Investigations and field results for high speed moving crossings

Size: px
Start display at page:

Download "Investigations and field results for high speed moving crossings"

Transcription

1 Investigations and field results for high speed moving crossings Ph.Pouligny 1, S.Nierengarten 1, J. Plu 1, J.Y. Grunchec 1, JM.Pauchet 1 ; M.Sebes 2, D.Boulanger 3 ; Ph. Mugg 4, L.Winiar 5, W.Schöch 6 1 SNCF, Paris, France; 2 INRETS, Paris, France; 3 CORUS RAIL, Hayange, France; 4 VOSSLOH COGIFER, Reichshoffen, France; 5 RAILTECH, Raismes, France; 6 SPENO, Genève, Suisse. Abstract Experience from various high speed lines operated by SNCF has shown a frequent development of head-checking cracks on moving frogs, exhibiting a similar orientation to train direction than for plain track. After some months, these superficial cracks are growing down to a threshold depth which can be detected by ultrasonic testing and which makes it necessary to organize a costly replacement of the frog. SNCF decided to experiment two different technical solutions : - Designing new moving frog with bainitic blades to improve future moving frogs behavior, - Grinding off damaged steel in the frog point area so as to displace contact path out of the head checking zone. This study presents the theoretical simulation and field tests realized to design and assess these points. Introduction Wheel running over switches, especially over the frog, is not so smooth than in plain track because of a number of specific irregularities in the wheel/rail contact tread. The most visible irregularity is caused by the existing gap between the wing rail and the frog point. For this reason, high speed lines are equipped with steel moving frogs which eliminate the existing gap of rigid frogs. Although this strongly alleviates dynamical and shocks caused by passing wheels, there still remains running irregularities which cannot be totally suppressed, because passing wheels experience changes in tread diameter over the different successive transversal profiles resulting from crossing construction. According to SNCF experience, this situation creates rapidly Head checks on moving frog s blades and leads to a important increase of maintenance costs. At this time, we needed to develop a technical solution to improve the design of future moving frogs and a second solution to repair the moving crossings already in track, and because of fundamental safety, experiments and field tests on lines circulated by 300 km/h operated trains need important previous studies. Thus, wheels passing over moving crossings generate nevertheless dynamic forces directly on milled and tooled steel blades. Then complete dynamic simulations have to be performed to : - evaluate shocks and contact forces levels undergone by the blade, - estimate the stability of the train passing over the grinded moving crossings - assess chosen grinding profile for the moving frogs In the other hand, bainitic steel must be evaluated in order to be sure that beyond its well-known head-checks proof qualities : - it keeps its stiffness and flexibility qualities, - it can be manufactured in SNCF or VOSSLOH factories, - its weld ability and durability in high speed line.

2 In 2005, INRETS realized a previous simulation based on theoretical crossings profiles before and after moving frog grinding. The results were not completely satisfying because the systematic plastic deformation of the surface (especially the wing rail) could not be taken into account as required in contact stresses calculation. Nevertheless, this first work permitted INRETS to develop a new approach numerical model of railway dynamics with varying rail profiles. The computed values of Y/Q ratio also allowed us to undertake such a high speed line test with grinded moving crossings. At the beginning of 2006, two moving crossings where chosen on Paris-Lyon high speed line. They both presented early RCF defects. Figure 1: View of crossing # 2703 Figure 2: Chronology of simulations and grindings After an early visit before the grinding (with rail profile measurements), the two crossings have been visited every two months in the year 2006 and then every six months in Crossing # 2513 : - Paris to Lyon HSL, run at 270 km/h from blade to tail. End of a curve; - Grinded in the middle of may 2006 with curative anti head checks profile(ahcc) Crossing # 2703 : - Lyon to Paris HSL, run at 300 km/h from tail to blade. Alignment; - Grinded in the middle of may 2006 with preventive anti head checks profile (AHCP). The study has been undertaken in two steps : - Assessment of the model with comparison between calculated and measured rolling contact zones, - Calculation of the effect of the grinding on the dynamic behavior of the vehicle rolling over the movable frog.

3 Data for theoretical simulation Beyond classical data for multi-body vehicle model (in this case TGV Duplex for an entire train simulation), this project needed a very complete description of the track at each part of the crossing and of the moving frog itself. Beginning of the frog s blade Slope ( ) Cv (km -1 ) Figure 3: Extract of track geometry around the crossing # 2703 Cv=vertical curvature Transversal profiles were precisely measured in each movable frog, before and after grinding according to the drawing below : Figure 4: Measurement points for the moveable frog Figure 5: Complete profiles for moveable frog and TVG wheels

4 The new wheel profiles shown Figure 5 come from standard NF F used by SNCF on TGV. For the realism of the contact stresses results, INRETS did the simulation with 28 different wear levels for TGV wheel, including new wheel profile. From these wheel and rail profiles, the contact zones table was calculated at each moveable frog measurement points. As sketched Figure 6 below, the rolling contact zones are divided with narrow strips, and elsewhere with large strips. Figure 6: Mesh of a moveable frog with rolling contact zones. Perspective effects removed The semi Hertzian method [1] has been implemented in the VOCOLIN multibody research software which was used for every simulation of dynamic behaviour, including the contact zones determination. Validation of the simulation In July 2007, fourteen months after grinding, rolling contact zones on the rail surface have been measured and compared with calculated contact zones. This comparison showed that a correct simulation needed not only to consider the first leading passing wheel, but the superposition of many. Taking into account the dynamic behaviour of the TGV train set and most of all the variations of the wheel profiles due to wear, simulation get much closer to the reality. Figure 7: Rolling contact zones (A) On track measurements (B) One leading wheel; (C) 28 different worn wheel profiles

5 In the following stages of the study, especially to evaluate the grinding influence on dynamic behaviour and W/R contact forces, we shall consider the average value by merging the wheel/rail contact forces calculated for 28 wear wheel profiles. Influence of the grinding (VOCOLIN simulations) Eight cases have been simulated : 1. Crossing #2513 with its own profiles and track geometry. Tip to heel circulation. a) before grinding b) after AHCC grinding 2. Crossing #2513 with #2703 profiles and #2513 track geometry. Tip to heel circulation. a) before grinding b) after AHCP grinding (#2703 profiles) 3. Crossing #2703 with its own profiles and track geometry. Heel to tip circulation. a) before grinding b) after AHCP grinding 4. Crossing #2703 with #2513 profiles and #2703 track geometry. Heel to tip circulation. a) before grinding b) after AHCC grinding (#2513 profiles) Cases #1 and #3 are representative of the field tests situation at present time. We calculated the cases #2 and #4 to clearly mark the difference between the influences of the grinding and those coming from track geometry and defects. The chosen comparison criterion is the Y/Q ratio. The Figure 8 below sketches the maximum values of Y/Q calculated on moveable frog area in cases #1 to #4. Figure 8: Comparison between Y/Q ratio maximum values Y/Q ratios increase in a important way after AHCC grinding. It is not significant with AHCP grinding. The case #4 increases over 0.8 but we have to consider that : - case #4 doesn t represent a on track case, - the calculated Y/Q signal is not 20Hz low-pass filtered as it should be in reel line tests measurements This study aimed to analyse the consequences of moveable frog grinding on the TGV train set dynamic behaviour and the W/R contact forces generated by the passing wheels. The

6 simulations sketch a Y/Q peak value during the wheel transfer inside the moveable frog, between blade and wing rail. After the validation of the model and the results offered by VOCOLIN research software, we concluded that AHCP grinding is safe in relation to dynamic behaviour and passing wheel shocks. Although the AHCC grinding gave higher Y/Q increase, we stood confident about dynamic behaviour because of the shape of the signal. Indeed, the peak generated by the wheel transfer is to fast to have any influence on the axle stability. This dynamical point of view of the moveable frogs grinding must be confirmed by the metallurgical analysis offered by observations on track. Influence of the grinding (Track observations) The track observations of the crossing and moveable frogs are based on the following parameters : - visual observations, - transversal and longitudinal profiles - surface hardness - Mauzin recordings of track geometry Visual observations on moveable frog tip Crossing #2513 measurement point P9 (3,4 m from the tip) One year after grinding, wheels still don t roll over the grinded zone Before grinding Severe head checking 29/08/ months After AHCC grinding 7.5 MGT Deep HC is not completely removed by AHCC 26/10/ months After AHCC grinding 11.2 MGT Rolling contact zone is changing but doesn t reach the remaining HC area

7 03/07/2007 One year After AHCC grinding 26.8 MGT Rolling contact zone reached the middle of the rail head and is close to the remaining HC area Crossing #2703 measurement point P8 (2,8 m from the tip) After one year in track, it seems that AHCP grinding tested on the crossing #2703 didn t move the rolling contact zone durably out of the HC area. As early as the second visit, the contact take place on the HC cracks again. 18/07/ months After AHCC grinding 4.4 MGT Deep HC is not completely removed by AHCC 29/08/ months After AHCC grinding 7.5 MGT The main HC crack keeps growing (1). Two new cracks have appeared. 26/10/ months After AHCC grinding 11.2 MGT Visual stability for the three cracks

8 Transverse profiles No abnormal wear revealed by the frog blade transverse profile measurements. Figure 9: Crossings #2513 and #2703 transverse profiles Conclusion about the moveable frog grinding This study enables the SNCF to assess the possibility of moveable frog maintenance by AHCC or AHCP grinding. INRETS has adapted its multibody research software VOCOLIN to semi-hertzian method applied with varying rail profiles. Thus it was possible to calculate and evaluate in a dynamic point of view, the grinding profiles in moveable crossings. Visual observations in track have shown that an AHCC grinding can be used on crossings with head checks. Nevertheless, this type of grinding is not applicable on new crossings because blade head geometry is excessively changed with creation of heavy load areas and stresses concentration. In this case, AHCP grindings are sufficient to avoid or delay head checks. Bainitic moving frog field tests For many years, SNCF and CORUS have been performing tests by installing in the same site new bainitic steel rails adjoining usual grade 900A. After more than 100 MGT in France and well performances on various sites worldwide, we knew the qualities of bainitic steel B320 against head checks. Wear and hardness behaviour are well known too. Figure 10: HC field tests B320 vs 900A Moreover, mechanical characteristics of the bainitic steel enable VOSSLOH COGIFER and SNCF to make two B360 bainitic moving frogs intended to field tests.

9 Figure 11: Vossloh bainitic moving frog setting up After More than 2 years field tests, the B360 bainitic moving frog is about to be validate.. Behaviour in HSL track : No rolling contact fatigue.. Weldability for aluminothermic welding : Ok, but few studies are in progress to solve little martensite problem.. Weldability for restoration of rails by electric arc welding SNCF laboratory examinations are satisfactory. Manufacturability SNCF and VOSSLOH factories tests are satisfactory.. Compatibility with track circuits SNCF examinations during field tests are satisfactory. Conclusion This project has performed few experiments in a large range of techniques from numerical dynamic simulations to hardness and rail profiles measurements in field tests. Thanks to competence of our suppliers and partner s: - INRETS for theoretical approach and numerical simulation, - CORUS for bainitic steel rail, - VOSSLOH COGIFER for switch and crossing manufacturing, - SPENO for grinding technology, - RAILTECH for aluminothermic welding experience, SNCF has been able to undertake this study which will lead soon to validate two solutions against advanced HSL crossings removals due to moveable frogs RCF. By increasing the global lifetime of these essential components of RFF high speed infrastructure, we expect to reduce the global maintenance costs of existing and future HSL. SNCF is having now a group of validated grinding profiles to improve maintenance on specific HSL crossing. On a theoretical part of this project, the RCF issue in moveable frog gave the opportunity to develop the simulation of vehicle dynamic behaviour and the associated wheel/rail contact forces, in the case of varying profile as it occurs in crossings.

10 It is a real benefit for railways dynamic software and especially infrastructure components stresses simulation to be able to take into account, beyond usual track parameters, every scale of geometry variations : - Alignments, curves and transitions - Track geometries defects - Varying transverse rail profiles or rail surface small defects This opens a wide field of investigations especially forces and stresses submitted by rails or track components in presence of surface punctual irregularities or defects. Perspectives With a similar methodology, the next step will be to experiment bainitic switch blades on high traffic classic lines. A site near PARIS is about to be chosen and the field tests with such a switch and crossing will soon start. The new capability of VOCOLIN to match in the same railways model every scale components from an entire TGV to a small rail surface defect, has still to be developed and improved but it will be useful in future studies like rail damage analysis or derailments investigations. Acknowledgements This study was mainly launched few years ago by Louis Girardi who retired last year. As the project is close to the end, we would like to thank him warmly. This kind of subject, which needs large participation and competences, couldn t be achieved without the contribution of many people in SNCF and partner enterprises. We thank all of them. References [1] M. Sebes, J.-B. Ayasse, H. Chollet, P. Pouligny, B. Pirat. Application of a semi Hertzian method to the simulation of vehicles in high speed switches INRETS (2007). [2] M. Sebes, J.-B. Ayasse. Meulage des pointes mobiles. Simulation de circulations. INRETS (2007). [3] J. PLU, J.-M. Balabaud. Approche théorique de la maintenance des profils de pointe mobiles SNCF IGEV (2007). Technical report. [4] D. Boulanger. Zones d essai de nuance de rail, CORUS (2007).

CORUS PREMIUM GRADES TO ADRESS WEAR AND ROLLING CONTACT FATIGUE. Dr Jay Jaiswal Corus Rail. Pascal Sécordel Corus Rail. Frédéric Fau Corus Rail

CORUS PREMIUM GRADES TO ADRESS WEAR AND ROLLING CONTACT FATIGUE. Dr Jay Jaiswal Corus Rail. Pascal Sécordel Corus Rail. Frédéric Fau Corus Rail 2097 words CORUS PREMIUM GRADES TO ADRESS WEAR AND ROLLING CONTACT FATIGUE Dr Jay Jaiswal Corus Rail Pascal Sécordel Corus Rail Frédéric Fau Corus Rail ABSTRACT In order to improve the wear and rolling

More information

D4.5.5 Guidelines for Management of Rail Grinding

D4.5.5 Guidelines for Management of Rail Grinding Integrated Project (IP) Thematic Priority 6: Project No. TIP5-CT-2006-031415 Sustainable Development, Global Change and Ecosystems D4.5.5 Guidelines for Management of Rail Grinding INNOTRACK GUIDELINE

More information

NBT Presentation IRITS. 18 th February 2016

NBT Presentation IRITS. 18 th February 2016 NBT Presentation IRITS 18 th February 2016 Agenda 1. Introduction / HSL Tracks context 2. NBT system presentation 3. Mock-up lab test 4. Construction process 5. Monitoring 6. Test section in Russia 7.

More information

Wheel / Rail Interaction Georg Hettasch

Wheel / Rail Interaction Georg Hettasch BACK TO THE FUTURE Biennial Symposium: 10 11 October 2012 Wheel / Rail Interaction Georg Hettasch Presentation overview Why railways work The goal The wheel / rail interaction universe Acknowledgements:

More information

Management and understanding of rolling contact fatigue

Management and understanding of rolling contact fatigue Research Brief Management and understanding of rolling contact fatigue Background Rolling contact fatigue (RCF) has been a safety concern to the railway industry for many years. The cost of managing RCF

More information

S&C Failures - root causes and way forward 1 st Dissemination Event, UIC Paris th June 2015

S&C Failures - root causes and way forward 1 st Dissemination Event, UIC Paris th June 2015 Capacity for Rail S&C Failures - root causes and way forward st Dissemination Event, UIC Paris 0- th June 205 Dr Yann Bezin Institute of Railway Research, University of Huddersfield Introduction C4R WP3

More information

AAR Track Research Program Update Report to AREMA Annual Conference Track Section October 7, 2003

AAR Track Research Program Update Report to AREMA Annual Conference Track Section October 7, 2003 AAR Track Research Program Update Report to AREMA Annual Conference Track Section October 7, 2003 - 1 Transportation Technology Center, Inc., a subsidiary of the Association of American

More information

Rail Choice, Modelling and Materials. Brian Whitney Principal - Track Engineer Network Rail 20 th November 2012

Rail Choice, Modelling and Materials. Brian Whitney Principal - Track Engineer Network Rail 20 th November 2012 Rail Choice, Modelling and Materials Brian Whitney Principal - Track Engineer Network Rail 20 th November 2012 1 Rail Loading - Surface Damage This type of damage accounts for the majority of defects we

More information

IMPROVEMENT OF ALUMINOTHERMIC WELDING CYCLE LIFE

IMPROVEMENT OF ALUMINOTHERMIC WELDING CYCLE LIFE IMPROVEMENT OF ALUMINOTHERMIC WELDING CYCLE LIFE Luke Cherviakov Managing Director Railtech Australia, Brisbane, Australia Oliver.W Dolder Managing Director Railtech Boutet, Napoleon, USA Frédéric Delcroix

More information

Eurailspeed Parallel Session D.1

Eurailspeed Parallel Session D.1 Eurailspeed Parallel Session D.1 Heinz Ossberger Head of Engineering and Design VAE Voest-Alpine 23 november 2005 Max Mustermann 1 Milano November 8, 2005 Presented by: Heinz OSSBERGER Head of Engineering

More information

Two-Material Rail Development to Prevent Rolling Contact Fatigue and to Reduce Noise Levels in Curved Rail Track

Two-Material Rail Development to Prevent Rolling Contact Fatigue and to Reduce Noise Levels in Curved Rail Track Two-Material Rail Development to Prevent Rolling Contact Fatigue and to Reduce Noise Levels in Curved Rail Track E.J.M.Hiensch a, A.Kapoor b, B.L.Josefson c, J.W.Ringsberg c, J.C.O Nielsen c and F.J.Franklin

More information

A Reliability Study of Phased Array Ultrasonic Inspections Applied to Aluminothermic Welds in Rails

A Reliability Study of Phased Array Ultrasonic Inspections Applied to Aluminothermic Welds in Rails 7 th European-American Workshop on Reliability of NDE More info about this article: http://www.ndt.net/?id=21791 A Reliability Study of Phased Array Ultrasonic Inspections Applied to Aluminothermic Welds

More information

RRB TECHNICAL EXAM PAPER. Railway Engineering

RRB TECHNICAL EXAM PAPER. Railway Engineering RRB TECHNICAL EXAM PAPER Railway Engineering 1. The bent-up length of rail used in front of nose of crossing which help in channelising the train wheels in their proper routes are known as: (a) lead rail

More information

ESTIMATION OF ROLLING CONTACT FATIGUE IN RAILWAY VEHICLES

ESTIMATION OF ROLLING CONTACT FATIGUE IN RAILWAY VEHICLES Int. J. Mech. Eng. & Rob. Res. 2014 Goutam Nayak and Piyush Verma, 2014 Research Paper ISSN 2278 0149 www.ijmerr.com Special Issue, Vol. 1, No. 1, January 2014 National Conference on Recent Advances in

More information

Fundamentals and Selected Technical Issues High Speed and Heavy Axle Railroad Engineering

Fundamentals and Selected Technical Issues High Speed and Heavy Axle Railroad Engineering Fundamentals and Selected Technical Issues High Speed and Heavy Axle Railroad Engineering Dr. Allan M Zarembski, PE Professor Director of the Railroad Engineering and Safety Program University of Delaware

More information

22/06/2012. LCC of Track. Peter Veit

22/06/2012. LCC of Track. Peter Veit 22/06/2012 LCC of Track The best track is the cheapest Peter Veit Graz, Austria University of Technology Quality Behaviour Cost Driver High Quality Strategies Investment Under Sleeper Pads Asphalt Layer

More information

International Journal of Railway Research, Vol.1, No1, pp International Journal of. Railway Research

International Journal of Railway Research, Vol.1, No1, pp International Journal of. Railway Research International Journal of Railway Research, Vol.1, No1, pp 53-60 International Journal of Railway Research Life Estimation in the Railway Wheels Under the Influence of Residual Stress Field S.M. Salehi

More information

steel transforming cities Grooved Rails for Tramways Technical Manual Edition - January 2018 ArcelorMittal Grooved Rails

steel transforming cities Grooved Rails for Tramways Technical Manual Edition - January 2018 ArcelorMittal Grooved Rails ArcelorMittal Europe Long Products Rails & Special Sections Grooved Rails for Tramways Technical Manual Edition - January 2018 steel transforming cities Tramways / Streetcars transforming tomorrow ArcelorMittal

More information

STRC 7 th Swiss Transport Research Conference. The Swiss experience on the wear of railway switches & crossings. Willem-Jan Zwanenburg, LITEP - EPFL

STRC 7 th Swiss Transport Research Conference. The Swiss experience on the wear of railway switches & crossings. Willem-Jan Zwanenburg, LITEP - EPFL The Swiss experience on the wear of railway switches & crossings Willem-Jan Zwanenburg, LITEP - EPFL Conference paper STRC 2007 STRC 7 th Swiss Transport Research Conference Monte Verità / Ascona, September

More information

Stress Analysis on Behaviour of Rails

Stress Analysis on Behaviour of Rails From the SelectedWorks of Innovative Research Publications IRP India Winter January 1, 2015 Stress Analysis on Behaviour of Rails Innovative Research Publications, IRP India, Innovative Research Publications

More information

Influence of Rail Surface Roughness Formed by Rail Grinding on Rolling Contact Fatigue

Influence of Rail Surface Roughness Formed by Rail Grinding on Rolling Contact Fatigue PAPER Influence of Rail Surface Roughness Formed by Rail Grinding on Rolling Contact Fatigue H. CHEN, Ph.D Senior Researcher, Track Dynamics Laboratory, Railway Dynamics Division M. ISHIDA General Manager,

More information

Rail Steel Metallurgy: Why Different Elements are Important and Latest Mixes

Rail Steel Metallurgy: Why Different Elements are Important and Latest Mixes Rail Steel Metallurgy: Why Different Elements are Important and Latest Mixes PWI London Technical Seminar: Rails On Our Mettle Jay Jaiswal & Adam Bevan Overview Brief history of rails Past and present

More information

Optimisation of Wheelset Maintenance using Whole System Cost Modelling

Optimisation of Wheelset Maintenance using Whole System Cost Modelling RRUKA Annual Conference, 7 November 2012 1 Optimisation of Wheelset Maintenance using Whole System Cost Modelling Adam Bevan, Institute of Railway Research, University of Huddersfield Paul Molyneux-Berry,

More information

Evaluation of rail wear characteristics on heavy haul track section using measurement data

Evaluation of rail wear characteristics on heavy haul track section using measurement data track section using measurement data Luleå Railway Research Centre Luleå, Sweden Matthias Asplund Trafikverket Luleå, Sweden Uday Kumar Luleå Railway Research Centre Luleå, Sweden SUMMARY The rail is a

More information

WA Machines The go-to provider of automated equipment for wear protection. WA IntegraTM The go-to provider of engineered wear protection solutions

WA Machines The go-to provider of automated equipment for wear protection. WA IntegraTM The go-to provider of engineered wear protection solutions Testimonials In today s world a reduction in carbon footprint requires a cost effective and sustainable transport system - weld restoration of worn Grooved Rails offers a cost effective approach for life

More information

Notch effect of welded joint

Notch effect of welded joint Notch effect of welded joint Vladimír Chmelko 1*, Matúš Margetin 1, and Michal Harakaľ 1 1 Faculty of Mechanical Engineering, Department of Applied Mechanics and Mechatronics, Námestie slobody 17, 812

More information

Technical Data Sheet: The Corrugated HC-Omega

Technical Data Sheet: The Corrugated HC-Omega Performance Structural Concrete Solutions, LLC P.O. Box 2377, Davidson, NC 28036-2377 P: 980-333-6414 info@pscs-llc.com www.pscs-llc.com Technical Data Sheet: The Omega Figure 1. Omega armor joint on grade.

More information

Rail Maintenance: Internal Defects, Surface Conditions and Maintenance Techniques. by Gordon Bachinsky

Rail Maintenance: Internal Defects, Surface Conditions and Maintenance Techniques. by Gordon Bachinsky Rail Maintenance: Internal Defects, Surface Conditions and Maintenance Techniques by Gordon Bachinsky 1 Why do we do Rail Maintenance Safety Economy Avoid Impacts of Unscheduled Repairs Squeal and corrugation

More information

Switches and Crossings

Switches and Crossings Switches and Crossings Synopsis This document sets out general requirements for the design, inspection and maintenance of switches and crossings (S&C). It also defines particular requirements for fixed

More information

Forming to Crash Simulation in Full Vehicle Models

Forming to Crash Simulation in Full Vehicle Models 4 th European LS-DYNA Users Conference Metal Forming II Forming to Crash Simulation in Full Vehicle Models Authors: Janka Cafolla, Roger W. Hall*, David P. Norman, Iain J. McGregor Corus Automotive, UK

More information

steel Grooved Rails for Tramways Technical Manual ArcelorMittal Grooved Rails ArcelorMittal Europe Long Products Rails & Special Sections

steel Grooved Rails for Tramways Technical Manual ArcelorMittal Grooved Rails ArcelorMittal Europe Long Products Rails & Special Sections ArcelorMittal Europe Long Products Rails & Special Sections Grooved Rails for Tramways Technical Manual steel transforming cities Tramways / Streetcars transforming tomorrow ArcelorMittal Grooved Rails

More information

Anti-fatigue Performance Analysis on Steel Crane Beam

Anti-fatigue Performance Analysis on Steel Crane Beam Sensors & Transducers 2013 by IFSA http://www.sensorsportal.com Anti-fatigue Performance Analysis on Steel Crane Beam Yuanmin Xie College of Machinery and Automation, Wuhan University of Science and Technology,

More information

Use of Rail Milling Technology to Extend Rail Life and Eliminate Defects. Elvis Kozica International Sales Manager Linsinger

Use of Rail Milling Technology to Extend Rail Life and Eliminate Defects. Elvis Kozica International Sales Manager Linsinger Use of Rail Milling Technology to Extend Rail Life and Eliminate Defects Elvis Kozica International Sales Manager Linsinger ALWAYS ON TOP LINSINGER Austria offers: SAWING TECHNOLOGY RAILSERVICE MILLING

More information

VIGNOLE TURNOUT SYSTEMS INNOVATIVE WEICHENSYSTEME

VIGNOLE TURNOUT SYSTEMS INNOVATIVE WEICHENSYSTEME IMG_VAE VIG_VAE _2 VIGNOLE TURNOUT SYSTEMS INNOVATIVE WEICHENSYSTEME voestalpine VAE Führend bei Weichen und Signaltechnik Efficient turnouts for standard- and non standard-gauge railways and metros voestalpine

More information

Field Investigation on Vibration Behavior of Railway Track Systems

Field Investigation on Vibration Behavior of Railway Track Systems Field Investigation on Vibration Behavior of Railway Track Systems Received: July 29 Accepted: August 21 Downloaded from ijce.iust.ac.ir at 6:32 IRDT on Sunday August 19th 218 Abstract: Investigations

More information

Björn Paulsson 1 1 UIC, Paris, France

Björn Paulsson 1 1 UIC, Paris, France INNOTRACK - Innovative Track System - A Unique Approach of Infrastructure Managers and Competitive Track Supply Industry for Developing the Innovative Products of the Future Björn Paulsson 1 1 UIC, Paris,

More information

Always ready for the track: Asset Management

Always ready for the track: Asset Management Always ready for the track: Asset Management Rail Inspection Data Processing Training and Consulting Inspections WE MAINTAIN WHAT YOU VALUE Rail defects form during manufacture and over the rail s entire

More information

Rail Maintenance. by Gordon Bachinsky

Rail Maintenance. by Gordon Bachinsky Rail Maintenance by Gordon Bachinsky 1 Why we do Rail Maintenance Safety Economy Avoid Impacts of Unscheduled Repairs Squeal and corrugation noise Ride quality 2 If Mother Nature is your Track Maintenance

More information

System DFF 21. Highly elastic rail fastening for conventional rail and metro the optimum single support point for slab track

System DFF 21. Highly elastic rail fastening for conventional rail and metro the optimum single support point for slab track System DFF 21 Highly elastic rail fastening for conventional rail and metro the optimum single support point for slab track System DFF 21 Highly elastic rail fastening for conventional rail and metro the

More information

EXPERIMENTAL REFERENCE DATABASE OF MECHANICAL DAMAGE DEFECTS FOR DEVELOPING AND VALIDATING DEFECT ASSESSMENT MODELS

EXPERIMENTAL REFERENCE DATABASE OF MECHANICAL DAMAGE DEFECTS FOR DEVELOPING AND VALIDATING DEFECT ASSESSMENT MODELS EXPERIMENTAL REFERENCE DATABASE OF MECHANICAL DAMAGE DEFECTS FOR DEVELOPING AND VALIDATING DEFECT ASSESSMENT MODELS M. ZAREA, R. BATISSE, P. CARDIN GDFSUEZ, France B. LEIS - Battelle Institute Columbus,

More information

HC-Omega (Sinus Slide ) armour joints

HC-Omega (Sinus Slide ) armour joints HENGELHOEF CONCRETE JOINTS A new era in industrial flooring technology () armour joints Technical sheet Technical sheet joint page. 1 of 18 Table of Contents: Description... 3 Characteristics... 4 Product

More information

Railway interoperability. Academic perspective

Railway interoperability. Academic perspective Railway interoperability. Academic perspective Ernesto García Vadillo (Prof) Department of Mechanical Engineering University of The Basque Country (UPV/EHU) Brussels, 7th May 2013 1 Contents 1. Directive

More information

4.3 Residual Strength Capability

4.3 Residual Strength Capability 4.3 Residual Strength Capability To establish the residual strength capability of a given structure under certain loading conditions, prediction techniques must be developed with a thorough understanding

More information

Analysis of Failures within Switches and Crossings using Failure Modes and Effects Analysis Methodology

Analysis of Failures within Switches and Crossings using Failure Modes and Effects Analysis Methodology DESTination RAIL Decision Support Tool for Rail Infrastructure EU Project No. 636285 Analysis of Failures within Switches and Crossings using Failure Modes and Effects Analysis Methodology Elias Kassa

More information

Arch. Metall. Mater., Vol. 61 (2016), No 4, p

Arch. Metall. Mater., Vol. 61 (2016), No 4, p Arch. Metall. Mater., Vol. 61 (2016), No 4, p. 1833 1838 DOI: 10.1515/amm-2016-0296 T. Giętka*,#, K. Ciechacki** Modeling of railway wheels made of austempered ductile iron A person is forced to travel

More information

Rail Repair using Wire Feed Welding

Rail Repair using Wire Feed Welding Civil Engineering 1 Introduction RTS 3733, 16 January 2009 This standard establishes requirements for the repair of rail and crossings by qualified persons using approved wirefeed welding processes. Wire

More information

Influence of corrosion on the behaviour of wheelsets in service

Influence of corrosion on the behaviour of wheelsets in service Influence of corrosion on the behaviour of wheelsets in service P. FERAUD 1, J. J. VIET 2, M. DIENER 3, M. GRAB 4, 1 SNCF: Agence d Essai Ferroviaire 21, avenue Salvador Allende - F - 94407 Vitry-sur-Seine

More information

Developments in Rail Welding London Underground Marc Clarke Technical Lead for Rail Welding

Developments in Rail Welding London Underground Marc Clarke Technical Lead for Rail Welding Developments in Rail Welding London Underground Marc Clarke Technical Lead for Rail Welding The past The present The future Introduction We are welding track more than ever before. We have improved on

More information

1.15 Chemical Tanker Longitudinal corrugated bulkhead (vertical type).

1.15 Chemical Tanker Longitudinal corrugated bulkhead (vertical type). Table A.1 corrugated bulkhead s Case Ship Type Damage Location 1.1 Chemical Tanker Longitudinal corrugated bulkheads (horizontal type) in way of mid cargo area. 1.2 Product Tanker Transverse corrugated

More information

A tool to estimate the wheel/rail contact and temperature rising under dry, wet and oily conditions

A tool to estimate the wheel/rail contact and temperature rising under dry, wet and oily conditions Computers in Railways XIV 191 A tool to estimate the wheel/rail contact and temperature rising under dry, wet and oily conditions K. D. Vo 1,2, A. K. Tieu 1,2, H. T. Zhu 1,2 & P. B. Kosasih 1 1 Faculty

More information

Content. perform. Brief profile. Product information for high-strength thermomechanically hot-rolled strip and cut-to-length plate

Content. perform. Brief profile. Product information for high-strength thermomechanically hot-rolled strip and cut-to-length plate Steel perform Product information for high-strength thermomechanically hot-rolled strip and cut-to-length plate Issue: January 22, 2019, version 0 / WB 660 Brief profile Outstanding surface quality Bending

More information

Industeel Industeel, the right steel Creusabro at the right place Unique, Best, Proven

Industeel Industeel, the right steel Creusabro at the right place Unique, Best, Proven Industeel Industeel, Creusabro the right steel at Unique, the right Best, place Proven A complete range to meet any situation Creusabro is a complete range of advanced abrasion resistant steel plates bringing

More information

EN 14363:2016 A new and feasible way of homologating vehicles from a running dynamics point of view

EN 14363:2016 A new and feasible way of homologating vehicles from a running dynamics point of view EN 14363:2016 A new and feasible way of homologating vehicles from a running dynamics point of view - Mikael Wrang Presentation for the 19th Nordic Seminar on Railway Technology 14 September 2016 EN 14363

More information

THREE-DIMENSIONAL FINITE ELEMENT SIMULATION OF RESIDUAL STRESSES IN UIC60 RAILS DURING THE QUENCHING PROCESS

THREE-DIMENSIONAL FINITE ELEMENT SIMULATION OF RESIDUAL STRESSES IN UIC60 RAILS DURING THE QUENCHING PROCESS THERMAL SCIENCE: Year 217, Vol. 21, No., pp. 11-17 11 THREE-DIMENSIONAL FINITE ELEMENT SIMULATION OF RESIDUAL STRESSES IN UIC6 RAILS DURING THE QUENCHING PROCESS by Reza MASOUDI NEJAD, Mahmoud SHARIATI

More information

Vehicle Track Interaction Strategic Model (VTISM) Overview for ICRI Project (Apr-2016)

Vehicle Track Interaction Strategic Model (VTISM) Overview for ICRI Project (Apr-2016) V/T SIC Vehicle / Track System Interface Committee Vehicle Track Interaction Strategic Model (VTISM) Overview for ICRI Project (Apr-2016) Andy Rhodes, Serco Adam Bevan, University of Huddersfield Overview

More information

Active crack control in continuously reinforced concrete pavements (CRCP)

Active crack control in continuously reinforced concrete pavements (CRCP) fib_symposium_2017, 245, v2 (final): Active crack control in continuously reinforced co... 1 Active crack control in continuously reinforced concrete pavements (CRCP) Pieter De Winne 1, Hans De Backer

More information

TUBE CRACK DETECTION BY AE MONITORING OF DEEP DRAWING OPERATIONS IN THE AUTOMOTIVE INDUSTRY B. Bisiaux, T. Wartel 1, A. Proust. D.

TUBE CRACK DETECTION BY AE MONITORING OF DEEP DRAWING OPERATIONS IN THE AUTOMOTIVE INDUSTRY B. Bisiaux, T. Wartel 1, A. Proust. D. TUBE CRACK DETECTION BY AE MONITORING OF DEEP DRAWING OPERATIONS IN THE AUTOMOTIVE INDUSTRY B. Bisiaux, T. Wartel 1, A. Proust. D. Marlot 2 1 Vallourec-CEV, Aulnoye-Aymeries, France; 2 EuroPhysicalAcoustics,

More information

Gridin's Group certificates INSPECTION AND MAINTENANCE OF WIND GENERATORS

Gridin's Group certificates INSPECTION AND MAINTENANCE OF WIND GENERATORS Gridin's Group certificates INSPECTION AND MAINTENANCE ONSHORE / OFFSHORE Wind power engineering is a rapidly developing branch in the field of electric energy production. Wind power turbines are constantly

More information

EDDY CURRENT & RAIL MILLING 1 NEW TOOLS IN THE RAIL MANAGEMENT ENGINEER S BOX

EDDY CURRENT & RAIL MILLING 1 NEW TOOLS IN THE RAIL MANAGEMENT ENGINEER S BOX EDDY CURRENT & RAIL MILLING 1 NEW TOOLS IN THE RAIL MANAGEMENT ENGINEER S BOX Sorin L Castravete Senior Asset Engineer (Support) [Track] Route London North East, Network Rail, United Kingdom 1 Network

More information

Use of Railway Track Vibration Behaviour for Design and Maintenance

Use of Railway Track Vibration Behaviour for Design and Maintenance Use of Railway Track Vibration Behaviour for Design and Maintenance Coenraad ESVELD Professor of Railway Engineering Delft University of Technology Delft, the Netherlands Amy DE MAN System Development

More information

Rail System and Turnout Services

Rail System and Turnout Services Rail System and Turnout Services Inspection and testing Diagnostics Maintenance Asset management Delivery of standard Vignole-rail turnout Asset management Rails and turnouts in the best possible condition

More information

A Reliability Study of Phased Array Ultrasonic Inspections Applied to Aluminothermic Welds in Rails

A Reliability Study of Phased Array Ultrasonic Inspections Applied to Aluminothermic Welds in Rails ESIS TC24 Workshop: Integrity of Railway Structures A Reliability Study of Phased Array Ultrasonic Inspections Applied to Aluminothermic Welds in Rails Andrea GIANNEO 1, Michele CARBONI 2 1 Politecnico

More information

Railway Bridge to EUROCODE. Presenter: Robert Salca technical support engineer, Midas UK

Railway Bridge to EUROCODE. Presenter: Robert Salca technical support engineer, Midas UK Railway Bridge to EUROCODE Presenter: Robert Salca technical support engineer, Midas UK In order to make sure that the sound system is working well a poll will appear shortly on your screens. Please vote

More information

WHEEL TRUCKING TEST FOR WELD OF U-SHAPED RIB AND DECK PLATE IN THE ORTHOTROPIC STEEL DECK. Susumu Inokuchi 1

WHEEL TRUCKING TEST FOR WELD OF U-SHAPED RIB AND DECK PLATE IN THE ORTHOTROPIC STEEL DECK. Susumu Inokuchi 1 Abstract WHEEL TRUCKING TEST FOR WELD OF U-SHAPED RIB AND DECK PLATE IN THE ORTHOTROPIC STEEL DECK Susumu Inokuchi 1 Recently, many fatigue problems around the weld of U-shaped rib and deck plate in orthotropic

More information

NUMERICAL MODELLING OF REINFORCEMENT OF CONCRETE COLUMNS BY JACKETING

NUMERICAL MODELLING OF REINFORCEMENT OF CONCRETE COLUMNS BY JACKETING NUMERICAL MODELLING OF REINFORCEMENT OF CONCRETE COLUMNS BY JACKETING João Duarte Sénica Caeiro Department of Civil Engineering, Architecture and Earth Resources, IST, University of Lisbon 1 INTRODUCTION

More information

The Effects of Top of Rail Materials on Head Hardened Rail with the Practice of Rail Grinding

The Effects of Top of Rail Materials on Head Hardened Rail with the Practice of Rail Grinding 1 Nick Dryer Mark Richards BNSF EVRAZ The Effects of Top of Rail Materials on Head Hardened Rail with the Practice of Rail Grinding There have been studies of the current effects of top of rail materials

More information

CARBON STEEL BARS HOT ROLLED

CARBON STEEL BARS HOT ROLLED CARBON STEEL BARS HOT ROLLED Grade Description...3-2 Rounds...3-3 thru 3-4 Strip...3-5 Flats (A-36)...3-6 thru 3-8 (M1044)...3-9 Squares...3-9 Reinforcing Bars...3-10 Reinforcing Mesh...3-10 TOLERANCES...3-11

More information

Innovation Programme 3:

Innovation Programme 3: Innovation Programme 3: COST EFFICIENT - HIGH CAPACITY INFRASTRUCTURE Shift2Rail - Entreprise commune européenne Appels à propositions 2018 Immeuble LUMIERE - 40 avenue des Terroirs de France - 75012 PARIS

More information

The impact of the rail welds geometry on the noise in urban zones

The impact of the rail welds geometry on the noise in urban zones Urban Transport XII: Urban Transport and the Environment in the 21st Century 643 The impact of the rail welds geometry on the noise in urban zones S. Lakusic University of Zagreb, Faculty of Civil Engineering,

More information

THE WORK ROLL SURFACE DAMAGING STUDY: A KEY FACTOR IN USING HSS ALLOYS IN HOT ROLLING

THE WORK ROLL SURFACE DAMAGING STUDY: A KEY FACTOR IN USING HSS ALLOYS IN HOT ROLLING THE WORK ROLL SURFACE DAMAGING STUDY: A KEY FACTOR IN USING HSS ALLOYS IN HOT ROLLING (1a) Alberto Tremea (2a) Massimo Grespi (1b) Andres Esteban Walter Martinez (2b) ABSTRACT In many hot strip mills the

More information

Structural behaviour and failure mechanisms of concrete monoblock railway sleepers

Structural behaviour and failure mechanisms of concrete monoblock railway sleepers Structural behaviour and failure mechanisms of concrete monoblock railway sleepers Olli Kerokoski, Antti Nurmikolu and Tommi Rantala Department of Civil Engineering, Tampere University of Technology, P.O.

More information

High strength low alloy (HSLA) steels for cold forming

High strength low alloy (HSLA) steels for cold forming Automotive Worldwide High strength low alloy (HSLA) steels for cold forming Extract from the product catalogue -European edition Note: Information contained in this catalogue is subject to change. Please

More information

Tools and Techniques for Data Driven Track Maintenance

Tools and Techniques for Data Driven Track Maintenance Tools and Techniques for Data Driven Track Maintenance Julian Stow Institute of Railway Research Graham Shields, Paul Gitsham Omnicom Engineering Overview Introduction Big data Data driven maintenance

More information

Development of bimodal grain structures in microalloyed steels:

Development of bimodal grain structures in microalloyed steels: Development of bimodal grain structures in microalloyed steels: Niobium and titanium are added to high strength low alloy (HSLA) steels to provide grain boundary pinning precipitates to help produce the

More information

Railway Track Stress-Strain State Control the Missing Link in the Railroad Traffic Safety

Railway Track Stress-Strain State Control the Missing Link in the Railroad Traffic Safety 19 th World Conference on Non-Destructive Testing 2016 Railway Track Stress-Strain State Control the Missing Link in the Railroad Traffic Safety Anatolii DUBOV 1, Aleksandr DUBOV 1 1 Energodiagnostika

More information

STRAIL - installation instructions. Subject to technical changes / December STRAIL level crossing systems & STRAILastic track damping systems

STRAIL - installation instructions. Subject to technical changes / December STRAIL level crossing systems & STRAILastic track damping systems STRAIL - installation instructions Subject to technical changes / December 2009 STRAIL level crossing systems & STRAILastic track damping systems Gummiwerk KRAIBURG Elastik Gmbh / D-85429 Tittmoning Goellstrasse

More information

Concrete Tie Insulator Performance

Concrete Tie Insulator Performance Concrete Tie Insulator Performance Eric Gehringer Director of Track Maintenance AREMA 213 983 Agenda Concrete tie strategy Objectives of research Histogram of insulator design Terminology Failure mechanisms

More information

The Ballastless Track Technology For China High Speed Line

The Ballastless Track Technology For China High Speed Line The Ballastless Track Technology For China High Speed Line Jijun Wang Senior Researcher, CARS May 4 th 2011 1 Contents 1. Application of Ballastless Track in China 2. Technical Features of Ballastless

More information

Abstract. 1.0 Introduction

Abstract. 1.0 Introduction Effects of Reeling on the Mechanical Properties of HFI Welded Pipes Dr. Scott McCann, David Evans and Adam Bannister, Corus Tubes, UK and Dr Hock Tan, Subsea 7 Abstract In the offshore oil and gas industry

More information

Load transfer at joints for industrial floors. Where do we come from?

Load transfer at joints for industrial floors. Where do we come from? Load transfer at joints for industrial floors Where do we come from? Traditional load transfer calculations have been based on bending and shear of steel bars or plates connecting adjacent concrete panels

More information

Evaluating and Modelling the Effect of Carbon Fiber Grid Reinforcement in a Model Asphalt Pavement

Evaluating and Modelling the Effect of Carbon Fiber Grid Reinforcement in a Model Asphalt Pavement Fourth International Conference on FRP Composites in Civil Engineering (CICE2008) 22-24July 2008, Zurich, Switzerland Evaluating and Modelling the Effect of Carbon Fiber Grid Reinforcement in a Model Asphalt

More information

Virtual testing environment tools for railway vehicle certification

Virtual testing environment tools for railway vehicle certification Virtual testing environment tools for railway vehicle certification Y Bezin, C Funfschilling, S Kraft, Mazzola L University of Huddersfield, Institute of Railway Research, Huddersfield, HD1 3DH, UK SNCF,

More information

Best Practices for Concrete Sidewalk Construction

Best Practices for Concrete Sidewalk Construction Construction Technology Update No. 54 Best Practices for Concrete Sidewalk Construction by Balvant Rajani Concrete sidewalks often fail prematurely. This Update describes practices that will help ensure

More information

URBAN TRACK Final Conference Alternative to Floating Track Slab High Attenuation Sleeper. Presented by Ian Robertson, ALSTOM 24 June 2010, Prague

URBAN TRACK Final Conference Alternative to Floating Track Slab High Attenuation Sleeper. Presented by Ian Robertson, ALSTOM 24 June 2010, Prague URBAN TRACK Final Conference Alternative to Floating Track Slab High Attenuation Sleeper Presented by Ian Robertson, ALSTOM 24 June 2010, Prague Contents Specific objectives of study Chosen concept Detailed

More information

IMPACT TEST OF SURFACE ANTONÍN KŘÍŽ, PETR BENEŠ, JIŘÍ ŠIMEČEK

IMPACT TEST OF SURFACE ANTONÍN KŘÍŽ, PETR BENEŠ, JIŘÍ ŠIMEČEK IMPACT TEST OF SURFACE ANTONÍN KŘÍŽ, PETR BENEŠ, JIŘÍ ŠIMEČEK Research Centre of Rail Vehicles, University of West Bohemia, Faculty of Mechanical Engineering Czech Republic The components in many industrial

More information

HORIZONTAL SPLIT-WEB FRACTURES OF FLASH BUTT WELDED RAILS

HORIZONTAL SPLIT-WEB FRACTURES OF FLASH BUTT WELDED RAILS HORIZONTAL SPLIT-WEB FRACTURES OF FLASH BUTT WELDED RAILS Hassan FARHANGI and Seyed Mostafa MOUSAVIZADEH School of Metallurgy and Materials Engineering, Faculty of Engineering, University of Tehran, Tehran,

More information

Durability Load Data Analysis. Unrestricted Siemens AG 2018

Durability Load Data Analysis. Unrestricted Siemens AG 2018 Durability Load Data Analysis Page 2 Page 3 Page 4 Input source-2: Simulation Input source-1: Test Durability Load Data Analysis Tasks Roads Measure Roads/Office Validate Analysis Office Report & share

More information

Grooved rail. Keeping cities on the move

Grooved rail. Keeping cities on the move Grooved rail Keeping cities on the move Grooved rail for wear-resistant operation and easy maintenance We have extensive experience in the manufacture of grooved rail sections for the growing urban mass

More information

LONGITUDINAL SURFACE CRACKING IN ASPHALT PAVEMENTS ON STEEL BRIDGE DECKS

LONGITUDINAL SURFACE CRACKING IN ASPHALT PAVEMENTS ON STEEL BRIDGE DECKS LONGITUDINAL SURFACE CRACKING IN ASPHALT PAVEMENTS ON STEEL BRIDGE DECKS Tatsuo Nishizawa 1, Kenji Himeno 2, Kitaro Uchida 3, Kenichiro Nomura 4 and Sigeo Higashi 5 (1) Ishikawa National College of Technology,

More information

Capacity for Rail. C4R Workshop on Dissemination Paris Dr Björn PAULSSON Trafikverket, Sweden

Capacity for Rail. C4R Workshop on Dissemination Paris Dr Björn PAULSSON Trafikverket, Sweden Capacity for Rail C4R Workshop on Dissemination Paris 205-06-0-- Dr Björn PAULSSON Trafikverket, Sweden Contents of presentation Contents Background and idea Objectives Traffic situations Infrastructure

More information

REVENUE SERVICE EVALUATION OF ADVANCED DESIGN INSULATED JOINTS

REVENUE SERVICE EVALUATION OF ADVANCED DESIGN INSULATED JOINTS REVENUE SERVICE EVALUATION OF ADVANCED DESIGN INSULATED JOINTS Muhammad Akhtar, Transportation Technology Center, Inc. David Davis, Transportation Technology Center, Inc. Tom O Connor, BNSF Railway Company

More information

Relia. Industeel. Relia : Quality Wear Resistant Plates PROPERTIES STANDARDS TECHNICAL CHARACTERISTICS

Relia. Industeel. Relia : Quality Wear Resistant Plates PROPERTIES STANDARDS TECHNICAL CHARACTERISTICS Industeel Relia Relia: Quality Wear Resistant Plates Relia is a range of high hardness, conventional low-alloyed martensitic steels, which obtain their hardness through intense water quenching during plate

More information

Dynamic response of bridges on very high speed lines Madrid 21 September 2017

Dynamic response of bridges on very high speed lines Madrid 21 September 2017 Capacity for Rail Dynamic response of bridges on very high speed lines Madrid 21 September 2017 Raid KAROUMI KTH Royal Inst. of Technology Contents Introduction Analysis of dynamic effects from HST on

More information

Introduction

Introduction www.bowersjones.co.uk Introduction Background Founded in 1954 by Mr. Arthur Bowers and Mr. Doug Jones in Wednesfield, Wolverhampton, UK. Making high precision forming rolls for tube, section and copper

More information

Aluminothermic Welder RT3 to TW3 - Conversion. Convert RT3 Welder to TW3 Welder. Course Type. Face to Face

Aluminothermic Welder RT3 to TW3 - Conversion. Convert RT3 Welder to TW3 Welder. Course Type. Face to Face Aluminothermic Welder RT3 to TW3 - Conversion Convert RT3 Welder to TW3 Welder. Aluminothermic welder - RT5 head wash repair - Initial RT5 head wash repair - Initial. Aluminothermic Welder TW4 - Initial

More information

TWO-MATERIAL RAIL DEVELOPMENT: FIELD TEST RESULTS REGARDING ROLLING CONTACT FATIGUE AND SQUEAL NOISE BEHAVIOUR

TWO-MATERIAL RAIL DEVELOPMENT: FIELD TEST RESULTS REGARDING ROLLING CONTACT FATIGUE AND SQUEAL NOISE BEHAVIOUR 6th International Conference on Contact Mechanics and Wear of Rail/Wheel Systems (CM2003) in Gothenburg, Sweden June 10 13, 2003 TWO-MATERIAL RAIL DEVELOPMENT: FIELD TEST RESULTS REGARDING ROLLING CONTACT

More information

2. WHY SPECIFY A PAVEMENT IN CONCRETE OR IN CONTINUOUS REINFORCED CONCRETE?

2. WHY SPECIFY A PAVEMENT IN CONCRETE OR IN CONTINUOUS REINFORCED CONCRETE? ROUNDABOUTS IN CONTINUOUSLY REINFORCED CONCRETE DESIGN CONSTRUCTION R. Debroux and R. Dumont Service Public de Wallonie, Belgium raymond.debroux@spw.wallonie.be C. Ployaert FEBELCEM, Belgium c.ployaert@febelcem.be

More information

European Rail Research Advisory Council

European Rail Research Advisory Council MARKET IMPACT EVALUATION ERRAC was set up in 2001 and is the single European body with the competence and capability to help revitalise the European rail sector : To make it more competitive To foster

More information

Trackway Guidelines for Streetcar and Light Rail Circulator Systems Infrastructure 12th National Light Rail Conference

Trackway Guidelines for Streetcar and Light Rail Circulator Systems Infrastructure 12th National Light Rail Conference Trackway Guidelines for Streetcar and Light Rail Circulator Systems Infrastructure 12th National Light Rail Conference Sustaining the Metropolis: LRT & Streetcars for Super Cities Session: Growing Streetcar

More information

& STRUCTURES TECHNICAL SESSION T6

& STRUCTURES TECHNICAL SESSION T6 PROCEEDINGS 10 th International Heavy Haul Association Conference "Capacity Building through Heavy Haul Operation" TRACK & STRUCTURES TECHNICAL SESSION T6 Rail Welding (Rail Joining) Optimization of Thermit

More information