Ore Reserves and Mineral Resources Statements 30 June 2013

Size: px
Start display at page:

Download "Ore Reserves and Mineral Resources Statements 30 June 2013"

Transcription

1 ASX Release / 22 August 2013 Ore Reserves and Mineral Resources Statements 30 June 2013 Ore Reserves at 30 June 2013: g/t Au for 5.24 million ounces of contained gold The acquisition of Gold Ridge and Operations during the year has added significantly to Ore Reserves and Mineral Resources. Gwalia Deeps Ore Reserves are estimated at 6.6 million tonnes 8.3 grams per tonne of gold (g/t Au) for 1.75 million ounces (Moz) of contained gold (1.93 Moz at June 2012), representing an indicative mine life of at least 9 years. Gwalia Deeps Mineral Resources as at 30 June 2013 reduced by 0.14 Moz to be g/t Au for 3.79 Moz of contained gold. The Gwalia ore body remains open at depth, particularly South West Branch lode, with potential within the planned mining interval to add to Mineral Resources in both the South Gwalia Series and Main Lodes. Company Summary at 30 June 2013 Total Ore Reserves are estimated at: g/t Au for 5.24 Moz of contained gold, comprising: Australian Operations: g/t Au for 2.13 Moz of contained gold Pacific Operations: g/t Au for 3.11 Moz of contained gold Total Mineral Resources are estimated at: g/t Au for Moz of contained gold, comprising: Australian Operations: g/t Au for 4.91 Moz of contained gold Pacific Operations: g/t Au for 8.31 Moz of contained gold The 30 June 2013 Ore Reserves and Mineral Resources Statements are attached. Tim Lehany Managing Director and CEO St Barbara Limited Ore Reserves and Mineral Resources Statements 30 June 2013 Page 1 of 8 St Barbara Limited Level 10, 432 St Kilda Road, Melbourne VIC 3004 T F ACN Locked Bag 9, Collins Street East, Melbourne VIC 8003 W

2 Mineral Resources Statement as at 30 June 2013 The Company's total Measured, Indicated and Inferred Mineral Resources as at 30 June 2013 are million tonnes 1.5 grams per tonne of gold (g/t Au) containing million ounces of gold (Moz) (refer Table 1). The previous publicly reported estimate of Mineral Resources was g/t Au containing 7.61 Moz of gold as at 30 June The increase in the Company s Mineral Resource Inventory is primarily due to the inclusion of the and Gold Ridge resources for the first time following the acquisition of Allied Gold Mining Plc (Allied Gold) in September During the 2013 financial year the Company finalised the sale of the Southern Cross Operations and reviewed a number of non-operational projects in the Leonora tenements that, along with depletion through mining at Gwalia and King of the Hills Mines, resulted in a reduction of the Mineral Resource inventory of 3.11 Moz of gold. Resource additions were realised through: revision of the geological models for King of the Hills Mine and the Kailis project; revision of the Tower Hill deposit s cut-off grade; and addition of the and Gold Ridge Mineral Resources subsequent to the acquisition of Allied Gold. These changes resulted in resource additions of 8.69 Moz of gold, illustrated in Figure 1. Figure 1: Major sources of variance to Mineral Resource Inventory between FY12 and FY13 koz 14,000 +2,062 13,215 12,000 +5,031 10,000 8,000 7,613 6, ,215 4,000-2,405 2,000 0 June 2012 Mining Depletion (Leonora) Leonora Review Sthn Cross Sale Koth Geology Revision Tower Hill Cut-Off Grade Change Kailis Oxide Sulphide Gold Ridge June 2013 St Barbara Limited Ore Reserves and Mineral Resources Statements 30 June 2013 Page 2 of 8

3 Mineral Resource Depletion (Leonora) - A total of 210 thousand ounces (koz) of gold has been depleted from the Company's Resources, 155 koz from Gwalia and 55 koz from King of the Hills. The total includes resource additions resulting from grade control and resource definition drilling. Leonora Review The Gwalia Intermediates (resource within the Gwalia Mine), Harbour Lights, McGraths, Rainbow and Royal Arthur Bore projects are legacy Mineral Resources that have been carried since the Company acquired the Sons of Gwalia gold assets in These projects were reviewed over the year, as part of the Company s Leonora Province Plan, which aimed to identify deposits that could provide mill feed to Gwalia in the eventuality King of the Hills Mine ceases production. Resources for Gwalia Mine West Lode and stockpiles at Tarmoola and Tower Hill were also reviewed. This review has resulted in the removal of 477 koz from the mineral inventory, due either to low grade, lack of treatment options or high risk, high cost and low recovery mining options. Southern Cross Sale - A total of 2.41 Moz of gold have been depleted from the Company s mineral inventory following the sale of the Southern Cross Operation, completed in April Gwalia The Gwalia resource has reduced by 147 koz overall with small resource additions to the South West Branch and Main Lode helping to offset mining depletion of 155 koz. King of the Hills Mine Geology Review Underground mapping, a review of the local structural geology and infill drilling has resulted in the revision of the controls on high grade mineralisation at King of the Hills. Previous models have interpreted the orientation of high grade lodes to follow the granite contact as it plunged to the north-west. However, recent work has shown that lodes have a shallow south-west dipping orientation. The revised geological model has resulted in additional 84 koz of gold. Tower Hill deposit cut-off grade change - The Tower Hill Mineral Resource was reported at cut-off grade of 3.2 g/t Au in the 2012 statement. This cut-off grade has been be dropped to 2.5 g/t Au which is in line with reporting for the Gwalia Mineral Resource estimate. This has resulted in the addition of 188 koz of gold. Kailis Project - The Kailis geological model and Mineral Resource estimate has been revised this year following on from a structural study of the Leonora region and has added approximately 114 koz. Mine Oxide - The Oxide Mineral Resource is reported for the first time as part of the Company s mineral inventory and contributes 1.22 Moz of gold. Sulphide - The Sulphide Mineral Resource is reported for the first time as part of the Company s mineral inventory and contributes 5.03 Moz of gold Gold Ridge Mine - The Gold Ridge Mineral Resource is reported for the first time as part of the Company s mineral inventory and contributes 2.06 Moz of gold. St Barbara Limited Ore Reserves and Mineral Resources Statements 30 June 2013 Page 3 of 8

4 ASX Release / 22 August 2013 Table 1: Mineral Resource Summary June 2013 Category Measured Indicated Inferred Total Region Project Tonnes (k) Au g/t k oz Tonnes (k) Au g/t k oz Tonnes (k) Au g/t k oz Tonnes (k) Au g/t k oz Leonora Gwalia Deeps 5, ,088 7, ,362 1, , ,791 King of the Hills , , Tower Hill , , Kailis , , Total Leonora 5, ,088 14, ,335 2, , ,907 Oxide Bekou (Oxide) Botlu (Oxide) , , Pigibo (Oxide) , , Pigiput (Oxide) 4, , , , Pigicow (Oxide) Samat (Oxide) , , Sorowar(Oxide) 4, , , , Total Oxide 9, , , , ,215 Sulphide Bekou (Sulphide) Botlu ( Sulphide) , , , Pigibo (Sulphide) , , , Pigiput (Sulphide) , ,784 24, , ,515 Pigicow(Sulphide) , , Samat (Sulphide) , , , Sorowar(Sulphide) 2, , , , Total Sulphide 2, , ,719 76, , , ,031 Gold Ridge Valehaichichi 1, , , , Namachamata , Kupers 3, , , , Dawsons 1, , , , Total Gold Ridge 5, , ,273 14, , ,062 Total All Areas 23, , , , , , , ,215 St Barbara Limited Ore Reserves and Mineral Resources Statements 30 June 2013 Page 4 of 8

5 ASX Release / 22 August 2013 Notes to Table 1: 1. Mineral Resources are reported inclusive of Ore Reserves. 2. Cut-off Grades Leonora: Gwalia Deeps (2.5 g/t Au), King of The Hills (3.0 g/t Au), Tower Hill (2.5 g/t Au), Kailis (0.8 g/t Au). 3. Cut-off Grade Oxide (0.3 g/t Au). 4. Cut-off Grade Sulphide (0.5 g/t Au). 5. Cut-off Grade Gold Ridge (0.5 g/t Au). 6. Details relating to each of the estimates are contained in the St Barbara Ltd Annual Mineral Resource Report which is available at 7. Data is rounded to thousands of tonnes and thousands of ounces. Discrepancies in totals may occur due to rounding. Competent Persons Statement The information in this report that relates to Mineral Resources is based on information compiled by Mr Phillip Uttley, who is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Uttley is a full-time employee of St Barbara Ltd and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Uttley consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The Competent Persons who have completed work on each of the mines or deposits are as follows: Gwalia and King of the Hills Mines Mr Robert Love (FAusIMM) Kailis and Tower Hill Deposits Ms Jane Bateman (MAusIMM) Mine Mr Jacek Drzymulski (MAusIMM) Gold Ridge Mine Mr Kevin Crossling (MAusIMM) St Barbara Limited Ore Reserves and Mineral Resources Statements 30 June 2013 Page 5 of 8

6 Ore Reserves Statement as at 30 June 2013 As at 30 June 2013, the Company s Proved and Probable Ore Reserves are estimated to be million tonnes (Mt) at 2.1 grams per tonne of gold (g/t Au) containing 5.24 million ounces (Moz) (refer Table 2). The previously reported Reserve in 2012 was g/t Au for 2.53 Moz of contained gold. Ore Reserves are located at Gwalia, King of the Hills, Tower Hill, and Gold Ridge. This represents a net increase of 2.71 Moz over the June 2012 estimate. The acquisition of Allied Gold has significantly rescaled and reshaped the reportable Reserve through the addition of large tonnage low grade open pit reserves. This is the first time these Reserves have been reported by St Barbara. The sale of Southern Cross Operations was completed in April 2013, after the operations were placed on care and maintenance in December Southern Cross Operations produced 1.08 Moz between 2005 and 2012 under St Barbara ownership. Key events influencing the 2013 estimate are as follows: A gold price of $A1,250 per ounce has been used for all projects and operations. This is consistent with last year s price estimate and peer producers. Leonora has total Reserves depletion of 279 koz, comprising 249 koz depletion from mining activities, and a net 30 koz depletion from design and interpretation changes at King of Hills, Tower Hill and Gwalia. Southern Cross depletion from mining activities was 36 koz, inclusive of 6 koz for unclassified material. Reserves at sale were 90 koz, resulting in a net depletion of 120 koz. Oxides have been added to Company s Reserves and are estimated to have a Proved and Probable Reserve of 756 koz. Oxides were estimated using current operating parameters, with an updated Life of Mine plan. Sulphides are estimated to have a Proved and Probable Reserve of 1.55 Moz. This estimate is based on a Pre-Feasibility Study (PFS) completed by Allied Gold prior to acquisition. An updated Life of Mine Plan has been completed to support the study using existing operating parameters. Gold Ridge has been added to the Company s Reserves and has an estimated 905 koz of Proved and Probable Reserves. Dawson s deposit holds the majority of Reserves and is scheduled for development in FY14. Reserve depletion and addition are illustrated in Figure 2. Figure 2: Major variances to Ore Reserves between FY12 and FY13 koz 5,500 5, ,238 4,500 +1,449 4,000 3,500 3, ,500 2, , ,500 Jun-12 Gwalia Mining Depletion Gwalia Changes* KoTH Mining Depletion KoTH Changes* Tower HillSthn CrossSthn CrossSthn Cross Changes* Mining Depletion Changes* Sale Oxide Sulphide Gold Ridge Jun-13 * Changes include Geology, Design and Factor Changes St Barbara Limited Ore Reserves and Mineral Resources Statements 30 June 2013 Page 6 of 8

7 Table 2: June 2013 Ore Reserve Summary Category Proved Probable Total Region Project Kt Au g/t Koz Kt Au g/t Koz Kt Au g/t koz Leonora Southern Cross Gwalia Deeps 1, , ,330 6, ,754 Tower Hill 2, , King of the Hills Total Leonora 1, , ,704 9, ,128 Sorowar 4, , , Pigiput 3, , ,174 27, ,262 Pigibo , , Samat , , Botlu , , Pigicow Bekou Stockpiles Total 9, , ,929 50, ,205 Gold Ridge Dawsons , , Kupers 2, , , Valehaichichi , , Namachamata Stockpiles Total Gold Ridge 3, , , Total All Areas 14, , ,348 77, ,238 St Barbara Limited Ore Reserves and Mineral Resources Statements 30 June 2013 Page 7 of 8

8 Notes to Table 2: 1. Reserves based on a gold price of A$1,250/oz for Gwalia, King of the Hills,, Gold Ridge and Tower Hill. 2. Resources are reported as inclusive of Reserves. 3. All data is rounded to two significant figures. Discrepancies in summations will occur due to rounding. 4. Details relating to each of the estimates are available as short form reports at Competent Persons Statement The Ore Reserves have been estimated and complied under the direction of Mr John de Vries. Mr de Vries is a Member of The Australasian Institute of Mining and Metallurgy and a full time employee of St Barbara Limited. Mr de Vries has sufficient experience relevant to the style of mineralisation, type of deposit under considerations and for the activity being undertaken to qualify as a Competent Person as defined by the 2012 edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore reserves'. Mr de Vries consents to the inclusion in the report of the matters based on their information in the form and context in which it appears. St Barbara Limited Ore Reserves and Mineral Resources Statements 30 June 2013 Page 8 of 8

Prominent Hill 2011 Annual Mineral Resource and Ore Reserve Statement

Prominent Hill 2011 Annual Mineral Resource and Ore Reserve Statement 16 DECEMBER 2011 ASX Release Prominent Hill 2011 Annual Mineral Resource and Ore Reserve Statement OZ Minerals has today released its annual Prominent Hill Mineral Resource and Ore Reserve Statement for

More information

ASX Release Prominent Hill 2012 Annual Mineral Resources and Ore Reserves Statement

ASX Release Prominent Hill 2012 Annual Mineral Resources and Ore Reserves Statement 21 JANUARY 2013 ASX Release Prominent Hill 2012 Annual Mineral Resources and Ore Reserves Statement OZ Minerals has today released its annual Prominent Hill Mineral Resources and Ore Reserves Statement

More information

Saracen Mineral Holdings Limited ACN

Saracen Mineral Holdings Limited ACN Saracen Mineral Holdings Limited ACN 009 215 347 ASX Release 25 September 2012 2012 Mineral Resources and Ore Reserves Corporate Details: As at 30 June 2012 ASX codes: Ordinary shares: SAR 30 June 2013

More information

SARACEN MINERAL HOLDINGS LTD

SARACEN MINERAL HOLDINGS LTD Saracen Mineral Holdings Limited Australian Gold Producer ASX:SAR SARACEN MINERAL HOLDINGS LTD Guido Staltari, Executive Chairman Raleigh Finlayson, Chief Operating Officer Diggers n Dealers Conference

More information

2016 Mineral Resource Tritton Tenement Package

2016 Mineral Resource Tritton Tenement Package 2016 Mineral Resource Tritton Tenement Package Tritton Underground Measured 3,850 1.9 73 2,750 2.1 59 Indicated 4,940 1.2 61 4,140 1.6 66 Total M + I 8,790 1.5 133 6,890 1.8 125 Inferred 1,960 1.2 24 3,140

More information

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES July 25 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES The Process

More information

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET May 30 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET First Gold poured from Dalgaranga

More information

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE Monday, 12 May 2014 QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE Hillgrove Resources Limited (ASX: HGO) is pleased to report further consolidation of production at its Kanmantoo

More information

2018 Resources and Reserves

2018 Resources and Reserves 2018 Resources and Reserves Aeris Resources Limited has updated its Mineral Resource and Ore Reserves estimates for its Tritton Copper Operations as at 30 June 2018. reported Measured and Indicated Mineral

More information

For personal use only

For personal use only 12 July 2011 ASX RELEASE (ASX: SRQ) Exploration and resource update of the Mt Muro epithermal gold and silver project Resources Limited (SRQ) is pleased to present the following exploration update on the

More information

Thalanga Operations Ore Reserve and Mineral Resource Statement

Thalanga Operations Ore Reserve and Mineral Resource Statement Thalanga Operations Ore Reserve and Mineral Resource Statement Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq. (%) West 45 (1) Proved 101 0.3 2.0 4.6 0.3 38 8.4 Probable

More information

For personal use only

For personal use only Bulletin Resources is the 100% owner of the Nicolson s Gold Project located near Halls Creek in the Kimberley region of Western Australia. The project has a combined open pit and underground Mineral Resource

More information

ASX : BLK. Australian gold producer with exceptional growth opportunity

ASX : BLK. Australian gold producer with exceptional growth opportunity ASX : BLK Australian gold producer with exceptional growth opportunity AMEC Conference Perth June 2017 The information contained in the report that relates to ore reserves at the Matilda Gold Project is

More information

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces ABN 28 009 174 761 31 March 2011 Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 www.regisresources.com Level 1 1 Alvan

More information

2014 MINERAL RESOURCES AND ORE RESERVES

2014 MINERAL RESOURCES AND ORE RESERVES 9 October 2014 ASX & MEDIA RELEASE 2014 MINERAL RESOURCES AND ORE RESERVES The Directors of Saracen Mineral Holdings Limited (ASX: SAR) ( Saracen or the Company ), are pleased to advise the updated Mineral

More information

For personal use only

For personal use only Saracen Mineral Holdings Limited Australian Gold Producer ASX:SAR SARACEN MINERAL HOLDINGS LTD Guido Staltari, Executive Chairman Raleigh Finlayson, Chief Operating Officer Denver Gold Forum Denver, CO

More information

SARACEN MINERAL HOLDINGS LTD

SARACEN MINERAL HOLDINGS LTD Saracen Mineral Holdings Limited Australian Gold Producer ASX:SAR SARACEN MINERAL HOLDINGS LTD Guido Staltari, Executive Chairman Raleigh Finlayson, Chief Operating Officer Denver Gold Forum Denver, CO

More information

For personal use only

For personal use only ACN 097 088 689 01 DEFINITIVE FEASIBILITY STUDY SUPPORTS A MAJOR EXPANSION OF THE SYAMA GOLD MINE Definitive Feasibility Study completed for multifaceted expansion of Syama operation confirms its technical

More information

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserves Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq.

More information

DALGARANGA PRE-FEASIBILITY UPDATE

DALGARANGA PRE-FEASIBILITY UPDATE January 19th, 2016 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA PRE-FEASIBILITY UPDATE PFS Pit optimisations indicate a production target far larger than anticipated

More information

For personal use only

For personal use only January 19th, 2016 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA PRE-FEASIBILITY UPDATE PFS Pit optimisations indicate a production target far larger than anticipated

More information

Gruyere Project - Updated Mine Plan

Gruyere Project - Updated Mine Plan ASX Announcement 6 December 2018 Gruyere Project - Updated Mine Plan CONTACT DETAILS Highlights Gruyere confirmed as a global Tier 1 gold mine 1 with a long life and forecast high margins Life of mine

More information

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 12 NOVEMBER 2018 Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 Prominent Hill underground Ore Reserve increased to 40Mt @ 1.7% copper equivalent i with a 50% increase in Proved

More information

Maiden Ore Reserve for Camel Creek JV

Maiden Ore Reserve for Camel Creek JV 10 September 2013 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN 85 003 257 556 Maiden Ore Reserve for Camel

More information

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD November 3 rd 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD Construction work at Gascoyne s 100%

More information

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project ASX ANNOUNCEMENT 16th October 2015 Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project Hot Chili and its partner in the Productora Project, Compañía Minera del Pacífico S.A. (CMP)

More information

Pilbara Gold Project, Western Australia Open Pit Development Opportunity Scoping Study nearing completion. ASX Code : DEG May 2017 Andy Beckwith

Pilbara Gold Project, Western Australia Open Pit Development Opportunity Scoping Study nearing completion. ASX Code : DEG May 2017 Andy Beckwith Pilbara Gold Project, Western Australia Open Pit Development Opportunity Scoping Study nearing completion ASX Code : DEG May 2017 Andy Beckwith De Grey Corporate Snapshot ASX: DEG De Grey Ordinary Shares

More information

Second drill rig to accelerate major drilling program at Productora

Second drill rig to accelerate major drilling program at Productora DRAFT ASX ANNOUNCEMENT Thursday 11th September 2014 Second drill rig to accelerate major drilling program at Productora Expanded resource-reserve base will underpin completion of Productora Pre-feasibility

More information

Kingsgate 2012 Mineral Resources & Ore Reserves

Kingsgate 2012 Mineral Resources & Ore Reserves 16 October 2012 Via ASX Online Manager Company Announcements Office Australian Securities Exchange Kingsgate 2012 Mineral Resources & Ore Reserves Kingsgate Consolidated Limited (ASX: KCN) increased its

More information

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE December 24 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE Dalgaranga Operational Update: The project remains Lost

More information

For personal use only

For personal use only December 24 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE Dalgaranga Operational Update: The project remains Lost

More information

For personal use only

For personal use only 21 November 2011 Kentor Gold (ASX: KGL) is an Australian-based, emerging midadvanced tier gold company with projects in Australia and the Kyrgyz Republic. Formed in 1998 and listed on the ASX in 2005,

More information

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD December 8 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD Construction at Gascoyne s

More information

Australia's Newest Gold Producer

Australia's Newest Gold Producer ASX : BLK Australia's Newest Gold Producer AGM 25 November 2016 Australia s Newest Gold Producer Gold production commenced in Oct 2016 at 5.1Moz Matilda/Wiluna Gold Operation 5.1Moz resource, 4 large gold

More information

DALGARANGA GOLD PROJECT CONSTRUCTION & OPERATIONAL UPDATE 2 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT CONSTRUCTION & OPERATIONAL UPDATE 2 MONTHS TO FIRST GOLD March 19 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT CONSTRUCTION & OPERATIONAL UPDATE 2 MONTHS TO FIRST GOLD Process plant construction

More information

Gold Producer and Developer Corporate Presentation September 2015

Gold Producer and Developer Corporate Presentation September 2015 Kingsgate Consolidated Limited Gold Producer and Developer Corporate Presentation September 2015 Disclaimer Forward Looking Statements: These materials include forward looking statements. Forward looking

More information

Gold in 8 months Australia s next ~200Koz pa gold producer

Gold in 8 months Australia s next ~200Koz pa gold producer Gold in 8 months Australia s next ~200Koz pa gold producer Diggers & Dealers Site Visit Mt Morgans Gold Project August 6, 2017 Important Notice & Disclaimer The purpose of this presentation is to provide

More information

For personal use only

For personal use only 25 January 2013 EXCELLENT RECOVERIES IN HEAP LEACH TESTS AT MELROSE PROJECT HIGHLIGHTS Excellent gold recoveries in column leach tests with 94%+ Au extracted after 32 days of leaching from Bungarra deposit

More information

For personal use only

For personal use only ASX Announcement 19 December 2014 BOARD OF DIRECTORS Paul Murphy (Non-Executive Chairman) Bryan Dixon (Managing Director) Alan Thom (Executive Director) Greg Miles (Non-Executive Director) ASX CODE BLK

More information

FIRST GOLD ORE DISPATCHED FROM ULYSSES

FIRST GOLD ORE DISPATCHED FROM ULYSSES Genesis Minerals Limited (ASX: GMD) ASX Announcement 14 November 2016 FIRST GOLD ORE DISPATCHED FROM ULYSSES Genesis poised for first cash-flow as first parcel of ore departs for Paddington gold plant

More information

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE 28 December 2011 BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE Highlights The Ore Reserve has been established and a new Life of Mine plan for Southern Operations has been developed with economic

More information

SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE

SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE Wednesday, 20 February 2013 SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE The Kanmantoo Copper Mine s Indicative Life of Mine (LOM) anticipated to extend to

More information

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months ASX ANNOUNCEMENT Wednesday 18 th May 2016 CMP to Purchase Additional Stake in Productora for US$1.5 Million Sprott Loan to be Reduced and Extended by 12 Months Hot Chili Limited (ASX Code: HCH) is pleased

More information

Great Western Scoping Study Update & Onsite Gold Processing

Great Western Scoping Study Update & Onsite Gold Processing ASX RELEASE 10 August 2017 ABN: 45 116 153 514 ASX: TMX Great Western Scoping Study Update & Onsite Gold Processing Terrain Minerals Limited (ASX: TMX) is pleased to provide the following update on its

More information

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai PANAUST LIMITED ABN 17 011 065 160 Level 1, 15 James Street, Fortitude Valley, Brisbane QLD 4006 Australia PO Box 2297, Fortitude Valley Business Centre QLD 4006 T: +61 (0)7 3117 2000 F: +61 (0)7 3846

More information

DALGARANGA GOLD PROJECT DEVELOPMENT UPDATE

DALGARANGA GOLD PROJECT DEVELOPMENT UPDATE August 7 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT DEVELOPMENT UPDATE Credit approved commitment letters received from a number of tier

More information

For personal use only

For personal use only 2 May 2018 ASX Announcement METALLURGICAL TESTWORK CONFIRMS WILUNA TRANSITIONAL RESERVES AMENABLE TO PROCESSING THROUGH THE EXISTING WILUNA CIL PLANT Highlights Expansion PFS published in Aug 17 includes

More information

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES 7 November 2008 UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES Highlights Broken Hill Ore Reserves increase life of mine to 9 years at conservative price assumptions Substantial Resource base

More information

MINING COMMENCES AT KONONGO GOLD PROJECT

MINING COMMENCES AT KONONGO GOLD PROJECT ASX Release Monday 28 th March 2011 MINING COMMENCES AT KONONGO GOLD PROJECT Signature Metals Limited is pleased to announce that it has commenced mining at the Konongo Gold Project. SIGNATURE METALS LIMITED

More information

For personal use only REGIS RESOURCES LTD JUNE 2016 QUARTERLY REPORT & EXPLORATION UPDATE

For personal use only REGIS RESOURCES LTD JUNE 2016 QUARTERLY REPORT & EXPLORATION UPDATE 1 REGIS RESOURCES LTD JUNE 2016 QUARTERLY REPORT & EXPLORATION UPDATE DISCLAIMER & COMPETENT PERSONS STATEMENT 2 This presentation contains only a brief overview of Regis Resources Limited and its associated

More information

SOUTHERNGOLD COMPELLING VALUE IN A UNIQUE GOLD EXPLORER AND PRODUCER. ASX Ticker: SAU

SOUTHERNGOLD COMPELLING VALUE IN A UNIQUE GOLD EXPLORER AND PRODUCER. ASX Ticker: SAU SOUTHERNGOLD COMPELLING VALUE IN A UNIQUE GOLD EXPLORER AND PRODUCER Gubong Gold Project, South Korea, Isometric View of Historic Underground Workings and Access Points ASX Ticker: SAU Disclaimer Forward-looking

More information

Malachite Resources AGM. November For personal use only. Malachite Resources Limited

Malachite Resources AGM. November For personal use only. Malachite Resources Limited Malachite Resources AGM November 2013 1 Malachite Resources Limited Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk

More information

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016 QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016 Hillgrove Resources Limited (ASX: HGO) reports for the quarter ended 31 March 2016 HIGHLIGHTS While conditions remain

More information

Cowal Drilling revolution. CWEDG 18 August 2016 Joe Booth Geology Superintendent- Cowal

Cowal Drilling revolution. CWEDG 18 August 2016 Joe Booth Geology Superintendent- Cowal Cowal Drilling revolution CWEDG 18 August 2016 Joe Booth Geology Superintendent- Cowal Site summary Residential workforce Workforce: 264 employees and 91 contractors Shift roster: 7:7 Mining commenced

More information

SPECTACULAR DRILL RESULTS EXTEND HIGH GRADE RESOURCE AT DUCKHEAD PROSPECT, BRAZIL

SPECTACULAR DRILL RESULTS EXTEND HIGH GRADE RESOURCE AT DUCKHEAD PROSPECT, BRAZIL ASX ANNOUNCEMENT 24 August 2012 ASX Code: BDR SPECTACULAR DRILL RESULTS EXTEND HIGH GRADE RESOURCE AT DUCKHEAD PROSPECT, BRAZIL 10 m @ 70.9 g/t gold (incl. 5 m @ 139.1 g/t gold) 15 m @ 31.6 g/t gold (incl.

More information

For personal use only

For personal use only 7 August 2012 ASX: PAN Gidgee Gold Project Scoping Study Key Highlights Gold Production estimated at 606,000oz of gold over an initial seven years, average annual production of 87,000oz Operating Cash

More information

For personal use only

For personal use only ACN 092 471 513 QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2018 HIGHLIGHTS PENNY S FIND GOLD MINE KALGOORLIE (WA) 25,771 dry tonnes of ore processed at an average head grade of 6.55g/t Au 5,061 ounces

More information

30 January 2012 AIM: AR. Archipelago Resources plc ( Archipelago or the Company ) Updated resource and reserve estimates for Archipelago

30 January 2012 AIM: AR. Archipelago Resources plc ( Archipelago or the Company ) Updated resource and reserve estimates for Archipelago 30 January 2012 AIM: AR. Archipelago Resources plc ( Archipelago or the Company ) Updated resource and reserve estimates for Archipelago Archipelago is pleased to announce a material increase in mineral

More information

For personal use only

For personal use only 28 November 2017 Corporate Details Ordinary Shares: 780,917,069 Market Capitalisation: ~$156 million Cash and bullion at 30 September 2017: ~$20.1 million Debt: NIL ASX Code: MOY Board of Directors Greg

More information

Drilling indicates strike continuity of gold-silver mineralisation at the Ban Houayxai deposit, Laos

Drilling indicates strike continuity of gold-silver mineralisation at the Ban Houayxai deposit, Laos ASX ANNOUNCEMENT 15 June 2007 ACN 011 065 160 ABN 17 011 065 160 Level 2, 99 Melbourne St PO Box 3468, South Brisbane, Qld 4101 Telephone (07) 3846 1811 Facsimile (07) 3846 4899 Drilling indicates strike

More information

Molybdenum- The New Battery Metal 2018

Molybdenum- The New Battery Metal 2018 Molybdenum- The New Battery Metal 2018 Why Hammer Why Molybdenum? 2018 Molybdenum has been one of the best price performing metals traded on the London Metals Exchange (LME) up 62.5% in the first 4 months

More information

ASX ANNOUNCEMENT. MacPhersons Nimbus Silver Target up to 6 Million Ounces. Highlights. ASX Code: MRP. Contact Details

ASX ANNOUNCEMENT. MacPhersons Nimbus Silver Target up to 6 Million Ounces. Highlights. ASX Code: MRP. Contact Details ASX Code: MRP Contact Details PO Box 10977 109 Maritana Street Kalgoorlie WA 6430 T +61 (0) 8 9091 7515 F +61 (0) 8 9091 7610 E info@macphersonsreward.com.au ABN 98 139 357 967 ASX ANNOUNCEMENT 28 July

More information

Positioned for Production

Positioned for Production Positioned for Production August 2015 ACN 130 955 725 Disclaimer This presentation is provided on the basis that neither the Company nor its representatives make any warranty (express or implied) as to

More information

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum ASX ANNOUNCEMENT 29 March 2010 Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum PanAust is pleased to announce that the Board of Directors

More information

Ravenswood Expansion Project Update

Ravenswood Expansion Project Update 11 July 2018 Ravenswood Expansion Project Update Highlights AISC down, mine life extended, all required approvals received Significant enhancements have been made to Ravenswood Expansion Project All required

More information

For personal use only

For personal use only High-grade gold intercepts from multiple holes in Borborema infill drilling program All 11 recent diamond and 35 RC holes hit ore-grade, in wide intersections Best intercepts include: - - Drilling at the

More information

ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington

ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington ASX Code: WRM Issued Securities Shares: 441.3 million Options: 100.5 million

More information

Krasny project JORC resources update: oz of gold at 1,200 USD/oz gold price

Krasny project JORC resources update: oz of gold at 1,200 USD/oz gold price Kopy Goldfields AB (publ) Press release 11/2016 Stockholm, May 26, 2016 Krasny project JORC resources update: 955 000 oz of gold at 1,200 USD/oz gold price Kopy Goldfields AB (publ) ( Kopy Goldfields or

More information

For personal use only

For personal use only ASX Announcement Arafura Extends Nolans Mine Life To Beyond Thirty Years 2 September 217 Two-thirds of Measured and Indicated Resources inventory identified as NdPr-bearing phosphate-rich material types

More information

Quarterly Report for Shareholders Period Ending 30 September 2010

Quarterly Report for Shareholders Period Ending 30 September 2010 Quarterly Report for Shareholders Period Ending 30 September 2010 ASX Code: BDR Directors: Craig Readhead Mike Donaldson Jim Jewell Peter Bowler Robert Watkins Greg Barrett Corporate Details: Non-Exec.

More information

For personal use only. Australian gold producer with exceptional growth opportunity

For personal use only. Australian gold producer with exceptional growth opportunity Australian gold producer with exceptional growth opportunity ASX : BLK 121 Conference Kong Kong Mar 2017 1 Gold producer with exceptional growth opportunity Matilda Gold production commenced in Oct 2016

More information

Australian gold producer with exceptional growth opportunity

Australian gold producer with exceptional growth opportunity Australian gold producer with exceptional growth opportunity ASX : BLK 121 Conference Kong Kong Mar 2017 1 Gold producer with exceptional growth opportunity Matilda Gold production commenced in Oct 2016

More information

Australia s leading explorer in Mexico

Australia s leading explorer in Mexico Australia s leading explorer in Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director & CEO VRIC January 2017 Corporate Overview KEY STATISTICS ASX Code Share Price AZS

More information

ASX Announcement. June 2012 Resources and Reserves Statement. 25 September 2012

ASX Announcement. June 2012 Resources and Reserves Statement. 25 September 2012 ASX Announcement 25 September 2012 ABN: 74 084 669 036 Registered Office P +61 2 9696 2900 F +61 2 9696 2901 Level 28 175 Liverpool Street Sydney NSW 2022 www.evolutionmining.com.au June 2012 Resources

More information

For personal use only

For personal use only ASX Release 20 March 2012 PANTON REVIEW STUDY RESULTS (ASX:PLA) is pleased to advise that the results from the recently completed Panton Review Study ( PRS ) showed that the Project could achieve and Internal

More information

ASX ANNOUNCEMENT 12 MAY 2016

ASX ANNOUNCEMENT 12 MAY 2016 ASX ANNOUNCEMENT 12 MAY 2016 FÄBOLIDEN METALLURGICAL TEST WORK IMPROVES RECOVERY LEVELS Dragon Mining Limited (ASX:DRA) ( Dragon Mining or the Company ) is pleased to announce that the second phase of

More information

TEMBANG PROJECT OPTIMISATION

TEMBANG PROJECT OPTIMISATION ASX ANNOUNCEMENT 16 April 2012 (13 pages by email) TEMBANG PROJECT OPTIMISATION Sumatra Copper & Gold plc ('Sumatra' or 'the Company') is pleased to confirm Optimisation Studies for its wholly-owned Tembang

More information

For personal use only

For personal use only ASX RELEASE Sorby Hills Silver Lead Project Major Milestone Achieved with Environmental Approval As announced on 3 April, the WA Minister for Environment has approved the development of the Sorby Hills

More information

Ramelius Resources Limited

Ramelius Resources Limited Ramelius Resources Limited (ASX:RMS) Mark Zeptner - Managing Director Investor Presentation February 2017 Qualification Forward Looking Statements This presentation contains certain forward looking statements

More information

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study Chalice Gold Mines Limited ABN 47 116 648 956 30 October 2009 Highlights Scoping Study finds Koka deposit at the Zara Project in Eritrea

More information

For personal use only

For personal use only Malachite Resources Limited ABN 86 075 613 268 ASX Announcement ASX Code: MAR 12 March 2012 LORENA GOLD PROJECT - UPDATE Summary Malachite s commitment to establish a gold mining and production plant at

More information

JORC RESOURCE AT KONONGO INCREASED TO 1.47 MILLION OUNCES OF CONTAINED GOLD

JORC RESOURCE AT KONONGO INCREASED TO 1.47 MILLION OUNCES OF CONTAINED GOLD ASX Release Wednesday 10 November 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill Oliver (Managing Director) E-mail:

More information

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au

More information

ASX ANNOUNCEMENT 28 July 2011 ASX Code: BDR EXCEPTIONAL GOLD AND IRON ORE RESULTS - TUCANO

ASX ANNOUNCEMENT 28 July 2011 ASX Code: BDR EXCEPTIONAL GOLD AND IRON ORE RESULTS - TUCANO ASX ANNOUNCEMENT 8 July 011 ASX Code: BDR EXCEPTIONAL GOLD AND IRON ORE RESULTS - TUCANO 10 m @ 0 g/t gold in RC grade control Tapereba AB1 m @ 14.0 g/t gold from Tapereba Sul 1. m @ 8. g/t gold from Tapereba

More information

JORC RESOURCE FOR OLD KONONGO TAILINGS DAM

JORC RESOURCE FOR OLD KONONGO TAILINGS DAM ASX Release Friday 5 March 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 JORC RESOURCE FOR OLD KONONGO TAILINGS DAM The Company

More information

Kingsgate Consolidated Limited

Kingsgate Consolidated Limited Kingsgate Consolidated Limited Gold producer and developer Diggers & Dealers Presentation August 2015 Disclaimer Forward Looking Statements: These materials include forward looking statements. Forward

More information

FURTHER HIGH GRADE RESULTS FROM RC DRILLING

FURTHER HIGH GRADE RESULTS FROM RC DRILLING ASX Release Friday 21 May 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 FURTHER HIGH GRADE RESULTS FROM RC DRILLING Signature

More information

For personal use only

For personal use only 25 May 2012 AMENDED PERKOA JOINT VENTURE PROJECT MINERAL RESOURCE UPGRADE Please find attached an amended version of the Perkoa Joint Venture Project Mineral Resource Upgrade announcement released yesterday.

More information

Nearing Steady State Operations

Nearing Steady State Operations Nearing Steady State Operations Rohan Williams, Executive Chairman & CEO A$200M project construction completed on time and on budget Increasing production in FY19 to +200Koz pa, targeting ~A$1,000/oz for

More information

AVALON SIGNS HOA WITH HANNANS TO ACQUIRE DISCOVERY ZONE COPPER-IRON DEPOSIT FOR A$4M

AVALON SIGNS HOA WITH HANNANS TO ACQUIRE DISCOVERY ZONE COPPER-IRON DEPOSIT FOR A$4M 6 May 2013 AVALON SIGNS HOA WITH HANNANS TO ACQUIRE DISCOVERY ZONE COPPER-IRON DEPOSIT FOR A$4M Highlights Following continued negotiations Avalon and Hannans have signed a Heads of Agreement for Avalon

More information

ASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold

ASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold ASX ANNOUNCEMENT 2 February 2013 ASX Code: BDR MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 58,000 tonnes @ 3.8 g/t for 71,000 oz gold MAIDEN DUCKHEAD HANGINGWALL STARTER PIT RESERVE 272,000 tonnes @ 3.2

More information

Hot Chili Commences Scoping Study on Productora Copper Project, Chile

Hot Chili Commences Scoping Study on Productora Copper Project, Chile ASX ANNOUNCEMENT Thursday 12th January 2012 Hot Chili Commences Scoping Study on Productora Copper Project, Chile Leading engineering and project development group AUSENCO appointed to undertake study

More information

For personal use only

For personal use only ASX Code: MRP MacPhersons Resources Ltd ABN 98 139 357 967 ACN 139 357 967 Contact Details PO Box 10977 109 Maritana Street Kalgoorlie WA 6430 T +61 (0) 8 9091 7515 F +61 (0) 8 9091 7610 E info@mrpresources.com.au

More information

AN EXCITING PLAYER IN AUSTRALIAN BASE METALS. Annual General Meeting 21 st October 2016

AN EXCITING PLAYER IN AUSTRALIAN BASE METALS. Annual General Meeting 21 st October 2016 AN EXCITING PLAYER IN AUSTRALIAN BASE METALS Annual General Meeting 21 st October 2016 2 IMPORTANT INFORMATION This document has been prepared by Aeon Metals Limited (Aeon) for the purpose of providing

More information

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 11 May 2010 The Manager Company Announcements Platform Australian Securities Exchange

More information

For personal use only

For personal use only Operations Improving, Continued Exploration Success July 2016 Picture taken from Monkey Hill looking north Disclaimer Forward Looking Statements These materials include forward looking statements. Forward

More information

Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results

Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results 31 January 2007 ASX ANNOUNCEMENT. Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results The Company is pleased to announce results of infill drilling at the Mt Thirsty Cobalt Nickel Project, strategically

More information

Australian gold producer with exceptional growth opportunity Jan 2017 ASX : BLK

Australian gold producer with exceptional growth opportunity Jan 2017 ASX : BLK Australian gold producer with exceptional growth opportunity Jan 2017 ASX : BLK 1 Gold producer with exceptional growth opportunity Matilda Gold production commenced in Oct 2016 Expect production of 60-70koz

More information

AGM - Lorena Gold Project

AGM - Lorena Gold Project AGM - Lorena Gold Project For personal use onlynovember 2015 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors

More information

EXCO S PROJECT PIPELINE

EXCO S PROJECT PIPELINE EXCO S PROJECT PIPELINE INVESTOR UPDATE EXCO RESOURCES N.L. MAY 2010 Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking statements that are subject to

More information