1 300 Stabilized Subgrade Base and Shoulders Plate Subgrade Modification - Manipulation for Aggregate Subgrade Modification (*) (**) Recap of Aggregate for Base 301-1b Aggregate Base Actual Depths 301-2b Aggregate Base Crown Checks 301-2c Manipulation for In-Place Material Subgrade Modification (**) Aggregate Base Actual Depths 301-2b Aggregate Base Crown Checks 301-2c Aggregate (tons) 301-1a Aggregate for Subgrade Modification (sq yards) Aggregate Tally for Subgrade (cu yds) 301-2a Calcium Chloride Recap of Calcium Chloride 301-3a Cement Recap of Cement 301-4a Fly Ash Recap of Fly Ash 301-5a Water (Subgrade Modification) (Set Price) Recap of Water 301-6a 302 Lime Treated Subgrade Lime Manipulation (Lime Treated Subgrade) Preliminary Mixing of Lime Sub-Grade 302-2a Final Mixing Check of Lime Subgrade 302-2b Moisture Content in Lime Base 302-2c Moisture Content at Beginning of Curing 302-2d Water (Lime Treated Subgrade) Recap of Water Hauled 301-6a 303 Cement or Fly Ash Treated Subgrade Cement Recap of Cement 301-4a Fly Ash Recap of Fly Ash 301-5a Manipulation for Treated Subgrade Water (Treated Subgrade) (Set Price) Recap of Water Hauled 301-6a

2 300 Stabilized Subgrade Base and Shoulders Plate 304 Crushed Stone Subgrade Crushed Stone Subgrade (*) Aggregate Tally for Subgrade (cu yds) 301-2a Aggregate Base Actual Depths 301-2b Aggregate Base Crown Checks 301-2c Water (Crushed Stone Subgrade) Recap of Water Hauled 301-6a 305 Aggregate Base and Aggregate Shoulders Aggregate Base (*) (**) Aggregate Base Actual Depths 301-2b Aggregate Base Crown Checks 301-2c Aggregate Shoulder (*) (**) Aggregate Base Actual Depths 301-2b Aggregate Base Crown Checks 301-2c Calcium Chloride Recap of Calcium Chloride 301-3a Water (Aggregate Base) (Set Price) Recap of Water Hauled 301-6a Water (Aggregate Shoulders) (Set Price) Recap of Water Hauled 301-6a 306 Cement Treated Base Cement Treated Base Aggregate Base Actual Depths 301-2b Aggregate Base Crown Checks 301-2c Quality Control Testing (CTB) Liquid Membrane Forming Compound (CTB) Density Test (CTB) Density Moving Averages Day Compressive Strength Test Granular Base Granular Base (*) Aggregate Base Actual Depths 301-2b Aggregate Base Crown Checks 301-2c Water (Granular Base) (Set Price) Recap of Water Hauled 301-6a

3 AGGREGATE FOR BASE Line No. Plan Qty. Type of Tons Roadway Accum Date Location Material Delivered Lin. Ft. Width Sq. Ft. Sq. Yds. Sq. Yds. Insp THIS PLATE MAY BE USED FOR CEMENT TREATED BASE, COMBINED MATERIAL, CRUSHED RAP SUBGRADE GRANULAR SUBBASE, LEAN CONCRETE BASE, LIME TREATED SUBGRADE, SUBGRADE MODIFICATION, MANIPULATION FOR AGGREGATE G SUBGRADE MODIFICATION, O MANIPULATION FOR IN-PLACE MATERIAL, SUBGRADE MODIFICATION, MANIPULATION FOR LIME TREATED SUBGRADE, AGGREGATE BASE, AGGREGATE SHOULDER, FLY ASH, LIGHT TYPE SURFACING, SILT, CRUSHED STONE SUBGRADE, PORTLAND CEMENT TREATED BASE, STABILIZED SUBBASE.

4 AGGREGATE Line No. Plan Qty. Date Location Side Tons Accum Tons Station Length Accum Length Tons Per Sta. Remarks Insp a This plate is a total of a days work completed and is also used for estimate purposes. This plate may also be used for Aggregate For Shoulder, Aggregate For Subgrade Modification, Combined Material, Fly Ash, Light Type Surfacing, Lime, Permeable Asphalt Treated Base, Silt, Sodium Chloride, Surfacing Material, and Unstable Repair.

5 RECAP OF AGGREGATE FOR BASE LINE NO. PLAN QTY Week Ref. Week Estimate Ending Accum Book & Ending Number Total Total Page REMARKS Insp b This plate may also be used for Aggregate for Subgrade Modification, Manipulation for Aggregate or In place Subgrade Modification, Manipulation at for Lime, Cement, e Fly Ash, or Crushed Stone Treated Subgrade, Aggregate Base or Shoulder, or Granular Base.

6 AGGREGATE FOR SUBGRADE MODIFICATION Line No. Plan Qty. Type of Tons Accum Date Locaton Material Delivered Cu. Yd. Cu. Yd. Remarks Insp

7 10 AGGREGATE TALLY FOR SUBGRADE Line No. Plan Qty Date Load Tally Truck Number Truck size (Cu. YDS.) Daily Total Accum Total Remarks INSP 301-2a

8 10 AGGREGATE BASE ACTUAL DEPTH Date Location Sta. Plan Actual INSP Remarks This plate is a record of actual depth checks conducted to assure the depth of the granular sub-base was in resonable conformance with plan depth. This plate may be used with other aggregate bases b

9 AGGREGATE BASE 2" CROWN CHECKS (24" WIDTH) Distance From C.L. Plan Depth Sta Actual Depth Sta Actual Depth Sta Actual Depth 301-2c Date INSP Remarks This plate is a record of crown measurements to assure that the aggregate base is being constructed in reasonable conformance with the typical section shown on the plans. This plate gives a comparison of the plan and actual measurement. This plate may be used for other aggregate bases.

10 CALCIUM CHLORIDE (CaCl2) Line No. Plan Qty. TONS % % TONS ACCUM CU. YDS. (CaCl2) RETAINED RETAINED per CU. DATE LOCATION (CaCl2) TONS AGG. 1 1/2 " SIEVE 1/2 " SIEVE YD. AGG. INSP

11 RECAP OF CALCIUM CHLORIDE (CaC12) RECEIVED, USED, & ON HAND Tons Tons Tons Accum Invoice Tank (CaC12) (CaC12) (CaC!2) Tons Date Number Brand Grade Number Recivd. Used On Hand Used Remarks Insp a

12 CEMENT (For subgrade Modification) TONS % % TONS ACCUM CU. YDS. CEMENT RETAINED RETAINED per CU. DATE LOCATION CEMENT TONS AGG. 1 1/2 " SIEVE 1/2 " SIEVE YD. AGG. INSP

13 RECAP OF CERTIFIED CEMENT RECEIVED, USED, & ON HAND TONS TONS TONS ACCUM. INVOICE BIN CU. YDS. CEMENT CEMENT CEMENT TONS CEMENT DATE NUMBER BRAND TYPE NUMBER PLACED RECIVD. USED ON HAND USED INSP a This may also be used as a field record of aggregates, received, used and on hand.

14 FLY ASH (For Subgrade Modification) Line No. Plan Qty TONS % % TONS ACCUM CU. YDS. FLY ASH RETAINED RETAINED per CU. DATE LOCATION FLY ASH TONS AGG. 1 1/2 " SIEVE 1/2 " SIEVE YD. AGG. INSP

15 RECAP OF FLY ASH RECEIVED, USED, & ON HAND Tons Tons Tons Accum Invoice Bin Fly Ash Fly Ash Fly Ash Tons Date Number Brand Type Number Recivd Used On Hand Used Remarks Insp a

16 WATER (*) Set Price Line No Plan Qty. Tank Daily Daily Ticket Tank Size M. Gal. Total Accum Number Weekly Total Date Load Tally Number M. Tank M. Gal. Total Issued Book Page Insp 301-6

17 RECAP OF WATER HAULED LINE NO. PLAN QTY Weekly Accum Reference Week Total Total Book Estimate Type of Ending Ending Ending Page Number Use Remarks Insp a CAN ALSO BE USED WITH BACKFILLING FOR STRUCTURES U S

18 10 LOG OF HYDRATED LIME RECEIVED, TESTED, AND USED Line No. Plan Qty Car/Truck Load No. Car/Truck Lab No. Assigned Lab No. Date Sampled Sampled By Lbs. W.T. Bill Lading Tons Accum. Tons Cert. No. Date Used INSP Spread No. Sta. to Sta. Lane Remarks This plate is a record of material received, tested and used on any project. Shown are car or truck load numbers, car or truck number, assigned lab number, date sampled and by whom, weight in pounds and tons. This can be project scale weights or ticket weights at the source of the material. It also shows accumlative tons, certification number, date used, inspector, spread number, and location used, and total number of tons for estimate purposes.

19 MANIPULATION (LIME TREATED SUBGRADE) Line No. Plan Qty. Accum Date Sta to Sta. Lin. Ft. Width Sq. Yds. Sq. Yds. Remarks Insp May also be used for Cement or Fly Ash Treated Subgrade

20 PRELIMINARY MIXING CHECK OF LIME SUBGRADE WEIGHT OF WT. PASSING % PASSING % DATE LOCATION SAMPLE 2" SIEVE 2" SIEVE REQUIRED INSP A

21 FINAL MIXING CHECK OF LIME SUBGRADE WT. % WT. % WT. OF PASSING PASSING % PASSING PASSING % 1 1/2" 1 1/2 " DATE LOCATION SAMPLE SIEVE SIEVE REQ. #4 SIEVE #4 SIEVE REQ. INSP b

22 10 MOISTURE CONTENT IN LIME BASE Date Sta. Side Test Number Percent Moisture Optimum Moisture Remarks INSP c This plate is a record of the results of moisture tests conducted to show that the moisture at the time of laydown was in compliance with the specifications. Deficient tests should be recorded as well as the remedial action taken.

23 10 MOISTURE CONTENT IN LIME BASE AT BEGINNING OF CURING PROCESS Date Sta. Side Test Number Percent Moisture Optimum Miisture Remarks INSP d This plate records the actual moisture content and the optimum moisture for comparison to insure substantial compliance with the specifications at the beginning of the curing process.

24 WATER (Lime Treated Subgrade) (Set Price) Line No. Plan Qty. Tank or Accum Date Location Meter Type of Use M-Gal. M-Gal. Remarks Insp

25 WATER ( * ) (Set Price) Tank or Type of Optimum Accum Date Location Meter Use Moisture M-Gal. M-Gal. Remarks Insp (*) May be either Crushed Stone Subgrade, Base, Shoulder, or Granular Base

26 CEMENT TREATED BASE Line No. Plan Qty. Mix Tons Date Location Design Delivered Lin. Ft. Width Sq. Ft. Sq. Yds. Sq. Yds. Insp

27 QUALITY CONTROL TESTING Line No. Plan Qty. Accum Date Sq. Yds. Sq. Yds. Lot # Tester Remarks Insp

28 Recap of Liquid Membrane Forming Compound for Cure of CTB Bid Item # Date Location Length Width Sq Yds Gals. Used Gals./Sq Yd Accum Gals. Insp Minimum i Rate is Gals./Sq.Yd.

29 CTB DENSITY TESTS DATE LOCATION DIST. FROM CL TEST #1 TEST#2 TEST#3 AVG. CORR. FACT. CORR. READ. STD. %STD. INSP

30 DATE STANDARD DENSITY & MOVING AVERAGE STANDARD DENSITIES LAB SPEC. NO. lbs./cu. ft. 3 DAY AVG. lbs./cu. ft. REMARKS INSP

31 RECAP OF 7 DAY COMPRESSIVE STRENGTH TESTS R-1 PLACEMENT BREAKING CONTRACTOR KDOT REMOVE LOT SIZE PAY LOT # DATE DATE PSI PSI PASS/FAIL YES/NO SQ. YD. FACTOR INSP