1 NERC Organization Standards: What are they???? Northeast Power Coordinating Council General Meeting September 19, 2002 Stanley E. Kopman Director, Planning and Compliance Northeast Power Coordinating Council

2 Outline Brief History of NERC, Its Policies and Standards Why change? NERC Organization Standards Process Overview Role of NPCC Questions?

3 Abbreviations NOS - NERC Organization Standards WESM - Wholesale Electric Standards Model SAC- Standards Authorization Committee SAR - Standard Authorization Request SPM Standards Process Manager

4 History NERC formed in 1968 NERC Operating Policies Developed shortly after NERC s inception Constantly being reviewed and updated NERC Planning Standards Adopted by NERC Board of Trustees (BOT) in 1997 Field Tests, Not completed to date NERC Organization Standards Process Approved by NERC BOT in October, 2001

5 Why Change? Need to improve quality of Standards Need to develop Standards that don t unduly hamper open markets & innovative methods of operating markets Need to Open Standards development process to all who are interested

6 Why Change? (cont d) Contain numerous interrelated requirements - what s mandatory? Contain mix of how to and good utility practice information - overly prescriptive in places Developed for a different industry structure - vertically integrated utility Focused on reliability, sometimes at the expense of competitive markets

7 NOS Process Overview Purpose: Develop Set of Core Reliability Standards Material to Reliability Measurable NOS Process Description WESM Model Stakeholder-based Weighted Segment Voting Open participation Consensus-building NERC Functional Model

8 Reliability Principles 1. Plan and operate system reliably 2. Maintain frequency on schedule 3. Provide operating and planning information 4. Have emergency plans 5. Maintain communications facilities 6. Ensure personnel are qualified 7. Monitor and assess reliability for wide area

9 Market Interface Principles 1. Recognize that reliability is essential to our economy 2. Not provide unfair competitive advantage 3. Neither mandate nor prohibit specific market structure 4. Not preclude market solutions for compliance 5. Maintain data confidentiality or equal opportunity to access non-sensitive information

10 NOS Process Overview Submit SAR to to SAC Draft Standard Ballot Standard Post for for Comment Post for for Comment Board Adopts SAC Reevaluates SAR Trial Use Testing Authorize Drafting Standard Prepare to to Ballot

11 NOS Process Characteristics SAR Poses Question: Do we need a Standard? NOT THE STANDARD! Regional Differences Identified SAC Selects SAR Drafting Team Evaluates Initial SAR Posts for Public Comment Determines if SAR Moves Forward

12 NOS Process Characteristics (cont d) SPM Manages Process Liaison with SAC Standards Drafting Team Technically Proficient Appointed by SAC Recommended by SPM Limited in Size

13 NOS Process Characteristics (cont d) Trial Use Testing (May not be required) Recommended by NERC Compliance Director Working with Standards Drafting Team Authorized by SAC Balloting Proposed Standard (Use of WESM Model) Two Ballots Anticipated Registered Ballot Body Standard Ballot Pool Weighted- Sector Voting Adoption By NERC BOT

14 Elements of a SAR Supporting Documents Implementation Plan Regional Differences Related SARs & Standards Detailed Description Initial Data Required for Acceptance - Name & Contact Info - Purpose & Industry Need - Brief Description - Applicable Reliability Functions -Principles

15 Elements of a Standard Standard Compliance Administration Supporting Information Identification Number Title Effective Date and Status Purpose Who Must Comply Requirement(s) What not necessarily How Measure(s) Expected Performance or Outcomes Regional Differences

16 Elements of a Standard (cont.) Standard Compliance Administration Compliance Monitoring Process Levels of Non-Compliance Sanctions Supporting Information

17 Elements of a Standard (cont.) Interpretations Relationships Implementation Plan Standard Compliance Administration Supporting References Forms Reference Documents White Papers Supporting Information

18 WESM Model Being Incorporated into NOS Process Manual Weighted-segment voting Registered Ballot Pool Standard Ballot Pool 75% of Standard Ballot Pool for Quorum 2/3 Weighted Affirmative Vote Needed for Approval of Standard Re-defines role of NERC BOT, SAC, NERC Standing Committees

19 RTOs Stakeholder Segments and Ballot Body Registered Ballot Body Lg Cust Sm Cust LSEs Gov t Trans Owners Brokers, Marketers Trans Dep Utilities Elec Generators

20 Registered Ballot Body Registration Process Underway 296 Total Registrants to date All segments have registered members

21 SAC Under WESM Model 2 Representatives From Each Segments ISO, RTO, RRO Segment: One Representative from ISO/RTO One Representative from RRO Currently Being Formed

22 Bulk Electric System Adequacy Transmission Reliability and Resource Balance Recovery (Return to Normal Operations) Analysis Assess Transmission Future Needs and Develop Trans Plans Balance Resources and Demand Prepare for and Respond to Abnormal or Emergency Conditions Monitor and Analyze Disturbances, Event and Conditions Determine Facility Ratings, Op. Limits, & Transfer Capabilities Monitor and Assess Short Term Trans - Operate within Limits Prepare for and Respond to Blackout or Island Conditions Design, Install, and Coordinate Controls and Protection (G&T) Define Connection Requirements (GT&D) Coordinate Interchange Coordinate Trans. Outages, Operations and Reliability Initial SARS for Organization Standards

23 SAR Development 11 Total SARs Proposed All SARs Have Been Posted For Public Comment (Comment Period Ended May 3, 2002) One SAR (Balance Resources and Demand) Reviewed and Posted three times

24 SAR Development Three additional SAR Drafting Teams Formed: Monitor and Assess Short-term Transmission Reliability - Operate Within Limits Determine Facility Ratings, Operating Limits, and Transfer Capabilities Coordinate Interchange Remaining SAR Drafting Teams to Be Formed after New SAC is Created.

25 Role of NPCC Active Participation : in Development of Process in Development of Initial SARs On SAR and Standards Drafting Teams Provide Input During Public Comment Periods Identify Regional Differences

26 NERC Functional Model Compliance Monitor Service Functions Interchange Authority Reliability Authority Balancing Authority Trans Service Provider Planning Authority Planning & Operating Functions Generator Transmission Owner Load-Serving Entity Transmission Operator Purchase- Selling Entity Distribution Provider Merchant Functions

27 Questions?

Standard Authorization Request Form

Standard Authorization Request Form Standard Authorization Request Form Title of Proposed Standard Withdraw 3 Midwest ISO Waivers Request Date April 2, 2009 SC Approval Date April 15, 2009 SAR Requester Information SAR Type (Check a box

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, please email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability

More information

Primary Contact Roger Harszy Revision to existing Standard. Telephone: Withdrawal of existing Standard

Primary Contact Roger Harszy Revision to existing Standard. Telephone: Withdrawal of existing Standard Title of Proposed Standard: Coordinate Operations Request Date: March 7, 2002 Authorized for Posting: March 20, 2002 SAR ID# : COORD_OPERATONS_01_02 SAR Requestor Information Name: Jim Byrd (Roger Harszy

More information

Standards Authorization Request Form

Standards Authorization Request Form When completed, please email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards. Please use this form to

More information

Standard Authorization Request Form

Standard Authorization Request Form Standard Authorization Request Form Title of Proposed Standard Glossary of Terms change System Operator definition (Project 2010-16 Definition of System Operator) Request Date October 5, 2010 SC Approval

More information

Standard Authorization Request Form

Standard Authorization Request Form When completed, email to: gerry.cauley@nerc.net Standard Authorization Request Form Title of Proposed Standard System Personnel Training Request Date 07/01/2004 Revised 12/01/04 SAR Requestor Information

More information

Standards Authorization Request Form

Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.net NERC welcomes suggestions for improving the reliability of the Bulk-Power System through improved Reliability Standards. Please use this form to submit

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: Howard.Gugel@nerc.netValerie.Agnew@nerc.net For questions about this form or for assistance in completing the form, call Howard

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form Request to propose a new or a revision to a Reliability Standard Title of Proposed Standard(s): EOP-010-1 Geomagnetic Disturbance Operations TPL-007-1 Transmission

More information

Northeast Power Coordinating Council, Inc. Regional Reliability Standards Development Procedure

Northeast Power Coordinating Council, Inc. Regional Reliability Standards Development Procedure Northeast Power Coordinating Council, Inc. Regional Reliability Standards Development Procedure Approved by NPCC Board of Directors September 19, 2007 Approved by NERC BOT October 23, 2007 Adopted by FERC

More information

NERC Compliance Public Bulletin # Guidance for Entities that Delegate Reliability Tasks to a Third Party Entity

NERC Compliance Public Bulletin # Guidance for Entities that Delegate Reliability Tasks to a Third Party Entity NERC Compliance Public Bulletin #2010-004 Guidance for Entities that Delegate Reliability Tasks to a Third Party Entity Version 2.0 July 16, 2015 Public Process Announcement I. Introduction This guidance

More information

SPP RE Regional Reliability Standards Development Process Manual

SPP RE Regional Reliability Standards Development Process Manual SPP RE Regional Reliability Standards Development Process Manual FERC Approved January 31, 2014 Table of Contents I. Introduction...2 II. Background...3 III. Regional Reliability Standard Definition, Characteristics,

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, please email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved Reliability

More information

North American Energy Standards Board

North American Energy Standards Board Principles & Assumptions: The joint standards should be readily and easily available to all industry participants required to follow them. The jointly developed standard(s) should clearly distinguish components

More information

North American Energy Standards Board

North American Energy Standards Board North American Energy Standards Board 1301 Fannin, Suite 2350, Houston, Texas 77002 Phone: (713) 356-0060, Fax: (713) 356-0067, E-mail: naesb@naesb.org Home Page: www.naesb.org NERC NAESB Template Prepared

More information

The North American Electric Reliability Corporation ( NERC ) hereby submits

The North American Electric Reliability Corporation ( NERC ) hereby submits December 8, 2009 VIA ELECTRONIC FILING Dan McInnis Assistant Deputy Minister Energy Development Initiative 1200-155 Carlton Street Winnipeg, Manitoba, Canada R3C 3H8 Re: North American Electric Reliability

More information

Comment Form System Operator Training Standard 1 st Draft

Comment Form System Operator Training Standard 1 st Draft Please use this form to submit comments on the proposed System Operator Training standard. Comments must be submitted by October 26, 2006. You may submit the completed form by e-mail to sarcomm@nerc.com

More information

Comment Form for Functional Model Version 4 and Associated Technical Reference

Comment Form for Functional Model Version 4 and Associated Technical Reference Comment Form for Functional Model Version 4 and Associated Technical Reference Please use this form to submit comments on Version 4 of the Functional Model and its associated Technical Reference. must

More information

Standards Authorization Request Form

Standards Authorization Request Form NERC welcomes suggestions to improve the When completed, please email this form to: reliability of the Bulk-Power System through sarcomm@nerc.com. improved Reliability Standards. Please use this Standard

More information

NERC Standards and Compliance 101

NERC Standards and Compliance 101 NERC Standards and Compliance 101 Mallory Huggins, NERC Standards Developer Adina Mineo, NERC Senior Compliance Operations Auditor Standards and Compliance Spring Workshop April 1, 2014 Presentation Agenda

More information

Approved by Standing Committees Approved by Board of Trustees

Approved by Standing Committees Approved by Board of Trustees Reliability Functional Model Function Definitions and Responsible Entities Prepared by the Functional Model Working Group Version 4 Approved by Standing Committees Approved by Board of Trustees August

More information

NERC Analysis of NERC Standard Process Results Second Quarter 2011 in Docket Nos. RR , RR

NERC Analysis of NERC Standard Process Results Second Quarter 2011 in Docket Nos. RR , RR July 29, 2011 VIA ELECTRONIC FILING Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 Re: NERC Analysis of NERC Standard Process Results Second

More information

Periodic Review Template: [Insert Standard Number/Name] Updated February 2016

Periodic Review Template: [Insert Standard Number/Name] Updated February 2016 Periodic Review Template: [Insert Standard Number/Name] Updated February 2016 Introduction The rth American Electric Reliability Corporation (NERC) is required to conduct a periodic review of each NERC

More information

NYISO COMPREHENSIVE PLANNING PROCESS for RELIABILITY NEEDS

NYISO COMPREHENSIVE PLANNING PROCESS for RELIABILITY NEEDS NYISO COMPREHENSIVE PLANNING PROCESS for RELIABILITY NEEDS By Garry Brown Vice President Strategic Development New York Independent System Operator September 29, 2004 Montreal, Quebec Background NYISO

More information

4/1/2014. FAC-003 Transmission Vegetation Management. Agenda. About NERC. About NERC. About NERC. About NERC. About NERC and FERC

4/1/2014. FAC-003 Transmission Vegetation Management. Agenda. About NERC. About NERC. About NERC. About NERC. About NERC and FERC Agenda FAC-003 Transmission Vegetation Management Robert Novembri Novembri Consulting, LLC and FERC FAC-003 Requirements and FERC Order 777 Preparing for FAC-003-3 Enforcement Dates for Transmission Owners

More information

NERC Reliability Functional Model Technical Document Version 5

NERC Reliability Functional Model Technical Document Version 5 Reliability Functional Model Technical Document Version 5 Prepared by the Functional Model Working Group This document is a companion to Version 5 of the Functional Model. It provides context, explanations,

More information

Periodic Review Template INT Implementation of Interchange

Periodic Review Template INT Implementation of Interchange INT-009-2.1 Implementation of Interchange Executive Summary The Subject Matter Expert (SME) stakeholder team completed an initial comprehensive review of INT- 009-2.1 Implementation of Interchange. The

More information

Approved at the 2/27/07 BOD Meeting 2007 Corporate Goals

Approved at the 2/27/07 BOD Meeting 2007 Corporate Goals Approved at the 2/27/07 BOD Meeting 2007 Corporate Goals The Board of Directors of NPCC Inc. and NPCC CBRE have established the following regional corporate goals for 2007 which are consistent with the

More information

Comment Form Standard PER-005 System Personnel Training

Comment Form Standard PER-005 System Personnel Training Comment Form Standard PER-005 System Personnel Training Please use this form to submit comments on the second draft Standard PER-005 System Personnel Training. Comments must be submitted by September 28,

More information

SPP at a Glance. Located in Little Rock. Approximately 600 employees

SPP at a Glance. Located in Little Rock. Approximately 600 employees SPP at a Glance Located in Little Rock Approximately 600 employees Primary jobs electrical engineering, operations, settlements, and IT 24 x 7 operation Full redundancy and backup site 2 Regulatory Environment

More information

Roles and Responsibilities: Standards Drafting Team Activities (Approved by Standards Committee June 2018)

Roles and Responsibilities: Standards Drafting Team Activities (Approved by Standards Committee June 2018) Roles and Responsibilities: Standards Drafting Team Activities (Approved by Standards Committee June 2018) Standards are developed by industry stakeholders, facilitated by NERC staff, following the process

More information

Reliability Standards Development Plan:

Reliability Standards Development Plan: Reliability Standards Development Plan: 2010 2012 Volume I Overview October 7, 2009 Reliability Standards Development Plan: 2010 2012 Acknowledgement The NERC Reliability Standards Program would like to

More information

ELECTRIC TRANSMISSION 201: Markets, ISO/RTOs and Grid Planning/Operations

ELECTRIC TRANSMISSION 201: Markets, ISO/RTOs and Grid Planning/Operations ELECTRIC TRANSMISSION 201: Markets, ISO/RTOs and Grid Planning/Operations Kevin Reeves Managing Director, Transmission Strategy American Electric Power Organized Markets Organized markets are managed by

More information

WECC-0111 TOP-007-WECC-1a System Operating Limits Retire or Modify Supporting Narrative and Crosswalk to Retire

WECC-0111 TOP-007-WECC-1a System Operating Limits Retire or Modify Supporting Narrative and Crosswalk to Retire MEMO Date: August 6, 2015 Subject: Retirement of TOP-007-WECC-1a (TOP) System Operating Limits Posting 2 The WECC-0111, TOP-007-WECC-1a, System Operating Limits (TOP) Retire or Modify Drafting Team (DT)

More information

Performance Standards Issues. Donald Lamontagne Principal Engineer Arizona Public Service

Performance Standards Issues. Donald Lamontagne Principal Engineer Arizona Public Service Performance Standards Issues Donald Lamontagne Principal Engineer Arizona Public Service Free Template from www.brainybetty.com 2 Regulatory Entities FERC Energy Policy Act of 2005 NERC Designated Electric

More information

The North American Electric Reliability Corporation ( NERC ) hereby submits its North

The North American Electric Reliability Corporation ( NERC ) hereby submits its North May 13, 2009 VIA ELECTRONIC FILING David Erickson Interim President and Chief Executive Officer Alberta Electric System Operator 2500, 330 5 Avenue SW Calgary, Alberta T2P 0L4 Re: North American Electric

More information

NPCC 2008 Corporate Goals

NPCC 2008 Corporate Goals NPCC Board of Directors Approved - 2/15/08 NPCC 2008 Corporate Goals The Board of Directors of NPCC have established the following corporate goals for 2008 which are consistent with the evolving long term

More information

DRAFT Reliability Standards Development Plan. June 15, 2016

DRAFT Reliability Standards Development Plan. June 15, 2016 DRAFT Reliability Standards Development Plan 2017 2019 June 15, 2016 I Table of Contents Background... iii Executive Summary... iv 2016 Progress Report...1 FERC Directives...1 Projects Completed in 2016...1

More information

Standards Authorization Request Form

Standards Authorization Request Form NERC welcomes suggestions to improve the When completed, please email this form to: reliability of the Bulk-Power System through sarcomm@nerc.com. improved Reliability Standards. Please use this Standard

More information

Periodic Review Template INT Dynamic Transfers

Periodic Review Template INT Dynamic Transfers INT-004-3.1 Dynamic Transfers Executive Summary The Subject Matter Expert (SME) stakeholder team completed an initial comprehensive review of INT- 004-3.1 Dynamic Transfers. The SME stakeholder team finds

More information

Agenda Standards Committee s Executive Committee

Agenda Standards Committee s Executive Committee Agenda Standards Committee s Executive Committee Monday, March 21, 2011 10-11:30 a.m. Eastern Conference Call: 866-740-1260 Code: 4685998 1. Administrative Items a. Introductions and Quorum (A. Mosher)

More information

Periodic Review Template INT Evaluation of Interchange Transactions

Periodic Review Template INT Evaluation of Interchange Transactions INT-006-4 Evaluation of Interchange Transactions Executive Summary The Subject Matter Expert (SME) stakeholder team completed an initial comprehensive review of INT- 006-4 Evaluation of Interchange Transactions.

More information

Standard Authorization Request Form

Standard Authorization Request Form E-mail completed form to [E-mail] Standard Authorization Request Form Title of Proposed Standard PRC-001-1 System Protection Coordination Request Date March 22, 2007 SAR Requestor Information Name NERC

More information

NERC Reliability Functional Model

NERC Reliability Functional Model Comment Version NERC Reliability Functional Model Function Definitions and Responsible Entities Comments due February 27, 2004 Approved by Standing Committees: Approved by Board of Trustees: February 27,

More information

Standard Authorization Request Form

Standard Authorization Request Form Standard Authorization Request Form Title of Proposed Standard: Transmission and Generation Protection System Maintenance and Testing Request Date: August 4, 2011 SAR Requestor Information SAR Type (Check

More information

The Role of the ISO/RTO in Today s. Robert B. Burke Principal Analyst ISO New England Inc.

The Role of the ISO/RTO in Today s. Robert B. Burke Principal Analyst ISO New England Inc. The Role of the ISO/RTO in Today s Electric Grid Robert B. Burke Principal Analyst ISO New England Inc. Purpose Describe the role of the ISO in today s grid. Where are the ISO/RTOs Deregulation Description

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR06-1- RELIABILITY CORPORATION )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR06-1- RELIABILITY CORPORATION ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION NORTH AMERICAN ELECTRIC ) Docket No. RR06-1- RELIABILITY CORPORATION ) QUARTERLY REPORT OF THE NORTH AMERICAN ELECTRIC RELIABILITY

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR06-1- RELIABILITY CORPORATION )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR06-1- RELIABILITY CORPORATION ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION NORTH AMERICAN ELECTRIC ) Docket No. RR06-1- RELIABILITY CORPORATION ) QUARTERLY REPORT OF THE NORTH AMERICAN ELECTRIC RELIABILITY

More information

March 12, 2014 VIA ELECTRONIC FILING. Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2

March 12, 2014 VIA ELECTRONIC FILING. Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2 March 12, 2014 VIA ELECTRONIC FILING Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2 Re: North American Electric Reliability Corporation Dear

More information

Standard PRC Under-Voltage Load Shedding Program Database

Standard PRC Under-Voltage Load Shedding Program Database Attachment G Standard PRC-020-1 Under-Voltage Load Shedding Program Database Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will

More information

FRCC - PROC - RC - EOP-004. FRCC Disturbance Reporting Procedure

FRCC - PROC - RC - EOP-004. FRCC Disturbance Reporting Procedure FRCC - PROC - RC - EOP-004 FRCC Disturbance Reporting Procedure Revisions Rev. No. Date Description Developed by: Approved by: 1 September 2, 2009 Conversion of RRO Legacy document FRCC Disturbance Reporting

More information

45-day Formal Comment Period with Parallel Initial Ballot December January 2014September - October 2013

45-day Formal Comment Period with Parallel Initial Ballot December January 2014September - October 2013 Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

N ORTH A MERICAN E LECTRIC R ELIABILITY C OUNCIL

N ORTH A MERICAN E LECTRIC R ELIABILITY C OUNCIL N ORTH A MERICAN E LECTRIC R ELIABILITY C OUNCIL Princeton Forrestal Village, 116-390 Village Boulevard, Princeton, New Jersey 08540-5731 September 11, 2006 VIA OVERNIGHT MAIL Deb Young, Minister s Secretary

More information

November 14, 2016 VIA ELECTRONIC FILING

November 14, 2016 VIA ELECTRONIC FILING November 14, 2016 VIA ELECTRONIC FILING David Erickson President and Chief Executive Officer Alberta Electric System Operator 2500, 330-5 Avenue SW Calgary, Alberta T2P 0L4 RE: North American Electric

More information

Joint CCC/SC Meeting. Wednesday, December 7, Meeting Time: 1:00 p.m. 5:00 p.m. EST Lunch: 12 1:00 p.m.

Joint CCC/SC Meeting. Wednesday, December 7, Meeting Time: 1:00 p.m. 5:00 p.m. EST Lunch: 12 1:00 p.m. Joint CCC/SC Meeting Wednesday, December 7, 2011 Meeting Time: 1:00 p.m. 5:00 p.m. EST Lunch: 12 1:00 p.m. Dial-In: 1.866.740.1260 Passocde: 6515232 Security Code: 120711 Introductions and Chair s Remarks

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

Periodic Review Team Preliminary Recommendation FAC Facility Ratings

Periodic Review Team Preliminary Recommendation FAC Facility Ratings Periodic Review Team Preliminary Recommendation FAC-008-3 Facility Ratings Executive Summary The Review Team completed a comprehensive review of FAC 008 3 Facility Ratings. The team found the standard

More information

Standards Committee Committee

Standards Committee Committee Standards Committee A New Beginning Scott Miller, Manager, Corporate Affairs, MEAG Power Mark Lauby, Vice President and Director, NERC Standards Standards Committee Meeting January 16, 2013 Presentation

More information

NERC Reliability Update Power System Reliability Regulation Overview

NERC Reliability Update Power System Reliability Regulation Overview NERC Reliability Update Power System Reliability Regulation Overview Herb Schrayshuen Principal Power Advisors, LLC November 3, 2014 CNY Engineering Expo 1 Learning Objectives By the conclusion of this

More information

NERC Reliability Functional Model

NERC Reliability Functional Model Agenda Item 4.d Attachment 1 NERC Reliability Functional Model Function s and FunctionalResponsible Entities Version 54 Approved by Standing Committees: Approved by Board of Trustees: Prepared by the Functional

More information

The North American Electric Reliability Corporation ( NERC ) hereby submits

The North American Electric Reliability Corporation ( NERC ) hereby submits April 13, 2011 VIA ELECTRONIC FILING Ms. Erica Hamilton, Commission Secretary British Columbia Utilities Commission Box 250, 900 Howe Street Sixth Floor Vancouver, B.C. V6Z 2N3 Re: North American Electric

More information

The North American Electric Reliability Corporation ( NERC ) hereby submits

The North American Electric Reliability Corporation ( NERC ) hereby submits April 13, 2011 VIA OVERNIGHT MAIL Anne-Marie Erickson, Secretary of the Board National Energy Board 444 Seventh Avenue SW Calgary, Alberta T2P 0X8 Re: North American Electric Reliability Corporation Dear

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Notice of Proposed Rulemaking on ) Docket Nos.: Preventing Undue Discrimination and ) RM05-25-000 Preference in Transmission Service

More information

Proposed Criteria for Determining Scope of Section 215 Activities Request for Comments

Proposed Criteria for Determining Scope of Section 215 Activities Request for Comments Proposed Criteria for Determining Scope of Section 215 Activities Request for Comments Comments Due: December 21, 2012 The North American Electric Reliability Corporation (NERC) is requesting comment on

More information

Agenda Board of Trustees December 17, :00 p.m. 3:00 p.m. Eastern Conference Call

Agenda Board of Trustees December 17, :00 p.m. 3:00 p.m. Eastern Conference Call Agenda Board of Trustees December 17, 2014 2:00 p.m. 3:00 p.m. Eastern Conference Call Participant Line: 1-800-926-5082 Call to Order Introductions and Chair s Remarks NERC Antitrust Compliance Guidelines

More information

Consideration of Comments on First Ballot of Coordinate Interchange Standards. 1 st Vote Affirm. Segment UserName. Vote. Neg

Consideration of Comments on First Ballot of Coordinate Interchange Standards. 1 st Vote Affirm. Segment UserName. Vote. Neg Consideration of on First Ballot of Coordinate Interchange Standards Summary Consideration: The drafting team did not make any changes to the Coordinate Interchange standards as a result of the comments

More information

Standard FAC System Operating Limits Methodology for the Planning Horizon

Standard FAC System Operating Limits Methodology for the Planning Horizon Standard FAC-010-1 System Operating Limits Methodology for the Planning Horizon Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will

More information

Black Start and System Restoration Phase 2. Issue Paper

Black Start and System Restoration Phase 2. Issue Paper Black Start and System Restoration Phase 2 Issue Paper January 17, 2016 California ISO Straw Proposal Table of Contents 1 Introduction and Background... 3 2 Additional Procurement and Cost Allocation...

More information

Note This form is to comment on Version 2 of the Assess Transmission Future Needs and Develop Transmission Plans SAR.

Note This form is to comment on Version 2 of the Assess Transmission Future Needs and Develop Transmission Plans SAR. Transmission Plans SAR (2 nd Posting) te This form is to comment on Version 2 of the Assess Transmission Future Needs and Develop Transmission Plans SAR. The latest version of this SAR (TRNS_NDS_&_PLNS_01_02)

More information

Statement of Compliance Registry Criteria (Revision 3.1)

Statement of Compliance Registry Criteria (Revision 3.1) Statement of Compliance Registry Criteria (Revision 3.1) Summary Since becoming the Electric Reliability Organization (ERO), NERC has initiated a program to identify candidate organizations for its compliance

More information

Periodic Review Recommendation FAC System Operating Limits Methodology for the Planning Horizon

Periodic Review Recommendation FAC System Operating Limits Methodology for the Planning Horizon Periodic Review Recommendation FAC-010-3 - System Operating Limits Methodology for the Planning Horizon Introduction NERC is required to conduct a periodic review of each NERC Reliability Standard at least

More information

Project ATC Revisions (MOD A) Consideration of Directives (November 12, 2013)

Project ATC Revisions (MOD A) Consideration of Directives (November 12, 2013) Project 2012-05 - ATC Revisions (MOD A) s (November 12, 2013) Directive NERC S-Ref 10204 Order No. 729 at P 129 129. If the Commission determines upon its own review of the data, or upon review of a complaint,

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

NYSRC RELIABILITY RULE/NERC STANDARD CROSS-REFERENCE

NYSRC RELIABILITY RULE/NERC STANDARD CROSS-REFERENCE 7/1/05 NYSRC RELIABILITY RULE/NERC STANDARD CROSS-REFERENCE NYSRC Reliability A. RESOURCE ADEQUACY A-R1. Statewide Installed Reserve Margin Requirements A-R2. Load Serving Entity ICAP Requirements None

More information

Agenda Technology Committee Conference Call

Agenda Technology Committee Conference Call Agenda Technology Committee Conference Call July 27, 2010 2:00-3:00 p.m. EDT Dial-In: 888-612-1053 (No Code Needed) Introductions and Chairman s Remarks NERC Antitrust Compliance Guidelines *1. Minutes

More information

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004 Glossary of Terms Used in Standards Preliminary Draft Version 0 Standards September 1, 2004 Source References (Noted in draft only will not be part of final glossary) Functional Model () Glossary (GL)

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION North American Electric Reliability Corporation ) ) Docket No. PETITION OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION FOR

More information

September 12, 2016 VIA ELECTRONIC FILING

September 12, 2016 VIA ELECTRONIC FILING !! September 12, 2016 VIA ELECTRONIC FILING Kirsten Walli, Board Secretary Ontario Energy Board P.O Box 2319 2300 Yonge Street Toronto, Ontario, Canada M4P 1E4 Re: North American Electric Reliability Corporation

More information

NPCC Regional Feedback Mechanism process

NPCC Regional Feedback Mechanism process NPCC Regional Feedback Mechanism process Review and Re Approval Requirements: The NPCC Regional Feedback Mechanism process as documented herein will be reviewed periodically as appropriate for possible

More information

Thomas Basso and Richard DeBlasio National Renewable Energy Laboratory 1617 Cole Blvd, Golden, CO

Thomas Basso and Richard DeBlasio National Renewable Energy Laboratory 1617 Cole Blvd, Golden, CO Advancing Smart Grid Interoperability and Implementing NIST s Interoperability Roadmap: IEEE P2030 TM Initiative and IEEE 1547 TM Interconnection Standards Thomas Basso and Richard DeBlasio National Renewable

More information

Five-Year Review Template Updated February 26, 2012

Five-Year Review Template Updated February 26, 2012 Five-Year Review Template Updated February 26, 2012 Introduction NERC has an obligation to conduct a five-year review of each Reliability Standard developed through NERC s American National Standards Institute-accredited

More information

DRAFT FOR DISCUSSION PURPOSES PROPOSED STRAWMAN PROPOSAL IN RESPONSE TO ORDER 890

DRAFT FOR DISCUSSION PURPOSES PROPOSED STRAWMAN PROPOSAL IN RESPONSE TO ORDER 890 DRAFT FOR DISCUSSION PURPOSES PROPOSED STRAWMAN PROPOSAL IN RESPONSE TO ORDER 890 OVERVIEW AND PURPOSE This strawman proposes enhancements to NYISO s existing reliability and economic planning processes

More information

Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources

Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources Draft White Paper Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources Project 2014-01 Standards Applicability for Dispersed

More information

DESCRIPTION OF NERC AND NPCC STANDARD & CRITERIA DOCUMENTS

DESCRIPTION OF NERC AND NPCC STANDARD & CRITERIA DOCUMENTS DESCRIPTION OF NERC AND NPCC STANDARD & CRITERIA DOCUMENTS NERC RELIABILITY STANDARDS A NERC Reliability Standard includes a set of Requirements that define specific obligations of owners, operators, and

More information

NERC Reliability Functional Model

NERC Reliability Functional Model NERC Reliability Functional Model Function Definitions and Responsible Entities Version 4 Approved by Standing Committees: Approved by Board of Trustees: [Version FM V4 Redline_2008 08 11 Prepared by the

More information

Revised Draft Final Proposal for Participation of Non-Generator Resources in California ISO Ancillary Services Markets

Revised Draft Final Proposal for Participation of Non-Generator Resources in California ISO Ancillary Services Markets Revised Draft Final Proposal for Participation of Non-Generator Resources in California ISO Ancillary Services Markets March 8, 2010 Revised Draft Final Proposal for Participation of Non- Generator Resources

More information

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development www.fourcornerswind.org Photo courtesy of Avangrid Renewables, LLC UNDERSTANDING REGIONAL ELECTRICITY

More information

Reliability Standards Development Plan

Reliability Standards Development Plan Reliability Standards Development Plan 2018-2020 October 18, 2017 NERC Report Title Report Date I Table of Contents Background... iii Executive Summary... iv 2017 Progress Report...1 FERC Directives...1

More information

Five-Year Review Template Updated February 26, 2012

Five-Year Review Template Updated February 26, 2012 Five-Year Review Template Updated February 26, 2012 Introduction NERC has an obligation to conduct a five-year review of each Reliability Standard developed through NERC s American National Standards Institute-accredited

More information

ISO/RTO Metrics Initiative

ISO/RTO Metrics Initiative ISO/RTO Metrics Initiative Mary McGarvey Vice President & Chief Financial Officer New York Independent System Operator Management Committee NYISO Krey Corporate Center January 20, 2010 Government Accountability

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

Proposed Definitions for the NERC Glossary of Terms Project : Emergency Operations

Proposed Definitions for the NERC Glossary of Terms Project : Emergency Operations Proposed Definitions for the NERC Glossary of Terms Project 2009-03: Emergency Operations The Emergency Operations Standards Drafting (EOP SDT) proposes revisions to a defined term in the NERC Glossary

More information

Introduction... 4 Principles Supporting the NERC Standards Development Procedure... 4

Introduction... 4 Principles Supporting the NERC Standards Development Procedure... 4 Endorsed by the Standards Committee Revised April, 2009 Table of Contents Table of Contents Introduction... 4 Principles Supporting the NERC Standards Development Procedure... 4 Refining a SAR the Work

More information

Compliance and Certification Committee Report on the ERO Enterprise Effectiveness Survey

Compliance and Certification Committee Report on the ERO Enterprise Effectiveness Survey Compliance and Certification Committee Report on the ERO Enterprise Effectiveness Survey December 2016 NERC Report Title Report Date I Table of Contents Preface... iii Introduction... iv Response Rates

More information

Criteria for Annual Regional Entity Program Evaluation

Criteria for Annual Regional Entity Program Evaluation Criteria for Annual Regional Entity Program Evaluation CCC Monitoring Program CCCPP-010-4 October 2016 NERC Report Title Report Date I Table of Contents Revision History... iii Preface... iv Executive

More information

NERC Standards Report, Status and Timetable for Addressing Regulatory Directives, and Periodic Review of Reliability Standards Docket No.

NERC Standards Report, Status and Timetable for Addressing Regulatory Directives, and Periodic Review of Reliability Standards Docket No. March 31, 2016 Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 Re: NERC Standards Report, Status and Timetable for Addressing Regulatory

More information

Periodic Review of EOP Event Reporting Project Emergency Operations Periodic Review

Periodic Review of EOP Event Reporting Project Emergency Operations Periodic Review Periodic Review of EOP-004-2 Event Reporting Project 2015-02 Emergency Operations Periodic Review Introduction NERC is required to conduct a periodic review of each NERC Reliability Standard at least once

More information

Frequently Asked Questions August 2013

Frequently Asked Questions August 2013 Frequently Asked Questions August 2013 General What is the Bulk-Power System or Bulk Electric System? NERC defines the Bulk-Power System as the electricity power generation facilities combined with the

More information

Adequate Level of Reliability Definition and Technical Report

Adequate Level of Reliability Definition and Technical Report Adequate Level of Reliability Definition and Technical Report Unofficial Comment Form Please DO NOT use this form for submitting comments. Please use the electronic form to submit comments on the proposed

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) UNITED STATES OF AMERICA BEFE THE FEDERAL ENERGY REGULATY COMMISSION North American Electric Reliability Corporation ) ) Docket No. JOINT PETITION OF THE NTH AMERICAN ELECTRIC RELIABILITY CPATION AND RELIABILITYFIRST

More information