1 19 March 2014 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN Dear Sir/Madam Via Electronic Lodgement Nullagine Gold Project Life of Mine Update Millennium Minerals Limited ( Millennium or the Company ) is pleased to report the key outputs of the life of mine (LOM) plan for the Nullagine Gold Project (the Project) that includes the recently announced Ore Reserve 1. The information provided covers the period January 2014 to December Highlights Mining inventory included in the LOM now stands at 481,000 ounces, including the Ore Reserve of 465,000 contained ounces, treatment of medium grade stockpiles and some Inferred Mineral Resources likely to be mined. The plan forecasts mining and processing 9.8 million tonnes at an average grade of 1.52 g/t Au to recover 426,000 ounces, at an average metallurgical recovery of 89. Higher mill throughput of 1.6 million tonnes per year. Forecast LOM mine level cash flow of $171 million 2, using a spot gold price of US$1350/oz and exchange rate of $US0.90 : $1.00 and the average hedged gold price of $1594/oz (for 72,000 ounces.) Project before tax, pre debt, NPV (7 discount rate) of $144 million. Average LOM cash (C1) costs of A$989 per ounce and sustaining cash cost of $1,160 per ounce. Using the above prices, an average LOM gross operating margin (Project level) of A$527 per ounce. FY2014 production is estimated at approximately 76,000 ounces at a C1 cash cost of A$975 per ounce and a sustaining cash cost of A$1140 per ounce. 1 All Mineral Resources and Ore Reserves are reported in accordance with JORC, All currency units are Australian dollars unless otherwise denoted Ground Floor 10 Kings Park Road West Perth WA 6005 Australia. PO Box 117 West Perth WA 6872 Australia. T: +61 (0) F: +61 (0) E: info@millenniumminerals.com.au W:

2 Updated Project Outputs The Project business model was revised with the new mining schedule, updated operating costs and metallurgical recovery estimates. The key Project outputs are set out in Table 1. Item Table 1: Key Project Outputs Production Total volume mined Ore production Ore grade Contained ounces (including inferred resources) Processing recovery Gold production Mining strip ratio Mill throughput Life of mine Unit BCM million tonnes million g/t Au ounces ounces Ratio Mtpy Years AS of March 2014 Metrics , , : Average Yearly Production first 4 years Unit Operating Costs Mining (including haulage) Processing (including maintenance) Site Administration Total Operating Cost Ounces $/BCM $/tonne $/tonne $/tonne 74,000 Capital Expenditure Sustaining Capex ( ) A$ million 10 LOM unit costs per ounce Cash (C1) cost per ounce* Sustaining cost per ounce** Life of Mine Economics Revenue Operating cash flow (EBITDA) Mine operating margin per ounce*** Project Net Present Value (7) Assumptions Spot gold price Exchange Rate Discount rate Tax rate Royalty rate Average Hedge Price $/ ounce $/ ounce A$ million A$ million A$/ounce A$ million US$/ounce A$:US$ A$/ounce $989 $1, *Cash (C1) cost per ounce includes the costs of mining, processing, administration and by product credits. It does not include capital expenditure, exploration, corporate costs or royalty payments. **Sustaining cost per ounce includes Cash (C1) cost, royalties, capital expenditure and corporate costs. It does not include exploration. *** Mine Operating margin per ounce is calculated as realised gold price less C1 cash cost that measures the gross operating margin at the mine level. Page 2 of 2

3 The Company recently updated the Nullagine Gold Project s Ore Reserve (ASX announcement of 10 March 2014). The mine operating schedule produced recognises Ore Reserve depletion, lower spot gold prices and actual operating costs experienced over the first year of operation. The mining schedule now forecasts mining and processing 9.8 million tonnes at an average grade of 1.52 g/t Au including Inferred Mineral Resources not included in the Ore Reserve but expected to be mined under practical mining conditions. Planning also assumes that all medium and low grade stockpiles are treated during the life of higher grade mine and mill operations. This will be achieved by utilising available mill capacity above and beyond that required to treat the higher grade ore, and where the operating margin per ounce of lower grade material treated warrants its processing cost. Mine Scheduling The Project consists of five main deposit areas; Golden Eagle, All Nations, Barton, Golden Gate and Shearers. Smaller higher grade deposits surrounding the Golden Gate area; Crow, G Reef, Harrier, Falcon and Condor are also included in this study. The updated mining schedule also includes the Little Wonder, Otways deposits and the Camel Creek Joint Venture deposits. The LOM is based on achieving a mill run time of 96, based on better SAG mill liner life and continuing improvements in wear component life. The updated planning assumptions reflect actual operating performance achieved by the operation. Whilst this reduces mine life marginally to six years the forecast reflects a higher and more consistent gold production profile than that forecast in the original base case model, particularly over the period 2014 through to The gold production profile for the period is constrained by the current Ore Reserve. It is expected that this profile will change following in fill drilling and Mineral Resource to Ore Reserve conversion studies to be completed during Future Performance A feature of the LOM plan is the greater flexibility available to the Company due to the recent establishment of multiple ore sources and associated mining operations. From 2014 mining and process operations have available oxidised, transition and fresh ore from the Golden Eagle deposit, higher grade oxidised ore at Golden Gate and substantial medium grade stockpiles located at the process plant. Improved blending of these materials should allow more uniform head grades, gold recovery and mill throughput over the currently planned life of the Project. In addition, the remaining deposits included in the mining schedule yet to be developed will largely add oxidised and transition ore types to the mining and milling plan so the proportion of fresh ore included in the mill feed blend will progressively decrease from around 50 in , to below 30 for the remaining LOM plan. The Company views the current mine life of six years as more than adequate as a reserve base to allow for the future development of additional Ore Reserves from the reported 1.9 million ounce Mineral Resource inventory. Longer term, the Company has a highly prospective pipeline of targets within its mining leases that show potential for further Mineral Resource development. These targets need to be drilled out over the next two years and assessed before that potential can be determined. Corporate Following completion of the updated LOM plan, Millennium is currently in discussions with its bankers to agree an amended debt repayment schedule to match the Project s updated production profile (as previously announced). Those discussions are expected to be completed prior to March 31, 2014 when Millennium is required to make its next loan repayment. Page 3 of 3

4 Nullagine Gold Project Background The Project contains a 1.91 million ounce gold Mineral Resource situated within 9 deposits on granted mining leases (Table 2). The current Ore Reserve has 465,000 contained ounces (Table 3). The operation is located 10 kilometres south of the township of Nullagine. Mine construction commenced in July 2011 with first gold poured 30 September Commercial production was declared from 1 January Brian Rear Managing Director ENQUIRIES: Brian Rear Ground Floor 10 Kings Park Road West Perth WA 6005 Postal: PO Box 117 West Perth WA 6872 T: F: W: Media : Geoff Fowlstone Nullagine Gold Project Site Map Millennium Tenements Page 4 of 4

5 Table 2. Nullagine Gold Project Mineral Resource Estimate November 2013 (0.5 g/t Au Cut off) Deposit Measured Indicated Inferred Total Mt Grade Mt Grade Mt Grade Mt Grade Ounces g/t Au g/t Au g/t Au g/t Au Golden Eagle ,000 Bartons ,000 Shearers ,000 Otways ,000 All Nations ,000 Little Wonder ,700 Golden Gate (ABCD) ,000 Falcon ,000 Condor ,000 Harrier ,000 Crow ,500 G_Reef ,200 Au ,900 Camel Creek JV ,500 Beatons Creek Earn In ,000 Total ,908,800 Notes: 1. Figures in Table may not sum due to rounding. 2. The Golden Eagle deposit was estimated using Multiple Indicator Kriging methodology for grade estimation by CSA Global. 3. The Bartons, Shearers, Otways, All Nations, Little Wonder and Au81 were estimated using Ordinary Kriging methodology for grade estimation by CSA Global. 4. The Golden Gate (ABCD reef), and Golden Gate satellite deposits, namely Falcon, Condor, Harrier, Crow and G Reef were estimated using Ordinary Kriging. 5. The Golden Gate and Bartons deposits are the subject of a mining licence agreement whereby Millennium has the sole and exclusive right to explore and mine gold and other minerals. Millennium then is required to pay 25 of the net proceeds to the tenement owners (Livestock Marketing Pty Ltd, Duncan Thomas Young, Simba Holdings Pty Ltd and Ronald Lane Swinney) after mining and processing cost deductions. 6. The Mineral Resources at the Camel Creek JV (CCJV) were estimated using Ordinary Kriging methodology by CSA Global. Only Millennium's 50 interest is stated in the above table. 7. The Mineral Resources at Beatons Creek deposit estimated using Ordinary Kriging methodology for grade estimation by Tetra Tech Inc. Beatons Creek is subject to a farmin Joint Venture with Novo Resources Corp (Novo) (CNSX:NVO). Under the Farm In agreement Novo may earn a 70 interest in the Beatons Creek tenements by delivering a bankable Feasibility Study on the property within 5 years of commencement of the Agreement which was executed in August As Novo has yet to earn an interest in the Beatons Creek tenements, the Company accounts for 100 of the mineral resource on the Beatons Creek tenements. Page 5 of 5

6 Table 3. Nullagine Gold Project Ore Reserve Estimate 1 delivered to mill basis (includes MML 50 of CC JV)December 2013 Prospect Proven Probable Total Ore (t) Grade Ore (t) Grade Ore (t) Grad Ounces g/t Au g/t Au e g/t Au Golden Eagle 4,305, , ,827, ,500 Bartons 802, , ,032, ,800 All Nations 354, , , ,300 Shearers 411, , , ,100 Otways 169, , , ,000 Little Wonder (MML) 105, , , ,500 Golden Gate ABCD 434, , , ,100 Condor 66, , , ,300 Crow 18, , , ,600 Falcon 75, , ,400 Harrier 39, , ,500 G Reef 31, , ,600 Little Wonder (CCJV) 92, , , ,600 Roscoes Reward 153, , , ,600 Junction 43, , , ,500 6,955,900 1,279, ,236, ,000 Total 1.7 Stockpiles ROM: LG 420, ,400 HG 37, ,000 Total 8,694, ,400 Notes: 1 Numbers may not sum due to rounding. Page 6 of 6

7 Competent Persons Statements Exploration Results Mr Irvine Hay (MAIG), a geologist employed full time by Millennium Minerals Limited, compiled the technical aspects of this Report. Mr Hay is a member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to this style of mineralization and type of deposit under consideration and to the activity that is being reported on to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Hay consents to the inclusion in the report of the matters in the form and context in which it appears. Competent Persons Statements Mineral Resources The information in this Report which relates to the Golden Eagle, Bartons, Shearers, Otways, All Nations, Little Wonder, CC JV, Golden Gate ABCD reef, and satellites Condor & Crow Mineral Resource estimates accurately reflects information prepared by competent persons (as defined by the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves). The Golden Eagle, Bartons, Shearers, Otways, All Nations, Little Wonder, Golden Gate ABCD reef, and Condor & Crow Golden Gate satellite deposits Mineral Resource estimates have been compiled and prepared by Dr Bielin Shi, (MAusIMM) of CSA Global Pty. Ltd. who is a Competent Person as defined by the Australasian Code for the reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition and who consents to the inclusion in this report of the matters based on the information in the form and context in which it appears. The information in this Report which relates to the Au81 Mineral Resource estimate accurately reflects information prepared by competent persons (as defined by the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves). The Au81 deposit Mineral Resource estimate has been compiled and prepared by Grant Louw, (MAIG, MGSSA) of CSA Global Pty. Ltd. who is a Competent Person as defined by the Australasian Code for the reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition and who consents to the inclusion in this report of the matters based on the information in the form and context in which it appears. The information in this Report which relates to the Golden Gate G reef Mineral Resource estimate accurately reflects information prepared by competent persons (as defined by the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves). The Golden Gate G reef deposit Mineral Resource estimate has been compiled and prepared by Dmitry Pertel, (MAIG, MGSSA) of CSA Global Pty. Ltd. who is a Competent Person as defined by the Australasian Code for the reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition and who consents to the inclusion in this report of the matters based on the information in the form and context in which it appears. The information in this Report which relates to the Golden Gate Falcon and Harrier Mineral Resource estimates accurately reflects information prepared by competent persons (as defined by the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves). The Golden Gate Falcon & Harrier satellite deposits Mineral Resource estimates have been compiled and prepared by Steven Hodgson, (MAIG) formerly of CSA Global Pty. Ltd. who is a Competent Person as defined by the Australasian Code for the reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition and who consents to the inclusion in this report of the matters based on the information in the form and context in which it appears. Patrick Huxtable of Tetra Tech, Perth, Australia, has prepared the Mineral Resource Estimate for the Beatons Creek Gold Project, and is independent of Novo Resources Corporation for purposes of National Instrument Standards of Disclosure for Mineral Projects ("NI "). Mr Huxtable (RPGeo MAIG) is a Qualified Person as defined by NI Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. The quantity and grade of reported inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these inferred resources as an indicated or measured mineral resource and it is uncertain if further exploration will result in upgrading them to an indicated or measured mineral resource category. The mineral resources in this news release were estimated using current Canadian Institute of Mining, Metallurgy and Petroleum (CIM) standards, definitions and guidelines. Competent Persons Statements Ore Reserves The information in this Report, which relates to the Ore Reserve estimates accurately reflect information prepared by competent persons (as defined by the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves). The information in this public statement that relates to the Ore Reserves at the Millennium Minerals Nullagine Project is based on information compiled by Mr Steve Lampron and Mr. Daniel Tuffin. Mr. Daniel Tuffin of Auralia Mining Consulting completed the Ore Reserve estimate. Mr Daniel Tuffin is a Member of the Australasian Institute of Mining and Metallurgy (#228649) and a Certified Professional. He has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that they are undertaking to qualify him as a Competent Person as defined in accordance with the Australasian Joint Ore Reserves Committee (JORC)2012. Qualifying Statement This release may include forward looking statements. These forward looking statements are based on Millennium s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Millennium, which could cause actual results to differ materially from such statements. Millennium makes no undertaking to subsequently update or revise the forward looking statements made in this release, to reflect the circumstances or events after the date of this release. Page 7 of 7

March 2014 Quarterly Activities Report

March 2014 Quarterly Activities Report 14 April 2014 March 2014 Quarterly Activities Report QUARTERLY HIGHLIGHTS Nullagine Gold Project Achieves Record Quarterly Results ABN 85 003 257 556 Quarterly Production Performance Gold output of 18,762

More information

June 2014 Quarterly Activities Report

June 2014 Quarterly Activities Report 23 July 2014 June 2014 Quarterly Activities Report QUARTERLY HIGHLIGHTS ABN 85 003 257 556 Gold output of 17,789 ounces 1 poured, in line with the upper end of guidance of 16,000 to 18,000 ounces. For

More information

The global Mineral Resource estimate now stands at Mt grading at 1.19 g/t Au for 1,328,500 contained gold ounces.

The global Mineral Resource estimate now stands at Mt grading at 1.19 g/t Au for 1,328,500 contained gold ounces. 15 December 2011 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN 85 003 257 556 Dear Sir/Madam Via Electronic

More information

Nullagine Gold Project Pictorial Update October 2011

Nullagine Gold Project Pictorial Update October 2011 24 November 2011 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 Dear Sir/Madam ABN 85 003 257 556 Via Electronic

More information

Nullagine Gold Project

Nullagine Gold Project Nullagine Gold Project ABN 85 003 257 556 Construction Update June 2012 Construction of the gold process plant and associated infrastructure remains on schedule and within the capital cost estimate of

More information

Maiden Ore Reserve for Camel Creek JV

Maiden Ore Reserve for Camel Creek JV 10 September 2013 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN 85 003 257 556 Maiden Ore Reserve for Camel

More information

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES July 25 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES The Process

More information

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces ABN 28 009 174 761 31 March 2011 Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 www.regisresources.com Level 1 1 Alvan

More information

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET May 30 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET First Gold poured from Dalgaranga

More information

For personal use only

For personal use only Poised to become a +100kozpa Australian gold producer in the Pilbara Region, WA Reaping the rewards of our aggressive exploration commitment and expansion strategy at Nullagine -------------------------------------------

More information

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016 QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016 Hillgrove Resources Limited (ASX: HGO) reports for the quarter ended 31 March 2016 HIGHLIGHTS While conditions remain

More information

A Step-Change at Nullagine

A Step-Change at Nullagine A Step-Change at Nullagine Building a +100kozpa Australian gold producer ------------------------------------------- Peter Cash, CEO Corporate Presentation May 2018 1 Disclaimer & Competent Person s Statement

More information

Gruyere Project - Updated Mine Plan

Gruyere Project - Updated Mine Plan ASX Announcement 6 December 2018 Gruyere Project - Updated Mine Plan CONTACT DETAILS Highlights Gruyere confirmed as a global Tier 1 gold mine 1 with a long life and forecast high margins Life of mine

More information

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD November 3 rd 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD Construction work at Gascoyne s 100%

More information

For personal use only

For personal use only 30 April 2015 ASX Announcement ASX: PGI SNAPSHOT Share price* (A$) 0.18 Shares on issue (m) 84.8 Market cap* (A$m) 15.3 Turnover (m/mnth) 14.5 52-week high 0.59 52-week low 0.11 PANTERRA GOLD LIMITED QUARTERLY

More information

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE December 24 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE Dalgaranga Operational Update: The project remains Lost

More information

For personal use only

For personal use only December 24 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE Dalgaranga Operational Update: The project remains Lost

More information

DALGARANGA PRE-FEASIBILITY UPDATE

DALGARANGA PRE-FEASIBILITY UPDATE January 19th, 2016 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA PRE-FEASIBILITY UPDATE PFS Pit optimisations indicate a production target far larger than anticipated

More information

For personal use only

For personal use only January 19th, 2016 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA PRE-FEASIBILITY UPDATE PFS Pit optimisations indicate a production target far larger than anticipated

More information

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai PANAUST LIMITED ABN 17 011 065 160 Level 1, 15 James Street, Fortitude Valley, Brisbane QLD 4006 Australia PO Box 2297, Fortitude Valley Business Centre QLD 4006 T: +61 (0)7 3117 2000 F: +61 (0)7 3846

More information

FIRST GOLD ORE DISPATCHED FROM ULYSSES

FIRST GOLD ORE DISPATCHED FROM ULYSSES Genesis Minerals Limited (ASX: GMD) ASX Announcement 14 November 2016 FIRST GOLD ORE DISPATCHED FROM ULYSSES Genesis poised for first cash-flow as first parcel of ore departs for Paddington gold plant

More information

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserves Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq.

More information

Thalanga Operations Ore Reserve and Mineral Resource Statement

Thalanga Operations Ore Reserve and Mineral Resource Statement Thalanga Operations Ore Reserve and Mineral Resource Statement Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq. (%) West 45 (1) Proved 101 0.3 2.0 4.6 0.3 38 8.4 Probable

More information

QUARTERLY ACTIVITIES REPORT For the period ending June 30, 2009

QUARTERLY ACTIVITIES REPORT For the period ending June 30, 2009 QUARTERLY ACTIVITIES REPORT For the period ending June 30, 2009 HIGHLIGHTS NULLAGINE IRON ORE PROJECT (Pilbara, WA 100% BCI) Breakthrough Infrastructure Agreement with Fortescue Metals Group BC Iron and

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 30th September, 2014 ABM s Development Plan & Production Guidance for Old Pirate High-Grade Gold Deposit Highlights: 50,000 to 60,000 ounces of gold production

More information

ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington

ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington ASX Code: WRM Issued Securities Shares: 441.3 million Options: 100.5 million

More information

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum ASX ANNOUNCEMENT 29 March 2010 Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum PanAust is pleased to announce that the Board of Directors

More information

DALGARANGA GOLD PROJECT CONSTRUCTION & OPERATIONAL UPDATE 2 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT CONSTRUCTION & OPERATIONAL UPDATE 2 MONTHS TO FIRST GOLD March 19 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT CONSTRUCTION & OPERATIONAL UPDATE 2 MONTHS TO FIRST GOLD Process plant construction

More information

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD December 8 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD Construction at Gascoyne s

More information

For personal use only

For personal use only ACN 097 088 689 01 DEFINITIVE FEASIBILITY STUDY SUPPORTS A MAJOR EXPANSION OF THE SYAMA GOLD MINE Definitive Feasibility Study completed for multifaceted expansion of Syama operation confirms its technical

More information

For personal use only

For personal use only ASX Release 20 March 2012 PANTON REVIEW STUDY RESULTS (ASX:PLA) is pleased to advise that the results from the recently completed Panton Review Study ( PRS ) showed that the Project could achieve and Internal

More information

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE Monday, 12 May 2014 QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE Hillgrove Resources Limited (ASX: HGO) is pleased to report further consolidation of production at its Kanmantoo

More information

EXCO S PROJECT PIPELINE

EXCO S PROJECT PIPELINE EXCO S PROJECT PIPELINE INVESTOR UPDATE EXCO RESOURCES N.L. MAY 2010 Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking statements that are subject to

More information

Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010

Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010 ASX RELEASE 18 AUGUST 2010 Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010 Key Points: Mining approvals granted for Stage 1 of the Nullagine Iron Ore JV

More information

Haoma Mining NL. Dear Sir, ACTIVITIES REPORT FOR THE QUARTER ENDED MARCH 31, 2011 HIGHLIGHTS

Haoma Mining NL. Dear Sir, ACTIVITIES REPORT FOR THE QUARTER ENDED MARCH 31, 2011 HIGHLIGHTS Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03)

More information

HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT

HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT OXIDE COPPER STUDY UNDERWAY AT 8 HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT 20 AUGUST 2015 ASX Code: HOR Management Mr Neil Marston Managing Director/Company Secretary Mr Michael Fotios Non-Executive

More information

WA s MT THIRSTY COBALT-NICKEL PROJECT POTENTIALLY WORLD S FOURTH LARGEST COBALT PRODUCER

WA s MT THIRSTY COBALT-NICKEL PROJECT POTENTIALLY WORLD S FOURTH LARGEST COBALT PRODUCER WA s MT THIRSTY COBALT-NICKEL PROJECT POTENTIALLY WORLD S FOURTH LARGEST COBALT PRODUCER Highlights Project has potential to deliver 3,700 tonnes of cobalt, 10,300 tonnes of nickel and 27,000 tonnes of

More information

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study Chalice Gold Mines Limited ABN 47 116 648 956 30 October 2009 Highlights Scoping Study finds Koka deposit at the Zara Project in Eritrea

More information

Great Western Scoping Study Update & Onsite Gold Processing

Great Western Scoping Study Update & Onsite Gold Processing ASX RELEASE 10 August 2017 ABN: 45 116 153 514 ASX: TMX Great Western Scoping Study Update & Onsite Gold Processing Terrain Minerals Limited (ASX: TMX) is pleased to provide the following update on its

More information

For personal use only

For personal use only 15 August 2016 ASX: AOH, FSE: A2O ALTONA TO EXPAND EXPLORATION FOOTPRINT IN MT ISA REGION Altona strategy of leveraging existing position and knowledge of the Mt Isa Inlier A total of 1,868 square kilometres

More information

For personal use only

For personal use only 1 SCOPING STUDY CONFIRMS PROFITABLE POTENTIAL OF HASTINGS HEAVY RARE EARTH PROJECT The Manager Company Announcements Office Australian Securities Exchange 4th Floor, 20 Bridge Street SYDNEY NSW 2000 Hastings

More information

For personal use only

For personal use only 2 May 2018 ASX Announcement METALLURGICAL TESTWORK CONFIRMS WILUNA TRANSITIONAL RESERVES AMENABLE TO PROCESSING THROUGH THE EXISTING WILUNA CIL PLANT Highlights Expansion PFS published in Aug 17 includes

More information

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT ASX RELEASE 30 DECEMBER 2016 STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT HIGHLIGHTS Independent Pre-Feasibility Study (PFS) supports development of the Urquhart Bauxite

More information

Nueva Esperanza Project Teterita Mineral Resource Upgrade

Nueva Esperanza Project Teterita Mineral Resource Upgrade ABN 42 000 837 472 18 April 2012 The Manager, Company Announcements Office Australian Securities Exchange Via ASX Online [5 pages] Nueva Esperanza Project Teterita Mineral Resource Upgrade Kingsgate Consolidated

More information

Highlights. Wa Project. Akoko Project. Scoping studies on the Julie West gold vein were completed with the following outcomes;

Highlights. Wa Project. Akoko Project. Scoping studies on the Julie West gold vein were completed with the following outcomes; 24 th July 2009 June December 2009 Quarterly Report Report 2008 Highlights Wa Project Scoping studies on the Julie West gold vein were completed with the following outcomes; 250,000 tonnes @ 4.9g/t gold

More information

SARACEN MINERAL HOLDINGS LTD

SARACEN MINERAL HOLDINGS LTD Saracen Mineral Holdings Limited Australian Gold Producer ASX:SAR SARACEN MINERAL HOLDINGS LTD Guido Staltari, Executive Chairman Raleigh Finlayson, Chief Operating Officer Diggers n Dealers Conference

More information

EXCO S PROJECT PIPELINE. Unlocking the Value

EXCO S PROJECT PIPELINE. Unlocking the Value EXCO S PROJECT PIPELINE Unlocking the Value EXCO RESOURCES N.L. 20 AUGUST 2010 Wholesale Investors Forum Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking

More information

ASX ANNOUNCEMENT. MacPhersons Nimbus Silver Target up to 6 Million Ounces. Highlights. ASX Code: MRP. Contact Details

ASX ANNOUNCEMENT. MacPhersons Nimbus Silver Target up to 6 Million Ounces. Highlights. ASX Code: MRP. Contact Details ASX Code: MRP Contact Details PO Box 10977 109 Maritana Street Kalgoorlie WA 6430 T +61 (0) 8 9091 7515 F +61 (0) 8 9091 7610 E info@macphersonsreward.com.au ABN 98 139 357 967 ASX ANNOUNCEMENT 28 July

More information

Aeon Metals Limited HIGHLIGHTS

Aeon Metals Limited HIGHLIGHTS ASX Announcement 15 February 2017 WALFORD CREEK PRELIMINARY ECONOMIC ASSESSMENT Early start up Copper-Zinc-Cobalt project indicated for Vardy Zone 2017 drill program focused on significant mine life extension

More information

Financial results for the 6 months to 30 June 2008

Financial results for the 6 months to 30 June 2008 28 August 2008 Financial results for the 6 months to 30 June 2008 During the June half 2008, PanAust emerged as a significant producer of copper gold concentrate in Southeast Asia. Activities during the

More information

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months ASX ANNOUNCEMENT Wednesday 18 th May 2016 CMP to Purchase Additional Stake in Productora for US$1.5 Million Sprott Loan to be Reduced and Extended by 12 Months Hot Chili Limited (ASX Code: HCH) is pleased

More information

For personal use only

For personal use only Pre-Feasibility Study Highlights World Class Potential of Mt Lindsay Tin/Tungsten Project ASX Announcement Tuesday, 1 March 2011 Ref: /VMS/606/VMS/0249 Highlights: Project generates substantial revenue

More information

Confidence in Carrapateena project grows

Confidence in Carrapateena project grows 7 NOVEMBER 2016 Confidence in Carrapateena project grows Carrapateena Pre-Feasibility Study released - project competitive with, or better than comparable long-life copper assets globally Project metrics

More information

For personal use only

For personal use only ASX Announcement 19 December 2014 BOARD OF DIRECTORS Paul Murphy (Non-Executive Chairman) Bryan Dixon (Managing Director) Alan Thom (Executive Director) Greg Miles (Non-Executive Director) ASX CODE BLK

More information

STUDIES CONFIRM COMBINED WILUNA URANIUM PROJECT IMPROVEMENTS

STUDIES CONFIRM COMBINED WILUNA URANIUM PROJECT IMPROVEMENTS ASX RELEASE 30th January 2014 STUDIES CONFIRM COMBINED WILUNA URANIUM PROJECT IMPROVEMENTS Uranium developer Toro Energy Limited (ASX: TOE) (Toro) today announced the completion of an independent Mining

More information

Activities Report Quarter Ended 31 st March 2015

Activities Report Quarter Ended 31 st March 2015 ASX & Media Release ASX Code AZM 30 th April 2015 www.azumahresources.com.au Investment Highlights: Wa Project: 2.0Moz Mineral Resource including 1.3Moz Measured & Indicated 624,000oz Ore Reserves at 2.14

More information

For personal use only

For personal use only 7 August 2012 ASX: PAN Gidgee Gold Project Scoping Study Key Highlights Gold Production estimated at 606,000oz of gold over an initial seven years, average annual production of 87,000oz Operating Cash

More information

SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE

SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE Wednesday, 20 February 2013 SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE The Kanmantoo Copper Mine s Indicative Life of Mine (LOM) anticipated to extend to

More information

2014 MINERAL RESOURCES AND ORE RESERVES

2014 MINERAL RESOURCES AND ORE RESERVES 9 October 2014 ASX & MEDIA RELEASE 2014 MINERAL RESOURCES AND ORE RESERVES The Directors of Saracen Mineral Holdings Limited (ASX: SAR) ( Saracen or the Company ), are pleased to advise the updated Mineral

More information

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME ASX ANNOUNCEMENT 23 February 2012 (8 pages by email) TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME Sumatra Copper & Gold plc ( Sumatra or the Company ) is pleased to announce that the Prefeasibility

More information

MINING COMMENCES AT KONONGO GOLD PROJECT

MINING COMMENCES AT KONONGO GOLD PROJECT ASX Release Monday 28 th March 2011 MINING COMMENCES AT KONONGO GOLD PROJECT Signature Metals Limited is pleased to announce that it has commenced mining at the Konongo Gold Project. SIGNATURE METALS LIMITED

More information

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 12 NOVEMBER 2018 Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 Prominent Hill underground Ore Reserve increased to 40Mt @ 1.7% copper equivalent i with a 50% increase in Proved

More information

For personal use only

For personal use only Saracen Mineral Holdings Limited Australian Gold Producer ASX:SAR SARACEN MINERAL HOLDINGS LTD Guido Staltari, Executive Chairman Raleigh Finlayson, Chief Operating Officer Denver Gold Forum Denver, CO

More information

SARACEN MINERAL HOLDINGS LTD

SARACEN MINERAL HOLDINGS LTD Saracen Mineral Holdings Limited Australian Gold Producer ASX:SAR SARACEN MINERAL HOLDINGS LTD Guido Staltari, Executive Chairman Raleigh Finlayson, Chief Operating Officer Denver Gold Forum Denver, CO

More information

Haoma Mining NL A.B.N

Haoma Mining NL A.B.N Company Announcements Office Australian Stock Exchange Level 45, Rialto South Tower 525 Collins Street MELBOURNE. VIC. 3000 Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1,

More information

Hidden Valley PNG s Newest Mine Briefing for Analysts

Hidden Valley PNG s Newest Mine Briefing for Analysts Hidden Valley PNG s Newest Mine Briefing for Analysts 30 March 2011 Harmony Gold Disclosure Statement This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities

More information

For personal use only

For personal use only ACN 092 471 513 QUARTERLY REPORT FOR THE PERIOD ENDING 31 DECEMBER 2017 HIGHLIGHTS PENNY S FIND GOLD MINE KALGOORLIE (WA) 84,367 tonnes of ore processed at an average head grade of 3.09g/t Au 7,837 ounces

More information

Millennium delivers outstanding operational performance, beating production and cost guidance and achieving 100kozpa run rate

Millennium delivers outstanding operational performance, beating production and cost guidance and achieving 100kozpa run rate Corporate Details Ordinary Shares: 792,144,996 Market Capitalisation: ~$190 million Cash and bullion at 30 September 2018: $17.8 million Debt: $10 million ASX Code: MOY Board of Directors Greg Bittar Non-Executive

More information

For personal use only

For personal use only Corporate Details Ordinary Shares: 792,144,996 Market Capitalisation: ~$190 million Cash and bullion at 30 September 2018: $17.8 million Debt: $10 million ASX Code: MOY Board of Directors Greg Bittar Non-Executive

More information

Haoma Mining NL A.B.N

Haoma Mining NL A.B.N Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03)

More information

For personal use only

For personal use only 21 November 2011 Kentor Gold (ASX: KGL) is an Australian-based, emerging midadvanced tier gold company with projects in Australia and the Kyrgyz Republic. Formed in 1998 and listed on the ASX in 2005,

More information

For personal use only

For personal use only ABN 79 106 879 690 30 August 2016 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (11 pages by email) Updated Internal Scoping Study Delivers Positive Results (ASX: AUK) The Directors

More information

PROJECT FINANCIAL ROBUSTNESS CONFIRMED SMALLER SCALE PROJECTS REMAIN IN THE LOWER HALF OF THE SECTOR COST CURVE

PROJECT FINANCIAL ROBUSTNESS CONFIRMED SMALLER SCALE PROJECTS REMAIN IN THE LOWER HALF OF THE SECTOR COST CURVE 4 December 2013 HÄGGÅN URANIUM PROJECT SCOPING STUDY REMODELLED AT LOWER THROUGHPUT RATES PROJECT FINANCIAL ROBUSTNESS CONFIRMED SMALLER SCALE PROJECTS REMAIN IN THE LOWER HALF OF THE SECTOR COST CURVE

More information

For personal use only

For personal use only 11 June 2015 ASX Limited Marked Announcements Platform Exchange Centre 20 Bridge Street Sydney NSW 2000 Preliminary Economic Assessment Delivers Excellent Results at the Fair Bride Deposit Study confirms

More information

September 2018 Quarterly Report Presentation and Webcast 25 October 2018

September 2018 Quarterly Report Presentation and Webcast 25 October 2018 September 2018 Quarterly Report Presentation and Webcast 25 October 2018 Access this presentation at: http://webcasting.brrmedia.com/broadcast/5bb2ad1abfd72969440cb5a0 or http://www.sandfire.com.au 1 Important

More information

March 2018 Quarterly Report Presentation and Webcast 27 April 2018 Access this presentation at:

March 2018 Quarterly Report Presentation and Webcast 27 April 2018 Access this presentation at: March 2018 Quarterly Report Presentation and Webcast 27 April 2018 Access this presentation at: http://webcasting.brrmedia.com/broadcast/5aaaeaf8271b41638bdc7495 or http://www.sandfire.com.au 1 Important

More information

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2018

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2018 ASX ANNOUNCEMENT 31 JANUARY 2019 ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2018 OVERVIEW Horseshoe Metals Limited (ASX: HOR) ( Horseshoe or the Company ), through its wholly owned subsidiary,

More information

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT ABN 46 006 045 790 14 th December 2010 ASX ANNOUNCEMENT Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA Cullen Resources Limited (ASX:CUL) (Cullen) is pleased to report the maiden JORC

More information

Second drill rig to accelerate major drilling program at Productora

Second drill rig to accelerate major drilling program at Productora DRAFT ASX ANNOUNCEMENT Thursday 11th September 2014 Second drill rig to accelerate major drilling program at Productora Expanded resource-reserve base will underpin completion of Productora Pre-feasibility

More information

Bald Hill Delivers Excellent Metallurgical Test Work Results

Bald Hill Delivers Excellent Metallurgical Test Work Results 6 September 2017 Bald Hill Delivers Excellent Metallurgical Test Work Results Tawana Resources NL (TAW:ASX) (Tawana) and Alliance Mineral Assets Limited (SGX:AMA) (AMAL) are pleased to announce encouraging

More information

ASX Release ASX Code: YTC

ASX Release ASX Code: YTC HERA DEFINITIVE FEASIBILITY STUDY TO BE EXPANDED Hera DFS scope to be expanded to include the assessment of mining and treatment of high grade copper ores from the Nymagee Copper Mine together with additional

More information

For personal use only

For personal use only 28 November 2017 Corporate Details Ordinary Shares: 780,917,069 Market Capitalisation: ~$156 million Cash and bullion at 30 September 2017: ~$20.1 million Debt: NIL ASX Code: MOY Board of Directors Greg

More information

Copper Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle

Copper Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle Vancouver, B.C., September 27, 2018 Mountain Mining Corporation ( Mountain or the Company) is pleased to announce that

More information

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project ASX ANNOUNCEMENT 16th October 2015 Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project Hot Chili and its partner in the Productora Project, Compañía Minera del Pacífico S.A. (CMP)

More information

For personal use only

For personal use only ASX Announcement Arafura Extends Nolans Mine Life To Beyond Thirty Years 2 September 217 Two-thirds of Measured and Indicated Resources inventory identified as NdPr-bearing phosphate-rich material types

More information

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES 7 November 2008 UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES Highlights Broken Hill Ore Reserves increase life of mine to 9 years at conservative price assumptions Substantial Resource base

More information

Malachite Resources AGM. November For personal use only. Malachite Resources Limited

Malachite Resources AGM. November For personal use only. Malachite Resources Limited Malachite Resources AGM November 2013 1 Malachite Resources Limited Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk

More information

Grange Resources Australia s leading magnetite producer

Grange Resources Australia s leading magnetite producer Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au

More information

For personal use only

For personal use only 28 February 2013 Another Major Milestone for IOH Iron Valley Transaction with Mineral Resources Limited Highlights Mine Gate Sale Agreement executed with Mineral Resources Limited (MIN) MIN to develop

More information

Wa Gold Project, Ghana. Wa Gold Project, Ghana ASX ASX : AZM. Perth 2 nd September Africa Dow n Under Perth September 2015

Wa Gold Project, Ghana. Wa Gold Project, Ghana ASX ASX : AZM. Perth 2 nd September Africa Dow n Under Perth September 2015 Wa Gold Project, Ghana Wa Gold Project, Ghana Africa Dow n Under Perth September 2015 ASX : AZM Africa Dow n Under Perth 2 nd September 2015 ASX Cautionary Statement The Company has not made a production

More information

Azure Minerals Ltd ASX Code:

Azure Minerals Ltd ASX Code: Azure Minerals Ltd ASX Code: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd Objective To be a low cost, high margin copper producer Strategy Developing our

More information

Quarterly Report 30 June 2011

Quarterly Report 30 June 2011 Quarterly Report 30 June 2011 ASX Announcement: 13 July 2011 SIGNIFICANT EVENTS ASX CODE: MRE BOARD OF DIRECTORS Malcolm Macpherson Chairman Peter Johnston Managing Director and Chief Executive Officer

More information

TEMBANG PROJECT OPTIMISATION

TEMBANG PROJECT OPTIMISATION ASX ANNOUNCEMENT 16 April 2012 (13 pages by email) TEMBANG PROJECT OPTIMISATION Sumatra Copper & Gold plc ('Sumatra' or 'the Company') is pleased to confirm Optimisation Studies for its wholly-owned Tembang

More information

Advancing the Wa Gold Project, Northwest Ghana. March 2015 ASX : AZM

Advancing the Wa Gold Project, Northwest Ghana. March 2015 ASX : AZM Advancing the Wa Gold Project, Northwest Ghana March 2015 ASX : AZM $10M Market Capitalisation: $3M cash and listed investments 2.0Moz Mineral Resources 0.65Moz Mining Inventory Dominant regional position

More information

A Tiger in the Congo. Charles Brown, COO, S.E.K SPRL, Katanga Province, D R Congo

A Tiger in the Congo. Charles Brown, COO, S.E.K SPRL, Katanga Province, D R Congo A Tiger in the Congo Charles Brown, COO, S.E.K SPRL, Katanga Province, D R Congo Disclaimer Forward-Looking Statements This presentation contains forward-looking information, which is based on assumptions

More information

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au

More information

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource

More information

For personal use only

For personal use only 25 May 2012 AMENDED PERKOA JOINT VENTURE PROJECT MINERAL RESOURCE UPGRADE Please find attached an amended version of the Perkoa Joint Venture Project Mineral Resource Upgrade announcement released yesterday.

More information

Kingsgate 2012 Mineral Resources & Ore Reserves

Kingsgate 2012 Mineral Resources & Ore Reserves 16 October 2012 Via ASX Online Manager Company Announcements Office Australian Securities Exchange Kingsgate 2012 Mineral Resources & Ore Reserves Kingsgate Consolidated Limited (ASX: KCN) increased its

More information