2 Outline Safety-oriented architectural design Safety of fringe magnetic field Cryogen safety Safety considerations for upgrading 1.5T MRI system to 3T

3 Magnetic Resonance Imaging

4 Safe MRI Practices Safety-oriented architectural and interior design Screening of all patients, accompanying personnel, attending health care professionals and house-keeping staff who enter the controlled access volume Monitoring of the patients being examined MR safety education for all staff Clear lines of responsibility Regular review of safety practices

5 MRI Site Planning Technical considerations for the environment of MRI site Structural loading Avoid vehicle and lift ferromagnetic influences Avoid vibration and noise sensitive areas Avoid electrical main supplies to the building Feasibility to control access to regions within 5 Gauss line Safe area for the outlet of quench vent pipe Easy access of service vehicle and cryogen supply

6 Safety-oriented Floor Layout MRI site is conceptually divided into four zones Zone I Freely accessible to the general public Zone II Interface between the publicly accessible, uncontrolled Zone I and the strictly controlled Zones III & IV Patient preparation area ACR Safe MR Practices 2007

7 Safety-oriented Floor Layout Zone III All access to Zone III should be strictly restricted Free access by unscreened non-mr personnel or ferromagnetic objects / equipment can result in serious injury and death ACR Safe MR Practices 2007

8 Safety-oriented Floor Layout Zone IV MR scanner magnet room Zone IV should always located within Zone III MR technologists would be able to directly observe and control, via line of sight or via CCTV, the entrances or access corridors to Zone IV from their normal positions when stationed at the operator console ACR Safe MR Practices 2007

9 Safety-oriented Floor Layout Many multi-modality radiology facilities may combine patient waiting areas for patients undergoing different types of imaging examinations Safety challenges for unscreened patients inadvertently enter Zone III & IV with a contraindicated implant or a ferromagnetic object The practice of shared patient waiting areas between MR and other imaging modalities is discouraged from the point of view of MR safety

10 Inappropriate Design of MRI Suite Patient Waiting Area Magnet Room Control Room

11 Safety-oriented Floor Layout

12 Safety-oriented Floor Layout Zone II Zone I Zone II Zone III Zone IV Zone III Zone IV

13 Emergency Resuscitation In case of medical emergency within Zone IV (Magnet Room), MR personnel should immediate initiate CPR while the patient is emergently removed from Zone IV to a predetermined magnetically safe location in Zone II or III Quenching the magnet is not advised for medical emergency

14 Emergency Resuscitation Emergency patient table unlatching and undocking mechanism MRI compatible stretcher

15 Magnetic Fringe Field Magnetic Field Strength Tesla (T) Gauss (G) 1 Tesla = 10,000G Hand-held Gaussmeter

16 Magnetic Fringe Field Magnetic field is three dimensional and extends into space above and below the magnet as well as to the surrounding space at the same level Objects including biomedical implants & other equipment within this 3D space can be affected by the magnetic field or can affect the magnetic field Proximity Limits

17 Fringe Field Plot Top View Vertical View

18 Magnet Moving Metal Sensitivity Line Plot

19 Two Magnet Site Layout For two magnets installation, interaction can occur between magnetic fields To avoid magnetic field interaction, the 3 Gauss line of each magnet must not intersect

20 Magnetic Shielding Magnetic shielding is used to limit the fringe field around the magnet Limit the size of 5- Gauss exclusion zone Methods of magnetic shielding Active Shielding Passive Shielding

21 Active Shielding The interaction of the magnetic coils and shielding coils results in effective shielding of active shield magnets

22 Passive Shielding Consists of iron plates in the magnet room walls, floor & ceiling Special consideration should be given when selecting a magnet site location due to the expense and effort required to provide passive shielding Designing a magnetic shield requires a comprehensive computer analysis which predicts the effect the shield will have on the homogeneity of the magnetic field

23 5 Gauss Exclusion Zone 3-dimensional volume Confine within the magnet room (Zone IV) for the sake of easy control access

24 5-Gauss Exclusion Zone Outside Magnet Room 5-Gauss Exclusion Zone Magnet Room Control Room

25 Blooming of Magnetic Field Active shield magnets Potential for the active shielding coils that restrain the magnetic field to fail independently from the primary magnetic coils The magnetic field will be bloomed or expanded to a much larger volume It is necessary to consider the size of the unrestrained magnetic field during site planning

26 Magnetic Contamination Gradual buildup of permanent magnetic field in ferrous materials near the magnet including steel column, steel reinforcing in concrete and steel conduits due to long term exposure to high-strength magnetic field of MRI system Unlikely to develop magnetic field at the level of Zone III & IV May interfere with operation of other modalities if there were to be sited in the former magnet room

27 Cryogen Safety Superconducting magnets for mid- to high-field MRI systems Liquid Helium is the most commonly used cryogen in MR environment In case of quenching, the cryogenic liquid will rapidly boil off and expand into a gaseous state The liquid / gas ratio for Helium is 1 / 760

28 Cryogen Vent Pathway If superconducting magnet quenches, the escaping cryogenic gases are ducted outside the building to an unoccupied discharge area via the quench vent pipe Obstruction, inappropriate pipe materials, insufficient pipe caliber / length, or faulty connections in the length of quench vent pathway may cause failure between the magnet and the point of discharge

29 Cryogen Safety Potential safety concerns: Asphyxiation is possible as cryogenic gas replace oxygenated air Frostbite and cryo-burn may occur due to the exceedingly low temperature of the cryogen Hyperbaric pressure considerations within magnet room (Zone IV) can rarely exist in the unlikely event of a quench in which some of the cryogenic gases escape into the magnet room

30 Cryogen Vent Pathway To install the quench vent pipe according to the technical specifications of individual MRI system To inspect cryogen vent systems at least annually Following any quench of a superconducting magnet, to conduct a thorough inspection of the cryogen vent system

31 Cryogen Safety Failure of cryogen vent pipe may lead to considerable quantities of cryogenic gas being inadvertently discharged into the magnet room (Zone IV) The thermal expansion of the cryogens can positively pressurize the magnet room and displace oxygenated air within the magnet room Oxygen sensor and alarm system shall be available to alert the MR personnel for low oxygen level within the magnet room

32 Design Considerations Door of Magnet Room Swing in towards magnet room The positive pressure builds up within the magnet room due to leakage of cryogenic gases may push a closed door against the stops and entrap persons inside the magnet room until the pressure inside the magnet room is equalized with that outside the room

33 Design Considerations Door of Magnet Room Swing away from magnet room In a severe positivepressure situation, unlatching an outwardswing door may permit the door to burst open with tremendous pressure, potentially injuring person opening the door

34 Design Elements for Hyperbaric Pressure Considerations All magnet rooms shall be provided with an emergency exhaust pathway to vent the cryogenic gas away from the magnet room An additional form of passive pressure relief / pressure equalization system shall be available to minimize the risk of hyperbaric pressure

35 Technical Considerations for upgrading 1.5T MRI System to 3T Increased structural loading for 3T MRI system

36 Technical Considerations for upgrading 1.5T MRI System to 3T Increased structural loading for 3T MRI system Expanded fringe fields? Interference with other modalities in close vicinity 5-Gauss exclusion zone may be outside the magnet room (Zone IV) Bird Eye View 5.0m Magnet 2.48m 3.0T & 1.5T 4.0m 5 Gauss line for 3T MRI system 2.8m 5 Gauss line for 1.5T MRI system

37 Technical Considerations for upgrading 1.5T MRI System to 3T Increased structural loading Expanded fringe fields? Interference with other modalities in close vicinity 5-Gauss exclusion zone may be outside the magnet room (Zone IV) Blooming of magnetic field

38 Technical Considerations for upgrading 1.5T MRI System to 3T Increased structural loading Expanded fringe fields? Interference with other modalities 5-Gauss exclusion zone may be outside the magnet room (Zone IV) Blooming of magnetic field Vibration sensitivity & Moving metal sensitivity

39 Technical Considerations for upgrading 1.5T MRI System to 3T Increased structural loading Expanded fringe fields? Interference with other modalities 5-Gauss exclusion zone may be outside the magnet room (Zone IV) Blooming of magnetic field Vibration sensitivity & moving metal sensitivity Field strength limits for MR conditional equipment Physiological monitor, infusion pump or portable ventilator

40 Conclusion Safety-oriented architectural design is important for implementation of MR safety procedures and policy Although quenching is a rare event, cryogen safety shall be seriously considered Upgrade of 1.5T MRI system to 3T is not a simple equipment replacement Safety awareness of MRI personnel is crucial

41 Conclusion There is escalating pressure on MRI Unit to perform ever-increasing no. & range of examinations in shorter time Without good site design, incorporating safety considerations from very beginning, clear operational procedures, well-trained staff and cooperation from other health-care professionals this pressure may lead to system failure which will sooner or later result in an accident or adverse event

42

MRI Safety Overview - Quench

MRI Safety Overview - Quench MRI Safety Overview - Quench Zachary W. Friis, Ph.D., DABR Quench What is a Quench? Quench is term we give to the situation that occurs (accidentally or purposefully) in which a super conducting magnet

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

MR Project Implementation Guide

MR Project Implementation Guide GE Healthcare MR Project Implementation Guide Working together to get your new technology online so you can begin providing patient care. Table of Contents Table of Contents... 3 Use of this Guide...

More information

Chapter 2. Magnetic Resonance Safety. Andrew Simmons and Kristina Hakansson. Abstract. 1. Legislation, Guidance and Best Practice

Chapter 2. Magnetic Resonance Safety. Andrew Simmons and Kristina Hakansson. Abstract. 1. Legislation, Guidance and Best Practice Chapter 2 Magnetic Resonance Safety Andrew Simmons and Kristina Hakansson Abstract The safe operation of both clinical and pre-clinical MR systems is critical. There are a wide range of potential MR hazards.

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

Superconducting. magnets. The heart of NMR

Superconducting. magnets. The heart of NMR MARTIN TOWNSEND OXFORD INSTRUMENTS SUPERCONDUCTIVITY Superconducting The achievements of Oxford Instruments Superconductivity as a world leader in the research and development of superconducting magnets

More information

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding

More information

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS Introduction An applicant applying for permanent electric service who opts to have the padmounted transformers installed inside his building

More information

MRI Safety. How can we ever forget?? July Missile Effect. Have we lost sight of our MR Safety responsibility?

MRI Safety. How can we ever forget?? July Missile Effect. Have we lost sight of our MR Safety responsibility? How can we ever forget?? July 2001 MRI Safety Kristan Harrington, MBA, RT (R ),(MR)(ARRT) 1 2 Missile Effect. https://lh4.googleusercontent.com/-ivs-anw8vig/twmc3bjnp7i/aaaaaaaadtq/hzqgheggdcy/s1600/047.jpg

More information

CHILLED WATER DISTRIBUTION SYSTEM

CHILLED WATER DISTRIBUTION SYSTEM Campus-Wide System: A campus-wide central chilled water system has been developed in recent years and is being expanded to serve additional cooling loads as need arises and opportunity affords. This system

More information

TRENCH SAFETY TRAINING

TRENCH SAFETY TRAINING TRENCH SAFETY TRAINING TRENCH SAFETY TRAINING TRENCHING ACCIDENTS ACCOUNT FOR MORE THAN 100 DEATHS A YEAR ON U.S. SOIL. 11 TIMES MORE WORKERS ARE INJURED 1% OF ALL CONSTRUCTION ACCIDENTS INJURY RATE FOR

More information

STRUCTURAL RADIATION SAFETY AT A NUCLEAR FACILITY

STRUCTURAL RADIATION SAFETY AT A NUCLEAR FACILITY GUIDE YVL C.1 / 15 November 2013 STRUCTURAL RADIATION SAFETY AT A NUCLEAR FACILITY 1 Introduction 3 2 Scope of application 3 3 General design requirements 3 4 Radiation safety aspects in the layout design

More information

Requirements for Additions/Enclosed Deck/Finished Bonus Room/Dormer

Requirements for Additions/Enclosed Deck/Finished Bonus Room/Dormer Requirements for Additions/Enclosed Deck/Finished Bonus Room/Dormer Architectural prints one (1) set floor plan addressing the following items: o Decay-resistant sill plates o Show how and where combustion

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G

More information

SAFETY ORIENTATION FOR EXCAVATION WORKERS

SAFETY ORIENTATION FOR EXCAVATION WORKERS SAFETY ORIENTATION FOR EXCAVATION WORKERS Every excavation job is different: soil, work zone characteristics, near by structures, utilities, nothing is ever the same. Because of this, an effective worker

More information

2 / 1. SUMMARY public, should be well documented, and should be reviewed on a regular basis to determine whether it continues to meet the operational

2 / 1. SUMMARY public, should be well documented, and should be reviewed on a regular basis to determine whether it continues to meet the operational 1. Summary This Report is concerned with the protection of individuals who may be exposed to radiation emitted by x-ray equipment and both sealed and unsealed radioactive sources in the practice of veterinary

More information

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 27, 2014 ITB NO. 14-33 WAKEFIELD PUMPING STATION UPGRADE ADDENDUM NUMBER

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

PUMP STATION CHECK LIST

PUMP STATION CHECK LIST PUMP STATION CHECK LIST I. SITE LOCATION D. E. Location of pump station site has to be reviewed and approved by Planning Department and Department of Public Utilities. (II-V-F-1-J-i) The pump station has

More information

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION: SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section

More information

Victorian Dangerous Goods (Storage & Handling) Regulations 2012 Summary

Victorian Dangerous Goods (Storage & Handling) Regulations 2012 Summary Victorian Dangerous Goods (Storage & Handling) Regulations 2012 Summary Duties of Manufacturer / Supplier Regs 16 & 17 Must not supply dangerous goods if have reasonable grounds to suspect packaging and

More information

Assessing Hazards in Manure Storage & Handling Systems

Assessing Hazards in Manure Storage & Handling Systems Assessing Hazards in Manure Storage & Handling Systems Cheryl A. Skjolaas Agricultural Safety Specialist UW Center for Agricultural Safety and Health More regulations Isn t there enough already? Wage and

More information

Eurobitume UK. Site Inspection for Delivery of Bitumen

Eurobitume UK. Site Inspection for Delivery of Bitumen Eurobitume UK Site Inspection for Delivery of Bitumen June 2015 To be used in conjunction with the UK edition of the Eurobitume Guide to Safe Delivery of Bitumen Introduction and Scope This site inspection

More information

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com

More information

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED Chapter 17 Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.1.1 Applicability The regulations in this chapter apply to any private potable water supply system where plumbing fixtures are

More information

SECTION COPPER MODULAR PANEL RADIO FREQUENCY AND ELECTRO-MAGNETIC SHIELDING (STEEL OPTION)

SECTION COPPER MODULAR PANEL RADIO FREQUENCY AND ELECTRO-MAGNETIC SHIELDING (STEEL OPTION) SECTION 13096 COPPER MODULAR PANEL RADIO FREQUENCY AND ELECTRO-MAGNETIC SHIELDING (STEEL OPTION) PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Radio frequency shielding system for the MRI Scan Room and

More information

Advanced Ventilation for Residential applications FBC Res 2010.

Advanced Ventilation for Residential applications FBC Res 2010. Advanced Ventilation for Residential applications FBC Res 2010. Course Description Review of the Residential Ventilation requirements in the Florida Building Code, Residential 2010. I. Introduction Dean

More information

Installation instructions

Installation instructions Installation instructions Holetherm Double-walled flue gas discharge system (DW) 2016 All information in this release is subject to misprints. No liability is accepted for the consequences of misprints.

More information

Basic Design Considerations for a Laboratory. The Ministry of Health & Family Welfare, under the Drugs & Cosmetics Act, laid down

Basic Design Considerations for a Laboratory. The Ministry of Health & Family Welfare, under the Drugs & Cosmetics Act, laid down Basic Design Considerations for a Laboratory Archana Salil, Director and Principal Architect- Arena Consultants The Ministry of Health & Family Welfare, under the Drugs & Cosmetics Act, laid down Good

More information

IDENTIFICATION OF VENTILATION PROBLEMS IN AN UNDERGROUND BUS TERMINAL IN KOREA

IDENTIFICATION OF VENTILATION PROBLEMS IN AN UNDERGROUND BUS TERMINAL IN KOREA IDENTIFICATION OF VENTILATION PROBLEMS IN AN UNDERGROUND BUS TERMINAL IN KOREA H Han 1* and Y-I Kwon 2 1 Dept. Of Mechanical Engineering, Kookmin University, Korea 2 Dept. Of Building Mechanical Engineering,

More information

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

Engineering Design Center. Standard Drawings. 1st Edition -January 2016 Engineering Design Center Standard Drawings 1st Edition -January 2016 Golden State Water Company Standard Drawings 1/11/2016 Table of Contents PART A STANDARD DRAWINGS Section I Pipeline Construction P-1

More information

Comparison of the life safety elements of the 1997 UBC and the IBC 2000.

Comparison of the life safety elements of the 1997 UBC and the IBC 2000. Comparison of the life safety elements of the 1997 UBC and the IBC 2000. Introduction The Building Performance Research Institute s mission is primarily one of education on building safety and performance.

More information

Section Asbestos Containment Procedures

Section Asbestos Containment Procedures Section Cover Page Section 02 82 05 2017-10-01 Use this Section where full containment will be required, or if a Contractor option, may be required, depending on the removal method(s) selected by the Contractor.

More information

ANSI/ASHRAE STANDARD , METHODS OF TESTING CHILLED BEAMS

ANSI/ASHRAE STANDARD , METHODS OF TESTING CHILLED BEAMS ANSI/ASHRAE STANDARD 200-2015, METHODS OF TESTING CHILLED BEAMS NEMIC 2017 Agenda 1. Foreword 2. Purpose & Scope 3. Definitions 4. Instrumentation & Facilities 5. Test Methods 6. Reporting 7. Normative

More information

ENBRIDGE GAS DISTRIBUTION METER BOX. Builders Installation Guidelines September 2011

ENBRIDGE GAS DISTRIBUTION METER BOX. Builders Installation Guidelines September 2011 ENBRIDGE GAS DISTRIBUTION METER BOX Builders Installation Guidelines September 2011 Meter Box Builder s Guildline for Installations Introduction These guidelines are provided to communicate to Builders,

More information

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Communications equipment coordination and installation. 2. Sleeves for pathways and cables. 3. Raceway

More information

BC BUILDING CODE ERRATA

BC BUILDING CODE ERRATA BC BUILDING CODE ERRATA The following changes should be made to print and offline copies of the 2012 BC Codes. The 2012 BC Codes subscription products include these changes. Highlighted text is used in

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 07 40 00 Roofing 1. General Several factors repeatedly show up during the inspection of roofs that have failed prematurely. They include inappropriate use of materials, poor drainage systems, poor details

More information

Acoustic and Vibration Isolation for Asylum Research AFMs

Acoustic and Vibration Isolation for Asylum Research AFMs Vibration Enclosures and Tables Acoustic and Vibration Isolation for Asylum Research AFMs DATA SHEET 01 Isolation from the lab environment plays an important role in image and measurement quality. Our

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form

Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Reclaimed Water

More information

RESIDENTIAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING REQUIREMENTS RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell

More information

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS NOTE: Building Code compliance is the obligation of design professionals and/or contractors. Plan review and inspection guidelines are to be used to ensure

More information

CONTENT ELECTRICAL WORKS INSTALLATION OF LOW VOLTAGE SYSTEMS VENTILATION AND AIR-CONDITIONING SYSTEMS WATER SUPPLY AND SEWERAGE FACADE WORKS

CONTENT ELECTRICAL WORKS INSTALLATION OF LOW VOLTAGE SYSTEMS VENTILATION AND AIR-CONDITIONING SYSTEMS WATER SUPPLY AND SEWERAGE FACADE WORKS ENGINEERING WORKS CONTENT ELECTRICAL WORKS INSTALLATION OF LOW VOLTAGE SYSTEMS VENTILATION AND AIR-CONDITIONING SYSTEMS WATER SUPPLY AND SEWERAGE FACADE WORKS 5 6 7 9 10 FINISHING WORKS SECURITY FIBER

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

Basement Renovation Guide For Residential Dwellings

Basement Renovation Guide For Residential Dwellings 1 Development Services Department Building Permit & Inspection Services Basement Renovation Guide For Residential Dwellings This document is a guide for home owners and does not cover all possible conditions.

More information

Freight Elevator Series GFM-T

Freight Elevator Series GFM-T Freight Elevator Series GFM-T Mitsubishi Freight Elevators Can Improve our Goods-Handling Ability Elevator Selection 1. Rated capacity and car size What is the maximum weight or size of goods to be transported

More information

2012 IRC Sections R303 R310 Building Planning II

2012 IRC Sections R303 R310 Building Planning II Study Session 3 2012 IRC Sections R303 R310 Building Planning II OBJECTIVE: To develop an understanding of the health and safety criteria of the code, including light and ventilation; minimum room areas

More information

Preventing Electrocutions:

Preventing Electrocutions: SAFETY CORNER Preventing Electrocutions: While Working with Scaffolds Near Overhead Power Lines Warning! Workers may be electrocuted when erecting, moving, or working from metal or conductive scaffolds

More information

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

NOTE: Some guidance on a performance approach to natural ventilation systems design is provided in the Supplement to this Standard.

NOTE: Some guidance on a performance approach to natural ventilation systems design is provided in the Supplement to this Standard. 19 SECTION 3 NATURAL VENTILATION 3.1 SCOPE OF SECTION This Section specifies the means of achieving the quantity of outdoor air required in a naturally ventilated enclosure. The provisions described include

More information

WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES

WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES Project Name: Project Manager: Date Building of Hand Over: Design Consultants: Qualifications, skills, experience: Hazard Identified Risk Level

More information

Acoustic Design Criteria

Acoustic Design Criteria Apartment Acoustics Apartment Buildings Acoustic Design Criteria Building Code of Australia: - Intertenancy walls and floors - Corridor walls and doors - Floor impact isolation - Lift, stair and core walls

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Push Fit Drain, Waste and Vent (DWV) Fittings

Push Fit Drain, Waste and Vent (DWV) Fittings NSF International Special Engineered Specification NSF SE 14974 Push Fit Drain, Waste and Vent (DWV) Fittings The Public Health and Safety Company. TM NSF SE 14974 SPECIFICATIONS FOR A SPECIAL ENGINEERED

More information

FIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS

FIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS FIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS ENCLOSURE MODEL 90566400 FOR INSERT MODEL 5660NA And ENCLOSURE MODEL 90566000 FOR INSERT MODEL 5660 STANDARD KEEP THESE INSTRUCTIONS FOR FUTURE USE

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

The Potential for Electromagnetic Metal Forming for Plane (Car Body) Components

The Potential for Electromagnetic Metal Forming for Plane (Car Body) Components The Potential for Electromagnetic Metal Forming for Plane (Car Body) Components R. Neugebauer, P. Blau, H. Bräunlich, M. Pfeifer Abstract Classical quasi-static technologies of sheet metal forming are

More information

Engineering Specifications for the CXI Room of the FEH LUSI Document # ESD SP

Engineering Specifications for the CXI Room of the FEH LUSI Document # ESD SP LCLS Engineering Specifications Document # 1.9-114 LUSI, CF, XES Revision 0 Engineering Specifications for the CXI Room of the FEH LUSI Document # ESD SP-391-001-37 Aymeric Robert Author, LUSI Scientist

More information

INC Pre-Assembled Structures

INC Pre-Assembled Structures INC Pre-Assembled Structures Drop-In In-Place Noise Control Pre-Engineered Factory Finished High Performance Rugged Durability INC pre-assembled structures offer a high performance, cost-effective alternative

More information

ArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette

ArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette ArcelorMittal Europe - Long Products Sections and Merchant Bars Office Building ArcelorMittal in Esch Alzette Location the country, at the heart of the iron and steel region. It has good access to the

More information

Radon Vent Pipe System. Labeling Performance Indicators

Radon Vent Pipe System. Labeling Performance Indicators Section 6 Radon Vent Pipe Labeling Performance Indicators Radon Vent Pipe System Connected after sub-grade system installed Pipe cannot be trapped Provide space in chases Support at each floor level Discharge

More information

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility: Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Sanitary Sewer

More information

Customer Requirements Customer-owned Transformer Vault Room

Customer Requirements Customer-owned Transformer Vault Room Scope This standard documents the requirements for customer-owned vault rooms containing transformers and switches that are owned, operated, and maintained by Tacoma Power. It does not address transformer

More information

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Paper 4d Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Liquefied Ammonia, or Liquid NH3, is (like LNG or liquefied natural gas) a cryogenic fluid and production

More information

IECC Commercial Significant Changes Summary Tier I

IECC Commercial Significant Changes Summary Tier I 2009-2015 IECC Commercial Significant Changes Summary Tier I The first change is in the layout of the book. Instead of having Chapters 1-3 that applied to all projects and then having Chapter 4 Residential

More information

THOMAS JEFFERSON UNIVERSITY HOSPITAL STANDARD OPERATING PROCEDURE FOR THE BUILD OUT OF TELECOMMUNICATIONS ROOMS AND ASSOCIATED SPACES

THOMAS JEFFERSON UNIVERSITY HOSPITAL STANDARD OPERATING PROCEDURE FOR THE BUILD OUT OF TELECOMMUNICATIONS ROOMS AND ASSOCIATED SPACES THOMAS JEFFERSON UNIVERSITY HOSPITAL STANDARD OPERATING PROCEDURE FOR THE BUILD OUT OF TELECOMMUNICATIONS ROOMS AND ASSOCIATED SPACES PREPARED BYBALA CONSULTING ENGINEERS, INC FOR THOMAS JEFFERSON UNIVERSITY

More information

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART

More information

Application for Certificate of Acceptance

Application for Certificate of Acceptance Application for Certificate of Acceptance Section 97, Building Act 2004 The Building: Street address of building: [For structures that do not have a street address, state the nearest street intersection

More information

Jean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp.

Jean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp. Cable Management Firestop Jean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp. FIRESTOPPING KNOWLEDGE FOR BETTER SPECIFICATION AND DESIGN OF FIRE-RATED CONSTRUCTION Presentation Topics and

More information

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220550 - VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. It is the intent of this specification to provide vibration isolation supports for Plumbing

More information

RESEARCH REACTOR FRJ-1 (MERLIN) THE CORE STRUCTURES OF THE REACTOR BLOCK ARE DISMANTLED

RESEARCH REACTOR FRJ-1 (MERLIN) THE CORE STRUCTURES OF THE REACTOR BLOCK ARE DISMANTLED RESEARCH REACTOR FRJ-1 (MERLIN) THE CORE STRUCTURES OF THE REACTOR BLOCK ARE DISMANTLED B. Stahn, R. Printz, K. Matela, C. Zehbe Forschungszentrum Jülich GmbH 52425 Jülich, Germany J. Pöppinghaus Gesellschaft

More information

Communications Page 1 of 9

Communications Page 1 of 9 Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a

More information

Installation instructions

Installation instructions Installation instructions Holetherm Single-walled flue gas discharge system (EW) 2016 All information in this release is subject to misprints. No liability is accepted for the consequences of misprints.

More information

Zero Carbon Building Energy Modelling Guidelines. October 31, 2017

Zero Carbon Building Energy Modelling Guidelines. October 31, 2017 Zero Carbon Building Energy Modelling Guidelines October 31, 2017 Contents 1. INTRODUCTION... 3 1.1 DEFINITIONS... 4 2. CALCULATING TEDI... 5 2.1 INTERNAL HEAT GAINS... 6 2.2 CALCULATING BUILDING ENVELOPE

More information

Insight. The Hollow Building. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE

Insight. The Hollow Building. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE Insight The Hollow Building An edited version of this Insight first appeared in the ASHRAE Journal. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE Buildings today are hollow and multilayered with

More information

Welding and Cutting Safety

Welding and Cutting Safety Welding and Cutting Safety Welding and Cutting Objectives Describe welding safety requirements for: Eye protection Protective clothing Fire Prevention Requirements Ventilation Safety Requirements Electrical

More information

FA R-0014 FTEV , Alter Area for 19 SOS Sim Parts Storage Bldg Questions & Answers

FA R-0014 FTEV , Alter Area for 19 SOS Sim Parts Storage Bldg Questions & Answers FA4417-17-R-0014 FTEV 16-1177, Alter Area for 19 SOS Sim Parts Storage Bldg. 90710 Questions & Answers Question 1 Please clarify the extents of removal of pipe with asbestos containing insulation shown

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

MSC Guidelines for Review of Ventilation System Plans

MSC Guidelines for Review of Ventilation System Plans K. B. FERRIE, CDR, Chief, Hull Division Purpose: This Plan Review Guideline (PRG) explains the requirements for seeking plan approval of ventilation systems from the Marine Safety Center (MSC) for most

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Transport Sector Portfolio

Transport Sector Portfolio Transport Sector Portfolio Rehabilitation of 4.476 Kms of Asphalt Road in Shindand District, Herat Province, Afghanistan. United Nations Office for Project Services ( UNOPS ) -and- Name of Contractor Site

More information

Commercial Medical Marijuana Operation Design Guidelines

Commercial Medical Marijuana Operation Design Guidelines City of Coalinga Community Development Department Commercial Medical Marijuana Operation Design Guidelines The provisions set forth in this document identify the desired level of design quality for all

More information

INTERIOR ENVIRONMENT

INTERIOR ENVIRONMENT CHAPTER 12 INTERIOR ENVIRONMENT > SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern ventilation, temperature control, lighting, yards and courts, sound transmission, room dimensions,

More information

Element Z General Design Requirements Room Standards

Element Z General Design Requirements Room Standards Toilet Room Guidelines PART 1 - GENERAL 1.01 OVERVIEW A. This document provides design and construction criteria for public/patient, and staff toilet rooms at (Owner). PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

STERIS Continuous Effluent Decontamination (CED) System

STERIS Continuous Effluent Decontamination (CED) System LABORATORY RESEARCH STERIS Continuous Effluent Decontamination (CED) System The Safety and Efficacy of Continuous Effluent Decontamination A Breakthrough in Decontamination Technology Continuous Effluent

More information

Fast Corrosion Screening Technique Saturation Low Frequency Eddy Current

Fast Corrosion Screening Technique Saturation Low Frequency Eddy Current Summary The inspection of ferromagnetic and non-ferromagnetic material components is an attractive and efficient method due to its fast screening of large areas with low surface preparations. Already qualified

More information

Best practices for preparing vessel internals segmentation projects

Best practices for preparing vessel internals segmentation projects Best practices for preparing vessel internals segmentation projects Joseph BOUCAU a*, Per SEGERUD b, Moisés SANCHEZ c a Westinghouse Electric Company, 43 rue de l Industrie, 1400 Nivelles, Belgium b Westinghouse

More information

Division 08 OPENINGS TABLE OF CONTENTS

Division 08 OPENINGS TABLE OF CONTENTS Division 08 OPENINGS TABLE OF CONTENTS 08 1000 GENERAL... 2 A. RELATED DIVISIONS... 2 B. GENERAL... 2 08 1000 DOORS AND FRAMES... 2... 2 B. EXTERIOR DOORS AND FRAMES... 2 C. DOOR FRAMES... 2 D. HOLLOW

More information

4.5 ELECTROMAGNETIC FIELDS

4.5 ELECTROMAGNETIC FIELDS 4.5 ELECTROMAGNETIC FIELDS This section presents information on electromagnetic fields and interference related to the BEP and SVRTP alternatives. Information in this section is based on the Electromagnetic

More information

Methane concentrations are measured using portable gas detection instruments, usually a methane meter or explosimeter which has a readout in either

Methane concentrations are measured using portable gas detection instruments, usually a methane meter or explosimeter which has a readout in either Methane gas produced by decomposing solid wastes can become an explosion hazard (see Section 6A - Solid Waste Decomposition). Methane monitoring is required at every Wyoming sanitary landfill to ensure

More information

The DAΦNE Cryogenic System

The DAΦNE Cryogenic System LABORATORI NAZIONALI DI FRASCATI SIS Pubblicazioni LNF 97/046 (IR) 19 Dicembre 1997 The DAΦNE Cryogenic System M. Modena INFN - Laboratori Nazionali di Frascati, P. O. Box 13, I-00044 Frascati (Roma),

More information

Building Construction Occupations

Building Construction Occupations Job Ready Assessment Blueprint Building Construction Occupations Test Code: 2011 / Version 01 Measuring What Matters Specific Competencies and Skills Tested in this Assessment: Safety and General Knowledge

More information

Powered Industrial Truck/Forklift Operations Standards and Procedures. Disaster Cycle Services Standards & Procedures DCS SP DMWT

Powered Industrial Truck/Forklift Operations Standards and Procedures. Disaster Cycle Services Standards & Procedures DCS SP DMWT Powered Industrial Truck/Forklift Operations Standards and Procedures Disaster Cycle Services Standards & Procedures DCS SP DMWT April 2015 Change Log Date Page(s) Section Change Author: Deploy Materials,

More information

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES... DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements

More information

2012 Fiscal Impact International Mechanical Code

2012 Fiscal Impact International Mechanical Code 2012 Section No. 306.5 Item 2 2012 Code Information - bold text = new text found in 2012 strike out = text deleted and not found in the 2012 Equipment and appliances on roofs or elevated structures: Item

More information

Vehicle Impact Barriers for Elevated Structures

Vehicle Impact Barriers for Elevated Structures technical notes CAR IMPACT BARRIERS FOR ELEVATED STRUCTURES Wheel stops should not be relied upon to prevent cars falling off elevated structures. Impact barriers must be provided. Impact barriers must

More information