1 Code Opérationnel de Réseau Transmission Part B3.5 The distribution of capacity between the North-South link and PITS Nord Atlantique and Sud Atlantique For information

2 Sommaire Physical network Physical to Contractual Capacities Distribution rule 2

3 Part constitution, amendments and changes GRTgaz makes every effort within its means to provide accurate and up-todate information, and reserves the right to amend its content subject to 25 days notice. The information provided is for indicative purposes only, including the hyperlinks and any other IT-related connection used directly or indirectly, as well as any information of a financial nature. No information appearing in this document may be considered as being an offer to purchase, to provide services or to conclude a contract. It has no liability for any data and/or information in this document. No liability will be accepted by GRTgaz for : Damage of any kind whatsoever, wether direct or indirect, arising from the use of this document and, in particular, any operating, financial or commercial loss; Inability to access this document; Omissions and/or errors that this document may contain. 3

4 Physical network 4

5 PITS is a contractual point between GRTgaz and storages operator PITS Nord-Atlantique + PITS Sud-Atlantique = Serene Littoral + Serene Sud = Chémery + Soings + Cere North-South link A delivery point belongs either to the North Zone or the South Zone. The link is the interface between the two zones. The same network facilities make available capacity used for both the link and the PITS Atlantique North and South 5

6 Network performance In an interconnected network such as GRTgaz, all structures are interdependant The IP capacity is available through the structures connected to this point but also through the structures connected to these structures and so on In the case of the North-South link, all GRTgaz structures make the capacity Capacities made available on the North-South link result from all network bottlenecks and from the distribution rule between the North- South link and the PITS Atlantique (according to the season) 6

7 3 identified network bottlenecks In the scheme of two GRTgaz zones, 2 bottlenecks limit the availability of firm capacity for the link and the PITS North and South Atlantique 1. «North» bottleneck 2. «South-East» bottleneck - Note that the PITS capacity is declared climatic i.e. consumption dependant These bottlenecks are presented in the Winter Outlook 7

8 Physical to Contractual 8

9 Physical to Contractual Entry/Exit system - Independant subscription and use of each entry/exit point - No more physical routes In practice, includes every combinations of Possible flow - Except extreme and unlikely cases - Economically efficient Includes assumptions related to a normal use of the gas system 9

10 Contractual network DUNKERQUE GNL IT0004 DUNKERQUE IR0006 ALVERINGEM IR0059 TAISNIERES B IR0015 QUEVY IR0013 NORD B PS000B ARLEUX IR0044 BLAREGNIES IR0014 Balancing zone Interconnection point Delivery pool Virtual Trading Point (PEG) Storage Link MONTOIR IT0002 NORD-OUEST PS000NA PEG NORD EG001N PL001N NORD-ATLANTIQUE PS000NC SUD-ATLANTIQUE PS000SC NORD LIAISON NORD-SUD NS0001 NORD-EST PS000NB JTS NS0003 OBERGAILBACH IR0010 OLTINGUE IR0011 JURA IR0031 PL000S TRS SUD-EST PS000SA TRS EG001S FOS TONKIN IT0001 FOS CAVAOU IT

11 North to south link Physical to Contractual Capacities depending on consumption and flows Same network facilities for different contractual products DUNKERQUE GNL IT0004 NORD B PS000B DUNKERQUE IR0006 ALVERINGEM IR0059 ARLEUX IR0044 TAISNIERES B IR0015 QUEVY IR0013 BLAREGNIES IR0014 NORD-OUEST PS000NA PL001N NORD OBERGAILBACH IR0010 o o Injection Nord-Atlantique vs. North to South link Withdrawal Sud-Atlantique vs. North to South link Distribution rules need to be defined MONTOIR IT0002 PEG NORD EG001N NORD-ATLANTIQUE PS000NC SUD-ATLANTIQUE PS000SC LIAISON NORD-SUD NS0001 NORD-EST PS000NB JTS NS0003 OLTINGUE IR0011 JURA IR0031 PL000S TRS SUD-EST PS000SA TRS EG001S FOS TONKIN IT0001 FOS CAVAOU IT

12 Distribution rules They were established in Concertation Gaz They are available in the part B3.1 of Code Opérationnel de Réseau They take into account - Requests made by shippers before 2:00pm D-1 for the link and the concerned PITS - Technical capacities available for the day, depending on: Consumption on the GRTgaz network Flows at every entry/exit points on GRTgaz network The rules depend on the season and the direction of flow at the PITS (injection/withdrawal) They are working outside of maintenance periods - The technical capacity of the system changes during maintenance periods 12

13 Capacities 13

14 Capacities For the North-to-South link 270 GWh/d of firm available capacity in normal conditions Capacities (GWh/d) South Zone Consumption (GWh/d) 14

15 Capacities For the North-to-South link 270 GWh/d of firm available capacity in normal conditions 30 GWh/d of climatic interruptible capacity, depending on the consumption forecast in the southern zone : - 30 GWh/d if South Consumption 650 GWh/d - 0 if South Consumption 260 GWh/d - Linear between these two points Capacities (GWh/d) South Zone Consumption (GWh/d) 15

16 Capacities For the North-to-South link 270 GWh/d of firm available capacity in normal conditions 30 GWh/d of climatic interruptible capacity, depending on the consumption forecast in the southern zone : - 30 GWh/d if South Consumption 650 GWh/d - 0 if South Consumption 260 GWh/d - Linear between these two points A scheduling part, shareable with the PITS(s) Atlantic, up to 150 GWh/d Capacities (GWh/d) South Zone Consumption (GWh/d) 16

17 Capacities For the exit capacities from North Zone Nord to PITS Nord- Atlantique A global firm capacity, available in normal operating conditions, depending on the consumption forecast on all zones of the GRTgaz network : GWh/d if all zones consumption 550 GWh/d - 0 if all zones consumption 1450 GWh/d - Linear between these 2 points Capacities (GWh/d) All zones Consumption (GWh/d) 17

18 Capacities For the exit capacities from North Zone Nord to PITS Nord- Atlantique A global firm capacity, available in normal operating conditions, depending on the consumption forecast on all zones of the GRTgaz network : GWh/d if all zones consumption 550 GWh/d - 0 if all zones consumption 1450 GWh/d - Linear between these 2 points A scheduling part, shareable with the North-to-South link in summer up to 185 GWh/d Capacities (GWh/d) All zones Consumption (GWh/d) 18

19 Capacities Entry capacity from PITS Sud-Atlantique to South Zone A firm capacity part available in normal operating conditions, depending on the consumption forecast in South Zone : GWh/d if South Consumption 960 GWh/d - 0 if South Consumption 380 GWh/d - Linear between these 2 points Capacities (GWh/d) South Zone Consumption (GWh/d) 19

20 Capacities Entry capacity from PITS Sud-Atlantique to South Zone A firm capacity part available in normal operating conditions, depending on the consumption forecast in South Zone : GWh/d if South Consumption 960 GWh/d - 0 if South Consumption 380 GWh/d - Linear between these 2 points A scheduling part, shareable with the North-to-South link, in winter Capacities (GWh/d) South Zone Consumption (GWh/d) 20

21 Capacities Entry capacity from PITS Sud-Atlantique to South Zone A firm capacity part available in normal operating conditions, depending on the consumption forecast in South Zone : GWh/d if South Consumption 960 GWh/d - 0 if South Consumption 380 GWh/d - Linear between these 2 points A scheduling part, shareable with the North-to-South link, in winter An interruptible part, depending on flows to TIGF Capacities (GWh/d) South Zone Consumption (GWh/d) 21

22 Distribution rules 22

23 Distribution rule in summer Every day, GRTgaz defines the available capacity for both points towards North-to-South link and PITS Nord-Atlantique Distribution is done during summer between exit capacities from North Zone to PITS Nord Atlantique and the North-to-South link A first calculation is made to share the global available capacity on these two points in proportion to the nomination made on these two points before 2:00pm 23

24 Distribution rule in summer For each of the 2 points, in the event that the prorata results in a lower capacity to : - Firm capacity + climatic interruptible capacity for the North-to-South link liaison or - Climatic firm capacity or 2:00pm la nomination (in the limit of 170 GWh/d) for the PITS Nord-Atlantique Capacities are switched between these two points to ensure these minimum levels 24

25 Distribution rule in winter Every day, GRTgaz defines the available capacity for both points towards North-to-South link and PITS Sud-Atlantique Distribution is done during winter between entry capacities from PITS Sud Atlantique to South Zone and the North-to-South link A first calculation is made to share the global available capacity on these two points in proportion to the nomination made on these two points before 2:00pm 25

26 Distribution rule in winter For each of the 2 points, in the event that the prorata results in a lower capacity to: - Firm capacity + climatic interruptible capacity for the North-to-South liaison link or - Climatic firm capacity or 2:00pm nomination (in the limit of 300 GWh/d) for the PITS Sud-Atlantique Capacities are switched between these two points to ensure these minimum levels - This transfer will be done within the limits of shareable capacity with the North-to-South link 26

27