1 CAM MACAU INTERNATIONAL AIRPORT Co. Ltd. T MACAU INTERNATIONAL AIRPORT RENOVATION WORKS ON THE FIRE STATION AND BOAT HOUSE NEW WAREHOUSE AND OFFICE 施工計劃 FINAL DESIGN 部份 : SECTION : G 空調及通風系統 HEATING, VENTILATION AND AIR-CONDITIONING

2 CAM MACAU INTERNATIONAL AIRPORT Co. Ltd. MACAU INTERNATIONAL AIRPORT T RENOVATION WORKS ON THE FIRE STATION AND BOAT HOUSE NEW WAREHOUSE AND OFFICE 施工計劃 FINAL DESIGN 空調及通風系統 HEATING, VENTILATION AND AIR-CONDITIONING 文件目錄 LISTA DE DOCUMENTOS DOCUMENTS LIST 928_PE_AC_LD_BL 修改 A - Revision A 2011 年 07 月 27 日 文件編號 NÚMERO DOC. DOC. NUMBER 發行次數 EMISSÃO ISSUE 發行日期 DATA EMISÃO ISSUE DATE

3 T RENOVATION WORKS ON THE FIRE STATION AND BOAT HOUSE NEW WAREHOUSE AND OFFICE A Revision of Equipment Schedule and Drawings, due to changes on 1st Floor PR 第一次 - Primeira Emissão - First Issue PR 發行次數 EMISSÃO ISSUE 日期 DATA DATE 描述 DESCRIÇÃO DESCRIPTION 檢定 VERIF. CHECK 文件目錄 - LISTA DE DOCUMENTOS - DOCUMENTS LIST REVISIONS SHEET

4 T RENOVATION WORKS ON THE FIRE STATION AND BOAT HOUSE NEW WAREHOUSE AND OFFICE 部份 SECÇÃO SECTION 項目 DISCIPLINA DISCIPLINE A B C D E F G 建築設計 ARQUITECTURA ARCHITECTURE 地基與結構 FUNDAÇÕES E ESTRUTURAS FOUNDATIONS AND STRUCTURES 排水系统 DRENAGEM DRAINAGE 供水系统 ABASTECIMENTO DE ÁGUA WATER SUPPLY 消防系统 INSTALAÇÕES DE SEGURANÇA CONTRA INCÊNDIOS FIRE FIGHTING SERVICES 電力安裝, 通訊及保安系統 INSTALAÇÕES ELÉCTRICAS, COMUNICAÇÕES E SEGURANÇA ELECTRICAL INSTALLATIONS, COMMUNICATIONS AND SECURITY SYSTEMS 空調及通風系統 AQUECIMENTO, VENTILAÇÃO E AR CONDICIONADO HEATING, VENTILATION AND AIR-CONDITIONING 文件類型 TIPO DOC. DOC.TYPE 描述 DESCRIÇÃO DESCRIPTION DW DM TS LD CN BQ GI FE TR TP DS ES 圖則 - DESENHO - DRAWING 說明備忘錄 - MEMÓRIA DESCRITIVA - DESCRIPTIVE MEMORANDUM 技術規格 - ESPECIFICAÇÃO TÉCNICA - TECHNICAL SPECIFICATION 文件目錄 - LISTA DE DOCUMENTOS - DOCUMENTS LIST 工程計算書 - NOTAS DE CÁLCULO - CALCULATION NOTES 數量清單 - MAPA DE QUANTIDADES - BILL OF QUANTITIES 總目錄 - ÍNDICE GERAL - GENERAL INDEX 電力技術表 - FICHA ELECTROTÉCNICA - ELECTRICAL LOAD TABLE 責任聲明書 - TERMO DE RESPONSABILIDADE - AFFIDAVIT 技術文件 - PAPEL TÉCNICO - TECHNICAL PAPER 產品目錄 - CATÁLOGOS - DATA SHEETS 設備表 - LISTA DE EQUIPAMENTOS - EQUIPMENT SCHEDULE 文件目錄 - LISTA DE DOCUMENTOS - DOCUMENTS LIST REFERENCES

5 T RENOVATION WORKS ON THE FIRE STATION AND BOAT HOUSE - NEW WAREHOUSE AND OFFICE 部份 : 項目 : SECÇÃO: G DISCIPLINA: SECTION: DISCIPLINE: 空調及通風系統 AQUECIMENTO, VENTILAÇÃO E AR CONDICIONADO HEATING, VENTILATION AND AIR-CONDITIONING 文件類型 TIPO DOC. DOC.TYPE LD TR DM DM CN TS 文件編號 NUM. DOC. DOC. NUMBER 文件 DOCUMENTOS - DOCUMENTS 文件目錄 928_PE_AC_LD_BL DOCUMENTS LIST 責任聲明書 928_PE_AC_TR_PT AFFIDAVIT 說明備忘錄 ( 中文 ) 928_PE_AC_DM_CH DESCRIPTIVE MEMORANDUM (CHINESE) 說明備忘錄 ( 英文 ) 928_PE_AC_DM_EN DESCRIPTIVE MEMORANDUM (ENGLISH) 計算書 928_PE_AC_CN_PT CALCULATION NOTES 技術規格 928_PE_AC_TS_BL TECHNICAL SPECIFICATIONS 928_PE_AC_ES_BL 設備表 EQUIPMENT SCHEDULE 文件名稱 NOME DOCUMENTO DOC. NAME 修改 / 日期 - REVISÃO / DATA - REVISION / DATE -- A B C D E F G H I J K DW DW 928AC AC002 圖則 DESENHOS - DRAWINGS 新倉儲和辦公室 - 平面圖 New Warehouse and Office - Plans 新倉儲和辦公室 - 平面圖 剖面圖 系統圖及圖例 New Warehouse and Office - Plans, Sections, Diagram and Symbology _PE_AC_LD_BL.xls 文件目錄 - LISTA DE DOCUMENTOS - DOCUMENTS LIST Pag. 1/1

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20 CAM MACAU INTERNATIONAL AIRPORT CO. LTD. MACAU INTERNATIONAL AIRPORT T RENOVATION WORKS ON THE FIRE STATION AND BOAT HOUSE NEW WAREHOUSE AND OFFICE 施工計劃 FINAL DESIGN 空調及通風系統 HEATING VENTILATION AND AIR CONDITIONING 計算書 CALCULATION NOTES 928_PE_AC_CN_EN 修改 A - Revisão A 27 July 2011 文件編號 DOC. NUMBER 發行次數 ISSUE 發行日期 ISSUE DATE

21 T NEW WAREHOUSE AND OFFICE AIR CONDITIONING SYSTEM - CALCULATION SUMMARY VENTILATION REQUIREMENTS SPACE AND LOCATION AREA Nr. FRESH AIR EXHAUST COOLING AIR FLOW HEATING PEOPLE RATE FLOW RATIO FLOW TOTAL SENS LAT RATIO (or unit) l/s/pr or l/s/m² l/s l/s kw kw kw SH/TH l/s kw FLOOR REF. DESCRIPTION ZONE (m 2 ) l/s/un 0.1 Truck Tools Store st Aid Mater.Store Foam Conc.Store G/F 0.4 Entrance Hall Store Room Hall Store Room Switchboard Room Administrative Office Chief Office Assistance Office Assistance Office Offices Ward Stairway Hall st Floor 1.6 Archive Toilet Shower Office Hall Staff Ward Pantry Corridor TOTALS % _PE_AC_CN_En_A.doc HVAC - Calculation Notes 2/2

22 CAM MACAU INTERNATIONAL AIRPORT CO. LTD. MACAU INTERNATIONAL AIRPORT T RENOVATION WORKS ON THE FIRE STATION AND BOAT HOUSE NEW WAREHOUSE AND OFFICE 施工計劃 FINAL DESIGN 空調及通風系統 HEATING VENTILATION AND AIR CONDITIONING 計算書 (1) CALCULATION NOTES (1) 928_PE_AC_CN1_EN 修改 A - Revisão A 27 July 2011 文件編號 DOC. NUMBER 發行次數 ISSUE 發行日期 ISSUE DATE

23 Design Weather Parameters & MSHGs AIM Fire Station Extension PAL Profabril Asiaconsult Ltd. 05:40PM Design Parameters: City Name Taipa Location China Latitude 22.2 Deg. Longitude Deg. Elevation 27.0 m Summer Design Dry-Bulb 32.0 C Summer Coincident Wet-Bulb 28.1 C Summer Daily Range 4.2 K Winter Design Dry-Bulb 6.9 C Winter Design Wet-Bulb 4.6 C Atmospheric Clearness Number 0.90 Average Ground Reflectance 0.20 Soil Conductivity W/(m- K) Local Time Zone (GMT +/- N hours) -8.0 hours Consider Daylight Savings Time No Simulation Weather Data nonen/a Current Data is User Modified Design Cooling Months January to December Design Day Maximum Solar Heat Gains (The MSHG values are expressed in W/m² ) Month N NNE NE ENE E ESE SE SSE S January February March April May June July August September October November December Month SSW SW WSW W WNW NW NNW HOR Mult January February March April May June July August September October November December Mult. = User-defined solar multiplier factor. Hourly Analysis Program v.4.2 Page 1 of 1 Page 2 of 29 (Total)

24 Wall Constructions AIM Fire Station Extension PAL Profabril Asiaconsult Ltd. 05:44PM Brick Partition Wall Details Outside Surface Color Light Absorptivity Overall U-Value W/(m²- K) Wall Layers Details (Inside to Outside) Thickness Density Specific Ht. R-Value Weight Layers mm kg/m³ kj / (kg - K) (m²- K)/W kg/m² Inside surface resistance mm stucco mm common brick mm stucco Outside surface resistance Totals External Double Wall Wall Details Outside Surface Color Medium Absorptivity Overall U-Value W/(m²- K) Wall Layers Details (Inside to Outside) Thickness Density Specific Ht. R-Value Weight Layers mm kg/m³ kj / (kg - K) (m²- K)/W kg/m² Inside surface resistance mm stucco mm common brick Air space mm common brick mm stucco Outside surface resistance Totals Hourly Analysis Program v.4.2 Page 1 of 1 Page 3 of 29 (Total)

25 Roof Constructions AIM Fire Station Extension PAL Profabril Asiaconsult Ltd. 05:45PM Floor slab Roof Details Outside Surface Color Medium Absorptivity Overall U-Value W/(m²- K) Roof Layers Details (Inside to Outside) Thickness Density Specific Ht. R-Value Weight Layers mm kg/m³ kj / (kg - K) (m²- K)/W kg/m² Inside surface resistance mm HW concrete Outside surface resistance Totals General Roof Roof Details Outside Surface Color Dark Absorptivity Overall U-Value W/(m²- K) Roof Layers Details (Inside to Outside) Thickness Density Specific Ht. R-Value Weight Layers mm kg/m³ kj / (kg - K) (m²- K)/W kg/m² Inside surface resistance mm HW concrete Thermal Insulation LW concrete Outside surface resistance Totals Hourly Analysis Program v.4.2 Page 1 of 1 Page 4 of 29 (Total)

26 Window Constructions AIM Fire Station Extension PAL Profabril Asiaconsult Ltd. 05:45PM Window J01 Window Details: Detailed Input Yes Height 1.60 m Width 1.00 m Frame Type Aluminum with thermal breaks Internal Shade Type None Overall U-Value W/(m²- K) Overall Shade Coefficient Glass Details: Gap Type 13 mm Air Space Glazing Glass Type Transmissivity Reflectivity Absorptivity Outer Glazing 6mm clear Glazing #2 6mm clear Glazing #3 Not Used Window J02 Window Details: Detailed Input Yes Height 2.10 m Width 0.50 m Frame Type Aluminum with thermal breaks Internal Shade Type None Overall U-Value W/(m²- K) Overall Shade Coefficient Glass Details: Gap Type 13 mm Air Space Glazing Glass Type Transmissivity Reflectivity Absorptivity Outer Glazing 6mm clear Glazing #2 6mm clear Glazing #3 not used Window J03 Window Details: Detailed Input Yes Height 2.40 m Width 1.00 m Frame Type None Internal Shade Type None Overall U-Value W/(m²- K) Overall Shade Coefficient Glass Details: Gap Type 13 mm Air Space Glazing Glass Type Transmissivity Reflectivity Absorptivity Outer Glazing 6mm clear Glazing #2 6mm clear Glazing #3 Not Used Hourly Analysis Program v.4.2 Page 1 of 1 Page 5 of 29 (Total)

27 Air System Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM DESIGN COOLING DESIGN HEATING COOLING DATA AT Aug 1700 HEATING DATA AT DES HTG COOLING OA DB / WB 31.6 C / 28.0 C HEATING OA DB / WB 6.9 C / 4.6 C Sensible Latent Sensible Latent ZONE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 64 m² m² - - Wall Transmission 303 m² m² Roof Transmission 181 m² m² Window Transmission 64 m² m² Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 10 m² m² Floor Transmission 326 m² m² Partitions 374 m² m² Ceiling 184 m² m² Overhead Lighting 3869 W Task Lighting 381 W Electric Equipment 400 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads Zone Conditioning Plenum Wall Load 0% Plenum Roof Load 0% Plenum Lighting Load 0% Exhaust Fan Load 0 L/s 0-0 L/s 0 - Ventilation Load 437 L/s L/s Ventilation Fan Load 0 L/s 0-0 L/s 0 - Space Fan Coil Fans Duct Heat Gain / Loss 0% 0-0% 0 - >> Total System Loads Terminal Unit Cooling Terminal Unit Heating >> Total Conditioning Key: Positive values are clg loads Positive values are htg loads Negative values are htg loads Negative values are clg loads Hourly Analysis Program v.4.2 Page 1 of 1 Page 6 of 29 (Total)

28 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 1.1.A. COMPONENT LOADS FOR SPACE '' 0.01-Truck Tools Store '' IN ZONE '' Zone 1 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Nov 1600 HEATING DATA AT DES HTG COOLING OA DB / WB 28.0 C / 26.4 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 11 m² m² - - Wall Transmission 67 m² m² Roof Transmission 0 m² 0-0 m² 0 - Window Transmission 11 m² m² Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 60 m² m² Partitions 42 m² m² Ceiling 60 m² m² Overhead Lighting 648 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 1.1.B. ENVELOPE LOADS FOR SPACE '' 0.01-Truck Tools Store '' IN ZONE '' Zone 1 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) W EXPOSURE WALL WINDOW E EXPOSURE WALL S EXPOSURE WALL WINDOW Hourly Analysis Program v.4.2 Page 1 of 19 Page 7 of 29 (Total)

29 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 2.1.A. COMPONENT LOADS FOR SPACE '' st Aid Mater.Store '' IN ZONE '' Zone 2 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Jul 1700 HEATING DATA AT DES HTG COOLING OA DB / WB 31.6 C / 28.0 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 2 m² m² - - Wall Transmission 19 m² m² Roof Transmission 0 m² 0-0 m² 0 - Window Transmission 2 m² 51-2 m² Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 35 m² m² Partitions 63 m² m² Ceiling 35 m² m² Overhead Lighting 378 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 2.1.B. ENVELOPE LOADS FOR SPACE '' st Aid Mater.Store '' IN ZONE '' Zone 2 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) W EXPOSURE WALL WINDOW Hourly Analysis Program v.4.2 Page 2 of 19 Page 8 of 29 (Total)

30 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 3.1.A. COMPONENT LOADS FOR SPACE '' 0.03-Foam Conc.Store '' IN ZONE '' Zone 3 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Jun 1700 HEATING DATA AT DES HTG COOLING OA DB / WB 31.0 C / 28.0 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 8 m² m² - - Wall Transmission 71 m² m² Roof Transmission 0 m² 0-0 m² 0 - Window Transmission 8 m² m² Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 3 m² 40-3 m² 85 - Floor Transmission 67 m² m² Partitions 42 m² m² Ceiling 67 m² m² Overhead Lighting 724 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 3.1.B. ENVELOPE LOADS FOR SPACE '' 0.03-Foam Conc.Store '' IN ZONE '' Zone 3 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) W EXPOSURE WALL WINDOW N EXPOSURE WALL WINDOW E EXPOSURE WALL DOOR Hourly Analysis Program v.4.2 Page 3 of 19 Page 9 of 29 (Total)

31 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 5.1.A. COMPONENT LOADS FOR SPACE '' 0.04-Entrance Hall '' IN ZONE '' Zone 5 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Aug 0900 HEATING DATA AT DES HTG COOLING OA DB / WB 29.0 C / 27.4 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 2 m² m² - - Wall Transmission 0 m² 13-0 m² 7 - Roof Transmission 0 m² 0-0 m² 0 - Window Transmission 2 m² 35-2 m² Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 3 m² 64-3 m² Floor Transmission 9 m² m² Partitions 11 m² m² Ceiling 9 m² m² Overhead Lighting 97 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 5.1.B. ENVELOPE LOADS FOR SPACE '' 0.04-Entrance Hall '' IN ZONE '' Zone 5 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) E EXPOSURE WALL WINDOW DOOR GLASS Hourly Analysis Program v.4.2 Page 7 of 19 Page 10 of 29 (Total)

32 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 4.1.A. COMPONENT LOADS FOR SPACE '' 0.05-Store Room Hall '' IN ZONE '' Zone 4 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Aug 1700 HEATING DATA AT DES HTG COOLING OA DB / WB 31.6 C / 28.0 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 2 m² m² - - Wall Transmission 0 m² 14-0 m² 7 - Roof Transmission 0 m² 0-0 m² 0 - Window Transmission 2 m² 51-2 m² Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 3 m² 90-3 m² Floor Transmission 13 m² m² Partitions 47 m² m² Ceiling 13 m² m² Overhead Lighting 140 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 4.1.B. ENVELOPE LOADS FOR SPACE '' 0.05-Store Room Hall '' IN ZONE '' Zone 4 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) W EXPOSURE WALL WINDOW DOOR GLASS Hourly Analysis Program v.4.2 Page 4 of 19 Page 11 of 29 (Total)

33 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 4.3.A. COMPONENT LOADS FOR SPACE '' 0.06-Store Room '' IN ZONE '' Zone 4 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Mar 2200 HEATING DATA AT DES HTG COOLING OA DB / WB 26.4 C / 25.7 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m² 0-0 m² - - Wall Transmission 0 m² 0-0 m² 0 - Roof Transmission 0 m² 0-0 m² 0 - Window Transmission 0 m² 0-0 m² 0 - Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 3 m² 82-3 m² Partitions 12 m² m² Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 32 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 4.3.B. ENVELOPE LOADS FOR SPACE '' 0.06-Store Room '' IN ZONE '' Zone 4 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) Hourly Analysis Program v.4.2 Page 6 of 19 Page 12 of 29 (Total)

34 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 4.2.A. COMPONENT LOADS FOR SPACE '' 0.07-Switchboard Room '' IN ZONE '' Zone 4 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Mar 2200 HEATING DATA AT DES HTG COOLING OA DB / WB 26.4 C / 25.7 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m² 0-0 m² - - Wall Transmission 0 m² 0-0 m² 0 - Roof Transmission 0 m² 0-0 m² 0 - Window Transmission 0 m² 0-0 m² 0 - Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 6 m² m² Partitions 12 m² m² Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 65 W Task Lighting 0 W Electric Equipment 400 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 4.2.B. ENVELOPE LOADS FOR SPACE '' 0.07-Switchboard Room '' IN ZONE '' Zone 4 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) Hourly Analysis Program v.4.2 Page 5 of 19 Page 13 of 29 (Total)

35 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 6.1.A. COMPONENT LOADS FOR SPACE '' 1.01-Adminstrat. Office '' IN ZONE '' Zone 6 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Aug 1700 HEATING DATA AT DES HTG COOLING OA DB / WB 31.6 C / 28.0 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 8 m² m² - - Wall Transmission 38 m² m² Roof Transmission 40 m² m² Window Transmission 8 m² m² Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 40 m² m² Partitions 28 m² m² Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 432 W Task Lighting 200 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 6.1.B. ENVELOPE LOADS FOR SPACE '' 1.01-Adminstrat. Office '' IN ZONE '' Zone 6 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) S EXPOSURE WALL WINDOW E EXPOSURE WALL WINDOW H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 12 of 19 Page 14 of 29 (Total)

36 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 7.1.A. COMPONENT LOADS FOR SPACE '' 1.02-Chief Office '' IN ZONE '' Zone 7 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Aug 1700 HEATING DATA AT DES HTG COOLING OA DB / WB 31.6 C / 28.0 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 6 m² m² - - Wall Transmission 24 m² m² Roof Transmission 18 m² m² Window Transmission 6 m² m² Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 18 m² m² Partitions 30 m² m² Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 194 W Task Lighting 90 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 7.1.B. ENVELOPE LOADS FOR SPACE '' 1.02-Chief Office '' IN ZONE '' Zone 7 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) W EXPOSURE WALL WINDOW S EXPOSURE WALL WINDOW H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 13 of 19 Page 15 of 29 (Total)

37 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 8.1.A. COMPONENT LOADS FOR SPACE '' Assistance Office '' IN ZONE '' Zone 8 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Aug 1700 HEATING DATA AT DES HTG COOLING OA DB / WB 31.6 C / 28.0 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 2 m² m² - - Wall Transmission 5 m² 73-5 m² Roof Transmission 9 m² m² 86 - Window Transmission 2 m² 38-2 m² 75 - Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 9 m² m² Partitions 12 m² m² Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 97 W Task Lighting 45 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 8.1.B. ENVELOPE LOADS FOR SPACE '' Assistance Office '' IN ZONE '' Zone 8 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) W EXPOSURE WALL WINDOW H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 14 of 19 Page 16 of 29 (Total)

38 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 9.1.A. COMPONENT LOADS FOR SPACE '' Assistance Office '' IN ZONE '' Zone 9 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Aug 1700 HEATING DATA AT DES HTG COOLING OA DB / WB 31.6 C / 28.0 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 2 m² m² - - Wall Transmission 10 m² m² Roof Transmission 9 m² m² 88 - Window Transmission 2 m² 38-2 m² 75 - Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 9 m² m² Partitions 12 m² m² Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 99 W Task Lighting 46 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 9.1.B. ENVELOPE LOADS FOR SPACE '' Assistance Office '' IN ZONE '' Zone 9 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) W EXPOSURE WALL WINDOW H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 15 of 19 Page 17 of 29 (Total)

39 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 10.1.A. COMPONENT LOADS FOR SPACE '' 1.04-Ward of Officials '' IN ZONE '' Zone 10 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Jun 1700 HEATING DATA AT DES HTG COOLING OA DB / WB 31.0 C / 28.0 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 6 m² m² - - Wall Transmission 21 m² m² Roof Transmission 18 m² m² Window Transmission 6 m² m² Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 18 m² m² Partitions 0 m² 0-0 m² 0 - Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 194 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 10.1.B. ENVELOPE LOADS FOR SPACE '' 1.04-Ward of Officials '' IN ZONE '' Zone 10 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) W EXPOSURE WALL WINDOW N EXPOSURE WALL WINDOW H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 16 of 19 Page 18 of 29 (Total)

40 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 5.2.A. COMPONENT LOADS FOR SPACE '' 1.05-Stairsway Hall '' IN ZONE '' Zone 5 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Jul 1600 HEATING DATA AT DES HTG COOLING OA DB / WB 31.9 C / 28.1 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 5 m² m² - - Wall Transmission 13 m² m² Roof Transmission 30 m² m² Window Transmission 5 m² 97-5 m² Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 15 m² m² Partitions 24 m² m² Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 162 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 5.2.B. ENVELOPE LOADS FOR SPACE '' 1.05-Stairsway Hall '' IN ZONE '' Zone 5 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) E EXPOSURE WALL WINDOW H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 8 of 19 Page 19 of 29 (Total)

41 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 5.3.A. COMPONENT LOADS FOR SPACE '' 1.06-Archive '' IN ZONE '' Zone 5 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Jul 2000 HEATING DATA AT DES HTG COOLING OA DB / WB 30.0 C / 27.7 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m² 0-0 m² - - Wall Transmission 0 m² 0-0 m² 0 - Roof Transmission 7 m² 96-7 m² 62 - Window Transmission 0 m² 0-0 m² 0 - Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 6 m² m² Partitions 0 m² 0-0 m² 0 - Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 65 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 5.3.B. ENVELOPE LOADS FOR SPACE '' 1.06-Archive '' IN ZONE '' Zone 5 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 9 of 19 Page 20 of 29 (Total)

42 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 5.4.A. COMPONENT LOADS FOR SPACE '' 1.07-Toilet '' IN ZONE '' Zone 5 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Jul 2200 HEATING DATA AT DES HTG COOLING OA DB / WB 29.1 C / 27.4 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m² 0-0 m² - - Wall Transmission 0 m² 0-0 m² 0 - Roof Transmission 3 m² 43-3 m² 29 - Window Transmission 0 m² 0-0 m² 0 - Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 3 m² 82-3 m² Partitions 6 m² 65-6 m² 97 - Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 32 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 5.4.B. ENVELOPE LOADS FOR SPACE '' 1.07-Toilet '' IN ZONE '' Zone 5 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 10 of 19 Page 21 of 29 (Total)

43 Space Design Load Summary for DX System_A Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 06:41PM TABLE 13.1.A. COMPONENT LOADS FOR SPACE '' 1.08-Showers '' IN ZONE '' Zone 13 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Jul 2200 HEATING DATA AT DES HTG COOLING OA DB / WB 29.1 C / 27.4 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m² 0-0 m² - - Wall Transmission 0 m² 0-0 m² 0 - Roof Transmission 13 m² m² Window Transmission 0 m² 0-0 m² 0 - Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 0 m² 0-0 m² 0 - Partitions 0 m² 0-0 m² 0 - Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 140 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 13.1.B. ENVELOPE LOADS FOR SPACE '' 1.08-Showers '' IN ZONE '' Zone 13 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 22 of 29 (Total) Page 19 of 20

44 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 5.5.A. COMPONENT LOADS FOR SPACE '' 1.09-Offices Hall '' IN ZONE '' Zone 5 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Jul 2000 HEATING DATA AT DES HTG COOLING OA DB / WB 30.0 C / 27.7 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m² 0-0 m² - - Wall Transmission 0 m² 0-0 m² 0 - Roof Transmission 9 m² m² 86 - Window Transmission 0 m² 0-0 m² 0 - Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 9 m² m² Partitions 12 m² m² Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 97 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 5.5.B. ENVELOPE LOADS FOR SPACE '' 1.09-Offices Hall '' IN ZONE '' Zone 5 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 11 of 19 Page 23 of 29 (Total)

45 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 11.1.A. COMPONENT LOADS FOR SPACE '' 1.10-Ward of Staff '' IN ZONE '' Zone 11 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Jun 1800 HEATING DATA AT DES HTG COOLING OA DB / WB 30.6 C / 27.9 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 6 m² m² - - Wall Transmission 30 m² m² Roof Transmission 21 m² m² Window Transmission 6 m² m² Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 0 m² 0-0 m² 0 - Partitions 0 m² 0-0 m² 0 - Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 227 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 11.1.B. ENVELOPE LOADS FOR SPACE '' 1.10-Ward of Staff '' IN ZONE '' Zone 11 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) W EXPOSURE WALL N EXPOSURE WALL WINDOW H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 17 of 19 Page 24 of 29 (Total)

46 Space Design Load Summary for DX System_A Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 06:41PM TABLE 12.1.A. COMPONENT LOADS FOR SPACE '' 1.11-Pantry '' IN ZONE '' Zone 12 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Aug 1700 HEATING DATA AT DES HTG COOLING OA DB / WB 31.6 C / 28.0 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 3 m² m² - - Wall Transmission 6 m² 87-6 m² Roof Transmission 11 m² m² Window Transmission 3 m² 76-3 m² Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 0 m² 0-0 m² 0 - Partitions 6 m² 65-6 m² 97 - Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 119 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 12.1.B. ENVELOPE LOADS FOR SPACE '' 1.11-Pantry '' IN ZONE '' Zone 12 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) W EXPOSURE WALL WINDOW H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 18 of 20 Page 25 of 29 (Total)

47 Space Design Load Summary for DX System Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 08:39PM TABLE 12.1.A. COMPONENT LOADS FOR SPACE '' 1.12-Corridor '' IN ZONE '' Zone 12 '' DESIGN COOLING DESIGN HEATING COOLING DATA AT Jul 2000 HEATING DATA AT DES HTG COOLING OA DB / WB 30.0 C / 27.7 C HEATING OA DB / WB 6.9 C / 4.6 C OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 21.0 C Sensible Latent Sensible Latent SPACE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m² 0-0 m² - - Wall Transmission 0 m² 0-0 m² 0 - Roof Transmission 6 m² 88-6 m² 57 - Window Transmission 0 m² 0-0 m² 0 - Skylight Transmission 0 m² 0-0 m² 0 - Door Loads 0 m² 0-0 m² 0 - Floor Transmission 6 m² m² Partitions 15 m² m² Ceiling 0 m² 0-0 m² 0 - Overhead Lighting 65 W Task Lighting 0 W Electric Equipment 0 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads TABLE 12.1.B. ENVELOPE LOADS FOR SPACE '' 1.12-Corridor '' IN ZONE '' Zone 12 '' COOLING COOLING HEATING Area U-Value Shade TRANS SOLAR TRANS (m²) (W/(m²- K)) Coeff. (W) (W) (W) H EXPOSURE ROOF Hourly Analysis Program v.4.2 Page 18 of 19 Page 26 of 29 (Total)

48 Zone Sizing Summary for DX System_A Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 06:40PM Air System Information Air System Name Equipment Class Air System Type Sizing Calculation Information Zone and Space Sizing Method: DX System_A TERM SPLT-FC Number of zones 13 Floor Area m² Location Taipa, China Zone L/s Space L/s Sum of space airflow rates Individual peak space loads Calculation Months Sizing Data Jan to Dec Calculated Zone Sizing Data Maximum Design Minimum Time Maximum Zone Cooling Air Air of Heating Floor Sensible Flow Flow Peak Load Area Zone Zone Name (kw) (L/s) (L/s) Load (kw) (m²) L/(s-m²) Zone Nov Zone Jul Zone Jun Zone Aug Zone Jul Zone Aug Zone Aug Zone Aug Zone Aug Zone Jun Zone Jun Zone Aug Zone Jul Terminal Unit Sizing Data - Cooling Total Sens Coil Coil Water Time Coil Coil Entering Leaving Flow of Load Load DB / WB DB / 5.6 K Peak Zone Name (kw) (kw) ( C) ( C) (L/s) Load Zone / / Jul 0700 Zone / / Jul 0700 Zone / / Jun 0700 Zone / / Aug 1700 Zone / / Jul 1500 Zone / / Jul 1500 Zone / / Aug 1700 Zone / / Aug 1700 Zone / / Aug 1700 Zone / / Jul 1700 Zone / / Jul 1500 Zone / / Jul 1600 Zone / / Jul 0700 Terminal Unit Sizing Data - Heating, Fan, Ventilation Hourly Analysis Program v.4.2 Page 1 of 2 Page 27 of 29 (Total)

49 Zone Sizing Summary for DX System_A Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 06:40PM HEATING COIL SIZING DATA FAN SIZING DATA VENT Coil Water Coil Ent/Lvg Flow Design Fan Fan Design Load K Airflow Motor Motor Airflow Zone Name (kw) ( C) (L/s) (L/s) (BHP) (kw) (L/s) Zone / Zone / Zone / Zone / Zone / Zone / Zone / Zone / Zone / Zone / Zone / Zone / Zone / Space Loads and Airflows Cooling Time Air Heating Floor Zone Name / Sensible of Flow Load Area Space Space Name Mult. (kw) Load (L/s) (kw) (m²) L/(s-m²) Zone Truck Tools Store Nov Zone st Aid Mater.Store Jul Zone Foam Conc.Store Jun Zone Store Room Hall Aug Switchboard Room Mar Store Room Mar Zone Entrance Hall Aug Stairsway Hall Jul Archive Jul Toilet Jul Offices Hall Jul Zone Adminstrat. Office Aug Zone Chief Office Aug Zone Assistance Office Aug Zone Assistance Office Aug Zone Ward of Officials Jun Zone Ward of Staff Jun Zone Pantry Aug Zone Showers Jul Corridor Jul Hourly Analysis Program v.4.2 Page 2 of 2 Page 28 of 29 (Total)

50 Ventilation Sizing Summary for DX System_A Project Name: AIM Fire Station Extension - Rev_A Prepared by: PAL Profabril Asiaconsult Ltd. 06:40PM 1. Summary Ventilation Sizing Method Sum of Space OA Airflows 2. Space Ventilation Analysis Table Floor Maximum Required Required Required Required Uncorrected Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Zone Name / Space Name Mult. (m²) Occupants (L/s) (L/s/person) (L/(s-m²)) (L/s) (% of supply) (L/s) Zone Truck Tools Store Zone st Aid Mater.Store Zone Foam Conc.Store Zone Store Room Hall Switchboard Room Store Room Zone Entrance Hall Stairsway Hall Archive Toilet Offices Hall Zone Adminstrat. Office Zone Chief Office Zone Assistance Office Zone Assistance Office Zone Ward of Officials Zone Ward of Staff Zone Pantry Zone Showers Corridor Totals (incl. Space Multipliers) Hourly Analysis Program v.4.2 Page 1 of 1 Page 29 of 29 (Total)

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75 CAM MACAU INTERNATIONAL AIRPORT Co. Ltd. T MACAU INTERNATIONAL AIRPORT RENOVATION WORKS ON THE FIRE STATION AND BOAT HOUSE NEW WAREHOUSE AND OFFICE 施工計劃 FINAL DESIGN 空調及通風系統 HEATING, VENTILATION AND AIR-CONDITIONING 設備表 EQUIPMENT SCHEDULE 928_PE_AC_ES_BL 修改 A - Revisão A 2011 年 07 月 27 日 文件編號 NÚMERO DOC. DOC. NUMBER 發行次數 EMISSÃO ISSUE 發行日期 DATA EMISSÃO ISSUE DATE

76 T M.I.A. FIRE STATION - NEW WAREHOUSE AND OFFICES 設備表 - EQUIPMENT SCHEDULE Reference EAF-1.1 Equipment Reference Model (Manufacturer) Description Exhaust Fan - Ductable mixed type, FRP casing RVK100E2-A1 (Systemair) EAF-1.2 Exhaust Fan - Ductable mixed type, FRP casing RVK250E2-A1 (Systemair), Including a 5 steps controller with motor protection, and class IP54 EAF-1.3 Kitchen type Exhaust Hood C610 Classic (Teka), White case, 3 steps control one motor EXF-1.1 EXF-1.2 DEH-0.1 to DEH-0.3 OU-01 and OU-02 IU1-0.2 IU1-0.1 IU1-0.3 IU2-0.1 IU2-0.2 IU2-0.3 IU2-1.3 IU2-1.4 IU1-1.4 IU2-1.1 IU1-1.1 IU1-1.2 IU1-1.3 IU1-1.5 IU2-1.2 IU2-1.5 Heat Recovery Unit with intake and exhaust fansvam500gjve (Daikin) and heat exchanger Dehumidifier units VRV outdoor units - compressor, controls and air cooler condenser Indoor unit for VRV system, ceiling suspended cassete with 3 ways blow Indoor unit for VRV system, ceiling suspended cassete front blow Indoor unit for VRV system, wall mounted Indoor unit for VRV system, ceiling mounted cassete double-flow. Indoor unit for VRV system, ceiling mounted cassete multi-flow, to install in 600x600mm modular ceiling MK 300 (Munters) RXQ--PAY1 (Daikin) FXUQ--MVA1 (Daikin) Including connection unit BEVQ--MAVE (Daikin) FXHQ--MVAE (Daikin) FXAQ--MVAE (Daikin) FXCQ--MVE (Daikin) FXZQ--MVE (Daikin) Annex Nr. 1 1A 1B 1C A Equipment Characteristics Airflow: 32 l/s Static P.: 80 Pa Power Supply: 230V, 50Hz, 1Ø Airflow: 130 l/s Static P.: 120 Pa (output at 160V) Power Supply: 230V, 50Hz, 1Ø Airflow: 50 l/s Power Supply: 230V, 50Hz, 1Ø Airflow: 138 l/s Ext.Static P.: 100 Pa Power Supply: 230V, 50Hz, 1Ø Capacity: - at 30 C, 80%RH): 21.6 L/day; - at 20 C, 60%RH: 7.7 L/day Airflow: 78 L/s; Refrigerant: R407C or R410A Power Supply: 230V, 50Hz, 1Ø Airflow rate Cooling and Heating capacities: see Selection Table; Refrigerant: R410A; Power Supply: 400V, 50Hz, 3Ø; Airflow rate Cooling and Heating capacities: see Selection Table; Refrigerant: R410A; Power Supply: 230V, 50Hz, 1Ø Airflow rate Cooling and Heating capacities: see Selection Table; Refrigerant: R410A; Power Supply: 230V, 50Hz, 1Ø Airflow rate Cooling and Heating capacities: see Selection Table; Refrigerant: R410A; Power Supply: 230V, 50Hz, 1Ø Airflow rate Cooling and Heating capacities: see Selection Table; Refrigerant: R410A; Power Supply: 230V, 50Hz, 1Ø Airflow rate Cooling and Heating capacities: see Selection Table; Refrigerant: R410A; Power Supply: 230V, 50Hz, 1Ø Page 2 of 3

77 T M.I.A. FIRE STATION - NEW WAREHOUSE AND OFFICES SPACE AND LOCATION FLOOR REF. DESCRIPTION ZONE AIR CONDITIONING SYSTEM - EQUIPMENT SCHEDULE - SELECTION TABLE REQUIREMENTS UNITS SELECTION COOLING COOLING AIR FLOW HEATING AIR FLOW HEATING MODEL POWER INPUT TOTAL SENS LAT RATIO SYSTEM Number TOTAL SENS LAT RATIO kw kw kw SH/TH l/s kw of Units KW KW KW SH/TH l/s KW AMP V KVA 0.1 Truck Tools Store IU1-0.1 IU FXHQ63MAVE st Aid Mater.Store IU FXHQ100MAVE Foam Conc.Store IU1-0.3 IU FXHQ63MAVE G/F 0.5 Store Room Hall Store Room IU FXUQ71MAV Switchboard Room Entrance Hall Stairway Hall Archive IU FXCQ63MVE Toilet Office Hall Administrative Office IU1-1.1 IU FXZQ40MVE Chief Office IU FXZQ50MVE st Floor Assistance Office IU FXAQ25MAVE Assistance Office (2) IU FXAQ25MAVE Officials Ward IU FXZQ50MVE Staff Ward IU FXZQ50MVE Pantry IU FXZQ40MVE Shower Corridor IU FXCQ50MVE TOTALS Roof Outdoor Unit OU RXYQ16PAY Outdoor Unit OU RXYQ16AY TOTALS Page 3 of 3

78

79

80

81 C 610 Classic Electric Characteristics Power supply (V) / 50 Hz Power supply (V) 127 / 60 Hz - Light power (W) 2 x 40 Motor power (W) 125 Maximum power (W) 205 Air outlet (ø mm) 120 Reduction outlet (ø 150 / ø 120) - Optional recirculation kit Capacity and sound levels Exhaust capacity, test conditions (m3/h) 532 Exhaust capacity, free outlet (m3/h) 380 Exhaust capacity, UNE EN (m3/h) 227 Sound power level dba UNE EN Sound level (re 1pw UNE EN ) db 44 Maximum recommended kitchen size (m2) 10 CHARACTERISTICS. Classic hood. Mechanical slider control panel. Colours: white or dark. One motor. Exhaust capacities; maximum in test conditions: 523 m3/h, free outlet: 380 m3/h, UNE-EN-61591: 227 m3/h. Recommended for kitchens up to 10 m2. 3 speeds. Soft design metal filters. Candle type lamps. Operating pilot light. Sound level (UNE-EN ): 44 dba. Optional: recirculation kit TECHNICAL DRAWING Control panel Touch control - Electronic - Push button (S. steel) Mechanical slider (Classic) Mechanical inswing - Features Number of motors 1 Double turbine motor - Armoured motor - Number of speeds 3 Stop delay timer - Easy-clean inside panel - Decorative filters Metal filters Operating pilot light Filter saturation indicator - Humidity detector - Perimetric extraction system -

82

83

84

85

86 Ceiling Mounted Cassette (Compact Multi Flow) Type New FXZQ20M/ FXZQ25M/ FXZQ32M FXZQ40M/ FXZQ50M Quiet, compact, and designed for user comfort Dimensions correspond with 600 mm X 600 mm architectural module ceiling design specifications. Low operation sound level (db(a)) FXZQ-M Sound level (H/L) 230 V 240 V 20/ /25 32/26 36/28 41/33 32/26 34/28 37/29 42/35 Comfortable airflow 1 Wide discharge angle: 0 to 60 Auto swing Fixed angles: 5 levels Angles can be also set on site to prevent drafts (0-35 ) or soiling of the ceiling (25-60 ), other than standard setting (0-60 ). 2 2-, 3-, and 4-way airflow patterns are available, enabling installation in the corner of a room. Drain pump is equipped as standard accessory with 750 mm lift. 4-way flow 3-way flow L-shaped 2-way flow 750 mm For 3-way or 2-way flow installation, the sealing member for air discharge outlet (option) must be used to close each unused outlet. 16