1 IR-release: Q3 and 9M 2014 Operational Overview October 20, 2014

2 Disclaimer 2 The below applies to the presentation (the Presentation ) following this important notice, and you are therefore advised to read this important notice carefully before reading, accessing or making any other use of this Presentation. This Presentation contains statements about future events and expectations that are forward-looking statements. Any statement herein (including, without limitation, a statement regarding our financial position, strategy, management plans and future objectives) that is not a statement of historical fact is a forward-looking statement that involves known and unknown risks, uncertainties and other factors which may cause ALROSA s actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Past performance should not be taken as an indication or guarantee of future results, and no representation or warranty, express or implied, is made regarding the future performance. The information and opinions contained in this document are provided as at the date hereof (unless indicated otherwise) and are subject to change without notice. ALROSA assumes no obligation to update, supplement or revise the forward-looking statements contained herein to reflect actual results, changes in assumptions or changes in factors affecting these statements. The diamond resources and reserves estimates provided in this Presentation have been prepared and presented in accordance with the standards and classifications of the JORC Code (the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves as promulgated by the Australasian Joint Ore Reserves Committee), which differ in significant respects from the standards and classifications applicable to the disclosure of mineral resources and reserves under the laws and regulations of certain other jurisdictions, including the regulations of the U.S. Securities Exchange Commission (the SEC ) with respect to registration statements and other documents filed with the SEC. Among other things, in accordance with the JORC Code, this Presentation provides certain mineral resources estimates classified as inferred, indicated or measured, which differ in significant respects from probable and proven mineral reserves estimates and are not disclosed in certain jurisdictions, including in SEC filings. There can be significant uncertainty as to whether mineral resources can ever be feasibly and commercially mined. For further explanation of the JORC Code, see the JORC website at This Presentation does not constitute or form part of and should not be construed as, an offer to sell or issue or the solicitation of an offer to buy or acquire any securities in any jurisdiction or an inducement to enter into any investment activity. The contents hereof should not be construed as investment, legal, tax, accounting or other advice, and investors and prospective investors in securities of any issuer mentioned herein are required to make their own independent investigation and appraisal of the business and financial condition of such issuer and the nature of the securities and consult their own advisers as to legal, financial, tax and other related matters. This Presentation has not been independently verified. No representation or warranty or undertaking, express or implied, is made as to the accuracy, completeness or fairness of the information or opinions contained in this Presentation. None of ALROSA nor any of its shareholders, directors, officers or employees, affiliates, advisors, representatives nor any other person accepts any liability whatsoever for any loss howsoever arising from any use of this Presentation or its contents or otherwise arising in connection therewith. No reliance may be placed for any purpose whatsoever on the information contained in this Presentation or on its completeness, accuracy or fairness. This Presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, publication, availability or use would be contrary to law or regulation or which would require any registration or licensing within such jurisdiction. Persons in whose possession this Presentation and/or such information may come are required to inform themselves about and to observe such restrictions. Some numerical figures included in this Presentation have been subject to rounding adjustments. By reviewing and/or attending this Presentation you acknowledge and agree to be bound by the foregoing.

3 Operational of ALROSA 3 Diamond production (5%) 9M 27.1 mln cts 29.9 mln t 0.90 cpt 9M mln cts 28.6 mln t 0.90 cpt +21% Diamonds produced (mln cts) Q1 Q2 Q3 Q4 Q Q Q Ore and gravels processed (mln t) Q results Q diamond production totaled 9.7 million carats, an increase of 21% q-o-q. The production increase was driven by: seasonal production growth at the alluvial deposits completion of planned annual maintenance at Processing Plant No. 8 production ramp-up at Severalmaz in line with the Company s plan 9M 2014 results 9M 2014 diamond production totaled 25.7 million carats, a decrease of 5% y-o-y. The production decrease results from the reduction in ore processing at the Udachnaya pipe. The Udachny underground mine development has been progressing with no deviation from the Company s plan

4 Diamond production cts Q Q Q vs. Q M M 9M 2014 vs. 9M Aikhal Division 2,981 2,368 26% 8,349 8,109 3% Jubilee pipe 2,141 2,357 (9%) 6,824 6,628 3% Aikhal underground mine ,381 1,435 (4%) Komsomolskaya pipe х х Mirny Division 621 1,552 (60%) 3,650 5,455 (33%) International underground mine (79%) 2,327 3,228 (28%) Mir underground mine (72%) 689 1,586 (57%) Alluvial and technogenic deposits % (1%) Udachny Division 293 1,039 (72%) 2,449 3,462 (29%) Udachnaya pipe 257 1,012 (75%) 2,324 3,353 (31%) Zarnitsa pipe % % Nyurba Division 2, х 5,179 5,076 2% Nyurbinskaya pipe 1, х 4,397 4,288 3% Alluvial deposits х (1%) Lomonosov Division (OJSC Severalmaz (hereinafter Severalmaz)) % 1, х Arkhangelskaya pipe % 1, х OJSC Almazy Anabara (hereinafter Almazy Anabara) 1,820 1,239 47% 3,059 2,521 21% OJSC Nizhne-Lenskoye (hereinafter Nizhne-Lenskoye) 1, х 1,818 2,010 (10%) Total 9,737 8,024 21% 25,655 27,056 (5%)

5 ALROSA s production footprint 5 Mining methods: Underground mining (17%) Arkhangelsk Region (4%) Lomonosov Division (4%) Arkhangelskaya pipe (4%) Open-pit mining (58%) Alluvial mining (25%) Russia Arkhangelsk Karpinskogo-1 pipe ( ) Russia Republic of Sakha (Yakutia) (96%) Almazy Anabara (12%) Nizhne-Lenskoye (7%) Republic of Sakha (Yakutia) Udachny Division (10%) Aikhal Division (33%) Jubilee pipe (27%) Aikhal pipe (5%) Komsomolskaya pipe (less then 1%) Mirny Division (14%) Mir pipe (3%) Udachny Aikhal Nyurba Mirny Yakutsk Udachnaya pipe (9%) Zarnitsa pipe (less than 1%) Nyurba Division (20%) Nyurbinskaya pipe (17%) International pipe (9%) Alluvial deposits (2%) Botuobinskaya pipe ( ) Alluvial deposits (3%) Note: Percentage in brackets indicates the share of region/division/pipe in 9M 2014 ALROSA diamond production

6 AIKHAL DIVISION 6

7 Aikhal Division 7 Division structure Processing Plant No. 8 Aikhal pipe Komsomolskaya pipe Processing Plant No. 14 Jubilee pipe Location of operations Komsomolskaya pipe 8 km Processing Plant No. 14 Capacity: 10 mln t annually 18 km Share in ALROSA production: 33% Jubilee pipe 1 km Processing Plant No. 8 Capacity: 1.7 mln t annually Mining methods: Aikhal pipe Underground mining Open-pit mining Results vs Diamonds produced 12,088 35% Almazy Anabara Ore processed 9,817 (7%) Nizhne-Lenskoye Tonnage Resources inclusive of reserves (1) Tonnage Reserves (1) Contained diamonds 117, ,578 Contained diamonds 215, ,694 Note: (1) According to JORC Code (as of ) km Udachny Division Aikhal Division Udachny Aikhal Nyurba Division Nyurba Mirny Division Mirny Yakutsk

8 Operational of Aikhal Division 8 Diamond production 3% 8,109 9M ,349 9M % Diamonds produced 1,984 3,669 2,456 3,978 3,000 2,368 2,981 Q1 Q2 Q3 Q4 Q Q Q Ore processed 2,605 2,644 2,040 2,528 2,436 2,244 2, Q results 9M 2014 results Q diamond production totaled 2,981 thousand carats, which is 26% higher compared to Q Diamond production increase was due to the resumption of ore processing at the Aikhal underground mine in Q2 2014, the ore was not processed due to planned overhaul at Processing Plant No. 8 9M 2014 diamond production totaled 8,349 thousand carats, which is 3% higher y-o-y Diamond production increase was driven by mining and processing of higher grade ore from the central lobe of the Jubilee pipe

9 Jubilee pipe 9 Mining method: Open-pit mining current mining area Commissioned: m surface Current open pit depth: 340 m -340 m current open pit depth eastern lobe central lobe western lobe Resources inclusive of reserves (as of ) according to JORC Code Tonnage Indicated Contained diamonds 129, ,166 Inferred 65, ,594 Total 194, ,760 Indicated resources Inferred resources Resources not classified in accordance with JORC Code (1) Note: (1) Potential resources according to the Russian State Commission for Mineral Reserves classification -720 m target open pit depth; boundary of indicated resources -1,100 m boundary of inferred resources -1,300 m boundary of exploration

10 Jubilee pipe: production 10 24% Share in ALROSA production Q diamond production decreased by 9% vs Q due to planned maintenance works at Processing Plant No. 14 in September 2014 Diamond production increase in 9M 2014 by 3% vs 9M was driven by mining of higher grade ore from the pipe s central lobe 3% 6,628 9M 6,824 9M 2014 (9%) 1,940 2,232 2,456 2,347 2,325 2,357 2,141 Diamonds produced Q1 Q2 Q3 Q4 Q Q Q Ore processed 2,405 2,375 2,040 2,221 2,225 2,215 1,

11 Aikhal pipe 11 Period of open-pit mining: current mining area Open pit depth: 305 м 0 m surface Mining method: Underground mine Start of underground mining operations: m open pit depth south-western ore body -500 m boundary of indicated resources north-eastern ore body Resources inclusive of reserves (as of ) according to JORC Code -700 m boundary of inferred resources of southwestern ore body Tonnage Contained diamonds western lobe eastern lobe Indicated 7, ,159 Inferred 8, ,967 Total 15, ,126 Indicated resources Inferred resources Resources not classified in accordance with JORC Code (1) Note: (1) Potential resources according to the Russian State Commission for Mineral Reserves classification -900 m boundary of exploration

12 Aikhal pipe: production 12 8% Share in ALROSA production In Q no ore processing was taking place due to planned overhaul at Processing Plant No. 8 Diamond production decrease in 9M 2014 by 4% vs 9M was due to the processing of lower grade ore (4%) 1,435 9M 1,381 9M ,435 1,627 Diamonds produced Q1 Q2 Q3 Q4 Q Q Q Ore processed

13 Komsomolskaya pipe 13 Mining method: Open-pit mining Commissioned: m surface Current open pit depth: 337 m -337 m current open pit depth Resources inclusive of reserves (as of ) according to JORC Code Tonnage Indicated Contained diamonds 4, ,808 Total 4, ,808 Indicated resources -460 m target open pit depth; boundary of indicated resources

14 Komsomolskaya pipe: production 14 less than 1% Share in ALROSA production Q diamond production increased 8.8 times vs Q due to overhaul at Processing Plant No. 8 in Q Diamond production increased 3.1 times in 9M 2014 vs 9M as Processing Plant No.8 was loaded with ore from the Jubilee pipe in 3.1х 46 9M 144 9M х 97 Diamonds produced Q1 Q2 Q3 Q4 Q Q Q Ore processed

15 MIRNY DIVISION 15

16 Mirny Division 16 Division structure Processing Plant No. 3 Mir pipe International pipe Vodorazdelnye Galechniki placer Tailings of Processing Plant No. 5 Dredges No. 201, 202, 203 Irelyakhskaya placer Location of operations Vodorazdelnye Galechniki placer 10 km Share in ALROSA production: 20% 16 km Processing Plant No. 3 Capacity: 2 mln t annually 4 km Dredges No. 201, 202, 203 Capacity: 4 mln t annually International pipe Mir pipe Irelyakhskaya placer Mining methods: Underground mining Alluvial mining Results vs Diamonds produced 7,361 (15%) Ore and gravels processed, incl.: 5,347 0% Processing Plant No.3 2,256 4% Almazy Anabara Nizhne-Lenskoye Dredges 201, 202, 203 3,091 (3%) Tonnage Reserves (1) Contained diamonds 34, ,815 Udachny Division Udachny Aikhal Division Aikhal Nyurba Division Nyurba Yakutsk Tonnage Resources inclusive of reserves (1) Contained diamonds 45, , km Mirny Division Mirny Note: (1) According to JORC Code (as of )

17 Operational of Mirny Division 17 Diamond production (33%) 5,455 9M ,650 9M 2014 (60%) Diamonds produced 1,792 1,778 1,885 1,907 1,477 1, Q1 Q2 Q3 Q4 Q Q Q Ore processed 516 1,383 2,135 1, ,329 1, Q3 and 9M 2014 results Q diamond production totaled 621 thousand carats, which is 60% lower compared to Q M 2014 diamond production totaled 3,650 thousand carats, which is 33% lower y-o-y Diamond production decrease was due to planned annual maintenance works at Processing Plant No. 3 in August-September 2014

18 International pipe 18 Period of open-pit mining: m surface Period of open pit development: Open pit depth: 315 m -315 m open pit depth Mining method: Underground mining current mining area Start of underground mining operations: 1999 Resources inclusive of reserves (as of ) according to JORC Code Tonnage Indicated Contained diamonds 4, ,739 Inferred 1, ,304 Total 5, ,043 Indicated resources Inferred resources Resources not classified in accordance with JORC Code (1) Note: (1) Potential resources according to the Russian State Commission for Mineral Reserves classification -1,085 m boundary of indicated resources -1,215 m boundary of inferred resources -1,475 m boundary of exploration

19 International pipe: production 19 12% Share in ALROSA production Q diamond production decreased by 79% vs Q due to planned annual maintenance works at Processing Plant No. 3 in August- September 2014 Diamond production decrease in 9M 2014 by 28% vs 9M was driven by planned annual maintenance works at Processing Plant No. 3 in August-September 2014 and the replacement of a number of the underground mine s skip shaft components in May-July 2014 (28%) 3,228 9M 2,327 9M ,082 1,047 1,099 1,150 1, (79%) Diamonds produced 173 Q1 Q2 Q3 Q4 Q Q Q Ore processed

20 Mir pipe 20 Period of open-pit mining: current mining area Open pit depth: 525 m 0 m surface Mining method: Underground mining Start of underground mining operations: m open pit depth -545 m upper boundary of indicated resources dry shutdown Resources inclusive of reserves (as of ) according to JORC Code Tonnage Indicated Contained diamonds 29, ,782 Inferred 10, ,940 Total 40, ,722 Indicated resources Inferred resources -950 m boundary of indicated resources -1,235 m boundary of exploration

21 Mir pipe: production 21 6% Share in ALROSA production Q diamond production decrease by 72% vs Q and 9M 2014 diamond production decrease by 57% y-o-y was due to planned annual maintenance works at Processing Plant No. 3 in August-September 2014 (57%) 1,586 9M 689 9M (72%) Diamonds produced Q1 Q2 Q3 Q4 Q Q Q Ore processed

22 Alluvial and technogenic deposits 22 Deposits Vodorazdelnye Galechniki placer Irelyakhskaya placer Tailings of Processing Plant No. 5 2% Share in ALROSA production Q diamond production increased by 46% vs Q due to higher grade gravels processing Diamond production in 9M 2014 stayed almost flat y-o-y (1%) 641 9M 634 9M % Diamonds produced (mln cts) Q1 Q2 Q3 Q4 Q Q Q Gravels processed (mln t) 242 1,081 1,868 1, ,091 1, Results Gravels processed Diamonds produced 3, Resources and reserves of Mirny Division alluvial placers were not included into JORC Code valuation

23 UDACHNY DIVISION 23

24 Udacnhy Division 24 Division structure Processing Plant No. 12 Udachnaya pipe Zarnitsa pipe Location of operations Zarnitsa pipe Udachnaya pipe 21 km 2 km Share in 2012 ALROSA production: 13% Processing Plant No. 12 Capacity: 12 mln t annually Mining methods: Underground mining Open-pit mining Results vs Diamonds produced 4,892 (16%) Almazy Anabara Ore processed 5,825 26% Nizhne-Lenskoye Tonnage Tonnage Reserves (1) Resources inclusive of reserves (1) Contained diamonds 150, ,358 Contained diamonds 223, ,771 Note: (1) According to JORC Code (as of ) Udachny Division Udachny Aikhal Division Aikhal Nyurba Division Nyurba Mirny Division Mirny km Yakutsk

25 Operational of Udachny Division 25 Diamond production (29%) 3,462 9M ,449 9M 2014 (72%) Diamonds produced 1,598 1,383 1,430 1,117 1, Q1 Q2 Q3 Q4 Q Q Q Ore processed 1,650 1, ,720 1,570 1, Q3 and 9M 2014 results Q diamond production totaled 293 thousand carats, which is 72% lower compared to Q M 2014 diamond production totaled 2,449 thousand carats, which is 29% lower y-o-y Diamond production decrease was driven by the reduction in ore processing at the Udachnaya pipe in accordance with the Company's plan for the transition to underground mining at the deposit

26 Udachnaya pipe 26 Mining method: Open-pit mining current mining area Commissioned: 1971 Current open pit depth: 640 m Ore stockpile (measured resources) 0 m surface -640 m current open pit depth Resources inclusive of reserves (as of ) according to JORC Code western lobe -890 m boundary of indicated resources Tonnage Contained diamonds eastern lobe Measured 4, ,329 Indicated 82, ,278 Inferred 78, ,157 Total 165, ,764 Measured resources Indicated resources Inferred resources -1,390 m boundary of inferred resources

27 Udachnaya pipe: production 27 13% Share in ALROSA production Q diamond production decreased by 75% vs Q due to planned annual maintenance works at Processing Plant No. 12 in May-September 2014 Diamond production decrease in 9M 2014 by 31% vs 9M was driven by the reduction in ore processing in accordance with the Company's plan for the transition to underground mining at the deposit. The Udachny underground mine development has been processing with no deviation from the Company s plan (31%) 3,353 9M 2,324 9M ,557 1,330 1,382 1,055 1,012 (75%) Diamonds produced Q1 Q2 Q3 Q4 Q Q Q Ore processed 1,400 1, ,415 1,180 1,

28 Zarnitsa pipe 28 Mining method: Open-pit mining current mining area Commissioned: 1999 Current open pit depth: 90 m 0 m surface -90 m current open pit depth -200 m boundary of indicated resources; target open pit depth Resources inclusive of reserves (as of ) according to JORC Code Tonnage Contained diamonds -700 m boundary of exploration Indicated 58, ,007 Total 58, ,007 Indicated resources Resources not classified in accordance with JORC Code (1) Note: (1) Potential resources according to the Russian State Commission for Mineral Reserves classification

29 Zarnitsa pipe: production 29 less than 1% Share in ALROSA production Q diamond production increased by 33% vs Q due to higher grade ore processing Diamond production growth in 9M 2014 by 15% vs 9M was driven by increased volumes and higher grades of ore processed 15% 109 9M 125 9M 2014 Diamonds produced % 36 Q1 Q2 Q3 Q4 Q Q Q Ore processed

30 м 30 NYURBA DIVISION

31 Nyurba Division 31 Division structure Location of operations Processing Plant No. 15 Nyurbinskaya placer Botuobinskaya placer (1) Processing Plant No. 16 Nyurbinskaya pipe Botuobinskaya pipe (1) Nyurbinskaya placer Note: (1) Pre-construction activities and waste stripping are in progress 5 km Processing Plant No. 15 Capacity: 0.5 mln t annually Processing Plant No. 16 Capacity: 1.4 mln t annually 2 km Share in ALROSA production: 20% Botuobinskaya placer Nyurbinskaya pipe Mining methods: Botuobinskaya pipe Nyurbinskaya placer Open-pit mining Alluvial mining Results vs Diamonds produced 7,407 (7%) Almazy Anabara Ore and gravels processed 2,040 (3%) Nizhne-Lenskoye Tonnage Reserves (2) Contained diamonds 30, ,178 Udachny Division Udachny Aikhal Division Aikhal Nyurba Division Nyurba Yakutsk Tonnage Resources inclusive of reserves (2) Contained diamonds 47, , km Mirny Division Mirny Note: (2) According to JORC Code (as of )

32 Operational of Nyurba Division 32 Diamond production 2% 5,076 9M ,179 9M х Diamonds produced 1,978 1,076 2,022 2,331 2, ,264 Q1 Q2 Q3 Q4 Q Q Q Ore processed Q3 and 9M 2014 results Q diamond production totaled 2,264 thousand carats, which is 2.7 times higher compared to Q M 2014 diamond production totaled 5,179 thousand carats, which is 2% higher y-o-y Diamond production increase results from higher volumes of ore processed at the Nyurbinskaya pipe

33 Nyurbinskaya pipe 33 Mining method: Open-pit mining Commissioned: 2001 Current open pit depth: 287 m current mining area 0 m surface -287 m current open pit depth -450 m target open pit depth Resources inclusive of reserves (as of ) according to JORC Code -570 m boundary of indicated resources Tonnage Indicated Contained diamonds 12, ,661 Inferred 1, ,465 Total 13, ,126 Indicated resources Inferred resources Resources not classified in accordance with JORC Code (1) Note: (1) Potential resources according to the Russian State Commission for Mineral Reserves classification -750 m boundary of exploration; boundary of inferred resources

34 Nyurbinskaya pipe: production 34 18% Share in ALROSA production Q diamond production increased 2.9 times vs Q due to planned annual maintenance works at Processing Plant No.16 in April 2014 Diamond production increase in 9M 2014 by 3% vs 9M was driven by higher volumes of ore processed 3% 4,288 9M 4,397 9M 2014 Diamonds produced 1, ,509 2,303 2, х 1,733 Q1 Q2 Q3 Q4 Q Q Q Ore processed

35 Botuobinskaya pipe 35 Current open pit depth: 60 m Commencement of waste stripping: December m surface -60 m current open pit depth -75 m depth of ore body bedding overburden Resources inclusive of reserves (as of ) according to JORC Code Tonnage Indicated Contained diamonds 13, ,044 Inferred 2, ,790 Total 16, ,834 Indicated resources Inferred resources Resources not classified in accordance with JORC Code (1) Note: (1) Potential resources according to the Russian State Commission for Mineral Reserves classification -580 m target open pit depth; boundary of indicated resources -780 m boundary of inferred resources -980 m boundary of exploration

36 Alluvial deposits 36 Deposits Nyurbinskaya placer Botuobinskaya placer 2% Share in ALROSA production Q diamond production increased 2.1 times vs Q due to started gravels processing at the seasonal Processing Plant No. 15 in late May 2014 Diamond production in 9M 2014 stayed almost flat y-o-y (1%) 788 9M 782 9M х 531 Diamonds produced (mln cts) Q1 Q2 Q3 Q4 Q Q Q Gravels processed (mln t) Resources inclusive of reserves (as of ) according to JORC Code Tonnage Contained diamonds 13, ,989

37 СЕВЕРАЛМАЗ 37 LOMONOSOV DIVISION (SEVERALMAZ)

38 Lomonosov Division (Severalmaz) 38 Division structure Processing Plant No. 1 Arkhangelskaya pipe Karpinskogo-1 pipe (1) Notes: (1) Waste stripping in progress Location of operations Karpinskogo-1 pipe 2 km Processing Plant No. 1 Share in ALROSA production: 2% Module No. 2 Capacity: 3 mln t annually Arkhangelskaya pipe 3 km Module No. 1 Capacity: 1 mln t annually Mining method: Open-pit mining Results vs Diamonds produced % Ore processed 1,193 8% Tonnage Reserves (2) Contained diamonds 75, ,107 Arkhangelsk Lomonosov Division Tonnage Resources inclusive of reserves (3) Contained diamonds 125, ,501 Note: (2) According to JORC Code (as of ) km

39 Arkhangelskaya pipe 39 Mining method: Open-pit mining Commissioned: 2005 Current open pit depth: 122 m current mining area 0 m surface -122 m current open pit depth -324 m target open pit depth -460 m boundary of indicated resources Resources inclusive of reserves (as of ) according to JORC Code Tonnage Contained diamonds Indicated 56, ,406 Inferred 39, ,623 Total 95, ,029 Indicated resources Inferred resources -940 m boundary of inferred resources

40 Arkhangelskaya pipe: production 40 2% Share in ALROSA production Q diamond production increase by 33% vs Q and 9M 2014 diamond production increase 2.7 times y-o-y were driven by higher volumes of ore processed following the launch of the second module of the site s processing plant 2.7х 423 9M 1,151 9M % Diamonds produced Q1 Q2 Q3 Q4 Q Q Q Ore processed ,

41 Karpinskogo-1 pipe 41 Current open pit depth: 69 m Commencement of waste stripping: m surface -69 m current open pit depth overburden -262 m target open pit depth -462 m boundary of indicated resources Resources inclusive of reserves (as of ) according to JORC Code -662 m boundary of inferred resources Tonnage Contained diamonds Indicated 24, ,960 Inferred 5, ,512 Total 30, ,472 Indicated resources Inferred resources Resources not classified in accordance with JORC Code (1) Note: (1) Potential resources according to the Russian State Commission for Mineral Reserves classification -942 m boundary of exploration

42 ALMAZY ANABARA

43 Almazy Anabara 43 Deposits Morgogor placer Istok placer Holomolokh placer Ebelyakh placer Gusinaya placer Ruchey 41 placer Kurung-Yuryakh placer 7% Share in ALROSA production Q diamond production increased by 47% vs Q due to seasonal production growth Diamond production increase in 9M 2014 by 21% vs 9M was driven by the commissioning of higher grade Ebelyakh and Gusinaya placers 2,521 9M 21% 3,059 9M % Diamonds produced (mln cts) 967 1,554 1,239 1,820 Diamonds produced Gravels processed Results vs ,521 5% 6,750 17% Q1 Q2 Q3 Q4 Q Q Q Gravels processed (mln t) 0 1,874 4, ,200 3, Tonnage Reserves (1) Contained diamonds 36, ,749 Resources inclusive of reserves (1) Tonnage Contained diamonds 36, ,597 Note: (1) According to JORC Code (as of )

44 НИЖНЕ-ЛЕНСКОЕ 44 NIZHNE-LENSKOYE

45 Nizhne-Lenskoye 45 Deposits Molodo placer Billyakh placer Ruchey Shlihovoy placer 5% Share in ALROSA production Q diamond production increased 2.1 times vs Q due to seasonal production growth Diamond production decrease in 9M 2014 by 10% vs 9M was driven by processing of lower grades gravels; larger volumes of gravels processing was driven by the commissioning of the Shlikhovoy placer (10%) 2,010 9M 1,818 9M ,398 2,1х 1,234 Diamonds produced (mln cts) Q1 Q2 Q3 Q4 Q Q Q Gravels processed (mln t) 0 1,786 3, ,080 3, Results Diamonds produced 2,010 Gravels processed 5,338

46 Appendix 46

47 Diamond production cts Q1 Q2 Q3 9M Q4 Q Q Q M 2014 Aikhal Division 12,088 1,984 3,669 2,456 8,109 3,978 3,000 2,368 2,981 8,349 Jubilee pipe 8,975 1,940 2,232 2,456 6,628 2,347 2,325 2,357 2,141 6,824 Aikhal underground mine 3, , ,435 1, ,381 Komsomolskaya pipe Mirny Division 7,361 1,792 1,778 1,885 5,455 1,907 1,477 1, ,650 International underground mine 4,378 1,082 1,047 1,099 3,228 1,150 1, ,327 Mir underground mine 2, , Alluvial and technogenic deposits Udachny Division 4,892 1,598 1, ,462 1,430 1,117 1, ,449 Udachnaya pipe 4,735 1,557 1, ,353 1,382 1,055 1, ,324 Zarnitsa pipe Nyurba Division 7,407 1,978 1,076 2,022 5,076 2,331 2, ,264 5,179 Nyurbinskaya pipe 6,591 1, ,509 4,288 2,303 2, ,733 4,397 Alluvial deposits Severalmaz ,151 Arkhangelskaya pipe ,151 Almazy Anabara 2, ,554 2, ,239 1,820 3,059 Nizhne-Lenskoye 2, ,398 2, ,234 1,818 Total 36,914 7,478 9,627 9,949 27,056 9,860 7,894 8,024 9,737 25,655

48 Ore and sands processing t Q1 Q2 Q3 9M Q4 Q Q Q M 2014 Aikhal Division 9,817 2,605 2,644 2,040 7,289 2,528 2,436 2,244 2,168 6,848 Jubilee pipe 9,041 2,405 2,375 2,040 6,820 2,221 2,225 2,215 1,783 6,223 Aikhal underground mine Komsomolskaya pipe Mirny Division 5, ,383 2,135 4,034 1, ,329 1,474 3,272 International underground mine Mir underground mine Alluvial and technogenic deposits 4, ,081 1,868 3, ,091 1,389 2,778 Udachny Division 5,825 1,650 1, ,105 1,720 1,570 1, ,251 Udachnaya pipe 4,825 1,400 1, ,410 1,415 1,180 1, ,540 Zarnitsa pipe 1, Nyurba Division 2, , ,548 Nyurbinskaya pipe 1, Alluvial deposits Severalmaz 1, ,022 2,311 Arkhangelskaya pipe 1, ,022 2,311 Almazy Anabara 6, ,874 4,876 6, ,200 3,404 5,604 Nizhne-Lenskoye 5, ,786 3,552 5, ,080 3,734 5,814 Total 36,310 5,443 10,199 14,286 29,928 6,382 5,366 10,262 13,020 28,648

49 Thank you! Corporate Finance and Analytics Investor Relations Russia, , Moscow 1-st Kazachy Per., Tel.:

IR-release: Q4 and FY 2015 Operational Overview

IR-release: Q4 and FY 2015 Operational Overview IR-release: Q4 and FY Operational Overview 28 January 2016 Disclaimer 2 The below applies to the presentation (the Presentation ) following this important notice, and you are therefore advised to read

More information

IR-release: Q Operational Overview. 20 April 2017

IR-release: Q Operational Overview. 20 April 2017 IR-release: Q1 2017 Operational Overview 20 April 2017 Disclaimer 2 The below applies to the presentation (the Presentation ) following this important notice, and you are therefore advised to read this

More information

IR-release: Q3 and 9M 2017 Operational Overview. 23 October 2017

IR-release: Q3 and 9M 2017 Operational Overview. 23 October 2017 IR-release: and Operational Overview 23 October Disclaimer 2 The below applies to the presentation (the Presentation ) following this important notice, and you are therefore advised to read this important

More information

Q and 9M 2018 Operating results

Q and 9M 2018 Operating results and 9M Operating results Moscow, 22 October ALROSA, a global leader in diamond production, reports its and 9M production and sales update. Key highlights: diamond production grew by 23% (up 2% ) to 10.5

More information

SOCIAL AND ENVIRONMENTAL REPORT 2015

SOCIAL AND ENVIRONMENTAL REPORT 2015 SOCIAL AND ENVIRONMENTAL REPORT 2015 ALROSA* is a Russian Group of diamond mining companies that occupies a leading position in the industry and has the largest rough diamond reserves in the world. The

More information

ALROSA. When your conditions are extreme

ALROSA. When your conditions are extreme ALROSA When your conditions are extreme The Republic Of Sakha (Yakutia) 000 km More than 40% of Yakutia lies beyond the Arctic circle Capital Yakutsk Population Under Mio people Population density 0.3

More information

Strengthening the experience and embracing the shift

Strengthening the experience and embracing the shift Strengthening the experience and embracing the shift THIS PRESENTATION IS NOT AN OFFER OR SOLICITATION OF AN OFFER TO BUY OR SELL SECURITIES. IT IS SOLELY FOR USE AT A CAPITAL MARKETS EVENT AND IS PROVIDED

More information

Bald Hill Delivers Excellent Metallurgical Test Work Results

Bald Hill Delivers Excellent Metallurgical Test Work Results 6 September 2017 Bald Hill Delivers Excellent Metallurgical Test Work Results Tawana Resources NL (TAW:ASX) (Tawana) and Alliance Mineral Assets Limited (SGX:AMA) (AMAL) are pleased to announce encouraging

More information

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 12 NOVEMBER 2018 Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 Prominent Hill underground Ore Reserve increased to 40Mt @ 1.7% copper equivalent i with a 50% increase in Proved

More information

Rosneft the Leader of the Russian Oil Industry. Eduard Khudainatov President of Rosneft New York, April 18, 2012

Rosneft the Leader of the Russian Oil Industry. Eduard Khudainatov President of Rosneft New York, April 18, 2012 Rosneft the Leader of the Russian Oil Industry Eduard Khudainatov President of Rosneft New York, April 18, 2012 Post-IPO Dynamics (2006-2011) Reserve replacement Well above the industry average Discovery

More information

Indium facility at the Auby smelter

Indium facility at the Auby smelter Indium facility at the Auby smelter 20 September 2012 Xavier Constant Technology Manager, Auby smelter Important Notice This presentation has been prepared by the management of Nyrstar NV (the "Company").

More information

February 2018 KURUÇAY ZINC PROJECT

February 2018 KURUÇAY ZINC PROJECT February 2018 KURUÇAY ZINC PROJECT Disclaimer: The economic analysis contained in this presentation is based, in part, on inferred resources, and is preliminary in nature for the Kuruçay Zinc Project («Project»)

More information

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014 BEER & CO - SECOND ANNUAL TIN CONFERENCE WEDNESDAY, 5 NOVEMBER, 2014 PATRICK SCOTT - DIRECTOR SCOTT@AUSTRALIA.ROHSTOFF.DE Disclaimer This presentation has been prepared by and issued by Tin International

More information

Piper Jaffray Clean Technology & Renewables Conference. Samuel Yang, Chief Executive Officer

Piper Jaffray Clean Technology & Renewables Conference. Samuel Yang, Chief Executive Officer Piper Jaffray Clean Technology & Renewables Conference Samuel Yang, Chief Executive Officer February 20, 2008 Disclaimer This presentation does not constitute an offer to sell or issue or the solicitation

More information

4 th Drilling Rig Mobilised to drill High- Grade Pipes at SPD Vanadium Project

4 th Drilling Rig Mobilised to drill High- Grade Pipes at SPD Vanadium Project 23 November 2018 4 th Drilling Rig Mobilised to drill High- Grade Pipes at SPD Vanadium Project Figure 1. Drilling equipment being slung into place. Tando Resources (ASX: TNO, Tando or the Company) is

More information

For personal use only. Mining the Territory. Korab Resources Limited NT RESOURCES WEEK ASX: KOR. Andrej K. Karpinski Executive Chairman

For personal use only. Mining the Territory. Korab Resources Limited NT RESOURCES WEEK ASX: KOR. Andrej K. Karpinski Executive Chairman Korab Resources Limited Mining the Territory NT WEEK Andrej K. Karpinski Executive Chairman Diversified International Minerals Company Precious metals, agricultural and industrial commodities Magnesium

More information

Investment projects. Verkhne-Munskoe ore field. Company profile. Gas assets. Bourevestnik

Investment projects. Verkhne-Munskoe ore field. Company profile. Gas assets. Bourevestnik Investment projects Company profile Verkhne-Munskoe ore field Company profile ALROSA is a Russian Group of diamond mining companies that occupies a leading position in the industry and has the largest

More information

T S X : R M X N Y S E. M K T : R B Y

T S X : R M X N Y S E. M K T : R B Y T S X : R M X N Y S E. M K T : R B Y News Release A p r i l 1 4, 2015 Rubicon s Phoenix Gold Project Commences Mill Commissioning and Remains on Schedule for Mid-2015 Projected Initial Production TORONTO,

More information

5 th Asian Bauxite & Alumina Conference

5 th Asian Bauxite & Alumina Conference 5 th Asian Bauxite & Alumina Conference October 2015 Bauxite Hills Project Deliberate Focus ASX : MMI CORPORATE SNAPSHOT Shareholders 0.140 0.120 MMI Share Price (A$) Other 47% NetWealth Investments 5%

More information

AFC Energy plc AGM Presentation. 25 April 2017

AFC Energy plc AGM Presentation. 25 April 2017 AFC Energy plc AGM Presentation 25 April 2017 1 Disclaimer This presentation has been prepared by AFC Energy plc (the Company ). By attending this presentation and/or reviewing the slides you agree to

More information

Focused on delivery of high-value metals critical to energy revolution. Peter Williams, CEO Noosa Mining & Exploration Conference July 2018

Focused on delivery of high-value metals critical to energy revolution. Peter Williams, CEO Noosa Mining & Exploration Conference July 2018 Focused on delivery of high-value metals critical to energy revolution Peter Williams, CEO Noosa Mining & Exploration Conference July 2018 Important Information Forward Looking Statement This presentation

More information

November 24, Recent acquisitions by Astral Poly Technik Ltd.

November 24, Recent acquisitions by Astral Poly Technik Ltd. November 24, 2014 Recent acquisitions by Astral Poly Technik Ltd. Disclaimer The information in this presentation has been prepared for use in presentations by Astral Poly Technik Limited (the Company

More information

FIRST QUARTER RESULTS 2016 INVESTOR PRESENTATION

FIRST QUARTER RESULTS 2016 INVESTOR PRESENTATION FIRST QUARTER RESULTS 2016 INVESTOR PRESENTATION THREE MONTH RESULTS 21 APRIL 2016 Highlights and key figures Operating and financial review Outlook and priorities Appendix FIRST QUARTER RESULTS 21 APRIL

More information

SARACEN MINERAL HOLDINGS LTD

SARACEN MINERAL HOLDINGS LTD Saracen Mineral Holdings Limited Australian Gold Producer ASX:SAR SARACEN MINERAL HOLDINGS LTD Guido Staltari, Executive Chairman Raleigh Finlayson, Chief Operating Officer Diggers n Dealers Conference

More information

Carbon Energy Low cost, low emission energy has arrived

Carbon Energy Low cost, low emission energy has arrived Carbon Energy Low cost, low emission energy has arrived Investor Presentation Andrew Dash Managing Director Australian Securities Exchange Spotlight Conference London 10th March 2011 Important Statements

More information

H&M group capital markets day Stockholm 2018 H&M GROUP CAPITAL MARKETS DAY 2018

H&M group capital markets day Stockholm 2018 H&M GROUP CAPITAL MARKETS DAY 2018 H&M group capital markets day Stockholm 2018 Disclaimer THIS PRESENTATION IS NOT AN OFFER OR SOLICITATION OF AN OFFER TO BUY OR SELL SECURITIES. IT IS SOLELY FOR USE AT A CAPITAL MARKETS EVENT AND IS PROVIDED

More information

Sunrise Communications AG. Sunrise ONE versus Swisscom inone - High level comparison

Sunrise Communications AG. Sunrise ONE versus Swisscom inone - High level comparison unrise Communications AG unrise ONE versus wisscom inone - High level comparison unrise ONE - Everything unlimited aunch andline & obile in ONE package New fully convergent high-end product, complementing

More information

Reorganisation & Revised Segmental Reporting. November 2016

Reorganisation & Revised Segmental Reporting. November 2016 Reorganisation & Revised Segmental Reporting November 2016 Disclaimer This document has been prepared by the Company solely for purpose of communicating the change to the Company s Segmental Reporting

More information

N E W S R E L E A S E

N E W S R E L E A S E ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604) 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 www.avino.com February 21, 2018 N E W S R E L E A S E AVINO

More information

BOLD STRATEGY ROADMAP. Christophe De Hauwer, Chief Strategy and Development Officer

BOLD STRATEGY ROADMAP. Christophe De Hauwer, Chief Strategy and Development Officer BOLD STRATEGY ROADMAP Christophe De Hauwer, Chief Strategy and Development Officer Employing an Adaptive Strategy Roadmap Placing Customer-centricity at the core Developing an optimised and flexible technology

More information

Valence Industries. Australia s Only Graphite Producer. Asia Pacific I Europe I North America. Manufacturing Our Carbon Future TM.

Valence Industries. Australia s Only Graphite Producer. Asia Pacific I Europe I North America. Manufacturing Our Carbon Future TM. Valence Industries Australia s Only Graphite Producer Asia Pacific I Europe I North America December 2014 Manufacturing Our Carbon Future TM Valence (noun). the combining power of an element, especially

More information

For personal use only

For personal use only Renascor Resources Limited ASX code: RNU Investor Presentation Sourcing High-Tonnage Graphite in Australia 14 December 2015 Our graphite projects Recent acquisitions offer immediate opportunities to define

More information

Investor Presentation Sourcing High-Tonnage Graphite in Australia

Investor Presentation Sourcing High-Tonnage Graphite in Australia Renascor Resources Limited ASX code: RNU Investor Presentation Sourcing High-Tonnage Graphite in Australia 14 December 2015 Our graphite projects Recent acquisitions offer immediate opportunities to define

More information

INVESTOR PRESENTATION Keith Allaun Executive Chairman

INVESTOR PRESENTATION Keith Allaun Executive Chairman INVESTOR PRESENTATION Keith Allaun Executive Chairman P O W E R H O U S E E N E R G Y INTRODUCTION AIM listed PowerHouse Energy Group plc has fully commissioned its new G3-UHt Gasification System (G3 System)

More information

N E W S R E L E A S E

N E W S R E L E A S E ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604) 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 www.avino.com February 21, 2018 N E W S R E L E A S E AVINO

More information

Mining s innovation imperative

Mining s innovation imperative Mining s innovation imperative Chris Salisbury Chief executive Iron Ore Cautionary statements This presentation has been prepared by Rio Tinto plc and Rio Tinto Limited ( Rio Tinto ). By accessing/attending

More information

OJSC Polyus Gold. The Board approves the first stage of construction of Natalka mine

OJSC Polyus Gold. The Board approves the first stage of construction of Natalka mine OJSC Polyus Gold The Board approves the first stage of construction of Natalka mine Cautionary statements The information contained herein has been prepared using information available to Polyus Gold Group

More information

For personal use only

For personal use only MetroCoal Limited (ASX:MTE) and Developing a Multi Commodity Company Presentation to Annual General Meeting 25 November 2014 1 METROCOAL AT YEAR END 2014 MetroCoal Holds >90% of Cape Alumina Commenced

More information

The Industrial Application of Ultrafiltation and Reverse Osmosis for the Recovery of Cu, Ag and CN from Gold Leach Liquors.

The Industrial Application of Ultrafiltation and Reverse Osmosis for the Recovery of Cu, Ag and CN from Gold Leach Liquors. The Industrial Application of Ultrafiltation and Reverse Osmosis for the Recovery of Cu, Ag and CN from Gold Leach Liquors. A.J. Monhemius Anglo Asian Mining plc 1 Disclaimer The information in this document

More information

INNOVATING SES S TECHNOLOGY SOLUTIONS. Martin Halliwell, Chief Technology Officer

INNOVATING SES S TECHNOLOGY SOLUTIONS. Martin Halliwell, Chief Technology Officer INNOVATING SES S TECHNOLOGY SOLUTIONS Martin Halliwell, Chief Technology Officer Innovating SES s Technology Solutions Expanding flexibility and scalability of SES s global network and capabilities Delivering

More information

HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION

HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION CHEUVREUX GERMAN CORPORATE CONFERENCE FRANKFURT, 20 JANUARY 2010 Hamburger Hafen und Logistik AG DISCLAIMER The facts and information contained herein

More information

Meknes Drilling Update

Meknes Drilling Update Kasbah Resources Limited ASX : KAS Meknes Drilling Update 1 DISCLAIMER Certain oral and written statements contained or incorporated by reference in this presentation, including information as to the future

More information

FIRST GOLD ORE DISPATCHED FROM ULYSSES

FIRST GOLD ORE DISPATCHED FROM ULYSSES Genesis Minerals Limited (ASX: GMD) ASX Announcement 14 November 2016 FIRST GOLD ORE DISPATCHED FROM ULYSSES Genesis poised for first cash-flow as first parcel of ore departs for Paddington gold plant

More information

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au

More information

HPS vs. LED Indoor Cannabis Cultivation. Lasse Schulze (Ph.D.)

HPS vs. LED Indoor Cannabis Cultivation. Lasse Schulze (Ph.D.) HPS vs. LED Indoor Cannabis Cultivation Lasse Schulze (Ph.D.) Disclaimers & Cautionary Statements The information found herein, and any other materials provided by Cronos Group (the Company ), are intended

More information

For personal use only

For personal use only The Future of TV is Personal Linius patented Video Virtualization Engine is designed to convert cumbersome, legacy video into interactive, virtual video, enabling Artificial Intelligence, personalization,

More information

DEVELOPING FERTILISER PROJECTS TO MEET THE GROWING DEMAND IN BRAZIL AND THE WORLD

DEVELOPING FERTILISER PROJECTS TO MEET THE GROWING DEMAND IN BRAZIL AND THE WORLD EST MINE HARVEST MINERALS Developing Fertiliser Projects DEVELOPING FERTILISER PROJECTS TO MEET THE GROWING DEMAND IN BRAZIL AND THE WORLD Corporate advisor: Investor Presentation July 2015 ASX: HMI www.harvestminerals.net

More information

AVINO SILVER & GOLD MINES LTD.

AVINO SILVER & GOLD MINES LTD. April 13, AVINO SILVER & GOLD MINES LTD. T 604.682.3701 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P1 www.avino.com NYSE-MKT: ASM TSX-V: ASM FSE: GV6 AVINO ANNOUNCES

More information

Grange Resources Australia s leading magnetite producer

Grange Resources Australia s leading magnetite producer Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au

More information

Focused on delivery of high-value metals critical to energy revolution. Annual General Meeting 20 November 2018

Focused on delivery of high-value metals critical to energy revolution. Annual General Meeting 20 November 2018 Focused on delivery of high-value metals critical to energy revolution Annual General Meeting 20 November 2018 Important Information Forward Looking Statement This presentation may contain certain statements

More information

Pan American Silver Mineral Reserves Increase to 288 Million Ounces

Pan American Silver Mineral Reserves Increase to 288 Million Ounces Suite 1500-625 Howe St. Vancouver, BC Canada, V6C 2T6 604-684-1175 www.panamericansilver.com Pan American Silver Mineral Reserves Increase to 288 Million Ounces All financial figures are expressed in US$

More information

NIUMINCO GROUP LIMITED PNG MINING & PETROLEUM INVESTMENT CONFERENCE DECEMBER 2014

NIUMINCO GROUP LIMITED PNG MINING & PETROLEUM INVESTMENT CONFERENCE DECEMBER 2014 NIUMINCO GROUP LIMITED PNG MINING & PETROLEUM INVESTMENT CONFERENCE DECEMBER 2014 Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any

More information

HELPING TO PROTECT PROFITS WITH POWERFUL INSIGHT

HELPING TO PROTECT PROFITS WITH POWERFUL INSIGHT HELPING TO PROTECT PROFITS WITH POWERFUL INSIGHT moving money for better CASH MANAGEMENT Contents International opportunity brings financial complexity Page 3 Leverage insight to improve cash flow Page

More information

For personal use only

For personal use only ASX:ELT For further information please contact Chris Creagh Chief Executive Officer Email cc@elementos.com.au Level 10, 110 Mary St Brisbane, QLD Australia 4000 +617 3221 7770 www.elementos.com.au Board

More information

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 T S X : R M X N Y S E. M K T : R B Y News Release D e c e m b e r 1 8, 2014 Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 TORONTO, Ontario Rubicon Minerals Corporation

More information

Fortuna provides update on the Lindero gold Project in Argentina

Fortuna provides update on the Lindero gold Project in Argentina Fortuna provides update on the Lindero gold Project in Argentina Vancouver, March 22, 2017-- Fortuna Silver Mines Inc. (NYSE: FSM) (TSX: FVI) is pleased to present an update of preliminary results of the

More information

Element 25 Limited Investor Update

Element 25 Limited Investor Update Element 25 Limited Investor Update Transitioning from a diversified explorer to the developer of a world class high purity manganese project to supply the battery revolution. - August 2018 Disclaimer This

More information

ELEMENTOS. For personal use only. Asia Tin Summit 2017 Progressing the Development of the Cleveland Project. (ASX:ELT) September 2017

ELEMENTOS. For personal use only. Asia Tin Summit 2017 Progressing the Development of the Cleveland Project. (ASX:ELT) September 2017 ELEMENTOS (ASX:ELT) September 2017 Asia Tin Summit 2017 Progressing the Development of the Cleveland Project ASX:ELT For further information please contact Chris Creagh Chief Executive Officer Email cc@elementos.com.au

More information

Investor Presentation. Carbon Energy. May 2009

Investor Presentation. Carbon Energy. May 2009 Investor Presentation Carbon Energy May 2009 Disclaimer The information contained in this presentation is given without any liability whatsoever to Carbon Energy Ltd or any of its related entities or their

More information

ELEMENTOS LTD ASX:ELT summary

ELEMENTOS LTD ASX:ELT summary ELEMENTOS LIMITED ASX:ELT For further information please contact Chris Creagh Chief Executive Officer Email cc@elementos.com.au ELEMENTOS LIMITED Level 10, 110 Mary St Brisbane, QLD Australia 4000 +617

More information

AVINO ANNOUNCES FOURTH QUARTER AND FULL YEAR 2017 PRODUCTION RESULTS FROM ITS AVINO PROPERTY

AVINO ANNOUNCES FOURTH QUARTER AND FULL YEAR 2017 PRODUCTION RESULTS FROM ITS AVINO PROPERTY ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 avino.com January 16, 2018 AVINO ANNOUNCES FOURTH QUARTER AND

More information

Diamond Guidelines Tania R Marshall

Diamond Guidelines Tania R Marshall Diamond Guidelines Tania R Marshall SAMCODE Companion Volume Conference, May 2016 marshall.tania@gmail.com SAMREC Code Diamonds are Different SAMREC Code 2000/2007/2009 SAMREC Code diamond specific clauses

More information

Valence Industries Australia s Only Graphite Producer

Valence Industries Australia s Only Graphite Producer Valence Industries Australia s Only Graphite Producer Asia Pacific I Europe I North America December 2014 Christopher S. Darby MD & CEO SAEM Conference Adelaide Manufacturing Our Carbon Future TM Valence

More information

Update on Strategy and Market Segments Felix Frank Vice President, AutoScout24

Update on Strategy and Market Segments Felix Frank Vice President, AutoScout24 AutoScout24 Update on Strategy and Market Segments Felix Frank Vice President, AutoScout24 Christian Gisy CFO, Scout24 AG Scout24 Capital Markets Day, November 2017 We are the Largest EU Automotive Digital

More information

Future Matters US Disclosure

Future Matters US Disclosure Disclaimer This presentation has been prepared by Samsung Electronics Co., Ltd. (the "Company"). It does not purport to contain all the information that a prospective investor may require in connection

More information

INVESTOR PRESENTATION

INVESTOR PRESENTATION INVESTOR PRESENTATION SWISS EQUITIES CONFERENCE BAADER HELVEA R. ERNI, CFO BAD RAGAZ 12 JANUARY 2018 Panalpina Biz Model / Strategy Achievements and key figures Operating and financial review Appendix

More information

Disciplined Growth From Back-to-Basics Focus

Disciplined Growth From Back-to-Basics Focus Disciplined Growth From Back-to-Basics Focus Stephan DuCharme, CEO X5 Capital Markets Day 2014 Moscow, Russian Federation 29 October 2014 X5 RETAIL GROUP INTRODUCTION 2 CURRENT X5 CONTEXT Effective multi-format

More information

OAO QUADRA. London September 2011

OAO QUADRA. London September 2011 OAO QUADRA London September 2011 Disclaimer The information contained herein has been prepared by the Company. The opinions presented herein are based on general information gathered at the time of writing

More information

Appendix 5A. Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code)

Appendix 5A. Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code) Appendix 5A Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The ) Introduced 1/7/96. Origin: Appendix 17. Amended 1/9/99, 17/12/2004 A U S T R A L I A N I N

More information

ICL Strategy March 2018

ICL Strategy March 2018 מטפחים את ההווה. מפתחים את העתיד. CULTIVATING THE PRESENT. DEVELOPING THE FUTURE. ICL Strategy March 2018 1 מטפחים את ההווה. מפתחים את העתיד. CULTIVATING THE PRESENT. DEVELOPING THE FUTURE. ICL Strategy

More information

ASTARTA. Extending Value Chain and Increasing Diversification. Initiating Soybean Processing Project

ASTARTA. Extending Value Chain and Increasing Diversification. Initiating Soybean Processing Project ASTARTA Extending Value Chain and Increasing Diversification Initiating Soybean Processing Project June 2012 Disclaimer This presentation is being provided to you solely for your information and may not

More information

NIUMINCO GROUP LIMITED

NIUMINCO GROUP LIMITED NIUMINCO GROUP LIMITED THE GOLD INVESTMENT SYMPOSIUM, SYDNEY OCTOBER 2014 Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction

More information

LITHIUM & BATTERY METALS KORAB RESOURCES LIMITED. For personal use only. Perth, Western Australia March 2018

LITHIUM & BATTERY METALS KORAB RESOURCES LIMITED. For personal use only. Perth, Western Australia March 2018 LITHIUM & BATTERY METALS Perth, Western Australia 21-22 March 2018 KORAB RESOURCES LIMITED Andrej K. Karpinski Executive Chairman Tel: (08) 9474 6166 How Green is Green? 1 21 Why all the Fuss? 2 21 Why

More information

Carbon Energy UCG Projects update. UCG Association London March 2011

Carbon Energy UCG Projects update. UCG Association London March 2011 Carbon Energy UCG Projects update UCG Association London March 2011 Cliff Mallett Technical Director Important Statements Disclaimer The information contained in this presentation is given without any

More information

Future Matters US Disclosure

Future Matters US Disclosure Disclaimer This presentation has been prepared by Samsung Electronics Co., Ltd. (the "Company"). It does not purport to contain all the information that a prospective investor may require in connection

More information

For personal use only

For personal use only BIGTINCAN HOLDINGS LIMITED FULL YEAR RESULTS PRESENTATION AUGUST 2018 1 2017 BIGTINCAN 2018 BIGTINCAN I SEPTEMBER 11, 2017 FY18 Financial Highlights ARR* $15.4m REVENUE $13.1m LOSS ($6.8m) 41% 42% 15%

More information

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase NEWS RELEASE NYSE: NEM newmont.com Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase DENVER, February 21, 2018 Newmont Mining Corporation (NYSE: NEM)

More information

Australia s New Nickel

Australia s New Nickel Australia s New Nickel Proactive Investors Forum, Sydney David Singleton, MD & CEO 9 July 2014 Agenda The Windarra Nickel Mine Black Swan Processing Plant & Mine Nickel Market Boom developing 2 2 Windarra

More information

BECOMING A MAJOR BASE METAL MINER. ASX Listed Zinc Focused Developer

BECOMING A MAJOR BASE METAL MINER. ASX Listed Zinc Focused Developer BECOMING A MAJOR BASE METAL MINER ASX Listed Zinc Focused Developer Disclaimer FORWARD LOOKING STATEMENTS The following information is not intended to guide any investment decisions in Ironbark Zinc Limited.

More information

For personal use only

For personal use only ABN 64 123 993 233 ASX Announcement 21 March ABN 2016 64 123 993 233 Leigh Creek Magnesite - Project Study Highlights The Study examines possible open pit mining and processing options and provides a strong

More information

Molybdenum- The New Battery Metal 2018

Molybdenum- The New Battery Metal 2018 Molybdenum- The New Battery Metal 2018 Why Hammer Why Molybdenum? 2018 Molybdenum has been one of the best price performing metals traded on the London Metals Exchange (LME) up 62.5% in the first 4 months

More information

Our pursuit of continuous improvement

Our pursuit of continuous improvement Western Australia Iron Ore Our pursuit of continuous improvement Mike Henry President HSE, Marketing and Technology 27 October 2014 Disclaimer Forward-looking statements This presentation contains forward-looking

More information

Potash is the main source of fertiliser in the world. Potash demand is expected to be underpinned by a rapidly growing world population.

Potash is the main source of fertiliser in the world. Potash demand is expected to be underpinned by a rapidly growing world population. WHY POTASH? As the world s population increases, issues of food security are becoming more and more prominent. The amount of arable land is decreasing and what remains is being depleted of nutrients from

More information

STRATEGIC UPDATE 20 DECEMBER 2017

STRATEGIC UPDATE 20 DECEMBER 2017 STRATEGIC UPDATE 20 DECEMBER 2017 DISCLAIMER - This presentation is intended to constitute a summary of certain information about Synlait Milk Limited ( Synlait ). It should be read in conjunction with,

More information

18,000+ ACTIVE USERS. AGM PRESENTATION November 2017 $600M+ TRANSACTION VALUE

18,000+ ACTIVE USERS. AGM PRESENTATION November 2017 $600M+ TRANSACTION VALUE 18,000+ ACTIVE USERS AGM PRESENTATION November 2017 $600M+ TRANSACTION VALUE A Leading Payment Solutions & Technology Partner In Asia-Pacific SOUTH EAST ASIA 2 Our Markets $120B Singapore retail & online

More information

For personal use only 18,000+ ACTIVE USERS $600M+ TRANSACTION VALUE. AGM PRESENTATION November 2017

For personal use only 18,000+ ACTIVE USERS $600M+ TRANSACTION VALUE. AGM PRESENTATION November 2017 18,000+ ACTIVE USERS AGM PRESENTATION November 2017 $600M+ TRANSACTION VALUE A Leading Payment Solutions & Technology Partner In Asia-Pacific SOUTH EAST ASIA 2 Our Markets $120B Singapore retail & online

More information

ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT. March 2018

ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT. March 2018 ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT March 2018 Transaction Highlights 2 High Grade Vanadium in Drilling Significant Whole Rock Results include1: 9m at 1.34% V2O5 + 10.5% TiO2 from 9m (SFR019)

More information

Future Matters US Disclosure

Future Matters US Disclosure Disclaimer This presentation has been prepared by Samsung Electronics Co., Ltd. (the "Company"). It does not purport to contain all the information that a prospective investor may require in connection

More information

Shape your water future. Our Green Bond Framework

Shape your water future. Our Green Bond Framework Shape your water future Our Green Bond Framework Introduction We are the UK s largest water and wastewater services provider, serving 15 million customers across the South East of England. As well as being

More information

Arafura Resources Limited

Arafura Resources Limited Arafura Resources Limited Up and coming supplier of NdPr to permanent magnets used in the growing clean energy industry Corporate Presentation Disclaimer 2 Important Notice This presentation has been prepared

More information

MORANBAH NORTH MINE. Analyst & Investor Site Visit Australia 28 October 2011

MORANBAH NORTH MINE. Analyst & Investor Site Visit Australia 28 October 2011 MORANBAH NORTH MINE Analyst & Investor Site Visit Australia 28 October 2011 DISCLAIMER Disclaimer: This presentation has been prepared by Anglo American plc ( Anglo American ) and comprises the written

More information

Creating a high-value, multi project tin company ASX : ELT

Creating a high-value, multi project tin company ASX : ELT Creating a high-value, multi project tin company ASX : ELT Investor Presentation March 2019 Australian Energy & Minerals Conference, Brisbane Cautionary Statements Forward-looking statements This document

More information

EN LINE TOKEN ECONOMY white paper ver.1.2

EN LINE TOKEN ECONOMY white paper ver.1.2 EN LINE TOKEN ECONOMY white paper ver.1.2 2 Contents Important Notice 3 01 LINE and Blockchain 4 02 The LINK Ecosystem Ecosystem Principles Ecosystem Participants 5 5 5 03 Token Economy LINK Overview Token

More information

EN LINE TOKEN ECONOMY white paper ver.1.3

EN LINE TOKEN ECONOMY white paper ver.1.3 EN LINE TOKEN ECONOMY white paper ver.1.3 2 Contents Important Notice 3 01 LINE and Blockchain 4 02 The LINK Ecosystem Ecosystem Principles Ecosystem Participants 5 5 5 03 Token Economy LINK Overview Token

More information

DELIVERING SUSTAINED AND PROFITABLE GROWTH. Karim Michel Sabbagh, President and CEO

DELIVERING SUSTAINED AND PROFITABLE GROWTH. Karim Michel Sabbagh, President and CEO DELIVERING SUSTAINED AND PROFITABLE GROWTH Karim Michel Sabbagh, President and CEO World s Leading Satellite-enabled Solutions Provider Covering 99.99% of the globe and world s population Serving customers

More information

SA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015

SA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015 SA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015 Disclaimer This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides

More information

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource

More information

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months ASX ANNOUNCEMENT Wednesday 18 th May 2016 CMP to Purchase Additional Stake in Productora for US$1.5 Million Sprott Loan to be Reduced and Extended by 12 Months Hot Chili Limited (ASX Code: HCH) is pleased

More information

For personal use only

For personal use only ASX Announcement 1st March 2018 Balama Central Graphite Project Scoping Study shows outstanding economics Battery Minerals Limited (ASX:BAT) is pleased to report it has completed a Scoping Study on the

More information

ASX Announcement 1st March 2018 Balama Central Graphite Project Scoping Study shows outstanding economics

ASX Announcement 1st March 2018 Balama Central Graphite Project Scoping Study shows outstanding economics ASX Announcement 1st March 2018 Balama Central Graphite Project Scoping Study shows outstanding economics Battery Minerals Limited (ASX:BAT) is pleased to report it has completed a Scoping Study on the

More information