1 December 2013 Toxic Reduction Plan Summaries Copper Cliff Smelter Complex Carbon monoxide Sulphur dioxide Particulate Matter (TSP, PM10, PM2.5) Nitrogen oxides VOCs

2 Toxic Substance Reduction Plan Summaries for Toxic Substances at the Copper Cliff Smelter Complex 1. Facility information NPRI identification number: 444 NAICS identification number: NAICS Canada code: 33 Legal and trade name of company: Vale Canada Limited Facility Street Address: Copper Cliff Smelter 18 Rink Street, Copper Cliff, Ontario P0M 1N0 Facility Mailing Address: Copper Cliff Smelter, 18 Rink Street, Copper Cliff, Ontario P0M 1N0 Number of full time employee equivalents (2012): 492 UTM x: UTM y: Public Contact: Frank Javor, Manager Environment (Air) Central Engineering Building, 18 Rink Street, Copper Cliff, Ontario P0M 1N0 Prepared Plan: Vanessa Bonanno Intermediate Analyst Environment (Air) Central Engineering Building, 18 Rink Street, Copper Cliff, Ontario, P0M 1N0

3 Highest ranking official: Joe Costigan, Manager Operations, Bulk Smelter Copper Cliff Smelter, 18 Rink Street, Copper Cliff, Ontario P0M 1N0 Toxic Reduction Planner and certifier: Mary Dubel Licence number: TSRP0118 Company information: Vale Canada Limited Business Number: DUNS number: Street Address: 200 Bay Street, Suite 200, South Tower, P.O. Box 70 Toronto, Ontario M5J 2K2 Parent Company: Companhia Vale Do Rio Doce (Vale) Business Number: DUNS Number: Graça Aranha Avenue, Rio de Janeiro, Brazil 2. List of Toxic Substances used and created at the Copper Cliff Smelter Complex and CAS # of Substance Carbon monoxide, Sulphur dioxide, Particulate matter (TSP, PM10, PM2.5), NA-M08, NA-M09, NA-M10 Nitrogen oxides, VOCs NA M16 3. Toxic Reduction Policy Statement of Intent At Vale s Sudbury Operations, we are committed to sustainable development meeting the needs of the present without compromising the ability of future generations to meet their own needs. Vale believes in zero harm, to our people, to our workplaces, to the communities in which we operate and to the natural environment. Vale Canada Sudbury Operation s is committed to playing a leadership role in protecting the environment. While, for milling, smelting and refining, this primarily means reducing toxic substances end-of-pipe emissions, wherever feasible, Vale will adopt safer alternatives and

4 technologies to reduce the use and release of toxic substances. Toxic substance reduction will be a continuing effort in our company and new technologically and economically feasible reduction options will be considered if opportunities become available in the future and are in compliance with all federal and provincial regulations. 4. Objectives 4.1. Carbon monoxide At this time, Vale s Sudbury Operation does not intend to reduce the creation of carbon monoxide at the Copper Cliff Smelter Complex. Reduction options were identified, however, at this time all options were not technically or economically feasible for the facility. In 2013, Vale s Sudbury Operation decided to move to a one flash furnace operation at the Copper Cliff Bulk Smelter. With the move to a one furnace operation, the facilities within the Copper Cliff Smelter Complex will be shut-down and the equipment decommissioned. The removal of these circuits is anticipated to reduce the consumption of natural gas at the Smelter Complex, in turn, reducing the creation of carbon monoxide. Vale s Sudbury Operations have committed to and completed projects that resulted in the reduction of carbon monoxide creation at the Smelter Complex. Projects starting in 2010 were implemented to reduce the natural gas usage in the Super Stack burners. The flue system at the Bulk Smelter is designed so that flue gases leaving the process through the Super Stack are at a temperature of 130 o C. This temperature is achieved through the use of natural gas burners that heat the gas before exiting the Super Stack. One project, completed in 2012, decreased the low firing rate of the flue burners by 50%, reducing the amount of natural gas consumed. This reduction in natural gas consumption reduced the creation of carbon monoxide from this source Sulphur dioxide At this time, Vale s Sudbury Operations does not intend to reduce the creation of sulphur dioxide at the Copper Cliff Smelter complex. Vale s Sudbury Operations were not able to identify options to reduce the creation of sulphur dioxide at the facility. The current process flow at the Copper Cliff Smelter Complex is designed to process the nickel sulphide (bulk) concentrate at the Flash Furnaces. The exothermic reaction produced by the combustion of iron and sulphur maintains the heat balance needed for the smelting process. Sulphur dioxide capture and abatement continue to be the focus of Vale s Sudbury Operations for the reduction of sulphur dioxide emissions from the facility. Part of Vale s continued initiatives to reduce sulphur dioxide emissions and to comply with Ontario Regulations 194/05 and Ontario Regulation 419/05. Vale s Sudbury Operations have begun construction on the Clean AER (Atmospheric Emission Reduction) project. With the implementation of the Clean AER project in conjunction with the move to a one flash furnace operation, sulphur dioxide emissions for the Smelter will be reduce by over 70% from current levels. The Clean AER project is designed primarily to capture sulphur bearing gases from the Smelter s converter aisle that currently report to the Super stack and convert these emissions into sulphuric acid. In 2013, Vale s Sudbury Operation decided to move to a one flash furnace operation at the Copper Cliff Bulk Smelter. With the move to a one furnace operation, a reduction in SO 2 creation from the flash furnace is expected.

5 4.3. Particulate matter At this time, Vale s Sudbury Operations does not intend to reduce the creation of particulate matter emissions at the Copper Cliff Smelter complex. Reduction options were identified, however, at this time all options were not technically or economically feasible for the facility. Abatement of particulate matter emissions has been a long standing objective at the Copper Cliff Smelter. Part of Vale s continued initiatives to reduce metals and particulate matter emissions. Vale s Sudbury Operations have begun construction on the Clean AER (Atmospheric Emission Reduction) project. With the implementation of the Clean AER project, in conjunction with the move to a one flash furnace operation, particulate matter emissions for the Smelter will be reduced to meet the Federal Pollution Prevention Planning emissions targets. Engineering and procurement for Smelter upgrade work is currently underway at the facility Nitrogen oxides Vale s Sudbury Operations does not intend to reduce the creation of nitrogen oxide at the Copper Cliff Smelter Complex. Reduction options were identified, however, at this time all options were not technically or economically feasible for the facility. In 2013, Vale s Sudbury Operation decided to move to a one flash furnace operation at the Copper Cliff Bulk Smelter. With the move to a one furnace operation, the facilities within the Copper Cliff Smelter Complex will be shut-down and the equipment decommissioned. The removal of these circuits is anticipated to reduce the consumption of natural gas at the Smelter Complex, in turn, reducing the creation of nitrogen oxides. Vale s Sudbury Operations have committed to and completed projects that resulted in the reduction of nitrogen oxides creation at the Smelter Complex. Projects starting in 2010 were implemented to reduce the natural gas usage in the Super Stack burners. The flue system at the Bulk Smelter is designed so that flue gases leaving the process through the Super Stack are at a temperature of 130 o C. This temperature is achieved through the use of natural gas burners that heat the gas before exiting the Super Stack. One project, completed in 2012, decreased the low firing rate of the flue burners by 50%, reducing the amount of natural gas consumed. This reduction in natural gas consumption reduced the creation of nitrogen oxides from this source. As part of Vale s policy of zero harm, all new and replacement natural gas heaters/burners at the Smelter Complex must meet a low NO x specification as part of Vale s engineering standards VOCs At this time, Vale s Sudbury Operations does not intend to reduce the creation of VOCs. Vale s Copper Cliff Smelter Complex was not able to identify new options to reduce the creation and release of VOCs. Vale s Sudbury Operations have committed to and started to deploy projects that will reduce the creation of VOCs. The Clean AER (Atmospheric Emissions Reduction) project will make several significant changes to the consumption of natural gas at the Smelter Complex, the source for the creation of VOCs. 5. Description of Substances 5.1. Carbon monoxide

6 Carbon monoxide is created from the incomplete combustion of natural gas in heaters and burners used throughout the Smelter complex. Natural gas is used in burners/heaters for supplementary heat in the process, heating of process gas and equipment and, in some areas, provide heat for the workroom environment Sulphur dioxide The ore, which is processed at Clarabelle Mill, naturally contains many elements, including nickel, copper, cobalt, precious metals and sulphur. Sulphur is a component of the feed materials processed at the Smelter with bulk (nickel) concentrate from the Mill being the primary source. It is the goal of the smelting and refining process to remove the undesirable impurities to produce a pure base metal product. In the presence of heat and oxygen, the sulphur found within the feed is converted into sulphur dioxide. Sulphur is a necessary component in the feed material for the flash furnaces. The exothermic reaction caused by the creation of sulphur dioxide is needed in order for the feed material to flash smelt and turn into a molten material. To reduce the emissions of sulphur dioxide to the atmosphere, the process gases from the Smelter Complex are captured and the sulphur recovered into the form of sulphuric acid Particulate matter Particulate matter is created during the processing of the metals concentrate through high temperature chemical processes to recover metals. Volatile metal oxides and sulphides are produced during the metallurgical processes and enter the off-gas stream, collected and sent to pollution control equipment. Fugitive particulate matter emissions can occur during charging of materials and by the movement of materials. Particulate matter is defined as microscopic solid and liquid particles that remain suspended in the air. Total particulate matter is any airborne particulate matter with a diameter less than 100 microns. PM 10 and PM 2.5 are particle size fractions of the total particulate matter produced and emitted. PM 10 dust particles are approximately 10 micrometers in size or less and PM 2.5 are particle size of approximately 2.5 micrometers or less Nitrogen oxides Nitrogen oxides are produced from the combustion of natural gas in heaters and burners used for supplementary heat in the process, heating of process gas and equipment and, in some areas, provide heat for the workroom environment throughout the Smelter Complex. NO x is created through the thermal dissociation and subsequent reaction of nitrogen (N 2 ) and oxygen (O 2 ) molecules in the combustion air VOCs VOCs are created from natural gas combustion at the Smelter Complex. Natural gas is used for supplementary heat in the process, heating of process gas and equipment, and, in some cases, to provide heat for the workroom environment.

7 6. Rationale as to Why No Reduction Options Were Selected 6.1. Carbon monoxide Even though several reduction options were identified for carbon monoxide, at this time, these options were not selected for implementation. At the moment it is impossible to provide an absolute reduction estimate for the creation of carbon monoxide at the Smelter Complex, as the process flow for the move to a one furnace operation is still being developed. Until the process flow is finalized, the anticipated reduction of natural gas usage and establishing a definitive timeline cannot be made at this time Nitrogen oxides Even though several reduction options were identified for nitrogen oxides, at this time, these options were not selected for implementation. At the moment it is impossible to provide an absolute reduction estimate for the creation of nitrogen oxides at the Smelter Complex, as the process flow for the move to a one furnace operation is still being developed. Until the process flow is finalized, the anticipated reduction of natural gas usage and establishing a definitive timeline cannot be made at this time Particulate matter Even though several reduction options were identified for particulate matter, at this time, these options were not selected for implementation. The options presented did not meet the technical or economic feasibility criteria established by the facility. Abatement of particulate matter emissions has been a long standing objective at the Copper Cliff Smelter. Part of Vale s continued initiatives to reduce metals and particulate matter emissions. Vale s Sudbury Operations have begun construction on the Clean AER (Atmospheric Emission Reduction) project. With the implementation of the Clean AER project, in conjunction with the move to a one flash furnace operation, particulate matter emissions for the Smelter will be reduced to meet the Federal Pollution Prevention Planning emissions targets. Engineering and procurement for Smelter upgrade work is currently underway at the facility Sulphur dioxide Vale s Sudbury Operations were not able to identify options to reduce the creation of sulphur dioxide at the facility. The current process flow at the Copper Cliff Smelter Complex is designed to process nickel sulphide (bulk) concentrate at the Flash Furnaces. The exothermic reaction produced by the combustion of iron and sulphur maintains the heat balance needed for the smelting process. Sulphur dioxide capture and abatement continue to be the focus of Vale s Sudbury Operations for the reduction of sulphur dioxide emissions from the facility. Abatement of SO 2 emissions has been a long standing objective at the Copper Cliff Smelter. Historically, Vale has met improved annual emission targets and has achieved significant SO 2 reductions since the late 1970s. With decreasing SO 2 emission allowances in Ontario, in the early 1990s the Copper Cliff Smelter examined many alternative SO 2 abatement technologies and flowsheets before adopting the current process flow. This strategy for SO 2 abatement consists of optimizing the use of the chemical energy that is generated by oxidation of the iron sulphide species found in the bulk concentrate. Using the available oxygen technology, a new flash furnace was designed and constructed at the Copper Cliff Bulk Smelter leading to high SO 2 off-gas streams amenable to economic fixation through utilizing a Sulphuric Acid Plant and Liquid SO 2 Plant. The main fuel for the Flash Furnace is pyrrhotite (FeS) found in the bulk concentrate, which contains the highest

8 amount of iron and sulphur. The combustion of the iron and sulphur is an exothermic reaction within the Flash Furnace free board. When the sulphur flashes in the furnace the reaction with oxygen converts the sulphur into sulphur dioxide and heat. Within the bulk converters, the reaction of pyrrhotite (FeS) and oxygen also provides the necessary heat for the converting process. The conversion of sulphur dioxide from the off-gas to sulphur products at the Sulphuric Acid Plant is a necessary stage in the smelting process providing pollution control required to operate the facility with current environmental regulations and targets. Mid-2013, the Liquid SO 2 plant was shut-down, stopping the creation of liquid SO 2 on property VOCs Even though a reduction option was identified for creation of VOCs, at this time, this option was not selected for implementation. The option presented in the plan did not meet the economic feasibility criteria established by the facility. Due to possible construction and cash-flow restrictions associated with the construction and commissioning of the Clean AER (Atmospheric Emissions Reduction) project, the reduction of natural gas combustion at the Smelter Complex due to the Clean AER will only be considered for implementation once the Clean AER project is undergoing the commissioning phase of the project. Additional Information Vale has incorporated the concept of sustainability into the mining, milling, smelting and refining practices in Ontario, endeavoring to achieve zero harm to our people, to our workplaces and to the natural environment. For the Base Metals Industry, this is primarily accomplished through pollution control of end-of-pipe emissions. For the Sudbury Operations, past pollution control projects have reduced property source fugitive air emissions and reduced process air emissions, which included the construction of new storage handling facilities for feed material, re-vegetation of property boundary areas, and the installation of new baghouses and electrostatic precipitators to capture dust emissions. Vale is undertaking its Clean AER (Atmospheric Emissions Reduction) project to reduce sulphur dioxide emissions by a further 70%, to significantly reduce particulate and metal emissions and improve local air quality. As part of the Clean AER (Atmospheric Emissions Reduction) project, the current outdoors Feed and Material Handling area, located at the Copper Cliff Smelter Complex, will be moved into vented buildings with dust capture. By enclosing the dry feed material, environmental forces, such as wind erosion, will no longer act on the material reducing the material loss to the environment. These projects will ensure Vale s Sudbury Operations will continue to contribute decades of employment, economic growth and community support. 8. Plan Summary Statement This plan summary is an accurate synopsis of the content of the toxic substance reduction plan for carbon monoxide, nitrogen oxides, particulate matter, sulphur dioxide and VOCs creation at the Copper Cliff Smelter Complex, Sudbury Operations, prepared for Vale Canada Limited, dated December The content of the summary is up to date and reflects the current version of the toxic substance reduction plan.

9

10

Copper Cliff Nickel Refinery Complex

Copper Cliff Nickel Refinery Complex December 2013 Toxic Reduction Plan Summaries Copper Cliff Nickel Refinery Complex Carbon monoxide Iron pentacarbonyl Particulate matter (TSP, PM10, PM2.5) Nitrogen oxides Sulphur dioxide Toxic Substance

More information

Clarabelle Mill and Water Treatment Plants Joint Facility

Clarabelle Mill and Water Treatment Plants Joint Facility December 2013 Toxic Reduction Plan Summaries Clarabelle Mill and Water Treatment Plants Joint Facility Ammonia Carbon disulphide Nitrate ion Nitrogen oxides Particulate Matter (TSP. PM10, PM2.5) Total

More information

Copper Cliff Nickel Refinery Complex

Copper Cliff Nickel Refinery Complex December 2012 Toxic Reduction Plan Summaries Copper Cliff Nickel Refinery Complex Arsenic Cadmium Chromium Cobalt Copper Dioxins, Furans and Hexachlorobenzene Lead Nickel Selenium Sulphuric Acid Toxic

More information

Report for Ontario Regulation 455/09: Toxics Reduction Act

Report for Ontario Regulation 455/09: Toxics Reduction Act Report for Ontario Regulation 455/09: Toxics Reduction Act The Province of Ontario developed a Toxics Reduction Strategy that included the introduction of the Toxics Reduction Act, 2009 to reduce toxic

More information

Action Plan Status Update: Copper Cliff Smelter Site-Specific Standard Approvals for Sulphur Dioxide, # rv1, rv1

Action Plan Status Update: Copper Cliff Smelter Site-Specific Standard Approvals for Sulphur Dioxide, # rv1, rv1 March 29, 2018 Action Plan Status Update: Copper Cliff Smelter Site-Specific Standard Approvals for Sulphur Dioxide, # 503-12-rv1, 504-12-rv1 Context On December 24, 2012 the Ministry of Environment issued

More information

March 29, Action Plan Status Update: Copper Cliff Smelter Site-Specific Standard Approvals for Nickel, # rv0. Context

March 29, Action Plan Status Update: Copper Cliff Smelter Site-Specific Standard Approvals for Nickel, # rv0. Context March 29, 2018 Action Plan Status Update: Copper Cliff Smelter Site-Specific Standard Approvals for Nickel, # 502-11-rv0 Context On December 28, 2011 the Ministry of Environment issued Vale Canada Limited

More information

Toxic Substance Reduction Plan

Toxic Substance Reduction Plan Toxic Substance Reduction Plan Pembroke MDF Colin Welburn, M.Eng., P.Eng., TSRP colin@welburnconsulting.ca 1 TOXIC SUBSTANCE REDUCTION PLAN SUMMA RY 1 Substances Included in the Plan CAS Number Substance

More information

Toxic Substance Reduction Plan Summaries. for 2012 Reporting Year. Kimberly-Clark Inc. Huntsville Mill

Toxic Substance Reduction Plan Summaries. for 2012 Reporting Year. Kimberly-Clark Inc. Huntsville Mill Toxic Substance Reduction Plan Summaries for 2012 Reporting Year Kimberly-Clark Inc. Huntsville Mill Basic Facility Information Legal Name of Company Company Street Address/Mailing Address Kimberly-Clark

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY TOXIC SUBSTANCE REDUCTION PLAN SUMMARY This Toxic Substance Reduction Plan Summary has been prepared in accordance with Section 8(2) of the Toxics Reduction Act and satisfies the minimum Plan Summary content

More information

TOXICS REDUCTION ACT PUBLIC ANNUAL SUMMARY REPORT

TOXICS REDUCTION ACT PUBLIC ANNUAL SUMMARY REPORT TOXICS REDUCTION ACT PUBLIC ANNUAL SUMMARY REPORT REPORTING YEAR 2016 Basic Facility Information Company Name Facility Name Alamos Gold Inc. Young-Davidson Mine Facility physical and mailing address Mine

More information

TOXICS REDUCTION ACT PUBLIC ANNUAL SUMMARY REPORT

TOXICS REDUCTION ACT PUBLIC ANNUAL SUMMARY REPORT TOXICS REDUCTION ACT PUBLIC ANNUAL SUMMARY REPORT REPORTING YEAR 2017 Basic Facility Information Company Name Facility Name Alamos Gold Inc. Young-Davidson Mine Facility physical and mailing address Mine

More information

SONOCO CANADA CORPORATION BRANTFORD OPERATIONS 33 PARK AVENUE EAST, BRANTFORD, ONTARIO N3S 7R9

SONOCO CANADA CORPORATION BRANTFORD OPERATIONS 33 PARK AVENUE EAST, BRANTFORD, ONTARIO N3S 7R9 SONOCO CANADA CORPORATION BRANTFORD OPERATIONS 33 PARK AVENUE EAST, BRANTFORD, ONTARIO N3S 7R9 TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLAN SUMMARIES 2013 REPORT PREPARED BY: O2E INC. REPORT PREPARED

More information

2. This item is addressed as part of action item 1. This item is complete.

2. This item is addressed as part of action item 1. This item is complete. September 22, 2017 Action Plan Status Update: Copper Cliff Smelter Site-Specific Standard Approvals for Nickel, # 501-11-rv0, 502-11-rv0 Context On December 28, 2011 the Ministry of Environment issued

More information

2016 Environment Management System & Community Engagement Report

2016 Environment Management System & Community Engagement Report 2016 Environment Management System & Community Engagement Report March 28, 2017 3 Table of Contents Summary 1. Background 2. Communications and Community Engagement 3. Community Air Quality Monitoring

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY TOXIC SUBSTANCE REDUCTION PLAN SUMMARY This Toxic Substance Reduction Plan Summary has been prepared in accordance with Section 8(2) of the Toxics Reduction Act and satisfies the minimum Plan Summary content

More information

TOXICS REDUCTION ACT

TOXICS REDUCTION ACT ISLAND GOLD MINE RICHMONT MINES INC. TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLANS FOR TRA PHASE II SUBSTANCES Table of Contents TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLANS FOR TRA PHASE

More information

Toxic Reduction Act Gerdau Ameristeel Corporation Whitby Mill Phase 2 Toxics Reduction Plan Summaries

Toxic Reduction Act Gerdau Ameristeel Corporation Whitby Mill Phase 2 Toxics Reduction Plan Summaries Toxic Reduction Act Gerdau Ameristeel Corporation Whitby Mill Phase 2 Toxics Reduction Plan Summaries December 2013 Table of Contents 1. INTRODUCTION... 1 2. CERTIFICATION BY HIGHEST RANKING EMPLOYEE...

More information

Toxic Reduction Act Gerdau Ameristeel Corporation Cambridge Mill Phase 2 Toxics Reduction Plan Summaries

Toxic Reduction Act Gerdau Ameristeel Corporation Cambridge Mill Phase 2 Toxics Reduction Plan Summaries Toxic Reduction Act Gerdau Ameristeel Corporation Cambridge Mill Phase 2 Toxics Reduction Plan Summaries December 2013 Table of Contents 1. INTRODUCTION... 1 2. CERTIFICATION BY HIGHEST RANKING EMPLOYEE...

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY TOXIC SUBSTANCE REDUCTION PLAN SUMMARY This Toxic Substance Reduction Plan Summary has been prepared in accordance with Section 8(2) of the Toxics Reduction Act and satisfies the minimum Plan Summary content

More information

PLAN SUMMARY 2012 REPORTING YEAR. Pioneer Construction Inc. FACILITY: Sudbury, Skead Rd. Aggregate. Operation & Hot Mix Asphalt Plant

PLAN SUMMARY 2012 REPORTING YEAR. Pioneer Construction Inc. FACILITY: Sudbury, Skead Rd. Aggregate. Operation & Hot Mix Asphalt Plant 2012 REPORTING YEAR FACILITY: Sudbury, Skead Rd. Aggregate Operation & Hot Mix Asphalt Plant 2340 Skead Rd. Garson, ON ASPHALT PLANT March 2014 2 This Plan Summary has been prepared in accordance with

More information

2017 Environment Management System & Community Engagement Report

2017 Environment Management System & Community Engagement Report 2017 Environment Management System & Community Engagement Report March 30, 2018 Table of Contents Summary 1. Background 2. Communications and Community Engagement 3. Community Air Quality Monitoring 4.

More information

Toxics Reduction Regulation. Annual Report Ontario Regulation 455/09. Report for Prepared by: Janet Payette. P.Eng. Sr Environmental Engineer

Toxics Reduction Regulation. Annual Report Ontario Regulation 455/09. Report for Prepared by: Janet Payette. P.Eng. Sr Environmental Engineer Toxics Reduction Regulation Annual Report Ontario Regulation 455/09 Report for 2017 Prepared by: Janet Payette. P.Eng. Sr Environmental Engineer INVISTA (Canada) Company Kingston Site This report is prepared

More information

TOXIC REDUCTION POLICY STATEMENT OF INTENT

TOXIC REDUCTION POLICY STATEMENT OF INTENT TOXIC REDUCTION POLICY STATEMENT OF INTENT Hexachlorobezene is created and released at the DeBeers Canada Inc Victor Mine site during the incineration of mine waste. Although the camp facility at the Victor

More information

SPINRITE LP 320 LIVINGSTONE AVENUE S, LISTOWEL, ONTARIO, N4W 3H3

SPINRITE LP 320 LIVINGSTONE AVENUE S, LISTOWEL, ONTARIO, N4W 3H3 SPINRITE LP 320 LIVINGSTONE AVENUE S, LISTOWEL, ONTARIO, N4W 3H3 TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLAN SUMMARIES 2013 REPORT PREPARED BY: O2E INC. REPORT PREPARED FOR: SPINRITE LP OCTOBER

More information

ONTARIO TOXICS REDUCTION ACT

ONTARIO TOXICS REDUCTION ACT ONTARIO TOXICS REDUCTION ACT DE BEERS CANADA INC. VICTOR MINE 2017 REPORT ON TOXIC SUBSTANCE ACCOUNTING SUMMARY INTRODUCTION In 2009, the Toxics Reduction Act (Act) and its associated regulation (O.Reg.

More information

GKN SINTER METALS LTD. 7 MICHIGAN BLVD., ST THOMAS, ONTARIO N5P 1H1

GKN SINTER METALS LTD. 7 MICHIGAN BLVD., ST THOMAS, ONTARIO N5P 1H1 GKN SINTER METALS LTD. 7 MICHIGAN BLVD., ST THOMAS, ONTARIO N5P 1H1 TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLAN SUMMARIES 2013 REPORT PREPARED BY: O2E INC. REPORT PREPARED FOR: PATRICK AMBROSE

More information

O.Reg. 455/09 Toxic Substance Reduction Plan Summary Parmalat Canada Inc.

O.Reg. 455/09 Toxic Substance Reduction Plan Summary Parmalat Canada Inc. O.Reg. 455/09 Toxic Substance Reduction Plan Summary Parmalat Canada Inc. Substance & CAS No: Substances at the Facility for which a Plan has been developed: Company Name Facility Name Facility Address

More information

CLEANER PRODUCTION GUIDELINES IN SMELTING INDUSTRIESS

CLEANER PRODUCTION GUIDELINES IN SMELTING INDUSTRIESS 2015 CLEANER PRODUCTION GUIDELINES IN COPPER SMELTING INDUSTRIESS Gujarat Cleaner Production Centre (Established by Industries & Mines Department, GoG) ENVIS Centre on: Cleaner Production/Technology Supported

More information

TRA ANNUAL SUMMARY OPERATIONAL COMPARISON Manager, Engineering Services

TRA ANNUAL SUMMARY OPERATIONAL COMPARISON Manager, Engineering Services TRA ANNUAL SUMMARY OPERATIONAL COMPARISON 2015-2016 BASIC FACILITY INFORMATION Company Name: Nestle Canada Inc. Contact Information: Technical Contact: Parent Company: Facility Address: Brand Barber Manager,

More information

Toxics Reduction Act Public Annual Report 2017

Toxics Reduction Act Public Annual Report 2017 Toxics Reduction Act Public Annual Report 2017 The legal and trade names of the owner and the operator of the facility, the street address of the facility and, if the mailing address of the facility is

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY TOXIC SUBSTANCE REDUCTION PLAN SUMMARY This Toxic Substance Reduction Plan Summary has been prepared in accordance with Section 8(2) of the Toxics Reduction Act and satisfies the minimum Plan Summary content

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY TOXIC SUBSTANCE REDUCTION PLAN SUMMARY This Toxic Substance Reduction Plan Summary has been prepared in accordance with Section 8(2) of the Toxics Reduction Act and satisfies the minimum Plan Summary content

More information

Toxics Reduction Plan -

Toxics Reduction Plan - Toxics Reduction Plan - Public Summary Particulate Matter 2.5 Microns (CAS # - N/A) Prepared for: 875 Speedsville Road Cambridge, ON N3H4S8 Prepared by: 222 Matheson Blvd E Mississauga, ON L4Z 1X1 December

More information

Toxics Reduction Act Public Annual Report Calendar 2017

Toxics Reduction Act Public Annual Report Calendar 2017 Toxics Reduction Act Public Annual Report Calendar 2017 The legal and trade names of the owner and the operator of the facility, the street address of the facility and, if the mailing address of the facility

More information

TEMBEC HEARST OPERATIONS 67 FONTAINE DRIVE, HEARST ONTARIO, P0L 1N0

TEMBEC HEARST OPERATIONS 67 FONTAINE DRIVE, HEARST ONTARIO, P0L 1N0 TEMBEC HEARST OPERATIONS 67 FONTAINE DRIVE, HEARST ONTARIO, P0L 1N0 TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 2013 REPORT PREPARED BY: O2E INC. REPORT PREPARED FOR: TINA RENAUD TEMBEC

More information

Toxic Reduction 2015 Plan Summary Zinc

Toxic Reduction 2015 Plan Summary Zinc Toxic Reduction 2015 Plan Summary Zinc Date Amended: August 17, 2016 388 Goodyear Rd. Napanee, Ontario SUBSTANCE AND FACILITY INFORMATION Toxic Substances Substance Name Zinc CAS # CAS 7440-66-6 Other

More information

TRA ANNUAL SUMMARY OPERATIONAL COMPARISON Operations Manager % ownership

TRA ANNUAL SUMMARY OPERATIONAL COMPARISON Operations Manager % ownership TRA ANNUAL SUMMARY OPERATIONAL COMPARISON 2015-2016 BASIC FACILITY INFORMATION Company Name: Wallenstein Feed & Supply Limited Wallenstein Operations Facility Address: 7307 Highway 86 Wallenstein, Ontario

More information

Notice s. 36 (1) (a) of O. Regulation 419/05 made under the Environmental Protection Act

Notice s. 36 (1) (a) of O. Regulation 419/05 made under the Environmental Protection Act Ministry of the Environment and Climate Change Ministère de l'environnement et de l Action en matière de changement climatique Notice number: Regulation 419 s. 36(1) (a) 504-12-rv1 Reference number: 3643-A6BRXK

More information

Toxics Reduction Plan Summary

Toxics Reduction Plan Summary Toxics Reduction Plan Summary Nickel (and its compounds) CAS # - NA - 11 December 15, 2017 Prepared for: Samuel Plate Sales () 12 Teal Avenue Stoney Creek, Ontario L8E 3Y5 Prepared by: 222 Matheson Blvd

More information

Douglas Barwick Inc. (Brockville, Ontario) Toxics Reduction Act Plan Report / 2013 Toxics Accounting Report - to Public & Staff

Douglas Barwick Inc. (Brockville, Ontario) Toxics Reduction Act Plan Report / 2013 Toxics Accounting Report - to Public & Staff Effective Date June 1, 2014 Douglas Barwick Inc. (Brockville, Ontario) Toxics Reduction Act Plan Report / 2013 Toxics Accounting Report - to Public & Staff Category Substance Name(s) and CAS #(s) Data

More information

Hamilton Works 2016 Annual Toxic Substances Reduction Report (O. Reg. 455/09)

Hamilton Works 2016 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Hamilton Works 2016 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Issued June 1, 2017 Basic Facility Information Section 1 Facility Information Owner U. S. Steel Canada Inc. Facility name Hamilton

More information

1. Basic Facility Information

1. Basic Facility Information 1. Basic Facility Information Name & CAS # of Substance Manganese (and its compounds) PM10 PM2.5 NA-09 NA-M09 NA-M10 Company Name Facility Name Facility Address Facility Identification and Site Address

More information

ExxonMobil Chemical Films Canada Ltd. 321 University Avenue Bellville, Ontario K8N 5A2. Prepared for: Jeannette Hull, SSHE Supervisor

ExxonMobil Chemical Films Canada Ltd. 321 University Avenue Bellville, Ontario K8N 5A2. Prepared for: Jeannette Hull, SSHE Supervisor Toxics Substance Reduction Plan Summary For Ethylene glycol hexyl ether (CAS # 112-25-4) PM 10 Particulate matter (CAS # NA-09) PM 2.5 Particulate matter (CAS # NA-10) ExxonMobil Chemical Films Canada

More information

CAMPBELL COMPANY OF CANADA TORONTO PLANT

CAMPBELL COMPANY OF CANADA TORONTO PLANT CAMPBELL COMPANY OF CANADA TORONTO PLANT 2016 TOXICS REDUCTION PLAN SUMMARY REPORT 60 Birmingham St. Toronto, ON M8V 2B8 CAMPBELL COMPANY OF CANADA TORONTO PLANT TOXICS REDUCTION PLAN SUMMARY AND 2016

More information

Toxic Substance Reduction Plan Summaries Phase 2 Substances

Toxic Substance Reduction Plan Summaries Phase 2 Substances 2012 TOXICS REDUCTION ACT Toxic Substance Reduction Plan Summaries Phase 2 Substances VERSION 1.0 Petro-Canada Lubricants Inc. 385 Southdown Road Mississauga, Ontario L5J 2Y3 December 1, 2013 Version Control

More information

Douglas Barwick Inc. (Brockville, Ontario) Toxics Reduction Act Plan Report / 2012 Toxics Accounting Report - to Public & Staff

Douglas Barwick Inc. (Brockville, Ontario) Toxics Reduction Act Plan Report / 2012 Toxics Accounting Report - to Public & Staff Effective Date June 1, 2013 Douglas Barwick Inc. (Brockville, Ontario) Toxics Reduction Act Plan Report / 2012 Toxics Accounting Report - to Public & Staff Category Substance Name(s) and CAS #(s) Data

More information

FINAL Toxics Substance Reduction Plan Summary for PM10 (CAS# NA-M09) & PM2.5 (CAS# NA-M10) 15 Biggar Avenue, Hamilton, Ontario

FINAL Toxics Substance Reduction Plan Summary for PM10 (CAS# NA-M09) & PM2.5 (CAS# NA-M10) 15 Biggar Avenue, Hamilton, Ontario Toxics Substance Reduction Plan Summary for PM10 (CAS# NA-M09) & PM2.5 (CAS# NA-M10) 15 Biggar Avenue, Hamilton, Ontario Prepared for: Canadian Liquid Processors Limited 15 Biggar Avenue Hamilton, Ontario

More information

Ivaco Rolling Mills Report on Toxics Reduction

Ivaco Rolling Mills Report on Toxics Reduction Toxics Reduction Act Public Annual Report for 2015 Calendar Year This report was prepared for the purposes of Ontario Regulation 455/09, Toxics Reduction Act, 2009 and the Ontario Toxics Reduction Program

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 3M CANADA, LONDON, ONT.

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 3M CANADA, LONDON, ONT. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 3M CANADA, LONDON, ONT. 2012 REPORTING YEAR BASIC FACILITY INFORMATION Name and CAS # of Substance(s) for which plans are required n-butyl alcohol Cyclohexane Isopropyl

More information

Toxic Reduction Plan BASIC FACILITY INFORMATION

Toxic Reduction Plan BASIC FACILITY INFORMATION Resolute Growth - Atikokan Sawmill TRA Reduction Plan December 2016 Toxic Reduction Plan BASIC FACILITY INFORMATION Substance Name & CAS # PM NA - M08 PM10 NA - M09 PM2.5 NA - M10 VOC NA - M16 alpha-pinene

More information

November Nanticoke Refinery Reduction plan summary (OR 455/09)

November Nanticoke Refinery Reduction plan summary (OR 455/09) R. Henderson Nanticoke Refinery Manager 519.587.4992 November 2014 Nanticoke Refinery Reduction plan summary (OR 455/09) Provincial regulations set out requirements for business owners to inform Ontarians

More information

TOXIC REDUCTION POLICY STATEMENT OF INTENT

TOXIC REDUCTION POLICY STATEMENT OF INTENT TOXIC REDUCTION POLICY STATEMENT OF INTENT De Beers Canada Inc., is committed to playing a leadership role in protecting the environment. Our employees are encouraged to participate in all types of toxic

More information

Risk Management Report

Risk Management Report Risk Management Report Follow Up to the Sudbury Soils Study Human Health Risk Assessment May 13, 2008 Prepared by: TABLE OF CONTENTS LIST OF FIGURES...ii LIST OF TABLES...ii LIST OF APPENDICES...ii PREFACE...

More information

Toxics Reduction Act Public Annual Report Calendar 2012

Toxics Reduction Act Public Annual Report Calendar 2012 Toxics Reduction Act Public Annual Report Calendar 2012 The legal and trade names of the owner and the operator of the facility, the street address of the facility and, if the mailing address of the facility

More information

Toxic Substance Reduction Summary Plans. ArcelorMittal Woodstock Tubular Products

Toxic Substance Reduction Summary Plans. ArcelorMittal Woodstock Tubular Products Toxic Substance Reduction Summary Plans BASIC FACILITY INFORMATION Substances Included in the Plan Manganese (CAS No. 7439-94-5) Sulphuric Acid (CAS No. 7664-93-9) Facility Identification and Site Address

More information

Toxics Reduction Plan Summary

Toxics Reduction Plan Summary Toxics Reduction Plan Summary Manganese (CAS # - NA-09) Prepared for: 875 Speedsville Road Cambridge, ON N3H4S8 Prepared by: 222 Matheson Blvd E Mississauga, ON L4Z 1X1 December 19, 2016 1.0 Introduction

More information

2016 Toxics Reduction Act Public Report Goderich Salt Mine 300 North Harbor Road Goderich, Ontario N7A 3Y9

2016 Toxics Reduction Act Public Report Goderich Salt Mine 300 North Harbor Road Goderich, Ontario N7A 3Y9 2016 Toxics Reduction Act Public Report Goderich Salt Mine 300 North Harbor Road Goderich, Ontario N7A 3Y9 Compass Minerals GHD 651 Colby Drive Waterloo Ontario N2V 1C2 70756 21 Report 11 June 7 2017 Page

More information

Hamilton Works 2017 Annual Toxic Substances Reduction Report (O. Reg. 455/09)

Hamilton Works 2017 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Hamilton Works 2017 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Issued June 1, 2018 Basic Facility Information Section 1 Facility Information Owner Stelco Inc. Facility name Hamilton Works

More information

2016 Public Report of Accounting Results for Tenaris Algoma Tubes, Sault Ste. Marie

2016 Public Report of Accounting Results for Tenaris Algoma Tubes, Sault Ste. Marie 2016 Public Report of Accounting Results for Tenaris Algoma Tubes, Sault Ste. Marie 1. General Information Substance Information Substance Name CAS # Manganese (and its compounds) NA - 09 Particulate Matter

More information

Integrated Pollution Prevention and Control (IPPC) Reference Document on Best Available Techniques in the Cement and Lime Manufacturing Industries

Integrated Pollution Prevention and Control (IPPC) Reference Document on Best Available Techniques in the Cement and Lime Manufacturing Industries EUROPEAN COMMISSION Integrated Pollution Prevention and Control (IPPC) Reference Document on Best Available Techniques in the December 2001 Executive Summary EXECUTIVE SUMMARY This Reference Document

More information

2013 TOXIC REDUCTION PLAN SUMMARY for CHROMIUM. DCL International Inc. Bradwick Facility 27812

2013 TOXIC REDUCTION PLAN SUMMARY for CHROMIUM. DCL International Inc. Bradwick Facility 27812 2013 TOXIC REDUCTION PLAN SUMMARY for CHROMIUM BASIC FACILITY INFORMATION Facility Identification Company Facility National Pollutant Release Inventory (NPRI) Identification Number Bradwick Facility 27812

More information

November Nanticoke Refinery Reduction plan summary (OR 455/09)

November Nanticoke Refinery Reduction plan summary (OR 455/09) S. Kuntz Nanticoke Refinery Manager 519.587.4992 November 2015 Nanticoke Refinery Reduction plan summary (OR 455/09) Provincial regulations set out requirements for business owners to inform Ontarians

More information

TRA Plan Summary - N-Butyl Acetate

TRA Plan Summary - N-Butyl Acetate TRA Plan Summary - N-Butyl Acetate Basic Facility Information Name & CAS # of Substance n-butyl Acetate 123-86-4 Substances for which other plans have been prepared Methyl Ethyl Ketone 78-93-3 10 µm Particulate

More information

Toxics Reduction Plan Summary

Toxics Reduction Plan Summary Toxics Reduction Plan Summary Ethylene Glycol CAS: 107-68-8 Prepared for: Atlas Roofing Corporation-Toronto Facility 55 Akron Road Etobicoke, Ontario M8W 1T3 Prepared by: 222 Matheson Boulevard East Mississauga,

More information

Hamilton Works. Toxic Substance Reduction Plan Summary

Hamilton Works. Toxic Substance Reduction Plan Summary Hamilton Works Toxic Substance Reduction Plan Summary Name of Substance CAS # of Substance VOC (Volatile Organic Compounds) Hexane (All isomers excluding hexane) NA 16 NA - 32 Acetone 67-64-1 Asbestos

More information

Final Report. Toxic Reduction Plan. Conestoga-Rovers & Associates 651 Colby Drive Waterloo, Ontario N2V 1C2.

Final Report. Toxic Reduction Plan. Conestoga-Rovers & Associates 651 Colby Drive Waterloo, Ontario N2V 1C2. www.craworld.com Final Report Toxic Reduction Plan 10 µm Particulate Matter 2.5 µm Particulate Matter Prepared for: Firestone Textiles Co. Conestoga-Rovers & Associates 651 Colby Drive Waterloo, Ontario

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY FOR SULPHURIC ACID. Sivaco Ontario, 330 Thomas Street Ingersoll Ontario N5C 3K5.

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY FOR SULPHURIC ACID. Sivaco Ontario, 330 Thomas Street Ingersoll Ontario N5C 3K5. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY FOR SULPHURIC ACID Sivaco Ontario, 330 Thomas Street Ingersoll Ontario N5C 3K5 December 20, 2012 Table of Contents 1 General Information...2 1.1 Basic Facility Information...2

More information

Maple Leaf Foods Inc. 321 Courtland Avenue Kitchener, Ontario N2G 3X8. December 6, 2013 Pinchin File: 82392

Maple Leaf Foods Inc. 321 Courtland Avenue Kitchener, Ontario N2G 3X8. December 6, 2013 Pinchin File: 82392 Toxic Substance Reduction Plans Summary For Ammonia (total) (CAS # NA-16) Particulate Matter 2.5 (CAS# NA-M10) Particulate Matter 10 (CAS# NA-M09) Sulphuric Acid (CAS# 7664-93-9) Maple Leaf Foods Inc.

More information

425 MCCARTNEY STREET, ARNPRIOR, ONTARIO REF.: 12-XXX

425 MCCARTNEY STREET, ARNPRIOR, ONTARIO REF.: 12-XXX FINAL REPORT SANDVIK MATERIALS TECHNOLOGY CANADA 425 MCCARTNEY STREET, ARNPRIOR, ONTARIO TOXIC SUSTANCE REDUCTION PLAN SUMMARY (CHROMIUM) REF.: 12-XXX Submitted: December 21, 2012 Prepared by: SNC-Lavalin

More information

Atmospheric Emissions from Stationary Combustion Turbines

Atmospheric Emissions from Stationary Combustion Turbines GUIDELINE A-5 Atmospheric Emissions from Stationary Combustion Turbines Legislative Authority: Environmental Protection Act, Sections 6, 9, and 14 Ontario Regulation 346 Responsible Director: Director,

More information

Toxic Substance Reduction Plan. Particulates PM PM10 PM2.5

Toxic Substance Reduction Plan. Particulates PM PM10 PM2.5 Toxic Substance Reduction Plan Particulates PM PM10 PM2.5 Plan Date: December 16, 2013 Date of Plan: December 16, 2013 1 BASIC FACILITY INFORMATION: Name and CAS # of PM Substance PM10 Substances for which

More information

General Motors of Canada Company. Ontario Regulation 455/09. Public Summary. December 2016 for the 2015 Reporting Year

General Motors of Canada Company. Ontario Regulation 455/09. Public Summary. December 2016 for the 2015 Reporting Year General Motors of Canada Company Ontario Regulation 455/09 Public Summary December 2016 for the 2015 Reporting Year OUR PURPOSE OUR VALUES WAYS GM IS LEADING GM Canada s Environmental Policy As a responsible

More information

CAMPBELL COMPANY OF CANADA TORONTO PLANT

CAMPBELL COMPANY OF CANADA TORONTO PLANT CAMPBELL COMPANY OF CANADA TORONTO PLANT 2017 TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLAN SUMMARIES Campbell Company of Canada 60 Birmingham St. Toronto, ON M8V 2B8 June 1, 2018 Version Control

More information

NESTLE CANADA INC. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 2012 Operations Phase II Substances

NESTLE CANADA INC. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 2012 Operations Phase II Substances NESTLE CANADA INC. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 2012 Operations Phase II Substances PARTICULATE MATTER

More information

A Review of Sulfide Smelting Process Gas Handling Systems

A Review of Sulfide Smelting Process Gas Handling Systems A Review of Sulfide Smelting Process Gas Handling Systems Paykan Safe Gas Cleaning Technologies 4950 North O Connor Road Suite 250 Irving, Texas, U.S.A. 75062 1.0 SMELTER PROCESS GAS CHARACTERISTICS Off-gas

More information

Toxic Substance Reduction Plan Summary. for 2014 Reporting Year. Novelis Inc. Kingston Works

Toxic Substance Reduction Plan Summary. for 2014 Reporting Year. Novelis Inc. Kingston Works Toxic Substance Reduction Plan Summary for 2014 Reporting Year Novelis Inc. Kingston Works Basic Facility Information Legal Name of Company Company Street Address/Mailing Address Novelis Inc. Company Business

More information

Toxics Substance Reduction Plan Summary For PM 2.5 Particulate Matter (CAS #NA-M10)

Toxics Substance Reduction Plan Summary For PM 2.5 Particulate Matter (CAS #NA-M10) Toxics Substance Reduction Plan Summary For PM 2.5 Particulate Matter (CAS #NA-M10) KTH Shelburne Manufacturing Inc. 300 Second Line Shelburne, Ontario L0N 1S0 Prepared for: Jim Clayton EHS Associate November

More information

Toxic Substance Reduction Plan Summary

Toxic Substance Reduction Plan Summary Toxic Substance Reduction Plan Summary BASIC FACILITY INFORMATION Substance Name & CAS # Volatile Organic Compound - Toluene 108-88-3 Substance Name & CAS # Volatile Organic Compound Benzene 71-43-2 Substance

More information

Ontario Toxics Reduction Program. A Guide For Regulated Facilities

Ontario Toxics Reduction Program. A Guide For Regulated Facilities Ontario Toxics Reduction Program A Guide For Regulated Facilities Queen s Printer for Ontario, 2012 PIBS 8695e Table Of Contents Introduction 1 Rationale 2 What Regulated Ontario Facilities Need To Do

More information

2015 Toxics Reduction Plan Summary INVISTA (Canada) Company Maitland Site

2015 Toxics Reduction Plan Summary INVISTA (Canada) Company Maitland Site 2015 Toxics Reduction Plan Summary INVISTA (Canada) Company Maitland Site This Toxic Reduction Plan (TRP) Report is prepared under O.Reg. 455/09 for the INVISTA (Canada) Company, Maitland Site. This TRP

More information

Hamilton Works. Toxic Substance Reduction Plan Summary. Sulphuric Acid Zinc Mercury Benzene.

Hamilton Works. Toxic Substance Reduction Plan Summary. Sulphuric Acid Zinc Mercury Benzene. Hamilton Works Toxic Substance Reduction Plan Summary Name of Substance CAS # of Substance Sulphuric Acid 7664-93-9 Zinc 7440-66-6 Mercury 7439-97-6 Benzene 71-43-2 Toluene 108-88-3 Xylene 1330-20-7 7H-dibenzo(c,g)carbazole

More information

TOXICS REDUCTION ACT. Bombardier Thunder Bay Plant - Facility Information. Section 1: Prescribed Toxic Substances On-Site

TOXICS REDUCTION ACT. Bombardier Thunder Bay Plant - Facility Information. Section 1: Prescribed Toxic Substances On-Site TOXICS REDUCTION ACT The Toxics Reduction Act was introduced in the Province of Ontario in 2010; the Act requires regulated facilities to: Track, quantify and report annually on the toxic substances they

More information

Lake Erie Works 2012 Annual Toxics Reduction Report (O. Reg. 455/09)

Lake Erie Works 2012 Annual Toxics Reduction Report (O. Reg. 455/09) Lake Erie Works 2012 Annual Toxics Reduction Report (O. Reg. 455/09) Issued May 24, 2013 Basic Facility Information Section 1 Facility Information Owner US Steel Canada Facility name Lake Erie Works Address

More information

Toxic Substance Reduction Plans. Nemak of Canada Windsor Aluminum Plant

Toxic Substance Reduction Plans. Nemak of Canada Windsor Aluminum Plant Toxic Substance Reduction Plans Nemak of Canada Windsor Aluminum Plant BASIC FACILITY INFORMATION Phenol (CAS No. 108-95-2) Aluminum (Fume or Dust) (CAS No. 7429-90-5) Company Name Facility Name Facility

More information

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION UDK 621.311.22:502.174 Dip.el.eng. Igor SEKOVSKI NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION Abstract Today people make a lot of analysis, of work of

More information

FINAL Toxic Substance Reduction Summary Plan for Butane (all isomers) (CAS# NA - 24) 100 West Drive, Brampton, ON

FINAL Toxic Substance Reduction Summary Plan for Butane (all isomers) (CAS# NA - 24) 100 West Drive, Brampton, ON Toxic Substance Reduction Summary Plan for Butane (all isomers) (CAS# NA - 24) 100 West Drive, Brampton, ON Prepared for: 100 West Drive Brampton, ON L6T 2J5 Attn: Mimo Stanghini Engineering Manager August

More information

In 2016, Nanticoke refinery prepared new plans for the following substances:

In 2016, Nanticoke refinery prepared new plans for the following substances: S. Kuntz Nanticoke Refinery Manager 519.587.4992 December 2016 Nanticoke Refinery Reduction plan summary (OR 455/09) Provincial regulations set out requirements f business owners to infm Ontarians about

More information

Center for Advanced Sustainable Iron & Steel Making

Center for Advanced Sustainable Iron & Steel Making Proposed Project 10: Effects of Carbonate Minerals on Filtration Rates Objective(s): Determine how carbonate minerals that either occur naturally in the ore, or are added as flux, affect the filtration

More information

BASIC FACILITY INFORMATION

BASIC FACILITY INFORMATION Toxic Substance Reduction Plan Summary BASIC FACILITY INFORMATION Substance Name & CAS # Sulphuric Acid 7664 93 9 Substance Name & CAS # Methanol 67 56 1 Substance Name & CAS # Toluene 108 88 3 Substance

More information

Toxics Substance Reduction Plan Summary For PM 10 Particulate Matter (CAS #NA-M09) PM 2.5 Particulate Matter (CAS #NA-M10)

Toxics Substance Reduction Plan Summary For PM 10 Particulate Matter (CAS #NA-M09) PM 2.5 Particulate Matter (CAS #NA-M10) Toxics Substance Reduction Plan Summary For PM 10 Particulate Matter (CAS #NA-M09) PM 2.5 Particulate Matter (CAS #NA-M10) Bell City Foundry (Brantford) Limited 411 West Street Brantford, Ontario N3R 3V9

More information

TOXICS SUBSTANCE REDUCTION PLAN SUMMARY

TOXICS SUBSTANCE REDUCTION PLAN SUMMARY TOXICS SUBSTANCE REDUCTION PLAN SUMMARY Ontario Redimix, a division of Holcim (Canada) Inc. Portlands Plant 8 Unwin Avenue Toronto, ON M5A 3L1 www.holcim.ca December 2013 Strength. Performance. Passion.

More information

1214 Union St. Kitchener, ON N2H 6K4. PO Box 1120, Kitchener, ON N2G 4G1 Spatial Coordinates of Facility Zone 17

1214 Union St. Kitchener, ON N2H 6K4. PO Box 1120, Kitchener, ON N2G 4G1 Spatial Coordinates of Facility Zone 17 Annual Public TRA Summary Report- Plasti-Fab Kitchener Operational Comparison 2015-2016 Basic Facility Information Name & CAS of Substance VOC(Pentane) NA-M16 Particulate Matter 2.5 (PM2.5) NA-M10 Facility

More information

425 MCCARTNEY STREET, ARNPRIOR, ONTARIO REF.:

425 MCCARTNEY STREET, ARNPRIOR, ONTARIO REF.: FINAL REPORT SANDVIK MATERIALS TECHNOLOGY CANADA 425 MCCARTNEY STREET, ARNPRIOR, ONTARIO TOXIC SUSTANCE REDUCTION PLAN SUMMARY (HEAVY ALKYLATE NAPHTHA) REF.: 615482 Submitted: December 18, 2013 Prepared

More information

Coatings 85 Ltd. Toxics Reduction Plan Public Report.

Coatings 85 Ltd. Toxics Reduction Plan Public Report. Coatings 85 Ltd. Toxics Reduction Plan Public Report. June 18, 2018 Introduction This report is a summary report of the Toxic Substance Reduction Plans prepared in accordance with the requirements of the

More information

Toxics Reduction Act Public Annual Report Calendar Facility NPRI identification number Mississauga

Toxics Reduction Act Public Annual Report Calendar Facility NPRI identification number Mississauga Toxics Reduction Act Public Annual Report Calendar 2012 The legal and trade names of the owner and the operator of the facility, the street address of the facility and, if the mailing address of the facility

More information

Toxics Reduction Plan Summary for Viasystems (formerly DDi Toronto Corp.)

Toxics Reduction Plan Summary for Viasystems (formerly DDi Toronto Corp.) Toxics Reduction Plan Summary for Viasystems (formerly DDi Toronto Corp.) (Prepared in Compliance with the Toxics Reduction Act, 2009 & Ontario Regulation 455/09) December 2012 Ref: 3197-01 Prepared for:

More information

RECENT CHANGES TO REGULATORY REQUIREMENTS FOR LOW LEVEL RADIOACTIVE WASTES INCINERATION AT FUEL FACILITIES IN CANADA

RECENT CHANGES TO REGULATORY REQUIREMENTS FOR LOW LEVEL RADIOACTIVE WASTES INCINERATION AT FUEL FACILITIES IN CANADA Canadian Nuclear Commission canadienne Safety Commission de sûreté nucléaire RECENT CHANGES TO REGULATORY REQUIREMENTS FOR LOW LEVEL RADIOACTIVE WASTES INCINERATION AT FUEL FACILITIES IN CANADA A Technical

More information

SECTIONS 37, 46 AND 96-THE AIR POLLUTION CONTROL (LICENSING AND EMISSION STANDARDS) REGULATIONS Regulations by the Minister

SECTIONS 37, 46 AND 96-THE AIR POLLUTION CONTROL (LICENSING AND EMISSION STANDARDS) REGULATIONS Regulations by the Minister SECTIONS 37, 46 AND 96-THE AIR POLLUTION CONTROL (LICENSING AND EMISSION STANDARDS) REGULATIONS Regulations by the Minister Statutory Instrument 141 of 1996 24 of 1997 1. These Regulations may be cited