Leachate Management Leachate Control and Collection

Size: px
Start display at page:

Download "Leachate Management Leachate Control and Collection"

Transcription

1 Leachate Management Leachate Control and Collection

2 Leachate Collection Sanitary landfills have leachate collection and removal system above liner At un-lined landfills and dump sites Perimeter Ditch - can be used to drain leachate and carry it to treatment system Subsurface Perimeter Gravity Drain (aka Toe Drain, French Drain) - can be built around waste

3 Leachate Control Control of leachate migration starts by properly siting, designing, constructing, and operating the solid waste disposal site Bottom Liner Drainage slopes Collection and removal system

4 Bottom Liner System Design Low permeability (clay) liner Natural (in place) Re-compacted clay Geosynthetics Single geosynthetic layer Double synthetic liner (with or without leak detection) Composite liner Combination of Clay and Geosynthetics With or without leak detection

5 Leachate Collection Bottom Liner

6 Example Liner System Double Liner with Composite

7 Typical Layout of Leachate Collection System (top view)

8 Side View of Leachate Drainage Slopes

9

10 Design Leachate Flow Model conceptual designs to assess leachate generation and flow Use generation and flow calculations to design leachate management components: Drainage media Pipes and spacing Collection sump Leachate pumps Discharge gravity and force mains Storage tanks Tanker trucks Treatment option

11 Leachate Collection Systems Purpose To efficiently convey leachate off of liner and minimize pressure head over the liner (30 cm max. per Subtitle D US regulation) 11

12 Leachate Collection Systems Proper precautions when designing the leachate management system and maintaining the extraction system, whether manual or automatic, are essential to avoid clogging of the system. Blockage of the leachate system is caused by: Sedimentation Biological growth Pipe breakage or deterioration. 12

13 System Components Drainage media (high permeability) Sand or Gravel Geonet or geocomposite drainage net Other: tire chips, crushed glass Protective cover: Material between drainage layer and waste Granular media (sand or gravel) Geotextile Other: tire chips Pipe (HDPE)

14 Leachate Collection Collection Pipe Above Liner

15 Leachate Surface Discharges Obvious Visual Impact 15 15

16 16 Leachate Collection Layer at Battle Creek Landfill Cell 8

17 Drainage Media: Design Parameters Hydraulic Conductivity, k (coefficient of Permeability) Sands: 10-4 cm/s k 10-2 cm/s Gravels: 10-2 cm/s k 100 cm/s Geonets: 1 to 34 cm/s Chipped Tires 10-2 cm/s k 100 cm/s Must factor in compressibility under loading Darcy s law q = kia (Laminar flow) Q = rate of flow i = hydraulic gradient a = gross cross sectional area through which flow occurs Flow Velocity v = ki Velocity through pores, v = ki/n Transmissivity (T) = k x thickness of layer

18 Drainage Media: Design Parameters Slope (s) Liner placed at minimum 1 to 2% slope for leachate collection Maximum allowable pressure head (h) of leachate per Subtitle D (US regulation) 30 cm (12-inches) Distance (L) between collection pipes dependent on: Maximum pressure head Pipe size Slope Leachate flow

19 Design Steps Establish bottom liner geometry Estimate initial collection system geometry Estimate infiltration to drainage layer (HELP Model) Evaluate head over liner Revise bottom liner or collection system geometry as needed (pipe spacing revisions) Determine required pipe size and strength Size sumps Size pumps Size gravity/force mains Select material specifications

20 Pipe Design Pipe sizing Leachate flow rate Area flowing to pipe Pipe slope Use Manning s equation for design Pipe Strength Wall crushing Wall buckling Ring deflection Loading based on material over pipe and vehicle traffic (transfer trailer/compactor)

21 21 Leachate Collection Layer and Piping at Arthurstown Landfill, Ireland

22 Pumps and Sumps Area Purpose: Provide collection point for pumping leachate Location: Function of design configuration, low point Sizing based on: Leachate flow rate Desired pump cycle time Type: Submersible May have redundant pump system or back-up pumps available Sizing ancillary components (electrical) for largest pump anticipated Control systems

23 Typical Leachate Collection System 1 FT ALLOWABLE LEACHATE HEAD LEVEL (EXAGGERATED FOR DEMONSTRATION) LEACHATE COLLECTION PIPE LEACHATE RISER PIPE PUMP TOP OF LINER SUMP

24 Leachate pumps in LFG Wells Used to pump leachate out of the LFG wells Types Electric submersible (centrifugal) Air-powered automatic Piston

25 Summary Modeling can be a useful tool to estimate leachate generation on a site specific basis Components of leachate collection system require careful design to ensure proper performance

Landfill design General principles

Landfill design General principles Landfill design General principles Average height of a landfill should be at least 15 m Each section (cell) should accommodate waste to be landfilled during 5 years period Sections/cells should be hydraulically

More information

ACTION LEAKAGE RATE GUIDELINE. Prepared by:

ACTION LEAKAGE RATE GUIDELINE. Prepared by: ACTION LEAKAGE RATE GUIDELINE Prepared by: INDUSTRIAL WASTE AND WASTEWATER BRANCH AIR AND WATER APPROVALS DIVISION ALBERTA ENVIRONMENTAL PROTECTION MAY 1996 ACTION LEAKAGE RATE GUIDELINE INDUSTRIAL WASTE

More information

COMPARISON BETWEEN HORIZONTAL DRAINAGE USING NATURAL GRANULAR MATERIAL AND USING INTERDRAIN GEOCOMPOSITES

COMPARISON BETWEEN HORIZONTAL DRAINAGE USING NATURAL GRANULAR MATERIAL AND USING INTERDRAIN GEOCOMPOSITES COMPARISON BETWEEN HORIZONTAL DRAINAGE USING NATURAL GRANULAR MATERIAL AND USING INTERDRAIN GEOCOMPOSITES CONTENTS: 1. INTRODUCTION 2. FINANCIAL COMPARISON 3. COMPARISON OF DRAINAGE CAPACITIES 1. INTRODUCTION

More information

Appendix B Addendum 1 - Revisions to the Operation and Training Plan (dated November 2015) for the Indian River County Class I Landfill

Appendix B Addendum 1 - Revisions to the Operation and Training Plan (dated November 2015) for the Indian River County Class I Landfill Appendix B Addendum 1 - Revisions to the Operation and Training Plan (dated November 2015) for the Indian River County Class I Landfill The IRC Landfill 20-year Construction/Operation Permit Nos. 0128769-022-SC

More information

Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia

Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia Upland Excavating Ltd. Engineering Consultant: GHD Limited Presentation Agenda Project Background Site

More information

Guidance for Liner Design for Demolition Debris or Industrial Solid Waste Landfills Waste/Solid Waste #5.02, October 2005

Guidance for Liner Design for Demolition Debris or Industrial Solid Waste Landfills Waste/Solid Waste #5.02, October 2005 Solid Waste Program Guidance for Liner Design for Demolition Debris or Industrial Solid Waste Landfills, October 2005 INTRODUCTION In Minnesota, ground water is owned by the people of the state until it

More information

Bioreactor Landfill Design

Bioreactor Landfill Design Bioreactor Landfill Design Timothy Townsend, PhD, PE Department of Environmental Engineering Sciences University of Florida ttown@ufl.edu Bioreactor Landfill Design Modern landfill design entails many

More information

Lateral drainage design update Part 2

Lateral drainage design update Part 2 Lateral drainage design update Part 2 By Gregory N. Richardson, P.E., Ph.D., J.P. Giroud, P.E., Ph.D., and Aigen Zhao, P.E., Ph.D. Part 1 of this series established the need to design lateral drainage

More information

Evaluation of Drainage Layer Alternatives for Proposed Landfill Liner at the E.W. Brown Generating Station

Evaluation of Drainage Layer Alternatives for Proposed Landfill Liner at the E.W. Brown Generating Station Evaluation of Drainage Layer Alternatives for Proposed Landfill Liner at the E.W. Brown Generating Station Nicholas G. Schmitt, PE 1, and M. Brian Cole, PE 2 1 Senior Principal Engineer, AMEC Environment

More information

Run-on and Run-off Control System Plan

Run-on and Run-off Control System Plan Run-on and Run-off Control System Plan SWEPCO John W. Turk, Jr. Power Plant Fulton, Arkansas Permit No. 0311-S3N-R1 AFIN: 29-00506 October 2016 Terracon Project No. 35167133 Prepared for: SWEPCO 3711 Highway

More information

Leachate Management Plan

Leachate Management Plan Leachate Management Plan LEACHATE MANAGEMENT PLAN Chesapeake Energy Center Ash Landfill Permit #440 Submitted To: Dominion Chesapeake Energy Center 2701 Vepco Street Chesapeake, Virginia 23323 Submitted

More information

LANDFILL CLOSURE PLAN. Submitted To: Dominion Chesapeake Energy Center 2701 Vepco Street Chesapeake, Virginia 23323

LANDFILL CLOSURE PLAN. Submitted To: Dominion Chesapeake Energy Center 2701 Vepco Street Chesapeake, Virginia 23323 LANDFILL CLOSURE PLAN Chesapeake Energy Center Ash Landfill - Permit #440 Closure Plan Submitted To: Dominion Chesapeake Energy Center 2701 Vepco Street Chesapeake, Virginia 23323 Submitted By: Golder

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals

More information

Geosynthetics Cost/Benefit Analysis for the Development of a Landfill Expansion Module in Monterey, California

Geosynthetics Cost/Benefit Analysis for the Development of a Landfill Expansion Module in Monterey, California The First Pan American Geosynthetics Conference & Exhibition 2-5 March 2008, Cancun, Mexico Geosynthetics Cost/Benefit Analysis for the Development of a Landfill Expansion Module in Monterey, California

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 JANUARY 15, 2016 ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

Percolation through landfill final covers

Percolation through landfill final covers Percolation through landfill final covers By Gregory N. Richardson, Ph.D. P.E., Principal of GN Richardson and Assoc. and G. David Garrett It seems that more of our time is now spent evaluating alternative

More information

Groundwater 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology

Groundwater 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology GG22A: GEOSPHERE & HYDROSPHERE Hydrology Definitions Groundwater Subsurface water in soil or rock that is fully saturated. Aquifer Contains enough saturated material to yield significant quantities of

More information

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance TECHNICAL BULLETIN Synthetic Turf Athletic Field Drainage Design Assistance The SportsEdge HQ geocomposite strip drain products are engineered specifically for use in synthetic turf athletic field base

More information

1/31/2006 CE Engineered Landfills Construction & Filling Sequence. Engineered Landfills Key Components. Perimeter Berm or Embankment.

1/31/2006 CE Engineered Landfills Construction & Filling Sequence. Engineered Landfills Key Components. Perimeter Berm or Embankment. Reference: Dr. Qian s Textbook Engineered Landfills Construction & Filling Sequence Perimeter Berm or Embankment Engineered Landfills Key Components Gas Collection System Final Cap Leachate Recirculation

More information

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 4

More information

Coal Combustion Product Risk Assessment Using a Probabilistic Cost Modeling Approach

Coal Combustion Product Risk Assessment Using a Probabilistic Cost Modeling Approach 2015 World of Coal Ash (WOCA) Conference in Nasvhille, TN - May 5-7, 2015 http://www.flyash.info/ Coal Combustion Product Risk Assessment Using a Probabilistic Cost Modeling Approach Ryan Baeten, PE 1

More information

LESSONS LEARNED FROM A LANDFILL SLOPE FAILURE INVOLVING GEOSYTNTHETICS

LESSONS LEARNED FROM A LANDFILL SLOPE FAILURE INVOLVING GEOSYTNTHETICS LESSONS LEARNED FROM A LANDFILL SLOPE FAILURE INVOLVING GEOSYTNTHETICS Virginia L. Wilson Environmental Engineer Ohio Environmental Protection Agency Division of Solid & Infectious Waste Northeast District

More information

Design and construction of a reinforced soil embankment on soft soil

Design and construction of a reinforced soil embankment on soft soil Design and construction of a reinforced soil embankment on soft soil Russell Jones, Golder Associates Gareth Swift, University of Salford Overview Background Site details Design philosophy Design issues

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM FOR INTERNAL DISCUSSION PURPOSES ONLY TECHNICAL MEMORANDUM TO: Augusta Resource Corp. ATTENTION: Jamie Sturgess FROM: Troy Meyer Project Manager, Vector Colorado LLC (Vector) DATE: June 5, 2006 SUBJECT:

More information

Action Leakage Rate Calculation

Action Leakage Rate Calculation 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Action Leakage Rate Calculation Christopher S. Jordan, EI, 1 and Cedric H. Ruhl, PE 2 1 Amec Foster Wheeler

More information

Bioreactor Landfills: Issues and Implementation

Bioreactor Landfills: Issues and Implementation Bioreactor Landfills: Issues and Implementation Emerging Technologies in Solid Waste Management Conference 2005 March 31, 2005 Debra R. Reinhart, PhD, PE, DEE Civil and Environmental Engineering University

More information

Golder Associates Inc W. Laburnum Avenue, Suite 200 Richmond, VA USA Tel: (804) Fax: (804)

Golder Associates Inc W. Laburnum Avenue, Suite 200 Richmond, VA USA Tel: (804) Fax: (804) Date: June 1, 014 Made by: DPM Project No.: 130-0193 Checked by: ATN Subject: Leachate Pipe Capacity Reviewed by: JRD Project Short Title: CHESAPEAKE ENERGY CENTER ASH LANDFILL SWP #440 1.0 OBJECTIVE CALCULATIONS

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 JANUARY 15, 2016 ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

Closure Plan Ash Disposal Area PGE Boardman Power Plant

Closure Plan Ash Disposal Area PGE Boardman Power Plant FIRST ISSUE REVISION 0 Closure Plan Ash Disposal Area PGE Boardman Power Plant Prepared for Portland General Electric September 2015 2020 SW 4th Avenue, Suite 300 Portland, Oregon 97201 This document was

More information

AN EVALUATION OF POTENTIAL CLOGGING OF GEONETS AND GEOCOMPOSITES DUE TO SUSPENDED SOIL PARTICLES

AN EVALUATION OF POTENTIAL CLOGGING OF GEONETS AND GEOCOMPOSITES DUE TO SUSPENDED SOIL PARTICLES AN EVALUATION OF POTENTIAL CLOGGING OF GEONETS AND GEOCOMPOSITES DUE TO SUSPENDED SOIL PARTICLES Dhani B. Narejo GSE Lining Technology, Inc., Houston, TX USA ABSTRACT A series of tests were performed to

More information

GRI Standard GC8 * Determination of the Allowable Flow Rate of a Drainage Geocomposite

GRI Standard GC8 * Determination of the Allowable Flow Rate of a Drainage Geocomposite Geosynthetic Institute 475 Kedron Avenue Folsom, PA 19033-1208 USA TEL (610) 522-8440 FAX (610) 522-8441 GEI GRI GSI GAI GCI GII Original: April 17, 2001 Rev. 1: January 9, 2013-Editorial GRI Standard

More information

WASTEWATER & STORM WATER COLLECTION AND REMOVAL

WASTEWATER & STORM WATER COLLECTION AND REMOVAL CVE 471 WATER RESOURCES ENGINEERING WASTEWATER & STORM WATER COLLECTION AND REMOVAL Assist. Prof. Dr. Bertuğ Akıntuğ Civil Engineering Program Middle East Technical University Northern Cyprus Campus CVE

More information

REVIEW OF LINER AND CAP REGULATIONS FOR LANDFILLS

REVIEW OF LINER AND CAP REGULATIONS FOR LANDFILLS National Waste Processing Conference Proceedings ASME 1994 REVIEW OF LINER AND CAP REGULATIONS FOR LANDFILLS ROBERT E. LANDRETH U.S. Environmental Protection Agency Risk Reduction Engineering Laboratory

More information

LANDFILL and CONTAMINATED SITES

LANDFILL and CONTAMINATED SITES LANDFILL and CONTAMINATED SITES BOTTOM AND SLOPES Geonets and s have found a wide range of applications in controlled landfills by now, providing mechanical protection to geomenbranes, gas, collection

More information

INVITATION FOR BID (IFB) IFB NO. GSWA

INVITATION FOR BID (IFB) IFB NO. GSWA INVITATION FOR BID (IFB) IFB NO. GSWA 003-18 LAYON LANDFILL CONSTRUCTION OF CELL 3 ADDENDUM NO. 1 OCTOBER 8, 2018 ALL BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS ADDENDUM ON THE SPACE PROVIDED BELOW, AND

More information

A Comparison of Actual vs. Predicted Leachate Generation

A Comparison of Actual vs. Predicted Leachate Generation 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ A Comparison of Actual vs. Predicted Leachate Generation Cedric H. Ruhl, PE 1 and Chris Jordan, EI 2 1

More information

A Case Study of a Secured Landfill

A Case Study of a Secured Landfill 2018 IJSRST Volume 4 Issue 2 Print ISSN: 2395-6011 Online ISSN: 2395-602X Themed Section: Science and Technology A Case Study of a Secured Landfill Sandhya Rani R Department of Civil Engineering, MVSR

More information

POND SEALING OR LINING COMPACTED SOIL TREATMENT

POND SEALING OR LINING COMPACTED SOIL TREATMENT NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE STANDARD POND SEALING OR LINING COMPACTED SOIL TREATMENT CODE 520 (FT. 2 ) DEFINITION A liner for an impoundment constructed using compacted

More information

Technical Specifications Okeechobee Landfill

Technical Specifications Okeechobee Landfill Presented to: Waste Management Inc. of Florida 10800 NE 128th Avenue Okeechobee, FL 34972 Presented by: SCS ENGINEERS 1900 NW Corporate Blvd., Suite W110 Boca Raton, FL (954) 571-9200 May 2017 File No.

More information

Leachate Recirculation and Biogas Collection Methodologies in Bioreactors

Leachate Recirculation and Biogas Collection Methodologies in Bioreactors Leachate Recirculation and Biogas Collection Methodologies in Bioreactors E. McBean, Ph.D., P.Eng., P.E. School of Engineering University of Guelph 1 INPUT OUTPUT Municipal Solid Waste Moisture Decomposed

More information

Construction Dewatering. Lecture 11. Construction Dewatering

Construction Dewatering. Lecture 11. Construction Dewatering Construction Dewatering Lecture 11 Construction Dewatering The purpose of construction dewatering is to control the surface and subsurface hydrologic environment in such a way as to permit the structure

More information

EAGLE DRAINAGE DESIGN STANDARDS

EAGLE DRAINAGE DESIGN STANDARDS EAGLE DRAINAGE DESIGN STANDARDS November 17, 2015 City of Eagle Planning & Zoning Department P.O. Box 1520 Eagle, ID 83616 EAGLE DRAINAGE DESIGN STANDARDS A. PURPOSE 1. These standards amend the Design

More information

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40

More information

Lecture 11. WATER PUMPING EQUIPMENT and DEWATERING SYSTEM

Lecture 11. WATER PUMPING EQUIPMENT and DEWATERING SYSTEM Lecture 11 WATER PUMPING EQUIPMENT and DEWATERING SYSTEM TSP-308 MPK Ferdinand Fassa dewatering The purpose is to remove water from an excavation without causing instability in either the side slopes or

More information

Storage and Flow of Groundwater

Storage and Flow of Groundwater Storage and Flow of Groundwater Aquifer AQUIFER (in Greek)= AQUA (water) + FERRE (to bear) Aquifer- a saturated geological formation which will yield sufficient quantity of water to wells and springs Underground

More information

Wastewater Collection System

Wastewater Collection System WASTEWATER COLLECTION SYSTEM CE 370 1 Wastewater Collection System The function of the collection system is to collect the wastewater from residential, commercial, and industrial areas within the service

More information

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company POST CLOSURE PLAN CFR 257.104(d) Pond 1 Clinch Power Plant Russell County, West Virginia November 2016 Prepared for: Appalachian Power Company Prepared by: Amec Foster Wheeler Environment & Infrastructure,

More information

Waste Tires: Changes to End Use Markets & Landfill Application Uses

Waste Tires: Changes to End Use Markets & Landfill Application Uses Waste Tires: Changes to End Use Markets & Landfill Application Uses Anna Maylett CDPHE Waste Tire Inspector Brian Gaboriau CDPHE Waste Tire Grants Administrator Terry Gray Tetra Tech, Inc. / TAG Resource

More information

GEOSYNTHETIC FUNDAMENTALS IN LANDFILL DESIGN

GEOSYNTHETIC FUNDAMENTALS IN LANDFILL DESIGN Proc. of Int. Symp. on Geoenvironmental Eng., ISGE2009 September 8-10, 2009, Hangzhou, China GEOSYNTHETIC FUNDAMENTALS IN LANDFILL DESIGN Gregory N. Richardson 1, Aigen Zhao 2 ABSTRACT: Contemporary design

More information

C-1. Infiltration System

C-1. Infiltration System C-1. Infiltration System Design Objective An infiltration system captures surface stormwater runoff and allows it to infiltrate into the soil. This SCM is typically the work horse of a runoff volume match

More information

GUIDESHEET IV. Wastewater Treatment and Storage Lagoons

GUIDESHEET IV. Wastewater Treatment and Storage Lagoons GUIDESHEET IV Wastewater Treatment and Storage Lagoons Unless otherwise approved by the Department of Environmental Quality (DEQ) all wastewater treatment and storage lagoons associated with a discharge

More information

Inspection Report. David Burton, Facility Manager (NRG Indian River Generating Station)

Inspection Report. David Burton, Facility Manager (NRG Indian River Generating Station) Inspection Report To: From: David Burton, Facility Manager (NRG Indian River Generating Station) Richard Southorn, P.E., P.G., CPSWQ Re: Indian River Landfill Annual CCR Unit Inspection Report No. 2 Inspection

More information

Bioreactor Implementation and

Bioreactor Implementation and Bioreactor Implementation and Design Debra R. Reinhart, PhD, PE Professor and Associate Dean College of Engineering and Computer Science University of Central Florida Orlando, Florida USA Topics Leachate

More information

CE 240 Soil Mechanics & Foundations Lecture 4.3. Permeability I (Das, Ch. 6)

CE 240 Soil Mechanics & Foundations Lecture 4.3. Permeability I (Das, Ch. 6) CE 240 Soil Mechanics & Foundations Lecture 4.3 Permeability I (Das, Ch. 6) Outline of this Lecture 1. Permeability in Soils 2. Bernoulli s Equation 3. Darcy s Law 4. Hydraulic Conductivity 5. Hydraulic

More information

(Instructions and explanations of bid items and sources of unit costs are provided on the back of this page.)

(Instructions and explanations of bid items and sources of unit costs are provided on the back of this page.) CLOSURE COST ESTIMATE WORKSHEET FOR MSW LANDFILL FORM 1 OWNER: TOTAL PERMITTED AREA: AREA CURRENTLY OPEN: Total Volume of Site: LARGEST AREA TO EVER BE OPEN AT ANY TIME: (use this area for estimating closure

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 04821 TEMPORARY VEHICLE AND EQUIPMENT FUELING AREA PART 1 - GENERAL 1.01 Description Installation of erosion and sediment control for a temporary vehicle and equipment fueling

More information

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10 Table of Contents 1.0 Introduction...4 2.0 Description of Landfill...4 3.0 Review of Available Information...5 4.0 Inspection...5 4.1 Changes in Geometry since Last Inspection...5 4.2 Volume...5 4.3 Definitions

More information

DISTRIBUTION STATEMENT A ?

DISTRIBUTION STATEMENT A ? AAMS Application: Hydrologie Evaluation of Leachate Production and Quality (HELPQ) Module in CFs PURPOSE: This technical note describes the application of the Hydrologie Evaluation of Leachate Production

More information

Geosynthetics. Nanjundaswamy P. Dept. of Civil Engineering S J C E, Mysore

Geosynthetics. Nanjundaswamy P. Dept. of Civil Engineering S J C E, Mysore Geosynthetics Nanjundaswamy P. Dept. of Civil Engineering S J C E, Mysore What are Geosynthetics? GEO Soil, Rock or other Geotechnical material SYNTHETIC Man made Polymeric material Used to enhance, augment

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Joel Carrasco From: Monica Salguero Company: Tetra Tech Date: August 10, 2010

More information

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 217 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 2-S3N-R2 AFIN: 32-42 JANUARY 17, 218 217 Landfill Inspection Report Entergy Independence Plant Class 3N

More information

SWANA NEW YORK CHAPTER Landfill/Bioreactor/Leachate Recirculation Design and Operations Training Session. Douglas T. Mandeville, P.E.

SWANA NEW YORK CHAPTER Landfill/Bioreactor/Leachate Recirculation Design and Operations Training Session. Douglas T. Mandeville, P.E. SWANA NEW YORK CHAPTER Landfill/Bioreactor/Leachate Recirculation Design and Operations Training Session Douglas T. Mandeville, P.E. Columbia MD 410.381.4333 dmandeville@geosyntec.com 8 November 2006 Presentation

More information

Stage One North Detail Refer to Geoscience Drawings

Stage One North Detail Refer to Geoscience Drawings Stormwater and Leachate Treatment Stage One North Detail Refer to Geoscience Drawings Morning glory bell mouth spillway Pe r i me ter d Spreader Bar rain Sediment Retention, Stormwater Detention Pond Area

More information

Landfill Operations to Improve Installation of Cap and Gas Collection

Landfill Operations to Improve Installation of Cap and Gas Collection Landfill Operations to Improve Installation of Cap and Gas Collection Mr. Amarjit Riat, P.E. Assistant Director, I-95 Landfill Complex Manager County of Fairfax, Virginia Methane to Markets Partnership

More information

Landfill2015. Advantages of Geosynthetics over Natural Materials in Landfills with Composite Liner Systems. Kent von Maubeuge.

Landfill2015. Advantages of Geosynthetics over Natural Materials in Landfills with Composite Liner Systems. Kent von Maubeuge. Advantages of Geosynthetics over Natural Materials in Landfills with Composite Liner Systems Kent von Maubeuge Main author Andy Post Co-author, presenter Stephan Westhus Co-author Landfill TOP Liner with

More information

HOLLOW ROCK FACILITY 2016 ANNUAL LANDFILL INSPECTION REPORT FOR COAL COMBUSTION RESIDUALS (CCR) EXISTING LANDFILL

HOLLOW ROCK FACILITY 2016 ANNUAL LANDFILL INSPECTION REPORT FOR COAL COMBUSTION RESIDUALS (CCR) EXISTING LANDFILL HOLLOW ROCK FACILITY 2016 ANNUAL LANDFILL INSPECTION REPORT FOR COAL COMBUSTION RESIDUALS (CCR) EXISTING LANDFILL Prepared for FirstEnergy Generation LLC 76 S. Main Street Akron, Ohio, 44308 December,

More information

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

Design of Sewerage System for Jaffarpur area in Southwest New Delhi International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for

More information

FULL SCALE OPERATION OF A UNIQUE LANDFILL BIOREACTOR: THE CALGARY BIOCELL

FULL SCALE OPERATION OF A UNIQUE LANDFILL BIOREACTOR: THE CALGARY BIOCELL FULL SCALE OPERATION OF A UNIQUE LANDFILL BIOREACTOR: THE CALGARY BIOCELL J. Patrick. A. HETTIARATCHI (1), Carlos HUNTE (1), and Sunil KUMAR (2) (1) Center for Environmental Engineering Research and Education

More information

Coal Combustion Residuals Landfill Closure and Post-Closure Plans

Coal Combustion Residuals Landfill Closure and Post-Closure Plans Coal Combustion Residuals Landfill Closure and Post-Closure Plans Hatfield s Ferry Landfill October 2016 Prepared for: 76 South Main Street Akron, Ohio 44308 Prepared by: GAI Consultants, Inc. Murrysville

More information

USE OF TRENCH DRAINS TO IMPROVE CHRONIC EMBANKMENT STABILITY PROBLEMS. and SHANNON & WILSON, INC. ABSTRACT

USE OF TRENCH DRAINS TO IMPROVE CHRONIC EMBANKMENT STABILITY PROBLEMS. and SHANNON & WILSON, INC. ABSTRACT USE OF TRENCH DRAINS TO IMPROVE CHRONIC EMBANKMENT STABILITY PROBLEMS by Steven R. McMullen, P.E. Principal Engineer and Dexter N. McCulloch, C.E.G. Senior Vice President SHANNON & WILSON, INC. ABSTRACT

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii Preface to the Third Edition xiii About the Authors xv Acknowledgements xvii Contents PART ONE: THEORY...1 1. Groundwater in Construction...3 1.1 Groundwater in the Hydrologic Cycle 3 1.2 Origins of Dewatering

More information

(1) All sanitary landfill facilities, at a minimum, shall include the following:

(1) All sanitary landfill facilities, at a minimum, shall include the following: 3745-27-08 Sanitary landfill facility construction. (A) Applicability. The construction requirements for a sanitary landfill facility specified in this rule are applicable to a particular facility or permit

More information

4.0 ENVIRONMENTAL IMPACT ANALYSIS 4.10 UTILITIES -- WASTEWATER

4.0 ENVIRONMENTAL IMPACT ANALYSIS 4.10 UTILITIES -- WASTEWATER 4.0 ENVIRONMENTAL IMPACT ANALYSIS 4.10 UTILITIES -- WASTEWATER ENVIRONMENTAL SETTING Existing Conditions The BLRC generates wastewater in two forms: the liquid that is produced when water percolates through

More information

Pleasants Power Station Landfill Coal Combustion Residual 2017 Annual Report

Pleasants Power Station Landfill Coal Combustion Residual 2017 Annual Report Allegheny Energy Supply Company, LLC A FirstEnergy Company Pleasants County, West Virginia December 2017 Prepared for: Allegheny Energy Supply Company, LLC A FirstEnergy Company 800 Cabin Hill Drive Greensburg,

More information

A-3. Evaluation of Hydraulic Performance for SCA Final Cover Design

A-3. Evaluation of Hydraulic Performance for SCA Final Cover Design ONONDAGA LAKE SCA FINAL COVER DESIGN REPORT A-3 Evaluation of Hydraulic Performance for SCA Final Cover PARSONS P:\Honeywell -SYR\448533 SCA Final Cover \09 Reports\9.10 2016 Final Submittal\Final Submittal\SCA

More information

Design and Operation of Landfills

Design and Operation of Landfills Design and Operation of Landfills Soils and hydrogeology Site selection criteria Site layout and landfill operations Liner design Water balance Biological reactions in landfills Leachate quality Gas production

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

Colon Mine Site Structural Fill

Colon Mine Site Structural Fill Permit Application Colon Mine Site Structural Fill Charah, Inc. Sanford, North Carolina November 2014 Revised December 2014 Permit Application Colon Mine Site Structural Fill Charah, Inc. Sanford, NC

More information

Keywords: leachate collection system, geocomposite drainage materials, hazardous waste, landfill, drainage, longterm

Keywords: leachate collection system, geocomposite drainage materials, hazardous waste, landfill, drainage, longterm PARTIAL REPLACEMENT OF THE GRANULAR LAYER AT THE BOTTOM OF A LANDFILL: SHORT AND LONG TERM MONITORING OF DRAINAGE GEOSYNTHETICS Stephane Fourmont 1, Carole Bloquet 2 & Younes Haddani 3 1 Afitex, 13-15

More information

CCR Rule Operating Criteria Closure Plan

CCR Rule Operating Criteria Closure Plan CCR Rule Operating Criteria 257.102 Closure Plan FGD Pond 2 Jim Bridger Plant Point of Rocks, Wyoming PREPARED FOR PacifiCorp 1407 West North Temple Salt Lake City, UT 84116 (801) 521-0376 Fax (801) 220-4748

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

Guidance for Industrial Waste Management Evaluation Model (IWEM) Waste/Solid Waste #5.03, October 2005

Guidance for Industrial Waste Management Evaluation Model (IWEM) Waste/Solid Waste #5.03, October 2005 Solid Waste Program Guidance for Industrial Waste Management Evaluation Model (IWEM), October 2005 Contents: Introduction... 1 Background... 1 IWEM... 2 Tier 1 Evaluation... 2 Tier 2 Evaluation... 3 Infiltration

More information

PROGRESS REPORT. CONSTRUCTION PROGRESS REPORT 2017 Minor Construction Works

PROGRESS REPORT. CONSTRUCTION PROGRESS REPORT 2017 Minor Construction Works PROGRESS REPORT PRJ 17039 Cobble Hill Landfill 2017 Minor Construction Works CONSTRUCTION PROGRESS REPORT 2017 Minor Construction Works Project: Cobble Hill Landfill Closure Plan Date: October 15 th, 2017

More information

Achieve Longer Life Pavement Structure. Tommy E. Nantung INDOT Research and Development Division

Achieve Longer Life Pavement Structure. Tommy E. Nantung INDOT Research and Development Division Pavement Underdrain to Achieve Longer Life Pavement Structure Tommy E. Nantung INDOT Research and Development Division Sources of Moisture Through permeable surface From edge Capillary action Seepage from

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

Project/Research Sponsors. Why Manage Stormwater? Why Manage Stormwater? Why Manage Stormwater? Soils. Applications to Stormwater Management

Project/Research Sponsors. Why Manage Stormwater? Why Manage Stormwater? Why Manage Stormwater? Soils. Applications to Stormwater Management Applications to Stormwater Management Project/Research Sponsors Presented by: Mr. Brian Oram, PG, PASEO Soil Scientist Wilkes University Environmental Engineering and Earth Sciences Wilkes - Barre, PA

More information

Overview of Gas Collection and Control Systems. 9, December 2010 Novi Sad, Serbia

Overview of Gas Collection and Control Systems. 9, December 2010 Novi Sad, Serbia Overview of Gas Collection and Control Systems 9, December 2010 Novi Sad, Serbia 1 Overview Objectives of LFG Collection/Control Biogas Recovery Modeling Elements of a LFG collection System 2 Objectives

More information

ENVIRONMENTAL ASSESSMENT WORKSHEET

ENVIRONMENTAL ASSESSMENT WORKSHEET ENVIRONMENTAL ASSESSMENT WORKSHEET Note to reviewers: The Environmental Assessment Worksheet (EAW) provides information about a project that may have the potential for significant environmental effects.

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration

More information

SEPTIC TANK CONSTRUCTION GUIDELINES

SEPTIC TANK CONSTRUCTION GUIDELINES SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic

More information

The interior waste slope stability analysis is presented in Appendix C.3. 4.3.2.4 Stability of Final Filled Configuration Austin Community Recycling & Disposal Facility Permit Amendment Application TCEQ

More information

ENVIRONMENTAL MONITORING AT LANDFILLS

ENVIRONMENTAL MONITORING AT LANDFILLS ENVIRONMENTAL MONITORING AT LANDFILLS September 7, 2017 George Schuman Permit Section Manager, Solid Waste Bureau New Mexico Environment Department Environmental Monitoring at 2 SWB considers three activities

More information

WCEC Leachate Treatment Facility

WCEC Leachate Treatment Facility WCEC Leachate Treatment Facility Site Plan Control Community Information Session Ross Wallace, Waste Management Corporation of Canada Michelle Armstrong, FoTenn Consultants Michael Gundry, AECOM Presentation

More information

Defense Technical Information Center Compilation Part Notice

Defense Technical Information Center Compilation Part Notice UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP017710 TITLE: The Hows and Whys of Landfill Entomement DISTRIBUTION: Approved for public release, distribution unlimited This

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration

More information

Drainage geocomposite workshop

Drainage geocomposite workshop Drainage geocomposite workshop By Gregory N. Richardson, Sam R. Allen, C. Joel Sprague A number of recent designer s columns have focused on the design of drainage geocomposites (Richardson and Zhao, 998),

More information

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Water Management During Construction and Operations

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Water Management During Construction and Operations Black Butte Copper Project Mine Operating Permit Application (Revision 3) APPENDIX K-2: Water Management During Construction and Operations Tintina Montana, Inc. July 2017 www.knightpiesold.com Mr. Bob

More information