1 INSTRUCTION MANUAL Sintering furnace Version 0.6.6

2 Warning ATTENTION! ATTENTION! Mount on non-flammable surface material only! Take out the furnace with the assistance of two persons. To do so, each person will take a side by holding the bottom of the furnace with one hand and the top side with the other hand. Do not pull out the furnace by its support in order to avoid damages. CAUTION: PLEASE READ THE INSTRUCTIONS CAREFULLY BEFORE OPERATING THE FURNACE. When operating the furnace a Refractory support must always be on the lift tray! Only use ZrO2 powders, with recognized approval for use in dental furnaces. During use, the area around the furnace table is very hot; approach and contact with the table should be only when the furnace is cold Dental work must only be placed on the furnace table. Avoid placing or resting objects on any area of the furnace except the rest table. In the event of an external power failure while the furnace is in operation: 1) Disconnect the power supply cord from the electrical power outlet. 2) Lower the table by inserting the crank supplied, into the hexagonal screw located at the back of the furnace. 2 P a g e

3 Caution! Risk of electric shock Caution! Hot surface! Caution! Risk or Danger Refer to documentation. Location and environmental conditions: a) Altitude up to 2000m; b) Ambient Temperature 5ºC to 40ºC; c) Maximum relative humidity 80% for temperature up to 31ºC decreasing linearly relative humidity at 40ºC; d) Mains supply voltage fluctuations up to % of the nominal voltage; e) Transient over voltages typically present on the mains supply category II. Applicable rated pollution Degree 2. Place the furnace on a flat surface more than 10cm away from left, right and back walls and do not place anything inflammable near the furnace. Avoid direct sunlight on the furnace. Avoid strong air (like ventilator) to blow on the furnace. It may cause instability of the temperature reading when table is opened. Rating & Fuses: 230V 50Hz/60Hz, 200V50Hz/60Hz 8A Fuse F1 (on Power Card) - Rated: 250V, 8A Fuse Mains 10X38 gr (2 provided in L &N) - Rated: 500V, 16A 3 P a g e

4 Fuse Contactor 14X51 gr - Rated: 500V, 20A, 100V, 115V, 60Hz, 15A Fuse F1 (on Power Card) - Rated: 250V, 8A Fuse Mains 10X38 gr (2 provided in L &N) - Rated: 500V, 25A Fuse Contactor 14X51 gr - Rated: 500V, 20A, Standards and approvals: 1) CE Tested to :2001 (2nd Edition); EN ;2001(2 nd Edition) 2) ICES-003 Issue 4:2004 CAN/CSA-CE/IEC CISPR 22:02 3) Intertek ETL Listed Conforms to UL Std Certified to CAN/CSA Std C us Conforms to UL Std Certified CAN/CSA Std This product has been tested to the requirements of CAN/CSA-C22.2 No , second edition, including Amendment 1, or a later version of the same standard incorporating the same level of testing requirements Power Source: Connect the furnace to a grounded power outlet socket. Be certain that the power supply conforms to the electrical specifications of the SINTRA/SINTRA PLUS. A single source of electricity must be used. 4 P a g e

5 Table of Contents 1. Furnace Installation Unpacking Air cooling connection Furnace Connection to Power Outlet General Description Connections and Controls Data Keys Control Keys: Programming keys & Parameters Field: Display: Sound Messages: Initial Operation Power Switch: Set-Up possibilities: Idle Mode: Programming mode: STEP Programming Entering and Changing Parameter Data while in editing mode Parameters and their limitations The Firing Cycle Starting the Firing Cycle Canceling a Cycle Built in Program Supplementary Features The Menu Key SINTRA PLUS - Fast Cycle Accessories Technical Specifications General: P a g e

6 7.2 Warranty: Disclaimer: Maintenance Furnace Installation 1.1 Unpacking Check the contents of the shipping carton and compare content with the list below. Take out the accessories and check the contents: Electrical Mains cord 1 sintering firing table 2 sintering trays(crucibles) 2 cover Sintering beads, 100 g Lift emergency key Air connection tube 6X8 w/female fitting. User manual o Remove carefully the polyethylene foam. o Lift out the furnace carefully, and positioning it on its base. o DO NOT lift the furnace by the lift shaft. o Store the carton and the polyethylene foam for future use. 1.2 Air cooling connection To operate the furnace with the Air cooling feature, the following is required: Compressor. Max 10 Bar Air installation Air connections set includes: A pressure point preferably with Ball Valve, in order to enable opening or closing of the air flow. A quick-connect fitting that should be connected to the pressure point. The fitting should be with an appropriate edge (for 6 x 8 polyurethane tube).a 6 x 8mm Polyurethane Tube with female fitting (1) is provided with the furnace s accessories. It should be installed into the male Quick- Connect Fitting (2), which is lo 6 P a g e

7 cated on the filter in the back of the furnace. The other end of the polyurethane tube should be connected to the pressure point. POINTS TO NOTE: The Air pressure is not mandatory to operate the furnace. 1.3 Furnace Connection to Power Outlet Unit shall not be positioned so that it is difficult to operate the Disconnected device attachment plug. A readily accessible socket outlet shall be installed in the proximity of unit. A SINGLE SOURCE OF ELECTRICITY MUST BE USED. Check and ensure that the main power switch at the rear of the furnace is turned off. Connect the electrical power cord into the furnace power inlet. Plug the electrical power cord into the wall power outlet. Switch the MAIN POWER switch ON (located on the rear panel). You will hear a single beep. The furnace is now in Stand-by mode. The word ON will appear in the program field. Press the ON/OFF key on the front panel. The furnace is now in idle mode. Press the [STOP/LIFT] key - the platform will descend automatically. PLACE THE REFRACTORY SUPPORT (SINTERING PLATFORM) ON THE TABLE. The furnace is now ready for the Initial Operation Procedure. 7 P a g e

8 2. General Description This Chapter describes the controls of your SINTRA/SINTRA PLUS furnace and their functions. 2.1 Connections and Controls FRONT PANEL The furnace controls are located on the front panel and are divided into four sections:. Data keys. Control keys. Programming keys & Parameter Field. 3.5" LCD full color display REAR PANEL The main switch and the furnace connections are located on the rear panel.. Power switch. Hexagonal screw. Inlet. Muffle access. Power cord outlet. Air filter with pressure male fitting. USB connections. 8 P a g e

9 2.2 Data Keys Data keys are for the inserting, deleting, and changing of data. The data keys are:- NUMBERS From numbers 0-9. ENTER (ENT) CLEAR (CLR) SCR (SCREEN) MENU Confirms the selection of a program or a parameter. Cancels the previous key selection. Access the graphic screen; return to data screen Access to all setup of the furnace 2.3 Control Keys: The 4 control keys are:- ON/OFF STOP/LIFT START Turns the furnace on/off. Switching to Idle mode. Raising and lowering the platform. Interrupting a firing cycle. Starting a firing cycle. STEP allow to reach the second, third, fourth & fifth heating parameters and same in the 5 cooling steps 2.4 Programming keys & Parameters Field: PROG - (PROGRAM) Arrows keys Parameter Field Sets the furnace into the mode for program selection. Enable the user to reach the desired Parameter for Programming. 10 Parameters which may be used in the programming of a cycle are selected by using the Arrows 2.5 Display: The data screen displays the data information. The data information displayed can be either the temperature or the time. 9 P a g e

10 The program screen displays either the selected program (SINTRA), (SINTRA PLUS) or the clear sign [--]. The symbol C or F is displayed together with the temperature, and the symbol MIN is displayed with the time. 2.6 Sound Messages: The tone sound is a useful indicator for key selection and operation procedures. A double tone sounds when there is an incorrect key selection or choice of data. A repetitive tone sounds at the end of a firing cycle. 10 P a g e

11 3. Initial Operation 3.1 Power Switch: To start the furnace, press the power switch located on the rear panel to the ON position, the furnace is now in the Stand -by Mode. By pressing the ON/OFF button on the front panel, the furnace is turned on. This mode is called the Idle Mode. The temperature will not rise and will remain in STAND BY mode. The logo of the SINTRA/SINTRA PLUS is displayed. 3.2 Set-Up possibilities: In order to enter the Diagnostic mode you have to turn the furnace OFF from the front panel by pressing the ON/OFF key. Now the furnace is in the "SCR" status. 3.3 Idle Mode: Press the [ON/OFF] key located on the front panel, the furnace is now ready for Program selection. POINTS TO NOTE It is very important that you keep the firing chamber closed in the idle mode to prevent moisture from entering the muffle. 11 P a g e

12 3.4 Programming mode: PRESS" Prog" + Program number"xxx" + ent Then press " menu" + "3" to edit Using the arrow keys enter any number and to toggle between the parameters. 3.5 STEP Programming Following the initial programming of the first RAMP1+Temperature 1+ delay 1, proceed to the programming of each following step. Select the button "STEP" following the programming of the delay 1. After the programming of each delay, the "STEP" button can be press to program the following set of parameters: Ramp 2, High Temp 2, Delay 2, and so forth. This sequence is repeated for each set of 3 parameters for heating and cooling. The SINTRA/SINTRA PLUS gives you the possibility to program 5 completed heating STEPS and 5 complete cooling STEPS. POINTS TO NOTE If you want to change the selected program, press the CLEAR key and re-enter a different program number (0-199 for SINTRA or for SINTRA PLUS). The firing chamber temperature is displayed during the program mode. 12 P a g e

13 3.6 Entering and Changing Parameter Data while in editing mode By Pressing the Arrow keys, you select the desired parameter and the value appears on the data display. Using the data keys, enter the parameter data you require (for the programs). Using this method continue to toggle through your parameter, checking or entering data as required. Press the ENTER key when finished to introduce or to change all the required parameters. EXAMPLE 1 Entering a START TEMP of 120C and HEAT RATE 70C/min High Temp 1500 delay 2:00 : Press "Prog+XXX+ent" then press "Menu" + "3" 1. Press the Arrow key until the (degassing) will be indicated. 2. Press the keys [1], [2], [0]. 3. Press the Arrow UP key, until the HEAT RATE display will be indicated. 4. Press: "70" 5. Press the Arrow UP key, until the High temp display will be indicated. 6. Press: "1500" 7. Press the Arrow UP key, until the delay 1display will be indicated. 8. Press: "2:00" 9. Press ENTER key. EXAMPLE 2 Multiple steps: Entering a START TEMP of room temp C and ramp 70C/min High Temp 1000 delay 1:00. Ramp 2: 15C/min High Temp2: 1500 delay 2: 2:00 Press " Prog +XXX+ Ent " then press "Menu" + "3" 1. Press the Arrow key until the [degassing] will be indicated 2. Press the keys "clear", will result "- -" on the display panel 3. Press the Arrow UP key, until the HEAT RATE display will be indicated 4. Press"70" 5. Press the Arrow UP key, until the High temp display will be indicated. 6. Press" 1000" 13 P a g e

14 7. Press the Arrow UP key, until the delay 1display will be indicated 8. Press"1:00" 9. Press STEP key. 10. Press the Arrow UP key, until the HEAT RATE2 display will be indicated. 11. Press"15" 12. Press the Arrow UP key, until the High temp2 display will be indicated. 13. Press" 1500" 14. Press the Arrow UP key, until the delay 2display will be indicated. 15. Press "2:00" 16. By pressing " ent" all the program will be saved and ready to start. 3.7 Parameters and their limitations Parameter Function Degassing The temperature for degassing (in C or F). Will open the table by one cm until this temperature and activate the active degassing Limits 100C to 250C 212F to 482F Comments Not obligatory in order to run a program. Used to purge muffle before cycle when using acid based coating and coloration. Parameter Ramp 1 Function Limits The speed of rising temp in the first step 1 to 70 degrees C / mins 33 to 158 degrees F / mins Comments Ramp 1 is mandatory. Parameter HIGH TEMP 1 Function Limits The temperature (in C or F) to be reached at the end of the Ramp1 Up to 1600 C degrees. Up to 3000 F degrees. 14 P a g e

15 Parameter TEMP DELAY 1 Function Limits The duration of time that the furnace will remain at the HIGH TEMP1 before the firing chamber is opened or before the temperature will continue to Ramp2,3,4,5 (if defined). 1 minute to 4 hours and 30 minutes (specified in hours and minutes). POINTS TO NOTE If the " STEP" button is pressed after the 3 initial parameters This sequence of data entry can be repeated: Start temp/ramp/high temp/ delay Ramp2/ high Temp2/ delay2+ step Ramp3/ high temp3/delay3+step Ramp4/ high temp4/ delay4+step Ramp5/ high temp5/delay 5 Cooling temp1/cooling ramp /delay1 + step Cooling temp 2/ cooling ramp2 /delay 2+step Cooling temp 3 If the 'STEP" button is not selected, the furnace will jump automatically to the cooling "1" if again the "STEP" button will not be pressed the cooling will be natural. 15 P a g e

16 Parameter HIGH TEMP Function The temperature (in C or F) to be reached at the end of the Ramp2 Limits Up to 1600 C degrees. Up to 3000 F degrees. Parameter TEMP DELAY Function Limits Parameter Function Limits Comments The duration of time that the furnace will remain at the HIGH TEMP2 before the firing chamber is opened 1 minute to 4 hours and 30 minutes (specified in hours and minutes). Cooling steps1-5 Control the cooling rate of the furnace Ramp of cooling+ Temperature to reach+ delay for each cooling step up to 5 steps Furnace stabilizes the cooling to a requested temperature according to the cooling time request. If the time is too short and out of the furnace's time range, the furnace will ignore it. The furnace has an optional additional delay (6 th ) for colored ZR. At the end of the cooling at the requested temperature the furnace will performed an additional holding The parameter to programmed are three: 1- Temperature to reach 2- Time to reach this temperature/ Ramp 3- Holding time at the cooling temp Parameter Function Limits Comment Active cooling Start of the active cooling to fasten the cooling time. Up to 500 C / 932 F degrees For the SINTRA PLUS (fast cycles) this is not applicable. 16 P a g e

17 POINTS TO NOTE When programming data into a parameter, check that the data is correct and that it correlates with the other parameters. Remember that parameters have limits, if you enter data above or below these limits the data will not be accepted. In the event of an error, the warning will be seen on the screen by pressing START and the firing cycle will not start. This parameter isn t logical or it is out of the permitted limits. 17 P a g e

18 4. The Firing Cycle 4.1 Starting the Firing Cycle A short press (audio single beep) to lower the platform. The firing cycle will not start until the platform is completely lowered. A long press (audio double beep) is heard when platform rises. Place sintering crucible with restorations on the ceramic firing table. Select a program number + Enter. Press the [START] key. The firing cycle will automatically start when the firing chamber temperature reaches the temperature selected for the default START TEMP (60 C /140 F). The relevant function will be shown on the screen. You can see the graph of your cycle by pressing "SCR" simultaneously with the cycle progression, showing the actual status of the cycle. When the firing cycle has finished and the platform is in the lowest position the double tone sound will be heard. The platform can be open manually only below 450 C/ 840 F within cycle by pressing the stop button Normal opening will occur at 150 degrees. This safeguards the life of the heating elements and assures that the muffle provides constant temperature uniformity. (Different for the SINTRA PLUS cycle) 4.2 Canceling a Cycle Should you wish to cancel the program in the middle of a firing cycle, press the [STOP/LIFT] key. The platform is lowered and the furnace remains in the selected program mode. The platform will open only below 450 C/ 840 F degrees. 18 P a g e

19 5. Built in Program Please find below a short explanation about the recent feature that has been implemented into the SINTRA/SINTRA PLUS The preprogrammed sintering cycles are as follows: Prog 1 : Shenpaz Program Prog 2: Katana-multi-layer Prog 3: Metoxit unit Prog 4: Metoxit Bridge Prog 5: Spark Prog 6:Degudent Single crown Prog 7:DegudentBridge 1 Prog 8:Cercon HT Bridge 2 Prog 9: Cercon Prog 10: Sirona / YZ Vita Prog. 12: LAVA Prog 100: Zirlux standard cycle for single crown Prog 101: Zirlux standard bridge cycle IN SINTRA PLUS only - Prog 200: Zirlux fast cycle single crown Prog 201: Zirlux fast cycle 2-3 unit bridge POINTS TO NOTE The programs in the SINTRA/SINTRA PLUS memory bank have a manufacturers' variance of 25C to 30C degrees. Please check with the zirconia manufacturer for accurate programming. 19 P a g e

20 Prog. 1: ZirkonZahn Degazing 250 C Ramp 1 10 C High temp1 920 Temp Delay 20:00 Ramp 2 15 C High Temp C Temp Delay 2:00 Cooling to Temp Time and delay ---- By Time minimum ---- Active cooling 450 C Prog. 2: Katana Multi Layer Degazing - C Ramp 1 4 C High temp1 500 Temp Delay 00:00 Ramp 2 15 C High Temp C Temp Delay 2:00 Cooling to Temp 500 By Time minimum 3:00 Active cooling -- C Prog. 3: Metoxit single Degazing - C Ramp 1 10C High temp Temp Delay 01:00 Ramp 2 C High Temp2 C Temp Delay Cooling to Temp C By Time minimum Active cooling -- C 20 P a g e

21 Prog. 4: Metoxit bridge Degazing - C Ramp 1 5 C High temp Temp Delay 1:00 Ramp 2 C High Temp2 C Temp Delay Cooling to Temp C By Time minimum Active cooling -- C Prog. 5: Spark Degazing 200C Ramp 1 15 C High temp1 900 Temp Delay 0:05 Ramp 2 15C High Temp2 1450C Temp Delay 00:30 Cooling to Temp 900C By Time minimum 00:55 Active cooling -- C Prog. 6: Degudent Single Degazing 200C Ramp 1 12 C High temp1 900 Temp Delay 0:15 Ramp 2 12C High Temp2 1450C Temp Delay 2:00 Cooling to Temp 900C By Time minimum 1:50 Active cooling -- C 21 P a g e

22 Prog. 7: Degudent Bridge 2 Degazing 200- C Ramp 1 8 C High temp1 900 Temp Delay 0:30 Ramp 2 8C High Temp2 1450C Temp Delay 2:00 Cooling to Temp 900C By Time minimum 2:18 Active cooling -- C Prog.: 8 Degudent Degazing - C Ramp 1 23C High temp1 900C Temp Delay Ramp 2 11C High Temp2 1500C Temp Delay 2:25 Cooling to Temp By Time minimum Active cooling Prog. 9: Bridge Cercon HT Degazing - C Ramp 1 7 C High temp1 860C Temp Delay Ramp 2 2C High Temp2 1350C Temp Delay 2:00 Cooling to Temp By Time minimum 4:30 Active cooling 22 P a g e

23 Prog. 10: Sirona/Vita YZ Degazing - C Ramp 1 25 C High temp Temp Delay Ramp 2 8C High Temp2 1530C Temp Delay 2:00 Cooling to Temp By Time minimum Active cooling 450C Prog. 100 Zirlux single Degazing Ramp 1 10 C/min High temp1 700 C Temp Delay Ramp 2 5C/min High Temp2 1550C Temp Delay 2:00 Cooling to Temp By Time minimum Active cooling Prog. 101 Zirlux bridge Degazing Ramp 1 10 C/min High temp1 700 C Temp Delay Ramp 2 5C/min High Temp2 1500C Temp Delay 2:00 Cooling to Temp By Time minimum Active cooling 23 P a g e

24 Prog. 200 Zirlux single FAST CYCLE (SINTRA PLUS ONLY) Degazing Ramp 1 30 C/min High temp C Temp Delay Ramp 2 10C/min High Temp2 1500C Temp Delay 2:00 First open 6 cm Holding time 2:00 Step 1 cm Prog. 201 Zirlux bridge FAST CYCLE (SINTRA PLUS ONLY) Degazing Ramp 1 20 C/min High temp C Temp Delay Ramp 2 5C/min High Temp2 1500C Temp Delay 2:00 First open 6 cm Holding time 2:00 Step 1 cm For your convenience, ZIRLUX ST1 programs have been preprogrammed and are included in this SINTRA and SINTRA PLUS unit. Program no. 103: 1-5 units (not including pontics) Program no. 104: 2-5 units (including pontics) Program no. 105: 6-9 units 24 P a g e

25 parameters Zirlux 1-5- Pr103 Zirlux 2-5- Pr104 With Pontic Zirlux 6-9- Pr105 degasing Ramp1 10 c⁰ m 7 c⁰ m 7 c⁰ m Hightemp1 200 c⁰ 200 c⁰ 200 c⁰ Delay Ramp2 6 c⁰ m 4 c⁰ m 4 c⁰ m Hightemp2 500 c⁰ 500 c⁰ 500 c⁰ Delay Ramp3 10 c⁰ m 10 c⁰ m 10 c⁰ m Hightemp3 900 c⁰ 900 c⁰ 900 c⁰ Delay Ramp4 4 c⁰ m 4 c⁰ m 3 c⁰ m Hightemp c⁰ 1530 c⁰ 1530 c⁰ Delay 4 2:00 H 2:00H 2:00 H Cooling ramp1 12 c⁰ m 11 c⁰ m 7 c⁰ m Temp to 800 c⁰ 800 c⁰ 800 c⁰ Natural cooling Sample of screen graph showing a program with 4 heating steps and 3 cooling. 25 P a g e

26 Overview of a cycle The furnace will raise the table and close the muffle opening in order to start the preheating of the table and muffle. IF the degassing feature is chosen, the heat up ramp rate is 15 C /59 F/ min. until degassing temperature. The furnace will remain at each designated High Temperature until the user defines the desired delay times 1 through 5. Possibility of up to 5 sets. Upon the completion of the Final delay time the table will cool to ambient Temperature and descend. Zirconia sintered work is completed. At the end of the process, the 5 audio double-beep will be heard. The SINTRA furnace will cool down to below 150 C. NOTE: Different in the SINTRA PLUS. 26 P a g e

27 6. Supplementary Features 6.1 The Menu Key Supplementary features can be reached by selecting the Menu Key. This key allows you to reach the internal menu for options and setups. Each one of the above option can be reach by selecting the associated "number". Once an option I selected, follow the instruction provided in the display screen. 6.2 SINTRA PLUS - Fast Cycle From program numbers 200 to 249 fast cycle is available. (50 fast cycles) These cycles implement both fast start and permit rapid opening. These cycles start from any temperature below 300 degrees centigrade by pressing "Start" a second time on any temperature below 300 centigrade. In programs ranging from 200 to 249, the opening of the furnace will be automatically at 900 C degrees centigrade the furnace will open one (1) centimeter automatically and cool down to 800 C degrees. 27 P a g e

28 In addition to the automatic opening, 3 new cooling parameters are automatically accessible (replacing conventional cooling parameters): OPEN definition: This is the distance of the table opening once the furnace reached 800 C degrees. The default is an opening of 7 cm from the 1cm opening (for the 900C to 800C). The opening range can be set from 1cm to 15cm. TIME definition: This is the time to hold at the new position. Default 1:00 min STEP definition: This is the distance for the next distance opening default 1cm The last two parameters will reoccur until the door is fully opened. The fast cycles are recommended for 5-6 single units, or 2-3 bridges of 3 units. For best result on fast cycle, raise the temperature by 50 C degrees for sintering in the fast cycle mode. There are two modes of running the SINTRA PLUS in Normal heat ramp or Slow heat ramp. The default is the (normal ramp) on the SINTRA PLUS 115v.the furnace will hold at 150 C degrees before every cycle The active mode screen can be reached in the oven data from the Logo screen. (see below image and instructions on accessing the screen). The Normal Mode, the furnace is running in Full heat ramp if there is a stable electrical supply, the furnace mode remains as Normal, and there is no need to modify. If the contactor for any reason began to jump (clicking noise), the MODE needs to be changed to SLOW mode. In this mode, the first ramp until 300 C was modified to a slower ramp hence adapted to the available electricity supply. This mode might slightly lengthen the cycle. The default value in Sintra 11 V is (Slow) in the Sintra plus 115 is (normal) holding at 150C degrees. How to reach the heat ramp MODE: In Logo screen: 28 P a g e

29 Checking which MODE is active: Select "SCR" button Select "Ent" button to open "oven data" information - Following the HZ number you will see slow (S) or normal (N) How to change of Mode: Go back to Logo screen, by selecting the "SCR" button. Selected again the "SCR" button to access the Diagnostic Menu. Press button "4" on keyboard to select: "Elevator time setting" Then press either button "4" or "5". "4" is normal or "5" slow. See below image. 29 P a g e

30 Following the change go back to "oven data" and check that the change appear on the right side of the screen. Example (S). Note that the furnace in normal mode at 115 V will stand by at 150 degrees centigrade to avoid a burning of the heating fuse!!! Warning!!! 1-Do not use any tray for fast cooling cycle Place the work directly on the base of the sintering refractory table Fast cooling will cause the tray to crack. 2- Do not place the tray on a cold ceramic or metallic surface, the tray can be removed from the firing table only once completely cold. 6.3 Accessories 2 Sintering trays 2 Sintering cover 100 gr firing beads 30 P a g e

31 !!! Warning!!! The sintering beads are for for DENTAL purpose only. Not to be used with temperatures exceeding 1800 C / 3272 F Do not eat. Do not swallow With the evolution of materials some of the characteristics of this product may be adapted to the new products requirement without prior notice. 31 P a g e

32 7. Technical Specifications 7.1 General: Dimensions: 37X43X75 cm 14.6'X17"X5" Weight: 60 Kg 132 Lb Firing chamber: D 95mmXH 140mm D 3.7"X H 5.5" Main input: 230V AC 50 Hz 115 Volt AC 60 Hz 200V AC 50 /60Hz 100 Volt AC 50 /60Hz 7.2 Warranty: ShenPaz Dental Ltd. warrants that the non-consumable parts of this product including, but not limited to, the muffle are not defective for a period of one (1) year or 3500 hours. In the event that this product proves defective within a period of the one (1) year or 3500 hours of work from the date of shipment to Buyer, Buyers' exclusive remedy shall be at ShenPaz Dental Ltd. option; either replacement of the product or defective part or component, free of charge. 7.3 Disclaimer: DISCLAIMER of Consequential Damages: ShenPaz Dental Ltd. hereby disclaims any liability for loss or damage, direct or consequential that results from the use f this product. Disclaimer of ALL other Warranties: THERE ARE NO OTHER WARRANTIES OR ANY KIND, EXPRESSED OR IMPLIED, CONNECTED WITH THE SALE OF THIS RPODUCT. SHENPAZ DENTAL LTD. SPECIFICALLY DISCLAIMS ANY IMPLIED WARRANTY OF MERCHANTABILITY. 32 P a g e

33 8. Maintenance Before carrying out furnace maintenance, or in the event of a mechanical failure, switch off the electrical supply by the POWER switch located at the back of the furnace, and disconnect the power supply cord. Opening of the furnace may only be carried out by a technician recommended by your furnace supplier. Unauthorized opening of the furnace will invalidate the guarantee. The manufacturer empowers your supplier to carry out certain repairs and maintenance Cleaning: a) Turn off the furnace from the main switch (located on the rear panel. b) Disconnect the furnace from the electricity. In case the furnace's surface is hot leave it unplugged until the furnace would cool down completely. c) Clean the furnace using dry cloth only. d) DO NOT clean the furnace using any cleaning agents, but dry cloth only. We thank you for choosing the SINTRA/SINTRA PLUS, Zirconia sintering furnace for your laboratory needs. For any questions or additional support, please contact us and we will look forward to assisting you. ShenPaz Dental Ltd. 5 HaTasia Street, Ramat Gabriel Industrial Park Migdal HaEmek Phone: +972 (04) or +972 (03) Fax: +972 (04) denise@shenpaz.com 33 P a g e