1 1 of! 5 Address: Contractor: Contractor Phone: Line Item Bid Parts/Labor Labor Only Bid Week Complete (Circle One) General Scrape popcorn from ceilings throughout done 1 General Sheetrock repair done 3 Demolition/Disposal done 1 Retexture Ceiling done 2 Remove and Spray all A/C Vents done 2 Purchase and Install 11 interior doors (2-panel, brushed nickel) 3 Install New Doorbell Labor Only 1 Install 40 plugs/switches Labor Only 4 Install 46 Drawer/Cabinet Door Pulls Labor Only 4 Install 19 Interior and Exterior Light Fixtures/Ceiling Fans Labor Only 4 Install 4 Exterior and 11 Interior Door Hardware Labor Only 4 Install Trim/Baseboard as necessary Labor Only 2 Caulk as necessary done 4 Fix any bad texture spots done 2 All cleaning (pre-carpet, make-ready) 5 Paint Interior 2-color paint throughout house 2 Exterior 2-color paint (entire house) done 1 Paint 3 exterior doors 1 1

2 2 of! 5 Flooring Mid-grade carpet in Living, Hall, Bedrooms, closets 4 Tile Flooring in Kitchen, Laundry, Entry, Baths, Dining, 3 Install 6" Baseboards in Living 2 Kitchen Install 3 light cans and trim done 2 Repair loose board and loose crown on cabinets 4 Repair 1 Cabinet Drawer 4 Purchase/Install new countertops 4 Install Sink Labor Only 3 Install Sink Fixture Labor Only 3 Reset Garbage Disposal Labor Only 3 Install GFCI Plugs Where Appropriate 3 Purchase/Install Tile Backsplash 2 Remove Laundry Door frame, sheetrock opening done 3 Fix Cabinet door (top left from sink) 5 Fix Cabinet crown moulding where loose 5 Living/Entry Remove Paneling and retexture wall done 1 Install New Front Door and Trim Labor Only 1 Repair Fireplace Rock 4 Repair Backdoor 5 Cabinet Repair of Wet bar (bottom shelf) 4 Purchase/Install New Countertop on Wet bar 4 Repair/Balance Ceiling Fan Labor Only 4 2

3 3 of! 5 Reinstallation of existing Sink Labor Only 2 Installation of New Sink Fixture Labor Only 2 Fix Mantle 4 Clean fireplace with acid 5 replace valves and supply lines to bar sink done 2 Remove faux beam and rebuild box for ceiling fan done 1 replace light over bar with can light done 2 Hall Bath Purchase Install New Tub done 1 Tile Around Tub/Shower 3 Install New Vanity Labor Only 3 Move Flange/Install Toilet (Existing) 1 Install Sink and Tub Plumbing Figures Labor Only 3 Install mirror, Bath Fixtures, Towel Bars, etc. Labor Only 5 Master Bath Frame for door done Labor Only 1 Frame as needed done 1 Sheetrock as needed done 2 Install New Vanity, sink, sink fixture Labor Only 3 Install mirror, Bath Fixtures, Towel Bars, etc. Labor Only 5 Purchase/Install Standard Tub done 3 Install Tub/Shower Fixtures done Labor Only 4 Move Flange/Install Toilet (Existing) 1 Tile Around Tub/Shower 3 Add Switch to Closet Light done 3 Install Vanity Light Box done 3 Fix Vent Plumbing and install fan done 4 Remove existing shelves in closet done 1 3

4 4 of! 5 install L-shaped shelf and bar in closet 5 Move bath switch done 4 Finish venting out of roof done 5 Add insulation as necessary done 5 Front Bedroom Fix any damaged framing 1 Insulate where missing 1 Middle Bedroom Master Bedroom Fix Floor Plates where necessary done 1 Add insulation as necessary done 1 Exterior Repair Finish Desk/Handrails done 5 Install doors on shed (paint) 5 Finish Roof of deck done 2 Secure/replace as necessary fascia boards, trim boards, etc. done 2 Add 1x's to bottom of siding done 5 Caulk as necessary done 5 Pressure wash done 1 4

5 5 of! 5 Landscaping Labor Only Finish out Cedar Fence done Labor Only 5 Misc Fix laundry plumbing issues done 2 Repair garage door 5 Totals Grand Total Cost: $ -00 Cost by Week: Week Cost 1 $ $ $ $ $ $ $ $ -00 5