Drum-Buffer-Rope Scheduling

Size: px
Start display at page:

Download "Drum-Buffer-Rope Scheduling"

Transcription

1 Using Drum-Buffer-Rope Scheduling Rather Than Just-In-Time Production B Y P ATRICIA H UFF, CPA, P H.D. 36 WINTER 2001

2 Management accountants are familiar with the use of Just-In-Time (JIT) purchasing and production to reduce the raw materials and finished goods inventory that a company maintains. The premise behind JIT is that it produces a product only when one is ordered by a customer. JIT purchasing works well to reduce raw materials. However,to implement JIT production effectively,a series of changes needs to be made to the production process. If these changes are not made,production will build high levels of work-in-process (WIP) inventory,which costs the company money. Another system,drum-buffer-rope (DBR) scheduling,solves this problem by working with the existing production system instead of trying to make complicated changes. The techniques used in DBR eliminate the buildup of WIP by controlling the release of raw materials,or jobs,into the system,based on the capacity of a system constraint. J UST-IN-TIME S YSTEMS JIT purchasing is the purchase of goods or materials such that a delivery immediately precedes demand or use. 1 This calls for a major change in procurement activities. Instead of just purchasing materials from the lowest bidder,companies must begin to develop long-term relationships with a smaller number of suppliers. These agreements need to include provisions for a stated level of quality in the delivered products,rapid responses to changes in scheduled production,and frequent deliveries of smaller quantities of material. JIT production uses a demand-pull system, which is effective at reducing the amount of finished goods inventory. In this system, production and demand are synchronized because production does not start until an order is received. 2 JIT strives to reduce the throughput time the total time from the start of production until the product is ready to sell. To achieve this,jit requires a series of changes to the production system. First is an increase in quality,which includes the quality of raw materials used and the production process itself. Higher quality reduces the time and money wasted on production of defective units. The second change is a reduction in setup times. When less time is spent waiting for a machine to be set up,production is quicker. This also saves money on the holding costs of inventory and allows for products to be sold more rapidly. The third change is a balanced flow rate. The most difficult to implement,this requires each workstation or cell within the manufacturing process to have the same process time and capacity. If this change is not made,work-in-process inventory will increase. The fourth change is to improve the factory layout. Machines and processes are relocated so the product will not have to be physically moved from one part of the factory to the other during production. These changes allow the products to flow more smoothly along the production line. The final step is to design performance measurements and reward systems that encourage throughput. Eliminate or reduce rewards that discourage production of unnecessary inventory. 3 T HE T HEORY OF C ONSTRAINTS The theory of constraints (TOC) is a production management method that identifies and manages constraints within the production process. A constraint is anything that limits a system from achieving higher performance relative to its goal. 4 Without any constraints,a system can produce and sell an unlimited amount of output. A constraint,or bottleneck,can be internal to the compa- MANAGEMENT accounting quarterly 37

3 ny,such as a machine with limited capacity,or it can be external,such as a market limit that would restrict total sales. There are three principles for production under TOC: increase throughput,decrease operating expenses,and decrease inventory. 5 In TOC, throughput is defined as the rate at which an organization generates money through sales. 6 Operating expenses include all production costs required to produce throughput,except for direct material. Inventories include all money invested to purchase things intended to be sold. In TOC,inventories are liabilities to the company because they contain an investment of funds,but they do not produce throughput. TOC is built upon the idea that the goal of any company is to make money. Money is generated through the sale of products and services,not by building inventories even though a certain amount of inventory may be needed to meet current customer needs. 7 D RUM-BUFFER-ROPE S CHEDULING I m a Believer DBR scheduling is based on TOC methods. It recognizes that most companies operate with at least one constraint. It also considers that it is not always possible to balance the workstations so that they have the same capacity and process time. In DBR scheduling,jit purchasing can be used to reduce raw material inventories. Some of the changes required for JIT processing can also be used in DBR. Increase in quality,reduction of setup times,factory layout improvements,and new performance measurement systems support Drum-Buffer- Rope scheduling. The drum,in Drum-Buffer-Rope,is the constraint. The nonconstrained resources should be scheduled to serve the constrained resource. 8 The buffer is a time buffer used to protect the drum from disruptions in the preceding production steps. Disruptions can be caused by breakdowns,longerthan-normal setup times,vendors who do not deliver raw materials on time,and so forth. Some companies also use a shipping buffer to aid on-time deliveries. The rope is a schedule that dictates the timing of the release of raw materials,or jobs,into the system. This schedule is designed to make all the workstations perform at the pace of the drum. 9 As most management accountants and financial managers know, Dr. Eliyahu M. Goldratt is considered the inventor of constraint management. He described it and the theory of constraints logistics in his book, The Goal. From those ideas, the manual scheduling technique Drum-Buffer-Rope (DBR) evolved, which he and Bob Fox described in their book, The Race. Constraint management originated as a way of managing manufacturing environments where the ultimate goal is to maximize company profits. This goal is accomplished by maximizing throughput, minimizing inventory, and minimizing operating expenses. In the language of constraint management, according to Pinnacle Manufacturing Consulting, the constraining elements that determine the output of the system are often called drums because they determine the pace or drumbeat of the manufacturing operation. DBR comes from this analogy. I learned about Drum-Buffer-Rope when I took an information class from the California Technology Center, a state-funded consulting organization designed to assist small to mediumsized California manufacturers. I was intrigued by the effect on inventory that this scheduling technique could make. We played two production simulation games that very clearly demonstrated the difference in the buildup of work-in-process (WIP) inventory when using DBR as compared to regular production. I teach TOC and JIT in my cost and managerial accounting classes, and I started seeing a weakness in JIT production the buildup of WIP inventory. One day I realized that DBR could be used to solve this problem. Now I m a firm believer. According to the Avraham Y. Goldratt Institute, several companies boast DBR success stories. Bal Seal Engineering used DBR to increase output by more than 50%, reduce inventories by 50%, improve due date performance to 97%, reduce operating expense, and double net profits. Boeing s printed circuit board manufacturing operation experienced a 75% reduction in lead times and more than 100% increase in throughput. Rockland Manufacturing realized increased throughput, reduced WIP inventory, and experienced a nearly 100% on-time shipment rate after implementing DBR. For more information about DBR, go to or another search engine site, and do a search on Drum-Buffer- Rope. 38 WINTER 2001

4 Figure 1: Drum-Buffer-Rope Time Relationships TIME AT WHICH THE JOB IS RELEASED TO THE SHOP FLOOR TIME AT WHICH THE JOB IS SCHEDULED TO BEGIN PROCESSING AT THE BOTTLENECK CONSTRAINT DUE DATE PROTECTIVE BUFFER SHIPPER BUFFER PROCESSING TIME (INCLUDING SETUPS) FOR WORK CENTERS IN FRONT OF THE BOTTLENECK CONSTRAINT PROCESSING TIME (INCLUDING SETUPS) FOR THE BOTTLENECK CONSTRAINT AND SUBSEQUENT WORK CENTERS In a process costing operation,dbr scheduling involves several steps. First,the constrained task in the assembly line is identified. Then a buffer size is determined that will ensure the constrained task is kept busy at all times. This can also include the determination of the shipping buffer size. The buffer size reflects the amount of the fluctuations and the capacity level at nonconstraint resources. The capacity level is crucial because it determines the time needed for a nonconstraint resource to catch up after a disruption. 10 Next,the schedule of raw material release is established by working backward from the due date of the job. Figure 1 presents a visual example of the DBR time relationships. 11 For a job in a job order shop to be completed,it may be necessary for it to be processed through a particular department more than once. DBR first identifies the constrained department. The buffer is set,for example,at five tasks (or visits to the constrained department). When a new job is received that requires processing through the constrained department,a check is made to see how many jobs and tasks already in the system will be passing through the constrained department. If the buffer is already full,meaning the existing jobs require five visits to the constrained department, the new job will not be released until one of the other jobs is completed. This type of scheduling keeps the constrained department constantly working,and the amount of work-in-process inventory is reduced. A DBR EXAMPLE DBR scheduling can be used by service companies as well as manufacturing companies. Consider the hypothetical example of the processing steps required for standard blood and x-ray testing for preoperative patients at the Master Surgery Center (MSC). Each patient scheduled for surgery must report for blood testing and x-rays two days before their scheduled surgery date. At present,msc does not make appointments for the preoperative tests. The processing of patients has four separate stations: administrative intake,where forms are completed and insurance information is taken; the blood lab, where blood is drawn; x-ray,where a chest x-ray is taken; and administrative discharge,where each patient is given complete instructions for his/her scheduled surgery. An examination by the MSC management indicated that the bottleneck,or constrained resource,is x-ray. MSC has only one x-ray room available. In order to keep the station working at all times,a buffer of three patients was established for the x-ray waiting room. This buffer size was based on past MANAGEMENT accounting quarterly 39

5 experience with the unexpected variations that can occur in processing times of the other two departments. Variations can occur because of patient delays or employees who miss work for illness and other reasons. Under DBR scheduling,when a patient arrives at administrative intake,a check of the x-ray buffer is made. If there are already three patients in the x-ray waiting room,no new patient is taken into administrative intake. A new patient is taken into administrative intake only when the buffer falls below three patients. This system avoids a backlog of angry patients in the x-ray waiting room. MSC has found that waiting patients are less disruptive in administrative intake than in front of the bottleneck x-ray station. Over a period of time,msc could use its experience with DBR to make appointments for the preoperative tests. A COMPARISON OF JIT PRODUCTION AND DBR SCHEDULING According to P.C. Cook,there are two major differences between JIT and DBR methods. 12 First,JIT requires the plant to be balanced so each task has the same output level. On the other hand,dbr uses a buffer in front of the constrained resource to reduce the buildup of unnecessary WIP inventory and allow for a continuous flow of products through the system. Second,because of the balanced plant,jit creates transfer batches of equal size. DBR allows different sized batches,making it better suited for use in a job order shop that takes custom orders of differing sizes. There are several studies that compare the performance of JIT and DBR. D.W. Fogarty,J.H. Blackstone,and T. R. Hoffman found that TOC processing,using DBR scheduling, gives superior performance with less effort. 13 DBR produced approximately 2% more units of output than the JIT production. In a simulation study by Cook,DBR and JIT performed better than traditional processing. However, DBR outperformed JIT in a number of categories. 14 DBR required less inventory,which led to reduced manufacturing costs,better responsiveness to customer requirements,and the opportunity for better product quality. DBR also produced more product with a lower standard deviation of flow time. Cook defined this benefit as better due-date performance. Such performance resulted because it was easier to determine when the product would be ready for shipment. 15 Based on the information presented,it appears that DBR scheduling can achieve a higher level of performance. Because it doesn t require a balanced set of production tasks,dbr lends itself to a larger number of processing situations. As in the case of a job order shop,dbr can be used in situations that allow for different sizes of batches to be processed. The evidence also indicates that DBR scheduling results in lower WIP inventories,which leads to lower investment in manufacturing costs. Compared to JIT,Drum-Buffer-Rope scheduling is clearly the superior production method. Patricia Lee Huff, CPA, Ph.D., is associate professor in the department of accountancy at California State University, Fresno, in Fresno, Calif. You can reach her at (559) or patricia@csufresno.edu. 1 C. T. Horngren,G. Foster,and S. M. Datar,Cost Accounting: A Managerial Emphasis,10th edition,prentice Hall,Inc., Upper Saddle River,N.J.,2000,p J. Zimmerman, Accounting for Decision Making and Control, 3rd edition,irwin McGraw-Hill,New York,2000,p Zimmerman,2000,p E. Schragenheim,and B. Ronen, Drum-Buffer-Rope Shop Floor Control, Production and Inventory Management Journal,Third Quarter,1990,p E. Goldratt and J. Cox, The Goal: A Process of Ongoing Improvement,2nd revised edition,north River Press,Croton-on-Hudson,N.Y.,1992,p S. Jayson, Goldratt & Fox: Revolutionizing the Factory Floor, Management Accounting,May 1987,p E. Noreen,D. Smith,and J.T. Mackey,The Theory of Constraints and Its Implications for Management Accounting, North River Press Publishing Corporation,Great Barrington,Mass.,1995,pp Thru-Put Technologies, Theory of Constraint, 12, Schragenheim, et al.,p Schragenheim, et al.,p E. Noreen,D. Smith,and J. T. Mackey,p P. C. Cook, A Simulation Comparison of Traditional,JIT, and TOC Manufacturing Systems in a Flow Shop with Bottlenecks, Production and Inventory Management Journal, First Quarter,1994,p D. W. Fogarty,J. H. Blackstone,Jr.,and T. R. Hoffman, Production and Inventory Management,2nd edition,south- Western Publishing,Cincinnati, Cook,1994,p Ibid. 40 WINTER 2001

CHAPTER 4.0 SYNCHRONOUS MANUFACTURING SYSTEM

CHAPTER 4.0 SYNCHRONOUS MANUFACTURING SYSTEM CHAPTER 4.0 SYNCHRONOUS MANUFACTURING SYSTEM 4.1 Introduction Synchronous manufacturing is an all-encompassing manufacturing management philosophy that includes a consistent set of principles, procedures

More information

Drum-Buffer-Rope in PlanetTogether Galaxy

Drum-Buffer-Rope in PlanetTogether Galaxy Drum-Buffer-Rope in PlanetTogether Galaxy This document provides background on Theory of Constraints and Drum-Buffer-Rope scheduling. It describes how to assess whether the DBR approach is appropriate

More information

ThermoFab and DBR: Manufacturing At Warp Speed. A White Paper Report

ThermoFab and DBR: Manufacturing At Warp Speed. A White Paper Report ThermoFab and DBR: Manufacturing At Warp Speed A White Paper Report June 2004 You probably know ThermoFab as a leading custom thermoforming provider of high-quality plastic enclosures for a wide range

More information

USING THE THEORY OF CONSTRAINTS TO PRODUCTION PROCESSES IMPROVEMENT

USING THE THEORY OF CONSTRAINTS TO PRODUCTION PROCESSES IMPROVEMENT 7th International DAAAM Baltic Conference "INDUSTRIAL ENGINEERING" 22-24 April 2010, Tallinn, Estonia USING THE THEORY OF CONSTRAINTS TO PRODUCTION PROCESSES IMPROVEMENT Trojanowska J. & Pająk E. Abstract:

More information

COPYRIGHTED MATERIAL OVERVIEW OF THE THEORY OF CONSTRAINTS DEFINITIONS FOR THE OPERATIONAL ASPECTS OF THE THEORY OF CONSTRAINTS

COPYRIGHTED MATERIAL OVERVIEW OF THE THEORY OF CONSTRAINTS DEFINITIONS FOR THE OPERATIONAL ASPECTS OF THE THEORY OF CONSTRAINTS 1 OVERVIEW OF THE THEORY OF CONSTRAINTS Every now and then, a completely new idea comes along that can be described as either refreshing, disturbing, or both. Within the accounting profession, the theory

More information

Manufacturing Resource Planning

Manufacturing Resource Planning Outline Manufacturing Resource Planning MRP The Strategic Importance of Short- Term Scheduling Scheduling Issues Forward and Backward Scheduling Scheduling Criteria Outline Continued Scheduling Process-Focused

More information

Process design Push-pull boundary 35C03000 Process Analysis and Management Max Finne, Assistant Professor of Information and Service management

Process design Push-pull boundary 35C03000 Process Analysis and Management Max Finne, Assistant Professor of Information and Service management Process design Push-pull boundary 35C03000 Process Analysis and Management Max Finne, Assistant Professor of Information and Service management Arrangements for lectures 9 and 10 In class Studying outside

More information

Eli Schragenheim

Eli Schragenheim From DBR to Simplified-DBR Eli Schragenheim elyakim@netvision.net.il i i t il 1 Outline A historical perspective. What to change? What to change to? The toolkit of S-DBR. When S-DBR would not fit? Just

More information

By: Adrian Chu, Department of Industrial & Systems Engineering, University of Washington, Seattle, Washington November 12, 2009.

By: Adrian Chu, Department of Industrial & Systems Engineering, University of Washington, Seattle, Washington November 12, 2009. OPT Report By: Adrian Chu, Department of Industrial & Systems Engineering, University of Washington, Seattle, Washington 98195. November 12, 2009. The Goal Every manufacturing company has one goal to make

More information

Make-to-Stock under Drum-Buffer-Rope and Buffer Management Methodology

Make-to-Stock under Drum-Buffer-Rope and Buffer Management Methodology I-09 Elyakim M. Schragenheim Make-to-Stock under Drum-Buffer-Rope and Buffer Management Methodology WHY MAKE-TO-STOCK? At least from the theory of constraints (TOC) perspective this is a valid question.

More information

Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and

Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and private study only. The thesis may not be reproduced elsewhere

More information

The Five Focusing Steps

The Five Focusing Steps Back to Basic TOC The Five Focusing Steps Presented by: Eli Schragenheim Blog: www.elischragenheim.com elischragenheim@gmail.com Date: January 27, 2018 The power of having an insight Having an insight

More information

A Roadmap Approach For Implementing Theory of Constraints In Manufacturing Organisations

A Roadmap Approach For Implementing Theory of Constraints In Manufacturing Organisations A Roadmap Approach For Implementing Theory of Constraints In Manufacturing Organisations Prof. ND. Du Preez 1, Louis Louw 2 1 University of Stellenbosch, Industrial Engineering Department, South Africa

More information

Simulation and Implementation Study of Robust Drum-Buffer-Rope Management System to Improve Shop Performance

Simulation and Implementation Study of Robust Drum-Buffer-Rope Management System to Improve Shop Performance International Journal of Humanities and Social Science Vol.. ; January 20 Simulation and Implementation Study of Robust Drum-Buffer-Rope Management System to Improve Shop Performance Horng-Huei Wu, 2 Ching-Piao

More information

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Atanu Mukherjee, President, Dastur Business and Technology Consulting,

More information

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING International Journal of Mechanical Engineering and Technology (IJMET) Volume 8, Issue 9, September 2017, pp. 274 280, Article ID: IJMET_08_09_029 Available online at http://www.iaeme.com/ijmet/issues.asp?jtype=ijmet&vtype=8&itype=9

More information

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING International Journal of Mechanical Engineering and Technology (IJMET) Volume 8, Issue 9, September 2017, pp. 274 280, Article ID: IJMET_08_09_029 Available online at http://www.iaeme.com/ijmet/issues.asp?jtype=ijmet&vtype=8&itype=9

More information

THE GOAL. Dr. Eliyahu Goldratt. Theory of Constraints

THE GOAL. Dr. Eliyahu Goldratt. Theory of Constraints THE GOAL Dr. Eliyahu Goldratt Theory of Constraints Israeli physicist turned business consultant, Originator of the Theory of Constraints DR. ELIYAHU GOLDRATT His famous books are: The Goal, Its Not Luck,

More information

IT 470a Six Sigma Chapter X

IT 470a Six Sigma Chapter X Chapter X Lean Enterprise IT 470a Six Sigma Chapter X Definitions Raw Materials component items purchased and received from suppliers WIP work in process, items that are in production on the factory floor

More information

EXAMINATION OF THE EFFECTS OF BOTTLENECKS AND PRODUCTION CONTROL RULES AT ASSEMBLY STATIONS

EXAMINATION OF THE EFFECTS OF BOTTLENECKS AND PRODUCTION CONTROL RULES AT ASSEMBLY STATIONS EXAMINATION OF THE EFFECTS OF BOTTLENECKS AND PRODUCTION CONTROL RULES AT ASSEMBLY STATIONS By TIMOTHY M. ELFTMAN A THESIS PRESENTED TO THE GRADUATE SCHOOL OF THE UNIVERSITY OF FLORIDA IN PARTIAL FULFILLMENT

More information

Chapter 17. Synchronizing and Balancing Processes. Level the master production schedule. Production. Time

Chapter 17. Synchronizing and Balancing Processes. Level the master production schedule. Production. Time Chapter 17 Synchronizing and Balancing Processes 1 Goal Achieve uniform flow Level the master production schedule Production Time Avg. Reduce the size of batches produced for final assembly Production

More information

Profit Center Planning & Analysis

Profit Center Planning & Analysis Profit Center Planning & Analysis Theory of constraints, maximizing profitability, and capacity utilization Hierarchy of Resource Consumption Unit-level resources resources consumed on activities proportionally

More information

PULL PRODUCTION CYCLE-TIME UNDER VARYING PRODUCT MIXES

PULL PRODUCTION CYCLE-TIME UNDER VARYING PRODUCT MIXES Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. PULL PRODUCTION CYCLE-TIME UNDER VARYING PRODUCT MIXES Chakkaphan

More information

The entire presentation kit is having 2 main directories as below. Just in Time. 01 Introduction

The entire presentation kit is having 2 main directories as below. Just in Time. 01 Introduction M118 DEMO OF JIT- JUST IN TIME DEMO OF TRAINING PRESENTATION KIT Price 160 USD Buy: http://www.globalmanagergroup.com/just-in-timetraining-presentation.htm Chapter-1.0 CONTENTS OF JIT JUST IN TIME TRAINING

More information

Just-In-Time (JIT) Manufacturing. Overview

Just-In-Time (JIT) Manufacturing. Overview Just-In-Time (JIT) Manufacturing Overview The Just-in-Time (JIT) Manufacturing Philosophy Prerequisites for JIT Manufacturing Elements of JIT Manufacturing Benefits of JIT Manufacturing Success and JIT

More information

Application of Drum-Buffer-Rope Methodology in Scheduling of Healthcare System

Application of Drum-Buffer-Rope Methodology in Scheduling of Healthcare System University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Architectural Engineering -- Faculty Publications Architectural Engineering 212 Application of Drum-Buffer-Rope Methodology

More information

Drum Buffer-Rope. Skorkovský. Based on : R. Holt, Ph.D., PE

Drum Buffer-Rope. Skorkovský. Based on : R. Holt, Ph.D., PE Drum Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE Traditional Approach: Divide and Conquer Division of Labor breaks down linkages complex systems into manageable chunks. Which is harder to manage?

More information

Chapter 13. Lean and Sustainable Supply Chains

Chapter 13. Lean and Sustainable Supply Chains 1 Chapter 13 Lean and Sustainable Supply Chains 2 OBJECTIVES Lean Production Defined The Toyota Production System Lean Implementation Requirements Lean Services Lean Production 3 Lean Production can be

More information

Five Tips to Achieve a Lean Manufacturing Business

Five Tips to Achieve a Lean Manufacturing Business Five Tips to Achieve a Lean Manufacturing Business Executive Overview Introduction The more successful manufacturers today are those with the ability to meet customer delivery schedules while maintaining

More information

PRODUCTION AND INVENTORY. Capabili. TOC and critical chain methodologies aren t just for manufacturing anymore. 46 March 2005 APICS magazine

PRODUCTION AND INVENTORY. Capabili. TOC and critical chain methodologies aren t just for manufacturing anymore. 46 March 2005 APICS magazine PRODUCTION AND INVENTORY Capabili TOC and critical chain methodologies aren t just for manufacturing anymore 46 March 2005 APICS magazine The theory of constraints (TOC) is a management philosophy based

More information

to One Week Vice President sales to levels by 40 percent across the efficiency. were able OMD we achieved I was transferred is the title manager

to One Week Vice President sales to levels by 40 percent across the efficiency. were able OMD we achieved I was transferred is the title manager This article appeared in Nikkei Business on Septemberr 19, 2011. It is translated by Goldratt Consulting from the original Japanese and reprinted withh the permission of the magazine. Reducing Delivery

More information

KEY ISSUES in Advanced Operations Management. Timo Seppälä

KEY ISSUES in Advanced Operations Management. Timo Seppälä KEY ISSUES in Advanced Operations Management Timo Seppälä Production as a value creation process Operations system forms the transformation process between the inputs and the outputs of a manufacturing

More information

THE ANALYSIS OF PRODUCTION LINES BOTTLENECKS IDENTIFICATION AND WAYS OF MANAGEMENT

THE ANALYSIS OF PRODUCTION LINES BOTTLENECKS IDENTIFICATION AND WAYS OF MANAGEMENT THE ANALYSIS OF PRODUCTION LINES BOTTLENECKS IDENTIFICATION AND WAYS OF MANAGEMENT Poznan School of Logistics, Chair of Logistics Systems, Poland E-mail: joanna.kolinska@wsl.com.pl Abstract Poznan School

More information

Revisiting local TOC measures in an internal supply chain: a note

Revisiting local TOC measures in an internal supply chain: a note International Journal of Production Research ISSN: 0020-7543 (Print) 1366-588X (Online) Journal homepage: http://www.tandfonline.com/loi/tprs20 Revisiting local TOC measures in an internal supply chain:

More information

JUST IN TIME. Manuel Rincón, M.Sc. October 22nd, 2004

JUST IN TIME. Manuel Rincón, M.Sc. October 22nd, 2004 JUST IN TIME Manuel Rincón, M.Sc. October 22nd, 2004 Lecture Outline 1. Just-in-Time Philosophy 2. Suppliers Goals of JIT Partnerships Concerns of Suppliers 3. JIT Layout Distance Reduction Increased Flexibility

More information

Theory of Constraints Based Approach to Effective Change Management

Theory of Constraints Based Approach to Effective Change Management Theory of Constraints Based Approach to Effective Change Management Ajay Gupta 1, Arvind Bhardwaj 1, Arun Kanda 2, Anish Sachdeva 1* Department of Industrial & Production Engineering, NIT Jalandhar, India

More information

Drum Buffer-Rope. Based on : R. Holt, Ph.D., PE

Drum Buffer-Rope. Based on : R. Holt, Ph.D., PE Drum Buffer-Rope Based on : R. Holt, Ph.D., PE Traditional Approach: Divide and Conquer Division of Labor breaks down linkages complex systems into manageable chunks. Which is harder to manage? Left or

More information

CONSTRAINT MODELING AND BUFFER MANAGEMENT WITH INTEGRATED PRODUCTION SCHEDULER

CONSTRAINT MODELING AND BUFFER MANAGEMENT WITH INTEGRATED PRODUCTION SCHEDULER ABSTRACT CONSTRAINT MODELING AND BUFFER MANAGEMENT WITH INTEGRATED PRODUCTION SCHEDULER David, K. H. Chua 1, and Li Jun Shen 2 Constraint modeling is a necessary step in construction planning. The basic

More information

LEAN PRODUCTION FACILITY LAYOUT.

LEAN PRODUCTION FACILITY LAYOUT. LEAN PRODUCTION FACILITY LAYOUT www.fourprinciples.com BACKGROUND The production facility layout is as important as the technology it houses and has a significant impact on business performance. The layout

More information

Creating a Continuous Process Improvement (CPI) Culture using TOC, Lean and Six-Sigma

Creating a Continuous Process Improvement (CPI) Culture using TOC, Lean and Six-Sigma Dale T. Houle Chief Technology Officer North America group Avraham Y. Goldratt Institute Creating a Continuous Process Improvement (CPI) Culture using TOC, Lean and Six-Sigma Maximizing the Return on Your

More information

Contents Introduction to Logistics... 6

Contents Introduction to Logistics... 6 CONTENTS Contents... 3 1. Introduction to Logistics... 6 1.1 Interfaces between Logistics Manufacturing....7 1.2 Logistics: Manufacturing issues in Customer Service...9 I.3 Production scheduling...10 1.4

More information

Generic Case Study. Initial Condition. 1. Stability

Generic Case Study. Initial Condition. 1. Stability Generic Case Study This example is based on an actual project. Names of people and details about processes have been hidden. To achieve the current state it took 25 months, 1 fulltime kaizen leader, dedicated

More information

Herbie An Introduction to WiP Limits

Herbie An Introduction to WiP Limits Herbie An Introduction to WiP Limits Speaker: John Yorke Agile Coach at WWT Asynchrony Labs Email: John.Yorke@asynchrony.com Twitter: @JohnyVindex Blog: www.yorkesoftware.com Game: MotorCityGame.com Kanban

More information

Part 3 : 11/10/10 21:33:42. The four factors that derive from a company's distinctive competencies and which create competitive advantage are

Part 3 : 11/10/10 21:33:42. The four factors that derive from a company's distinctive competencies and which create competitive advantage are Question 1 - HOCK CMA P3A H45 - Strategic Planning The four factors that derive from a company's distinctive competencies and which create competitive advantage are A. the value (utility) customers place

More information

Fundamental Concepts of Theory of Constraints: An Emerging Philosophy

Fundamental Concepts of Theory of Constraints: An Emerging Philosophy Fundamental Concepts of Theory of Constraints: An Emerging Philosophy Ajay Gupta, Arvind Bhardwaj and Arun Kanda International Science Index, Economics and Management Engineering waset.org/publication/83

More information

Synchronous Flow Helping the Countertop Fabricator to synchronize the business system March 2017 Ed Hill

Synchronous Flow Helping the Countertop Fabricator to synchronize the business system March 2017 Ed Hill Synchronous Flow Helping the Countertop Fabricator to synchronize the business system March 2017 Ed Hill Custom countertop manufacturers are much like companies in any industry. They struggle to meet a

More information

AUTOMATED PROCESS MODELLING AND

AUTOMATED PROCESS MODELLING AND AUTOMATED PROCESS MODELLING AND CONTINUOUS IMPROVEMENT John Anthony Fresco A thesis submitted in the partial fulfilment of the requirements of De Montfort University for the degree of Doctor of Philosophy

More information

EasyChair Preprint. Economic Investigation in Variable Transfer Batch Size, in CONWIP Controlled Transfer Line

EasyChair Preprint. Economic Investigation in Variable Transfer Batch Size, in CONWIP Controlled Transfer Line EasyChair Preprint 57 Economic Investigation in Variable Transfer Batch Size, in CONWIP Controlled Transfer Line Guy Kashi, Gad Rabinowitz and Gavriel David Pinto EasyChair preprints are intended for rapid

More information

Operation Management (OM) Introduction

Operation Management (OM) Introduction Operation Management (OM) Introduction Ing.J.Skorkovský, CSc, Department of Corporate Economy FACULTY OF ECONOMICS AND ADMINISTRATION Masaryk University Brno Czech Republic What is going on? Use of Operations

More information

Theory of Constraints (TOC)

Theory of Constraints (TOC) Theory of Constraints (TOC) The Theory of Constraints thinking process is a minimalist approach: it helps you to solve the problem with the least investment in time and resources that will do the job effectively.

More information

JIT AND Lean Operations 14-1

JIT AND Lean Operations 14-1 Chapter 15 JIT AND Lean Operations 14-1 Product Structure Tree = Shop floor layouts A B(4) C(2) D(2) E(1) D(3) F(2) MRP vs. JIT 14-2 JIT/Lean Production Just-in-time: Repetitive production system in which

More information

Lessons for production management for MTO Using G-Sim Simulator

Lessons for production management for MTO Using G-Sim Simulator TOCICO 214 Conference Lessons for production management for MTO Using G-Sim Simulator Presented By: Oded Cohen Date: 9 th June, 214 214 TOCICO. All rights reserved. 1 Contents TOCICO 214 Conference Introduction

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION 1 CHAPTER 1 INTRODUCTION 1.1 MANUFACTURING SYSTEM Manufacturing, a branch of industry, is the application of tools and processes for the transformation of raw materials into finished products. The manufacturing

More information

Lecture 12. Introductory Production Control

Lecture 12. Introductory Production Control Lecture 12 Introductory Production Control 167 Where we ve come from: Models of Manufacturing Systems: Deterministic, Queuing, Simulation Key ideas: Some WIP useful for buffering stations, but More WIP

More information

By Eli Schragenheim Supporting TOC implementations worldwide

By Eli Schragenheim Supporting TOC implementations worldwide By Eli Schragenheim Supporting TOC implementations worldwide The idea of value-days The idea of using value-days is common in the banking systems But not much elsewhere For Eli Goldratt the idea came from

More information

INVENTORY MODELS. Defining Inventory. Different Types of Inventory

INVENTORY MODELS. Defining Inventory. Different Types of Inventory INVENTORY MODELS Defining Inventory Inventory is an idle stock of physical goods that contain economic value, and are held in various forms by an organization in its custody awaiting packing, processing,

More information

1. Inventory management

1. Inventory management 1. Inventory management 10.1 Introduction The importance of proper inventory management is evident when one considers that inventories have lead to the demise of many a business. The downfall of some companies

More information

CHAPTER 15 MANAGING INTERNATIONAL OPERATIONS

CHAPTER 15 MANAGING INTERNATIONAL OPERATIONS CHAPTER 15 MANAGING INTERNATIONAL OPERATIONS LEARNING OBJECTIVES: 1. Identify the elements that are important to consider when formulating production strategies. 2. Identify key considerations when acquiring

More information

EVALUATION OF THE GOAL SYSTEM VERSION 2.2 SOLUTION METHOD FOR INTERACTIVE CONSTRAINT SCHEDULING SITUATIONS THESIS. Michael D. Stephens, Captain, USAF

EVALUATION OF THE GOAL SYSTEM VERSION 2.2 SOLUTION METHOD FOR INTERACTIVE CONSTRAINT SCHEDULING SITUATIONS THESIS. Michael D. Stephens, Captain, USAF AFIT/GLM/LAL/96S-7 'flers QUALITY INSPECTED 8 EVALUATION OF THE GOAL SYSTEM VERSION 2.2 SOLUTION METHOD FOR INTERACTIVE CONSTRAINT SCHEDULING SITUATIONS THESIS Michael D. Stephens, Captain, USAF AFIT/GLM/LAL/96S-7

More information

What is production capacity? Factors that determine capacity. Antti Salonen PPU411. The maximum rate of output for a facility

What is production capacity? Factors that determine capacity. Antti Salonen PPU411. The maximum rate of output for a facility PPU411 1 What is production capacity? The maximum rate of output for a facility OR The rate at which output can be produced by an operating unit (machine, process, workstation, facility or an entire company).

More information

JIT and Lean Operations. JIT/Lean Operations

JIT and Lean Operations. JIT/Lean Operations 5/7/2011 16 JIT and Lean Operations By : Sa Ed M. Salhieh, Salhieh, Ph.D. 16-1 JIT/Lean Operations Good production systems require that managers address three issues that are pervasive and fundamental

More information

CHAPTER 3.0 JUST-IN-TIME (JIT) MANUFACTURING SYSTEMS

CHAPTER 3.0 JUST-IN-TIME (JIT) MANUFACTURING SYSTEMS CHAPTER 3.0 JUST-IN-TIME (JIT) MANUFACTURING SYSTEMS 3.1 Abstract The Just-In-Time technique based manufacturing system, developed and implemented in the Toyota Motor Company may be defined as manufacturing

More information

1. Lowering the costs is one of the objectives of the production and logistics function

1. Lowering the costs is one of the objectives of the production and logistics function Chapter 17 Global Production, Outsourcing, and Logistics True / False Questions 1. Lowering the costs is one of the objectives of the production and logistics function of an international firm. True False

More information

The five focusing steps of the Theory of Constraints have been successfully applied to the improvement

The five focusing steps of the Theory of Constraints have been successfully applied to the improvement TOC and the 5 focusing steps by Philip Viljoen Abstract The five focusing steps of the Theory of Constraints have been successfully applied to the improvement of the Throughput of many operations, delivering

More information

SCM 302 OPERATIONS MANAGEMENT JIT

SCM 302 OPERATIONS MANAGEMENT JIT SCM 302 OPERATIONS MANAGEMENT JIT 2 Agenda for this Module 1. Define just-in-time, TPS, and lean operations 2. Define the seven wastes and the 5Ss 3. Explain JIT partnerships 4. Determine optimal setup

More information

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Lecture - 24 Sequencing and Scheduling - Assumptions, Objectives and Shop

More information

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

Flow and Pull Systems

Flow and Pull Systems Online Student Guide Flow and Pull Systems OpusWorks 2016, All Rights Reserved 1 Table of Contents LEARNING OBJECTIVES... 4 INTRODUCTION... 4 BENEFITS OF FLOW AND PULL... 5 CLEARING ROADBLOCKS... 5 APPROACH

More information

THROUGHPUT ACCOUNTING

THROUGHPUT ACCOUNTING THROUGHPUT ACCOUNTING A GUIDE TO CONSTRAINT MANAGEMENT STEVEN M. BRAGG JOHN WILEY &SONS, INC. THROUGHPUT ACCOUNTING A GUIDE TO CONSTRAINT MANAGEMENT THROUGHPUT ACCOUNTING A GUIDE TO CONSTRAINT MANAGEMENT

More information

THE POSSIBLE WAYS TO ELEVATING AND FIXING THE CONSTRAINTS IN IRONFOUNDRY PRODUCTION. Nicole KYNCL

THE POSSIBLE WAYS TO ELEVATING AND FIXING THE CONSTRAINTS IN IRONFOUNDRY PRODUCTION. Nicole KYNCL THE POSSIBLE WAYS TO ELEVATING AND FIXING THE CONSTRAINTS IN IRONFOUNDRY PRODUCTION Nicole KYNCL Commercial foundry of gray and nodular cast iron Turnov, Prepere, Czech Republic, EU, kyncln@slevarna-turnov.cz

More information

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processes, the Value-Added and Non-Value Added. 2. The later

More information

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processes, the Value-Added and Non-Value Added. 2. The later

More information

CONSTRAINT MANAGEMENT SYSTEM OPTIMIZED PRODUCTION TECHNOLOGY (OPT)

CONSTRAINT MANAGEMENT SYSTEM OPTIMIZED PRODUCTION TECHNOLOGY (OPT) CONSTRAINT MANAGEMENT SYSTEM OPTIMIZED PRODUCTION TECHNOLOGY (OPT) Iveta KUBASÁKOVÁ, Katarína IVÁNKOVÁ System developer: Israeli physicist Goldratt (in the 1970s in the USA and introduced in the 1980s

More information

Differential Analysis and Product Pricing

Differential Analysis and Product Pricing chapter 24(9) Differential Analysis and Product Pricing OPENING COMMENTS This chapter covers (1) differential analysis, (2) methods of determining the selling price of a product using a cost-plus markup

More information

Tim Gutowski, July 8, 2002

Tim Gutowski, July 8, 2002 Measuring Performance; Metrics for Time, Rate, Cost, Quality, Flexibility, and the Environment Introduction Tim Gutowski, July 8, 2002 Manufacturing processes and systems operate in a competitive environment.

More information

The Goal is Lean. MTA English

The Goal is Lean. MTA English MTA English The Goal is Lean Eliyahu Goldratt s novel, The Goal, was a landmark book in the field of manufacturing management and is considered by many to be the book that sparked the Lean Manufacturing

More information

Planning. Dr. Richard Jerz rjerz.com

Planning. Dr. Richard Jerz rjerz.com Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

A PRODUCTION MANAGEMENT EXPERT SYSTEM DEVELOPED IN TIRS

A PRODUCTION MANAGEMENT EXPERT SYSTEM DEVELOPED IN TIRS A PRODUCTION MANAGEMENT EXPERT SYSTEM DEVELOPED IN TIRS D Toal 1, T Coffey 1, P Smith 2, A Skehill 1 1. Department of Electronics and Computer Engineering University of Limerick, Limerick, Ireland. Fax

More information

Operational Success = Audits, Metrics And Right Technology

Operational Success = Audits, Metrics And Right Technology Operational Success = Audits, Metrics And Right Technology Sponsored by: Presented by: Chris Arnold Intelligrated, Vice President Solutions Development Rod Gallaway Staples, VP Logistics Strategy, Design,

More information

PLUS VALUE STREAM MAPPING

PLUS VALUE STREAM MAPPING LEAN PRINCIPLES PLUS VALUE STREAM MAPPING Lean Principles for the Job Shop (v. Aug 06) 1 Lean Principles for the Job Shop (v. Aug 06) 2 Lean Principles for the Job Shop (v. Aug 06) 3 Lean Principles for

More information

Jim Curry, OpStat Group Inc. January 17, OpStat

Jim Curry, OpStat Group Inc. January 17, OpStat 1 Jim Curry, OpStat Group Inc. January 17, 2012 OpStat Background 2 How do we design an optimized supply chain in which all the functions and operations are synchronized? Issues to deal with Demand variability

More information

Modul ke: Akuntansi Biaya. Just In Time and Backflushing. Fakultas Ekonomi dan Bisnis. Program Studi S1 Manajemen

Modul ke: Akuntansi Biaya. Just In Time and Backflushing. Fakultas Ekonomi dan Bisnis. Program Studi S1 Manajemen Modul ke: 07 Suryadharma Fakultas Ekonomi dan Bisnis Akuntansi Biaya Just In Time and Backflushing Sim, SE, M. Ak Program Studi S1 Manajemen Just In Time Traditionally manufacturers have forecasted demand

More information

and Control approaches, key issues Professor Dr. Frank Herrmann Innovation and Competence Centre for

and Control approaches, key issues Professor Dr. Frank Herrmann Innovation and Competence Centre for Production Planning and Control State-of-the-art the art approaches, key issues Professor Dr. Frank Herrmann Innovation and Competence Centre for Production Logistics and Factory Planning (IPF) University

More information

PRACTICE PROBLEM SET Topic 1: Basic Process Analysis

PRACTICE PROBLEM SET Topic 1: Basic Process Analysis The Wharton School Quarter II The University of Pennsylvania Fall 1999 PRACTICE PROBLEM SET Topic 1: Basic Process Analysis Problem 1: Consider the following three-step production process: Raw Material

More information

1. Muda of waiting: a waiting employee does not create added value. 2. Muda of transport: products transported from one place to another in the plant do not create any added value. 3. Muda of inventory:

More information

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

Optimizing Inventory Control at PT. Total Pack Indonesia by Using Kanban System

Optimizing Inventory Control at PT. Total Pack Indonesia by Using Kanban System ISSN 1816-6075 (Print), 1818-0523 (Online) Journal of System and Management Sciences Vol. 5 (2015) No. 1, pp. 52-66 Optimizing Inventory Control at PT. Total Pack Indonesia by Using Kanban System Leonardo

More information

AN INTEGRATION ANALYSIS OF MATERIAL REQUIREMENTS PLANNING, JUST IN TIME, AND THE THEORY OF CONSTRAINTS

AN INTEGRATION ANALYSIS OF MATERIAL REQUIREMENTS PLANNING, JUST IN TIME, AND THE THEORY OF CONSTRAINTS AN INTEGRATION ANALYSIS OF MATERIAL REQUIREMENTS PLANNING, JUST IN TIME, AND THE THEORY OF CONSTRAINTS Lloyd J. Taylor, III, University of Texas of the Permian Basin ABSTRACT This study will detail many

More information

FLEXIBLE PRODUCTION SIMULATION FOR APPLIED SCIENCES

FLEXIBLE PRODUCTION SIMULATION FOR APPLIED SCIENCES FLEXIBLE PRODUCTION SIMULATION FOR APPLIED SCIENCES Klaus Altendorfer (a), Josef Pilstl (b), Alexander Hübl (c), Herbert Jodlbauer (d) Upper Austria University of Applied Sciences Wehrgraben 1-3, A-4400

More information

PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION. Raid Al-Aomar. Classic Advanced Development Systems, Inc. Troy, MI 48083, U.S.A.

PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION. Raid Al-Aomar. Classic Advanced Development Systems, Inc. Troy, MI 48083, U.S.A. Proceedings of the 2000 Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION Raid Al-Aomar Classic Advanced Development

More information

Integrating Lean Manufacturing and the Theory of Constraints. Mandyam M. Srinivasan

Integrating Lean Manufacturing and the Theory of Constraints. Mandyam M. Srinivasan Integrating Lean Manufacturing and the Theory of Constraints Mandyam M. Srinivasan Ball Corporation Distinguished Professor of Business, University of Tennessee October 5, 2006 Streamlined: 14 Principles

More information

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations JIT and Lean Operations Outline Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations Eliminate Waste Remove Variability Improve

More information

Hybrid Model applied in the Semiconductor Production Planning

Hybrid Model applied in the Semiconductor Production Planning , March 13-15, 2013, Hong Kong Hybrid Model applied in the Semiconductor Production Planning Pengfei Wang, Tomohiro Murata Abstract- One of the most studied issues in production planning or inventory management

More information

Running Head: Implementing Just-In-Time Production at Toyota

Running Head: Implementing Just-In-Time Production at Toyota Running Head: Implementing Just-In-Time Production at Toyota Implementing Just-In-Time Production at Toyota: The Effects on Productivity Growth Kevin Browning November 15, 2012 Implementing Just-In-Time

More information

Differential Analysis: Relevant Costs the Key to Decision Making

Differential Analysis: Relevant Costs the Key to Decision Making April 30, 2014 Differential Analysis: Relevant Costs the Key to Decision Making Today s Agenda Relevant Costs vs. Irrelevant Costs Differential Approach vs. Total Cost Approach Product Transfer Decision

More information

CUWIP: A modified CONWIP approach to controlling WIP

CUWIP: A modified CONWIP approach to controlling WIP CUWIP: A modified CONWIP approach to controlling WIP Jules Comeau, professor at Université de Moncton, NB Uday Venkatadri, professor at Dalhousie University, Halifax, N.S. Cahier électronique de la Faculté

More information

Integrating Cost, Capacity, and Simulation Analysis

Integrating Cost, Capacity, and Simulation Analysis Integrating Cost, Capacity, and Simulation Analysis Dr. Frank Chance Dr. Jennifer Robinson FabTime Inc. 325M Sharon Park Drive #219, Menlo Park, CA 94025 www.fabtime.com 1. Introduction In this article,

More information

USING ABC TO ENHANCE THROUGHPUT ACCOUNTING: AN INTEGRATED MANAGEMENT APPROACH

USING ABC TO ENHANCE THROUGHPUT ACCOUNTING: AN INTEGRATED MANAGEMENT APPROACH USING ABC TO ENHANCE THROUGHPUT ACCOUNTING: AN INTEGRATED MANAGEMENT APPROACH Andrei Yu. Sokolov, Kazan Federal University Tatyana V. Elsukova, Kazan Federal University ABSTRACT The relevance of the article

More information

MIT 2.853/2.854 Introduction to Manufacturing Systems. Multi-Stage Control and Scheduling. Lecturer: Stanley B. Gershwin

MIT 2.853/2.854 Introduction to Manufacturing Systems. Multi-Stage Control and Scheduling. Lecturer: Stanley B. Gershwin MIT 2.853/2.854 Introduction to Manufacturing Systems Multi-Stage Control and Scheduling Lecturer: Stanley B. Gershwin Copyright c 2002-2016 Stanley B. Gershwin. Definitions Events may be controllable

More information

Meeting Tight Software Schedules Through Cycle Time Reduction

Meeting Tight Software Schedules Through Cycle Time Reduction Meeting Tight Software Schedules Through Cycle Time Reduction Dennis J. Frailey Retired Principal Fellow, Raytheon Company Sole Proprietor, DJF CO Frailey@ACM.ORG Copyright 1995-2014, Dennis J. Frailey

More information