1 Outotec OreMet Optimizer , Luleå, Sweden Outotec Minerals Processing, Antti Remes Vesa-Pekka Takalo Matti Talikka OreMet Optimizer for mining value chain analysis ore to metal Geometallurgical modelling of concentrator plant for each ore types and plant operating scenarios The main discrete events, starting from extraction and ending up with concentrate storage are evaluated separately Their throughputs and stream compositions are simulated with the digital plant model corresponding operating expenses (OPEX) in $/ton of each stage are used for the calculation model The value of the final concentrate is calculated using the Net Smelter Return (NSR) formula 2 1
2 Determination of Value VPTakalo EXPLOITABLE BLOCK ORE CONCENTRATE Volumetric capacity Properties of the rock Rock mineralogy Official authorization Social license to operate CapEx OpEx Dry metric tonnes Metal and other valuable contents Deleterious and disturbing element contents Moisture Treatment charge Freight 3 Example: average orebody vs. domains Average orebody % Cu, 0.3 ppm Au Recovery 83 % Cu, 60 % Au BWi 20 Domain tonnes. Similar to average ore body. Domain % Cu Amenable to ore sorting: 30 % mass recovery 95 % Cu Flotation recovery 80 % Cu 30 % shorter milling time or smaller milling capacity Domain % Cu, 0.6 ppm Au Recovery 84 % Cu, 65 % Au Gravity circuit / flash flotation increases the overall gold recovery by 5 % Additional domain % Cu Not feasible to process without sensor-based sorting Amenable to ore sorting: 60 % mass recovery 70 % Cu BWi 14 (hard waste rock removed) Flotation recovery 80 % Cu 60 % shorter milling time or smaller milling capacity 4 2
3 Challenging the traditional mine value chain with geometallurgy An average ore body does not exist! Traditional approach: Single value/point does not represent the average ore boby. Does not recognize variations in operational circumstances. Information silos. Poor communication between disciplines and systems. Geometallurgical approach: A holistic approach, which intergrates geological, mining, metallurgical, environmental, economic and other relevant information with an aim to optimize the efficiency of utitization of an ore body. Aim to optimize the mining value chain. - Economic return, CO 2 emissions, energy and water consumption, - Supports risk management. Communication with different disciplines is essential. Recovery % Head grade, Ni% 5 Simulation of the processing scenarios and value chain analysis 6 3
4 Example: Average orebody vs. domains Recovery Average ore body, 83% Domains 1-3, 81.5% Domain 1: No changes Domain 2: Add ore sorting Domain 3: Add gravity circuit and flash flotation Domains 4, 79% Domain 4: Add ore sorting Value (NSR, non-discounted) Average ore body, 115 MUSD Domains 1-3, 143 MUSD Value increases 28 MUSD Domain 4, 145 MUSD Value increases 2 MUSD. Extends LOM Aim to maximize the value over the mining cycle. 7 Outotec OreMet Optimizer A unique ability to simulate the full processing cycle from ore to metal Ore characterization Based on HSC Chemistry software including OreMet Optimizer module Optimization can be based on e.g. economics, flowsheet performance, CO 2 emissions, water and energy consumption, LCA, and enables the selection of most sustainable process route Digital concentrator plant Enables time reduction in greenfield projects e.g. for scoping level and preliminary economic studies Quick and transparent way to compare potential development scenarios including high level opex and capex estimations with main equipment list Simulation, optimization and modifications of existing brownfield operations 8 4
5 Process economical viability study Value of the concentrate is calculated using the Net Smelter Return formula Operating expenses (OPEX, $/ton) for each processing stage are utilized VALUE ADDING CHAIN: Total operating cost Total operating profit (non-discounted) 9 Simulation from ore to concentrate 10 5
6
7
8 Case example Greenfield case example: Cu sulphide concentrator 15 Internal Presentation name, Author Two processing options Bench scale flotation test for two grind sizes Regrind in 20 or 10 microns Simulation models for two processing options different concentrates different OPEX / CAPEX 16 8
9 Cu sulphide plant OreMet optimization study: phase I EUR/ton INCREASE IN OPEX % INCREASE IN RECOVERY 15.7 MEUR/year INCREASE IN OPERATING PROFIT 17 Cu sulphide plant OreMet optimization study: phase II The preliminary results were good Next the process optimization is continued with intermediate regrinding size (15 microns) more detailed flotation and dewatering CAPEX / OPEX studies different ore types 18 9
10 SUMMARY Discrete event based approach OreMet Optimizer incorporating a digital plant, provides a tool to assess the significance of individual events and their response to the optimization throughout the mining value chain Fast comparison between different processing sequences becomes transparent An example how this platform is used to define the most economical and sustainable process route for the project, with a fast turnaround time, was shown 19 10
Evaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood
Evaluation of Grade Engineering using Enterprise Optimization Michael Scott, Nick Redwood Who we are Not for Profit Research Organization Site implementation of stepchange innovation Grade Engineering
More informationOlympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began
Olympias Olympias: Highlights 2011 2012 2013 2016 Q3 2017 EIA approved Acquired from European Goldfields in February Phase 1 Retreatment began Phase 1 Retreatment complete Planned Phase 2 Commercial Production
More informationIMPROVING EFFICIENCIES: THE ROLE OF PROCESS AUDITS
IMPROVING EFFICIENCIES: THE ROLE OF PROCESS AUDITS MINE AFRICA BREAKFAST, PDAC 2015 Mike Hallewell B.Sc., C.Eng. Business Development Manager COMMITMENT TO SERVICING AFRICA s NEEDS Mines in Africa SGS
More informationINTEGRATED SGS SERVICES FOR EXPLORATION AND RESOURCE DEVELOPMENT
SGS MINERALS SERVICES T3 SGS 1007 04-2010 INTEGRATED SGS SERVICES FOR EXPLORATION AND RESOURCE DEVELOPMENT AN OVERVIEW OF SERVICES FOR EXPLORATION AND RESOURCE DEVELOPMENT during the exploration and resource
More informationMAXIMIZING THE VALUE OF YOUR OPERATION TECHNICAL SOLUTIONS TO HELP REACH YOUR GOALS EFFICIENTLY AND EFFECTIVELY
MAXIMIZING THE VALUE OF YOUR OPERATION TECHNICAL SOLUTIONS TO HELP REACH YOUR GOALS EFFICIENTLY AND EFFECTIVELY MineAfrica Investing Seminar 08 March 2016 Steve Wilson Sr Vice President Global Head, Mine
More informationThe implications of ore hardness variability on comminution circuit energy efficiency (and some other thoughts)
The implications of ore hardness variability on comminution circuit energy efficiency (and some other thoughts) Peter Amelunxen Thursday 6 December 2012 Capital (Millions) Current Cu/Mo Mill Design (a
More informationFeasibility studies Ulaanbaatar August 2016
Feasibility studies Uranium exploration, development and eventual production, form a series of progressive and logical steps. Each step is part of a progression of activities with the objective of obtaining
More informationForward Looking Statement
Olympias Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation
More informationCIM Best Practice Guidelines for Mineral Processing
CIM Best Practice Guidelines for Mineral Processing Foreword These guidelines were prepared by the Sub-Committee on Best Practice Guidelines for Mineral Processing ( SBPGMP ). The committee reports to
More informationRESEARCH NEEDS IN MINERAL PROCESSING AND HYDROMETALLURGY. Geoff Senior
RESEARCH NEEDS IN MINERAL PROCESSING AND HYDROMETALLURGY Geoff Senior A link to commercial outcomes Included in a firm s technology strategy should be a ranking of R&D projects that reflects their significance
More informationGRAVITY CONCENTRATION AND FLOTATION OF SPANISH MOUNTAIN COMPOSITES
GRAVITY CONCENTRATION AND FLOTATION OF SPANISH MOUNTAIN COMPOSITES SEPTEMBER 2010 2 1.0 SUMMARY 3 Gravity concentration and flotation testwork has been carried out on three composite samples from the Spanish
More informationsmart(er) management of technical risk:
New digital technologies for the smart(er) management of technical risk: Examples and added value Roussos Dimitrakopoulos COSMO Stochastic Mine Planning Laboratory - http://cosmo.mcgill.ca/ Outline Introduction
More informationIntelliSense.io Case Study Thickener Circuit Optimisation
IntelliSense.io Case Study Thickener Circuit Optimisation The IntelliSense.io Thickener Circuit Optimisation application was implemented at one of the largest copper gold mines in Chile. The mine belongs
More informationADVANCED MINERALOGY FACILITIES
ADVANCED MINERALOGY FACILITIES SGS ADVANCED MINERALOGY LABS Canada Chile South Africa Australia 2 ADVANCED MINERALOGY NETWORK Lab network providing automated process mineralogy services QEMSCAN (10 yrs
More informationRE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY
January 29, 2001 Mr. Malcolm Swallow President & CEO Canadian Zinc Corporation Suite 1202-700 Pender Street Vancouver Canada V6C 1G8 By Fax: 604-688-2043 Total Number of Pages: 8 Dear Mr. Swallow: RE:
More informationinvent Greg Wilkie Program Coordinator Program 1: Define introduce Sensing and Sorting
invent Greg Wilkie Program Coordinator Program 1: Define G.Wilkie@crcore.org.au www.crcore.org.au introduce Sensing and Sorting GRADE ENGINEERING STUDY FRAMEWORK 1. Characterisation 2. Geometallurgy &
More informationIntegrated Mobile modularised Plant and Containerised Tools for selective, low-impact mining of small high-grade deposits
Integrated Mobile modularised Plant and Containerised Tools for selective, low-impact mining of small high-grade deposits This project is funded by the EU Horizon 2020 Programme; Grant no 730411 Vanessa
More informationDuluth Metals Provides Metallurgical Update on Twin Metals Minnesota Project
Duluth Metals Provides Metallurgical Update on Twin Metals Minnesota Project Positive results from various metallurgical options considered for the Twin Metals Minnesota Project Good metal recoveries to
More informationAn overview of HPGR testwork program at Mintek
Council for Mineral Technology An overview of HPGR testwork program at Mintek 5 th June 2009 Johnny T. Kalala Head of Comminution, Minerals Processing Division, Mintek Presentation overview Introduction
More informationKanowna Belle Pre-Oxidation Project
Kanowna Belle Pre-Oxidation Project Kanowna Belle Processing Kanowna Belle treats both free milling and refractory ores with the free milling material being sourced predominantly from the East Kundana
More informationMetallurgium TM. Lessons Learned from the Copper Industry Applied to Gold Extraction. John O. Marsden
Metallurgium TM Lessons Learned from the Copper Industry Applied to Gold Extraction John O. Marsden Keynote Presentation at World Gold 2009 Conference, Johannesburg, South Africa, October 30 th, 2009 Overview
More informationASX ANNOUNCEMENT 12 MAY 2016
ASX ANNOUNCEMENT 12 MAY 2016 FÄBOLIDEN METALLURGICAL TEST WORK IMPROVES RECOVERY LEVELS Dragon Mining Limited (ASX:DRA) ( Dragon Mining or the Company ) is pleased to announce that the second phase of
More informationEnabling Innovation Innovating to zero Roadmap to the Future
Enabling Innovation Innovating to zero Roadmap to the Future COM 2017 with World Gold Conference Vancouver August 28-30, 2017 Process & Energy Chair ~ Simon Hille, Goldcorp Co-author Rob Stevens, Teck
More informationResource Efficient Mining Processes of Tomorrow
Metso Process Technology & Innovation (PTI) Resource Efficient Mining Processes of Tomorrow R&D Project Authors: K Duffy W Valery A Jankovic P Holtham www.metso.com General PTI presentation 2014 2015 A
More informationBertil Norén. Processing Manager, Björkdalsgruvan. Euromine Expo, Skellefteå June 15, 2016
Bertil Norén Processing Manager, Björkdalsgruvan Euromine Expo, Skellefteå June 15, 2016 A Values-Based and Value-Focused Company Profitable and Dividend Paying: (3.3% yield)* We create exceptional shareholder
More informationConfidence in Carrapateena project grows
7 NOVEMBER 2016 Confidence in Carrapateena project grows Carrapateena Pre-Feasibility Study released - project competitive with, or better than comparable long-life copper assets globally Project metrics
More informationSustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE
Sustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE Making the big difference to our customers Mining Industry
More informationSte De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: Fax:
April 25, 2012 Ste. 3083 595 Burrard Street Vancouver, BC V7X 1L3 Tel: 604 566 9080 Fax: 604 566 9081 Ste. 560 999 De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: 514.289.1183 Fax: 514.289.1188 TSX Venture
More informationAura Minerals Announces the Results of the NI Feasibility Study for the Restart of Operations at the Aranzazu Mine in Zacatecas, Mexico
Aura Minerals Announces the Results of the NI 43-101 Feasibility Study for the Restart of Operations at the Aranzazu Mine in Zacatecas, Mexico BRITISH VIRGIN ISLANDS, Caribbean, July 16, 2018 -- Aura Minerals
More informationThe Los Bronces Development Project Brian Beamish CEO Anglo Base Metals 28th November 2007
The Los Bronces Development Project Brian Beamish CEO Anglo Base Metals 28th November 2007 This presentation is being made only to and is directed only at (a) persons who have professional experience in
More informationPYTHON UNDERGROUND PROCESSING PLANT CRITICAL DESIGN
PYTHON UNDERGROUND PROCESSING PLANT CRITICAL DESIGN S Gray 1 ABSTRACT The use of continuous gravity recovery in combination with a controlled breakage fine crushing and screening system followed by flash
More informationSAVANNAH RESOURCES PLC AIM: SAV. Savannah Resources Plc. Savannah Resources Plc / Index: AIM / Epic: SAV / Sector: Mining RNS 06 February 2017
Savannah Resources Plc SAVANNAH RESOURCES PLC AIM: SAV Savannah Resources Plc / Index: AIM / Epic: SAV / Sector: Mining RNS 06 February 2017 PROJECT PORTFOLIO MINERAL SANDS MOZAMBIQUE (CONSORTIUM AGREEMENT
More informationFEASIBILITY STUDY CONFIRMS KALKAROO COPPER-GOLD PROJECT. Highlights
FEASIBILITY STUDY CONFIRMS KALKAROO COPPER-GOLD PROJECT Havilah Resources Havilah Resources NL aims to become a significant producer of copper, gold, cobalt and molybdenum from its 100% owned Kalkaroo,
More informationSeizing Opportunity and Building Value
Hanson Lake District Seizing Opportunity and Building Value December 2017 www.foranmining.com Opportunity is meaningless unless one takes action. TSX-V FOM 2 The Parties Committed to value creation 100%
More informationHydrometallurgical Options to Add Value to Copper Projects and Operations
Hydrometallurgical Options to Add Value to Copper Projects and Operations Peter Rohner Core Resources, Brisbane www.coreresources.com.au 24 th March 2010 Company Overview Highlights Specialist services:
More informationMetallurgical Testwork Capability Statement
Metallurgical Testwork Capability Statement CPC Engineering provides a full range of testwork related services from sample selection through to testwork management and evaluation. CPC ensures that testwork
More informationFor personal use only
ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 5th September, 2012 Old Pirate Metallurgical Test-Work delivers Exceptional Gold Recovery (up to 97.3%) from Two Different Gravity Methods ABM Resources NL ( ABM
More informationOUTOTEC ROASTING SOLUTIONS
OUTOTEC ROASTING SOLUTIONS Outotec roasting solutions are based on our decades of experience in developing processing technologies for concentrates and ores. Safe, easy, and cost-efficient to operate,
More information16 July 2013 AIM:AMA / TSX:AMZ. Amara Mining plc ( Amara or the Company )
16 July 2013 AIM:AMA / TSX:AMZ Amara Mining plc ( Amara or the Company ) RESULTS OF METALLURGICAL TESTWORK AND FURTHER DRILLING RESULTS FROM YAOURE GOLD PROJECT Amara Mining plc, the dual AIM and TSX-listed
More informationFor personal use only
Corporate Details Ordinary Shares: 795,237,123 Market Capitalisation: ~$180 million Cash, bullion and available financing facilities at 31 December 2018: $18.2 million Debt at 31 December 2018: $5 million
More informationOUTOTEC FLOTATION TECHNOLOGIES
OUTOTEC FLOTATION TECHNOLOGIES Maintaining recovery and ensuring availability and sustainability while keeping costs under control is challenging. Our tailor-made flotation solutions maximize your return
More informationINNOVACIÓN EN PLANTAS HIDRO- METALÚRGICAS
1º SEMINARIO INTERNACIONAL INNOVACIÓN EN PLANTAS HIDRO- METALÚRGICAS 1º INTERNATIONAL SEMINAR: INNOVATION IN HYDROMETALLURGICAL PLANTS A sustainable hydrometallurgical process to develop copper deposits
More informationNOLANS REVIEW COMPLETED DELIVERING SIGNIFICANT COST AND OPERATIONAL BENEFITS
ASX RELEASE 28 June 2016 ASX: ARU NOLANS REVIEW COMPLETED DELIVERING SIGNIFICANT COST AND OPERATIONAL BENEFITS Extensive work programs identify substantial operational and cost efficiencies at Nolans Rare
More informationWe are building NEW AITIK. New Aitik. 36 million tonnes
We are building NEW AITIK New Aitik 36 million tonnes MODERN SOCIETY needs the metals Boliden produces. IN THIS CONTEXT, the Aitik mine is of major importance as a reliable supplier of copper, gold and
More informationSCOTGOLD CONONISH GOLD AND SILVER PROJECT BFS UPDATE EXECUTIVE SUMMARY
SCOTGOLD CONONISH GOLD AND SILVER PROJECT BFS UPDATE EXECUTIVE SUMMARY Report prepared for: Scotgold Compiled by: Pat Willis Reviewed by: Pat Willis Date: 6 March 2017 Copyright Bara Consulting Ltd This
More informationHummingbird Resources plc. Increased Metallurgical Recoveries for Tuzon Deposit
Increased Metallurgical Recoveries RNS Number : 7150F Hummingbird Resources PLC 29 April 2014 Hummingbird Resources plc ("Hummingbird" or the "Company") (AIM: HUM) Increased Metallurgical Recoveries for
More informationMINIMUM ENGINEERING STUDY REQUIREMENT. 128 June 2015
# 128 June 2015 MINIMUM ENGINEERING STUDY REQUIREMENT UPDATE The evaluation of a mining project from exploration through development and production is a lengthy and complicated process. Mine development
More informationFor personal use only
11 June 2015 ASX Limited Marked Announcements Platform Exchange Centre 20 Bridge Street Sydney NSW 2000 Preliminary Economic Assessment Delivers Excellent Results at the Fair Bride Deposit Study confirms
More informationMintek, a national resource of minerals processing expertise for platinum ores
DEEPLAUL, V and BRYSON, M. Mintek, a national resource of minerals processing expertise for platinum ores. International Platinum Conference Platinum Adding Value, The South African Institute of Mining
More informationLong Term Planning for Open Pit Mines
Long Term Planning for Open Pit Mines Introduction The profitable exploitation of a mineral deposit requires considerable evaluation and planning. First it must be determined what portion of the deposit
More informationOUTOTEC INDUSTRIAL WATER TREATMENT
OUTOTEC INDUSTRIAL WATER TREATMENT Outotec industrial water treatment provides tailored water treatment solutions to produce water that meets environmental discharge regulations. Our technologies maximize
More informationMETATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY
March 7, 2011 Symbol: TSX V-CKG NR1-2011 METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY Chesapeake Gold Corp. ( Chesapeake ) is pleased to announce the results
More informationFor personal use only
ASX Release 20 March 2012 PANTON REVIEW STUDY RESULTS (ASX:PLA) is pleased to advise that the results from the recently completed Panton Review Study ( PRS ) showed that the Project could achieve and Internal
More informationThe TMAC Resources Inc. Hope Bay Project An Innovative Approach. Gerhard Bezuidenhout
The TMAC Resources Inc. Hope Bay Project An Innovative Approach Gerhard Bezuidenhout Gekko s mission Global Footprint Global & Gold/Silver Focused - increasing coal/polymetallic focus Total 150 staff Team
More informationINNOVATIVE ENERGY EFFICIENT SOTKAMO SILVER
INNOVATIVE ENERGY EFFICIENT SOTKAMO SILVER Industry Summit, 5th October 2017, Oulu Timo Lindborg CEO, Dr. Tech., Adjunct professor Sotkamo Silver AB SOTKAMO SILVER AB Sotkamo Silver AB is listed in NGM
More informationFigure 1: Schematic block-diagram of the project test work
METHODOLOGY A brief schematic diagram for the project test work is presented in Figure 1 and comprises the following main steps: sample collection, sample preparation, chemical characterization, grinding
More informationPrieska Zinc-Copper Project Advanced-Stage Metallurgical Tests Achieve Impressive Recoveries to Saleable Product
ASX/JSE RELEASE: 12 June 2018 Prieska Zinc-Copper Project Advanced-Stage Metallurgical Tests Achieve Impressive Recoveries to Saleable Product Advanced-stage metallurgical testing of Prieska Project Deep
More informationFrom Drill Core to Metal A Multi-Disciplined Approach to Flowsheet Development
From Drill Core to Metal A Multi-Disciplined Approach to Flowsheet Development Process Mineralogy Extractive Metallurgy Plant Support Quantitative Mineralogy, Mineral Processing, Sampling & Statistics
More informationQEMSCAN. XPS Consulting & Testwork Services 6 Edison Road, Falconbridge, Ontario, Canada P0M 1S0. Process Mineralogy
QEMSCAN KEY CAPABILITIES Modal Mineralogy Size by Size Liberation Element Deportment by Mineral Grain Sizes Mineral Associations Mineral Recoveries False Coloured Images Ni Sulphide Deposits/Concentrators
More information9 July 2018 Atalaya Mining Plc ( Atalaya or the Company ) Proyecto Riotinto 29% Increase in Open Pit Mineral Reserves Updated Technical Report
9 July 2018 Atalaya Mining Plc ( Atalaya or the Company ) Proyecto Riotinto 29% Increase in Open Pit Mineral Reserves Updated 43-101 Technical Report Atalaya Mining Plc (AIM:ATYM, TSX:AYM) is pleased to
More informationNevsun Announces Updated PEA for Timok Upper Zone Copper Project With a US$1.5 Billion NPV and a 50% IRR
N E W S R E L E A S E Nevsun Announces Updated PEA for Timok Upper Zone Copper Project With a US$1.5 Billion NPV and a 50% IRR October 26, 2017 Nevsun Resources Ltd. (TSX:NSU) (NYSE MKT: NSU) (Nevsun or
More informationPractice Brief GOLD PROCESSING. Revision Date: October 23, 2015
Practice Brief GOLD PROCESSING Revision Date: October 23, 2015 Prepared by 330 Alison Blvd. Fredericton, New Brunswick Canada, E3C 0A9 Telephone: (506) 454-2359 www.thibault-process-engineering.ca Gold
More information930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:
930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4 Tel: (604) 998-4175 Tel: 1888 648-4218 www.sabinagoldsilver.com April 22, 2014 SBB NR 14-05 SBB TSX SABINA GOLD & SILVER REPORTS SIGNIFICANT
More informationMotivations for Sustainable Development in Mining Areas
Motivations for Sustainable Development in Mining Areas Bernhard Dold Division of Geosciences and Environmental Engineering, Luleå Technical University, Luleå, Sweden Sustainable Mining Research & Consultancy
More informationPressure Leaching of Copper Concentrates
Pressure Leaching of Copper Concentrates John O. Marsden Senior Vice President Technology & Product Development 2004 Phelps Dodge Corporation Presentation Outline Safety share Introduction Global copper
More informationThe Scheduling, Costing and Importance of Metallurgical Testwork Programs in Process Plant Feasibility Studies
The Scheduling, Costing and Importance of Metallurgical Testwork Programs in Process Plant Feasibility Studies W Anderson 1 ABSTRACT The metallurgical testwork program is generally the most important critical
More informationPine Point MRE Overview TSXV: OM
Pine Point MRE Overview TSXV: OM Forward-Looking Statements & Cautionary Notes Regarding TechnicalInformation This presentation (the "Presentation") contains "forward-looking information" and "forward-looking
More informationTEST SOTKAMO SILVER OY
TEST REPORT SORTING OF SILVER ORE SOTKAMO SILVER OY KIDEKUJA 2 88610 VUOKATTI FINLAND Peter Simons Wedel 12.08.2015 Customer: Sotkamo Silver Oy Represented by: Ilkka Tuokko Email: ilkka.tuokko@silver.fi
More informationSAG MILL GRINDING DESIGN VERSUS GEOMETALLURGY GETTING IT RIGHT FOR COMPETENT ORES
SAG MILL GRINDING DESIGN VERSUS GEOMETALLURGY GETTING IT RIGHT FOR COMPETENT ORES J Starkey 1 and P Scinto 2 ABSTRACT Smarter processing for the future, in the area of SAG mill design involves accurate
More informationIvanhoe Mines giant Kamoa copper discovery in the DRC a metallurgical perspective
http://dx.doi.org/10.17159/2411-9717/2016/v116n6a9 Ivanhoe Mines giant Kamoa copper discovery in the DRC a metallurgical perspective by V.L. Nkuna*, T. Naidoo*, and S.R. Amos* Ivanhoe Mines Kamoa copper
More informationStirred Milling machine development and application extension. Jon Allen Metso Global product manager, Stirred Mills
Stirred Milling machine development and application extension Jon Allen Metso Global product manager, Stirred Mills Current technologies Efficiency and application range development Contents Machine development
More informationDrilling, metallurgical test work and a new resource model add 21% to oxide gold reserves
LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource
More informationThe Albion Process at the GPM Gold Project The success of a technology
The Albion Process at the GPM Gold Project The success of a technology Paul Voigt, Glencore Technology (paul.voigt@glencore.com.au) David Walker, Core Resources (dwalker@coreresources.com.au) CIM Conference
More informationWhite Dam Gold Project Dump Leach
ALTA 2015 White Dam Gold Project Dump Leach A division of Midas Engineering Group Mineral Engineering Technical Services PO Box 5778 St Georges Tce WA 6831 P: (+61 8) 9421 9000 F: (+61 8) 9325 8311 ABN
More informationPEGMONT PEA HIGHLIGHTS
Advanced Lead-Zinc Resource Development PEGMONT PEA HIGHLIGHTS January 2019 Pegmont Deposit Queensland, Australia IMPORTANT INFORMATION Cautionary Statement on Forward Looking Information This presentation
More informationCopyright in this document is wholly reserved to Ausenco Services Pty Ltd.
DISCLAIMER This document is for the private information and benefit only of the client for whom it was prepared and the particular purpose previously advised to Ausenco Services Pty Ltd. The contents of
More informationTowards Minimum Impact Concentrators. PhD (Chem) Eija Saari Basf Innovation Day, Sept 13-14, 2018 Ludwigshafen
Towards Minimum Impact Concentrators PhD (Chem) Eija Saari Basf Innovation Day, Sept 13-14, 2018 Ludwigshafen Outotec - a process technology company 2 Minerals Processing Industry Will Face a Paradigm
More informationHard Creek Nickel. Emerging Giant Turnagain Nickel Project. Ed Beswick P Eng. HNC:TSX
Hard Creek Nickel Emerging Giant Turnagain Nickel Project Ed Beswick P Eng. HNC:TSX www.hardcreeknickel.com Minerals North Conference April 2010 Cautionary Statement The information contained in this presentation
More informationCASE: Well positioned for growth with hydrometallurgy
CASE: Well positioned for growth with hydrometallurgy Outotec Capital Markets Day 2017 Kalle Härkki, President Metals, Energy & Water Outotec House September 21 Our business on the value chain from ore
More informationNewmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase
NEWS RELEASE NYSE: NEM newmont.com Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase DENVER, February 21, 2018 Newmont Mining Corporation (NYSE: NEM)
More informationOptimizing mining operations
Optimizing mining operations Integration across the mining enterprise is key to increased productivity JOHN JESSOP As the resources sector continues to gain momentum, mining companies around the world
More informationHarte Gold Announces Positive PEA For the Sugar Zone Project
HARTE GOLD CORP. 8 King Street East, Suite 1700 Toronto, Ontario, M5C 1B5 Tel: 416-368-0999 Fax: 416-368-5146 Harte Gold Announces Positive PEA For the Sugar Zone Project Toronto May 3, 2018 - HARTE GOLD
More informationFOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR
FOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR AZARGA METALS ANNOUNCES POSITIVE, INDEPENDENT, PRELIMINARY ECONOMIC ASSESSMENT ( PEA ) ON UNKUR COPPER-SILVER PROJECT HIGHLIGHTS: Positive PEA result achieved
More informationFast Tracking the Superior Lake Project Re-Start Plan
ASX Announcement ASX: SUP 12 July 2018 superiorlake.com.au Fast Tracking the Superior Lake Project Re-Start Plan Highlights Historical review of mining operations and remaining infrastructure at Superior
More informationGreat Western Scoping Study Update & Onsite Gold Processing
ASX RELEASE 10 August 2017 ABN: 45 116 153 514 ASX: TMX Great Western Scoping Study Update & Onsite Gold Processing Terrain Minerals Limited (ASX: TMX) is pleased to provide the following update on its
More informationCompany Introduction. Management Team & Experience. Company
Company profile Company Introduction AZMET Technology & Projects is a world class multi-disciplined Engineering Design and Project Management Company. AZMET s Industry knowledge and experience, linked
More informationENGINEERING SERVICES
ENGINEERING SERVICES www.elb.co.za Processing Solutions ABOUT ELB ENGINEERING SERVICES ELB Engineering Services (ELB) is an internationally recognised technology driven holistic solutions provider to the
More informationFlowsheet development for the Sukari gold project in Egypt
RHODES, M. and PENNA, F. Flowsheet development for the Sukari gold project in Egypt. World Gold Conference 2009, The Southern African Institute of Mining and Metallurgy, 2009. Flowsheet development for
More informationSGS IRON ORE CAPABILITIES
SGS IRON ORE CAPABILITIES SGS METALLURGY - IRON ORE TESTWORK SPECIALISTS SGS metallurgy is a world leader in the provision of bankable metallurgical testwork solutions A CUT ABOVE THE REST SGS Metallurgy
More informationFor personal use only
ASX: GGG, GGGO US OTC: GDLNF.PK Company Announcement: Tuesday June 21st, 2011 Kvanefjeld Project, Technical Update: Major Improvements in Mine Schedule, Beneficiation and Rare Earth Recoveries Greenland
More informationAwak Mas DFS Optimisation - Metallurgical Breakthrough
10 October 2017 Awak Mas DFS Optimisation - Metallurgical Breakthrough Whole of Ore leach testwork delivers improved metallurgical recoveries. Gold recoveries range from 92% - 98% vs previous flotation-leach
More informationFor personal use only
ASX/Media Announcement 6 September 2016 PILBARA COMPLETES KEY METALLURGICAL TESTWORK PROGRAM AHEAD OF PILGANGOORA DEFINITIVE FEASIBILITY STUDY Phase 2 metallurgical testwork and process design completed
More informationFor personal use only
ASX/Media Announcement 12 May 2017 NEW METALLURGICAL TESTWORK RESULTS DELIVER PROCESS IMPROVEMENTS AND OPERATING COST SAVINGS Outstanding results from flotation testwork and pilot program demonstrates
More informationNiblack Project Poised For Development
Niblack Project Poised For Development AIDEA Board of Directors Meeting 38% 30% 22% 9% July 31, 2014 Forward-Looking Statements Except for statements of historical fact, this presentation contains certain
More informationOUTOTEC TOMRA SENSOR-BASED ORE SORTING SOLUTIONS BENEFITS
OUTOTEC TOMRA SENSOR-BASED ORE SORTING SOLUTIONS Outotec TOMRA sensor-based ore sorting solutions remove waste from the ore feed in your crushing and grinding circuit, increasing productivity and significantly
More informationFor personal use only
Mutiny makes substantial metallurgical performance gains Forecast copper recoveries increased from 58.5% to 64% in the oxide zone and copper concentrate grade increased from 21.5% Cu to 35% Cu Forecast
More informationSandspring Resources Positive Pre Feasibility Study for Toroparu demonstrates 2.6 year payback on initial 1.32 g/t gold grade
Sandspring Resources Positive Pre Feasibility Study for Toroparu demonstrates 2.6 year payback on initial 1.32 g/t gold grade Toronto, Ontario 9 th April, 2013 Sandspring Resources Ltd. (TSX Venture: SSP)
More informationDIVERSIFIED METAL EXPLORATION & DEVELOPMENT COMPANY
1 DIVERSIFIED METAL EXPLORATION & DEVELOPMENT COMPANY INVESTOR PRESENTATION Winter 2018 #101, 2148 West 38 th Avenue Vancouver, B.C. V6M 1R9 Tel: 604-685-1870 TF: 1-800- 667-1870 Email: Info@elninoventures.com
More informationIPS Inclined plate settlers. Maximum process recovery, minimum plant footprint
IPS Inclined plate settlers Maximum process recovery, minimum plant footprint 1 Beneficiation solutions from Metso In a time when mother earth gives less, it s time to reach further. Metso beneficiation
More informationDevelopment of an Innovative Copper Flowsheet at Phu Kham. M F Young and I Crnkovic
Development of an Innovative Copper Flowsheet at Phu Kham M F Young and I Crnkovic Phu Kham Location in Laos Phu Kham Plant Layout Plant Layout showing Primary Grinding Rougher Flotation IsaMill Regrinding
More information