1 Bioenergy Bioenergy is energy derived from organic material (biomass) it can be used for power generation (such as electricity) and heat applications in all energy sectors including domestic, commercial and industrial purposes. In 2014, 16% of Europe s energy supply came from renewable energy, with bioenergy contributing more than 60% of this share - (Gustav Melin, President European Biomass Association) Bioenergy from wooden biomass Why Serbia? Wooden biomass = forestry waste + wood processing waste. General Overview Republic of Serbia has performed internationally recognised economical reforms and has become a proven investment destination in the South East European region due to: Highly capable intellectual capital; Strategic position; Optimised taxes & operational expenditures; Customs free access to the 15% of the world market (Interim Trade Agreement with European Union, Free Trade Agreements with Russian Federation, CEFTA members, EFTA members, Belarus, Kazakhstan and Turkey)! Particular Overview a) Forests Bioenergy production starts in forest! ECOPOWER selects the area of Tara Mountain as advanced forested area with preserved and most productive forest communities in Europe! Over 75% of the Tara Mountain surface area is covered by forests (15, ha), covering 34 different communities. b) BioRES Biomass Logistic and Trade Centres (BLTC) BLTC stands for Biomass Logistic and Trade Centres, which are regional hubs linking wood supply from forest owners, saw mills and other wood producers with demand from bulk and small buyers. One of the largest established BLTC in Serbia is located at Tara Mountain, under management of ECOPOWER close associate! Fast Reactor ultimate bioenergy solution! Page 1

2 Successful bioenergy production relays on biomass logistic after successful development of BLTC under the BioRES project, the next step is development of unique device manufacture in close neighborhood to BLTC that operates under attractive economical terms and conditions! Bioenergy production methods Wood burning can produce power, electricity, or heat. To produce power, wood can be burned in a boiler or a large combustion chamber in order to heat water and generate steam. The ash is the waste of the process, and requires a proper treatment. is a process in which organic biomass are rapidly heated to C in the absence of air. Under these conditions, organic vapors or synthetic gases and charcoal are produced, and heat must be realized from pyrolysis device. All outputs of the process are commercial products and there is no waste! method of bioenergy production from wooden biomass The global tendency in respect of bioenergy production is Co- Generation or combined heat and power (CHP) production it is the usage of a heat engine or power station to generate electricity and useful heat at the same time. method allows CHP production of electricity and heat from wooden biomass with higher commercial efficiency in comparison with CHP technical solutions based on burnings. So far, pyrolysis has not been widely used for treatment of wooden biomass, since there are plenty of CHP technical solutions based on burnings classified as State of Art term that refers to the highest level of general development, as of a device, technique, or scientific field achieved at a particular time. VS in General Capital Expenditures (CAPEX) per 1 MW of electricity installed power M M (Estimated) Hourly Fuel Consumption (Wooden Chips) per 1 MW of electricity installed tons ton Ratio electricity/heat 30/70 45/55 VS Simple Commercial Comparison In order to illustrate commercial advantages of pyrolysis method, the following assumptions are taken: a) Analysed is performance per hour of CHP based on pyrolysis and burnings with 1 MW installed power of electricity: input is the same (wooden chips supplied by Serbian BLTC in the range of 1,000 km away), outputs are electricity, heat, and bio char (output of pyrolysis only!) b) Operational expenditures (OPEX) are not considered, although it is proven that pyrolysis suffers lower OPEX than burnings c) There is Serbian Feed In tariff concerning sale of electricity generated from wooden biomass (recently is /MWh) Fast Reactor ultimate bioenergy solution! Page 2

3 d) Income from heat sale is calculated under privileged terms and conditions: the rate of 20 /MWh in order to boost the sale e) Income from sale of Bio Char (Charcoal) is calculated considering the recent market price in Serbia (300 /t) f) performance is assumed considering experimental performance results of Fast Reactor (FPR) prototype measured and monitored by independent professionals. Input cost (120 / ton) Income from electricity sale Income from heat sale Income from charcoal sale 0 60 Profit per hour [7.14 %] Why? [85.71 %] a) CAPEX is lower in comparison with State of Art technologies based on burning of biomass; b) Lower consumption of biomass lower OPEX! c) No waste all outputs are commercial products! d) Small or Medium sized consumers can afford pyrolysis based CHP plant wider implementation range! Fast Reactor (FPR) Prototype Fast Reactor (FPR) prototype has been manufactured, installed and tested at Serbian BLTC and it confirms initial assumptions - pyrolysis is more efficient treatment of wooden biomass than burnings: Consumption of biomass is 1 ton/hour (confirmed by AEROLAB); FPR delivers 600 m 3 of synthetic gas with caloric value of MJ/m 3 (measured and confirmed by AEROLAB) delivered quantity ensures that gas could run turbine/generator of 1 MW installed power concerning electricity production; FPR was heated up to C (confirmed by AEROLAB)- this heat could be delivered upon cooling to ending users, or used for additional electricity production through ORC; 1 ton of biomass ended in 200 kg of charcoal (C percentage 56.55%, caloric value 22,032 kj/kg, measured and confirmed by JUGOINSPEKT); FPR Wide Implementation Measured results of prototype experimental performance indicate that FPR should be the basis for Co-Generation that serves energy requirements of: Wood processing plants it is attractive solution since their cost of biomass is lower (generated on the site!) Small or Medium and Large Industrial Plants adjusted FPR, or cascade installed FPR easily meets industrial energy requirements (from 0.5 MW and up of electricity installed power) ESCO providers (Commercial or non-profit business providing a broad range of energy solutions including designs and implementation of energy savings projects, retrofitting, energy conservation, energy infrastructure outsourcing, power generation and energy supply, and risk management).due to lower CAPEX and OPEX and higher return on investment! Fast Reactor ultimate bioenergy solution! Page 3

4 Business Goal & Usage of Donated Funds ECOPOWER Trust intents to create a Serbian company with objective develop FPR prototype to State of Art technology through: Additional testing of materials used in FPR prototype construction with objective to improve quality of synthetic gas, and mechanical corrections after testing for this purpose, FPR prototype must perform minimum 2,000 hours under permanent measurement and monitoring; Improving of heat management system at the end of pyrolysis, heat from reactor must be distributed to ending users, including FPR for next pyrolysis: this improvement requires design and implementation of cooling and distribution systems, which will distribute the heat in the required form (water, steam, air) to ending user; Design and implementation of automotive contro systeml performance testing and improvement of heat management define algorithm for design and implementation of automotive control system (hardware and software) that will control the pyrolysis process; Certifications of FPR applications and obtaining of CE Mark, TUV certificates, as well as ISO certificates; Industrial Design Copyright completion of work on projects, drawings, manuals, construction guidance, quality certificates of FPR and outputs and their copyright registration under the name of the Company; Settlement of Manufacturing Unit in Serbia that should produce FPR and design Co-Generation plants in accordance with particular demands of investors/ending users in the region; Distribution the Company should distribute FPR, Co-Generation plant and biomass from Serbian BLTC (where is necessary) to ending users in the region (in the range of 1,000 km away from BLTC) through intensive co-operation with ESCO providers, institutional investors (such as EBRD), and assistance to prospective applicants worldwide interested in settlement of their own manufacturing units through technology transfers (giving rights to use Industrial Design in exchange for royalty fees). It is expected that goals defined as above will be achieved with expenditure of 500,000 EUR, and prospective donators are invited to donate in accordance with their potential considering offered rewards, in order to speed up FPR development from prototype to State of Art technology. Initiators have already invested over 300,000 EUR in design, manufacturing, installation and testing of FPR prototype, establishment of BLTC, and prefer equity participations through crowd funding as the method of financing, in order to secure credibility for future financing of operations described as above! ECOPOWER Trust Custodian of your donations! ECOPOWER Trust is Special Purpose Vehicle (SPV) established for equity funding of ECOPOWER projects. It is formatted as the Private Trust, where ECOPOWER founder is a Settler, licensed management firm is the Trustee, and donators will be appointed beneficiaries. Current assets (Trust Fund) are: Fast Reactor Prototype, made in Serbia, installed at premise of Serbian BLTC, with over 500 hours of experimental performance; SOLID Model and detailed technical documentation (including all manufacturing drawings); CFD (Computational Fluid Dynamics) Model; Syngas monitoring system utilising the rack mountable analyser measuring CO,CO2, CH4, O2, H2 and CxHx with portable sample probe stainlees steel sample tube; 10 metre heated sample line and portable sample conditioning system with integral temperature controller, moisture sensor and sample flow meters, with additional inline filtration due to the use of the rack based analyser; There are no current or pending liabilities. Donations from Fundraiser campaign will be allocated to the Trust Fund for future benefits of donators. Fast Reactor ultimate bioenergy solution! Page 4

5 Upon completed Fundraiser Campaign, ECOPOWER Trust undertakes to: Create Serbian company under proposed name PYROPOWER DOO with head office in Cacak; Invest donated funds to newly established company as the equity capital; Complete the FPR development from prototype to State of Art technology within one year from the date of Fundraiser Campaign closing; Start with deliveries of standardised FPR devices and settlement of Co-Generation plants through close cooperation with Serbian BLTC and ESCO providers target is to deliver minimum five FPR devices and to settle five Co-Generation plants with estimated CAPEX of 2.5 M per plant; FPR device market price will not be lower than 300,000 EUR (EXW Manufacturing Unit Serbia) this policy secures minimum net profit at the range of 400,000 per annum; Net profit will be distributed to Trust Fund for future benefits of Beneficiaries; After three years from the date of Fundraiser Campaign closing, ECOPOWER Trust (considering the Will of the donator) will: a) Pay Rewards to donators with amount that includes given donation and accumulated profit, or b) Appoint donators as shareholder of Serbian Company consideration shall be donated amount increased for amount of accumulated profit; Rewards Illustration In respect of hereby given undertakings, donators should consider following ROI (Return on Investments) illustration of funding project: Donated Amount Reward (3 years after Fundraiser Campaign closing date) ,200 5,000 12,000 50, , ,000 1,200,000 Given illustration doesn t contain any guarantee on return it illustrates a business potential of the project, considering the recent business standings, positions, ethic, reputation and references of project initiators; Each participant receives a Trust Deed legal instrument that secures rewards payouts in accordance with hereby announced undertakings; In addition to ROI Rewards, ECOPOWER Trust offers EP Vouchers to prospective participants as additional benefits during development period (discounts on ECOPOWER products or services), free of charge tourist packages and free of charge ECOPOWER products: EP 50 (donations up to 50 ) 5% Free Tourist Package Free products EP 100 (donations up to 100 ) 10% EP 500 (donations up to 500 ) 25% EP 1,000 (donations up to 1,000 ) 35% EP 5,000 (donations up to 5,000 ) 50% Week in Serbia Pellet Fire Place EP 10,000 (donations up to 10,000 ) 60% Week in Montenegro Pellet Fire Place or Boiler EP 50,000 (donations of 50,000 and more) 70% Week in Cyprus + Branded Solar Tree EP 100,000 ((donations of 100,000 and more) 80% Week in Monaco + E3 Kit (summer house) Fast Reactor ultimate bioenergy solution! Page 5