The key objective of the Project is to provide a Feasibility Study on the Re-

Size: px
Start display at page:

Download "The key objective of the Project is to provide a Feasibility Study on the Re-"

Transcription

1 6th Meeting of the Low-Carbon Model Town Task Force APEC Low Carbon Model Town (LCMT) Project Phase 3 Feasibility Study for Ngu Hanh Son District in Da Nang City, Viet Nam 46 th Meeting of the APEC Energy Working Group and Associated Meetings 18 th November, 2013 Submitted by Masakazu ITAKURA (Project Officer) from NEWJEC Inc. 1

2 Project Purpose The key objective of the Project is to provide a Feasibility Study on the Re- development witch deals with the existing urban districts in Da Nang (Viet Nam), with a large focus on Ngu Hanh Son District. This will be done by investigating CO2 reduction visions, and verifying how to develop attractive, low-carbon development plan. Ngu Hanh Son District is long skinny district between the East Sea and the Han River. This area is 39.12km2 and the population is approximately 70,667. 2

3 Scope of work Outline Outline of APEC Low Carbon Model Town (LCMT) Project Phase 3 Present Situation and Issues for the Urbanization of Da Nang LCT Development Project Phase 1: Report on Low-Carbon Strategy for Da Nang Low-Carbon town Development Project Feedback! Da Nang People s Committee (Implementation Board) Phase 2: Report on Analyses of CO2 Reductions and Costs for the Selected Design Measures Phase 3: Report Study on the Implementing Methodology of Proposed CO2 Reductions Measures Phase 4: Finalization of the Feasibility Study Report with Executive Summary 3

4 Approach to a High-Level Vision for LCMT in Da Nang 1. Regional challenges - Re-development -Sprawl - Deterioration of the landscape - Excess of sewage - Traffic growth 2. Improve attractiveness 3. Benchmark of low-carbon -Urbandevelopment - Resort beach - Define the environmental target -Tourism 4. LCMT Introduced d measures - Prepare a low-carbon Guideline - Evaluate cost of CO2 reduction - Select CO2 reduction measures With the sustainable development of the future, the realization of attractive and innovative urban development!! 4

5 Legal Framework and Policies in Da Nang City 1) Da Nang s master plan for socio-economic development up to ) A General Plan for in Da Nang City 3) Building Da Nang City as An Environmental City (Aug. 2008) Based on the Agenda 21 of Viet Nam government (PM Decision, 2004) To aim at a sustainable development with the target year 2020, To develop many different environmental issues such as: air pollution reduction, waste treatment and recycling, energy conservation, and renewable energy. However, not indicate any scope and measure challenging climate change issues, GHG emission reduction and low-carbon city. 1) "Carbon Emission Situation Study at Da Nang City (2011) cooperated by Asian Institute of Technology (AIT) 2) "Action Plan in Responding to Climate Change and Sea Level Rise for Da Nang up to 2020" financed by Rockefeller Foundation 3) Sustainable Urban Energy Program (2011 to 2013) cooperated by Aus AID and World Bank 4) "Low-carbon Model Town Project Phase 3 " (2013) by APEC Policy development 5

6 CO2 Emission Estimation in the Base Year Estimated CO2 emissions for the base year 2010 in Ngu Hanh Son District totaled 95,720 tonnes of CO2e (CO2 equivalent). Table CO2 emissions by category in the base year 2010 in Ngu Hanh Son District. Category (sector subsector) CO 2 [10 3 tonnes] Greenhouse Gas CH 4 [10 3 tonnes] CO 2 e [10 3 tonnes] Percentage [%] 1. Energy Manufacturing industries and construction Transportation Commercial/institutional Residential Waste Solid waste Wastewater - - Industrial wastewater Total

7 Population forecast in Da Nang City Person ns 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 Hoa Vang Cam Le Ngu Hanh Son Son Tra Hai Chau Thanh Khe Lien Chieu 500, Year 7

8 Projections of COe2 emissions by category towards 2030 in Ngu Hanh Son District according to (BAU Scenario High Growth). [Ngu Hanh Son District] Emissions in CO 2 e [k tonnes] Category Energy Manufacturing industries Transportation Commercial/institutional Residential Waste Solid waste Wastewater Total % of 2010 base year emissions 100% 165% 295% 530% 794% Population [persons] 68, , , , ,142 8

9 Setting out CO2 emissions reduction target towards 2030 in accordance with the National Green Growth Strategy kt-co2/year 11,000 10,000 - Wastewater 9,000 - Solid waste 8, ,000 6, ,000 4,000 - Residential - Commercial/institutional - Transportation - Manufacturing industries BAU scenario for % % BAU scenario for % 20% 3,000 2,000 1, Year Base year (2010) 9

10 BS-H (BAU Scenario High Growth) Options for CO2e emission reduction targets Ngu Hanh Son District Option Target Contents Target Year A 10% from BAU Reductions from BAU 28 ktco2e 76 ktco2e % above base year level 166 % 615 % B 20% from BAU Reductions from BAU 57 ktco2e 152 ktco2e % above base year level 136 % 535 % C 30% from BAU Reductions from BAU 85 ktco2e 228 ktco2e % above base year level 107 % 456 % NB N.B. Target tfigures indicated din blue and red are in accordance with the voluntary reduction target the National Green Growth Strategy 10

11 Categories Establishment for Creating a Low Carbon Town Possible low carbon measures for Ngu Hanh Son District in Da Nang City can be divided into nine categories listed below: (1) Buildings (2) Transportation (3) Energy - Energy Management System (4) Energy - Area Energy Network (5) Energy - Untapped Energy (6) Energy - Renewable Energy (7) ICT Control (8) Environment (9) Water Supply ppy and Sewage 11

12 Categories and Possible CO2 Reduction Measures for Example 1. Buildings - Introduction of a system of comprehensive environment benchmarks that target buildings. etc. 2. Transportation - Facilitation of the spread of electric motor-bakes and charging facilities. etc. 9. Water Supply and Sewage - Bio generation by utilization of water treatment sludge. etc. 8. Environment 8 Planning - Making environmental initiatives visible visible. etc. 7. ICT Control - Optimized control of traffic flow due to an ITS (intelligent transportation system). etc. 23 Possible CO2 Reduction Measures 6. Energy - Renewable Energy - Purification and power generation utilization of biogas (digestive gas). etc. 3. Energy - Energy Management System - Stabilization of the electric power supply by a high capacity electrical storage facility. etc. 4. Energy - Area Energy Network - Heat pump style cooling system that uses river water and ocean water. etc. 5. Energy Untapped Energy U t de - Power supplied by renewable energy from wind power and d solar l power. etc. 12

13 Four Viewpoints for Determining Guidelines With these ideas in mind, the following four points are established as a guideline (evaluation viewpoints) in order to create a low carbon town in Ngu Hanh Son District Viewpoint 1: measures by which a large volume of CO2 reductions are expected. Viewpoint 2: measures whose cost-effectiveness is large. Viewpoint 3: measures that may contribute to solving the area s current challenges in addition to global warming. (*1) Viewpoint 4: measures that may lead to sustainable development and increasing attractiveness. (*2) (*1) The main current challenges are Re-development, Sprawl, Deterioration of the landscape and Energy supply. (*2) The main attractiveness is Low carbon town, Resort beach, Tourism and Sustainable. 13

14 Result of calculation (2-1) EV-bike (18Pt) (5-1) Bio-Generation (21Pt) (9-2) Bio-gas (13Pt) (5-2) Garbage (15Pt) (2-3) Subway (8Pt) (1-1) CASBEE (20Pt) (1-2) E-Saving (14Pt) (2-2) BRT (18Pt) (2-1) EV-bike (18Pt) (1-1) CASBEE (20Pt) (3-1) ES-Facility (8Pt) (7-3) ITS (14Pt) (2-2) BRT (18Pt) (2-3) Subway (8Pt) (3-1) ES-Facility (8Pt) (3-2) Peak Power (7Pt) (1-2) E-Saving (14Pt) (4-1) Heat Pump (10Pt) tco2/ /year (9-1) Water Supply (9Pt) (8-3) Planting Trees (16Pt) (5-3) BDF (9Pt) (7-1) LED (15Pt) (4-2) Waste Heat (8Pt) (7-2) Multiple (7Pt) (4-1) Heat Pump (10Pt) (6-1) Wind & Solor (10Pt) Implementation Board (4-2) Waste Heat (8Pt) (5-1) Bio-Generation (21Pt) (5-2) Garbage (15Pt) (5-3) BDF (9Pt) (6-1) Wind & Solor (10Pt) (6-2) PSPS (0Pt) (7-1) LED (15Pt) (7-2) Multiple (7Pt) (7-3) ITS (14Pt) (7-4) Smart Mater (7Pt) 10 (7-4) Smart Mater (7Pt) Policy for Selecting Measures in This Project (8-1) Visible (9Pt) (8-2) Citizens (12Pt) (8-3) Planting Trees (16Pt) (9-1) Water Supply (9Pt) (9-2) Bio-gas (13Pt) (8-2) Citizens (12Pt) (8-1) Visible (9Pt) (3-2) Peak Power (7Pt) (6-2) PSPS (0Pt) ,000 10, ,000 1,000,000 10,000,000 Initial Cost (1000USD) 14

15 1. Buildings Introduction of a system of comprehensive environmental benchmarks that t target t buildings 2. Transportation Motorcycle Facilitation of the spread of electric motor-bikes and charging facilities 3. Transportation BRT Introduction of a Bus Rapid Transit system 4. Untapped Energy Waste Water Purification and power generation utilizing of biogas (digestive gas) 5. Untapped Energy Solid Waste Biomass generation from kitchen garbage 6. ICT Control LED Optimum management and energy conservation of the street lights through LED lighting 15

16 1. Buildings Q:Env viromental Quality S BEE=1.0 Sustainable A B+ Vernacular Eco-friendly Modern B L:Enviromental Load C 0.5 Most of the buildings resulted in B+(Good) ~ B-(Slightly poor) Ranked in Modern CO2 2-Emission Rate 120% 100% 80% 60% 40% 20% B- B+ A Examples in Japan Results in DaNang 線 0% BEE Results of the site survey in Da Nang City based on CASBEE* system S CO2 reduction is possible by increasing the buildings ranked in S: Eco-Friendly and Sustainable Step 1 Development of Assessment System/ Tool for Built Environmental Performance Step 2 Administrative procedure of Assessment system Step 3 Action plan of environmental public building construction Approx. 11,764 tco2/year (6%) reduction from BAU -Starting of the measure implementation in Target number of buildings at 50% of new construction buildings -Expected implementation ti rate at 50% of target t number of buildings -Expected CO2 reduction ratio with 25% reduction for common building Contents Total CO2 Reduction Volume CASBEE system 11,764 tco2/year *CASBEE: Comprehensive Assessment System for Building Environmental Efficiency (JSBC in Japan) 16

17 2. Transportation-Motorcycles Shift to Electric MC Shift to BRT Share of means of transportation in Da Nang City in 2010 Share of means of transportation in Da Nang City in 2030 Policy1: Diffusion i & Educational Activities i i Policy2: Preferential Treatment concerning Taxes & Subsidy for Purchase Policy3: Parking Areas for Electric Motorcycles Contents Shift to Electric Motorcycle Description Total CO2 Reduction Volume 57,483 tco2/year Shift from gasoline to Electric Motorcycle 17

18 3. Transportation-BRT Contents Shift to BRT Description Total CO2 Reduction Volume 28,515 tco2/year Shift from car & motorcycle to BRT 18

19 4. Untapped Energy - Waste Water (A) Reduction of CO2 emissions when generate electricity using the methane recovery + (B) CO2 Reduction due to be recovered methane Contents (A) Generator (B) Digestion Tank CH4 Volume CO2 Conversion Generation Volume CO2 Conversion Total CO2 Reduction Volume 1,770.0tCH4/year 37,170.0tCO2/year 4,765,267.4kWh/year /2,112kWh = 2,260 Household 2,578.0tCO2/year 39,748 tco2/year Population = 370,142 (Ngu Hanh Son District (Y2030)) 19

20 5. Untapped Energy - Solid Waste (A) Suppress the naturally occurring methane gas from the landfill + (B) To power generation and purified methane gas from garbage CH4 = CO2 Cut! Cut! Contents (A) landfill (B) Generator CH4 Volume 1,757.0 tgh4/year CO2 Conversion 21,085.0 tco2/year Generation Volume 48,462.0 kwh/year /2,112kWh = 23 Household CO2 Conversion 8,783.0 tco2/year Total CO2 Reduction Volume 29,868 tco2/year Population = 370,142 (Ngu Hanh Son District (Y2030)) 20

21 6. ICT Control LED - Optimum Management and Energy Conservation of Street Lights (A) Replacing the existing street lights to LED (B) Smart street lighting system Maintenance costs Cost Reduction Initial cost (lease) and Operational cost System M anager Scheduling, Lighting control Fault m o nito ring LED,H PS Ballast PLC Node Electricity charges Maintenance costs Electricity it charges Center Server Power Line Communications (PLC) Internet Reduce by Lighting Control Communication line P ow er U sage PM 6:00 AM 6:00 Sm art Server Contents Total CO2 Reduction Volume CO2 Reduction 327 tco2/year 21

22 Estimated CO2 reductions by the six countermeasures when implemented to Ngu Hanh Son District over the period of 2015 to The CO2 reductions by the six countermeasures when implemented will total 54.1kt-CO2 in 2020 and 167.7kt-CO2 in The total amount of CO2 reductions (161kt-CO2) in 2030 consists of: (1) 57.5kt by electric motorcycles (2) 39.7kt by CH4 use (wastewater) (3) 29.9kt by CH4 use (solid waste) (4) 28.5kt by BRT (5) 11.8kt by EES of buildings (6) 0.3kt by ICT Control - LED Year BS-H emission s Reductio ns target EES of buildings Electric motor cycle CO2 Reductions by 6 countermeasures BRT Waste Water Solid Waste ICT Control LED Total Unit: t-co2 % of BS- H Level , ,759 14, , ,795 28,280 2,672 8,880 6,354 25,869 10, , ,575 90,144 6,948 33,366 17,052 35,118 19, , , ,009 11,764 57,483 28,515 39,722 29, ,

23 Roadmap for reducing CO2 by implementing the six countermeasures to Ngu Hanh Son District towards In comparison with the proposed reductions targets in accordance with the National Green Growth Strategy (NGGS), the CO2 reductions expected will total: 19.2% of the BAU scenario emissions in 2020 (Target: 10%) 21.2% of the BAU scenario emissions in 2030 (Target: 20%) t-co2/year 800, , ,000 LED CH4 (solid waste) CH4 (wastewater) BRT Target BAU emissions CO2 reductions by 6 countermeasures 21.2% Just over the target 500, , , ,000 Electric motorcycle EES of buildings Forecasted emissions Target The NGGS target (30% reductions) in 2030 consists of: (A) 20% reductions by voluntary effort + [additional] (B) 10% reductions by international support 100, Year 23

24 Thank you for your Attention Xin cám ơn 77