixed costs of serving customers were contained in the Service Charge. Table 4-3 Example of Average Monthly Bills - Residential Life Support / Senior Citizens Discount Program Average Monthly Energy (kwh) Current Rate ($/month) Option A Proposed Rates ($/month) Option A Proposed Rates Bill Change (%) Option B Cost of Service Average Bill ($/month) Option B Cost of Service Bill Change (%) % % % % % % % % % % % % % % 1, % % 1, % % 1, % % 1, % % 1, % % Figure 4-3 represents the average monthly bills for different usage levels. Figure 4-4 represents the average energy price for various energy usage levels within the Residential Life Support / Senior Citizen Discount Program customers. As the figure shows, the cost of serving low energy usage customer is significantly higher than what the existing and proposed tariffs charge. 4-6 R. W. Beck H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

30 DRAFT RATE DESIGN Residential - Life Support / Senior Citizen Average Monthly Bill $120 $105 $90 $75 $60 $45 Current Rate Option A - NTUA Proposal Option B - COS $30 $ ,000 1,100 1,200 1,300 1,400 1,500 kwh Usage per Month Figure 4-3: Residential Life Support / Senior Citizens Discount Program Average Monthly Bill Average $/kwh $0.15 $0.14 $0.13 $0.12 $0.11 $0.10 $0.09 $0.08 $0.07 $0.06 $0.05 Residential - Life Support / Senior Citizen Current Rate Option A - NTUA Proposal Option B - COS ,000 1,200 1,400 kwh Usage per Month Figure 4-4: Residential Life Support / Senior Citizens Discount Program Average $/kwh H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07 R. W. Beck 4-7

31 Section 4 DRAFT Residential Electric Heat Class The Cost of Service results show that the Residential Electric Heat class is projected to under-collect by approximately 32 percent as shown in Table 3-3. Option A was designed to achieve a specified level of subsidization. Option B reflects the proposed rates based on the Cost of Service results. Energy related expenses were assumed to be recovered through the base rate as well as the PCA charge. Demand related expenses were assumed to be recovered through the Energy Charge since Residential customers do not have demand meters and are not charged a demand rate. All customer related expenses were assumed to be recovered through the Service Charge. Table 4-4 displays the rates. Table 4-4 Proposed Rates Residential Electric Heat Current Rates Option A Proposed Rates Change (%) Option B Cost of Service Change (%) Service Charge $7.00 $ % $ % Energy Charge $ $ % $ % Revenue $2,080,215 $2,248,489 Cost of Service (2) 2,249,736 2,249,736 Difference (1) ($169,520) ($1,247) (1) The Cost of Service results do not equal zero. Rates were designed using four decimal places to match Cost of Service results as closely as possible. (2) Does not reflect CRSP adjustment. Table 4-5 presents example monthly bills for Residential Electric Heat customers. Based on the customer s energy usage, the estimated monthly bill was calculated using the current rates, Option A proposed rates and Option B proposed rates. The Option A proposed rate levels the Residential Electric Heat rate increase across all customers usage patterns. In effect, Option A proposed rates allow high energy users to subsidize the low energy users within the Residential Electric Heat class. Option A rates were designed to limit the average Residential Electric Heat customer at 1,000 kwh usage per month to a 22 percent rate increase. Option B proposed rates were developed based on the cost of providing service to each customer. As shown in Figure 4-5, the low energy usage customers are charged significantly below their Cost of Service. 4-8 R. W. Beck H:\004330\ \WP\R1083 DRAFTREPORTrv doc 8/13/07

Cost of Service Methodology Review

Cost of Service Methodology Review Final Report Cost of Service Methodology Review British Columbia Hydro and Power Authority December 20, 2013 Final Report Cost of Service Methodology Review British Columbia Hydro and Power Authority

More information

DRAFT REPORT City of Tracy Water Rate Study August 2017

DRAFT REPORT City of Tracy Water Rate Study August 2017 DRAFT REPORT City of Tracy Water Rate Study August 2017 August 23, 2017 Mr. Kuldeep Sharma Director of Utilities City of Tracy 3900 Holly Drive Tracy, CA 95304 Subject: Comprehensive Water Rate Study Draft

More information

Final Report Rate, Charge, and Cost of Service Study. For: Parker Water and Sanitation District. December 2014

Final Report Rate, Charge, and Cost of Service Study. For: Parker Water and Sanitation District. December 2014 Final Report Rate, Charge, and Cost of Service Study For: December December 29, Steve Hellman Chief Financial Officer 18100 E. Woodman Drive Parker, Colorado 80134 On behalf of MWH Global, I d like to

More information

DIRECT TESTIMONY OF THE COST OF SERVICE PANEL

DIRECT TESTIMONY OF THE COST OF SERVICE PANEL BEFORE THE NEW YORK STATE PUBLIC SERVICE COMMISSION ----------------------------------------------------------------------------x Proceeding on Motion of the Commission as to the Rates, Charges, Rules

More information

WATER AND WASTEWATER RATE STUDY

WATER AND WASTEWATER RATE STUDY WATER AND WASTEWATER RATE STUDY B&V PROJECT NO. 176244.0100 PREPARED FOR Camrosa Water District MARCH 20, 2013 Black & Veatch Holding Company 2011. All rights reserved. Camrosa Water District WATER AND

More information

Rate Design and Resource Planning

Rate Design and Resource Planning Rate Design and Resource Planning Rate Considerations and Resource Planning Decisions El Paso Electric Company New Mexico Public Advisory Group Meeting December 11, 2014 Rates and Resource Planning The

More information

WATER AND WASTEWATER CAPACITY FEES REPORT PROPOSED

WATER AND WASTEWATER CAPACITY FEES REPORT PROPOSED WATER AND WASTEWATER CAPACITY FEES REPORT PROPOSED B&V PROJECT NO. 197551 Black & Veatch Holding Company 2015. All rights reserved. PREPARED FOR Town of Clayton, North Carolina 4 MAY 2018 Table of Contents

More information

SECTION III RATE SCHEDULES Page 56

SECTION III RATE SCHEDULES Page 56 SECTION III RATE SCHEDULES Page 56 ENTERGY GULF STATES, INC. Sheet No.: 57 Electric Service Effective Date: 1-14-04 Texas Revision: 3 Supersedes: LQF Effective 7-5-95 SCHEDULE LQF Schedule Consists of:

More information

Causes of residential electricity bill changes in Victoria, 1995 to prepared for: Victorian Electricity Distribution Businesses

Causes of residential electricity bill changes in Victoria, 1995 to prepared for: Victorian Electricity Distribution Businesses Causes of residential electricity bill changes in Victoria, 1995 to 2017 prepared for: Victorian Electricity Distribution Businesses DISCLAIMER This report has been prepared for the Victorian Electricity

More information

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017 PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017 Prepared by Market Settlements Development Department PJM 2017 Table of Contents Table of Contents

More information

Rate Design: Part 2. Into the Weeds on Cost Allocation, Dynamic Pricing, Net Metering, and Alternatives

Rate Design: Part 2. Into the Weeds on Cost Allocation, Dynamic Pricing, Net Metering, and Alternatives Rate Design: Part 2 Into the Weeds on Cost Allocation, Dynamic Pricing, Net Metering, and Alternatives Jim Lazar, RAP Senior Advisor November 14, 2014 The Regulatory Assistance Project 50 State Street,

More information

Eagle Mountain Pumped Storage Project Draft License Application Exhibit D Project Costs and Financing

Eagle Mountain Pumped Storage Project Draft License Application Exhibit D Project Costs and Financing Eagle Mountain Pumped Storage Project Draft License Application Exhibit D Project Costs and Financing Palm Desert, California Submitted to: Federal Energy Regulatory Commission Submitted by: Eagle Crest

More information

Review of Salt River Project s Proposed Residential Customer Generation Price Plan. Prepared for Salt River Project

Review of Salt River Project s Proposed Residential Customer Generation Price Plan. Prepared for Salt River Project Review of Salt River Project s Proposed Residential Customer Generation Price Plan Prepared for Salt River Project December 31, 2014 Project Team Amparo Nieto Vice President About NERA Economic Consulting

More information

PROPOSED FULLY ALLOCATED COST STUDY FORECAST 2004

PROPOSED FULLY ALLOCATED COST STUDY FORECAST 2004 PROPOSED FULLY ALLOCATED COST STUDY FORECAST 2004 August 2003 Page 1 of 19 FULLY ALLOCATED COST STUDY Table of Contents 1 Summary....................................... Page 3 2 Introduction.....................................

More information

City of Stockton. Final Report Delta Water Supply Project: Water Rate and Financing Study. HDR Engineering, Inc. June 2009.

City of Stockton. Final Report Delta Water Supply Project: Water Rate and Financing Study. HDR Engineering, Inc. June 2009. City of Stockton Final Report Delta Water Supply Project: Water Rate and Financing Study June 2009 Prepared by HDR Engineering, Inc. June 8, 2009 Ms. Melissa Price Program Manager III City of Stockton

More information

KOSOVO ENERGY CORPORATION J.S.C. TARIFF APPLICATION FOR 2010

KOSOVO ENERGY CORPORATION J.S.C. TARIFF APPLICATION FOR 2010 KOSOVO ENERGY CORPORATION J.S.C. TARIFF APPLICATION FOR 2010 February 2010 Page 1 08 February 2010 Table of Contents: 1. Introduction,... 3 2. Focus on Privatization... 5 3. Tariff Strategy,...... 5 4.

More information

Update to Facility Capacity Charges Methodology and Schedule. A study for El Dorado Irrigation District. prepared by. Bartle Wells Associates

Update to Facility Capacity Charges Methodology and Schedule. A study for El Dorado Irrigation District. prepared by. Bartle Wells Associates APPENDIX A Update to Facility Capacity Charges Methodology and Schedule A study for El Dorado Irrigation District prepared by Bartle Wells Associates Principal Consultants Doug Dove, President Catherine

More information

charges in the Texas (ERCOT) market Draft of December 29, 2012 Jay Zarnikau *,a,b, Dan Thal a Austin, TX 78746, USA The University of Texas at Austin,

charges in the Texas (ERCOT) market Draft of December 29, 2012 Jay Zarnikau *,a,b, Dan Thal a Austin, TX 78746, USA The University of Texas at Austin, The response of large industrial energy consumers to four coincident peak (4CP) transmission charges in the Texas (ERCOT) market Draft of December 29, 2012 Jay Zarnikau *,a,b, Dan Thal a a Frontier Associates

More information

Rocky Mountain Power Docket No Witness: Joelle R. Steward BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER

Rocky Mountain Power Docket No Witness: Joelle R. Steward BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Rocky Mountain Power Docket No. 13-035-184 Witness: Joelle R. Steward BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Direct Testimony of Joelle R. Steward Cost of Service

More information

Overview of Price Regulation and Basic Ratemaking Process: Perspectives from Illinois. Commissioner Sherman J. Elliott Illinois Commerce Commission

Overview of Price Regulation and Basic Ratemaking Process: Perspectives from Illinois. Commissioner Sherman J. Elliott Illinois Commerce Commission National Association of Regulatory Utility Commissioners Energy Regulatory Partnership Program, The Energy Regulatory Office of Kosovo and The Illinois Commerce Commission Overview of Price Regulation

More information

EMBEDDED COST OF SERVICE Kim Wissman Executive Director Ohio Power Siting Board On behalf of NARUC

EMBEDDED COST OF SERVICE Kim Wissman Executive Director Ohio Power Siting Board On behalf of NARUC NARUC Partnership Program Public Utilities Commission of Ohio Ministry of Energy of Ghana Energy Commission of Ghana and Public Utilities Regulatory Commission of Ghana sponsored by United States Agency

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF THE APPLICATION OF ) OKLAHOMA GAS AND ELECTRIC COMPANY ) FOR APPROVAL OF A GENERAL CHANGE IN ) DOCKET NO. -0-U RATES AND TARIFFS ) Direct

More information

PacifiCorp Renewable Portfolio Standard Oregon Implementation Plan 2011 through 2015

PacifiCorp Renewable Portfolio Standard Oregon Implementation Plan 2011 through 2015 Oregon Administrative Rule (OAR) 860-038-0300 Electric Company and Electricity Service Suppliers Labeling Requirements (1) The purpose of this rule is to establish requirements for electric companies and

More information

1. Introduction Background Purpose Scope of the Tariff Structure Statement... 3

1. Introduction Background Purpose Scope of the Tariff Structure Statement... 3 Contents 1. Introduction... 3 1.1 Background... 3 1.2 Purpose... 3 1.3 Scope of the Tariff Structure Statement... 3 1.4 Application of the Tariff Structure Statement... 4 2. Compliance matrix... 7 3. Understanding

More information

Wastewater System Financial Plan. For the Corporation of the City of Thunder Bay

Wastewater System Financial Plan. For the Corporation of the City of Thunder Bay Wastewater System Financial Plan For the Corporation of the City of Thunder Bay Prepared January 2015 City of Thunder Bay 500 Donald Street East PO Box 800 Thunder Bay, Ontario, Canada P7C 5K4 Contents

More information

How to Submit Your Question

How to Submit Your Question Mike Ganley & Rich Larochelle CEO Web Conference June 2, 2010 How to Submit Your Question Step 1: Type in your question here. Step 2: Click on the Send button. Presenters Mike Ganley Director Strategic

More information

PREPARED FOR: ARIZONA PUBLIC SERVICE Updated Solar PV Value Report

PREPARED FOR: ARIZONA PUBLIC SERVICE Updated Solar PV Value Report PREPARED FOR: ARIZONA PUBLIC SERVICE 2013 Updated Solar PV Value Report MAY 2013 2013 Updated Solar PV Value Report Arizona Public Service May 10, 2013 This report has been prepared for the use of the

More information

The Role of Asset Management in Rates and Finance of Small Drinking Water Systems

The Role of Asset Management in Rates and Finance of Small Drinking Water Systems The Role of Asset Management in Rates and Finance of Small Drinking Water Systems 05/18/17 Dalton, GA www.efcnetwork.org This program is made possible under a cooperative agreement with the U.S. EPA. Generating

More information

Summary of Net Metered Projects as of June 30, Small Net Metered Projects as of 6/30/2016 Small Group Host Projects as of 6/30/2016

Summary of Net Metered Projects as of June 30, Small Net Metered Projects as of 6/30/2016 Small Group Host Projects as of 6/30/2016 Page 1 of 6 Summary of Net Metered Projects as of June 30, 2016 Small Net Metered Projects as of 6/30/2016 Small Group Host Projects as of 6/30/2016 Class # of Projects Capacity (kw) Annual Energy (kwh)

More information

DOCUMENT TITLE. 2 5 EES Collection of Fixed Costs. 6 7 Policy 29 Energy Services Rate Design Rates & Tariffs Updated Schedule

DOCUMENT TITLE. 2 5 EES Collection of Fixed Costs. 6 7 Policy 29 Energy Services Rate Design Rates & Tariffs Updated Schedule OPALCO s COST OF SERVICE ANALYSIS AND RATE DESIGN PROCESS The following documents summarize the lengthy process OPALCO and the Board of Directors went through to do a Cost of Service Analysis (COSA) and

More information

TARIFF STRUCTURE STATEMENT

TARIFF STRUCTURE STATEMENT TARIFF STRUCTURE STATEMENT Your power, your say 4 October 2016 TABLE OF CONTENTS LIST OF TABLES... 2 LIST OF FIGURES... 3 LIST OF ATTACHMENTS... 3 GLOSSARY... 4 ABOUT THIS... 5 1. EXECUTIVE SUMMARY...

More information

Renewable Energy Plan 2013 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619

Renewable Energy Plan 2013 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619 Renewable Energy Plan 2013 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619 This Biennial Review filing by the Lansing Board of Water & Light (LBWL) complies with State of Michigan

More information

Advanced Metering Infrastructure (AMI) Example Project Valuation Model User Guide

Advanced Metering Infrastructure (AMI) Example Project Valuation Model User Guide Advanced Metering Infrastructure (AMI) Example Project Valuation Model User Guide AMI User Guide (Version 1.00) Date: August 7, 2006 Note: This document refers to the AMI_Example_Model_v1.00 file McKinsey

More information

Differences Between Electric and Natural Gas Cost of Service Studies

Differences Between Electric and Natural Gas Cost of Service Studies Differences Between Electric and Natural Gas Cost of Service Studies Bonnie Janssen June 28, 2018 Electric and Gas Utility COSS Similarities Uniform System of Accounts Revenue Requirements Load Data/Load

More information

Review of Proposed Adjustments. Salt River Project s. Standard Electric Price Plans

Review of Proposed Adjustments. Salt River Project s. Standard Electric Price Plans Review of Proposed Adjustments to Salt River Project s Standard Electric Price Plans Prepared by: John Chamberlin Timothy Lyons December 12, 2014 Table of Contents Executive Summary... 1 Background...1

More information

Demand based network tariffs offering a new choice

Demand based network tariffs offering a new choice Version 1.1 30 September 2015 Demand based network tariffs offering a new choice Consultation paper September 2015 Table of Contents 1 Overview... 5 2 Background... 7 3 Purpose... 8 4 Network tariff strategy...

More information

LARGE GENERAL SERVICE RIDER. DESCRIPTION Option 1 Option 2

LARGE GENERAL SERVICE RIDER. DESCRIPTION Option 1 Option 2 Page 1 of 6 Second Revision LARGE GENERAL SERVICE RIDER DESCRIPTION Option 1 Option 2 Fixed Rate Energy Pricing 50-648 50-649 System Marginal Energy Pricing 50-642 50-645 Short-term Marginal Capacity Purchases

More information

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY TARIFF FOR BASIC SERVICE

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY TARIFF FOR BASIC SERVICE Sheet 1 MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY TARIFF FOR BASIC SERVICE 1. General This Tariff may be revised, amended, supplemented or supplanted in whole or in part from time to time

More information

Newfoundland Power Marginal Cost of Electricity Service Study

Newfoundland Power Marginal Cost of Electricity Service Study 12. Marginal Cost Study Newfoundland Power Marginal Cost of Electricity Service Study Newfoundland Power 2008 General Rate Application Newfoundland Power Marginal Cost of Electricity Service Study Prepared

More information

SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES. Comprehensive Water, Sewer, and Stormwater Rate Study

SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES. Comprehensive Water, Sewer, and Stormwater Rate Study SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES Comprehensive Water, Sewer, and Stormwater Rate Study Draft-Final Report / July 17, 2018 5619 DTC Parkway Suite 850 Greenwood Village, CO 80111 Phone 303.305.1135

More information

Frequently Asked Questions About Water and Wastewater Rates (FY )

Frequently Asked Questions About Water and Wastewater Rates (FY ) Frequently Asked Questions About Water and Wastewater Rates (FY 2017-18) The City of Melissa receives a number of questions regarding the water and wastewater rates. This FAQ is provided to address the

More information

Designing Water Rate Structures that Support Your Utility s Objectives

Designing Water Rate Structures that Support Your Utility s Objectives Designing Water Rate Structures that Support Your Utility s Objectives Thursday, August 24, 2017 1:00-2:00pm MT/3:00-4:00pm ET This program is made possible under a cooperative agreement with EPA. www.efcnetwork.org

More information

Bundled Energy Solutions to Lower Operating Costs and Maximize ROI. Harvey Katzen Director of Bundled Energy Services ABM Building and Energy

Bundled Energy Solutions to Lower Operating Costs and Maximize ROI. Harvey Katzen Director of Bundled Energy Services ABM Building and Energy Bundled Energy Solutions to Lower Operating Costs and Maximize ROI Harvey Katzen Director of Bundled Energy Services ABM Building and Energy Association of California Water Agencies Anaheim, CA November

More information

Water System Revenues

Water System Revenues Water System Revenues Glenn Barnes Environmental Finance Center The University of North Carolina at Chapel Hill 919-962-2789 glennbarnes@sog.unc.edu Session Objectives Understand how to pay for the costs

More information

Customer Capital Contributions Policy

Customer Capital Contributions Policy TasNetworks Customer Capital Contributions Policy Effective 1 July 2014 Tasmanian Networks Pty Ltd ABN 24 167 357 29 Page 1 of 25 Tasmanian Networks Pty Ltd ABN 24 167 357 299 1-7 Maria Street Lenah Valley

More information

Principles of cost recovery: electricity tariff design

Principles of cost recovery: electricity tariff design ERRA Tailor-made Training Course: Principles of Tariff Regulation Implemented for: Oman Power & Water Procurement Company Principles of cost recovery: electricity tariff design David Williams www. erranet.org

More information

CCA Terms Glossary. Valley Clean Energy Alliance. i CCA Terms Glossary

CCA Terms Glossary. Valley Clean Energy Alliance. i CCA Terms Glossary CCA Terms Glossary Valley Clean Energy Alliance i CCA Terms Glossary Table of Contents Energy Basics... 1 Wholesale Energy Services... 1 Finance... 2 Rate Setting... 3 Call Center and Data Management...

More information

Dale Barrie Training & Technical Assistance Specialist. Iowa Rural Water Association - Dale Barrie 1

Dale Barrie Training & Technical Assistance Specialist. Iowa Rural Water Association - Dale Barrie 1 Dale Barrie Training & Technical Assistance Specialist Iowa Rural Water Association - Dale Barrie 1 Goals for rates Type of rate structure which is best for you Who should be involved What information

More information

Methodology for calculating subsidies to renewables

Methodology for calculating subsidies to renewables 1 Introduction Each of the World Energy Outlook scenarios envisages growth in the use of renewable energy sources over the Outlook period. World Energy Outlook 2012 includes estimates of the subsidies

More information

City of Stockton California

City of Stockton California Report to: City of Stockton California Delta Water Supply Project (DWSP) Surface Water Supply Fee (SWSF) June 2009 Prepared by HDR, Inc. June 8, 2008 Ms. Melissa Price City of Stockton Municipal Utilities

More information

CONSERVATION AND DEMAND MANAGEMENT CODE FOR ELECTRICITY DISTRIBUTORS

CONSERVATION AND DEMAND MANAGEMENT CODE FOR ELECTRICITY DISTRIBUTORS Ontario Energy Board Commission de l énergie de l Ontario CONSERVATION AND DEMAND MANAGEMENT CODE FOR ELECTRICITY DISTRIBUTORS Issued: September 16, 2010 Table of Contents 1. GENERAL AND ADMINISTRATIVE

More information

NEWFOUNDLAND BOARD OF PUBLIC UTILITIES DATA RESPONSES TO THE CONSUMER ADVOCATE. Provide a copy of the report to the Board concerning Newfoundland

NEWFOUNDLAND BOARD OF PUBLIC UTILITIES DATA RESPONSES TO THE CONSUMER ADVOCATE. Provide a copy of the report to the Board concerning Newfoundland NEWFOUNDLAND BOARD OF PUBLIC UTILITIES DATA RESPONSES TO THE CONSUMER ADVOCATE CA181 Provide a copy of the report to the Board concerning Newfoundland Power Company s Study of Innovative Approaches to

More information

COST ALLOCATION. Canadian Gas Association 23nd Annual CGA Regulatory Course Ottawa, ON. Presented by: Brad De Ryck,

COST ALLOCATION. Canadian Gas Association 23nd Annual CGA Regulatory Course Ottawa, ON. Presented by: Brad De Ryck, COST ALLOCATION Canadian Gas Association 23nd Annual CGA Regulatory Course Ottawa, ON Presented by: Brad De Ryck, Gas Cost Allocation Supervisor Manitoba Hydro OVERVIEW Cost Allocation CONCEPTS What? Why?

More information

Overview of Local Facilities. Integrated Resource Planning Advisory Committee

Overview of Local Facilities. Integrated Resource Planning Advisory Committee Overview of Local Facilities Integrated Resource Planning Advisory Committee City of Henderson Utility Services System Overview 2 CITY OF HENDERSON Department of Utility Services The Department of Utility

More information

2018 Open Access Transmission Tariff (OATT) Rate Case

2018 Open Access Transmission Tariff (OATT) Rate Case 2018 Open Access Transmission Tariff (OATT) Rate Case October 10, 2017 Report 2018 Rate Case Filing Report - Service Colorado Springs Utilities (Utilities) is a transmission provider and provides nondiscriminatory

More information

RATE DS-4 LARGE GENERAL DELIVERY SERVICE

RATE DS-4 LARGE GENERAL DELIVERY SERVICE d/b/a Ameren Illinois 5 th Revised Sheet No. 14 Electric Service Schedule Ill. C. C. No. 1 (Canceling 4 th Revised Sheet No. 14) AVAILABILITY Service under this Rate is available for any eligible non-residential

More information

Price to Compare (PTC) Sample Calculation DISCLAIMER

Price to Compare (PTC) Sample Calculation DISCLAIMER Price to Compare (PTC) Sample Calculation DISCLAIMER Disclaimer This document does not include factors/adders such as surcharges and sales taxes applicable to PECO distribution service. The PTC contained

More information

Cost-Benefit Analysis of the 2007 New Jersey Clean Energy Program Energy Efficiency Programs. Summary Report

Cost-Benefit Analysis of the 2007 New Jersey Clean Energy Program Energy Efficiency Programs. Summary Report Cost-Benefit Analysis of the 2007 New Jersey Clean Energy Program Energy Efficiency Programs Summary Report March 2010 Center for Energy, Economics & Environmental Policy Edward J. Bloustein School of

More information

TARIFF DESIGN FOR FINAL CUSTOMERS

TARIFF DESIGN FOR FINAL CUSTOMERS TARIFF DESIGN FOR FINAL CUSTOMERS By prof. Vidmantas Jankauskas Chairman, NCC Lithuania Presented at the NARUC Training on Tariff Development and Utility Regulation Baku, Azerbaijan May 7-11, 2007 Plan

More information

The ESP Handbook. Chapter 9 Billing under CCA. Version 2.0 May 1, 2015

The ESP Handbook. Chapter 9 Billing under CCA. Version 2.0 May 1, 2015 The ESP Handbook Chapter 9 Billing under CCA Version 2.0 May 1, 2015 9.1 Introduction This chapter provides an overview of billing policies and procedures under Community Choice Aggregation (CCA). The

More information

Energy Policy 2012 Annual Update

Energy Policy 2012 Annual Update Energy Policy 2012 Annual Update May 2013 Energy Policy 2012 Annual Update May 2013 1.0 Energy Policy Update This report provides an update of 2012 activities and results related to the City of Fort Collins

More information

DC Surface (non-submersible) pumps are most economical. Reduce pumping energy by half

DC Surface (non-submersible) pumps are most economical. Reduce pumping energy by half Solar Electric Energy for Irrigation February 19, 2008 Erik Bakke You know Solar is good for the Earth Increase Profits - Reduce operating costs Decrease Risks - Hedge against rising prices Increase Cash

More information

Annual Pricing Proposal

Annual Pricing Proposal Annual Pricing Proposal for 1 July 2015 to 30 June 2016 Tasmanian Networks Pty Ltd Who is TasNetworks? Regulation of network charges TasNetworks commenced operations on 1 July 2014. It has been formed

More information

April 19, Dear Ms. Haskins

April 19, Dear Ms. Haskins 227 West Trade Street Phone 704 373 1199 www.raftelis.com Suite 1400 Fax 704 373 1113 Charlotte, NC 28202 April 19, 2018 Ms. Rhonda Haskins, CPA Director of Financial Planning Fayetteville Public Works

More information

Notice of Public Hearing on Proposed Water Service Rates, Fees and Charges. How to Submit a Protest

Notice of Public Hearing on Proposed Water Service Rates, Fees and Charges. How to Submit a Protest 220 Nellen Ave. Corte Madera, CA 94925 Notice of Public Hearing on Proposed Water Service Rates, Fees and Charges The Marin Municipal Water District (MMWD) Board of Directors will hold a public hearing

More information

227 West Trade Street Phone Suite 1400 Fax Charlotte, NC 28202

227 West Trade Street Phone Suite 1400 Fax Charlotte, NC 28202 227 West Trade Street Phone 704 373 1199 www.raftelis.com Suite 1400 Fax 704 373 1113 Charlotte, NC 28202 March 13, 2018 Ms. Courtney Driver Utilities Director Winston-Salem/Forsyth County Utilities PO

More information

2017 University Park Rate Filing

2017 University Park Rate Filing 2017 University Park Rate Filing August 1, 2017 What we will talk about tonight o New pipeline that will bring Kankakee softened and filtered water to your home by the end of this year o Cost of the new

More information

Council Minutes November 23, Minute No. 63 Report - Standing Policy Committee on Infrastructure Renewal and Public Works - November 8, 2005

Council Minutes November 23, Minute No. 63 Report - Standing Policy Committee on Infrastructure Renewal and Public Works - November 8, 2005 Council Minutes November 23, 2005 1 Minute No. 63 Report - Standing Policy Committee on Infrastructure Renewal and Public Works - November 8, 2005 Item No. 1 2006 Water and Sewer Utility Rates File WW-2.3

More information

WORKING DRAFT FOR DISCUSSION. Review of Cost Allocation and Rate Design Methodologies

WORKING DRAFT FOR DISCUSSION. Review of Cost Allocation and Rate Design Methodologies 34 King Street East, Suite 600 Toronto, Ontario, M5C 2X8 elenchus.ca Review of Cost Allocation and Rate Design Methodologies A Report Prepared by Elenchus Research Associates Inc. John Todd, Michael Roger

More information

Comprehensive Cost of Service and Rate Design Study

Comprehensive Cost of Service and Rate Design Study Comprehensive Cost of Service and Rate Design Study December 2009 TABLE OF CONTENTS Executive Summary.. ES -1 I. Introduction A. Scope of Study Page 2 B. RAC Involvement Page 3 II. Overview of the Rate

More information

Renewable Energy Plan 2011 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619

Renewable Energy Plan 2011 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619 Renewable Energy Plan 2011 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619 This Biennial Review filing by the Lansing Board of Water & Light (LBWL) complies with Public Act 295 of

More information

Senate Bill 350 Study

Senate Bill 350 Study Senate Bill 350 Study Volume VII: Ratepayer Impact Analysis PREPARED FOR PREPARED BY July 8, 2016 Senate Bill 350 Study The Impacts of a Regional ISO-Operated Power Market on California List of Report

More information

Resource and Financial Impact of Clean Line P&E HVDC Delivered Wind Resources for TVA

Resource and Financial Impact of Clean Line P&E HVDC Delivered Wind Resources for TVA Resource and Financial Impact of Clean Line P&E HVDC Delivered Wind Resources for TVA 1. What is the potential contribution of HVDC wind to TVA s forecast demand? HVDC wind could meet 1.4-4.1 % of TVA

More information

Handout 5: Stormwater Cost of Service

Handout 5: Stormwater Cost of Service Handout 5: Stormwater Cost of Service Introduction The purpose of this handout is to describe the current cost allocation methodology for the stormwater program. The existing Stormwater Management Service

More information

M A N I T O B A ) Order No. 117/15 ) THE PUBLIC UTILITIES BOARD ACT ) November 18, 2015

M A N I T O B A ) Order No. 117/15 ) THE PUBLIC UTILITIES BOARD ACT ) November 18, 2015 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) November 18, 2015 BEFORE: Susan Proven, P.H.Ec, Acting Chair The Hon. Anita Neville, P.C., B.A. (Hons.), Member MUNICIPALITY OF KILLARNEY-TURTLE MOUNTAIN

More information

Alberta Energy - Capacity Market Framework Engagement December 2017

Alberta Energy - Capacity Market Framework Engagement December 2017 Capacity Market Cost Allocation - Response Template The engagement is seeking stakeholder feedback on the questions below. Please submit your responses to these questions, and any additional input on this

More information

House Energy and Public Utilities Committee March 15, Kendal Bowman Vice President, Regulatory Affairs and Policy

House Energy and Public Utilities Committee March 15, Kendal Bowman Vice President, Regulatory Affairs and Policy House Energy and Public Utilities Committee March 15, 2017 Kendal Bowman Vice President, Regulatory Affairs and Policy At A Glance North Carolina 112 years of service 3.3 million retail customers in 83

More information

Témoignage de Mme Judy W. Chang de The Brattle Group sur la politique d'ajouts au réseau de transport

Témoignage de Mme Judy W. Chang de The Brattle Group sur la politique d'ajouts au réseau de transport Demande R--0 Témoignage de Mme Judy W. Chang de The Brattle Group sur la politique d'ajouts au réseau de transport Original : 0-0-0 HQT-, Document En liasse Policy on Network Upgrades Direct Testimony

More information

CITY OF ALBANY CITY COUNCIL AGENDA STAFF REPORT. Discussion of Community Choice Aggregation and Recommendation to Join the Marin Energy Authority

CITY OF ALBANY CITY COUNCIL AGENDA STAFF REPORT. Discussion of Community Choice Aggregation and Recommendation to Join the Marin Energy Authority CITY OF ALBANY CITY COUNCIL AGENDA STAFF REPORT Agenda Date: November 18, 2013 Reviewed by: Pat O SUBJECT: REPORT BY: Discussion of Community Choice Aggregation and Recommendation to Join the Marin Energy

More information

CLERK OF THE CIRCUIT COURT

CLERK OF THE CIRCUIT COURT Collier County Clerk of the Circuit Court Internal Audit Department Audit Report 2003 8 Water & Sewer Revenue Audit Collier County CLERK OF THE CIRCUIT COURT Collier County Clerk of the Circuit Court

More information

COUNCIL POLICY BACKGROUND

COUNCIL POLICY BACKGROUND COUNCIL POLICY Policy Title: User Fees and Subsidies Policy Policy Number: CFO010 Report Number: FCS2008-13 Approved by: City Council Effective Date: 2008 April 28 Business Unit: Chief Financial Officer

More information

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501 3 rd Revised Sheet No. 43 Canceling 2 nd Revised Sheet No. 43 Page 1 of 5 1. APPLICABILITY: This rate schedule sets forth the procedure to be used in calculating the Electric Fuel and Purchased Power Cost

More information

DRAFT. Recycled Water Cost of Service and Rate Study Report. Napa Sanitation District

DRAFT. Recycled Water Cost of Service and Rate Study Report. Napa Sanitation District DRAFT Recycled Water Cost of Service and Rate Study Report Napa Sanitation District December 2011 DRAFT Executive Summary Recycled Water Cost of Service and Rate Study Report 2 The Napa Sanitation District

More information

Internal Audit Update. Finance & Audit Committee Meeting December 19, 2017

Internal Audit Update. Finance & Audit Committee Meeting December 19, 2017 Internal Audit Update Finance & Audit Committee Meeting December 19, 2017 2016 Audit Plan Status # Entity Audited 2016 Audit/Review Expected Completion Date Status 1 PSEG LI Continuous Auditing Processes

More information

Energy Trust Electric and Gas Avoided Cost Update for Oregon for 2018 Measure and Program Planning

Energy Trust Electric and Gas Avoided Cost Update for Oregon for 2018 Measure and Program Planning Energy Trust Electric and Gas Avoided Cost Update for Oregon for 2018 Measure and Program Planning August 8, 2017 Energy Trust s estimates of future electric and gas avoided costs are critical assumptions

More information

Review of Cost Allocation and Rate Design Methodologies

Review of Cost Allocation and Rate Design Methodologies 34 King Street East, Suite 600 Toronto, Ontario, M5C 2X8 elenchus.ca Review of Cost Allocation and Rate Design Methodologies A Report Prepared by John Todd and Michael Roger Elenchus Research Associates

More information

New revenue guidance Implementation in the technology sector

New revenue guidance Implementation in the technology sector No. US2017-08 April 25, 2017 What s inside: Overview..1 Identify the contract.2 Identify performance obligations..6 Determine transaction price 9 Allocate transaction price 12 Recognize revenue. 14 Principal

More information

STANDARD CONTRACT RIDERS - (Continued) RIDER NO. 9 DAY-AHEAD HOURLY PRICE SERVICE

STANDARD CONTRACT RIDERS - (Continued) RIDER NO. 9 DAY-AHEAD HOURLY PRICE SERVICE THIRD REVISED PAGE NO. 89 CANCELLING SECOND REVISED PAGE NO. 89 RIDER NO. 9 DAY-AHEAD HOURLY PRICE SERVICE Day-ahead hourly price service provides large commercial and industrial customers with the ability

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * *

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * * Page of BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * * RE: IN THE MATTER OF ADVICE LETTER NO. -ELECTRIC FILED BY PUBLIC SERVICE COMPANY OF COLORADO TO REPLACE COLORADO PUC NO.

More information

March 11, Mr. Dan Brown Chief Executive Officer Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, NC Dear Mr.

March 11, Mr. Dan Brown Chief Executive Officer Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, NC Dear Mr. March 11, 2019 Mr. Dan Brown Chief Executive Officer Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, NC 27870 Dear Mr. Brown, Raftelis has completed an evaluation to develop cost-justified

More information

Solar Program Design Study

Solar Program Design Study Solar Program Design Study Prepared for: Prepared by: General Electric International, Inc. and Concentric Energy Advisors Date: July 24, 2017 Foreword Foreword This report was prepared by General Electric

More information

Price to Compare (PTC) Sample Calculation DISCLAIMER

Price to Compare (PTC) Sample Calculation DISCLAIMER Price to Compare (PTC) Sample Calculation DISCLAIMER Disclaimer This document does not include factors/adders such as surcharges and sales taxes applicable to PECO distribution service. The PTC contained

More information

ENERGY INDEPENDENCE AND SECURITY ACT OF 2007 New PURPA Standards (16-19) Management Policy Statement of Decatur County REMC

ENERGY INDEPENDENCE AND SECURITY ACT OF 2007 New PURPA Standards (16-19) Management Policy Statement of Decatur County REMC ENERGY INDEPENDENCE AND SECURITY ACT OF 2007 New PURPA Standards (16-19) Management Policy Statement of Decatur County REMC INTRODUCTION The Energy Independence and Security Act of 2007 proposes changes

More information

Retail Water Rates. Board of Directors August 2, 2017

Retail Water Rates. Board of Directors August 2, 2017 Western Municipal Water District Retail Water Rates Board of Directors August 2, 2017 Background BACKGROUND On February 15, the Board of Directors voted to cancel the March 15 retail water rates public

More information

Improving the way we price our network services. Consultation paper

Improving the way we price our network services. Consultation paper Improving the way we price our network services Consultation paper October 2015 Table of Contents 1 Overview... 4 2 Background... 6 3 Purpose... 7 4 Network tariff strategy... 7 4.1 Network tariff reform

More information

ENERGY AND CARBON MANAGEMENT PLAN

ENERGY AND CARBON MANAGEMENT PLAN AGENDA ITEM 7 CABINET 17 NOVEMBER 2016 ENERGY AND CARBON MANAGEMENT PLAN 2016-2021 Relevant Cabinet Member Mr A N Blagg Relevant Officer Director of Economy & Infrastructure Recommendation 1. The Cabinet

More information

Boone County Regional Sewer District User Rate Regulations Revised April 21, 2015

Boone County Regional Sewer District User Rate Regulations Revised April 21, 2015 Boone County Regional Sewer District User Rate Regulations Revised April 21, 2015 3.1 Title - This regulation including appendixes and tables shall be known, referred to and cited as the User Rate Regulation.

More information

Review of SaskPower s Cost Allocation and Rate Design Methodologies. John Todd, Michael Roger May 15, 2017

Review of SaskPower s Cost Allocation and Rate Design Methodologies. John Todd, Michael Roger May 15, 2017 Review of SaskPower s Cost Allocation and Rate Design Methodologies John Todd, Michael Roger May 15, 2017 5/11/2017 Agenda 1. Project Description 2. Background on Cost Allocation Methodology 3. Elenchus

More information

Ameren Missouri. Renewable Energy Standard Compliance Plan Prepared in Compliance with 4 CSR

Ameren Missouri. Renewable Energy Standard Compliance Plan Prepared in Compliance with 4 CSR Ameren Missouri Renewable Energy Standard Compliance Plan 2016-2018 Prepared in Compliance with 4 CSR 240-20.100 April 15, 2016 NP Table of Contents Page INTRODUCTION 4 SECTION (8) (B) 1 A: PLANNED RES

More information

Where Membership Matters!

Where Membership Matters! Welcome to Lumbee River EMC Where Membership Matters! As a new member, you become part of more than 50,000 other members who own the cooperative. Unlike other utilities, Lumbee River EMC is a not-for-profit