1 TITLE Integra Underground Monthly Environmental Report February 2012 PREPARED BY Dan Byrne DATE 11 th May 2012 Signature DISTRIBUTION 1. Manager, Sustainability 2. Integra Coal Website S:\Enviro\009 S\Monthly Web Reports\2012\Word Owner Environmental Advisor PAGE 1 of 9

2 Contents 1. INTENT 3 2. SCOPE 3 3. DEFINITIONS 3 4. REFERENCES 3 5. PROCEDURE REQUIREMENTS Air Quality Monitoring Noise Monitoring Water Monitoring Environmental Conditions 6 6. RELATED DOCUMENTS 9 S:\Enviro\009 S\Monthly Web Reports\2012\Word Owner Environmental Advisor PAGE 2 of 9

3 1. INTENT Provide monthly updates of environmental performance and assess compliance against specific consent conditions. To keep the company and stakeholders informed of the mine s environmental performance and maintain a transparent and accountable reporting system to inform all relevant stakeholders. 2. SCOPE This report covers various environmental conditions that are monitored at Integra Underground. These conditions, where applicable, are measured against consent criteria to determine compliance. Including; Water monitoring; Noise monitoring (quarterly); Air quality monitoring; and Environmental conditions over the month. 3. DEFINITIONS TSP Total Suspended Particles PM 10 Particulate Matter less than 10 microns in diameter HVAS High Volume Air Sampler SWL Standing Water Level, the groundwater level measured from the top of the piezometer casing. 4. REFERENCES Integra Underground Environmental Monitoring Dust Depositional Gauges, High Volume Air Samplers, Surface and Ground Waters, February 2012 Integra Underground Noise Monitoring, Q S:\Enviro\009 S\Monthly Web Reports\2012\Word Owner Environmental Advisor PAGE 3 of 9

4 5. PROCEDURE REQUIREMENTS 5.1 Air Quality Monitoring The following Tables summarise the monthly air quality monitoring conducted on behalf of Integra Coal Underground. Table 1: PM 10 Results Site Criterion averaging period Result Comments Annual 24 Hour Annual 24 Hour HVAS 2 Hardy 30µg/m 3 50µg/m 3 17µg/m 3 27/1/12 7µg/m 3 2/2/12 19µg/m 3 8/2/12 16µg/m 3 14/2/12 NRµg/m 3 20/2/12 NRµg/m 3 All results were below the criteria HVAS 4 Lambkin 30µg/m 3 50µg/m 3 13µg/m 3 27/1/12 7µg/m 3 2/2/12 3µg/m 3 8/2/12 16µg/m 3 14/2/12 8µg/m 3 20/2/12 19Rµg/m 3 All results were below the criteria NR: indicates that monitoring equipment has been damaged by livestock. Table 2: TSP Results Site Criterion (annual average) Result Comments HVAS 1 Hardy HVAS 3 Lambkin 90µg/m 3 22µg/m 3 The annual average for TSP was below the criterion of 90µg/m 3 90µg/m 3 30µg/m 3 The annual average for TSP was below the criterion of 90µg/m 3 S:\Enviro\009 S\Monthly Web Reports\2012\Word Owner Environmental Advisor PAGE 4 of 9

5 Table 3: Depositional Dust Results (15/08/ /09/2011) Site Criterion (annual average) Result (annual average) Comments DG1 4 g/m 2 /month 1.4/m 2 /month DG2 4 g/m 2 /month 1.6g/m 2 /month DG3 4 g/m 2 /month 2.0g/m 2 /month DG4 4 g/m 2 /month 2.0g/m 2 /month DG5 4 g/m 2 /month 3.0g/m 2 /month All annual averages for depositional dust monitoring locations were below the consent criteria of 4 g/m 2 /month DG6 4 g/m 2 /month 2.8 g/m 2 /month * Indicates an excessively contaminated gauge and is not included in the project average. Contamination can include bird droppings, vegetation (such as plant matter, algae, pollen & seeds) and insects. 5.2 Noise Monitoring Quarter 1 attended noise monitoring was conducted during February and March 2012 at six monitoring locations over six nights. All consent limits were complied with at all monitoring locations during quarter Water Monitoring Table 4 summarises the water quality monitoring conducted on behalf of Integra Coal Underground. Table 4: Water monitoring results Site Location Date Sampled ph EC (µs/cm) Depth SWL (m) GCSW01 Process dam C 22/2/ NA GCSW02 Portal Sump 22/2/ NA GCSW03 Possum Skin (PS) dam 22/2/ NA GCSW04 PS dam seepage collector 22/2/ NA S:\Enviro\009 S\Monthly Web Reports\2012\Word Owner Environmental Advisor PAGE 5 of 9

6 GCSW05 PS dam sediment pond 22/2/ NA GCSW06 Sewage Ponds 22/2/ NA GCSW07 Potable Water supply 22/2/ NA GCSW08 Run off Pond below Brambles 22/2/ NA GC01 Churchyard Piezo 22/2/ Piezo A PS dam Piezo 22/2/ Piezo B PS dam Piezo 22/2/ Environmental Conditions The following graphs outline the environmental conditions occurring throughout the month. S:\Enviro\009 S\Monthly Web Reports\2012\Word Owner Environmental Advisor PAGE 6 of 9

7 S:\Enviro\009 S\Monthly Web Reports\2012\Word Owner Environmental Advisor PAGE 7 of 9

8 S:\Enviro\009 S\Monthly Web Reports\2012\Word Owner Environmental Advisor PAGE 8 of 9

9 6. RELATED DOCUMENTS EMP_0001 Integra Underground Site Water Management Plan EMP_0002 Integra Underground Air Quality Management Plan EMP_0003 Integra Underground Noise Management Plan EMP_0005 Integra Underground Environmental Monitoring Program OMP_0200 Environmental Management Strategy S:\Enviro\009 S\Monthly Web Reports\2012\Word Owner Environmental Advisor PAGE 9 of 9