2 CALIFORNIA REGULATORY UPDATE California Senate Bill 295 (Annual Inspections) (Signed into law October 8, 2015) California Assembly Bill 864 (Leak Detection) (Signed into law October 8, 2015) California Senate Bill 661 (Dig Safe Act of 2016) ( Formally SB 119 vetoed in 2015)

3 SB 295 Annual Inspections - Senator Jackson History & Purpose: According to the author, on May 19, 2015 tragedy struck again when an onshore pipeline carrying crude oil ruptured and spilled over 100,000 gallons of oil, over 20,000 gallons of which ended up in the ocean off the Santa Barbara coastline. To date this spill has caused significant negative impacts to the ocean, local beaches, wildlife, and the local economy. The pipeline that ruptured, line 901, was being inspected every other year. If line 901 had been inspected annually the corrosion would likely have been detected before it ruptured and this disaster would have been avoided. The early version of the bill required more frequent testing hydrotests every one or two years. This was removed and replaced with the SFM performing annual inspections of every pipeline and operator.

4 CHAPTER 5.5. The Elder California Pipeline Safety Act Of 1981 Section a) Commencing January 1, 2017, the State Fire Marshal, or an officer or employee authorized by the State Fire Marshal, shall annually inspect all intrastate pipelines and operators of intrastate pipelines under the jurisdiction of the State Fire Marshal to ensure compliance with applicable laws and regulations. By January 1, 2017, the State Fire Marshal shall adopt regulations implementing this subdivision. b) For portions of interstate pipelines that are not under the jurisdiction of the State Fire Marshal pursuant to Section , the State Fire Marshal shall not become an inspection agent for those pipelines unless all regulatory and enforcement authority over those pipelines is transferred to the State Fire Marshal from the federal Pipeline and Hazardous Materials Safety Administration. c) The State Fire Marshal shall revise the fee assessed pursuant to Section to a level sufficient to cover the costs associated with the implementation of this section.

5 AB 864 Assembly member Williams History & Purpose: On May 19, 2015 a pipeline owned by Houston-based Plains All American Pipeline ruptured spilling approximately 130,000 gallons of heavy crude oil along the Gaviota coast at Refugio Beach in Santa Barbara County. The pipeline responsible for this spill transports oil that was produced on offshore platforms in state and federal waters onshore for refining. The pipeline was not equipped with automatic shut off technology that is installed on other pipelines of this size in Santa Barbara County. Regulation of this pipeline, as the result of an earlier lawsuit, was limited to the federal level. The Elder Act regulates intrastate pipelines. SFM estimates that there may be 2,000 miles of intrastate pipeline located within State waters and coastlines. Line 901 has been classified by the Pipeline and Hazardous Materials Safety Administration (PHMSA) as an interstate pipeline, which is not subject to the Elder Act.

6 CHAPTER 5.5. The Elder California Pipeline Safety Act Of (a) By January 1, 2018, any new or replacement pipeline near environmentally and ecologically sensitive areas in the coastal zone shall use best available technology, including, but not limited to, the installation of leak detection technology, automatic shutoff systems, or remote controlled sectionalized block valves, or any combination of these technologies, based on a risk analysis conducted by the operator, to reduce the amount of oil released in an oil spill to protect state waters and wildlife. (b) (1) By July 1, 2018, an operator of an existing pipeline near environmentally and ecologically sensitive areas in the coastal zone shall submit a plan to retrofit, by January 1, 2020, existing pipelines near environmentally and ecologically sensitive areas in the coastal zone with the best available technology, including, but not limited to, installation of leak detection technologies, automatic shutoff systems, or remote controlled sectionalized block valves, or any combination of these technologies, based on a risk analysis conducted by the operator to reduce the amount of oil released in an oil spill to protect state waters and wildlife.

7 CHAPTER 5.5. The Elder California Pipeline Safety Act Of (2) An operator may request confidential treatment of information submitted in the plan required by paragraph (1) or contained in any documents associated with the risk analysis described in this section, including, but not limited to, information regarding the proposed location of automatic shutoff valves or remote controlled sectionalized block valves.

8 CHAPTER 5.5. The Elder California Pipeline Safety Act Of 1981 AB Williams (c) The State Fire Marshal shall adopt regulations pursuant to this section by July 1, The regulations shall include, but not be limited to, all of the following: (1) A definition of automatic shutoff systems. (2) A process to assess the adequacy of the operator s risk analysis. (3) A process by which an operator may request confidential treatment of information submitted in the plan required by paragraph (1) of subdivision (b) or contained in any documents associated with the risk analysis described in this section. (4) A determination of how near to an environmentally and ecologically sensitive area a pipeline must be to be subject to the requirements of this section based on the likelihood of the pipeline impacting those areas.

9 CHAPTER 5.5. The Elder California Pipeline Safety Act Of 1981 AB Williams (d) An operator of a pipeline near environmentally and ecologically sensitive areas in the coastal zone shall notify the Office of the State Fire Marshal of any new construction or retrofit of pipeline in these waters. (e) For purposes of implementing this section, the State Fire Marshal shall consult with the Office of Spill Prevention and Response about the potential impacts to state water and wildlife. (f) For purposes of this section, environmentally and ecologically sensitive areas is the same term as described in subdivision (d) of Section (g) (1) For purposes of this section, best available technology means technology that provides the greatest degree of protection by limiting the quantity of release in the event of a spill, taking into consideration whether the processes are currently in use and could be purchased anywhere in the world. (2) The State Fire Marshal shall determine what is the best available technology and shall consider the effectiveness and engineering feasibility of the technology when making this determination.

10 Regulation Development The OSFM is working on two regulatory rule making packages SB 295 Annual inspections - Regulations completed by January 1, 2017 AB 864- Leak Detection Regulation completed by July 1, 2017 We formed several work groups of interested stakeholders to work on proposed language. These groups are broken down into the following areas: 1. Annual Inspection 2. Coastal Zone 3. Leak detection 4. Risk analysis/automatic shutoff Groups have met several times since the beginning of the year.

11 WORK GROUP If you are interested in more information regarding the progress of the work groups or to participate please contact: DANIEL HASTERT AGPA (562)

12

13 SB 661 Hill - Dig Safe Act of 2016 Protection of subsurface installations 1) Establishes the California Underground Facilities Safe Excavation Advisory Committee (the Advisory Committee), within the CSLB, to investigate violations of the state's excavation and subsurface installation laws, to coordinate education and outreach, and develop standards. 2) Creates a Safe Energy Infrastructure and Excavation Fund to cover administrative costs of the Advisory Committee, an education program, and a workforce training program. The administrative costs and programs will be funded by fines levied on gas and electric companies for safety violations, grants, fees charged to regional notification center members, filing fees from complaint hearings, and any other source. 3) Authorizes the CSLB, the Public Utilities Commission (PUC), and the Office of the State Fire Marshal to accept, amend, or reject the recommendations of the Advisory Committee to enforce specific provisions related to operators and excavators whose activities or business falls within the agency's statutorily defined enforcement jurisdiction Additional Requirements

14 Questions? Bob Gorham Program Manager OSFM Pipeline Safety Division

NATURAL GAS SYSTEM OPERATOR SAFETY PLAN

NATURAL GAS SYSTEM OPERATOR SAFETY PLAN TABLE OF CONTENTS SOCALGAS SAFETY- PLAN.0 SECTION DESCRIPTION REQUIRED ELEMENTS FROM CA Public Utilities Code 956.5, 961, and 963 1 INTRODUCTION 961(b)(1-3) 2 EXECUTIVE OFFICER S SAFETY PERFORMANCE 961(b)(4)

More information

Assembly Bill No CHAPTER 532

Assembly Bill No CHAPTER 532 Assembly Bill No. 1566 CHAPTER 532 An act to amend Sections 25270.2, 25270.4, 25270.12, 25281, and 25281.6 of, and to add Sections 25270.4.1, 25270.12.1, and 25270.12.5 to, the Health and Safety Code,

More information

Who Oversees the Safety of Oil and Gas Pipelines? Council of State Governments West July 30, 2015 Vail, Colorado

Who Oversees the Safety of Oil and Gas Pipelines? Council of State Governments West July 30, 2015 Vail, Colorado Who Oversees the Safety of Oil and Gas Pipelines? Council of State Governments West July 30, 2015 Vail, Colorado Pipeline and Hazardous Materials Administration U. S. Department of Transportation (DOT)

More information

DOT Proposes Tougher Safety Regulations For Hazardous Liquids Pipelines

DOT Proposes Tougher Safety Regulations For Hazardous Liquids Pipelines RESEARCH North America Fossil Fuels Oil DOT Proposes Tougher Safety Regulations For Hazardous Liquids Pipelines New Rule Would Expand Reach Of DOT Reporting Requirements; Cost Operators Upwards Of $22.4

More information

Hydrocarbon Transportation by Pipeline Industry Background

Hydrocarbon Transportation by Pipeline Industry Background Hydrocarbon Transportation by Pipeline Industry Background Transportation Research Board May 12-13, 2016 PiPRO 2016 Summary Pipelines: The Last Five Years The shale revolution was brought about by the

More information

Oversight & Safety Overview

Oversight & Safety Overview RAILROAD COMMISSION OF TEXAS Oversight & Safety Overview November 2015 San Antonio RRC Mission Our mission is to serve Texas by our stewardship of natural resources and the environment, our concern for

More information

FLORIDA PUBLIC SERVICE COMMISSION

FLORIDA PUBLIC SERVICE COMMISSION FLORIDA PUBLIC SERVICE COMMISSION NATURAL GAS PIPELINE ANNUAL SAFETY REPORT 2017 DIVISION OF ENGINEERING Table of Contents Figures and Tables... iii Gas Safety Background... 1 Transmission Integrity Management

More information

PHMSA Western Region What We Do and Updates

PHMSA Western Region What We Do and Updates PHMSA Western Region What We Do and Updates WRGC San Diego, CA August 29, 2017 Tom Finch Pipeline and Hazardous Materials Administration U. S. Department of Transportation (DOT) OST OIG SLSDC FAA FTA FMCSA

More information

NATURAL GAS SYSTEM OPERATOR SAFETY PLAN

NATURAL GAS SYSTEM OPERATOR SAFETY PLAN TABLE OF CONTENTS SOCALGAS SAFETY- PLAN.0 SECTION DESCRIPTION REQUIRED ELEMENTS FROM CA Public Utilities Code 956.5, 961, and 963 1 INTRODUCTION 961(b)(1-3) 2 EXECUTIVE OFFICER S SAFETY PERFORMANCE 961(b)(4)

More information

NATURAL GAS SYSTEM OPERATOR SAFETY PLAN

NATURAL GAS SYSTEM OPERATOR SAFETY PLAN TABLE OF CONTENTS SOCALGAS SP.0-SC SECTION DESCRIPTION REQUIRED ELEMENTS FROM CA Public Utilities Code 956.5, 961, and 963 1 INTRODUCTION 961(b)(1-3) 2 EXECUTIVE OFFICER S SAFETY PERFORMANCE EXPECTATIONS

More information

FACT SHEET REFUGIO OIL SPILL PUBLIC FORUM FACT SHEET BACKGROUND SAFETY. For updates on the oil spill, visit

FACT SHEET REFUGIO OIL SPILL PUBLIC FORUM FACT SHEET BACKGROUND SAFETY. For updates on the oil spill, visit PUBLIC FORUM FACT SHEET On May 30, 2015, representatives from the agencies who responded to the Refugio Oil Spill held an open house to respond to questions from the public regarding the oil spill response.

More information

Gas Pipeline Safety March 2012

Gas Pipeline Safety March 2012 Gas Pipeline Safety March 2012 Contact: edbaker@scottmadden.com jgdavis@scottmadden.com Introduction Pipeline safety has become a top priority for the gas industry. Several drivers have increased scrutiny

More information

Natural Gas Gathering Lines. John Williams Director Service Monitoring and Enforcement Department

Natural Gas Gathering Lines. John Williams Director Service Monitoring and Enforcement Department Natural Gas Gathering Lines John Williams Director Service Monitoring and Enforcement Department Gas Pipeline Safety Staff Program Manager Office Support Staff 11 Inspectors The Federal/State Partnership

More information

Annual Natural Gas Pipeline Safety Report

Annual Natural Gas Pipeline Safety Report Annual Natural Gas Pipeline Safety Report 2009 Florida Public Service Commission Division of Service, Safety and Consumer Assistance Annual Natural Gas Pipeline Safety Report 2009 At the March 5, 1984,

More information

Natural Community Conservation Planning Act California Fish and Game Code Section

Natural Community Conservation Planning Act California Fish and Game Code Section Natural Community Conservation Planning Act California Fish and Game Code Section 2800-2835 2800. This chapter shall be known, and may be cited, as the Natural Community Conservation Planning Act. 2801.

More information

Liquid Petroleum Pipelines Safe, Efficient and Improving

Liquid Petroleum Pipelines Safe, Efficient and Improving Liquid Petroleum Pipelines Safe, Efficient and Improving Peter Lidiak Pipeline Director March 15, 2012 U.S. Oil Pipelines & Refineries Pipelines: Safe and Getting Safer Safest and most efficient mode for

More information

Stephanie Weidman PHMSA Program Director

Stephanie Weidman PHMSA Program Director RAILROAD COMMISSION OF TEXAS Stephanie Weidman PHMSA Program Director Oversight and Safety Division Pipeline Safety February 2016 RRC Mission Our mission is to serve Texas by our stewardship of natural

More information

TITLE 165. CORPORATION COMMISSION CHAPTER 20. GAS & HAZARDOUS LIQUID PIPELINE SAFETY PERMANENT RULES. AMENDED, EFFECTIVE September 11, 2017

TITLE 165. CORPORATION COMMISSION CHAPTER 20. GAS & HAZARDOUS LIQUID PIPELINE SAFETY PERMANENT RULES. AMENDED, EFFECTIVE September 11, 2017 TITLE 165. CORPORATION COMMISSION CHAPTER 20. GAS & HAZARDOUS LIQUID PIPELINE SAFETY PERMANENT RULES AMENDED, EFFECTIVE September 11, 2017 Last Amended The Oklahoma Register Volume 34, Number 24 September

More information

WELL STIMULATION TREATMENTS

WELL STIMULATION TREATMENTS WELL STIMULATION TREATMENTS February 2017 Introduction There have been questions about whether the Los Cerritos Wetlands Oil Consolidation and Restoration Project (Project) will include well stimulation

More information

Legacy Pipelines. Planning December What to do about aging and abandoned energy infrastructure. By Tom Burns and Tan Hoang, AICP

Legacy Pipelines. Planning December What to do about aging and abandoned energy infrastructure. By Tom Burns and Tan Hoang, AICP Planning December 2013 Legacy Pipelines What to do about aging and abandoned energy infrastructure. By Tom Burns and Tan Hoang, AICP Owning a home is a dream for many Americans. The last thing a home owner

More information

OVERVIEW OF THE CALIFORNIA LEGISLATURE'S 1997 ENVIRONMENTAL BILLS. BY Kim Levy*

OVERVIEW OF THE CALIFORNIA LEGISLATURE'S 1997 ENVIRONMENTAL BILLS. BY Kim Levy* OVERVIEW OF THE CALIFORNIA LEGISLATURE'S 1997 ENVIRONMENTAL BILLS BY Kim Levy* In 1996, Califnrmia welcomed a new group of freshman legislators to the Capitol, resulting in a record number of pro-environmental

More information

Pipeline Safety Update

Pipeline Safety Update Jul y 2012 Pipeline Safety Update B r i e f S u m m a r y o f 2 0 1 1 It was a blur! San Bruno facts were still unknown NTSB immediate safety recommendations Cast iron failures in Pennsylvania US DOT Secretary

More information

California Hazardous Materials Spill / Release Notification Guidance

California Hazardous Materials Spill / Release Notification Guidance California Hazardous Materials Spill / Release Notification Guidance To Report all significant releases or threatened releases of hazardous materials: First Call: 9-1-1 (or local emergency response agency)

More information

Excavation Damage Prevention

Excavation Damage Prevention PHMSA OFFICE OF PIPELINE SAFETY SOUTHERN REGION Excavation Damage Prevention Georgia Municipal Association Gas Section & Georgia Public Service Commission Arthur O. Buff, P.E. CATS Program Manager PHMSA,

More information

Kevin C. Connors Pipeline Program Supervisor

Kevin C. Connors Pipeline Program Supervisor Underground Gathering Pipelines: Building a Regulatory Program Kevin C. Connors Pipeline Program Supervisor kcconnors@nd.gov 600 East Boulevard Ave. Dept 405 Bismarck, ND 58505-0840 (701)328-8020 Focused

More information

FLORIDA PUBLIC SERVICE COMMISSION

FLORIDA PUBLIC SERVICE COMMISSION FLORIDA PUBLIC SERVICE COMMISSION NATURAL GAS PIPELINE ANNUAL SAFETY REPORT 2012 DIVISION OF ENGINEERING TABLE OF CONTENTS TABLE OF FIGURES... II ABBREVIATIONS... III GAS SAFETY BACKGROUND... 1 GAS SAFETY

More information

OVERVIEW OF DIGITAL INFRASTRUCTURE & VIDEO COMPETITION ACT OF 2006 (DIVCA)

OVERVIEW OF DIGITAL INFRASTRUCTURE & VIDEO COMPETITION ACT OF 2006 (DIVCA) OVERVIEW OF DIGITAL INFRASTRUCTURE & VIDEO COMPETITION ACT OF 2006 (DIVCA) This document provides a brief summary of some key sections of DIVCA. BACKGROUND The passage of DIVCA in August 2006 (effective

More information

DOT s Federal Pipeline Safety Program: Background and Key Issues for Congress

DOT s Federal Pipeline Safety Program: Background and Key Issues for Congress DOT s Federal Pipeline Safety Program: Background and Key Issues for Congress Paul W. Parfomak Specialist in Energy and Infrastructure Policy May 20, 2016 Congressional Research Service 7-5700 www.crs.gov

More information

PHMSA = Pipelines and Hazardous. RITA = Research and Innovative Technologies Administration

PHMSA = Pipelines and Hazardous. RITA = Research and Innovative Technologies Administration Arkansas Gas Pipeline Safety Seminar June 20-21, 21, 2007 Arkansas Public Service Commission PHMSA T&Q Wayne St. Germain Pipeline Safety Specialist Phone (405) 954-7219 Live Person (405) 954-8575 Direct

More information

WHEREAS, The vast majority of litter in California s coast and ocean comes from land-

WHEREAS, The vast majority of litter in California s coast and ocean comes from land- AMENDED 5/23/13 FILE NO. 2013-07-COE RESOLUTION NO. 1 2 [Marine Plastic Pollution Producer Responsibility] Resolution supporting a California Statewide producer responsibility program to 3 minimize marine

More information

CALAFCO Daily Legislative Report as of 3/3/2010 1

CALAFCO Daily Legislative Report as of 3/3/2010 1 http://ct3k1.capitoltrack.com/public/publish.aspx?session=09&id=df65ac... CALAFCO Daily Legislative Report as of 3/3/2010 1 AB 419 (Caballero) Local government: change of organization or reorganization:

More information

TOWN OF DENNIS BOARD OF HEALTH

TOWN OF DENNIS BOARD OF HEALTH 4/14/11 TOWN OF DENNIS BOARD OF HEALTH REGULATIONS TO CONTROL UNDERGROUND STORAGE OF FUEL OR CHEMICALS TABLE OF CONTENTS AUTHORITY 2 SECTION 1 DEFINITIONS 2 SECTION 2 APPLICABILITY 3 SECTION 3 INSTALLATION

More information

Hazardous Materials Section. California Hazardous Material Spill/Release Notification Guidance To Report

Hazardous Materials Section. California Hazardous Material Spill/Release Notification Guidance To Report California Hazardous Material Spill/Release Notification Guidance To Report all significant releases or threatened releases of hazardous materials, First Call 9-1-1 (or the local emergency response agency)

More information

Oil and Gas Incidents: Knowing Who to Call May Railroad Commission of Texas June 27, 2016 (Change Date In First Master Slide)

Oil and Gas Incidents: Knowing Who to Call May Railroad Commission of Texas June 27, 2016 (Change Date In First Master Slide) Oil and Gas Incidents: Knowing Who to Call May 2018 www.rrc.texas.gov Overview Provide information on the jurisdiction of the Railroad Commission of Texas (RRC) Clarify who to contact in oil and gas related

More information

Regulation Of Oil And Natural Gas Pipelines: A Legal Primer For The Layman

Regulation Of Oil And Natural Gas Pipelines: A Legal Primer For The Layman Pipeline & Gas Journal March 2008 Copyright 2008 ProQuest Information and Learning All Rights Reserved Copyright 2008 Oildom Publishing Company of Texas, Inc. Section: Pg. 124; Vol. 235; No. 3; ISSN: 0032-0188

More information

Initiated by PHMSA, NTSB accident report, Congress, petition for rulemaking, inspector general, etc. Advance notice of proposed rulemaking (ANPRM)

Initiated by PHMSA, NTSB accident report, Congress, petition for rulemaking, inspector general, etc. Advance notice of proposed rulemaking (ANPRM) How a regulation is made Initiated by PHMSA, NTSB accident report, Congress, petition for rulemaking, inspector general, etc. Advance notice of proposed rulemaking (ANPRM) Public comments and possible

More information

BILL AS INTRODUCED H Page 1 of 8. Subject: Utilities; underground; damage prevention system; hot water and

BILL AS INTRODUCED H Page 1 of 8. Subject: Utilities; underground; damage prevention system; hot water and BILL AS INTRODUCED H. 0 Page of 0 H. Introduced by Representative Sibilia of Dover Referred to Committee on Date: Subject: Utilities; underground; damage prevention system; hot water and steam facilities

More information

Control Information: (copy and fill-in for each Operator)

Control Information: (copy and fill-in for each Operator) PUBLIC AWARENESS PROGRAM EFFECTIVE INSPECTION SPECIFIC INFORMATION Control Information: (copy and fill-in for each Operator) Inspection Date(s): Operator ID: OpID: State/Other ID: Unit ID No. Activity

More information

RESOLUTION NO. CC

RESOLUTION NO. CC N. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, TO PROTECT OUR COAST FROM OFFSHORE OIL AND GAS DRILLING AND EXPLORATION, AND OPPOSING PRESIDENTIAL EXECUTIVE ORDER CALLED IMPLEMENTING

More information

RULES AND REGULATIONS GOVERNING THE USE OF RECYCLED WATER

RULES AND REGULATIONS GOVERNING THE USE OF RECYCLED WATER RULES AND REGULATIONS GOVERNING THE USE OF RECYCLED WATER Effective February 2015 1 TABLE OF CONTENTS ARTICLE 1 GENERAL PROVISIONS... 3 1.1 INTRODUCTION... 3 1.2 PURPOSE... 3 1.3 POLICY... 3 1.4 INTENT...

More information

CITY OF SIMI VALLEY MEMORANDUM

CITY OF SIMI VALLEY MEMORANDUM CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. Consent (3) June 8, 2015 TO: FROM: City Council City Manager s Office SUBJECT: REQUEST AUTHORIZATION FOR THE MAYOR TO SEND A LETTER TO SENATOR FRAN PAVLEY

More information

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 H 3 HOUSE BILL 794 Committee Substitute Favorable 6/14/17 Committee Substitute #2 Favorable 6/21/17

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 H 3 HOUSE BILL 794 Committee Substitute Favorable 6/14/17 Committee Substitute #2 Favorable 6/21/17 GENERAL ASSEMBLY OF NORTH CAROLINA SESSION H HOUSE BILL Committee Substitute Favorable // Committee Substitute # Favorable // Short Title: NC Permitting Efficiency Act of. (Public) Sponsors: Referred to:

More information

1.0 Introduction. 1.1 Project Background

1.0 Introduction. 1.1 Project Background Gaviota Coast Plan Final EIR This chapter provides an overview of the Environmental Impact Report (EIR) for the proposed Gaviota Coast Plan (proposed Plan). The proposed Plan is described in detail in

More information

1.0 INTRODUCTION. 1.1 Overview of the Proposed Project

1.0 INTRODUCTION. 1.1 Overview of the Proposed Project 1.0 INTRODUCTION This Draft Environmental Impact Report (EIR) assesses the environmental impacts associated with the Tranquillon Ridge Oil and Gas Development Project (proposed project). Plains Exploration

More information

Natural Gas Pipelines The State of Pipeline Safety

Natural Gas Pipelines The State of Pipeline Safety Natural Gas Pipelines The State of Pipeline Safety Chris Helms, NiSource Gas Transmission & Storage Marcellus Advisory Commission Infrastructure Subcommittee April 11, 2011 0 Gas is Good Shale reserves

More information

APPENDIX A. Legislative Requirements. Urban Water Management Planning Act SBx7-7 Water Conservation Act of 2009 SB1478

APPENDIX A. Legislative Requirements. Urban Water Management Planning Act SBx7-7 Water Conservation Act of 2009 SB1478 APPENDIX A Legislative Requirements Urban Water Management Planning Act SBx7-7 Water Conservation Act of 2009 SB1478 Section K: California Water Code, Division 6, Part 2.6: Urban Water Management Planning

More information

SANTA BARBARA COUNTY PLANNING COMMISSION Staff Report for Revising Freestanding Solar Energy Systems Permit Requirements

SANTA BARBARA COUNTY PLANNING COMMISSION Staff Report for Revising Freestanding Solar Energy Systems Permit Requirements SANTA BARBARA COUNTY PLANNING COMMISSION Staff Report for Revising Freestanding Solar Energy Systems Permit Requirements Hearing Date: March 4, 2009 Development Services Director: Dianne Black Staff Report

More information

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP VALLEY LATERAL PROJECT RESOURCE REPORT 11 Reliability and Safety FERC Docket No. CP16- -000 November 2015 Section TABLE OF CONTENTS Page 11.0 RELIABILITY AND SAFETY... 11-1 11.1 NATURAL GAS PIPELINE INDUSTRY

More information

Underground Natural Gas Storage Safety Regulation. Mary L. McDaniel, P.E. Baker Engineering and Risk Consultants, Inc Oakwell Court Suite 100

Underground Natural Gas Storage Safety Regulation. Mary L. McDaniel, P.E. Baker Engineering and Risk Consultants, Inc Oakwell Court Suite 100 Underground Natural Gas Storage Underground Natural Gas Storage Safety Regulation Mary L. McDaniel, P.E. Baker Engineering and Risk Consultants, Inc. 3330 Oakwell Court Suite 100 San Antonio, Texas 78218

More information

APA CALIFORNIA LEGISLATIVE UPDATE SEPTEMBER

APA CALIFORNIA LEGISLATIVE UPDATE SEPTEMBER APA CALIFORNIA LEGISLATIVE UPDATE SEPTEMBER 2017 By John Terell, AICP, Vice President Policy and Legislation Sande George, APA California Lobbyist Lauren De Valencia y Sanchez, APA California Lobbyist

More information

Perchlorate BMP Regulations R TITLE 22 EMERGENCY REGULATIONS Perchlorate Best Management Practices DEPARTMENT REFERENCE NUMBER: R

Perchlorate BMP Regulations R TITLE 22 EMERGENCY REGULATIONS Perchlorate Best Management Practices DEPARTMENT REFERENCE NUMBER: R TITLE 22 EMERGENCY REGULATIONS Perchlorate Best Management Practices DEPARTMENT REFERENCE NUMBER: FINDING OF EMERGENCY These emergency regulations are mandated by section 25210.6 of California Health and

More information

4.10 SAFETY/RISK OF UPSET EXISTING CONDITIONS

4.10 SAFETY/RISK OF UPSET EXISTING CONDITIONS 4.10 SAFETY/RISK OF UPSET EXISTING CONDITIONS Within the Westchester-Playa del Rey Community Plan Area (CPA), manufacturing, processing, and research and development activities involve procedures, chemicals

More information

U.S. DOT Pipeline and Hazardous Materials Safety Administration

U.S. DOT Pipeline and Hazardous Materials Safety Administration U.S. DOT Pipeline and Hazardous Materials Safety Administration Today s Agenda PHMSA Update PHMSA Rulemaking PHMSA Advisory Bulletins 2017: What is happening Rulemaking action continues Covering all Congressional

More information

Pipeline Safety: Clarification of Terms Relating to Pipeline Operational Status.

Pipeline Safety: Clarification of Terms Relating to Pipeline Operational Status. This document is scheduled to be published in the Federal Register on 08/16/2016 and available online at http://federalregister.gov/a/2016-19494, and on FDsys.gov Billing Code: 4910-60-W DEPARTMENT OF

More information

MEETING HANDOUT. Meeting: Board of Directors Meeting. Date: April 21, 2017

MEETING HANDOUT. Meeting: Board of Directors Meeting. Date: April 21, 2017 MEETING HANDOUT Meeting: Board of Directors Meeting Date: April 21, 2017 AMENDED IN ASSEMBLY APRIL 18, 2017 AMENDED IN ASSEMBLY MARCH 23, 2017 california legislature 2017 18 regular session ASSEMBLY BILL

More information

establishing a permanent coastal management program for California.

establishing a permanent coastal management program for California. CHAPTER 1: INTRODUCTION A. THE COASTAL ACT 1. HISTORY Historically, land use in the California Coastal Zone has been regulated by local governments under the provisions of State Planning and Zoning Law.

More information

AUTHORIZE THE MAYOR TO SIGN LETTERS OF OPPOSITION TO AB 2923 (CHIU), SB 831 (WIECKOWSKI), AND SB 1469 (SKINNER)

AUTHORIZE THE MAYOR TO SIGN LETTERS OF OPPOSITION TO AB 2923 (CHIU), SB 831 (WIECKOWSKI), AND SB 1469 (SKINNER) G-6 STAFF REPORT MEETING DATE: May 22, 2018 TO: City Council 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org FROM: SUBJECT: Regan M. Candelario, City Manager Laura McDowall,

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS State-Mandated Chloride (Salt) Requirements in Santa Clarita Valley About the Santa Clarita Valley Sanitation District 1. Who is the Santa Clarita Valley Sanitation District? The Santa Clarita Valley Sanitation

More information

EXHIBIT LRP: :B ORDINANCE NO.

EXHIBIT LRP: :B ORDINANCE NO. EXHIBIT LRP: 2007-0003:B ORDINANCE NO. AN ORDINANCE AMENDING TITLE 19 OF THE SAN LUIS OBISPO COUNTY CODE, THE BUILDING AND CONSTRUCTION ORDINANCE, BY AMENDING SECTION 19.07.042 RELATING TO WATER CONSERVATION

More information

SENATE, No STATE OF NEW JERSEY. 210th LEGISLATURE INTRODUCED MAY 13, 2002

SENATE, No STATE OF NEW JERSEY. 210th LEGISLATURE INTRODUCED MAY 13, 2002 SENATE, No. STATE OF NEW JERSEY 0th LEGISLATURE INTRODUCED MAY, 00 Sponsored by: Senator BOB SMITH District (Middlesex and Somerset) SYNOPSIS Requires DEP to develop Site Master Plan for Six Mile Run Reservoir

More information

Minimizing the risk of non-conforming pipeline product

Minimizing the risk of non-conforming pipeline product November 22, 2013 Minimizing the risk of non-conforming pipeline product Rachel Giesber Clingman Issues Defining product specifications Defining shipper and pipeline obligations Quality / knowledge of

More information

Pipeline Safety Trust Annual Conference New Orleans, Louisiana October 20, 2016

Pipeline Safety Trust Annual Conference New Orleans, Louisiana October 20, 2016 Pipeline Safety Trust Annual Conference New Orleans, Louisiana October 20, 2016 PHMSA Pipeline Safety Program Updates Alan Mayberry Acting Associate Administrator Who is PHMSA - DOT/PHMSA? Pipeline and

More information

What information should be submitted to the District regarding Circulation Tanks for Well Stimulation Treatments?

What information should be submitted to the District regarding Circulation Tanks for Well Stimulation Treatments? Santa Barbara County Air Pollution Control District Greenhouse Gas Emission Standards for Crude Oil and Natural Gas Facilities Frequently Asked Questions Version 1.2 General The Regulation What is the

More information

CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS

CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS 20.8.10 PURPOSE AND INTENT... 8-2 20.8.20 INCORPORATION OF SMARA AND STATE REGULATIONS... 8-2 20.8.30 APPLICABILITY...8-2 20.8.40 CONTENTS OF

More information

CHAPTER Committee Substitute for Senate Bill No. 692

CHAPTER Committee Substitute for Senate Bill No. 692 CHAPTER 2012-121 Committee Substitute for Senate Bill No. 692 An act relating to the formation of local governments; amending s. 165.031, F.S.; deleting definitions; amending s. 165.041, F.S.; revising

More information

Gas Pipeline Safety Under Heightened State and Federal Scrutiny

Gas Pipeline Safety Under Heightened State and Federal Scrutiny Presenting a live 90-minute webinar with interactive Q&A Gas Pipeline Safety Under Heightened State and Federal Scrutiny Navigating the New Regulatory Landscape and Preparing for Increased Testing and

More information

Section 1. Title Section 2. Authority and Purpose Section 3. Definitions

Section 1. Title Section 2. Authority and Purpose Section 3. Definitions TOWN OF HOMER PROPOSED LOCAL LAW NO. 2 OF 2014 A MORATORIUM ON NATURAL GAS OR PETROLEUM EXTRACTION AND EXPLORATION ACTIVITIES, UNDERGROUND STORAGE OF NATUAL GAS, AND DISPOSAL OF NATURAL GAS OR PETROLEUM

More information

OCSD Urban Runoff Program SCAP Collection Systems in Motion

OCSD Urban Runoff Program SCAP Collection Systems in Motion OCSD Urban Runoff Program SCAP Collection Systems in Motion Tom B. Meregillano Regulatory Specialist Orange County Sanitation District, CA OCSD Service Area Los Angeles Santa Ana San Diego Orange County,

More information

PHMSA Western Region Updates. Western Regional Gas Conference Tempe, Arizona August 26, 2015

PHMSA Western Region Updates. Western Regional Gas Conference Tempe, Arizona August 26, 2015 PHMSA Western Region Updates Western Regional Gas Conference Tempe, Arizona August 26, 2015 Pipeline and Hazardous Materials Administration U. S. Department of Transportation (DOT) OST OIG SLSDC FAA FTA

More information

12 Year History of Santa Barbara Channelkeeper Research, Outreach and Advocacy Efforts on Santa Barbara s Sewage Problems

12 Year History of Santa Barbara Channelkeeper Research, Outreach and Advocacy Efforts on Santa Barbara s Sewage Problems 12 Year History of Santa Barbara Channelkeeper Research, Outreach and Advocacy Efforts on Santa Barbara s Sewage Problems November 2000 Santa Barbara Channelkeeper (SBCK) sent a letter to the City of Santa

More information

ATTACHMENT A: FINDINGS

ATTACHMENT A: FINDINGS ATTACHMENT A: FINDINGS 1.0 CEQA FINDINGS 1.1 CEQA Exemption The County Planning Commission finds that the proposed project is exempt from environmental review under the California Environmental Quality

More information

Checklist for Local Government To Evaluate Land Use and Development Practices Near Transmission Pipelines

Checklist for Local Government To Evaluate Land Use and Development Practices Near Transmission Pipelines Pipelines and Informed Planning Alliance () is a stakeholder initiative led and supported by the US Department of Transportation s Pipeline and Hazardous Materials Safety Administration (PHMSA). s goal

More information

Item 08E 1 of 12

Item 08E 1 of 12 MEETING DATE: February 14, 2018 PREPARED BY: Bob McSeveney, DEPT. DIRECTOR: Karen P. Brust Senior Management Analyst DEPARTMENT: City Manager s Office CITY MANAGER: Karen P. Brust SUBJECT: Legislative

More information

1.0 INTRODUCTION 1.1 PROJECT OVERVIEW 1.2 PROJECT OBJECTIVES

1.0 INTRODUCTION 1.1 PROJECT OVERVIEW 1.2 PROJECT OBJECTIVES 1.0 INTRODUCTION 1.1 PROJECT OVERVIEW The proposed ERG Foxen Petroleum Pipeline (Project) would be located in northern Santa Barbara County, six miles east of the City of Santa Maria, and between the towns

More information

UNDERGROUND UTILITY LOCATIONS MAKING OHIO A SAFER PLACE TO EXCAVATE. Darren D. Owens, PE, SI City Engineer City of Lebanon, Ohio

UNDERGROUND UTILITY LOCATIONS MAKING OHIO A SAFER PLACE TO EXCAVATE. Darren D. Owens, PE, SI City Engineer City of Lebanon, Ohio UNDERGROUND UTILITY LOCATIONS MAKING OHIO A SAFER PLACE TO EXCAVATE Darren D. Owens, PE, SI City Engineer City of Lebanon, Ohio TYPICAL PROJECT PROCESS (Public & Private) Design Project owner hires a consulting

More information

Final Regulation Order Portable Fuel Container Regulation

Final Regulation Order Portable Fuel Container Regulation Final Regulation Order Portable Fuel Container Regulation Amend title 13, California Code of Regulations, sections 2467, 2467.1, 2467.2, 2467.3, 2467.4, 2467.5, 2467.6, 2467.7; repeal of section 2467.8,

More information

TITLE 16 ECONOMIC REGULATION

TITLE 16 ECONOMIC REGULATION TITLE 16 ECONOMIC REGULATION PART 1 RAILROAD COMMISSION OF TEXAS CHAPTER 8 PIPELINE SAFETY REGULATIONS SUBCHAPTER A GENERAL REQUIREMENTS AND DEFINITIONS 8.1 General Applicability and Standards (a) Applicability.

More information

Cook Inlet Pipeline Infrastructure Assessment: STATUS UPDATE. Tim Robertson Nuka Research and Planning Group

Cook Inlet Pipeline Infrastructure Assessment: STATUS UPDATE. Tim Robertson Nuka Research and Planning Group Cook Inlet Pipeline Infrastructure Assessment: STATUS UPDATE Tim Robertson Nuka Research and Planning Group Overall Project Goals Anticipate potential problems as Cook Inlet pipeline infrastructure ages

More information

City of Anaheim. Amendments to 2015 Urban Water Management Plan

City of Anaheim. Amendments to 2015 Urban Water Management Plan City of Anaheim Amendments to 2015 Urban Water Management Plan December 2016 City of Anaheim Amendments to 2015 Urban Water Management Plan (Plan) Contents Revisions to Section 5.2.3 - Provide an outline

More information

NCSL Natural Gas Policy Institute

NCSL Natural Gas Policy Institute - 1 - Pipeline Infrastructure: Replacement and Expansion Needs NCSL Natural Gas Policy Institute PHMSA Pipeline Safety Program Updates September 9, 2015 - 2 - Topics for Today Introductions Who We are

More information

Regulatory Review PHMSA Regulatory Update. Tom Finch Western Region CATS Manager

Regulatory Review PHMSA Regulatory Update. Tom Finch Western Region CATS Manager Regulatory Review PHMSA Regulatory Update Tom Finch Western Region CATS Manager Rulemaking Process ANPRM Advance Notice of Proposed Rulemaking Used to gather information (non-mandatory) NPRM Notice of

More information

SECTION A-4, LEGAL AUTHORITY A-4.0 LEGAL AUTHORITY A-4.1 INTRODUCTION

SECTION A-4, LEGAL AUTHORITY A-4.0 LEGAL AUTHORITY A-4.1 INTRODUCTION A-4.0 LEGAL AUTHORITY A-4.1 INTRODUCTION In 1993, the Orange County Stormwater Permittees prepared a Model Water Quality Ordinance to provide a more uniform, countywide approach and a legal underpinning

More information

PHMSA Pipeline Safety Program Update

PHMSA Pipeline Safety Program Update PHMSA Pipeline Safety Program Update NACE Central Area Conference August 28, 2013 William Lowry, PE Community Assistance and Technical Services Mgr, Southwest Region USDOT/PHMSA 1 Today s Agenda Underlying

More information

Notice of Proposed Rulemaking (NPRM) Huy Nguyen Western Region

Notice of Proposed Rulemaking (NPRM) Huy Nguyen Western Region Notice of Proposed Rulemaking (NPRM) Huy Nguyen Western Region Rulemaking Process Topics Safety of Hazardous Liquid Pipelines (PHMSA- 2010-0229) Safety of Gas Transmission Pipelines (PHMSA- 2011-0023)

More information

CASITAS MUNICIPAL WATER DISTRICT

CASITAS MUNICIPAL WATER DISTRICT CASITAS MUNICIPAL WATER DISTRICT REQUEST FOR PROPOSAL TO PROVIDE GEOSPATIAL SERVICES GEOGRAPHIC INFORMATION SYSTEM (GIS)/ COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM (CMMS) RFP will be received at the office

More information

Pipeline and Informed Planning Alliance (PIPA) Recommended Practice Evaluation Worksheet For Pipeline Operators. Draft 12/15/2011

Pipeline and Informed Planning Alliance (PIPA) Recommended Practice Evaluation Worksheet For Pipeline Operators. Draft 12/15/2011 Pipeline and Informed Planning Alliance () Recommended Evaluation Worksheet For Pipeline Operators Draft 12/15/2011 Checklist for Pipeline Operator Recommended Evaluation The Pipelines and Informed Planning

More information

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS CHAPTER 19.66 SURFACE MINING AND RECLAMATION PLAN REGULATIONS Section: 19.66.010 PURPOSE AND INTENT 19.66.020 INCORPORATION OF SMARA AND STATE REGULATIONS 19.66.030 APPLICABILITY 19.66.040 EXEMPTIONS 19.66.050

More information

Public Awareness. and Concerns. About LNG

Public Awareness. and Concerns. About LNG . Public Awareness and Concerns About LNG Chapter III Public Awareness and Concerns About LNG Like many other types of energy and energy systems, the use of LNG as a method of transporting natural gas

More information

Recommendations For Reporting Mobile Refueling Vehicles & Portable Trailer-Mounted Generators At Fixed Facilities

Recommendations For Reporting Mobile Refueling Vehicles & Portable Trailer-Mounted Generators At Fixed Facilities Recommendations For Reporting Mobile Refueling Vehicles & Portable Trailer-Mounted Generators At Fixed Facilities Discussion AT&T requested additional clarification on two issues: 1. Mobile refueling vehicles

More information

CHAPTER 11 Climate Change Considerations

CHAPTER 11 Climate Change Considerations CHAPTER 11 CHAPTER 11 CLIMATE CHANGE CONSIDERATIONS 11.1 INTRODUCTION Human activities, such as energy production and land development also result in both direct and indirect emissions that contribute

More information

The Underground Utility Prevention Act

The Underground Utility Prevention Act Washington s Dig Law Chapter 19.122 RCW The Underground Utility Prevention Act Municipal Research and Services Center www.mrsc.org Welcome to: Washington s Dig Law Municipal Research and Services Center

More information

SECTION RISK-BASED ASSESSMENT AND CORRECTIVE ACTION FOR NON-UST PETROLEUM RELEASES

SECTION RISK-BASED ASSESSMENT AND CORRECTIVE ACTION FOR NON-UST PETROLEUM RELEASES SECTION.0500 - RISK-BASED ASSESSMENT AND CORRECTIVE ACTION FOR NON-UST PETROLEUM RELEASES 15A NCAC 02L.0501 PURPOSE AND SCOPE (a) The purpose of this Section is to establish procedures for risk-based assessment

More information

Memorandum of Law Kevin J, Moody, General Counsel Pennsylvania Independent Oil & Gas Association (PIOGA)

Memorandum of Law Kevin J, Moody, General Counsel Pennsylvania Independent Oil & Gas Association (PIOGA) Memorandum of Law Kevin J, Moody, General Counsel Pennsylvania Independent Oil & Gas Association (PIOGA) House Consumer Affairs Committee Hearing on HB 284 PA One Call Law reauthorization bill June 5,

More information

Senate committee approves bill to convert biosolids to clean energy

Senate committee approves bill to convert biosolids to clean energy Sen. Wieckowski Press release on For Immediate Release Contact: Jeff Barbosa April 6, 2016 916-651-4010 Senate committee approves bill to convert biosolids to clean energy New technology will help state

More information

SB 606 (Hertzberg) Summary As Chaptered on 5/31/18

SB 606 (Hertzberg) Summary As Chaptered on 5/31/18 SB 606 (Hertzberg) Summary As Chaptered on 5/31/18 Urban Water Use Objectives and Water Use Reporting Requirements: SB 606 requires the State Water Resources Control Board (State Water Board) and the Department

More information

CALAFCO Daily Legislative Report as of 8/4/2010 1

CALAFCO Daily Legislative Report as of 8/4/2010 1 1 of 7 8/4/2010 12:27 PM CALAFCO Daily Legislative Report as of 8/4/2010 1 AB 419 (Caballero D) Local government: change of organization or reorganization: elections. Current Text: Chaptered: 7/7/2010

More information

2015 NAPSR Central Region Meeting State of the State Report: Michigan

2015 NAPSR Central Region Meeting State of the State Report: Michigan 2015 NAPSR Central Region Meeting State of the State Report: Michigan David Chislea Program Manager 1 Program Staffing Overview Number of inspectors: 8 Number of inspectors w/ 3 years or less: 6 Number

More information

Table of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2

Table of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2 RULE 20.4 NEW SOURCE REVIEW PORTABLE EMISSION UNITS (ADOPTED AND EFFECTIVE 5/17/94) (REV. ADOPTED AND EFFECTIVE 12/17/97) (REV. ADOPTED 11/4/98; EFFECTIVE 12/17/98) (REV. ADOPTED AND EFFECTIVE 4/27/16)

More information

This Part prescribes requirements for the REPORTING of:

This Part prescribes requirements for the REPORTING of: This Part prescribes requirements for the REPORTING of: Incidents Safety Related Conditions Annual Pipeline Summary Data Other Reporting Requirements 191.1 (b) Offshore Gathering of Gas Upstream from the

More information