STABILO. System Parts Facade Scaffold. Vertical Frame (Steel) Vertical Frame (Aluminium) Vertical Frame. Vertical Frame (Aluminium) (Steel)
|
|
- Domenic Sherman
- 5 years ago
- Views:
Transcription
1 STABILO STABILO ø 48.3 x 4.0 mm Weight kg 6,0 14,0 19,0 Art.-No Vario Equipped with exchangeable stabilizer Weight kg 3,5 6,0 8,0 Art.-No Vario ø 48.3 x 4.0 mm Equipped with exchangeable stabilizer Weight kg 6,9 15,0 21,0 Art.-No Access Frame Access frame in the stairs tower Weight kg 4,0 7,0 9,0 Art.-No Corner Frame For scaffolding of building corners As lateral end frame in the stairs tower Width m 0,75 Height m 2,00 Weight kg 19,0 Art.-No Width m 0,75 0,75 Height m 1,00 2,00 Weight kg 12,0 22,0 Art.-No
2 Walk trough Frame (Aluminium/Wood) Aluminium frame with waterproof phenolic resin plate Non-slip walking area Stackable Width m 1,70 Height m 2,00 Weight kg 34,0 Art.-No with Hatch Aluminium frame with waterproof phenolic resin plate Non-slip walking area Stackable Width m 0,70 0,70 0,70 0,70 0,70 Height m 0,08 0,08 0,08 0,08 0,09 Weight kg 7,0 12,5 16,5 20,0 23,0 Art.-No with Hatch and integrated Ladder Aluminium frame with waterproof phenolic resin plate Non-slip walking area Stackable Width m 0,70 0,70 0,70 0,70 Height m 0,08 0,08 0,08 0,09 Weight kg 13,5 17,5 21,0 24,5 Art.-No (Wood) 50 mm impregnated solid wood Multiple waterproof bonding Length m 2,50 3,00 Width m 0,70 0,70 Height m 0,08 0,09 Weight kg 24,0 27,5 Art.-No and perforated Absolutely non-slip Width m 0,35 0,35 0,35 0,35 0,35 Height m 0,05 0,05 0,05 0,05 0,05 Weight kg 7,0 13,5 17,5 21,0 24,0 Art.-No Width m 0,35 0,35 0,35 0,35 0,35 Height m 0,06 0,06 0,06 0,06 0,06 Weight kg 7,0 13,5 19,0 22,5 25,0 Art.-No
3 Diagonal Brace With one-sided half-clamp For vertical scaffold reinforcement Field length m 2,00 2,50 3,00 Length m 2,73 3,12 3,74 Weight kg 6,0 7,0 8,0 Art.-No Diagonal Brace Side protection and for horizontal bracing Weight kg 0,6 1,5 2,0 2,5 3,0 Art.-No Rail Brace Side protection and for horizontal bracing End Board (Wood) Front side bottom protection Weight kg 3,5 4,5 5,5 6,5 Art.-No Length m 0,35 0,75 Height m 0,15 0,15 Weight kg 1,0 1,5 Art.-No Board (Wood) For insertion into the attachment points for bottom side protection Height m 0,15 0,15 0,15 0,15 Weight kg 3,5 4,5 5,5 6,5 Art.-No Front Rail Frame Front end of individual platform levels Stable execution Length m 0,35 0,75 Height m 0,54 0,54 Weight kg 3,7 4,5 Art.-No Rail Frame Double side protection Efficient assembly of protection rail in back and knee height For extended horizontal rigidity Rail Frame For extended horizontal rigidity Efficient assembly of protection rail in back and knee height Height m 0,53 0,53 0,53 0,53 Weight kg 2,7 3,6 4,5 5,5 Art.-No Height m 0,53 0,53 0,53 0,53 Weight kg 7,0 9,5 11,8 14,2 Art.-No
4 Rail Post simple Integrated platform locking Rail Post For the attachment of the rail braces or safety side net at the top platform level Height m 1,0 Weight kg 4,8 Art.-No Width m 0,75 0,75 Height m 1,00 2,00 Weight kg 6,5 11,5 Art.-No Bracket Post For the attachment of the rail braces or safety side net on brackets Useable also for platform locking Width m 0,75 0,75 Height m 1,00 2,00 Weight kg 6,5 12,0 Art.-No Bracket 0.75 m For extension and widening of the platform dimension Bracket 0.35 m For extension and widening of the platform dimension With welded half-clamp Width m 0,35 Weight kg 3,5 Art.-No Transversal Brace For support of the bracket Art. No For bracing of lattice beams in belt bracing Width m 0,75 Weight kg 6,0 Art.-No Art.-No Length m 1,85 Weight kg 5,5 Art.-No Roof Protection Bracket For assembly of roof protections to protect passageways for falling parts Base Cross Rod For insertion of standard platforms at the base of ladder ascent Width m 1,10 Weight kg 13,7 Art.-No Length m 0,75 Weight kg 3,0 Art.-No
5 Scaffold Stairs Useable in the scaffold tower Stairs Railing, Useable as two-part side protection for the assembling of the scaffold stairs Field length m 2,50 3,00 Width m 0,70 0,70 Weight kg 24,0 29,0 Art.-No Field length m 2,50 3,00 Weight kg 15,0 18,0 Art.-No Channel Profile Adapter With rigidly welded half-clamps for screw connection e.g. on lattice beams For insertion of standard platforms On request further lengths available Safety Side Net Steel, galvanized Fall protection, e.g. for roofing works Length m 2,45 2,95 Weight kg 8,5 10,2 Art.-No Height kg 1,00 1,00 1,00 1,00 Weight kg 15,0 20,0 25,0 30,0 Art.No Locking, Standard Lifting locking, for not used verticale frames or rail posts, e.g. inside brackets Exchangeable Stabilizer Spare part for the Vario vertical frame Width m 0,35 0,70 Weight kg 1,5 3,0 Art.-No Width m 0,75 Weight kg 2,0 Art.-No
6 Lattice Beam Connector with onesided-clamp Connect system-independent lattice beams with the vertical frame Attachment set included Lattice Beam Connector Connected system intependent lattice beams Attachment set included Length m 0,31 Weight kg 1,1 Art.-No Length m 0,50 Weight kg 1,9 Art.-No Intermediate Rung Channel profile with welded half-clamps on the ends For insertion of standard platforms by system lattice beams and for intermediate spacing of vertical frames Length m 0,75 Weight kg 3,0 Art.-No Lattice Beam Sliding Part For the attachment of platforms and vertical frames independent of the field length on system-independent lattice beams With integrated lifting locking Length m 0,82 Weight kg 3,8 Art.-No Lattice Beam (Aluminium/Steel) Enables a crossover in grid measurement (field length 2.50 m) Intermediate rung Art.-No required for assembly Length m 5,00 5,00 Height m 0,45 0,45 Weight kg 21,0 45,0 Execution Aluminium Steel Art.-No Lattice Beam, system-independent (Aluminium/Steel) Aluminium ø 48,3 x 4,0 mm Steel ø 48,3 x 3,25 mm galvanized Aluminium: Length m 3,20 4,20 5,20 6,20 8,20 Height m 0,45 0,45 0,45 0,45 0,45 Weight kg 13,0 17,0 20,0 25,0 32,0 Art.-No Steel: Length m 3,20 4,20 5,20 6,20 Height m 0,45 0,45 0,45 0,45 Weight kg 31,0 42,0 53,0 63,0 Art.-No
modular scaffolding R+
modular scaffolding R+ 1. Stand 6. Transverse U-transom Stand is the main element of modular scaffolding. Made of 48.2x3.2 mm steel pipe. Every 0,5m on the whole stand length are installed steel plates
More informationdistribution Modular Scaffolding
Modular Scaffolding Modular scaffolding PDM Universal scaffolding system plettac-pl PDM Application A characteristic feature of plettac PDM system is the use of wedge joint which provides quick and safe
More informationmodular scaffolding R+
modular scaffolding R+ 1. Stand 6. Transverse U-transom Stand is the main element of modular scaffolding. Made of 48.2x3.2 mm steel pipe. Every 0,5m on the whole stand length are installed steel plates
More informationRosette Modular Scaffolding System
Rosette Modular Scaffolding System The rosette modular security scaffolding system to be used in facades, has been produced in accordance with the structural design conditions stated by the following applicable
More informationSafety Ladders: Made of Aluminium
Y-Spar Anodized aluminium alloy ladder. Guide-rail profile: 52 x 51 mm. Comes with joint plate. Mounting brackets extra to order. Mounting distance: recommended 1400 mm - max. 1680 mm. Installation of
More informationCusters. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003
ASSEMBLY AND USER S INSTRUCTIONS Custers Camino CHIMNEY SCAFFOLDING 9505.903.001 ENG / (9505.202.015/016) Nov. 2003 CUSTERS HYDRAULICA B.V. Smakterweg 33, 5804 AE VENRAY NL Telephone : +31 (0) 478 55 30
More informationUSER S MANUAL HAKI UNIVERSAL ALUMINIUM
USER S MANU HAKI UNIVERS UMINIUM HAKI AB 2005 Important information HAKI s product liability and erection instructions apply only to scaffolds that are entirely composed of components that have been made
More informationSince it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one
access scaffolding Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one of the major players in the scaffolding and formwork industry in South
More informationModular Scaffolding MEKA 48
Modular Scaffolding MEKA 48 MODULAR SCAFFOLDING MEKA 48 MODULAR SCAFFOLDING The Modular Scaffolding MEKA 48 is designed to adapt to the most complex scaffold structures. Its versatility offers a wide range
More informationAllround Scaffolding System
Quality management certified according to ISO 9001:2008 by German TÜV-CERT L i m i t l e s s. S t r o n g. 8116.221 I n g e n i o u s. Catalogue Edition 01.04.2012 Allround Scaffolding System Layher Allround
More informationModular Scaffold MEKA 48
Modular Scaffold MEKA 48 Imperial units NA MODULAR SCAFFOLD MEKA 48 MODULAR SCAFFOLD The Modular Scaffold MEKA 48 is designed to adapt to the most complex scaffold structures. Its versatility offers a
More informationUSER S Manual. HAKI Bridge System (HBS)
USER S Manual HAKI Bridge System (HBS) HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made
More informationRolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:
Layher Rolling Towers Uni Wide Safety Structure Instructions for Assembly and Use Mobile working platforms to DIN EN 1004:2005-03 Working platform 1.5 x 2.85 m Rolling Towers max. working height: indoors
More informationMultidirectional_scaffolding MP
Multidirectional_scaffolding MP 162 Company Projects Products Scaffoldings and Coverings MP MULTIDIRECTIONAL SCAFFOLDING The MP multidirectional system is the modern solution that reflects in an industrialized
More informationRINGLOCK Introduction Ringlock is world most widely used scaffold system. It is a fully galvanized multi purpose steel scaffold system suitable for pr
RINGLOCK ACCESS SCAFFOLD SYSTEM 9 RINGLOCK Introduction Ringlock is world most widely used scaffold system. It is a fully galvanized multi purpose steel scaffold system suitable for providing general access
More informationTRITEC light Steel Panel Formwork
TRITEC light Steel Panel Formwork Perfection made in Germany Various practical illustrations of TRITEC Panel Combinations Guaranteed the largest possible range of sizes with the least possible amount of
More informationAssembly and Usage Instructions Z 600 S-PLUS mobile scaffold tower with stabilisers Z 600 S-PLUS folding scaffold unit COMPACT
09/2016 No. 291358 en Assembly and Usage Instructions Z 600 S-PLUS mobile scaffold tower with stabilisers Z 600 S-PLUS folding scaffold unit COMPACT 2 Contents en 1 General information... 4 1.1 Introduction...4
More informationAssembly and usage instructions REACHMASTER
Assembly and usage instructions REACHMASTER Assembly and usage instructions Assembly and usage instructions 3 Table of contents 1. General information 4 1.1. Introduction 4 1.2. Manufacturer 4 1.3. Type
More informationUSER S MANUAL HAKI PUBLIC ACCESS STAIR
USER S MANUAL HAKI PUBLIC ACCESS STAIR HAKI AB 2017 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made
More informationQUICK ALLY SCAFFOLD SPECIFICATIONS Standards: 1.0 m, 1.5 m, 2.0 m, 2.5 m, 3.0 m, 4.0 m. Ledgers: 0.5 m, 0.7 m, 1.2 m, 1.8 m, 2.4 m, 3.0 m. Polypropylene platforms: 0.7 m, 1.2 m, 1.8 m, 2.4 m, 3.0 m. Also
More informationscaffoldings/ coverings
scaffoldings/ coverings 198 MDS 222 temporary covers Scaffoldings / Coverings 197 SCAFFOLDINGS / COVERINGS MDS MDS multidirectional scaffolding The MDS multidirectional scaffolding is the modern solution
More informationThe Layher Cassette roof
The Layher Cassette roof for weatherproofing and temporary halls low-cost, labour-saving roofing. Layher cassette roofs have established themselves as a firm favourite at construction sites for conversion,
More informationSpeedyScaf System. Layher SpeedyScaf System. Catalogue Edition Quality management certified according to ISO 9001:2008 by German TÜV-CERT
C o m p l e t e. Quality management certified according to ISO 9001:2008 by German TÜV-CERT S a f e. 8102.253 Q u i c k. Catalogue Edition 01.04.2012 SpeedyScaf System Layher SpeedyScaf System u Contents
More informationALBLItZ 70 S INSTRUCTION FOR ERECTION AND USE
ALBLItZ 70 S INSTRUCTION FOR ERECTION AND USE Approval No. Z-8.1-864 Standard Version (as of ) C O N T E N T S 1. General...1 2. Erecting the scaffold...3 2.1 General requirements...3 2.2 Erecting the
More informationLadders and scaffold systems
Ladders and scaffold systems Customised-solutions for railway vehicles For each application the right solution! www.krause-systems.com Introduction Business Portrait KRAUSE-Werk GmbH & Co. KG For more
More informationUSER S MANUAL HAKI CONTINENTAL
USER S MANUAL HAKI CONTINENTAL HAKI AB 2003 HAKI User s Manual and product liability applies only to scaffolding containing components manufactured and supplied by HAKI. Building scaffolding using components
More informationAssembly and usage instructions. Z600 brace-free mobile scaffold
Assembly and usage instructions www.zarges.de brace-free mobile scaffold towers Assembly and usage instructions 3 Table of contents 1. General information 4 1.1. Introduction 4 1.2. Manufacturer 4 1.3.
More informationUSER S MANUAL HAKI COMPACT STAIR TOWER
USER S MANUAL HAKI COMPACT STAIR TOWER HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made
More informationOPERATING INSTRUCTIONS
OPERATING INSTRUCTIONS Multifunction Rolling Scaffold Towers 6, 12 and 18 READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. This manual provides
More informationBrochure All Solutions at a Glance. All Solutions. All Solutions at a Glance. v2013/10en
Brochure All Solutions at a Glance All Solutions All Solutions at a Glance v2013/10en Scaffolding, formwork, and shoring There s always a solution 02 The product range at Scafom-rux is extensive, very
More informationBRIO Modular scaffolding
BRIO Modular scaffolding // Versatile and multifunctional // Table of content Features Benefits Solutions Basic components 2 4 6 13 // Features BRIO Modular Scaffolding covers the different configurations
More informationBoSS Climalite Camera and lighting tower
Contents Safety First Safety First Quantity Schedules Toeboard 2 9 13 33 INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also
More informationLAYHER ACCESS TECHNOLOGY CATALOGUE
LAYHER ACCESS TECHNOLOGY CATALOGUE Edition 04.2018 Ref. No. 8118.229 Quality management certified according to ISO 9001:2008 ROLLING TOWERS FROM PAGE 34 ALU BRIDGING BEAM FROM PAGE 24 NOTICE All dimensions
More informationEdition Ref. No Quality management certified according to ISO 9001:2008 by German TÜV-CERT
LAYHER Allround scaffolding shoring tg 60 Edition 04.2013 Ref. No. 8116.206 Quality management certified according to ISO 9001:2008 by German TÜV-CERT Allround Scaffolding Layher Allround Scaffolding the
More informationUSER S MANUAL HAKI UNIVERSAL
USER S MANUAL HAKI UNIVERSAL Suspended scaffolding HAKI AB 2012 Important information HAKI s product liability and erection instructions apply only to scaffolds that are entirely composed of components
More informationConnectors. Multi-purpose connecting clamps. Stainless steel cross connectors
Connectors Multi-purpose connecting clamps Thread in lower part With mushroom head bolt and protection against twisting Art. No. Design Pack / Weight 100147 Galvanised steel, 2-part, round/round 100149
More informationPERI PD 8 The cost-effective shoring for slab tables and high loads
PERI PD 8 The cost-effective shoring for slab tables and high loads Edition 06/2010 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax +49 (0)7309.951-0
More informationUSER S MANUAL HAKI COMPACT STAIR TOWER
USER S MANUAL HAKI COMPACT STAIR TOWER HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made
More informationUSER S MANUAL HAKI PUBLIC ACCESS STAIR
USER S MANUAL HAKI PUBLIC ACCESS STAIR HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made
More informationLAYHER SPEEDYSCAF SYSTEM CATALOGUE
LAYHER SPEEDYSCAF SYSTEM CATALOGUE Edition 04.2013 8102.254 Quality management certified according to ISO 9001:2008 by German TÜV-CERT Layher QUALITY MADE BY LAYHER // Main plant in Eibensbach // Plant
More informationALISPLY. Scaffold Plank. Aligner. Plate Washer ½ x 6 x 6
Alisply components and accessories illustrated herein have been designed with safety and performance in mind to help achieve a safe and productive forming operation. It is recommended that all construction
More informationUniversal Panels & Accessories
Universal Panels & Accessories Erection Procedures INTRODUCTION Use common sense when working with Scaffold Your Safety is our #1 Concern Universal Scaffolds are designed with your safety in mind every
More informationAlisply Walls. Product brochure
Alisply Walls Product brochure Encofrados J. Alsina S.A. Pol. Ind. Pla d en Coll Camí de la Font Freda, 1 08110 Montcada i Reixac (Barcelona - Spain) Tel.: (+34) 935 753 000 Fax: (+34) 935 647 059 E-mail:
More informationPERI UP Easy * The lightweight and fast frame scaffold for safe working on facades
PERI UP Easy * The lightweight and fast frame scaffold for safe working on facades Product Brochure * If approval is required for the scaffolding system PERI UP Easy to be placed on the market in a country,
More informationBRIO Modular scaffolding
BRIO Modular scaffolding // Versatile and multifunctional // Table of content Features Benefits Solutions Basic components 2 4 6 13 // Features BRIO Modular Scaffolding covers the different configurations
More informationTru-lift. The self lifting, core forming system from Forming Concepts Inc
Tru-lift The self lifting, core forming system from Forming Concepts Inc Features & Benefits Complete system raised during the lifting cycle, maximizing system effectiveness. Introduction Tru-lift is the
More informationOPERATING INSTRUCTIONS
OPERATING INSTRUCTIONS Frame Scaffolding Towers Rolling & Stationary 5, 10, 15 and 20 High READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. This
More informationUSER S MANUAL HAKI UNIVERSAL
USER S MANUAL HAKI UNIVERSAL International version HAKI AB 2015 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have
More informationUSER S manual HAKI UNIVERSAL. International version
USER S manual HAKI UNIVERSAL International version HAKI AB 2014 Important information HAKI s product liability and erection instructions apply only to scaffolds that are entirely composed of components
More informationFormwork Direct International. Tel: Heavy Duty Panel System
Formwork Direct International Tel: 0151 532 0179 sales@formworkdirect.co.uk www.formworkdirect.co.uk Heavy Duty Panel System Product Overview The FD Max panel is a heavy duty wall formwork system capable
More informationstorage solutions Averys group PAL RACK The high quality pallet storage system for goods of all sizes and weights.
storage solutions Averys group PAL RACK The high quality pallet storage system for goods of all sizes and weights. CONVENTIONAL PALLET RACKING The Stow Pal Rack system consists of a full range of basic
More informationUSER S MANUAL. HAKI Loading Tower
USER S MANUAL HAKI Loading Tower HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made and
More informationJuly Climbing Scaffold with retractable formwork Instructions for erection and use
July 2008 Climbing Scaffold with retractable formwork Instructions for erection and use Contents Page Important remarks 2 Product features 2 Overview of climbing system Components 4 11 Assembly 25 Climbing
More informationCOLD DEFORMATION: A STRONGER ALTERNATIVE
COLD DEFORMATION: A STRONGER ALTERNATIVE LOAD TEST: ALUFASE Vs WELDING Load (Tons) / Deformation (mm) 7 6 The cold deformation system has been proven to be 3 times stronger than the traditional welding
More informationPS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION.
C.9. DOOR AND WINDOW OPENINGS Openings for doors and windows are formed with bucks, or frames, which are constructed to the rough opening dimensions required for the doors and windows to be installed.
More informationMOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly
MOBILE ACCESS TOWER Incorporating the 3T method of assembly SHALLOW BRACE INSTRUCTION MANUAL 2 INTRODUCTION This instruction manual contains all the information required to correctly assemble the OCTO
More informationPROFESSIONAL ROLLING TOWER SYSTEMS
Relax. It s an Altrex. ROLLING TOWER SYSTEMS Rolling tower Folding frame Relax. It s an Altrex. Working at height has several risks. Choosing Altrex is choosing safety, quality and durability. Altrex access
More informationSpan 400 Instruction Manual
Span 400 Instruction Manual DESIGNATION SPAN 400 Double Width EN 004 3 8/2 XXCD SPAN 400 Single Width EN 004 3 8/8 XXCD CEN designation of this instruction manual EN 298 IM en Rev-00 WARNING NEVER STAND
More informationPROPERTY OF JUMBO STILLADS A/S
PROPERTY OF PROPERTY OF PROPERTY OF PROPERTY OF CERTIFICATE EXAMINATION CERTIFICATE No. 35 37 02 Tower scaffolds Holder/Manufacturer/Supplier JUMBO Stillads A/S, Staalvej 9-23, DK-6000 Kolding, Denmark
More informationConfiguration. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES
Configuration User Guide Version: 2018.0 Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Contents Introduction... 1 Create a new project... 2 Open the configuration...
More informationAdjusta Minit Anti-Surf
Adjusta Minit Anti-Surf The One Piece Adjustable Folding Work Platform» New slip resistant front feet» Adjustable to 4 different platform levels» Guardrail automatically in place» No loose components»
More informationEASY STAIR EASIER! SAFER! Easy Stair improves site safety by removing the need for site personnel to climb ladders whilst carrying tools or materials.
EASY STAIR Easy Stair provides EASY, SAFE access between oor levels from the earliest stages of construction. EASIER! Easy Stair is a lightweight temporary staircase which makes life on site much EASIER
More informationMOBILE IS YOUR SCAFFOLD SITE-COMPLIANT?
MOBILE MINOR SCAFFOLDS Easy Access minor mobile scaffolds have been a favourite of tradies for many years, and are a common sight on construction sites throughout New Zealand. Modular components allow
More informationRAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017
For the highest requirements on concrete surfaces and edge formation Product Brochure Issue 10/2017 Content System advantages 5 For the highest requirements on concrete surfaces and edge formation 8 For
More informationLayher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use
Mobile access and working towers in accordance with: HD 1004; DIN 4422, Part 1 (Version 8/92) Working platform 2.8 x 2.8 m and 2.8 x 1.95 m Max. working height: in closed rooms 13.95 m, outdoors 10.0 m
More informationHigh-Clearance Alloy Scaffolds
High-Clearance Alloy Scaffolds Klik Hi-Clear Unit Scaffolds OmegaDeck 250 Scaffolds GP Hi-Clearance Scaffolds Bespoke Hi-Clearance Scaffolds over 3.0m long Alloy Step-Over Platforms HighClearanceAlloyScafolds2017A.pub
More informationEASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0107. Customer Service
MODEL: AL-Q0107 EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS Picture may differ from actual product. READ THESE INSTRUCTIONS CAREFULLY BEFORE USING THIS PRODUCT. KEEP THIS MANUAL
More informationEASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0106. Customer Service
MODEL: AL-Q0106 EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS Picture may differ from actual product. READ THESE INSTRUCTIONS CAREFULLY BEFORE USING THIS PRODUCT. KEEP THIS MANUAL
More informationEASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0108. Customer Service
MODEL: AL-Q0108 EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS Picture may differ from actual product. READ THESE INSTRUCTIONS CAREFULLY BEFORE USING THIS PRODUCT. KEEP THIS MANUAL
More informationSOLO 700. One Man Aluminium Tower 3T - Through the Trapdoor Method USER GUIDE
SOLO 700 One Man Aluminium Tower 3T - Through the Trapdoor Method USER GUIDE Contents Safety First Component Diagram Quantity Schedules Stabilisers Build Method 2 7 9 10 11 1 BoSS SOLO 700 User Guide Safety
More informationASSEMBLY.
ASSEMBLY www.proscaf.com ASSEMBLY SECTION Points to Consider These assembly instructions are generic and may not apply to all applications. If you have questions regarding specific applications contact
More informationAGR TOWER. Standard Features include. Tower Assembly Training Available
AGR TOWER The Euro Tamper Proof Advanced Guardrail is another solution to safe tower assembly. The ergonomic design lends itself to quick easy assembly and provides collective fall prevention before the
More informationSecuritBasic. Contents. Ref.-No. Description / Application Product m² List kg
Ref.-No. Description / Application Product m² List kg This product list includes all parts necessary for most applications. For parts required for special applications, please refer to the MEVA price list.
More informationRS TOWER 52 double width rolling tower
RS 2 double width rolling tower Professional use Up to 14.2 meter working height Double width rolling tower, large work surface Can be combined with all components from the RS -Series Wooden or lightweight
More informationSpan 400 Series Instruction Manual
Span 400 Series Instruction Manual DESIGNATION 400 400 004 3 8 2 400 400 004 3 8 8 CEN designation of this instruction manual EN 298 IM en Rev-0 WARNING NEVER STAND ON AN UNGUARDED PLATFORM SAFE WORKING
More informationINDEX. introduction 4. access scaffolding 5. selflock system 16. wall system 17. column boxes 29. slab system 31. props 36. contact details 40
PRODUCT BROCHURE INDEX introduction 4 access scaffolding 5 selflock system 16 wall system 17 column boxes 29 slab system 31 props 36 contact details 40 INTRODUCTION Augusta Manufacturing was established
More informationThe Finnish Quality Since 1960
The Finnish Quality Since 1960 SNOW ICE SAFETY ON THE ROOF Snow guards Roof walkways Ladders Guard rails RELIABILITY SAFETY DURABILITY FINNISH EXPERTISE TRADITIONS SINCE 1960 ORIMA's business traditions
More information2 PALLET P RA ALLET CKING RA
PALLET RACKING 2 PALLET RACKING 3 The pallet racking system uses simple modular construction for storing pallets that provides great variability for both small and large storage spaces. Pallet racks are
More informationDOOR AND WINDOW OPENINGS PREPARE IN ADVANCE VBUCK CONSTRUCTION
DOOR AND WINDOW OPENINGS Openings for doors and windows are formed with bucks, or frames, which are constructed to the rough opening dimensions required for the doors and windows to be installed. These
More information8 Rung Industrial Tower
A SAFER WAY TO REACH NEW HEIGHTS 8 Rung Industrial Tower Instruction Manual Mobile Access Tower 3T - Through the trap method Introduction This Assembly Guide is intended to provide you with step-by-step
More informationSuccessful Façade Scaffolding: Layher SpeedyScaf. SpeedyScaf
Successful Façade Scaffolding: Layher SpeedyScaf. SpeedyScaf Fast. Safe. Complete. Layher SpeedyScaf the Original. 5 basic parts = 1 scaffold: All advantages cleverly combined: that s the secret behind
More informationFALSEWORK SOLUTIONS: SLAB SHORING SYSTEM - ROYALFRAME50 SERIES
ROYALFRAME50 SLAB SHORING SYSTEM ROYAL FRAME 50 ROYALframe50 is a lightweight, improved alternate formwork shoring frame. It has galvanised tube legs, each with a 51mm outside diameter and a safe work
More informationTEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB
TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS Combisafe International AB CTS Combisafe International AB Contents Safety instructions... 3 Important... 4 General... 4 Data... 5 Safety posts 4140/4145/4150...
More informationMOBILE SCAFFOLDINGS MP-126 MP-102 MP-127 MP-103
3 MP-126 Supporting frame: 2.00 x 1.50 m Weight: 13.25 kg Vertical supporting aluminium frame 1.50 m wide and 2.00 m high for attachment of platform and braces. Antislip rungs of finned surface provide
More informationLayher. Keder Roof and Keder Hall. More Possibilities. The Scaffolding System. Layher Keder Roof and Keder Hall Instructions for Assembly and Use
Layher Keder Roof and Keder Hall Instructions for Assembly and Use Certification as per DIN ISO 9001/EN 29 001 by TÜV-CERT Keder Roof and Keder Hall Layher More Possibilities. The Scaffolding System. CONTENTS
More informationInstructions for erection and use of the RUX-SUPER 65 Rapid-Erection Scaffolding. - Standard Design - Rapid-Erection Scaffolding RUX-SUPER 65
Rapid-Erection Scaffolding RUX-SUPER 65 Instructions for erection and use of the RUX-SUPER 65 Rapid-Erection Scaffolding - Standard Design - Status: January 2007 Attention! Any instructions for erection
More informationWe store: high. wide. deep. safe. Cantilever racks. System K100 single-sided double-sided
We store: high. wide. deep. safe. Cantilever racks System K100 Economical Use of Space The K100 cantilever rack from Vogelsang meets all of the requirements when it comes to economically storing long and
More informationSafety Documents > Safety Manual > Scaffolds
Safety Documents > Safety Manual > Scaffolds D. Scaffolds 1. General Requirements for All Scaffolds a. Scaffolds shall be furnished and erected in accordance with this standard for persons engaged in work
More informationTru-Wall. The one sided wall slip forming system from Forming Concepts Inc
Tru-Wall The one sided wall slip forming system from Forming Concepts Inc Introduction The Tru-Wall forming system is a versatile labor and cost saving slip form for vertical concrete. Horizontal form
More informationGENERAL SAFETY RULES DOUBLE WIDTH 232 (NARROW RUNG) 3T INSTRUCTION MANUAL DISMANTLING NOTES: The 232 Tower Approved to the requirements of BS EN 1004
GENERAL SAFETY RULES DOUBLE WIDTH 232 (NARROW RUNG) 3T INSTRUCTION MANUAL The 232 Tower Approved to the requirements of BS EN 1004 MAX SAFE WORKING LOAD FOR STRUCTURE: 750KG MAX SAFE WORKING LOAD FOR PLATFORM:
More informationHANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity
HANDSET WALL FORM Quick Assembly - can be built using only a hammer Reduced weight increases productivity Unsurpassed flexibility in design and availability of panels for a wide variety of applications
More informationK stage System Scaffold
K stage System Scaffold Product Manual Coronet Group Suzhou Co.,Lt Email : Coronet@coronet scaffold.com TEL :+86 512 85557000 400 770 9995 FAX :+86 512 85557111 Addres:#1505 SIFC,SIP,SUZHOU,CHINA Coronet
More informationUnderbody Access Step Heavy Duty
Tail Lift Tuck-Away Access Step Extra c/w Gussets & Brace 345 260 215 100 No. ABUS882/BRGV 1 Rung wgt. 8.7kg 345 30 110 o Bolts directly onto underbody of tail lift framework 3 x fixing points, 11mm 400
More informationAllround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans
Layher Allround Bridging System Instructions for Assembly and Use Modular truss system for wide spans Certification according to DIN ISO 9001/EN 29 001 by TÜV-CERT Allround Scaffolding } CONTENT 1. Introduction...3
More informationSTEEL GRATINGS & STAIR STEPS
STEEL GRATINGS & STAIR STEPS Steel gratings and stair steps are resistant small weight holding building units with a long-term life-time used as stairs constructions, bridges and walk-ways used in building,
More informationInspect components prior to erection. Inspect tower prior to use. Castors locked and legs correctly adjusted. Stabilisers fitted as specified
Introduction This Guide is designed to provide you with step bystep instructions to ensure that your system is erected with themaximum of ease and safety. Before assembly, please read thesafety notes.
More informationDEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017
DEPAUL UNIVERSITY Scaffolding Program Environmental Health & Safety April 2017 1 TABLE OF CONTENTS SECTION PAGE NO. 1.0 PURPOSE 2 2.0 SCOPE 2 3.0 SCAFFOLDING ERECTOR 2 4.0 GENERAL 2 5.0 WOOD SCAFFOLDING
More informationSECTION VIBRATION ISOLATION
SECTION 15240 VIBRATION ISOLATION PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15450 - Plumbing Equipment. 2. 15510 - Piping (HVAC). 3. 15515 Valves, Hangers, and Specialties. 4. 15540 - Pumping
More informationONE MAN TOWER. Instruction/safety manual
ONE MAN TOWER Instruction/safety manual The UTS One Man Tower is both quick and easy to assemble and can be erected and dismantled by a single person. Safety Information IMPORTANT: Never use the ONE MAN
More informationWe store: high. wide. deep. safe. Shelving racks. System C 50 single-tier multi-tier
We store: high. wide. deep. safe. Shelving racks System C 50 single-tier multi-tier With C 50 to a practice-oriented multi-tier and high rack The C 50 shelving rack is an especially efficient solution
More information