1 Silvergrass East Table 1 The following table provides a summary of important assessment and reporting criteria used at Silvergrass East for the reporting of Mineral Resources and Ore Reserves in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections. SECTION 1 SAMPLING TECHNIQUES AND DATA Criteria Sampling techniques Commentary Samples for geologic logging and assay are collected on 2 m intervals using percussion and reverse circulation drilling methods. Diamond core drilling was performed to collect samples for geotechnical testing (HQ, 63.5 mm diameter) and metallurgical testing (PQ, 85 mm diameter). Drilling techniques Drill sample recovery Drilling is predominantly by reverse circulation with lesser percussion and diamond drill core. Refer to Section 2: Drill Hole Information for a detailed breakdown of drilling by type and year. No direct recovery measurements of reverse circulation samples are performed. Sample weights are recorded from laboratory splits and the recovery at the rig is visually estimated for loss per 2 m drilling interval. Diamond drill core recovery loss of 5 cm or greater is recorded by the driller. Overall recovery from diamond drill core exceeded 92% at Silvergrass East. Logging Standardised Rio Tinto Iron Ore logging systems are utilised for all drilling. Geologic and material type logging was performed on 1.5 m intervals for reverse circulation drilling until the 1990 s and at 2 m intervals thereafter. Intervals are logged at 2 m for all diamond core drilling. All drill holes since 1997 are logged using downhole geophysical tools for gamma trace, calliper, gamma density, resistivity, magnetic susceptibility, and magnetic deviation. Since 2008, all geotechnical drill holes are logged using an acoustic televiewer for structural data measurements. Sub-sampling techniques and sample preparation Sub-sampling (pre-1978): All sub-sampling for percussion drilling occurred at the rig. Methods were not documented. Sub-sampling ( ): Samples were split through a Jones multi-level riffle splitter, dividing the samples into three portions. Sub-sampling (post-1997): All reverse circulation drilling utilises the Rotating Cone Splitter (RCS) sampling system as per industry standards. Sample preparation: The sample is oven dried at 105 degrees Celsius for a minimum of 24 hours. The sample is then crushed to approximately 3 mm using a Jaw Crusher and split to produce a 500 g subsample. The sub-sample is pulverised to 95% of weight passing 150 μm. Assay methods: All assaying of samples used in Mineral Resource estimates have been performed by independent, National Association of Testing Authorities (NATA) certified laboratories. Fe, SiO 2, Al 2 O 3, P, Mn, MgO, TiO 2, CaO and S are assayed using Industry standard Lithium metaborate fusion and X-Ray Fluorescence (XRF) analysis. Loss on Ignition (LOI) is determined using industry standard Thermo-gravimetric analyser (TGA). Quality of assay data and laboratory tests Standardised Rio Tinto Iron Ore quality control procedures are in place for all drilling, post Prior to then, no quality control documentation is available. Field standards and field duplicates are systematically used. Laboratory preparation duplicates and assay duplicates are also included in the quality assurance and quality control protocol. Statistical analyses indicate a high level of precision and accuracy. Analyses of the duplicate dataset do not detect any bias in the field duplicate data. Verification of sampling and Several drill holes from the 1970 s and 1980 s were re-drilled between 2008 and 2009 showing adequate reproducibility between historic and modern methods. 1

2 assaying Comparison of reverse circulation and twinned diamond drill core assay data distributions show that the drilling methods have similar grade distributions verifying the suitability of reverse circulation samples in the Mineral Resource estimate. Location of data points All drill hole collar locations at the Silvergrass East deposit are surveyed to Geocentric Datum of Australia 1994 (GDA94) grid by Rio Tinto Iron Ore evaluation surveyors using Differential Global Positioning System survey equipment. Drill hole collar reduced level (RL) data is compared to detailed topographic maps and show that the collar survey data is accurate. The topographic surface is based on 10 m grid sampling of the 2012 Light Detecting and Ranging (LiDAR) survey, including spot heights from DGPS drilling collars and is considered robust. Data spacing and distribution Drill hole spacing is predominately 50 m 50 m. 200 m 50 m spacing drilling was performed on the eastern and western deposit extents. Dedicated geotechnical drilling has been completed to intersect planned final pit walls. Orientation of data in relation to geological structure Drill lines lie north to south along the GDA94 grid and perpendicular to the deposit strike. Drilling is predominantly vertical however angled holes were drilled in areas with restricted access or to intersect structures perpendicular to strike. Sample security Laboratory samples (A splits) are collected by field assistants, placed onto steel sample racks, and transported by Centurion trucks to Ultra Trace Laboratories in Perth, Western Australia for analyses. Retention samples (B splits) are collected and stored in drums for 2 years at the Evaluation camp located on-site. Assay pulps are retained indefinitely at Rio Tinto Iron Ore facilities located at either Pannawonica or Dampier. Audits or reviews No external audits have been performed. Internal Rio Tinto Iron Ore peer review processes and internal Rio Tinto technical reviews have been completed. These reviews concluded that the fundamental data collection techniques are appropriate. SECTION 2 REPORTING OF EXPLORATION RESULTS Criteria Mineral tenement and land tenure status Commentary 100% owned by Hamersley Iron Proprietary Limited (100% Rio Tinto Limited), held under Mining Lease (ML) 4SA Sections 265, 266 and Mining Lease (ML) 272SA Section 003. This deposit was previously held under Temporary Reserves 5587H, 5562H, 5563H and 5728H. Exploration done by other parties Temporary reserve (TR) 5587H was granted to Hancock Prospecting Proprietary Limited (Hancock) and Wright Prospecting Proprietary Limited (Wright) in In 1975, Texas Gulf Australia became a joint venture partner with Hancock and Wright and undertook evaluation work on the temporary reserve. A variation agreement to the Iron Ore (Wittenoom) Agreement (IOWA) between these joint venturers and the Western Australian State government was signed in In 1981, Texas Gulf Australia sold the rights in the temporary reserve to a subsidiary of Conzinc Riotinto of Australia Limited (CRA), which was later renamed as Hamersley Iron Proprietary Limited (HI). In 1991, an agreement between HI, Hancock, and Wright to purchase Hancock and Wright s share to the IOWA was concluded. Then in 1992, a variation to the IOWA was passed through the Western Australian State parliament whereby TR5587 was transferred from the IOWA to the Iron Ore (Hamersley Iron) State Agreement and incorporated into Mining Lease (ML) 272SA. Geology The deposit type is a bedded iron ore deposit hosted in the Archean Marra Mamba Iron Formation and the West Angelas Member of the Wittenoom Formation. The style of mineralisation is consistent with other Marra Mamba-hosted iron deposits located in the Pilbara region, Western Australia. 2

3 Drill hole Information Data aggregation methods Drilling Data Summary Table 1: Drilling Data Summary Year Diamonds Reverse Circulation Percussion # Holes Metres # Holes Metres # Holes Metres * 1, * 2, * 3, ** * * * * 1, * 3, ** * 1, * 56, ** * 53, ** 2, * 1,345 61* 4, * 2, ,808 Total 91* 8,143 2,601* 162, * 8,180 *One or more holes excluded from estimation. **Entire program excluded from estimation. The data had been composited to 2 m for Mineral Resource estimation. No maximum or minimum grade truncations were performed. Cut-off grade for High-Grade ore is greater than or equal to 58% Fe. Relationship between mineralisation widths and intercept lengths Diagrams Downhole lengths are reported which are essentially true width due to predominantly vertical drilling and gently folded, horizontal strata. In areas where the strata steepen, angled drill holes were completed. True width of mineralised intercepts is held consistent during geologic interpretations. 3

4 Balanced reporting Other substantive exploration data Not applicable. Rio Tinto Iron Ore has not specifically released exploration results for these deposits. A program of diamond drill core (PQ) metallurgical drilling has been completed to collect samples for metallurgical testing. Downhole gamma-gamma data has been collected for in situ bulk density data. This has been calibrated using a program of diamond drill core (HQ) across the deposits. Geologic surface mapping data has been collected across the Silvergrass East area in 2008 at the 1:10,000. 4

5 Further work Further infill reverse circulation drilling is planned at 50 m 50 m spacing. SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES Criteria Database integrity Commentary All drilling data is securely stored in an AcQuire geoscientific information management system managed by a dedicated team within Rio Tinto Iron Ore. The system is backed up nightly on servers located in Perth, Western Australia. The backup system has been tested in 2013, demonstrating that the system is effective. The drilling database used for Mineral Resource estimation has been internally validated by Rio Tinto Iron Ore personnel. Site visits The Competent Person visited Silvergrass East in Geological interpretation Geological modelling is undertaken by Rio Tinto Iron Ore senior geologists. The method involves interpretation of downhole stratigraphy using surface geologic mapping, lithological logging data, downhole gamma data, and assay data. Cross-sectional interpretation of each stratigraphic unit is performed followed by interpretation of mineralisation and hydration boundaries. Three-dimensional wireframes of the sectional interpretations are created to produce the geological model. Dimensions The deposit trends 7km east to west and varies between 200 m to 3 km north to south. The deposit extends to a depth of 300 m below the topographic surface. Estimation and modelling techniques The block model is aligned to the GDA94 grid. Block size is 25 m E 25 m N 5 m RL for parent blocks. Parent blocks are sub-celled to the geological boundaries to preserve volume. Mineralised domains are estimated by ordinary kriging and non-mineralised domains are estimated by inverse distance weighting to the first power. The estimated model was validated using a combination of visual, statistical and Multivariate Global Change of Support techniques. There is no production data to reconcile model quality. Moisture All Mineral Resource tonnages reported on a dry basis. Cut-off parameters Mining factors or assumptions Metallurgical factors or assumptions Environmental factors or assumptions The basis for the adopted cut-off grade is determined by Rio Tinto Iron Ore marketing teams to ensure the product meets internal specifications. The cut-off grade for high-grade Marra Mamba ore is greater than or equal to 58% Fe. Development of this Mineral Resource estimate assumes mining using standard Rio Tinto Iron Ore equipment. The assumed mining method is conventional truck and shovel open pit mining with 10 m benches. Mining practices will include detailed grade control utilising blast hole data. It is assumed that wet screening processes used by Rio Tinto Iron Ore will be applicable for the processing of the Silvergrass East deposit. Rio Tinto Iron Ore has an extensive environmental and heritage approval process. A detailed review of these requirements has been undertaken in a recent Pre-Feasibility Study and pending Feasibility Study. No issues were identified that would impact on the Mineral Resource estimate. Bulk density Dry bulk density was estimated using accepted gamma-density data collected at 10 cm intervals from downhole geophysical sondes. Accepted gamma-density data is corrected for moisture using diamond drill core specifically drilled throughout the deposit. Bulk density was estimated using ordinary kriging in mineralised zones and inverse distance weighted to the first power in non-mineralised zones. Classification The Mineral Resource includes the classifications: Measured, Indicated, and Inferred with additional material (greater than 50% Fe) set as unclassified. The Silvergrass East deposit is predominantly Measured Mineral Resources. The Competent Person is satisfied that the stated Mineral Resource classification reflects the geological controls interpreted and the estimation constraints of the deposits. Audits or All stages of Mineral Resource estimation have undergone an internal peer review process, 5

6 reviews Discussion of relative accuracy/ confidence which has documented all phases of the process. The Mineral Resource estimate has been accepted by the Competent Person. Rio Tinto Iron Ore operate multiple mines in the Pilbara region of Western Australia. The Mineral Resource data collection and estimation techniques used for the Silvergrass East deposit are consistent with those applied at other deposits which are being mined. Reconciliation of actual production with the Mineral Resource estimates for the existing operational deposits are generally within five percent for tonnes and grade. This result is indicative of a robust process. Accuracy and confidence of Mineral Resource estimation is consistent with the current level of study (Feasibility Study). SECTION 4 ESTIMATION AND REPORTING OF ORE RESERVES Criteria Mineral Resource estimate for conversion to Ore Reserves Commentary Ore reserve estimates in the 2013 Feasibility Study are based on a mineral resource estimate completed in March Where applicable the most recent Mineral Resource estimate was used for reporting Ore Reserves with previously defined pit designs. These were validated for economic viability. Mineral Resources are reported additional to Ore Reserves. Site visits The Competent Person visited Silvergrass East in Study status The reportable Ore Reserve is based on the Silvergrass East Feasibility Study which was finalised in Cut-off parameters Mining factors or assumptions Metallurgical factors or assumptions The cut-off grade for high-grade Marra Mamba ore is greater than or equal to 58% Fe. The Mineral Resource model was regularised to a block size of 12.5 m E 12.5 m N 5 m RL which was determined to be the selective mining unit following analysis of a range of selective mining unit options. Dilution and mining recovery were modelled by applying the regularisation process to the sub-block geological model. Pit optimisations utilising the Lerchs-Grosmann algorithm with industry standard software were undertaken. This optimisation utilised the regularised resource together with cost, revenue and geotechnical inputs. The resultant pit shells were used to develop detailed pit designs with due consideration of geotechnical, geometric and access constraints. These pit designs were used as the basis for production scheduling and evaluation purposes. Conventional mining methods (truck and shovel) similar to other Rio Tinto Iron Ore mines were selected. It is proposed to crush the material at Silvergrass East and convey it to a central processing facility at the Rio Tinto Nammuldi Iron Mine. The geotechnical parameters have been derived following geotechnical studies informed by 45 diamond drill holes specifically drilled for geotechnical purposes on the surrounding host rock. The resultant inter ramp slope angles vary between 13 and 46 degrees depending on the local rock mass and structural geological conditions. During the above process Inferred Mineral Resources were excluded from mine schedules and economic valuations utilised to validate the economic viability of Ore Reserves. During drill campaigns in 1998, 2008 and 2010, 660 m of metallurgical diamond core (PQ) were recovered in Silvergrass East. Data obtained from this core formed the basis for characterisation test work which informed the Preliminary Engineering Study for the design of the processing facility. The map below show the location of these drill holes. The diamond drill core test results were utilised to develop metallurgical models representing different metallurgical domains which were considered representative of the ore body. The metallurgical models predict product tonnage and grade parameters for lump and fines products. Wet processing is proposed for Silvergrass East with the Marra Mamba ore de-slimed in order to improve handling characteristics and to increase product grades. The average total product recovery modelled for the deposit is ~93%. 6

7 Environmental The Silvergrass East project was referred to the Environmental Protection Authority under section 38 of the Environmental Protection Act 1986 in 2010, as part of the Nammuldi- Silvergrass Expansion project. The Proposal was formally assessed at the level of Public Environmental Review and the Minister for Environment authorised implementation of the proposal via Ministerial Statement in The proposal was not referred under the Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 after it was determined in 2010 to be unlikely to have a significant impact on any matters of national environmental significance, after applying the Commonwealth Significant Impact Guidelines 1.1. A geochemical risk assessment for the project has been undertaken. The assessment encompasses all material types present at the site, and tests have been conducted in accordance with the Global Acid Rock Drainage Guide. Mining operations at the project pose a low acid mine drainage risk based on current pit shell designs and the assessment of samples from within the Project pit shells. Infrastructure General access to Silvergrass East will be via an extension of the Nammuldi Mine access road with an additional access to be constructed from the Brockman 4 to Brockman 2 road. Silvergrass East will utilise facilities at the Nammuldi Mine including product stockpiles, rail and train load-out system. Ore will be railed to Rio Tinto s ports at Dampier and Cape Lambert. Upon completion of current and planned/approved construction projects, the port and railway networks will have sufficient capacity to accommodate ore supply from Silvergrass East. Centrally located facilities will service both Nammuldi and Silvergrass East. These include: HME workshop and wash down, bulk lubricant, tyre change, and a fabrication workshop. Dewatering infrastructure, including a total of 21 bores, will feed water into an expanded irrigated agricultural area in addition to satisfying site water demand. Surface water management structures including diversion channels and bunds will be constructed to protect mining areas. Primary crushed ore from Silvergrass East will be transported to an expanded Nammuldi below water table (NBWT) wet process plant via a 9 km overland conveyor. The wet processing facility will include scrubbing, wet screening, classification and filtration circuits. Waste fines will be thickened and disposed in a waste fine storage facility. Fuel will be supplied via the rail fuel hub being constructed approximately 10 km south of the NBWT project. Bulk fuel storage and refuelling facilities will be provided on site. Supply of ammonium nitrate and fuel oil (ANFO) will be accessed from the combined NBWT/Silvergrass East explosives facility, transported by way of the Brockman 4 to Brockman 2 road. Electric power will be supplied to Silvergrass East from the Rio Tinto transmission network linking the existing Brockman 220 kv transmission line. 7

8 Fly-in, Fly-out (FIFO) personnel access will be via the all-weather Boolgeeda air strip and Brockman 4 to Brockman 2 road. Silvergrass East personnel will be housed in the existing Brockman 2 camp. Costs The capital costs are based on a Preliminary Engineering Study utilising experience from the construction of existing similar Rio Tinto Iron Ore projects in the Pilbara, Western Australia. Operating costs were benchmarked with similar operating Rio Tinto Iron Ore mine sites. Exchange rates were forecast by analysing and forecasting macro-economic trends in the Australian and World economy. Transportation costs were based on existing operating experience at Rio Tinto Iron Ore mine sites in the Pilbara, Western Australia. Allowances have been made for royalties to the Western Australian government and other private stakeholders. Revenue factors Rio Tinto applies a common process to the generation of commodity prices across the group. This involves generation of long-term price curves based on current sales contracts, industry capacity analysis, global commodity consumption and economic growth trends. In this process, a price curve rather than a single price point is used to develop estimates of mine returns over the life of the project. The detail of this process and of the price point curves is commercially sensitive and is not disclosed. Market assessment The supply and demand situation for iron ore is affected by a wide range of factors, and as iron and steel consumption changes with economic development and circumstances. Rio Tinto Iron Ore delivers products aligned with its Mineral Resources and Ore Reserves, these products have changed over time and successfully competed with iron ore products supplied by other companies. Economic Economic inputs such as foreign exchange rates, carbon pricing, and inflation rates are also generated internally at Rio Tinto. The detail of this process is commercially sensitive and is not disclosed. Sensitivity testing of the Silvergrass East Ore Reserves using both Rio Tinto long-term prices and a range of published benchmark prices demonstrates a positive net present value for the project sufficient to meet Rio Tinto Limited investment criteria. Social The Silvergrass East is located within Mining Lease (ML) 4SA sections 265 and 266 and Mining Lease (ML) 272SA section 003 which have been granted pursuant to the Iron Ore (Hamersley Range) Agreement Act The Silvergrass East mine and associated infrastructure fall within the area of the Eastern Guruma group s registered native title claim. Rio Tinto Limited and the Eastern Guruma people have a comprehensive relationship that has been documented in an Indigenous Land Use Agreement. Ethnographic and archaeological surveys have been conducted covering the Silvergrass East deposit and proposed infrastructure corridor which have identified several heritage sites; some of which are of extremely high importance to the local Traditional Owners. The sites of highest importance have been excised from the project impact area and, where possible, the other sites have been avoided during planning of the mine and infrastructure. Rio Tinto Iron Ore has completed biological surveys across the project area to support the development of the Silvergrass East project including flora and vegetation and terrestrial and subterranean fauna surveys and aquatic habitats. A number of native vegetation clearing permits have been granted by the Western Australian Department of Mines and Petroleum to allow for preliminary works such as sterilization drilling, geotechnical investigations and mineral exploration. The Silvergrass East project is located within the Shire of Ashburton and Rio Tinto Iron Ore has well established engagement frameworks with the Shire of Ashburton which includes scheduled meetings and project updates. Other Semi-quantitative risk assessments have been undertaken throughout the Silvergrass East study area. No material naturally occurring risks have been identified through the above mentioned risk management processes. Classification The Ore Reserves consist of 77% Proven Reserves and 23% Probable Reserves. The Competent Person is satisfied that the stated Ore Reserve classification reflects the outcome of technical and economic studies. Audits or No external audits have been performed. Internal Rio Tinto Iron Ore peer review processes and internal Rio Tinto technical reviews 8

9 reviews Discussion of relative accuracy/ confidence have been completed. These reviews concluded that the fundamental data collection techniques are appropriate. Rio Tinto Iron Ore operates multiple mines in the Pilbara region of Western Australia. The Ore Reserve estimation techniques utilised for the Silvergrass East deposit are consistent with those applied at the existing operations. Reconciliation of actual production with the Ore Reserve estimate for the existing operations is generally within 5 percent for tonnage and grade. This result is indicative of a robust Ore Reserve estimation process. Accuracy and confidence of modifying factors are generally consistent with the current level of study (Feasibility Study). 9

SECTION 1 SAMPLING TECHNIQUES AND DATA

SECTION 1 SAMPLING TECHNIQUES AND DATA Koodaideri Table 1 The following table provides a summary of important assessment and reporting criteria used at the Koodaideri deposits for the reporting of Mineral Resources and Ore Reserves in accordance

More information

INITIAL PROOF OF CONCEPT STUDY DEMONSTRATES SUITABILITY OF CONCENTRATE FOR BATTERY CHEMICALS

INITIAL PROOF OF CONCEPT STUDY DEMONSTRATES SUITABILITY OF CONCENTRATE FOR BATTERY CHEMICALS INITIAL PROOF OF CONCEPT STUDY DEMONSTRATES SUITABILITY OF CONCENTRATE FOR BATTERY CHEMICALS 3 December 2018 Birimian Limited (ASX: BGS, Birimian or the Company) is pleased to announce the following results

More information

MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES

MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES ASX Release: 9 September 2010 MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES Definitive Mining Studies confirm continuity, quality and quantum of Ore body at MARILLANA Detrital Ore Reserves

More information

ASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold

ASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold ASX ANNOUNCEMENT 2 February 2013 ASX Code: BDR MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 58,000 tonnes @ 3.8 g/t for 71,000 oz gold MAIDEN DUCKHEAD HANGINGWALL STARTER PIT RESERVE 272,000 tonnes @ 3.2

More information

For personal use only

For personal use only Venture Upgrades DSO Resource Base and Delivers a 4mt Maiden Ore Reserve. ASX Announcement Thursday, 26/07/12 Ref: /VMS/606/VMS00287 Australian mineral exploration company, Venture Minerals Limited (ASX

More information

Hancock s Pilbara Projects. Strengthening Australia. Hancock Prospecting. Presented by Bianca Rinehart. Director Hancock Prospecting Pty Ltd

Hancock s Pilbara Projects. Strengthening Australia. Hancock Prospecting. Presented by Bianca Rinehart. Director Hancock Prospecting Pty Ltd Hancock s Pilbara Projects Strengthening Australia Presented by Bianca Rinehart Director Hancock Prospecting Pty Ltd Metal Bulletin s 14th International Iron Ore Symposium Hancock Prospecting 30 May 1

More information

NEW HIGH GRADE IRON ORE DISCOVERY AT WOGGAGINNA

NEW HIGH GRADE IRON ORE DISCOVERY AT WOGGAGINNA ASX and Media Release 11 February 2009 KEY POINTS NEW HIGH GRADE IRON ORE DISCOVERY AT WOGGAGINNA Broad, near surface intervals of high grade iron mineralisation from RC drilling, including: 53m @ 60.5%

More information

For personal use only

For personal use only ASX Announcement July 2014 WILGERUP HEMATITE IRON ORE PROJECT General Manager 24 th July 2014 The Company Announcements Office Australian Securities Exchange Electronic Lodgement System Dear Sir/Madam

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 26 FEBRUARY 2019 PFS Metallurgical Drilling Update Highlights Thirteen PQ3 diamond holes completed for geotechnical tests and to provide approximately 2.4 tonnes of sample for metallurgical

More information

Exceptional cobalt, manganese and copper recovery at Ketchowla

Exceptional cobalt, manganese and copper recovery at Ketchowla ABN 64 123 993 233 ASX Announcement (ASX:AXE) 12 February ABN 64 123 2018 993 233 Exceptional cobalt, manganese and copper recovery at Ketchowla Highlights Metallurgical recoveries of > 90% for cobalt,

More information

BAUXITE RESOURCES LIMITED ABN

BAUXITE RESOURCES LIMITED ABN XITE RESOURCES LIMITED ABN 72 119 699 982 ASX/MEDIA RELEASE 22 August 2011 BRL INCREASES GLOBAL XITE RESOURCE BY 35% TO 33.4Mt HIGHLIGHTS Global bauxite resource increased to 33.4Mt @ 41.1% Total Alumina,

More information

Mount Gibson Iron Limited ABN

Mount Gibson Iron Limited ABN Mount Gibson Iron Limited ABN 87 008 670 817 Level 1, 2 Kings Park Road West Perth 6005, Western Australia PO Box 55, West Perth WA 6872 Telephone: 61-8-9426-7500 Facsimile: 61-8-9485 2305 E-mail: admin@mtgibsoniron.com.au

More information

BAUXITE RESOURCES LIMITED

BAUXITE RESOURCES LIMITED BAUXITE RESOURCES LIMITED ABN 72 119 699 982 ASX/MEDIA RELEASE 2 MAY 2013 Key Points: INTERIM DARLING RANGE BAUXITE RESOURCE UPGRADE - FELICITAS RESOURCE NOW AT 127.5Mt - TOTAL BAUXITE RESOURCE INCREASES

More information

For personal use only

For personal use only 21 March 2014 Drilling results confirm exploration model and presence of hematite at Mt Woods IMX Resources (ASX: IXR, TSX: IXR, IXR.WT) is pleased to advise that results of a pilot drilling program at

More information

For personal use only

For personal use only ASX Announcement October 2014 WILGERUP HEMATITE IRON ORE PROJECT General Manager 23 rd October 2014 The Company Announcements Office Australian Securities Exchange Electronic Lodgement System Dear Sir/Madam

More information

Significant cobalt and manganese mineralisation identified at Ketchowla

Significant cobalt and manganese mineralisation identified at Ketchowla ABN 64 123 993 233 ASX Announcement 17 January ABN 64 123 2017 993 233 Significant cobalt and manganese mineralisation identified at Ketchowla Highlights Ketchowla Cobalt Manganese Project exploration

More information

High-Grade Zinc Hits Continue at Far West

High-Grade Zinc Hits Continue at Far West ASX Release 29 June 2017 Highlights: High-Grade Zinc Hits Continue at Far West Assay results received for TH721, TH722 and TH723 diamond drill holes at the Thalanga Far West infill program, with the final

More information

Maiden Ore Reserve for Camel Creek JV

Maiden Ore Reserve for Camel Creek JV 10 September 2013 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN 85 003 257 556 Maiden Ore Reserve for Camel

More information

For personal use only

For personal use only KINGSTON RESOURCES LIMITED ASX Announcement 19 July 2017 ASX Code: KSN Share Price: A$0.018 Shares Outstanding: 665,769,985 Market Capitalisation: A$12.0m Cash: A$4.5m (Mar 31, 2017) ACN 009 148 529 Board

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 30th September, 2014 ABM s Development Plan & Production Guidance for Old Pirate High-Grade Gold Deposit Highlights: 50,000 to 60,000 ounces of gold production

More information

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT ABN 46 006 045 790 14 th December 2010 ASX ANNOUNCEMENT Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA Cullen Resources Limited (ASX:CUL) (Cullen) is pleased to report the maiden JORC

More information

Ferrowest acquires Yalyirimbi Iron Project

Ferrowest acquires Yalyirimbi Iron Project 16 May, 2013 Ferrowest acquires Yalyirimbi Iron Project Positive due diligence completed Ferrowest to proceed with the Sale and Purchase Agreement to acquire 60% of the Yalyirimbi Iron Project Strategic

More information

For personal use only

For personal use only AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT 22 June 2011 CENTAURUS DELIVERS INTERIM JORC RESOURCE UPGRADE FOR JAMBREIRO IRON ORE PROJECT DRILLING OF SOUTH EAST EXTENSION ZONE CONTINUES DRILLING & SCOPING

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 12 March 2018 MOU WITH BLACKHAM RESOURCES FOR POTENTIAL DEVELOPMENT OF LAKE WAY Salt Lake Potash (SLP) is pleased to announce that the Company has entered a Memorandum of Understanding

More information

Cleveland Tailings Project - Positive Metallurgical Test Results

Cleveland Tailings Project - Positive Metallurgical Test Results 4 December 2014 Highlights Cleveland Tailings Project - Positive Metallurgical Test Results Metallurgical test work supports the previous testing and proposed flow sheet designs for the Cleveland Tailings

More information

For personal use only

For personal use only BAUXITE RESOURCES LIMITED ABN 72 119 699 982 ASX/MEDIA RELEASE 2 May 2011 BAUXITE RESOURCE UPDATE FOR NORTH DARLING RANGE HIGHLIGHTS Upgrade in Resource for the Aurora Resource following modelling of recent

More information

For personal use only

For personal use only 4 April 2019 LITHIUM HYDROXIDE PROCESS WORKS UPDATE HIGHLIGHTS Argosy has undertaken high purity lithium hydroxide (LiOH) processing works at its pilot plant and in-house laboratory for customer sample

More information

For personal use only

For personal use only ASX RELEASE 26 FEBRUARY 2015 DIRECT SHIPPING BAUXITE CONFIRMED FOR METALLICA NEAR ITS NEW WEIPA MINE SITE Highlights of new bauxite assays for Area A at Urquhart Point (Cape York, Qld): New assay results

More information

ACQUISITION OF DINGO GOLD PROJECT

ACQUISITION OF DINGO GOLD PROJECT BLINA MINERALS NL ASX ANNOUNCEMENT Board: 5 May 2017 David Porter (Executive Director) Brett Fraser (Non-Executive Chairman) Jay Stephenson (Non-Executive Director) Capital Structure: 2.52 Billion Shares

More information

For personal use only

For personal use only 12 April, 2012 GOLD ASSAYS SUPPORT FURTHER EXPLORATION AT MARVEL LOCH Two gold anomalies identified at Edwards North A gold anomaly at Jaccoletti confirmed with silver and lead association Jaccoletti anomaly

More information

For personal use only

For personal use only ASX and Media Release 29 January 2013 SHEFFIELD GROWS PILBARA IRON PROJECT Five substantial new zones of hematite mineralisation outlined Three new tenements granted in the North Pilbara Sheffield wins

More information

For personal use only

For personal use only ASX/Media Announcement Tuesday, 18 th April 2017 Bulk sampling program in initial mining areas achieves average grades in excess of 2% Outstanding results demonstrate world-class strength of Pilgangoora

More information

2018 Resources and Reserves

2018 Resources and Reserves 2018 Resources and Reserves Aeris Resources Limited has updated its Mineral Resource and Ore Reserves estimates for its Tritton Copper Operations as at 30 June 2018. reported Measured and Indicated Mineral

More information

For personal use only

For personal use only Due Diligence Progressing on Cobalt Joint Venture Site Visit Confirms High Grade Cobalt Prospectivity Highlights Due diligence on high grade and near term cobalt production joint venture progressing well

More information

For personal use only

For personal use only ASX ASX ANNOUNCEMENT ANNOUNCEMENT th 15 15th January January 2018 2018 For personal use only PACIFIC BAUXITE ACQUIRES NEW BAUXITE PROJECT IN WESTERN AUSTRALIA HIGHLIGHTS Pacific Bauxite has acquired the

More information

PACIFIC BAUXITE ACQUIRES NEW BAUXITE PROJECT IN WESTERN AUSTRALIA

PACIFIC BAUXITE ACQUIRES NEW BAUXITE PROJECT IN WESTERN AUSTRALIA ASX ASX ANNOUNCEMENT ANNOUNCEMENT th 15 15th January January 2018 2018 PACIFIC BAUXITE ACQUIRES NEW BAUXITE PROJECT IN WESTERN AUSTRALIA HIGHLIGHTS Pacific Bauxite has acquired the Darling Range Bauxite

More information

The Manager 23 November 2010 Company Announcements Office Australian Securities Exchange

The Manager 23 November 2010 Company Announcements Office Australian Securities Exchange The Manager 23 November 2010 Company Announcements Office Australian Securities Exchange Dear Sir/Madam, RE : BARNES HILL RESERVE STATEMENT Metals Finance is pleased to provide the attached stock exchange

More information

Maiden Ore Reserve for Anglo Saxon Gold Project

Maiden Ore Reserve for Anglo Saxon Gold Project ABN 44 009 157 439 Company Announcement 20 June 2017 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com Maiden

More information

Increase in Mt Weld Resource Estimate for the Central Lanthanide Deposit and Duncan Deposit

Increase in Mt Weld Resource Estimate for the Central Lanthanide Deposit and Duncan Deposit 18 January 2012 Highlights Increase in Mt Weld Resource Estimate for the Central Lanthanide Deposit and Duncan Deposit The Mineral Resource estimate for Mount Weld is now 23.9 million tonnes, at an average

More information

BC IRON COMMITS TO FEASIBILITY STUDY ON NULLAGINE IRON ORE PROJECT POSITIVE SCOPING STUDY UNDERPINS MOVE TO FAST-TRACK DEVELOPMENT

BC IRON COMMITS TO FEASIBILITY STUDY ON NULLAGINE IRON ORE PROJECT POSITIVE SCOPING STUDY UNDERPINS MOVE TO FAST-TRACK DEVELOPMENT 1 July 08 BC IRON COMMITS TO FEASIBILITY STUDY ON NULLAGINE IRON ORE PROJECT POSITIVE SCOPING STUDY UNDERPINS MOVE TO FAST-TRACK DEVELOPMENT HIGHLIGHTS Scoping Study completed on 3Mtpa DSO operation from

More information

For personal use only

For personal use only ASX ANNOUNCEMENT AUSTRALIAN BAUXITE LIMITED ASX: ABZ Binjour Bauxite Resource Increased 46% to 24.5 Million Tonnes Company resources grow to 106 million tonnes 1,2,3,4 24.5 million tonnes of thick, gibbsite-rich

More information

ASX ANNOUNCEMENT 29 June 2012

ASX ANNOUNCEMENT 29 June 2012 ASX ANNOUNCEMENT AUSTRALIAN BAUXITE LIMITED ASX: ABZ Binjour Bauxite Resource Increased 46% to 24.5 Million Tonnes Company resources grow to 106 million tonnes 1,2,3,4 24.5 million tonnes of thick, gibbsite-rich

More information

For personal use only

For personal use only Acquisition of Strategic Zambian Cobalt Project to Proceed Following Successful Due Diligence HIGHLIGHTS: Legal and technical due diligence on the acquisition of a 70% interest in the Kitwe Cobalt-Copper

More information

For personal use only

For personal use only 24 July 2018 ASX ANNOUNCEMENT ASX: ASN, ASNOB Anson Receives Positive Results from Reactor Evaporation Work Highlights: Reactor evaporation completed within 2 hours Lithium concentration increased to 891ppm

More information

For personal use only

For personal use only 13 June 2018 Razafy system extends to the north-west and new lens identified at Razafy East Rock chip samples up to 20%TGC and mapping increases Razafy system to over 1.2km Drilling to commence immediately

More information

For personal use only

For personal use only Initial JORC Reserves Estimate for Bluff Project HIGHLIGHTS Initial JORC Reserves Estimate of 11 Mt mineable for Bluff Project In-fill drilling program completed to support further Resources and Reserves

More information

Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010

Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010 ASX RELEASE 18 AUGUST 2010 Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010 Key Points: Mining approvals granted for Stage 1 of the Nullagine Iron Ore JV

More information

BAUXITE RESOURCES LIMITED ABN

BAUXITE RESOURCES LIMITED ABN BAUXITE RESOURCES LIMITED ABN 72 119 699 982 ASX/MEDIA RELEASE 21 JUNE 2011 BRL INCREASES GLOBAL BAUXITE RESOURCE TO 24.8Mt IN NORTH DARLING RANGE HIGHLIGHTS Global Resource increased to 24.8Mt @ 30.6%

More information

IRON-NICKEL SCOPING STUDY COMMENCES ON KALGOORLIE NICKEL PROJECT

IRON-NICKEL SCOPING STUDY COMMENCES ON KALGOORLIE NICKEL PROJECT ASX Release 26 October 2011 IRON-NICKEL SCOPING STUDY COMMENCES ON KALGOORLIE NICKEL PROJECT INITIAL RESOURCE ESTIMATE COMPLETED AT THE GOONGARRIE SOUTH DEPOSIT AND BENCH-SCALE TESTING COMMENCED SUMMARY

More information

BAUXITE RESOURCES LIMITED

BAUXITE RESOURCES LIMITED BAUXITE RESOURCES LIMITED ABN 72 119 699 982 ASX/MEDIA RELEASE 5 JUNE 2012 SUBSTANTIAL NEW BAUXITE RESOURCE OF 73 MILLION TONNES AT FELICITAS PROJECT, DARLING RANGE WESTERN AUSTRALIA Key Points: Substantial

More information

Honeymoon Infill Drilling Campaign Complete - Mineralisation Remains Open at East Kalkaroo Deposit

Honeymoon Infill Drilling Campaign Complete - Mineralisation Remains Open at East Kalkaroo Deposit ASX Announcement 4 October 2018 ASX: BOE Honeymoon Infill Drilling Campaign Complete - Mineralisation Remains Open at East Kalkaroo Deposit HIGHLIGHTS Honeymoon Infill Drill Program completed ahead of

More information

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE ASX ANNOUNCEMENT 8 June 2016 MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE Open pit mining optimisation results demonstrate the potential for multiple low strip ratio, open pit operations across a range

More information

Fortescue Metals Group Ltd Diggers & Dealers 2006

Fortescue Metals Group Ltd Diggers & Dealers 2006 Fortescue Metals Group Ltd Diggers & Dealers 2006 Show Desktop.scf THE NEW FORCE IN IRON ORE August 2006 Project Dynamics The world needs more iron ore the basic building block of urbanisation Pilbara

More information

DIRECT SHIPPING BAUXITE QUALITY CONFIRMED

DIRECT SHIPPING BAUXITE QUALITY CONFIRMED ASX RELEASE 17 April 2015 DIRECT SHIPPING BAUXITE QUALITY CONFIRMED HIGH AVAILABLE ALUMINA RESULTS FOR AREA A DEPOSIT Highlights: Attractive average grades of 40% available alumina (Avl Al 2 O 3 ) and

More information

American Pacific Borate and Lithium agrees earn in rights to acquire 100% interest in two Borate and Lithium exploration Projects in Nevada, USA

American Pacific Borate and Lithium agrees earn in rights to acquire 100% interest in two Borate and Lithium exploration Projects in Nevada, USA 25 May 2018 American Pacific Borate and Lithium agrees earn in rights to acquire 100% interest in two Borate and Lithium exploration Projects in Nevada, USA Consistent with ABR s strategy to become a globally

More information

For personal use only

For personal use only Pre-Feasibility Study Highlights World Class Potential of Mt Lindsay Tin/Tungsten Project ASX Announcement Tuesday, 1 March 2011 Ref: /VMS/606/VMS/0249 Highlights: Project generates substantial revenue

More information

Duncan Deposit Update

Duncan Deposit Update 14 June 2012 Duncan Deposit Update Highlights: Scoping study advances Duncan Deposit process evaluation into pilot scale New customized process to be developed for feed material that is richer in Heavy

More information

Maiden Inferred Iron Ore Resources for Gum Flat

Maiden Inferred Iron Ore Resources for Gum Flat 30 April 2009 The Manager ASX Announcements Maiden Inferred Iron Ore s for Gum Flat Lincoln Minerals Limited ( LML ) is pleased to announce Inferred s for its Gum Flat Iron Ore Project on southern Eyre

More information

209 million 36.1% Fe

209 million 36.1% Fe ASX ANNOUNCEMENT 29 August 2011 ASX Code: BDR MAIDEN IRON ORE RESOURCE ON BEADELL S MINING CONCESSION - BRAZIL 209 million tonnes @ 36.1 Fe Beadell Resources Limited ( Beadell ) is pleased to announce

More information

New Graphite Discovery in Ghana

New Graphite Discovery in Ghana 30 July 2014 ASX Announcement New Graphite Discovery in Ghana RAB drilling has intersected significant widths of graphitic schist at Wa South with most holes ending in mineralisation This is the first

More information

STOCK EXCHANGE ANNOUNCEMENT SOUTHDOWN MAGNETITE PROJECT PROGRESS REPORT HIGHLIGHTS

STOCK EXCHANGE ANNOUNCEMENT SOUTHDOWN MAGNETITE PROJECT PROGRESS REPORT HIGHLIGHTS STOCK EXCHANGE ANNOUNCEMENT SOUTHDOWN MAGNETITE PROJECT PROGRESS REPORT HIGHLIGHTS 100 diamond drill holes aggregating 28,723 metres have been completed, representing approximately 80 of the planned resource

More information

ASX and Media Release

ASX and Media Release ASX and Media Release Quarterly activities report September quarter 2007 Western Plains Resources Ltd (ASX:WPG) completed a bankable feasibility study for the Peculiar Knob direct shipping iron ore project

More information

BAUXITE RESOURCES LIMITED ABN

BAUXITE RESOURCES LIMITED ABN BAUXITE RESOURCES LIMITED ABN 72 119 699 982 1 April 2010 CLARIFICATION OF 16 January 2009 RELEASE ON JORC RESOURCES Bauxite Resources Ltd (BRL or the company ASX code BAU ) has been advised by ASX that

More information

For personal use only

For personal use only ASX RELEASE 17 OCTOBER 2017 STUDIES COMMENCED AT WINGELLINA FOR HIGH GRADE NICKEL-COBALT Metals X Limited (Metals X or the Company) is pleased to advise that it has initiated further studies on its 100%-owned

More information

For personal use only

For personal use only 3 October 2018 ASX ANNOUNCEMENT ASX: ASN Anson Produces Lithium Hydroxide Product Highlights: First lithium hydroxide product precipitated from Cane Creek brine o Produced from R&D precipitation test work

More information

Cockatoo Island Proposed Acquisition Update and Stage 4 Valuation

Cockatoo Island Proposed Acquisition Update and Stage 4 Valuation Cockatoo Island Proposed Acquisition Update and Stage 4 Valuation HIGHLIGHTS Stage 4 Probable Ore Reserve reported in accordance with the JORC Code 1 of 1.2 Mt @ 68.5% iron. First iron ore production expected

More information

For personal use only

For personal use only Sean Kelly About Krucible Non executive Chairman Allan Branch Managing Director & CEO Ray Koenig Non executive Director ASX Announcement KRUCIBLE METALS LTD Mineral Discovery Company ABN:12 118 788 846

More information

OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT

OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT ASX Release 19 February 2010 OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT HIGHLIGHTS Option to purchase 100% of USA based Buena Vista Iron ore deposit for total consideration of $US8 million over approximately

More information

Arrium Mining. Continued Mining Success in the Face of Lower Iron Ore Prices. 11 th SAEMC 5 December 2014

Arrium Mining. Continued Mining Success in the Face of Lower Iron Ore Prices. 11 th SAEMC 5 December 2014 Arrium Mining Continued Mining Success in the Face of Lower Iron Ore Prices 11 th SAEMC 5 December 2014 Disclaimer The information in this presentation that relates to Mineral Resources or Ore Reserves

More information

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD November 3 rd 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD Construction work at Gascoyne s 100%

More information

Grants Iron Ore Basin Discovery Confirmed

Grants Iron Ore Basin Discovery Confirmed ASX MEDIA RELEASE 4 December 2018 Grants Iron Ore Basin Discovery Confirmed HIGHLIGHTS A major new iron ore deposit confirmed by discovery of thick, continuous iron formation over an area of at least 3.5

More information

Update on the Phase 1 Trial Mining Campaign at Gravelotte (Amended)

Update on the Phase 1 Trial Mining Campaign at Gravelotte (Amended) Update on the Phase 1 Trial Mining Campaign at Gravelotte (Amended) Phase 1 campaign delivers over 11,700 carats of emeralds to date, with test work results to assist with proposed reestablishment of commercial

More information

ASX ANNOUNCEMENT 27 February 2017

ASX ANNOUNCEMENT 27 February 2017 ASX ANNOUNCEMENT 27 February 2017 Exploration update. High quality refractory-grade bauxite discovered inland of Port Kembla ABx has discovered a layer of refractory-grade bauxite in Penrose state pine

More information

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES July 25 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES The Process

More information

DECEMBER 2010 QUARTERLY ACTIVITIES REPORT

DECEMBER 2010 QUARTERLY ACTIVITIES REPORT 21 January 2011 DECEMBER 2010 QUARTERLY ACTIVITIES REPORT HIGHLIGHTS Company s total JORC compliant resource inventory in south-east Brazil increased to 126.1 million tonnes at an average grade of 30.5%

More information

For personal use only

For personal use only ASX Release 12 May 2016 Sampling Confirms High Gold and Silver Grades at Liontown Tailings and Vomacka Oxide Stockpile Highlights: Sampling confirms high gold and silver grades at the Liontown tailings

More information

HIGHLY ENCOURAGING MANGANESE AND IRON ORE DRILLING RESULTS - WADDIKEE, SOUTH AUSTRALIA

HIGHLY ENCOURAGING MANGANESE AND IRON ORE DRILLING RESULTS - WADDIKEE, SOUTH AUSTRALIA For Immediate Release Friday 19 th September, 2008 ASX RELEASE HIGHLY ENCOURAGING MANGANESE AND IRON ORE DRILLING RESULTS - WADDIKEE, SOUTH AUSTRALIA HIGHLIGHTS Anomalous manganese and iron intersected

More information

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces ABN 28 009 174 761 31 March 2011 Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 www.regisresources.com Level 1 1 Alvan

More information

For personal use only

For personal use only ASX Code: MRP MacPhersons Resources Ltd ABN 98 139 357 967 ACN 139 357 967 Contact Details PO Box 10977 109 Maritana Street Kalgoorlie WA 6430 T +61 (0) 8 9091 7515 F +61 (0) 8 9091 7610 E info@mrpresources.com.au

More information

July 2009 DSO Resource and Reserve Upgrade

July 2009 DSO Resource and Reserve Upgrade 29 July, 2009 July 2009 DSO and Reserve Upgrade Atlas Iron Limited [ASX Code: AGO] is pleased to report its upgraded Direct Shipping Ore (DSO) resource and reserve position as at July 2009. HIGHLIGHTS

More information

FEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS FOR JOGJAKARTA IRON PROJECT

FEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS FOR JOGJAKARTA IRON PROJECT ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 29 AUGUST 2011 FEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS FOR JOGJAKARTA IRON PROJECT Highlights: Feasibility Study completed on a 2

More information

BAUXITE RESOURCES LIMITED

BAUXITE RESOURCES LIMITED BAUXITE RESOURCES LIMITED ABN 72 119 699 982 ASX/MEDIA RELEASE 30 JULY 2012 NEW BAUXITE RESOURCE AT WILLIAMS PROJECT, WESTERN AUSTRALIA Key Points: New Ceres Bauxite Resource 15.0 Mt @ 40.9 Al 2 O 3 (total),

More information

For personal use only

For personal use only ASX ASX ANNOUNCEMENT ANNOUNCEMENT 27 27 APRIL APRIL 2017 2017 PACIFIC BAUXITE TO ACQUIRE NEW BAUXITE PROJECT For personal use only IN SOLOMON ISLANDS HIGHLIGHTS Pacific Bauxite to expand its DSO-prospective

More information

Metallurgical Test Results Support Significant Cobalt Upgrade

Metallurgical Test Results Support Significant Cobalt Upgrade 10 August 2018 ASX: GAL Corporate Directory Directors Non-Executive Chairman Simon Jenkins Managing Director Brad Underwood Technical Director Noel O Brien Fast Facts Issued Capital 120.4m Share Price

More information

AGA. Australia ANGLOGOLD ASHANTI AUSTRALIA. Fraser Clark Manager: Geology

AGA. Australia ANGLOGOLD ASHANTI AUSTRALIA. Fraser Clark Manager: Geology AGA Australia ANGLOGOLD ASHANTI AUSTRALIA Utilisation of underground RC drilling and operational impacts at Sunrise Dam An Innovative Approach to Underground Grade Control Fraser Clark Manager: Geology

More information

For personal use only

For personal use only Canyon Resources Limited ACN 140 087 261 Level 9, 863 Hay St Perth, Western Australia, 6000 www.canyonresources.com.au 20 September 2018 HIGHLIGHTS: Minim Martap Bauxite Project JORC (2012) Compliant Resource

More information

MT CATTLIN DRILLING DELIVERS MORE HIGH GRADE INTERCEPTS

MT CATTLIN DRILLING DELIVERS MORE HIGH GRADE INTERCEPTS 8 December 2009 MT CATTLIN DRILLING DELIVERS MORE HIGH GRADE INTERCEPTS Highlights Latest drill results show excellent intercepts for lithium WMC Costean Zone shows near surface mineralisation with the

More information

For personal use only

For personal use only 29 February 2016 The Company Announcements Office Australian Securities Exchange Limited SCOPING STUDY ON APHRODITE OXIDE / SUPERGENE / TRANSITION ORES Key Points Aphrodite has commissioned independent

More information

ASX RELEASE 3 FEBRUARY 2015 AREA B URQUHART POINT DRILLING INTERSECTS ADDITIONAL BAUXITE

ASX RELEASE 3 FEBRUARY 2015 AREA B URQUHART POINT DRILLING INTERSECTS ADDITIONAL BAUXITE ASX RELEASE 3 FEBRUARY 2015 AREA B URQUHART POINT DRILLING INTERSECTS ADDITIONAL BAUXITE MAJOR SHIFT IN GLOBAL BAUXITE SUPPLY FAVOURS HIGHER AUSTRALIAN EXPORTS FROM CAPE YORK METALLICA Equity market sentiment

More information

8 January UPGRADED ORE RESERVE and EXTENDED MINELIFE MOLYHIL TUNGSTEN PROJECT

8 January UPGRADED ORE RESERVE and EXTENDED MINELIFE MOLYHIL TUNGSTEN PROJECT 8 January 2018 THOR MINING PLC UPGRADED ORE RESERVE and EXTENDED MINELIFE MOLYHIL TUNGSTEN PROJECT The Board of Thor Mining Plc ( Thor or the Company ) (AIM, ASX: THR), is pleased to provide a positive

More information

Re : Completion of the Barnes Hill drill-out

Re : Completion of the Barnes Hill drill-out 30 March 2010 The Manager Company Announcements Office Australian Securities Exchange By e-lodgement (ASX code: MFC) Dear Sir/Madam Re : Completion of the Barnes Hill drill-out The following comprises

More information

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD December 8 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD Construction at Gascoyne s

More information

For personal use only

For personal use only ASX Release 16 January 2018 High-grade zinc intersections continue at the Significant Liontown East Discovery Highlights: Assay results from LTED08W4 and LTED10 extend Liontown East and demonstrate excellent

More information

Axehandle Pit Feasibility Study and Mining Reserve

Axehandle Pit Feasibility Study and Mining Reserve Feasibility Study and Mining Reserve TECHNICAL REPORT NUMBER: Revision 2 NAME: See Above ACTIVITIES: N/A DUE DATE: N/A PREPARED BY: Charles Hastie DATE: 27/03/2015 Distribution: 1 COMPETENT PERSON S CONSENT

More information

Estimating and Reporting of

Estimating and Reporting of AUSTRALIAN GUIDELINES FOR Estimating and Reporting of Inventory Coal, Coal Resources and Coal Reserves 2003 EDITION PREPARED BY THE COALFIELDS GEOLOGY COUNCIL OF NEW SOUTH WALES AND THE QUEENSLAND MINING

More information

Updated Epanko Scoping Study

Updated Epanko Scoping Study ASX ANNOUNCEMENT 18 August 2014 Updated Epanko Scoping Study Kibaran Resources Limited (ASX: KNL) is pleased to announce the upgraded Scoping Study ( Study ) completed for its Epanko graphite deposit.

More information

Labrador Iron Mines Commences 2012 Exploration Program

Labrador Iron Mines Commences 2012 Exploration Program Labrador Iron Mines Commences 2012 Exploration Program Drill programs designed to expand and extend resources Toronto, Ontario, June 13, 2012. Labrador Iron Mines Holdings Limited ( LIM or the Company

More information

Maiden Scandium Resource announced for Lucknow Nickel Cobalt & Scandium Deposit

Maiden Scandium Resource announced for Lucknow Nickel Cobalt & Scandium Deposit Friday 20 th August 2010 ASX Release Maiden Scandium Resource announced for Lucknow Nickel Cobalt & Scandium Deposit Maiden resource announced for the Lucknow scandium (Sc - a Rare Earth Element) deposit

More information

Gum Creek Gold Project Free Milling Scoping Study

Gum Creek Gold Project Free Milling Scoping Study 18 March 2016 ASX: PAN Highlights Gum Creek Gold Project Free Milling Scoping Study Mining Inventory of 4.9Mt at 1.94g/t Au for 309koz gold based on material from Swan, Swift and Howards Resources Average

More information